A three-dimensional warehouse system for storing and sorting prefabricated building decoration raw materials

CN122977003APending Publication Date: 2026-10-27CHINA STATE CONSTR HAILONG TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611270854.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-10-27

AI Technical Summary

Technical Problem

鉴于现有技术的上述缺点、不足,本发明提供一种存储与分拣装配式建筑装修原材料的立体仓库系统,从而解决了由于托盘兼容性不足影响仓储效率甚至构成生产安全事故隐患的技术问题

Benefits of technology

本发明的一种存储与分拣装配式建筑装修原材料的立体仓库系统,由于设置了货架和堆垛机系统,且在货架中设置了尺寸不同的至少一列第一货格、至少一列第二货格和至少一列第三货格以及尺寸与其相匹配的第一托盘、A支架托盘、第二托盘和第三托盘。其中,A支架托盘的高度大于第一托盘、第二托盘和第三托盘的高度,将其单独设为一列第二货格。堆垛机系统包括堆垛机,堆垛机上并列设置有多个独立伸缩的货叉,伸出的货叉的跨度能够适配于第一托盘、A支架托盘、第二托盘和第三托盘的长度。相对于现有技术而言,其实现了能够用不同的货格兼容多规格托盘,而且,其中的A支架托盘适配超高原材料,能够将其高位隔离分区存储,避免干涉,保障高位作业安全,相应地,取货的堆垛机能够匹配运输多规格托盘,全规格覆盖装修原材料,适配性极强。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122977003A_ABST
    Figure CN122977003A_ABST
Patent Text Reader

Abstract

The present application belongs to the technical field of prefabricated building warehouse logistics, and particularly relates to a three-dimensional warehouse system for storing and sorting prefabricated building decoration raw materials. The rack of the system comprises at least one column of first storage compartments, at least one column of second storage compartments, at least one column of third storage compartments, and first pallets, A support pallets, second pallets and third pallets with decreasing lengths and consistent widths, and the height of the A support pallets is higher than that of the other pallets; the stacker of the stacker system is provided with multiple independently telescopic forks, and the span of the extended forks can be adapted to the length of the first pallets, the A support pallets, the second pallets and the third pallets. Therefore, the system can be compatible with multiple specifications of pallets with different storage compartments, and the A support pallets in the system are adapted to ultra-high raw materials, which can be stored in high-position isolated partitions to ensure the safety of high-position operation, and the stacker for taking goods can match the transportation of multiple specifications of pallets, and the adaptability is extremely strong.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of prefabricated building warehousing and logistics technology, and in particular relates to a three-dimensional warehouse system for storing and sorting prefabricated building decoration raw materials. Background Technology

[0002] In the production process of prefabricated building decoration components, raw material warehousing management is a key link connecting prefabrication and on-site assembly. Currently, the industry commonly uses high-rise automated warehouses (AS / RS) as transit and buffer units to automate the supply of decoration raw materials from suppliers to production line workstations. These AS / RS typically consist of racking systems, stacker cranes or shuttle cars, and a warehouse management system (WMS). Through preset storage code and aisle operation logic, they complete the automatic inbound and outbound of raw materials and inventory management.

[0003] However, existing automated warehouse (AS / RS) storage compartments are mostly designed with fixed spacing and uniform height, capable of holding only one or two industry-standard pallets. When incoming materials involve multiple pallet sizes, they can only be simply mixed together in the same compartment. This mixed placement not only disrupts the WMS's preset compartment logic but also requires manual intervention for confirmation in every inbound and outbound operation, significantly reducing the continuity of automated operations. Furthermore, due to the mixed pallet sizes, sensor signals detecting the outlines of goods often misinterpret or overlap, causing the system-recorded storage location coordinates to deviate from the actual physical location. This leads to difficulties in raw material traceability and discrepancies between inventory records and actual stock, forcing companies to conduct frequent full inventory checks, consuming significant manpower and time.

[0004] Furthermore, if the pallets delivered to the automated storage and retrieval system (AS / RS) are too high, they are highly susceptible to mechanical interference with the upper-level equipment. This can range from minor scratches and damage to packaging to more serious issues such as deformation of the stacker crane forks or even rack collapse, posing a significant safety hazard. Therefore, existing AS / RS systems are no longer adequate for the current needs of the prefabricated building decoration industry for flexible and intelligent warehousing. Summary of the Invention

[0005] (a) Technical problems to be solved In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides an automated warehouse system for storing and sorting prefabricated building decoration raw materials, thereby solving the technical problem that insufficient pallet compatibility affects storage efficiency and even poses a potential production safety hazard.

