Cleaning equipment production line data acquisition and analysis method and system based on multi-station cooperation
By collecting and binding assembly parameters and sub-component identifiers on the cleaning equipment production line, a risk parameter comparison table is constructed. Sub-components with combined risks are evaluated and replaced in real time, which solves the problem of multi-station parameter combinations affecting the overall machine performance, improves the efficiency of forward quality control, and reduces rework losses.
Patent Information
- Application Number
- CN202611461633.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-20
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2046-09-20
AI Technical Summary
Existing cleaning equipment production lines have difficulty identifying the impact of parameter combinations from multiple sub-assembly lines on the overall machine performance, resulting in abnormal machine performance being discovered only after final assembly and delayed rework.
By using a multi-station collaborative data collection and analysis method for cleaning equipment production lines, key assembly parameters and sub-component identifiers are collected and bound together. A risk parameter comparison table is constructed, and sub-components with combined risks are evaluated and replaced in real time, thereby reducing the quality risks caused by unreasonable parameter combinations.
Identify and mitigate the risks of unreasonable parameter combinations before final assembly, reduce production losses from rework after final assembly, and improve the efficiency of forward product quality control.
Smart Images

Figure CN122966043B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of intelligent manufacturing technology, specifically to a method and system for data acquisition and analysis of cleaning equipment production lines based on multi-station collaboration. Background Technology
[0002] As cleaning equipment manufacturing moves towards automation, flexibility, and digitalization, products such as household cleaning robots typically employ multiple sub-assembly lines to assemble different functional components in parallel. Each sub-component, after being buffered and paired, enters the main assembly line for final assembly, where functional tests such as operating current, noise, and suction power are performed at the end of the production line. Existing production lines are generally equipped with barcode or QR code recognition, workstation data acquisition terminals, and production databases, capable of recording assembly parameters such as pressing force, locking torque, and spring deformation. Furthermore, manufacturing execution systems and statistical process control (SPC) are used to trace and monitor process status and product quality.
[0003] Multiple sub-assembly lines typically implement quality control independently according to their respective process specifications. Existing control methods mainly determine whether parameters at a single workstation are within specified ranges. When two or more parameters from different sub-assembly lines are within allowable ranges but simultaneously biased in a specific direction, their combination can significantly impact the overall machine performance. Such cross-sub-assembly line parameter correlations are difficult to identify directly through single-workstation monitoring. While existing end-point functional testing can detect overall machine performance anomalies, these anomalies usually only become apparent after final assembly, requiring further backtracking of multiple sub-components and their historical process parameters. This leads to delays in root cause identification and rework. Therefore, how to fully utilize accumulated workstation parameters, sub-component pairing relationships, and continuous end-point measurement data to identify the impact of different sub-assembly line parameter combinations on the final product performance, and how to reduce the quality risks caused by unreasonable parameter combinations before final assembly, remains a problem that needs to be addressed in cleaning equipment production line data analysis and quality control. Summary of the Invention
[0004] To overcome the problems existing in related technologies, this manual provides a method and system for data acquisition and analysis of cleaning equipment production lines based on multi-station collaboration.
[0005] According to a first aspect of the embodiments of this application, a method for data acquisition and analysis of a cleaning equipment production line based on multi-station collaboration is provided, including: Key assembly parameters are collected at each workstation on multiple parallel sub-assembly lines. Each key assembly parameter is bound to the identification code of the corresponding sub-component and stored to form the parameter record of each sub-component. The pairing relationship of the sub-components when they enter the main assembly line is recorded, and the continuous measurement values of the end function test of the final product are associated with the parameter record of each sub-component. Based on the continuous measurement values and parameter records in historical production data, parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines are screened, and a risk parameter comparison table is constructed. Before the sub-components are paired from the cache and sent to the main assembly line, the parameter records of each sub-component to be paired are read, the risk score of each parameter pair is calculated according to the risk parameter lookup table, and the risk score is compared with the corresponding risk judgment threshold. When the risk score reaches or exceeds the risk determination threshold, a replacement sub-component is retrieved from the corresponding cache area, and a replacement sub-component that makes the risk score lower than the risk determination threshold is selected to replace the original pairing scheme before being sent to the main assembly line.
[0006] As an optional approach, the screening of parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines includes: establishing a multiple linear regression model containing cross-sub-assembly line parameter interaction terms, using the continuous measurement value as the dependent variable and the parameters from each sub-assembly line as independent variables; performing a significance test on the regression coefficients of each cross-sub-assembly line parameter interaction term, and including the parameter pairs corresponding to the parameter interaction terms that pass the significance test into the risk parameter comparison table.
[0007] As an optional approach, the significance test satisfies both statistical significance and engineering significance conditions. The statistical significance condition is that the t-test p-value of the regression coefficient of the interaction term is less than a preset statistical threshold. The engineering significance condition is that the estimated deviation of the regression coefficient of the interaction term from the continuous measurement value when the parameter takes the marginal value of the distribution exceeds a preset proportion of the specification margin, where the specification margin is the difference between the specification limit of the continuous measurement value and the historical mean.
[0008] As an optional approach, the calculation of the risk score for each parameter pair based on the risk parameter lookup table includes: standardizing each key assembly parameter in the parameter record to obtain a standardized value; multiplying the interaction coefficient recorded in the risk parameter lookup table by the standardized values of the two parameters in the corresponding parameter pair, taking the absolute value of the product and dividing it by the specification margin of the corresponding continuous measurement value to obtain the risk score for the parameter pair.
