Anchoring structure and construction method of prestressed steel reinforced concrete beam end and concrete filled steel tube column
Patent Information
- Application Number
- CN202611178973.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-05
- Publication Date
- 2026-10-23
AI Technical Summary
[0004]本发明的目的在于提供预应力型钢混凝土梁端部与钢管混凝土柱的锚固构造及施工方法,解决了上述背景技术中所提出的技术问题
(1)本发明通过优化预应力型钢混凝土梁端部与地下钢管混凝土柱之间的锚固连接形式,建立了更加合理的节点受力体系,使梁端荷载、预应力及型钢内力能够更加均匀、高效地传递至钢管混凝土柱,有效降低了节点区域的局部应力集中,提高了梁柱节点的整体受力性能。
Smart Images

Figure CN122960217A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of anchorage technology, specifically to the anchorage structure and construction method between the ends of prestressed steel-concrete beams and steel-concrete composite columns. Background Technology
[0002] Against the backdrop of the rapid development of integrated transportation hubs, large-span underground complexes and hub projects have placed higher demands on the load-bearing capacity and spatial coordination of structural systems. Prestressed steel-concrete composite beams are a type of composite structural component, consisting of a steel frame, outer concrete, and prestressing tendons. Due to their excellent bending stiffness and span adaptability, they have gradually become key horizontal components of underground large-span structures. Meanwhile, steel-concrete composite columns are widely used in underground heavy-duty column structures due to their high load-bearing efficiency and space-integrated advantages.
[0003] Significant differences in mechanical properties exist between the two types of components at the end anchorage joints. These joint locations are prone to problems such as localized stress concentration, prestressed tendon anchorage failure, and concrete cracking in the joint area. Existing technologies utilize stiffening rib extension plates fixed to the steel column, and longitudinal reinforcement connecting assemblies on the stiffening rib extension plates to connect to the reinforced concrete beams, or longitudinal reinforcement connecting assemblies on the steel-concrete beams. However, the stiffening rib extension plates have slightly insufficient strength under vertical loads, limiting their anchorage effectiveness. Summary of the Invention
[0004] The purpose of this invention is to provide an anchorage structure and construction method for the ends of prestressed steel-concrete beams and steel-concrete composite columns, thereby solving the technical problems mentioned in the background art.
[0005] To solve the above-mentioned technical problems, the present invention specifically provides the following technical solution: The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column includes the underground steel-concrete composite column and the prestressed steel-concrete composite beam connected to the underground steel-concrete composite column. The prestressed steel-concrete composite beam includes a steel frame, prestressed steel reinforcement bundles, a concrete beam body, a first connecting plate, a second connecting plate, and a prestressed corrugated metal pipe. The underground steel-concrete composite column includes a rectangular steel pipe skeleton, a concrete column inside the steel pipe, a cross-shaped vertical diaphragm, a steel reinforcement sleeve on the outside of the steel column, studs, grouting holes and vent holes. Two steel frame frames are symmetrically welded to a rectangular steel pipe frame. Prestressed steel reinforcement bundles are arranged around the outside of the steel frame and the rectangular steel pipe frame, and are located inside prestressed corrugated metal pipes. Multiple prestressed corrugated metal pipes are arranged on both sides of the prestressed steel-concrete beam. The concrete beam is cast on the outside of the steel frame and the rectangular steel pipe frame. The first connecting plate and the second connecting plate are parallel to each other and are both located inside the steel frame. A cross-shaped vertical partition is located inside the rectangular steel pipe frame, dividing the interior of the rectangular steel pipe frame into four independent spaces of equal size. Multiple concrete columns are located within the steel pipes and are situated within multiple independent spaces. Multiple grouting holes are located on multiple concrete columns within the steel pipes. Multiple vent holes are located on multiple concrete columns within the steel pipes. Multiple studs are located on multiple inner and outer sidewalls of the rectangular steel pipe frame. Multiple steel column outer reinforcement sleeves are located at multiple corner edges on the outer sidewall of the rectangular steel pipe frame. The area between the underground steel-concrete composite column and the prestressed steel-concrete composite beam forms a first node connection area, and the first node connection area is integrally cast.
[0006] As a preferred embodiment of the present invention, the rectangular steel pipe frame includes a plurality of interconnected concrete column steel plates, and the steel frame is welded to the corresponding concrete column steel plates.
[0007] As a preferred embodiment of the present invention, a plurality of first transverse diaphragms are provided at the flange of the steel frame along the vertical direction.