[0006] (II) Technical Solution To achieve the above objectives, the main technical solutions adopted by the present invention include: This invention provides an automated warehouse system for storing and sorting prefabricated building decoration raw materials, including racks and a stacker crane system. The racks include at least one first rack, at least one second rack, and at least one third rack. The automated warehouse system also includes a first pallet, an A-bracket pallet, a second pallet, and a third pallet with successively decreasing lengths and uniform widths. The height of the A-bracket pallet is greater than the height of the first, second, and third pallets. The dimensions of the first rack are adapted to accommodate the first pallet, the dimensions of the second rack are adapted to accommodate the A-bracket pallet, and the dimensions of the third rack are adapted to accommodate either the second or third pallet. The stacker crane system includes a stacker crane, which is movable along the extension direction of the racks. The movement space of the stacker crane forms an aisle, and the racks are arranged on both sides of the aisle. The stacker crane is equipped with multiple independently telescopic forks arranged in parallel, and the span of the extended forks is adapted to the length of the first, A-bracket, second, and third pallets.

[0007] Furthermore, one end of the shelf has two rows of first shelves, the other end of the shelf has one row of first shelves, the other end of the shelf has one row of second shelves adjacent to the first shelves, and the middle of the shelf between the two ends has multiple rows of third shelves.

[0008] Furthermore, the automated warehouse system also includes a first pallet, a second pallet, and a third pallet. The first pallet includes a first pallet body, and the first pallet includes a first pallet body and a first perimeter fence surrounding the first pallet body. The A-frame pallet includes a second pallet body and an A-frame on the second pallet body. The second pallet includes a second pallet body, and the second pallet includes a second pallet body and a second perimeter fence surrounding the second pallet body. The third pallet includes a third pallet body, and the third pallet includes a third pallet body and a third perimeter fence surrounding the third pallet body. The dimensions of the first storage compartment are also adapted to accommodate the first pallet, and the dimensions of the third storage compartment are also adapted to accommodate the second or third pallet.

[0009] Furthermore, the shelving system comprises three levels along its height, which can be aligned with the heights of the first, second, and third floors of the factory building, respectively. The first floor, on the side furthest from the factory building, has a first, second, and third entry point. The first entry point is for the first pallet and first material frame; the second entry point is for the A-bracket pallet, the second pallet, and the second material frame; and the third entry point is for the third pallet and the third material frame. The first, second, and third floors, on the side closest to the factory building, each have a first exit point. The second and third exit ports are as follows: the first exit port is used for the first pallet and the first material frame to exit; the second exit port is used for the A-bracket pallet, the second pallet, and the second material frame to exit; and the third exit port is used for the third pallet and the third material frame to exit. The first, second, and third entry ports, the first, second, and third exit ports on the first floor of the racking are used to connect with AGVs for automated inbound and outbound operations. The first, second, and third exit ports on the second and third floors of the racking are used to connect with forklifts for outbound operations.

[0010] Furthermore, a first pallet unpacking machine is installed on one side of the first inbound and first outbound entrances, a second pallet unpacking machine is installed on one side of the second inbound and second outbound entrances, and a third pallet unpacking machine is installed on one side of the third inbound and third outbound entrances. AGVs automatically dock with the first, second, and third pallet unpacking machines on the first floor of the racking system to complete outbound or return operations, while forklifts automatically dock with the first, second, and third pallet unpacking machines on the second and third floors of the racking system to complete outbound or return operations.

[0011] Furthermore, the first, second, and third floors of the racking system are equipped with picking loops on the side closest to the factory building, which are shared by the third pallet and the third material box. The stacker crane is slidably installed on the ground rail in the stacker crane pit, allowing the stacker crane to move laterally along the ground rail. The stacker crane pit is 600-1000mm lower than the ground. The first-level picking height of the racking system is 200-600mm, which is consistent with the height of the worker's platform next to the picking loop.

[0012] Furthermore, the stacker crane also includes a loading platform and columns located at both ends of the loading platform. The loading platform and the columns are slidably connected, allowing the loading platform to move up and down along the columns, and the columns to move laterally along the ground rails. Multiple forks are located at the bottom of the loading platform and are symmetrical about the center line of the loading platform.