[0009] As an optional approach, the standardization process is as follows: subtract the arithmetic mean of the parameter in historical production data from the original collected value of each key assembly parameter, and then divide by the standard deviation of the parameter in historical production data to obtain a dimensionless standardized value.
[0010] As an optional approach, the risk determination threshold is determined as follows: products whose continuous measurement values of end-function testing exceed a preset proportion of the specification limit are selected from historical production data and marked as high-risk samples; the risk score of each historical product is calculated retrospectively; and the smallest candidate value that ensures the detection rate of the high-risk samples is not lower than the preset detection rate target is selected as the risk determination threshold.
[0011] As an optional approach, retrieving alternative sub-components in the corresponding cache includes: comparing the absolute values of the standardized values of the parameters on both sides of the parameter pair that triggered the risk score to reach or exceed the risk determination threshold; identifying the sub-component with the larger standardized absolute value as the priority replacement target; calculating the risk score of each sub-component in the same category in the cache to which the sub-component belongs, after combining it with the remaining sub-components in the current pair, and selecting the candidate sub-component with a risk score lower than the risk determination threshold and the minimum value as the alternative sub-component.
[0012] As an optional solution, when there is no alternative sub-component in the cache that would cause the risk score to fall below the risk judgment threshold, the product corresponding to the current pairing scheme is marked as a key monitoring unit, and intermediate measurement is performed on the key monitoring unit at the intermediate inspection node of the main assembly line; when the intermediate measurement value exceeds the preset proportion of the corresponding specification limit, the key monitoring unit is transferred to offline re-inspection.
[0013] As an optional approach, the risk parameter lookup table is reconstructed according to a preset update cycle. During the update, newly added pairings and continuous measurement values of end-function detection in the most recent update cycle are included in the historical production data, and the screening step is re-executed to generate a new list of parameter pairs to replace the current risk parameter lookup table. Parameter pairs that fail the significance test in a preset number of consecutive update cycles are removed from the risk parameter lookup table.
[0014] According to a second aspect of the embodiments of this application, a data acquisition and analysis system for a cleaning equipment production line based on multi-station collaboration is also provided, comprising: The data acquisition and association module is used to collect key assembly parameters at each workstation of multiple parallel sub-assembly lines, bind each key assembly parameter with the identification code of the corresponding sub-component and store it to form the parameter record of each sub-component; record the pairing relationship when the sub-component enters the main assembly line, and associate the continuous measurement values of the end function test of the final product with the parameter record of each sub-component. The risk parameter comparison table construction module is used to filter parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines based on the continuous measurement values and parameter records in historical production data, and construct a risk parameter comparison table. The pairing risk assessment module is used to read the parameter records of each sub-component to be paired before the sub-components are paired from the cache and sent to the main assembly line, calculate the risk score of each parameter pair according to the risk parameter lookup table, and compare the risk score with the corresponding risk judgment threshold. The alternative pairing module is used to retrieve alternative sub-components from the corresponding cache area when the risk score reaches or exceeds the risk judgment threshold, select an alternative sub-component that makes the risk score lower than the risk judgment threshold to replace the original pairing scheme, and then send it to the main assembly line.
[0015] This application, based on the actual production organization of multiple parallel sub-assembly lines, establishes a correlation between key assembly parameters, sub-component identifiers, pairing relationships collected at each workstation and continuous measurement values of end-function testing. It also utilizes historical production data to identify interactive relationships with real impact between parameters belonging to different sub-assembly lines. A risk parameter comparison table is formed through a combination of statistical and engineering significance screening, enabling the quantification and identification of cross-workstation combination risks that would otherwise be difficult to detect through single-workstation parameter qualification judgments. Before sub-components enter the main assembly line, the current pairing scheme is evaluated in real time according to the aforementioned risk parameter comparison table. When the risk reaches the judgment condition, a more suitable alternative sub-component is retrieved from the buffer, thereby shifting quality risk control from end-function testing after final assembly to the pairing stage before final assembly. This method, without changing the existing allowable range of individual process parameters in each sub-assembly line, allows historical quality data to directly participate in current production pairing decisions, reducing the probability of abnormal overall machine function testing due to improper combinations of different sub-component parameters, and reducing production losses caused by cause tracing and rework after final assembly. Attached Figure Description
[0016] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this specification and, together with the description, serve to explain the principles of this specification.
[0017] Figure 1 This is a flowchart of a data acquisition and analysis method for a cleaning equipment production line based on multi-station collaboration, according to one embodiment of this application.
[0018] Figure 2 This is a schematic diagram of the data association logic of multiple workstations in one embodiment of this application.
[0019] Figure 3 This is a flowchart illustrating the construction of a risk parameter comparison table in one embodiment of this application.
[0020] Figure 4 This is a flowchart of subcomponent pairing risk assessment and alternative pairing in one embodiment of this application.
[0021] Figure 5This is a schematic block diagram of a cleaning equipment production line data acquisition and analysis system based on multi-station collaboration, as described in this application.
