Technical Problem

[0004]有鉴于此,本申请提供了一种乡村交直流混合微电网分阶段供电恢复方法、装置、电子设备及存储介质,以解决相关技术中的乡村配电系统故障恢复方法未充分利用本地电源支撑能力、关键负荷保障不足以及多路径恢复决策与交直流协同能力不足的问题

Benefits of technology

[0074]本申请面向配置交流母线、直流母线、分布式光伏、储能装置、柔性直流互联装置和电力电子变压器的乡村交直流混合微电网,构建储能优先建立局部运行基准、负荷分级与阶段推进、多候选供电路径动态优选、备用路径切换及预同步重联相结合的故障恢复机制。储能装置在故障隔离完成且满足孤岛启动条件时主动建立局部交流电压和频率参考以及直流母线电压参考;系统依据负荷重要等级和实时运行状态逐阶段扩大恢复范围,并依据故障后的物理测量量和设备状态选择目标供电路径,从而形成覆盖孤岛启动、带载恢复、供电扩展和上级电网重联的闭环恢复链条。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

This application discloses a method, apparatus, and medium for phased power restoration of a rural AC / DC hybrid microgrid. The method includes: detecting whether at least one distribution section has a fault, and isolating the faulty distribution section when a fault occurs; designating the distribution sections whose power supply was cut off due to isolation as the distribution sections to be restored; collecting first operating status information of the local power supply equipment and isolation information of the faulty distribution section, and determining whether the local power supply equipment meets preset islanding power supply conditions based on the first operating status information and isolation information; if the preset islanding power supply conditions are met, then using the local power supply equipment to supply power to the distribution section to be restored, and restoring power in stages according to the importance level of the load to be restored, thereby realizing the fault restoration of the distribution section to be restored. This application can improve the critical load guarantee capability, power supply continuity, and operational resilience.