现有输电线路水域跨越技术存在明显局限性,针对大宽度江河水域,常规输电铁塔无法直接在水面架设固定支撑结构
[0021]突破传统水域输电架设限制,无需依托岛屿建设铁塔、无需铺设水下电缆,通过可机动折叠的舟桥搭载绝缘塔/绝缘脚手架,可直接在水面完成输电支撑结构搭建,有效解决现有技术水域施工局限性问题,大幅降低施工成本、缩短施工周期。
Smart Images

Figure CN122980324A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of transmission line insulation tower equipment, specifically relating to a floating bridge insulation tower used in water. Background Technology
[0002] In the construction of power transmission lines crossing rivers and lakes, water crossing construction has always been a major and challenging project in power construction. Existing water crossing technologies for power transmission lines have significant limitations. For wide rivers and lakes, conventional transmission towers cannot be directly erected with fixed support structures on the water surface. Currently, the mainstream solutions in the industry are mainly divided into two types: one is to build transmission towers relying on natural islands in the water to complete the line crossing, but this method is greatly limited by geographical conditions and cannot be implemented in waters without islands, resulting in extremely poor adaptability; the other is to lay underwater cable channels. Although this can achieve power transmission over water, underwater cable laying has high construction costs, long cycles, and difficult subsequent maintenance. Furthermore, the cables are susceptible to water erosion, impact from underwater debris, and changes in water level, resulting in short service life and poor operational stability.
[0003] In addition, in the event of sudden natural disasters such as floods and water-related disasters, the existing land-based power transmission lines are easily damaged and interrupted. Disaster-stricken water areas urgently need to quickly build temporary power supply channels. However, the existing fixed transmission towers and underwater cable structures are all permanent facilities that cannot be quickly disassembled or deployed, making it difficult to meet the operational needs of rapid navigation, rapid power supply, and temporary emergency rescue in disaster emergency scenarios, which seriously restricts the efficiency of power emergency rescue and relief.
[0004] In summary, existing waterborne power transmission erection technologies suffer from poor scenario adaptability, low construction efficiency, lack of emergency response capabilities, and high operation and maintenance costs. There is an urgent need to develop a waterborne power transmission insulation support structure that can be deployed flexibly, built quickly, and adapted to various water conditions. Summary of the Invention
[0005] The purpose of this invention is to overcome the shortcomings of the prior art and solve the problems mentioned in the above-mentioned technical background.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a floating bridge insulation tower for water application, comprising a pontoon bridge with an internal power system, the pontoon bridge having two states: folded storage and unfolded operation. A bearing assembly for placing the insulation tower is provided on the inner surface of the pontoon bridge. The bearing assembly includes a bearing groove recessed into the inner surface of the pontoon bridge. An insulation tower is installed on the upper part of the unfolded pontoon bridge. A support assembly is provided at the bottom of the insulation tower. The support assembly includes multiple circumferentially symmetrically arranged connecting rods, both ends of which are fixedly connected to the bottom of the insulation tower. The connecting rods and the bearing groove cooperate with each other. The insulation tower is connected and fixed to the bearing assembly through the support assembly. Anchoring mechanisms are provided on all four sides of the pontoon bridge.
[0007] The bearing groove is mutually matched with the shape of the connecting rod, and a positioning assembly for fixing the connecting rod is arranged inside the support assembly.
[0008] The positioning assembly includes a positioning groove, the central axis of the positioning groove coincides with the bearing groove, vertical screws are symmetrically and fixedly arranged on both sides of the positioning groove, the two vertical screws are respectively located on both sides of the bearing groove, fastening nuts are screwed on the outer sides of the two vertical screws, a pressing piece is placed inside the positioning groove, and through holes for the vertical screws to pass through are provided at positions of the pressing piece corresponding to the vertical screws.
[0009] The bearing assembly includes multiple sets of bearing grooves with different dimensions, each set of bearing grooves is in the shape of a Chinese character "kou", and the multiple sets of bearing grooves with different dimensions are nested with each other, for mounting insulating towers of different models.