[0022] Figure 6 This is a structural diagram of an electronic device according to one embodiment of this application. Detailed Implementation
[0023] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0024] According to embodiments of this disclosure, this method is particularly applicable to cleaning equipment production lines with multiple parallel sub-assembly lines and one main assembly line. The production line layout consists of multiple sub-assembly lines assembling different functional sub-components. Each sub-component is temporarily stored in a buffer area and then paired before being sent to the main assembly line for final assembly. After final assembly, functional testing is performed at the end of the production line. Taking a household cleaning robot production line as an example, the sub-assembly lines include front brush assembly lines, brush lifting assembly lines, cloth brush lifting mechanism lines, wheel hub assembly lines, large fan assembly lines, laser assembly lines, dustbin assembly lines, etc., with a configuration of 8 to 15 lines. The main assembly line can be configured with 30 to 50 workstations. The end-of-line functional testing outputs continuous measurement values, i.e., continuous values given by the testing equipment (such as current value, noise decibel value, suction value, etc.), which differs from a binary judgment of only passing or failing. The production line has deployed a barcode or QR code identification system, and each workstation is equipped with a data acquisition terminal connected to the production line database.
[0025] The implementation process of the method described in this application will be explained in detail below with reference to specific embodiments.
[0026] Please see Figure 1 , Figure 1 This is a flowchart of a data acquisition and analysis method for a cleaning equipment production line based on multi-station collaboration, as described in one embodiment of this application. Figure 1 As shown, the method includes steps 101-104: Step 101: Collect key assembly parameters and form parameter records, record the pairing relationship and associate it with the continuous measurement values of end function detection.
[0027] Figure 2 This is a logical diagram illustrating the data association relationship among multiple workstations in one embodiment of this application. For example... Figure 2As shown, multiple parallel sub-assembly lines assemble different sub-components. Sub-assembly line 1 is an example of the front brush assembly line, sub-assembly line 2 is an example of the brush lifting assembly line, and other sub-assembly lines are represented by sub-assembly line N, such as the dustbin assembly line. Each sub-assembly line completes assembly sequentially from the loading station, station 1, station 2 to the final station, and collects assembly parameters at the corresponding stations. After each sub-component is assembled, it enters the corresponding buffer area 1, buffer area 2 to buffer area N, and then is sent to the main assembly line. The first station of the main assembly line scans the sub-component identification code and records the pairing relationship, and then completes the final assembly through subsequent stations and the final station. The end-function detection outputs continuous measurement values. During the data formation process, the assembly parameters collected by each sub-assembly line station are bound to the identification code to form parameter records; when the sub-component enters the main assembly line, the pairing relationship is recorded and associated with the product serial number; the continuous measurement values generated by the end-function detection are also associated with the product serial number and are uniformly associated and stored in the production line database.
[0028] In some embodiments, each parallel sub-assembly line scans the identification code of the sub-component at the loading station. This code flows with the sub-component through all stations on the line. After the assembly action is completed, the data acquisition terminal at each station binds the key assembly parameters of this process with the identification code and stores them in the production line database. Key assembly parameters refer to process parameters that directly affect the functional performance of the final product, such as peak pressing force, locking torque, and spring deformation. One to three parameters are selected for each station. When the sub-component completes all processes of the sub-assembly line and enters the buffer area, the production line database has stored complete parameter records under the identification code, i.e., the set of all key assembly parameter values of the sub-component as it passed through each station.
[0029] In some embodiments, the first station on the main assembly line scans the identification codes of all sub-components involved in the final assembly, records the pairing relationships of the sub-components upon entering the main assembly line, and writes this information into the production line database, associating it with the product serial number. After final assembly, the final product enters the end-function testing station, where the testing equipment writes continuous measurement values into the production line database and associates them with the same product serial number. Thus, the system associates the continuous measurement values of the end-function testing of the final product with the parameter records of each sub-component through the product serial number. After a period of normal production data accumulation (e.g., no less than 300 products), historical production data is formed in the production line database, which can be used for subsequent analysis.
[0030] Step 102: Screen parameter pairs that have significant interaction effects between parameters belonging to different sub-assembly lines and construct a risk parameter comparison table.
[0031] This step, based on continuous measurements and parameter records from historical production data, identifies whether interaction effects exist between parameters from different sub-assembly lines. An interaction effect refers to the limited impact of two parameters individually within their acceptable ranges on the final test metric, but when both are biased in a certain direction, the combined shift in the test metric is far greater than the sum of their individual effects. Mathematically, the interaction effect is represented by the coefficient of the interaction term in the regression model. Significantly non-zero. With two parameters. and For example, if only the main effect is considered... right The partial derivatives are After considering interactive items ,Right now right The degree of influence varies The value of changes linearly, and the rate of change That is, it has been quantified. and The strength of the interaction effect between them.
[0032] Each sub-assembly line in the production line is independently controlled in terms of process control. Statistical process control at the single workstation level only monitors whether the parameters of this workstation are within the specification range, and cannot discover the combined effects between parameters belonging to different sub-assembly lines. This step extracts such cross-workstation patterns from historical data through regression analysis and solidifies the results into a risk parameter comparison table.