[0008] As a preferred embodiment of the present invention, the prestressed steel-concrete beam is provided with an upper row of longitudinal reinforcing bars and a lower row of longitudinal reinforcing bars, wherein the upper row of longitudinal reinforcing bars passes through the first node connection area, and a portion of the lower row of longitudinal reinforcing bars is mechanically connected to the outer reinforcing bar sleeve of the steel column, while the other portion of the lower row of longitudinal reinforcing bars passes through the steel frame and then through the first node connection area.
[0009] In a preferred embodiment of the present invention, an above-ground steel-concrete composite column is provided on top of the underground steel-concrete composite column, and the underground steel-concrete composite column, the above-ground steel-concrete composite column, and the prestressed steel-concrete composite beam form a second node connection area. Multiple steel column outer reinforcing sleeves are also provided on the above-ground steel-concrete composite column. The upper row of longitudinal reinforcing bars are connected to the steel column outer reinforcing sleeves by threaded connection or to the above-ground steel-concrete composite column by welding. A second transverse diaphragm is provided inside the underground steel-concrete composite column, and the second transverse diaphragm is located between the upper row of longitudinal reinforcing bars on both sides of the above-ground steel-concrete composite column.
[0010] In a preferred embodiment of the present invention, a portion of the prestressed corrugated metal pipes penetrate the underground steel-concrete composite column. The rectangular steel pipe frame contains multiple steel plates, which are positioned on the rectangular steel pipe frame at the points through which the prestressed corrugated metal pipes penetrate. Concrete ring beams are cast on both sides of the underground steel-concrete composite column. The other portion of the prestressed corrugated metal pipes passes through the concrete ring beams and is located on both sides of the underground steel-concrete composite column.
[0011] As a preferred embodiment of the present invention, the outer side of the concrete ring beam is provided with a haunch angle connected to the concrete beam body, and the haunch angle is used to wrap the prestressed metal corrugated pipe.
[0012] As a preferred embodiment of the present invention, the second connecting plate is provided with a plurality of ring beam waist bars, and vertical stirrups are provided at the four corners of the first node connection area and the second node connection area, and the ring beam waist bars and vertical stirrups are all located inside the concrete ring beam.
[0013] The construction method for the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column includes the following steps: S1. Before construction, the manufacturer will make the positions of the openings on the rectangular steel pipe skeleton of the underground steel pipe concrete column, the steel reinforcement sleeves on the outside of the steel column, the first connecting plate, the first diaphragm and the second diaphragm according to the construction drawings. S2. After the underground steel-concrete composite column is installed, the prestressed steel-concrete composite beam and the underground steel-concrete composite column installed in the subsequent sequence are checked, including the installation verticality of the underground steel-concrete composite column, the clear distance between columns, the height and position of the reserved connection plate, and whether the number of reserved prestressed tendon holes meets the installation requirements. S3, the prestressed steel-concrete beam is designed and manufactured in sections based on its span and weight. The prestressed steel-concrete beam is divided into multiple sections. According to the hoisting plan, the sections are assembled on a jig near the steel beam installation site. Steel sections are used as the jig. The steel beam is assembled on site and then hoisted as a whole. Before the steel beam is assembled, temporary steel pads are set up at the bottom and side flanges of the beam. The jacks are used as levelers to adjust the slight tilt angle of the components. After the longitudinal axis of the two beam sections coincides with the node axis, the steel pads are welded. After precise leveling is completed, the hoisting hooks are removed. To prevent the components from shifting or rebounding during the removal process, temporary steel support stabilization devices are used on site for structural restraint. After the steel sections of the prestressed steel-concrete beam are in place and temporarily positioned, the ends of the two beam sections are welded. S4. Before hoisting the prestressed steel-concrete beam as a whole, remeasure the installation position of the steel section and the gap distance and pallet elevation between the underground steel pipe concrete columns to control the length of the steel section after assembly. The steel section in the horizontal position needs to be turned to the upright position first. Pay attention to the impact when standing upright. The steel section is hoisted to the installation position. After being adjusted into position by guy ropes or chain hoists, the upper flange of the steel section is placed on the pallet. The web plate of the steel section is bolted to the steel column connecting plate and tightened. After the bolts of the web plate and the steel column connecting plate are tightened, the beam-column joint welds are welded at both ends at the same time. After 70% of the welding is completed, the hoisting wire rope is removed. The welding personnel use a boom lift or cage to weld the remaining welds. S5. Erect the beam bottom support frame, tie the steel beam reinforcement, first place the upper layer of beam reinforcement, then attach the stirrups, and then thread the bottom reinforcement; prioritize connecting the beam reinforcement to the column joint reinforcement sleeves or through bars at both ends, and use double-threaded sleeves to connect the middle section of the beam reinforcement. Perform a full inspection of the sleeve connection quality to ensure the connection quality. Finally, adjust the position of the beam reinforcement sequentially and tie it securely, and set up protective layer spacers at the bottom and sides of the beam. S6. Install the beam side and slab formwork, reinforce the formwork system, insert prestressed corrugated metal pipes, set spring bars and anchor plates at the tensioning end, insert prestressed steel bars, tie the secondary beam steel bars, and pour the beam and slab concrete after inspection and approval. Before pouring concrete, place vibrators at the four corners of the underground steel pipe concrete column to the bottom of the column, and pull the vibrators upward as the pouring height increases to prevent the vibrators from not reaching the bottom during the pouring process, resulting in insufficient compaction. At the same time, insert long ducts through the grouting holes and pouring holes. The ducts are steel pipes with a flared mouth at the top. The first insertion is 4-8m long. After pouring to a depth of 0.5-1m, pull out the long ducts and replace them with shorter ones to ensure that the free fall height of the poured concrete does not exceed 2m to prevent aggregate segregation. After the concrete strength reaches the design requirements, tension the prestressed steel bars and seal the tensioning end tightly.