[0013] Furthermore, the first, second, and third inbound ports, the first, second, and third outbound ports, as well as the outbound and return ports of the picking loop, are all equipped with ground scales, shape inspection stations, and barcode readers. This ensures that the raw materials carried by the first pallet, first material frame, A-bracket pallet, second pallet, second material frame, third pallet, and third material frame during inbound and outbound operations, as well as during outbound and return operations of the picking loop, all meet the rated load and dimensions of the corresponding storage compartment.

[0014] Furthermore, the dimensions of the third storage compartment are capable of accommodating two third pallets and / or third material frames; when the first third pallet and / or third material frame carries raw materials into the third storage compartment, the weight is identified by a ground scale, and it is determined that the weight of the raw materials carried by the second third pallet and / or third material frame is less than or equal to the difference between the rated load of the third storage compartment and the weight of the raw materials carried by the first third pallet or third material frame.

[0015] Furthermore, the shelves on both sides of the aisle are arranged in two rows. The row of shelves closer to the aisle is used to place high-frequency raw materials, while the row of shelves further away from the aisle is used to place low-frequency raw materials.

[0016] (III) Beneficial Effects The beneficial effects of this invention are: This invention discloses an automated warehouse system for storing and sorting prefabricated building decoration raw materials. It incorporates racking and a stacker crane system. The racking includes at least one row of first, second, and third storage compartments of different sizes, along with matching first, A-frame, second, and third pallets. The A-frame pallets are taller than the first, second, and third pallets, and are thus housed as a separate second storage compartment. The stacker crane system includes a stacker crane with multiple independently extendable forks arranged in parallel. The span of the extended forks is adapted to the lengths of the first, A-frame, second, and third pallets. Compared to existing technologies, this system allows for the use of different storage compartments to accommodate multiple pallet sizes. Furthermore, the A-frame pallets are suitable for storing extra-tall raw materials, enabling high-level isolated storage to avoid interference and ensure safety during high-level operations. Correspondingly, the stacker crane can transport pallets of various sizes, covering all specifications of decoration raw materials, demonstrating strong adaptability. Attached Figure Description

[0017] Figure 1 Elevation view of an automated warehouse system for storing and sorting prefabricated building decoration raw materials; Figure 2 Cross-sectional view of an automated warehouse system for storing and sorting prefabricated building decoration raw materials; Figure 3 Floor plan of an automated warehouse system for storing and sorting prefabricated building decoration raw materials; Figure 4 for Figure 3 A magnified view of part A in the diagram; Figure 5 Floor plan of the second or third floor of an automated warehouse system for storing and sorting prefabricated building decoration raw materials; Figure 6 This is a schematic diagram of the stacker crane. Figure 7 This is a schematic diagram of the structure of the first tray; Figure 8 This is a schematic diagram of the structure of the first material frame; Figure 9 This is a structural diagram of the A-bracket tray; Figure 10 This is a schematic diagram of the third tray; Figure 11 This is a schematic diagram of the third material frame; Figure 12 This is a schematic diagram of the fourth tray; Figure 13 This is a schematic diagram of the fourth material frame.

[0018] [Explanation of Labels in the Attached Image] 110: Shelf; 1101: First shelf compartment; 1102: Second shelf compartment; 1103: Third shelf compartment; 120: Stacker crane system; 1201: Stacker crane; 12011: Forks; 12012: Loading platform; 12013: Column; 1202: Stacker crane pit; 1203: Ground rail; 1301: First pallet; 13011: First pallet body; 1302: A-bracket pallet; 13021: Second pallet body; 13022: A-bracket; 1303: Second pallet; 1304: Third pallet; 13041: Third pallet body; 1305: First material frame; 13051: First enclosure net; 1306: Second material frame; 13061: Second enclosure net; 1307: Third material frame; 13071: Third enclosure net; 140: Lane; 1501: First inbound port; 1502: Second inbound port; 1503: Third inbound port; 1504: First outbound port; 1505: Second outbound port; 1506: Third outbound port; 1701: First destacking and stacking machine; 1702: Second destacking and stacking machine; 1703: Third destacking and stacking machine; 180: Picking loop; 1901: Ground scale; 1902: Appearance inspection station; 1903: Barcode reader; 200: Factory building; 210: First floor of factory building; 220: Second floor of factory building; 230: Third floor of factory building. Detailed Implementation

[0019] To better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the present invention can be understood more clearly and thoroughly, and that the scope of the present invention can be fully conveyed to those skilled in the art.