[0033] Figure 3 This is a flowchart illustrating the construction of a risk parameter comparison table in one embodiment of this application. For example... Figure 3 As shown, the system uses parameter records and continuous measurements from historical production data as the basis for analysis. First, key assembly parameters are standardized based on the original collected values, arithmetic mean, and standard deviation. Then, a multiple linear regression model is established, including interaction terms between parameters from different sub-assembly lines. Only interaction terms belonging to different sub-assembly lines are included, and the regression coefficients of the interaction terms are subjected to significance testing. The significance test includes both statistical significance and engineering significance conditions. The statistical significance condition is that the p-value of the t-test is less than a preset statistical threshold, and the engineering significance condition is that the contribution of the interaction term is greater than a preset proportion of the specification allowance. Only parameter pairs that simultaneously meet both conditions are included in the risk parameter comparison table. The risk parameter comparison table records sub-assembly line A, parameter A, sub-assembly line B, parameter B, interaction coefficient, corresponding test index, and risk judgment threshold. For example, the interaction coefficient between the roller brush motor pressing force of the front brush assembly line and the lifting spring preload of the brush lifting assembly line is 35mA, the corresponding test index is the overall machine operating current, and the risk judgment threshold is 0.6. This comparison table is used for subsequent risk assessment.
[0034] Specifically, the key assembly parameters of each sub-assembly line have different physical dimensions. For example, the dimension of pressing force is Newton, the dimension of torque is Newton-meter, and the dimension of displacement is millimeter, making direct cross-parameter comparisons impossible. Before performing interactive analysis, all parameters are standardized. The original collected value of each key assembly parameter is subtracted from the arithmetic mean of that parameter in historical production data, and then divided by the standard deviation of that parameter in historical production data to obtain the dimensionless standardized value. ; in For the first The original collected values of key assembly parameters, This is the arithmetic mean of the parameter in historical production data. This represents the standard deviation of the parameter in historical production data. and The calculation is based on historical production data accumulated during normal production line operation, with a sample size of no less than 300 product corresponding parameter records.
[0035] For example, the raw value of the roller brush motor pressing force collected at a certain station on the front brush assembly line. N, historical mean N, historical standard deviation N, then the standardized value The original value of the lifting spring preload of the brush lifting assembly line. mm, historical average mm, historical standard deviation mm, then .
[0036] In one embodiment, a multiple linear regression model incorporating cross-sub-assembly line parameter interaction terms is established. Specifically, a continuous measurement value from the end-function inspection is selected as the dependent variable, and all standardized parameters from each sub-assembly line are used as independent variables to establish a multiple linear regression model incorporating cross-sub-assembly line parameter interaction terms. ; in These are predicted values for continuous measurements, and their dimensions are the same as the actual measured values. For the intercept term, For the first The main effect coefficients of each parameter For the first The parameter and the first The interaction effect coefficients (i.e., regression coefficients) between the parameters; This represents the total number of standardized parameters involved in the analysis. The model only includes interaction terms between parameters belonging to different sub-assemblies; interaction terms between parameters within the same sub-assembly line are not included in this step's analysis.
[0037] In one alternative implementation, the regression coefficients are solved using the least squares method. The principle of the least squares method is to find the combination of coefficients that minimizes the sum of squared residuals (the sum of the squared differences between predicted and observed values), which is a standard operation in linear algebra for solving normal equations. The above model is established for each continuous measurement of end-function testing.
[0038] In one example, when solving the problem, let the number of independent variables involved in the modeling be... (i.e., the total number of standardized parameters from each sub-assembly line), the training sample size is (That is, the number of products with complete parameter records and end-point test results in historical production data) Design Matrix The dimension is ,in The number of cross-sub-assembly line interaction items ( ).
[0039] The regression model can be solved using ordinary least squares (OLS), and the loss function is: ; in The entire training sample is traversed, and the QR decomposition method is used for numerical computation during the solution process to avoid the problem of excessively large condition numbers that may occur in solving normal equations. Optionally, when the number of interaction terms... In this case, Lasso regularization can be used ( Penalty term, regularization coefficient The coefficients of the interaction terms are sparsified by using 10-fold cross-validation to mitigate the risk of overfitting.
[0040] In one embodiment, a significance test is performed on the regression coefficients of the interaction terms. Specifically, the regression coefficients of the interaction terms for each cross-sub-assembly line parameter in the model are tested. Perform a significance test and include the parameter pairs corresponding to the parameter interaction terms that pass the significance test in the risk parameter comparison table; passing the significance test requires meeting both the statistical significance condition and the engineering significance condition.
[0041] Among them, for the statistical significance condition, the regression coefficient of the interaction term The p-value of the t-test is less than the preset statistical threshold. The t-test is a standard method in regression analysis to test whether a coefficient is significantly different from zero. The t-statistic is obtained by dividing the coefficient estimate by its standard error, and then the p-value is obtained according to the t-distribution. The smaller the p-value, the lower the probability that the coefficient is zero. The preset statistical threshold is, for example, 0.01.
[0042] Specifically, for the engineering significance condition, when the regression coefficient of the interaction term takes marginal values of the distribution, the estimated deviation of the continuous measurement values exceeds the preset proportion of the specification margin. The specification margin is the specification limit of the continuous measurement values. Compared with historical average The difference. Specifically, the determination method is as follows: assuming both parameters deviate from the mean by 2 standard deviations (i.e., a standardized value of 2), the contribution of the interaction term is... If this value exceeds a preset percentage of the specification allowance, then the engineering significance condition is met. The preset percentage is, for example, 20%. This refers to the upper limit (or two-sided specification limit) of the test index specified in the product technical specifications, with the same dimensions as the corresponding test index, such as mA or dB. This is the arithmetic mean of the test indicator in historical production data.