[0014] Compared with the prior art, the present invention has the following advantages: (1) By optimizing the anchorage connection between the end of the prestressed steel-concrete beam and the underground steel-concrete column, the present invention establishes a more reasonable node stress system, so that the beam end load, prestress and steel internal force can be transferred to the steel-concrete column more evenly and efficiently, effectively reducing the local stress concentration in the node area and improving the overall stress performance of the beam-column joint.
[0015] (2) The present invention enhances the overall stiffness and bearing capacity of the beam end anchorage zone. Compared with the existing anchorage method that relies on stiffening rib extension plates for connection, it can effectively improve the problem of insufficient local strength of stiffening rib extension plates under vertical load, improve the bending, shear and compressive strength of the nodes, and enhance the overall stability of the structure.
[0016] (3) This invention fully considers the synergistic stress relationship between the prestressed steel reinforcement bundles, steel frame and outer concrete in prestressed steel-concrete beams. By optimizing the anchorage structure, it improves the anchorage reliability of the prestressed steel reinforcement bundles, reduces prestress loss and the risk of local cracking in the anchorage area, and helps to give full play to the large span bearing advantage of prestressed steel-concrete beams.
[0017] (4) The present invention effectively improves the joint deformation coordination ability between steel tube concrete columns and prestressed steel concrete beams, making the joint area more continuously stressed, reducing the stress concentration phenomenon caused by sudden stiffness changes, reducing the development of joint concrete cracks, and improving the durability and service performance of the joint under long-term load and complex stress conditions.
[0018] (5) The construction method provided by the present invention can be matched with the anchoring structure, and the installation sequence and construction process of each component can be reasonably controlled to improve the installation accuracy and construction efficiency of the node, reduce the adverse effects of on-site welding and installation errors on the anchoring performance, help ensure the construction quality of the node, and have good engineering implementation and promotion application value.
[0019] (6) This invention is particularly applicable to projects such as underground integrated transportation hubs, large-span underground spaces, underground complexes and heavy-duty frame structures. It can give full play to the stress advantages of the prestressed steel-concrete beam and steel-concrete composite column structure, improve the overall load-bearing capacity, seismic performance and long-term service safety of the structure, and has good engineering application prospects.
[0020] (7) By constructing a multi-level collaborative anchoring system between prestressed steel-concrete beams, anchoring components and steel-concrete composite columns, the internal forces of the nodes are transformed from traditional single plate force transmission to multi-path collaborative force transmission. This not only improves the load-bearing efficiency of the nodes, but also enhances the ductility and energy dissipation capacity of the nodes, effectively improving the overall safety reserve of beam-column nodes under complex stress conditions. Attached Figure Description
[0021] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are merely exemplary, and those skilled in the art can derive other embodiments based on the provided drawings without creative effort.
[0022] Figure 1 A top view schematic diagram of the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column is provided for embodiments of the present invention. Figure 2 A partial structural schematic diagram of an underground steel-concrete composite column is provided for embodiments of the present invention; Figure 3 A partial structural schematic diagram of the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column is provided for embodiments of the present invention. Figure 4 The present invention provides a schematic diagram of the side sectional view of the anchorage structure between the end of the prestressed steel-concrete beam and the steel-concrete composite column, which is provided for the embodiment of the present invention. Figure 5 A side sectional view of the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column is provided for embodiments of the present invention.