[0020] like Figure 1-13 As shown, this invention provides an automated warehouse system for storing and sorting raw materials for prefabricated building decoration, such as... Figure 1 As shown, the system includes a rack 110, a stacker crane system 120, a first pallet 1301, a first storage rack 1305, an A-bracket pallet 1302, a second pallet 1303, a second storage rack 1306, a third pallet 1304, and a third storage rack 1307. The rack 110 includes at least one row of first storage racks 1101, at least one row of second storage racks 1102, and at least one row of third storage racks 1103. Pallets are typically used to carry goods weighing over 1 ton or with a large volume, as well as raw materials that will not scatter during transport and palletized raw materials. Storage racks are typically used to carry small to medium-sized, lighter goods or parts, generally weighing less than 25 kg, as well as raw materials that are easily scattered during transport.

[0021] like Figure 7-13 As shown, the lengths of the first pallet 1301, the A-bracket pallet 1302, the second pallet 1303, and the third pallet 1304 decrease sequentially while their widths are the same. The height of the A-bracket pallet 1302 is greater than the heights of the first pallet 1301, the second pallet 1303, and the third pallet 1304, which is suitable for high-quality raw materials.

[0022] Specifically, the first pallet 1301 includes a first pallet body 13011, the first material frame 1305 includes the first pallet body 13011 and a first enclosure net 13051 surrounding the first pallet body 13011, the A-bracket pallet 1302 includes a second pallet body 13021 and an A-bracket 13022 disposed on the second pallet body 13021, the second pallet 1303 includes the second pallet body 13021, the second material frame 1306 includes the second pallet body 13021 and a second enclosure net 13061 surrounding the second pallet body 13021, the third pallet 1304 includes the third pallet body 13041, and the third material frame 1307 includes the third pallet body 13041 and a third enclosure net 13071 surrounding the third pallet body 13041.

[0023] In this embodiment, the height of the shelf 110 is 3800-4000mm, the length of the first pallet 1301 is 3650±100mm, the width is 1250±100mm, and the height is 175±100mm, the length of the A-bracket pallet 1302 is 2450±100mm, the width is 1250±100mm, and the height is 2385±100mm, the length of the second pallet 1303 is 2450±100mm, the width is 1250±100mm, and the height is 175±100mm, the length of the third pallet 1304 is 1250±100mm, the width is 1250±100mm, and the height is 175±100mm, and the height of the first fence 13051, the second fence 13061, and the third fence 13071 are all 1100±100mm.

[0024] The first storage compartment 1101 is sized to accommodate a first pallet 1301 and a first material frame 1305. One first storage compartment 1101 can hold only one first pallet 1301 or one first material frame 1305. The second storage compartment 1102 is sized to accommodate an A-bracket pallet 1302. Only one second storage compartment 1102 can hold only one A-bracket pallet 1302, isolating the highest A-bracket pallet 1302 within a row of storage compartments as a dedicated high-level storage compartment to avoid interference with upper-level equipment. The third storage compartment 1103 is sized to accommodate a second pallet 1303, a third pallet 1304, a second material frame 1306, or a third material frame 1307. One third storage compartment 1103 can hold only one second pallet 1303 or one second material frame 1306, or two third pallets 1304 or two third material frames 1307.

[0025] It should be noted that the number of the first pallet 1301, the second pallet 1303 and the third pallet 1304 placed in the first storage compartment 1101 and the third storage compartment 1103 respectively is calculated horizontally. Multiple pallets can be stacked vertically to save storage compartments.

[0026] Preferably, such as Figure 1As shown, one end of the rack 110 has two rows of first storage compartments 1101, and the other end of the rack 110 has one row of first storage compartments 1101. The other end of the rack 110 has a row of second storage compartments 1102 located adjacent to the first storage compartments 1101. Multiple rows of third storage compartments 1103 are arranged in the middle of the rack 110 between the two ends. Because the stacker crane 1201 needs to move to the center of the storage compartment when retrieving goods to ensure stable pallet / frame loading, when the stacker crane 1201 wants to retrieve a pallet / frame from a storage compartment at the end of the rack 110, it will move a portion of the rack 110 to align with the center of the storage compartment. The greater the length of the storage compartments at both ends of the rack 110, the smaller the portion of the stacker crane 1201 moves out of the rack 110. Therefore, the ground rail 1203 under the stacker crane 1201 can be shortened. Thus, the first storage compartments 1101 are arranged at the ends of the rack 110.