[0043] As an example, the upper limit of the overall operating current specification. mA, historical average mA, specification margin is 180mA. Interaction coefficient between the pressing force of the roller brush motor in the front brush assembly line and the preload of the lifting spring in the brush lifting assembly line. mA, then the maximum interaction contribution mA, far exceeding mA meets the engineering significance condition. Simultaneously, if the t-test p-value is 0.003 (less than 0.01), the statistical significance condition is also met, and this parameter is included in the risk parameter comparison table.
[0044] Parameter pairs that satisfy both conditions are retained, and any interaction item that passes only one condition is not included in the lookup table.
[0045] In one embodiment, the risk parameter lookup table is constructed along with the risk assessment threshold. Specifically, all the selected parameter pairs are summarized to construct the risk parameter lookup table. Each record in the lookup table includes the name of the sub-assembly line to which each parameter in the parameter pair belongs, the parameter name, and the interaction coefficient. The numerical value, the corresponding name of the continuous measurement value index for end-function detection, and the risk judgment threshold for this parameter pair. The following are examples of comparisons:
[0046] In one possible implementation, the risk assessment threshold The calibration process involves selecting products from historical production data whose continuous measurement values for end-function testing exceed a preset percentage of specification limits and marking them as high-risk samples (e.g., products with continuous measurement values exceeding 80% of specification limits are marked). Risk scores for each parameter pair are calculated retrospectively for all historical products (the calculation method is described later and will not be repeated here). The detection rate of high-risk samples is statistically analyzed one by one from a set of candidate thresholds (e.g., from 0.3 to 0.9 in 0.05 increments). The detection rate is the proportion of high-risk samples whose risk scores exceed the candidate threshold to the total number of high-risk samples. The smallest candidate value that ensures the detection rate is not lower than the preset detection rate target is selected as the risk judgment threshold. The preset detection rate target is, for example, 85%. The sample size used for calibration is no less than 500 products. In actual calibration... Typical values fall between 0.5 and 0.7. Optionally, the risk assessment thresholds for different test indicators can be calibrated independently.
[0047] Step 103: Calculate the risk score for each parameter pair based on the risk parameter comparison table and compare it with the risk judgment threshold.
[0048] In some embodiments, the real-time calculation process of this step can be triggered when the production line scheduling system is preparing to retrieve sub-components from each buffer area for pairing and delivery to the main assembly line.
[0049] Specifically, before the sub-components are paired from the buffer and sent to the main assembly line, the scheduling system determines the pairing scheme, reads the identification codes of each sub-component to be paired, queries the parameter records corresponding to each identification code from the production line database and obtains the original collected values of key assembly parameters, and converts them into standardized values according to the standardization processing method described above.
[0050] Here, let the set of sub-components required for one final assembly on a main assembly line be denoted as . ,in The number of sub-components participating in this final assembly (equal to the number of parallel sub-assembly lines). Indicates from the A specific sub-component of a strip assembly line and its identification code, this set This is defined as a single pairing scheme. Each Each is associated with a parameter record. ,in This refers to the number of key assembly parameters collected at each workstation along the route of the sub-component.
[0051] In one embodiment, each record in the risk parameter lookup table is traversed, and the standardized values of the two parameters corresponding to that record in the current pairing scheme are read. The risk score is calculated based on the interaction coefficient recorded in the risk parameter lookup table: the interaction coefficient is multiplied by the standardized values of the two parameters in the corresponding parameter pair, and the absolute value of the product is divided by the specification margin of the corresponding continuous measurement value to obtain the risk score of the parameter pair. ; This is the interaction coefficient of the parameter with respect to records in the risk parameter lookup table. and This is the standardized value of the two parameters in the parameter pair. For the specification limits of the corresponding test indicators, This represents the historical average of the corresponding test metric. The physical meaning is the proportion of the interaction contribution of this parameter pair to the specification margin.
[0052] In practical applications, taking the first row of the comparison table as an example, the standardized value of the roller brush motor pressing force in the current pairing scheme is... Standardized value of lifting spring preload Interaction coefficient mA, specification margin is mA, then .
[0053] In one embodiment, the risk assessment threshold is determined by comparing each record in the risk parameter lookup table. The risk score of each parameter pair is compared with its corresponding risk assessment threshold. When the risk score of any parameter pair reaches or exceeds its risk assessment threshold, the current pairing scheme is determined to have combined risk. Continuing the previous example, If the threshold of 0.6 for the corresponding risk assessment in the comparison table is reached, it is determined that there is a combined risk.
[0054] When the risk scores of all parameter pairs are lower than their respective risk assessment thresholds, the current pairing scheme is released normally and sent to the main assembly line.