[0023] The labels in the diagram represent the following: 1. Grouting hole; 2. Concrete column steel tube plate; 3. Cross vertical diaphragm; 4. Vent hole; 5. First transverse diaphragm; 6. Stud; 7. Concrete column inside steel tube; 8. Rectangular steel tube skeleton; 9. Second transverse diaphragm; 10. Prestressed corrugated metal pipe; 11. Underground steel tube concrete column; 12. Prestressed steel-concrete beam; 13. Ring beam web reinforcement; 14. First connecting plate; 15. Second connecting plate; 16. Upper row of longitudinal reinforcing bars; 17. Above-ground steel-concrete column; 18. Lower row of longitudinal reinforcing bars; 19. Vertical stirrups; 20. Steel skeleton; 21. Concrete ring beam; 22. Haunch; 23. Steel column outer reinforcing sleeve; 24. Concrete beam; 25. Prestressed steel bar bundle; 26. Steel plate. Detailed Implementation
[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0025] The concepts involved in this application will first be described with reference to the accompanying drawings. It should be noted that the following descriptions of various concepts are only for the purpose of making the content of this application easier to understand and do not constitute a limitation on the scope of protection of this application; furthermore, the embodiments and features in the embodiments of this application can be combined with each other unless otherwise specified. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0026] like Figures 1 to 5 As shown, the present invention provides an anchorage structure between the end of a prestressed steel-concrete beam and a steel-concrete composite column, including an underground steel-concrete composite column 11 and a prestressed steel-concrete beam 12 connected to the underground steel-concrete composite column 11. The prestressed steel-concrete composite beam 12 includes a steel frame 20, prestressed steel bar bundles 25, a concrete beam body 24, a first connecting plate 14, a second connecting plate 15, and a prestressed corrugated metal pipe 10. The underground steel-concrete composite column 11 includes a rectangular steel pipe frame 8, a concrete column body inside the steel pipe 7, a cross-shaped vertical diaphragm 3, a steel reinforcement sleeve 23 on the outside of the steel column, a stud 6, a grouting hole 1, and a vent hole 4. Two steel frame frames 20 are symmetrically welded to the rectangular steel pipe frame 8. Prestressed steel reinforcement bundles 25 are arranged around the outside of the steel frame frames 20 and the rectangular steel pipe frame 8, and are placed inside the prestressed corrugated metal pipes 10. Multiple prestressed corrugated metal pipes 10 are arranged on both sides of the prestressed steel-concrete beam 12. The concrete beam body 24 is poured on the outside of the steel frame frames 20 and the rectangular steel pipe frame 8. The first connecting plate 14 and the second connecting plate 15 are parallel to each other and are both placed inside the steel frame frames 20. Cross-shaped vertical diaphragms 3 are placed inside the rectangular steel pipe. The frame 8 is divided into four independent spaces of equal size. There are multiple concrete columns 7 inside the steel pipe and they are located in multiple independent spaces. There are multiple grouting holes 1 and they are located on multiple concrete columns 7 inside the steel pipe. There are multiple venting holes 4 and they are located on multiple concrete columns 7 inside the steel pipe. There are multiple studs 6 and they are located on multiple inner side walls and multiple outer side walls of the rectangular steel pipe frame 8. There are multiple steel reinforcement sleeves 23 on the outer side of the steel column and they are located at multiple corner edges on the outer side wall of the rectangular steel pipe frame 8. The area between the underground steel-concrete composite column 11 and the prestressed steel-concrete composite beam 12 forms the first node connection area, and the first node connection area is integrally cast.
[0027] The rectangular steel pipe frame 8 includes multiple interconnected concrete column steel plates 2, and the steel frame 20 is welded to the corresponding concrete column steel plates 2.
[0028] Multiple first transverse diaphragms 5 are provided vertically along the flange of the steel frame 20.
[0029] The prestressed steel-concrete beam 12 is provided with an upper row of longitudinal reinforcing bars 16 and a lower row of longitudinal reinforcing bars 18. The upper row of longitudinal reinforcing bars 16 passes through the first node connection area. A portion of the lower row of longitudinal reinforcing bars 18 is connected to the outer reinforcing bar sleeve 23 of the steel column by mechanical connection, and another portion of the lower row of longitudinal reinforcing bars 18 passes through the steel frame 20 and then passes through the first node connection area.
[0030] A ground-level steel-concrete composite column 17 is installed on top of the underground steel-concrete composite column 11, and the underground steel-concrete composite column 11, the ground-level steel-concrete composite column 17 and the prestressed steel-concrete composite beam 12 form a second node connection area. Multiple steel column outer reinforcing sleeves 23 are also installed on the ground-level steel-concrete composite column 17. The upper row of longitudinal reinforcing bars 16 are connected to the steel column outer reinforcing sleeves 23 by threaded connection or to the ground-level steel-concrete composite column 17 by welding. A second transverse diaphragm 9 is installed inside the underground steel-concrete composite column 11, and the second transverse diaphragm 9 is located between the upper row of longitudinal reinforcing bars 16 on both sides of the ground-level steel-concrete composite column 17.
