Full circle or half circle wind power mixed tower pipe piece heating and humidifying curing device and curing method

CN122975838APending Publication Date: 2026-10-27CHINA MCC22 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611330804.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-10-27

AI Technical Summary

Technical Problem

[0002]整圆或半圆风电混塔管片因为其体积大、重量大、对天车要求高,一般都是在室外进行预制生产,在冬季,因为室外温度较低,会导致混凝土凝结时间较长、混凝土早期强度增长较慢、自然养护管片强度增长慢等问题,从而影响模具周转和发货周期,同时也会出现因为保温做的不到位导致的外表面裂缝等问题,对管片质量有一定影响,如果裂缝严重再加上修补不到位,还可能会引起结构安全

Benefits of technology

本发明够实现自动设定并控制温湿度、自动感应温湿度、自动调节功率等多种功能,可以全方位模拟标准养护室温湿度条件,在冬季施工期间,它既可以对成型后拆模前的管片进行养护,缩短混凝土凝结时间,提高混凝土早期强度,缩短拆模时间,又可以在管片拆模之后对其进行标准养护,让冬季室外的管片强度也能稳定增长,同时也能根据需求调节温度和湿度,实现了自动化、智能化养护,养护效率明显提升,养护效果也更加好,因为此装置外表面覆盖一层保温棉篷布,可以起到非常好的保温效果,在冬施期间不仅能保证管片强度稳定增长,还能减少裂缝出现,对提升管片养护效果和表观质量具有重要作用。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122975838A_ABST
    Figure CN122975838A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of building construction, and especially relates to a whole circle or half circle wind power mixed tower pipe piece heating and humidifying maintenance device and a maintenance method, which comprises a horizontal support framework, a vertical support framework, a temperature sensor, a humidity sensor and a temperature and humidity controller; the horizontal support framework is fixed in a top circular ring of the vertical support framework; a tarpaulin hook is slidably connected below a ring-shaped pipe; an upper heat preservation cotton tarpaulin is fixed on the horizontal support framework, vertical heat preservation tarpaulins are hung on the tarpaulin hook, and the upper heat preservation cotton tarpaulin and the vertical heat preservation tarpaulins form airtight hollow spaces; a transformer is electrically connected with a silicon rubber heating belt, and the transformer is electrically connected with the temperature and humidity controller. The maintenance device is covered with a layer of heat preservation cotton tarpaulin, which can achieve very good heat preservation effect, can ensure stable growth of pipe piece strength during winter construction, can reduce crack occurrence, and has an important role in improving pipe piece maintenance effect and apparent quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of building construction, and in particular to a heating and humidification curing device and method for full-circle or semi-circular wind power hybrid tower segments. Background Technology

[0002] Because of their large size, weight, and high requirements for overhead cranes, full-circle or semi-circular wind turbine tower segments are generally prefabricated outdoors. In winter, the low outdoor temperature leads to problems such as longer concrete setting time, slower early strength development of concrete, and slower strength development of naturally cured segments. This affects mold turnover and delivery cycle. At the same time, problems such as surface cracks due to inadequate insulation may also occur, which have a certain impact on the quality of the segments. If the cracks are severe and not repaired properly, it may even cause structural safety issues. Summary of the Invention

[0003] To address the problems existing in the prior art, the present invention provides a heating and humidification curing device and method for full-circle or semi-circular wind power hybrid tower segments.

[0004] On the one hand, the present invention provides a heating and humidification curing device for full-circle or semi-circular wind power hybrid tower segments, which adopts the following technical solution: A heating and humidification maintenance device for a full-circle or semi-circular wind power hybrid tower segment includes a horizontal support frame, a vertical support frame, a temperature sensor, a humidity sensor, and a temperature and humidity controller. The vertical support frame includes multiple vertical steel pipes arranged in a cylindrical shape, with rings fixed at the top and bottom of each vertical steel pipe. The horizontal support frame is fixed inside the top ring of the vertical support frame; An annular tube is provided around the upper ring of the vertical support frame, and a tarpaulin hook is slidably connected to the lower part of the annular tube. The tarpaulin hook can slide along the circumference of the annular tube. An upper thermal insulation tarpaulin is fixed to the horizontal support frame. The edge of the upper thermal insulation tarpaulin hangs down. A vertical thermal insulation tarpaulin is hung on the tarpaulin hook. The vertical thermal insulation tarpaulin surrounds the outside of the vertical support frame. The upper thermal insulation tarpaulin and the vertical thermal insulation tarpaulin form a closed hollow space. The temperature sensor and humidity sensor are fixed at the bottom of the horizontal support frame, and both the temperature sensor and humidity sensor are electrically connected to the temperature and humidity controller. A heating belt fixing plate is fixed on the vertical support frame, a silicone rubber heating belt is fixed on the heating belt fixing plate, a transformer is fixed on the vertical support frame, the transformer is electrically connected to the silicone rubber heating belt, and the transformer is electrically connected to the temperature and humidity controller. A humidifier interface is fixed on the outer wall of the bottom ring of the vertical support frame, and multiple moisture outlets are opened on the ring.