[0055] Figure 4 This is a flowchart illustrating the sub-component pairing risk assessment and alternative pairing process in one embodiment of this application. Figure 4As shown, before the sub-components are sent to the main assembly line, the parameter records of each sub-component to be paired are read, the risk score of each parameter pair is calculated according to the risk parameter comparison table, and the risk score is compared with the corresponding risk judgment threshold. When the risk score does not reach the risk judgment threshold, the current pairing scheme is directly sent to the main assembly line; when the risk score reaches or exceeds the risk judgment threshold, that is, when the condition "risk score ≥ risk judgment threshold" is met as shown in the figure, steps 4 to 6 are executed. First, the absolute values of the standardized values of the parameters on both sides of the triggering risk parameter pair are compared. If the standardized absolute value on the left is larger, the sub-component on the left is determined to be the priority replacement object; if the value on the right is larger, the sub-component on the right is determined to be the priority replacement object. Then, in the same type of sub-component in the cache area to which the priority replacement object belongs, the risk score of each sub-component combined with the other sub-components in the current pair is calculated one by one. The candidate sub-component with a risk score lower than the risk judgment threshold and the minimum value is selected as the replacement sub-component. Finally, the replacement sub-component replaces the original pairing scheme and is sent to the main assembly line. Here, left and right only refer to the two sub-components in the parameter pair that triggers the current risk score.
[0056] Specifically, in step 104, when it is determined that there is a combination risk, the alternative sub-component retrieval and pairing scheme adjustment are performed.
[0057] In some embodiments, for parameter pairs that trigger risk scores reaching or exceeding a risk assessment threshold, the absolute values of the standardized values of the parameters on both sides of the parameter pair are compared, and the sub-component with the larger standardized absolute value is identified as the priority replacement target. This side's parameters deviate more from the mean, contribute more to the interaction, and the risk reduction effect after replacement is more significant. (Continuing from the previous example) , The brush lifting component has a larger standardized absolute value, making it the priority for replacement.
[0058] Specifically, among the same type of sub-components in the cache of the priority replacement object, the parameter records of each candidate sub-component are read one by one, and the standardization process is performed according to the aforementioned steps. Then, the risk score after combining with the remaining sub-components in the current pairing is recalculated. The candidate sub-component with a risk score lower than the risk judgment threshold and the minimum value is selected as the replacement sub-component, and after replacing the original pairing scheme, it is sent to the main assembly line. The replaced atomic components remain in the cache to await subsequent pairing.
[0059] As an example, there is a standardized value for the preload of a lifting spring in the buffer area. The child components, recalculate If the value is below the threshold of 0.6 and is the smallest among all candidates, the sub-component is selected to replace the original pairing scheme.
[0060] In some embodiments, when there are no alternative sub-components in the buffer that would cause the risk score to fall below the risk assessment threshold (e.g., insufficient inventory or all candidate risk scores exceeding the threshold), the current pairing is not blocked, but the product corresponding to the current pairing scheme is marked as a key monitoring unit. This is because the absence of available alternatives in the buffer means that all in-stock sub-components currently output by the sub-assembly line have a combination risk with the parameters on the other side. Blocking the pairing would directly cause the entire main assembly line to stop waiting, and the downtime loss (calculated based on the production line's designed capacity per hour) usually far exceeds the rework cost of a single product.
[0061] In one embodiment, intermediate measurements are performed on key monitoring units at intermediate inspection nodes of the main assembly line; when the intermediate measurement value exceeds a preset percentage (e.g., 90%) of the corresponding specification limit, the key monitoring unit is transferred to the offline re-inspection channel to avoid further rework caused by continuing subsequent assembly; if the intermediate measurement value is within the normal range, the subsequent process continues.
[0062] Optionally, when multiple products trigger replacement pairing and the buffer area is consistently short of replacement parts, the system sends a prompt to the production line manager, suggesting that they check whether the distribution of process parameters in the relevant sub-assembly line has shifted.
[0063] In some embodiments, the risk parameter lookup table is rebuilt according to a preset update cycle, which can be configured to be once a week or once after a cumulative production of 1000 units. During the update, newly added pairings and continuous measurements of end-function tests from the most recent update cycle are incorporated into historical production data. All steps described above, from standardization to significance testing and screening, are re-executed to generate a new list of parameter pairs to replace the current risk parameter lookup table. (Standardization process...) and Recalculate synchronously with each update.
[0064] Optionally, parameter pairs that fail the significance test in a predetermined number of consecutive update cycles (e.g., 3) are removed from the risk parameter lookup table, allowing the lookup table to adapt to changes brought about by production line process improvements. In some embodiments, when raw material batches change or key tooling is replaced in a sub-assembly line, an early update can be manually triggered to shorten the adaptation cycle.
[0065] Optionally, when the production line is initially deployed and there is no historical data, the system only performs parameter collection, identifier binding, and pairing relationship recording, without performing risk assessment. After accumulating a preset number (e.g., 300 units) of products with complete parameter records and end-point test results, an initial screening analysis is performed to generate an initial risk parameter comparison table, and the system enters normal operation mode. If the production line already has electronic historical records before deployment, the existing data can be used directly to perform analysis.
[0066] Understandably, the real-time computational load of the above steps mainly consists of table lookups and floating-point multiplication and division operations. After screening, the risk parameter comparison table typically retains 5 to 20 records. The total computational load for a single pairing assessment does not exceed 100 floating-point multiplication and division operations, and the execution time on a general-purpose industrial control computer is far less than 1 second, while the production line pairing scheduling interval is usually no less than 30 seconds. Offline regression analysis with a sample size of 500 to 2000 records can be completed within minutes on a general-purpose industrial control computer and can be performed within the weekly maintenance window.