[0031] One part of the prestressed metal corrugated pipe 10 penetrates the underground steel pipe concrete column 11. Multiple steel plates 26 are installed inside the rectangular steel pipe frame 8, and the multiple steel plates 26 are located on the rectangular steel pipe frame 8 at the positions through which the prestressed metal corrugated pipe 10 penetrates. Concrete ring beams 21 are poured on both sides of the underground steel pipe concrete column 11. Another part of the prestressed metal corrugated pipe 10 passes through the concrete ring beams 21 and is located on both sides of the underground steel pipe concrete column 11.
[0032] The outer side of the concrete ring beam 21 is provided with a haunch angle 22 that is connected to the concrete beam body 24, and the haunch angle 22 is used to wrap the prestressed metal corrugated pipe 10.
[0033] Multiple ring beam waist bars 13 are provided on the second connecting plate 15. Vertical stirrups 19 are provided at the four corners of the first node connection area and the second node connection area. The ring beam waist bars 13 and the vertical stirrups 19 are all located inside the concrete ring beam 21.
[0034] This invention optimizes the anchorage connection between the underground steel-concrete composite column 11 and the prestressed steel-concrete composite beam 12. Specifically, it includes a steel frame 20, prestressed steel reinforcement bundles 25, a concrete beam 24, a first connecting plate 14, a second connecting plate 15, a prestressed corrugated metal pipe 10, a rectangular steel pipe frame 8, a concrete column inside the steel pipe 7, a cross-shaped vertical diaphragm 3, a steel reinforcement sleeve 23 on the outer side of the steel column 23, studs 6, grouting holes 1, and vent holes 4. By establishing a reasonable connection relationship and construction method, a more rational node stress system is created. This allows the beam end load, prestress, and internal forces of the steel to be transferred more evenly and efficiently to the steel-concrete composite column, effectively reducing local stress concentration in the node area, improving the overall load-bearing performance of the beam-column joint, enhancing the anchorage reliability of the prestressed steel reinforcement bundles 25, reducing prestress loss and the risk of local cracking in the anchorage area, and facilitating the full utilization of the large-span load-bearing advantage of the prestressed steel-concrete composite beam 12.
[0035] Secondly, existing technologies generally use stiffening rib extension plates for anchoring, but this application does not use this method. This can effectively improve the problem of insufficient local strength of stiffening rib extension plates under vertical loads, improve the bending, shear and compressive strength of the joints, and enhance the overall stability of the structure.
[0036] By optimizing the internal structure of the underground steel-concrete composite column 11 and the prestressed steel-concrete composite beam 12, the deformation coordination ability between the steel-concrete composite column and the prestressed steel-concrete composite beam 12 is effectively improved, making the stress in the joint area more continuous. This reduces the stress concentration caused by abrupt changes in stiffness, reduces the development of concrete cracks in the joint, and improves the durability and service performance of the joint under long-term loads and complex stress conditions.
[0037] This invention also provides a construction method for the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column, comprising the following steps: S1. Before construction, the manufacturer will make the opening positions on the rectangular steel pipe skeleton 8 of the underground steel pipe concrete column 11, the steel reinforcement sleeve 23 on the outside of the steel column, the first connecting plate 14, the first transverse diaphragm 5 and the second transverse diaphragm 9 in advance according to the construction drawings. S2. After the underground steel-concrete composite column 11 is installed, the prestressed steel-concrete composite beam 12 and the underground steel-concrete composite column 11 installed in the subsequent sequence are checked, including the installation verticality of the underground steel-concrete composite column 11, the net distance between columns, the height and position of the reserved connection plate, and whether the number of reserved prestressed tendon holes meets the installation requirements. S3, the prestressed steel-concrete beam 12 is designed and manufactured in sections according to its span and weight. The prestressed steel-concrete beam 12 is divided into multiple sections. According to the hoisting plan, the sections are assembled on a jig near the steel beam installation. Steel sections are used as the jig. The steel beam is assembled on site and then hoisted as a whole. Before the steel beam is assembled, temporary steel pads are set up at the bottom and side flanges of the beam. The jacks are used as levelers to adjust the slight tilt angle of the components. After the longitudinal axis of the two beam sections coincides with the node axis, the steel pads are welded. After accurate leveling is completed, the hoisting hooks are removed. To prevent the components from shifting or rebounding during the removal process, temporary steel support stabilization devices are used on site for structural restraint. After the steel sections of the prestressed steel-concrete beam 12 are in place and temporarily positioned, the ends of the two beam sections are welded. The steel beam refers to the location where it is designed, and the two beam segments refer to any two segmented beams that need to be welded.