[0005] Optionally, the horizontal support frame is a hexagonal frame with connecting steel pipes set at the diagonals of the hexagon. Both the horizontal and vertical support frames are made of hollow stainless steel pipes.

[0006] Optionally, the top of the horizontal support frame is fixed with a suspension point that passes through the upper thermal insulation tarpaulin.

[0007] Optionally, a connecting rod is fixed between the inner wall of the annular tube and the outer wall of the upper circular ring of the vertical support frame. The upper thermal insulation cotton tarpaulin hangs down after passing over the annular tube, and the bottom of the hanging edge of the upper thermal insulation cotton tarpaulin is lower than the height of the tarpaulin hook.

[0008] Optionally, the vertical insulation tarpaulin has a break in the vertical height direction, and a zipper is installed at the break. When the zipper is pulled open, the vertical insulation tarpaulin can move along the annular tube, thereby allowing the vertical insulation tarpaulin to be opened and closed.

[0009] Optionally, the humidifier interface is for connecting an external humidifier, and the moisture reaches the interior of the sealed hollow space through the moisture outlet.

[0010] On the other hand, the present invention also discloses a maintenance method for a heating and humidifying maintenance device for a full-circle or semi-circle wind power hybrid tower segment, including a maintenance step before demolding after molding and an outdoor maintenance step after demolding. The curing steps after molding and before demolding include: S1: After the cast-in-place round or semi-circular wind turbine hybrid tower segments are finished, the surface is covered with geotextile so that the geotextile wraps the entire mold. S2: Hoist the curing device onto the mold that needs curing, covering the entire mold; S3: Pull the vertical insulation tarpaulin to cover the entire area and ensure it is tightly closed; S4: Connect the power supply, set the curing temperature and curing time, and start the curing process; S5: During the maintenance process, the temperature and humidity controller controls the transformer to adjust the power by transmitting the temperature signal and the rate of temperature increase through the temperature sensor, thereby controlling the rate of temperature increase. When the temperature exceeds the set temperature by 2°C, the controller controls the transformer to cut off the power and stop heating. When the temperature is 2°C lower than the set temperature, the controller controls the transformer to reheat, and the cycle repeats. S6: After the curing is completed, wait until the temperature stabilizes and stops dropping, then remove the curing device and cover the mold with plastic sheeting. S7: Demolding should be performed after the temperature drops to room temperature; Outdoor maintenance steps after demolding include: T1: Cover the demolded full or semi-circular wind turbine hybrid tower segments with geotextile and transport them to the parking area; T2: Hoist the curing device above the tunnel lining segments to completely cover them; T3: Pull the vertical insulation tarpaulin to cover the entire area and ensure it is tightly closed; T4: Connect the power supply, set the temperature to 20±2℃ and the humidity to ≥95%, and start the curing process; T5: After curing to the specified age, turn off the power to end the curing process; T6: Uncover the vertical insulation tarpaulin and allow the tunnel lining segments to cool to ambient temperature before hoisting away the curing equipment.