[0027] The rated load capacity of the first storage compartment 1101, the second storage compartment 1102, the third storage compartment 1103, the first pallet 1301, the first material frame 1305, the A-bracket pallet 1302, the second pallet 1303, the second material frame 1306, the third pallet 1304, and the third material frame 1307 is 3 tons.

[0028] In this embodiment, the first tray 1301 can store boards and pipes, the A-bracket tray 1302 can store ultra-high aluminum windows, the second tray 1303 can store boards and stone, and the third tray 1304 can store tiles and toilets.

[0029] It should be noted that ultra-high aluminum windows can only be stored using A bracket tray 1302, while the storage type of other raw materials can be adjusted as needed.

[0030] like Figure 1 , Figure 2 , Figure 3 , Figure 5 As shown, the stacker crane system 120 includes a stacker crane 1201, which is slidably installed on a ground rail 1203 in a stacker crane pit 1202, allowing the stacker crane 1201 to move laterally along the ground rail 1203. The stacker crane 1201 is moved along the extension direction of the rack 110, and the movement space of the stacker crane 1201 forms an aisle 140. The rack 110 is arranged on both sides of the aisle 140.

[0031] Preferably, in order to improve storage density and access efficiency, the shelving 110 is designed as a double-deep unit, that is, the shelving 110 on both sides of the aisle 140 is provided with two rows. Among them, the row of shelving 110 closer to the aisle 140 is used to place high-frequency raw materials, and the row of shelving 110 further away from the aisle 140 is used to place low-frequency raw materials, so that the two rows can be coordinated and scheduled.

[0032] like Figure 1-3 , Figure 5-6As shown, the stacker crane 1201 includes a loading platform 12012, uprights 12013 located at both ends of the loading platform 12012, and multiple independently telescopic forks 12011 arranged side-by-side at the bottom of the loading platform 12012. The loading platform 12012 is slidably connected to the uprights 12013, allowing the loading platform 12012 to move up and down along the uprights 12013, and the uprights 12013 to move laterally along the ground rail 1203. The multiple forks 12011 are axially symmetrical about the centerline of the loading platform 12012, and the span of the extended forks 12011 can be adapted to the lengths of the first pallet 1301, the A-bracket pallet 1302, the second pallet 1303, and the third pallet 1304.

[0033] To improve the efficiency of material dispatching, shelving 110 is designed with independent inbound and outbound access at different levels. Specifically, as follows... Figure 2-3 , Figure 5 As shown, the shelving 110 includes three floors along its height, which can be aligned with the heights of the first floor 210, second floor 220, and third floor 230 of the factory building 200, respectively. The first floor of the shelving 110, on the side furthest from the factory building 200, has a first entry port 1501, a second entry port 1502, and a third entry port 1503, each extending into the interior of the shelving 110 with its own independent transport channel. The first entry port 1501 is used for storing the first pallet 1301 and the first material frame 1305; the second entry port 1502 is used for storing the A-bracket pallet 1302, the second pallet 1303, and the second material frame 1306; and the third entry port 1503 is used for storing the third pallet 1304 and the third material frame 1307.

[0034] On the first, second, and third floors of shelving 110, near the factory 200, there are a first outbound port 1504, a second outbound port 1505, a third outbound port 1506, and a picking loop 180. The first outbound port 1504 is used for the first pallet 1301 and the first material frame 1305. The second outbound port 1505 is used for the A-bracket pallet 1302, the second pallet 1303, and the second material frame 1306. The third outbound port 1506 is used for the third pallet 1304 and the third material frame 1307. The picking loop 180 is shared by the third pallet 1304 and the third material frame 1307 for high-frequency, rapid picking of small items, improving efficiency.