[0038] Before hoisting the prestressed steel-concrete beam 12 as a whole, remeasure the installation position of the steel section and the gap distance and pallet elevation between the underground steel-concrete column 11 to control the length of the steel section after assembly. The steel section in the flat position needs to be turned upside down to the upright position first. Pay attention to the impact when standing upright. The steel section is hoisted to the installation position. After being adjusted into position by guy ropes or chain hoists, the upper flange of the steel section is placed on the pallet. The web plate of the steel section is bolted to the steel column connecting plate and tightened. After the bolts of the web plate and the steel column connecting plate are tightened, the beam-column joint welds are welded at both ends at the same time. After 70% of the welding is completed, the hoisting wire rope is removed. The welding personnel use a boom lift or cage to weld the remaining welds. The pallet is a device used during the construction process.
[0039] S5. Erect the beam bottom support frame, tie the steel beam reinforcement, first place the upper layer of beam reinforcement, then attach the stirrups, and then thread the bottom reinforcement; prioritize connecting the beam reinforcement to the column joint reinforcement sleeves or through bars at both ends, and use double-threaded sleeves to connect the middle section of the beam reinforcement. Perform a full inspection of the sleeve connection quality to ensure the connection quality. Finally, adjust the position of the beam reinforcement in sequence and tie it securely, and set the protective layer spacers at the bottom and sides of the beam. S6. Install the beam side and slab formwork, reinforce the formwork system, insert prestressed corrugated metal pipes 10, set spring bars and anchor plates at the tensioning end, insert prestressed steel bars, tie the secondary beam reinforcement, and pour the beam and slab concrete after inspection and approval. Before concrete pouring, place vibrators at the four corners of the underground steel pipe concrete column 11 to the bottom of the column. Pull the vibrators upwards as the pouring height increases to prevent the vibrators from not reaching the bottom during pouring, resulting in insufficient compaction. At the same time, insert a long tremie pipe through the grouting hole 1 pouring hole. The tremie pipe is steel pipe-shaped with a flared opening at the top. The first insertion is 4-8m long. After pouring to a depth of 0.5-1m, pull out the long tremie pipe and replace it with a shorter one to ensure that the free fall height of the poured concrete does not exceed 2m to prevent aggregate segregation. After the concrete strength reaches the design requirements, tension the prestressed steel bars and seal the tensioning end tightly.
[0040] The construction method described in this application can be matched with the anchoring structure, allowing for reasonable control of the installation sequence and construction process of each component. This improves the installation accuracy and efficiency of the joints, reduces the adverse effects of on-site welding and installation errors on the anchoring performance, and helps ensure the quality of joint construction. It also has good engineering feasibility and application value, and is particularly suitable for projects such as underground integrated transportation hubs, large-span underground spaces, underground complexes, and heavy-duty frame structures. It can fully utilize the stress advantages of the combined structure of prestressed steel-concrete beams 12 and steel-concrete composite columns (including underground steel-concrete composite columns 11 and above-ground steel-concrete composite columns 17), improve the overall load-bearing capacity, seismic performance, and long-term service safety of the structure, and has good engineering application prospects. Furthermore, by constructing a multi-level collaborative anchoring system among the prestressed steel-concrete beams 12, anchoring components, and steel-concrete composite columns, the internal forces of the joints are transformed from traditional single-plate force transmission to multi-path collaborative force transmission. This not only improves the load-bearing efficiency of the joints but also enhances the ductility and energy dissipation capacity of the joints, effectively improving the overall safety reserve of beam-column joints under complex stress conditions.
[0041] The embodiments and / or implementation methods described above are merely preferred embodiments and / or implementation methods for implementing the technology of the present invention, and are not intended to limit the implementation methods of the technology of the present invention in any way. Any person skilled in the art can make some modifications or alterations to other equivalent embodiments without departing from the scope of the technical means disclosed in the content of the present invention, but they should still be regarded as the technology or embodiments that are substantially the same as the present invention.
[0042] This document uses specific examples to illustrate the principles and implementation methods of this application. The descriptions of the above embodiments are only for the purpose of helping to understand the methods and core ideas of this application. The above descriptions are only preferred embodiments of this application. It should be noted that due to the limitations of written expression, while there are objectively infinite specific structures, those skilled in the art can make several improvements, modifications, or changes without departing from the principles of this application, and can also combine the above technical features in an appropriate manner. These improvements, modifications, changes, or combinations, or the direct application of the inventive concept and technical solution to other situations without modification, should all be considered within the scope of protection of this application.