[0067] Using the above method, a risk assessment mechanism for cross-station parameter combinations was established in the buffer pairing stage where multiple parallel sub-assemblies converge into the main assembly line. Continuous measurements from end-of-line functional testing were used to mine cross-station parameter interaction patterns from historical data and create a comparison table. Combination risk scores were calculated in real-time before each pairing, and pairing schemes were replaced when necessary. This approach moves the quality interception point from the end of the production line to the sub-component pairing stage, reducing the probability of end-of-line functional testing anomalies caused by improper parameter combinations without tightening the individual acceptable range of each sub-station. This reduces rework costs associated with discovering problems only after final assembly.
[0068] Please see Figure 5 , Figure 5 This is a schematic block diagram of a cleaning equipment production line data acquisition and analysis system based on multi-station collaboration, as described in this application. Figure 5 As shown, the system includes: The data acquisition and association module 501 is used to collect key assembly parameters at each workstation of multiple parallel sub-assembly lines, bind each key assembly parameter with the identification code of the corresponding sub-component and store it to form the parameter record of each sub-component; record the pairing relationship when the sub-component enters the main assembly line, and associate the continuous measurement values of the end function test of the final product with the parameter record of each sub-component. The risk parameter comparison table construction module 502 is used to filter parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines based on the continuous measurement values and parameter records in historical production data, and construct a risk parameter comparison table. The pairing risk assessment module 503 is used to read the parameter records of each sub-component to be paired before the sub-component is paired from the cache area and sent into the main assembly line, calculate the risk score of each parameter pair according to the risk parameter comparison table, and compare the risk score with the corresponding risk judgment threshold. The alternative pairing module 504 is used to retrieve alternative sub-components in the corresponding cache area when the risk score reaches or exceeds the risk judgment threshold, select an alternative sub-component that makes the risk score lower than the risk judgment threshold to replace the original pairing scheme, and then send it to the main assembly line.
[0069] The implementation process of the functions and roles of each module in the above system is detailed in the implementation process of the corresponding steps in the above method, and will not be repeated here.
[0070] Figure 6 This is a schematic diagram of the structure of an electronic device according to one embodiment of this application. Figure 6 As shown, at the hardware level, the electronic device includes a processor 1102, an internal bus 1104, a network interface 1106, memory 1108, and non-volatile memory 1110, and may also include other hardware required for business operations. One or more embodiments of this specification can be implemented in software, for example, the processor 1102 reads the corresponding computer program from the non-volatile memory 1110 into the memory 1108 and then runs it. Of course, in addition to software implementation, one or more embodiments of this specification do not exclude other implementation methods, such as logic devices or a combination of hardware and software, etc. That is to say, the execution subject of the following processing flow is not limited to each logic module, but can also be hardware or logic devices.
[0071] Based on the same concept as the above-described method, this application also provides a machine-readable storage medium storing a plurality of computer instructions. When executed by a processor, these computer instructions can implement the multi-station collaborative cleaning equipment production line data acquisition and analysis method disclosed in the above examples of this application. The machine-readable storage medium can be any electronic, magnetic, optical, or other physical storage device, and can contain or store information such as executable instructions, data, etc.
[0072] Based on the same application concept as the above method, this application embodiment also provides a computer program product, which includes a computer program that, when executed by a processor, implements the multi-station collaborative cleaning equipment production line data acquisition and analysis method disclosed in the above examples of this application.
[0073] In the above embodiments, the descriptions of each embodiment have different focuses. Parts not described in detail in a certain embodiment can be referred to in the relevant descriptions of other embodiments. The above descriptions are merely preferred embodiments of this application and explanations of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in this application is not limited to the technical solutions formed by specific combinations of the above technical features, but should also cover other technical solutions formed by arbitrary combinations of the above technical features or their equivalent features without departing from the inventive concept.
Claims
1. A method for data acquisition and analysis of a cleaning equipment production line based on multi-station collaboration, characterized in that, include: Key assembly parameters are collected at each workstation on multiple parallel sub-assembly lines. Each key assembly parameter is bound to the identification code of the corresponding sub-component and stored to form the parameter record of each sub-component. The pairing relationship of the sub-components when they enter the main assembly line is recorded, and the continuous measurement values of the end function test of the final product are associated with the parameter record of each sub-component. Based on the continuous measurement values and parameter records in historical production data, parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines are screened, and a risk parameter comparison table is constructed. The selection of parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines includes: establishing a multiple linear regression model containing cross-sub-assembly line parameter interaction terms, using the continuous measured values as the dependent variable and parameters from each sub-assembly line as independent variables; performing a significance test on the regression coefficients of each cross-sub-assembly line parameter interaction term, and including the parameter pairs corresponding to the parameter interaction terms that pass the significance test in the risk parameter comparison table; the significance test simultaneously satisfies both statistical significance and engineering significance conditions; the statistical significance condition is that the t-test p-value of the interaction term regression coefficient is less than a preset statistical threshold; the engineering significance condition is that the estimated deviation of the interaction term regression coefficient from the continuous measured values when the parameters take the marginal values of the distribution exceeds a preset proportion of the specification margin, where the specification margin is the difference between the specification limit of the continuous measured values and the historical mean. Before sub-components are paired from the cache and sent to the main assembly line, the parameter records of each sub-component to be paired are read, the risk score of each parameter pair is calculated according to the risk parameter lookup table, and the risk score is compared with the corresponding risk judgment threshold. The risk judgment threshold is determined in the following way: products whose continuous measurement values of end function detection exceed the preset proportion of the specification limit are selected from historical production data and marked as high-risk samples; the risk score of each historical product is calculated retrospectively; the smallest candidate value that makes the detection rate of the high-risk samples not lower than the preset detection rate target is selected as the risk judgment threshold. When the risk score reaches or exceeds the risk determination threshold, a replacement sub-component is retrieved from the corresponding cache area, and a replacement sub-component that makes the risk score lower than the risk determination threshold is selected to replace the original pairing scheme before being sent to the main assembly line.