[0035] A first pallet unpacking machine 1701 is installed on one side of the first inbound port 1501 and the first outbound port 1504; a second pallet unpacking machine 1702 is installed on one side of the second inbound port 1502 and the second outbound port 1505; and a third pallet unpacking machine 1703 is installed on one side of the third inbound port 1503 and the third outbound port 1506. The first pallet unpacking machine 1701, the second pallet unpacking machine 1702, and the third pallet unpacking machine 1703 are used to unpack the first pallet 1301, the second pallet 1303, and the third pallet 1304 into individual pallets before they are stacked and after they are received with raw materials.

[0036] The first inbound port 1501, second inbound port 1502, third inbound port 1503, first outbound port 1504, second outbound port 1505, and third outbound port 1506 on the first floor of rack 110 all utilize AGVs for automated operations. The process is as follows: For empty pallets, the AGVs automatically connect to the first pallet unpacking / stacking machine 1701, second pallet unpacking / stacking machine 1702, and third pallet unpacking / stacking machine 1703 on the first floor of rack 110 to complete the empty pallet's inbound or outbound operation. For raw materials, the AGVs transport the raw materials from the inbound port to the transport channel, or the AGVs transport the raw materials from the conveyor to the outbound port to the production line.

[0037] On the second and third floors of rack 110, the first exit gate 1504, the second exit gate 1505, and the third exit gate 1506 are all operated manually using forklifts. The process is as follows: for empty pallets, the forklifts connect to the first pallet destacking machine 1701, the second pallet destacking machine 1702, and the third pallet destacking machine 1703 on the second and third floors of rack 110 to complete the empty pallet exit. For raw materials, the forklifts transport the raw materials, which are conveyed to the exit gates, to the production line side.

[0038] It should be noted that both the inbound and outbound ports are capable of returning to the warehouse.

[0039] Since the height of the stacker crane 1201 matches the first-level picking height of the rack 110, in order to allow for temporary picking by workers next to the picking loop 180, the stacker crane pit 1202 is sunken by 600-1000mm relative to the ground, so that the first-level picking height of the rack 110 is 200-600mm, which is consistent with the height of the worker's platform next to the picking loop 180, so as to meet the needs of direct manual picking.

[0040] It should be noted that the first-level retrieval height of shelf 110 is the height after the pallet is placed on the first-level shelf.

[0041] To ensure accurate and traceable inventory, such as Figure 4As shown, the first inbound port 1501, the second inbound port 1502, the third inbound port 1503, the first outbound port 1504, the second outbound port 1505, the third outbound port 1506, and the outbound and return ports of the picking loop 180 are all equipped with a ground scale 1901 for weighing, an external inspection station 1902 for detecting dimensions, and a barcode reader 1903 for verifying whether the barcode information of the materials and pallets / frames is consistent. This ensures that when the first pallet 1301, the first frame 1305, the A-bracket pallet 1302, the second pallet 1303, the second frame 1306, the third pallet 1304, and the third frame 1307 are put into and out of the warehouse, and when the picking loop 180 is put out of and returns to the warehouse, they undergo triple verification of weighing, external inspection, and barcode verification. This ensures that the raw materials carried meet the rated load and dimensions of the corresponding storage compartment, greatly improving safety. Furthermore, when the first third pallet 1304 and / or third material frame 1307 carries raw materials into the third storage compartment 1103, the weighbridge 1901 identifies the weight and determines that the weight of the raw materials carried by the second third pallet 1304 and / or third material frame 1307 entering the third storage compartment 1103 is less than or equal to the difference between the rated load capacity of the third storage compartment 1103 and the weight of the raw materials carried by the first third pallet 1304 or third material frame 1307. For example, when a third storage compartment 1103 receives a third pallet 1304 or third material frame 1307 carrying 2 tons of raw materials, the remaining space in the third storage compartment 1103 can only hold raw materials weighing ≤1 ton from the third pallet 1304 or third material frame 1307, to prevent the raw material load in the third storage compartment 1103 from exceeding 3 tons.

[0042] It should be noted that the third pallet 1304 or the third material frame 1307 of the first warehouse third storage compartment 1103 can be used as long as it does not exceed its own load capacity of 3 tons.

[0043] In addition, the automated warehouse system also includes a WMS (Logistics Management System) and a WCS (Logistics Control System). The WMS is used to store raw material information identified by the weighbridge 1901, the shape inspection station 1902, and the barcode reader 1903. The WCS is used to schedule raw materials based on the information in the WMS.