[0011] Compared with the prior art, the present invention has the following technical effects: This invention enables automatic setting and control of temperature and humidity, automatic sensing of temperature and humidity, and automatic power adjustment, among other functions. It can comprehensively simulate standard curing temperature and humidity conditions. During winter construction, it can both cure the pipe segments after molding and before demolding, shortening the concrete setting time, improving the early strength of the concrete, and shortening the demolding time, and perform standard curing after demolding, ensuring stable strength growth of the pipe segments outdoors in winter. It can also adjust temperature and humidity as needed, achieving automated and intelligent curing, significantly improving curing efficiency and effectiveness. Because the outer surface of the device is covered with a layer of insulating cotton tarpaulin, it provides excellent insulation, ensuring stable strength growth of the pipe segments during winter construction and reducing cracking, playing a crucial role in improving the curing effect and appearance quality of the pipe segments. Attached Figure Description

[0012] Figure 1 This is a front view of the structure of the present invention; Figure 2 This is a top view of the structure of the present invention.

[0013] Explanation of reference numerals in the attached drawings: 1. Vertical support frame; 2. Horizontal support frame; 3. Temperature sensor; 4. Humidity sensor; 5. Temperature and humidity controller; 6. Ring tube; 7. Heating belt fixing plate; 8. Silicone rubber heating belt; 9. Transformer; 10. Power connector; 11. Humidifier interface; 12. Moisture outlet; 13. Tarpaulin hook; 14. Hanging point; 15. Connecting rod. Detailed Implementation

[0014] The following is in conjunction with the appendix Figure 1 - Appendix Figure 2 The present invention will be described in further detail below.

[0015] Reference Figure 1 and Figure 2This invention discloses a heating and humidification maintenance device for the segments of a circular or semi-circular wind turbine tower, comprising a horizontal support frame 2, a vertical support frame 1, a temperature sensor 3, a humidity sensor 4, and a temperature and humidity controller 5. The vertical support frame 1 includes multiple vertical steel pipes arranged in a cylindrical shape, with rings fixed at both the top and bottom of each pipe. The horizontal support frame 2 is a hexagonal frame with connecting steel pipes arranged diagonally across the hexagon. The horizontal support frame 2 is fixed within the top ring of the vertical support frame 1. Both the horizontal support frame 2 and the vertical support frame 1 are made of hollow stainless steel tubing. A suspension point 14 is fixed to the top of the horizontal support frame 2.

[0016] An annular tube 6 is provided around the outer perimeter of the upper ring of the vertical support frame 1. A connecting rod 15 is fixed between the inner wall of the annular tube 6 and the outer wall of the upper ring of the vertical support frame 1. A tarpaulin hook 13 is slidably connected to the lower part of the annular tube 6, and the tarpaulin hook 13 can slide along the circumference of the annular tube 6. An upper thermal insulation tarpaulin is fixed on the horizontal support frame 2. The edge of the upper thermal insulation tarpaulin hangs down, passing over the annular tube 6 and hanging down. The bottom of the hanging edge of the upper thermal insulation tarpaulin is lower than the height of the tarpaulin hook 13. The hanging point 14 passes through the upper thermal insulation tarpaulin.

[0017] A vertical insulation tarpaulin is hung on tarpaulin hook 13, and the vertical insulation tarpaulin surrounds the vertical support frame 1. The vertical insulation tarpaulin has a break in its vertical direction, and a zipper is installed at the break. Pulling the zipper allows the vertical insulation tarpaulin to move along the annular pipe 6, thus enabling it to open and close. The upper insulation tarpaulin and the vertical insulation tarpaulin form a sealed hollow space. In use, the completed wind turbine tower segment insulation tarpaulin is covered.

[0018] Temperature sensor 3 and humidity sensor 4 are fixed at the bottom of the horizontal support frame 2. Temperature and humidity controller 5 can be installed on the vertical support frame 1. Temperature sensor 3 and humidity sensor 4 are both electrically connected to temperature and humidity controller 5. Heating belt fixing plate 7 is fixed on the vertical support frame 1. Silicone rubber heating belt 8 is fixed on heating belt fixing plate 7. Transformer 9 is fixed on the vertical support frame 1. Transformer 9 is electrically connected to silicone rubber heating belt 8 and temperature and humidity controller 5. Power connector 10 is connected to transformer 9.

[0019] A humidifier interface 11 is fixed to the outer wall of the bottom ring of the vertical support frame 1. Multiple moisture outlets 12 are provided on the ring, and an external humidifier can be connected to the humidifier interface 11. Moisture can reach the entire interior of the space through the moisture outlets 12. A display screen is installed on the temperature and humidity controller 5. When the humidity is low, staff can turn on the humidifier to increase the humidity inside the insulation tarpaulin.