2. The method according to claim 1, characterized in that, The calculation of the risk score for each parameter pair based on the risk parameter lookup table includes: standardizing each key assembly parameter in the parameter record to obtain a standardized value; multiplying the interaction coefficient recorded in the risk parameter lookup table by the standardized values of the two parameters in the corresponding parameter pair, taking the absolute value of the product and dividing it by the specification margin of the corresponding continuous measurement value to obtain the risk score for the parameter pair.
3. The method according to claim 2, characterized in that, The standardization process is as follows: subtract the arithmetic mean of the parameter in historical production data from the original collected value of each key assembly parameter, and then divide by the standard deviation of the parameter in historical production data to obtain a dimensionless standardized value.
4. The method according to claim 1, characterized in that, The step of retrieving alternative sub-components in the corresponding cache includes: comparing the absolute values of the standardized values of the parameters on both sides of the parameter pair that triggered the risk score to reach or exceed the risk determination threshold; determining the sub-component with the larger standardized absolute value as the priority replacement object; calculating the risk score of each sub-component in the same category in the cache to which the sub-component belongs, after combining it with the other sub-components in the current pair, and selecting the candidate sub-component with a risk score lower than the risk determination threshold and the minimum value as the alternative sub-component.
5. The method according to claim 1, characterized in that, When there is no alternative sub-component in the cache that would cause the risk score to fall below the risk judgment threshold, the product corresponding to the current pairing scheme is marked as a key monitoring unit, and intermediate measurement is performed on the key monitoring unit at the intermediate inspection node of the main assembly line; when the intermediate measurement value exceeds the preset proportion of the corresponding specification limit, the key monitoring unit is transferred to offline re-inspection.
6. The method according to claim 1, characterized in that, The risk parameter lookup table is reconstructed according to a preset update cycle; during the update, the newly added pairing relationships and continuous measurement values of the end function detection in the most recent update cycle are included in the historical production data, and the screening step is re-executed to generate a new parameter pair list to replace the current risk parameter lookup table; Parameter pairs that fail the significance test in a series of consecutive preset update cycles are removed from the risk parameter lookup table.
7. A data acquisition and analysis system for a cleaning equipment production line based on multi-station collaboration, characterized in that, include: The data acquisition and association module is used to collect key assembly parameters at each workstation of multiple parallel sub-assembly lines, bind each key assembly parameter with the identification code of the corresponding sub-component and store it to form the parameter record of each sub-component; record the pairing relationship when the sub-component enters the main assembly line, and associate the continuous measurement values of the end function test of the final product with the parameter record of each sub-component. The risk parameter comparison table construction module is used to filter parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines based on the continuous measurement values and parameter records in historical production data, and construct a risk parameter comparison table. The selection of parameter pairs with significant interaction effects between parameters belonging to different sub-assembly lines includes: establishing a multiple linear regression model containing cross-sub-assembly line parameter interaction terms, using the continuous measured values as the dependent variable and parameters from each sub-assembly line as independent variables; performing a significance test on the regression coefficients of each cross-sub-assembly line parameter interaction term, and including the parameter pairs corresponding to the parameter interaction terms that pass the significance test in the risk parameter comparison table; the significance test simultaneously satisfies both statistical significance and engineering significance conditions; the statistical significance condition is that the t-test p-value of the interaction term regression coefficient is less than a preset statistical threshold; the engineering significance condition is that the estimated deviation of the interaction term regression coefficient from the continuous measured values when the parameters take the marginal values of the distribution exceeds a preset proportion of the specification margin, where the specification margin is the difference between the specification limit of the continuous measured values and the historical mean. The pairing risk assessment module is used to read the parameter records of each sub-component to be paired before the sub-components are paired from the buffer area and sent to the main assembly line. It calculates the risk score for each parameter pair based on the risk parameter lookup table and compares the risk score with the corresponding risk judgment threshold. The risk judgment threshold is determined as follows: products whose continuous measurement values for end-function testing exceed a preset proportion of the specification limit are selected from historical production data and marked as high-risk samples; the risk score of each historical product is calculated retrospectively; and the smallest candidate value that ensures the detection rate of the high-risk samples is not lower than a preset detection rate target is selected as the risk judgment threshold. The alternative pairing module is used to retrieve alternative sub-components from the corresponding cache area when the risk score reaches or exceeds the risk judgment threshold, select an alternative sub-component that makes the risk score lower than the risk judgment threshold to replace the original pairing scheme, and then send it to the main assembly line.
Citation Information
Patent Citations
Assembling process and assembling production line for single-row roller bearings used in pairs
CN110905928A
Building monitoring data accurate registration method based on space-time dynamic weight
CN119989837A