[0044] In summary, this invention is an automated three-dimensional warehouse system compatible with the first pallet 1301, the first material frame 1305, the A-bracket pallet 1302, the second pallet 1303, the second material frame 1306, the third pallet 1304, and the third material frame 1307. It adopts a high-level storage compartment isolation, double-deep racks 110, a sunken design of the stacker crane pit 1202, mixed scheduling of AGVs on the first floor and forklifts on the second and third floors, independent entry and exit of different layers, inbound and outbound weighing, external inspection, and barcode verification. It is suitable for large-scale, multi-specification, heavy-load intelligent storage and sorting scenarios of prefabricated building decoration raw materials.

[0045] Workflow 1. Warehousing process S1: Empty pallets / frames are transported from the stacker crane 1201 to the first floor via a conveyor, and then transferred by AGV to the corresponding destacking machine for destacking.

[0046] S2: The AGV delivers a single empty pallet / frame to the inbound buffer area, where the decoration raw materials are manually loaded and the barcode information of the raw materials and the pallet / frame is bound.

[0047] S3: The AGV transports the raw materials to the corresponding warehouse entrance on the first floor. The ground scale 1901, appearance inspection station 1902, and barcode reader 1903 at the warehouse entrance weigh, inspect, and verify the barcodes.

[0048] S4: After the inspection is passed, stacker crane 1201 will put the raw materials into the corresponding storage compartment.

[0049] S5: The raw material information identified in the ground scale 1901, appearance inspection station 1902 and barcode reader 1903 is synchronized with the WMS.

[0050] 2. Outbound Process S1: WMS issues a warehouse instruction to WCS, and WCS controls stacker crane 1201 to pick up goods according to the storage compartment.

[0051] S2: First floor outbound: AGV connects to the destacking and stacking machine at the corresponding outbound port → picks up and delivers goods to the line side (next to the production line).

[0052] Outbound from the second and third floors: Forklifts connect to the pallet unpacking machine at the corresponding outbound exit → pick up and deliver to the production line (next to the production line).

[0053] Temporary picking is performed on the third pallet 1304 and the third material frame 1307 picking loop 180.

[0054] Outbound information is synchronized with WMS.

[0055] S3: After picking up the goods, send the empty pallet to the corresponding pallet stacking machine for stacking. Once the pallet is full, send it to the corresponding storage compartment for later use. Empty material boxes are sent directly to the corresponding storage compartment for later use.

[0056] 3. Warehouse return process S1: Leftover materials from the production line are loaded into the corresponding empty pallets / boxes, and then AGVs are used on the first floor, while forklifts are used on the second and third floors to deliver them to the corresponding outbound ports for return to the warehouse.

[0057] S2: The ground scale 1901, the shape inspection station 1902, and the barcode reader 1903 verify the remaining materials returned to the warehouse.

[0058] S3: After the verification is qualified, the stacker crane 1201 will return the remaining materials to the corresponding storage compartment, and the return information will be synchronized with the WMS.

[0059] In the description of this invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0060] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0061] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first and second features are in direct contact, or that they are in indirect contact through an intermediate medium. Furthermore, "above," "over," or "on top" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," or "beneath" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0062] In the description of this specification, the terms "one embodiment," "some embodiments," "embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0063] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make modifications, alterations, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A three-dimensional warehouse system for storing and sorting raw materials for prefabricated building decoration, characterized in that, Includes racking and stacker crane systems, wherein the racking includes at least one first rack, at least one second rack, and at least one third rack; The automated warehouse system also includes a first pallet, an A-frame pallet, a second pallet, and a third pallet, all with decreasing lengths and the same width. The height of the A-frame pallet is greater than the height of the first, second, and third pallets. The first compartment is sized to accommodate the first pallet, the second compartment is sized to accommodate the A-frame pallet, and the third compartment is sized to accommodate either the second or third pallet. The stacker crane system includes a stacker crane, which is installed to move along the extension direction of the rack. The space for the stacker crane to move forms an aisle, and the rack is installed on both sides of the aisle. The stacker crane is equipped with multiple independently telescopic forks arranged in parallel, and the span of the extended forks can be adapted to the length of the first pallet, the A-bracket pallet, the second pallet, and the third pallet.

2. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 1, characterized in that, Two rows of first shelves are set at one end of the shelf, one row of first shelves is set at the other end of the shelf, and a row of second shelves is set at the inner side of the adjacent first shelves at the other end of the shelf. Multiple rows of third shelves are arranged in the middle of the shelf between the two ends.

3. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 1, characterized in that, The automated warehouse system also includes a first pallet, a second pallet, and a third pallet. The first pallet includes a first pallet body, the first pallet includes a first pallet body and a first perimeter fence surrounding the first pallet body, the A-frame pallet includes a second pallet body and an A-frame on the second pallet body, the second pallet includes a second pallet body, the second pallet includes a second pallet body and a second perimeter fence surrounding the second pallet body, and the third pallet includes a third pallet body and the third pallet includes a third pallet body and a third perimeter fence surrounding the third pallet body. The dimensions of the first compartment are also adapted to accommodate the first material frame, and the dimensions of the third compartment are also adapted to accommodate the second or third material frame.

4. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 3, characterized in that, The shelving unit has three floors along its height, which can be aligned with the height of the first, second and third floors of the factory building, respectively. The first floor of the shelving unit has a first, second and third entry point on the side away from the factory building. The first entry point is used for the first pallet and the first material frame to be stored. The second entry point is used for the A-bracket pallet, the second pallet and the second material frame to be stored. The third entry point is used for the third pallet and the third material frame to be stored. The first, second, and third floors of the shelving are equipped with a first, second, and third exit on the side closest to the factory building. The first exit is used for the first pallet and the first material frame to be shipped out, the second exit is used for the A-bracket pallet, the second pallet, and the second material frame to be shipped out, and the third exit is used for the third pallet and the third material frame to be shipped out. The first, second, and third inbound and first outbound ports on the first floor of the shelving are used to connect to AGVs for automated inbound and outbound operations. The first, second, and third exit points on the second and third floors of the shelving are used to connect forklifts for outbound shipments.

5. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 4, characterized in that, A first unpacking and stacking machine is installed on one side of the first inlet and the first outlet; a second unpacking and stacking machine is installed on one side of the second inlet and the second outlet; and a third unpacking and stacking machine is installed on one side of the third inlet and the third outlet. AGVs automatically dock with the first, second, and third pallet destabilizers on the first floor of the racking system to complete outbound or return operations. Forklifts automatically dock with the first, second, and third pallet destabilizers on the second and third floors of the racking system to complete outbound or return operations.

6. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 4, characterized in that, The first, second, and third floors of the shelving are equipped with picking loops on the side closest to the factory building, which are shared by the third pallet and the third material basket. The stacker crane is slidably installed on the ground rail in the stacker crane pit, allowing the stacker crane to move laterally along the ground rail. The stacker crane pit is 600-1000mm lower than the ground. The first-level picking height of the rack is 200-600mm, which is consistent with the height of the worker's platform next to the picking loop.

7. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 6, characterized in that, The stacker crane also includes a loading platform and columns located at both ends of the loading platform. The loading platform and the columns are slidably connected, so that the loading platform can move up and down along the columns and the columns can move laterally along the ground rails. Multiple forks are located at the bottom of the loading platform and are symmetrical about the center line of the loading platform.

8. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 6, characterized in that, The first, second, and third inbound ports, the first, second, and third outbound ports, as well as the outbound and return ports of the picking loop, are all equipped with ground scales, shape inspection stations, and barcode readers. This ensures that the raw materials carried by the first pallet, first frame, A-bracket pallet, second pallet, second frame, third pallet, and third frame during inbound and outbound operations, as well as during outbound and return operations of the picking loop, all meet the rated load and dimensions of the corresponding storage compartment.

9. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 8, characterized in that, The third compartment is sized to accommodate two third pallets and / or a third material frame; When the first third pallet and / or third storage box carries raw materials into the third storage compartment, the weight is measured on the ground scale, and it is determined that the weight of the raw materials carried by the second third pallet and / or third storage box is less than or equal to the difference between the rated load of the third storage compartment and the weight of the raw materials carried by the first third pallet or third storage box.

10. The automated warehouse system for storing and sorting prefabricated building decoration raw materials according to claim 1, characterized in that, The shelves on both sides of the aisle are arranged in two rows. The row of shelves closer to the aisle is used to place high-frequency raw materials, and the row of shelves further away from the aisle is used to place low-frequency raw materials.