Claims
1. An anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column, characterized in that, It includes underground steel-concrete composite columns (11) and prestressed steel-concrete composite beams (12) connected to the underground steel-concrete composite columns (11). The prestressed steel-concrete composite beam (12) includes a steel frame (20), prestressed steel bar bundles (25), a concrete beam body (24), a first connecting plate (14), a second connecting plate (15), and a prestressed metal corrugated pipe (10). The underground steel-concrete composite column (11) includes a rectangular steel pipe frame (8), a concrete column body inside the steel pipe (7), a cross-shaped vertical diaphragm (3), a steel reinforcement sleeve (23) on the outside of the steel column, a stud (6), a grouting hole (1) and a vent hole (4). Two steel frame frames (20) are provided and symmetrically welded to the rectangular steel pipe frame (8). The prestressed steel bar bundles (25) are arranged around the outside of the steel frame frames (20) and the rectangular steel pipe frame (8) and are arranged inside the prestressed metal corrugated pipes (10). Multiple prestressed metal corrugated pipes (10) are provided and are respectively arranged on both sides of the prestressed steel-concrete beam (12). The concrete beam body (24) is cast on the outside of the steel frame frames (20) and the rectangular steel pipe frame (8). The first connecting plate (14) and the second connecting plate (15) are parallel to each other and are both arranged inside the steel frame frames (20). The cross vertical diaphragm (3) is provided. The rectangular steel pipe frame (8) is divided into four independent spaces of equal size. The concrete columns (7) inside the steel pipe are multiple and located in multiple independent spaces. The grouting holes (1) are multiple and located on multiple concrete columns (7) inside the steel pipe. The venting holes (4) are multiple and located on multiple concrete columns (7) inside the steel pipe. The studs (6) are multiple and located on multiple inner side walls and multiple outer side walls of the rectangular steel pipe frame (8). The steel column outer steel reinforcement sleeves (23) are multiple and located at multiple corner edges on the outer side wall of the rectangular steel pipe frame (8). The area between the underground steel-concrete composite column (11) and the prestressed steel-concrete composite beam (12) forms a first node connection area, and the first node connection area is integrally cast.
2. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 1, characterized in that, The rectangular steel pipe frame (8) includes multiple interconnected concrete column steel plates (2), and the steel frame (20) is welded to the corresponding concrete column steel plates (2).
3. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 1, characterized in that, The steel frame (20) has multiple first transverse diaphragms (5) arranged vertically along the flange.
4. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 1, characterized in that, The prestressed steel-concrete beam (12) is provided with an upper row of longitudinal reinforcing bars (16) and a lower row of longitudinal reinforcing bars (18). The upper row of longitudinal reinforcing bars (16) passes through the first node connection area. A portion of the lower row of longitudinal reinforcing bars (18) is mechanically connected to the outer reinforcing bar sleeve (23) of the steel column. Another portion of the lower row of longitudinal reinforcing bars (18) passes through the steel frame (20) and then through the first node connection area.
5. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 4, characterized in that, The underground steel-concrete composite column (11) is topped with an above-ground steel-concrete composite column (17), and the underground steel-concrete composite column (11), the above-ground steel-concrete composite column (17) and the prestressed steel-concrete composite beam (12) form a second node connection area. Multiple steel column outer steel reinforcement sleeves (23) are also provided on the above-ground steel-concrete composite column (17). The upper row of longitudinal reinforcing bars (16) are connected to the steel column outer steel reinforcement sleeves (23) by threaded connection or to the above-ground steel-concrete composite column (17) by welding. The underground steel-concrete composite column (11) is provided with a second transverse diaphragm (9), and the second transverse diaphragm (9) is located between the upper row of longitudinal reinforcing bars (16) on both sides of the above-ground steel-concrete composite column (17).
6. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 1, characterized in that, One part of the prestressed metal corrugated pipe (10) penetrates the underground steel pipe concrete column (11). The rectangular steel pipe frame (8) is provided with multiple steel plates (26), and the multiple steel plates (26) are located on the rectangular steel pipe frame (8) at the position through which the prestressed metal corrugated pipe (10) penetrates. Concrete ring beams (21) are poured on both sides of the underground steel pipe concrete column (11). Another part of the prestressed metal corrugated pipe (10) passes through the concrete ring beams (21) and is located on both sides of the underground steel pipe concrete column (11).
7. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 6, characterized in that, The concrete ring beam (21) is provided with a yoke (22) connected to the concrete beam body (24) on the outside, and the yoke (22) is used to wrap the prestressed metal corrugated pipe (10).
8. The anchorage structure between the end of the prestressed steel-concrete composite beam and the steel-concrete composite column according to claim 6, characterized in that, The second connecting plate (15) is provided with multiple ring beam waist bars (13), and vertical stirrups (19) are provided at the four corners of the first node connection area and the second node connection area. The ring beam waist bars (13) and the vertical stirrups (19) are both located inside the concrete ring beam (21).
9. A construction method for the anchorage structure between the end of a prestressed steel-concrete composite beam and a steel-concrete composite column as described in any one of claims 1-8, characterized in that, Including the following steps: S1. Before construction, the manufacturer will make the opening positions on the rectangular steel pipe skeleton (8) of the underground steel pipe concrete column (11), the steel reinforcement sleeve (23) on the outside of the steel column, the first connecting plate (14), the first diaphragm (5) and the second diaphragm (9) according to the construction drawings. S2, after the underground steel-concrete composite column (11) is installed, the prestressed steel-concrete composite beam (12) and the underground steel-concrete composite column (11) installed in the subsequent sequence are checked, including the installation verticality of the underground steel-concrete composite column (11), the net distance between columns, the height and position of the reserved connection plate, and whether the number of reserved prestressed tendon holes meets the installation requirements. S3, whether the prestressed steel concrete beam (12) is installed in sections during the detailed design and processing is determined according to the span and weight. The prestressed steel concrete beam (12) is divided into multiple sections. According to the hoisting plan, the section beams are set up near the steel beam installation. Steel is used as the assembly frame. The steel beams are assembled into a whole on site and then hoisted in whole sections. Before the steel beams are assembled, temporary steel pads are set up at the bottom of the beam and the flanges on both sides. The jack device is used as a leveler to adjust the slight tilt angle of the components. After the longitudinal axis of the two beams coincides with the node axis, the steel pads are welded. After the precise leveling is completed, the hoisting hooks are removed. In order to prevent the components from shifting or rebounding during the removal of the hooks, temporary steel support stabilization devices are used on site for structural constraint. After the steel of the prestressed steel concrete beam (12) is in place and the temporary positioning is completed, the end connection of the two beams is welded. S4, Before hoisting the prestressed steel-concrete beam (12) as a whole, remeasure the installation position of the steel section and the gap distance and pallet elevation between the underground steel pipe concrete column (11) to control the length of the steel section after assembly. The steel section in the flat position needs to be turned over to the upright position first. Pay attention to the impact when standing upright. The steel section is hoisted to the installation position. After adjusting the position by guy rope or chain hoist, the upper wing plate of the steel section falls on the pallet. The web plate of the steel section is bolted to the steel column connecting plate and tightened. After the bolts of the web plate and the steel column connecting plate are tightened, the beam-column joint weld is welded at both ends. After 70% of the welding is completed, the hoisting wire rope is removed. The welding personnel use a boom lift or cage to weld the remaining welds. S5, erect the beam bottom support frame, tie the steel beam reinforcement, first place the upper layer of beam reinforcement, then put on the stirrups, and then pass through the bottom reinforcement of the beam; the beam reinforcement is first connected to the column node reinforcement sleeves or through the reinforcement, and the middle beam reinforcement is connected with double threaded sleeves. The sleeve connection quality is fully checked to ensure the connection quality. Finally, adjust the position of the beam reinforcement in sequence and tie it firmly, and set the protective layer spacers at the bottom and sides of the beam. S6, install the beam side and slab formwork, reinforce the formwork system, insert prestressed metal corrugated pipe (10), set spring bars and anchor plates at the tensioning end, insert prestressed steel bars, tie the secondary beam steel bars, and pour the beam and slab concrete after inspection and approval; before pouring concrete, place vibrators at the four corners of the underground steel pipe concrete column (11) to the bottom of the column, and pull the vibrators up as the pouring height increases, so as to prevent the vibrators from not reaching the bottom during the pouring process and causing the vibration to be incomplete; at the same time, a long cistern needs to be inserted through the grouting hole (1) pouring hole. The cistern is steel pipe-shaped with a flared mouth at the top; the first time, it is 4~8m long. After pouring to the depth of the cistern burial depth of 0.5~1m, the long cistern is pulled out and replaced with a shorter cistern to ensure that the free fall height of the concrete pouring does not exceed 2m, to prevent aggregate separation. After the concrete strength reaches the design requirements, the prestressed steel bars are tensioned and the tensioning end is sealed tightly.