[0020] The temperature and humidity controller 5 in this patent can set the curing temperature, humidity and curing time. The temperature and humidity controller 5 can control the transformer 9 through the temperature signal and temperature increase rate transmitted by the temperature sensor 3, thereby adjusting the power and controlling the temperature rise rate. When the temperature exceeds the set temperature by 2°C, the transformer 9 can be controlled to cut off the power and stop heating. When the temperature is below 2°C, it can be reheated, and the cycle can be repeated.

[0021] This invention also discloses a maintenance method for a heating and humidification maintenance device for full-circle or semi-circular wind turbine hybrid tower segments: Curing after molding and before demolding 1. After the cast-in-place circular or semi-circular wind turbine tower segments are completed, the finishing process is finished and geotextile is applied, ensuring the geotextile completely covers the mold. 2. Use an overhead crane to hang the lifting point 14 and hoist the curing device onto the mold to be cured, covering the entire mold. 3. Pull the vertically movable insulating cotton tarpaulin to cover the entire area, ensuring a tight seal. 4. Connect the power connector 10, set the curing temperature and time, and begin curing. 5. During the entire curing process, the temperature and humidity controller 5, through the temperature signal and temperature increase rate transmitted by the temperature sensor 3, controls the transformer 9 to adjust the power, thereby controlling the temperature rise rate. When the temperature exceeds the set temperature by 2°C, the transformer 9 can be controlled to cut off the power and stop heating. When the temperature drops below 2°C, it can be reheated, repeating the cycle. 6. After curing, do not remove the curing device directly. Wait until the temperature stabilizes and stops decreasing before removing the curing device and immediately cover the mold with plastic sheeting. 7. After the temperature drops to room temperature, proceed with the subsequent demolding work.

[0022] Outdoor curing after demolding 1. After demolding, the full or semi-circular wind turbine tower segments are covered with geotextile and transported to the parking area; 2. Hoist this curing device above the segments and completely cover them; 3. Pull the vertically movable insulating cotton tarpaulin to cover the entire area, ensuring a tight seal; 4. Connect the power supply, set the temperature to 20±2℃ and the humidity to ≥95%, and begin curing; 5. After curing to the specified age, turn off the power supply to end the curing process; 6. Uncover the vertically movable insulating cotton tarpaulin to allow the segments inside to cool to ambient temperature, and then hoist the entire curing device away.

[0023] This invention patent can provide curing services for different stages of the forming of full-circle or semi-circle wind turbine hybrid tower segments during winter construction, namely curing before and after demolding. While achieving excellent curing results, it can also completely simulate the standard curing temperature and humidity conditions, providing standard curing for outdoor segments during winter construction. This is extremely beneficial for strength growth and crack prevention, resulting in excellent curing effects. Furthermore, it has multiple functions such as automatic setting and control of temperature and humidity, automatic temperature and humidity sensing, and automatic power adjustment, realizing the automation of segment curing. This is of great significance for promoting the automation and intelligent curing of this emerging component.

[0024] The above are all preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, all equivalent changes made in accordance with the structure, shape and principle of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A heating and humidification curing device for full-circle or semi-circular wind turbine hybrid tower segments, characterized in that: It includes a horizontal support frame (2), a vertical support frame (1), a temperature sensor (3), a humidity sensor (4), and a temperature and humidity controller (5). The vertical support frame (1) includes multiple vertical steel pipes, which are arranged in a cylindrical shape. The top and bottom of the vertical steel pipes are fixed with rings. The horizontal support frame (2) is fixed inside the top ring of the vertical support frame (1); A ring tube (6) is provided around the upper ring of the vertical support frame (1), and a tarpaulin hook (13) is slidably connected to the lower part of the ring tube (6). The tarpaulin hook (13) can slide along the circumference of the ring tube (6). The upper insulation cotton tarpaulin is fixed on the horizontal support frame (2). The edge of the upper insulation cotton tarpaulin hangs down. The vertical insulation tarpaulin is hung on the tarpaulin hook (13). The vertical insulation tarpaulin surrounds the outside of the vertical support frame (1). The upper insulation cotton tarpaulin and the vertical insulation tarpaulin form a closed hollow space. Temperature sensor (3) and humidity sensor (4) are fixed at the bottom of the horizontal support frame (2), and both temperature sensor (3) and humidity sensor (4) are electrically connected to temperature and humidity controller (5). A heating belt fixing plate (7) is fixed on the vertical support frame (1), a silicone rubber heating belt (8) is fixed on the heating belt fixing plate (7), a transformer (9) is fixed on the vertical support frame (1), the transformer (9) is electrically connected to the silicone rubber heating belt (8), and the transformer (9) is electrically connected to the temperature and humidity controller (5). A humidifier interface (11) is fixed on the outer wall of the bottom ring of the vertical support frame (1), and multiple moisture outlets (12) are opened on the ring.

