Mountain tunnel time point progress visual automatic early warning system and method

CN122948411APending Publication Date: 2026-10-20THE 3RD ENG CO LTD OF CHINA RAILWAY 18TH BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610931447.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-26
Publication Date
2026-10-20

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

This invention discloses a time-based automatic early warning system and method for the visualization of tunnel construction progress, belonging to the field of tunnel construction information management technology. The system adopts a lightweight approach integrating CAD and cloud, comprising a data layer, a business layer, and a display layer connected sequentially. The data layer stores tunnel design parameters, surrounding rock classification, process efficiency, progress data, and planned construction period. The business layer calls the data from the data layer, executes a daily iterative calculation algorithm and a four-process collaborative calculation model, generates progress calculation results at any given time, and generates graded early warning signals based on a comparison of the progress completion rate and a safety step threshold. The display layer receives the calculation results and early warning signals, and maps them to the tunnel longitudinal section map for visualization through CAD cloud integration technology. This invention solves the problems of low data collection efficiency, single analysis dimension, delayed early warning, insufficient visualization, and high deployment costs in existing technologies.