2. The heating and humidification curing device for full-circle or semi-circular wind power hybrid tower segments according to claim 1, characterized in that: The horizontal support frame (2) is a hexagonal frame with connecting steel pipes set at the diagonal of the hexagon. Both the horizontal support frame (2) and the vertical support frame (1) are made of hollow stainless steel pipes.

3. The heating and humidification curing device for full-circle or semi-circular wind power hybrid tower segments according to claim 1, characterized in that: The top of the horizontal support frame (2) is fixed with a hanging point (14), which passes through the upper thermal insulation cotton tarpaulin.

4. The heating and humidification curing device for full-circle or semi-circular wind power hybrid tower segments according to claim 1, characterized in that: A connecting rod (15) is fixed between the inner wall of the annular tube (6) and the outer wall of the upper circular ring of the vertical support frame (1). The upper thermal insulation cotton tarpaulin hangs down after passing over the annular tube (6), and the bottom of the hanging edge of the upper thermal insulation cotton tarpaulin is lower than the height of the tarpaulin hook (13).

5. The heating and humidification curing device for full-circle or semi-circular wind power hybrid tower segments according to claim 1, characterized in that: The vertical insulation tarpaulin has a break in the vertical height direction, and a zipper is installed at the break. When the zipper is pulled open, the vertical insulation tarpaulin can move along the annular pipe (6), so that the vertical insulation tarpaulin can be opened and closed.

6. The heating and humidification protection device for full-circle or semi-circular wind power hybrid tower segments according to claim 1, characterized in that: The humidifier interface (11) is used to connect an external humidifier, and the moisture reaches the interior of the sealed hollow space through the moisture outlet (12).

7. A maintenance method using the heating and humidification curing device for full-circle or semi-circular wind turbine hybrid tower segments according to any one of claims 1 to 6, characterized in that, This includes the curing steps before demolding after molding and the outdoor curing steps after demolding; The curing steps after molding and before demolding include: S1: After the cast-in-place round or semi-circular wind turbine hybrid tower segments are finished, the surface is covered with geotextile so that the geotextile wraps the entire mold. S2: Hoist the curing device onto the mold that needs curing, covering the entire mold; S3: Pull the vertical insulation tarpaulin to cover the entire area and ensure it is tightly closed; S4: Connect the power supply, set the curing temperature and curing time, and start the curing process; S5: During the maintenance process, the temperature and humidity controller (5) controls the transformer (9) to adjust the power through the temperature signal and temperature growth rate transmitted by the temperature sensor (3), thereby controlling the temperature rise rate. When the temperature exceeds the set temperature by 2°C, the transformer (9) is controlled to cut off the power and stop heating. When the temperature is lower than the set temperature by 2°C, the transformer (9) is controlled to reheat, and the cycle repeats. S6: After the curing is completed, wait until the temperature stabilizes and stops dropping, then remove the curing device and cover the mold with plastic sheeting. S7: Demolding should be performed after the temperature drops to room temperature; Outdoor maintenance steps after demolding include: T1: Cover the demolded full or semi-circular wind turbine hybrid tower segments with geotextile and transport them to the parking area; T2: Hoist the curing device above the tunnel lining segments to completely cover them; T3: Pull the vertical insulation tarpaulin to cover the entire area and ensure it is tightly closed; T4: Connect the power supply, set the temperature to 20±2℃ and the humidity to ≥95%, and start the curing process; T5: After curing to the specified age, turn off the power to end the curing process; T6: Uncover the vertical insulation tarpaulin and allow the tunnel lining segments to cool to ambient temperature before hoisting away the curing equipment.