[0010] The anchoring stopping mechanism includes an anchor pit and a cover plate, the cover plate is detachably mounted on the surface of the anchor pit, and an anchor assembly is arranged inside the anchor pit.
[0011] The anchor assembly includes a bracket and a winch, the central shaft of the winch is rotatably arranged inside the bracket through a bearing, a cable is wound on the outer surface of the winch, and an anchor is fixedly arranged at the end of the cable. Further, the type of the anchor is a stockless anchor, and a Hall anchor is preferably used.
[0012] An electric motor is fixedly arranged on one side of the bracket, the output end of the electric motor is fixedly connected with one end of the central shaft of the winch, a hand crank wheel is arranged on the other side of the bracket, and the hand crank wheel is fixedly connected with the other end of the central shaft of the winch.
[0013] A cable arranging assembly is arranged on the outer side of the winch, the cable arranging assembly includes a reciprocating lead screw, both ends of the reciprocating lead screw are rotatably arranged inside the bracket through bearings, a cable arranger is screwed on the outer side of the reciprocating lead screw, the cable passes through the interior of the cable arranger, transmission gears are respectively fixed on the exterior of the reciprocating lead screw and the exterior of the central shaft of the winch, and a transmission belt is connected between the two transmission gears.
[0014] A mooring mechanism is arranged on the outer side of the pontoon bridge, the mooring mechanism includes an anchor and a buoy, and the anchor and the buoy, as well as the buoy and the pontoon bridge, are connected by anchor chains.
[0015] The number of the mooring mechanisms is at least two.
[0016] Further, the type of the insulating tower can also be selected as an insulating scaffold, the bottom of the insulating scaffold is provided with rollers with brake pads, and the outer part of the insulating scaffold is provided with foldable and telescopic support rods.
[0017] Further, the inner surface of the pontoon bridge is correspondingly provided with a clamping wheel assembly and a clamping rod assembly for fixing the insulating scaffold. The numbers of the clamping wheel assemblies and the clamping rods correspond to the numbers of the rollers and the support rods respectively.
[0018] The roller assembly includes a roller groove, and an elongated anti-rotation slot is provided inside the roller groove. After the roller enters the roller groove, the brake pad is locked, and the roller falls into the anti-rotation slot. The anti-rotation slot can prevent the roller from rotating.
[0019] The clamping rod assembly includes a fixed block and a clamping seat. The fixed block protrudes and is fixed to the inner surface of the pontoon bridge. The clamping seat is located between the support rod and the fixed block. The clamping seat is fixedly connected to the support rod and the fixed block by bolts.
[0020] This invention provides a floating bridge insulation tower for underwater application, which has the following beneficial effects:
[0021] Breaking through the limitations of traditional waterway power transmission construction, it eliminates the need to build towers on islands or lay underwater cables. By using a mobile, foldable pontoon bridge to carry insulated towers / insulated scaffolding, the power transmission support structure can be built directly on the water surface. This effectively solves the limitations of existing waterway construction technologies, significantly reducing construction costs and shortening the construction period.
[0022] It is adaptable to both conventional power transmission construction and flood emergency rescue scenarios. Under normal circumstances, it can complete the construction of power transmission lines in wide waters. In disaster situations, it can use the autonomous power of the pontoon bridge to quickly move to the work area and quickly build a temporary water power channel, which greatly improves the efficiency of power emergency rescue.
[0023] The load-bearing component adopts a multi-set nested groove structure of different sizes, which can be adapted to the installation of various models of insulation tower support components, with extremely strong versatility and adaptability; it is equipped with positioning components, ferrule components, and clamping rod components to achieve rapid positioning and locking of the structure, with high assembly stability and convenient assembly and disassembly.
[0024] Equipped with a dual-mode electric and manual anchor deployment and retrieval mechanism, along with a cable arrangement component to ensure orderly cable deployment and retrieval, and multiple additional mooring mechanisms, the pontoon bridge significantly improves its stability in water operations and its resistance to wind, waves, and water flow interference, resulting in high operational safety.
[0025] The pontoon bridge has a folding and storage function, and its compact size after being folded makes it easy to transport and transfer. When unfolded, it has a large working area and can be used as a single unit, in multiple units, or in a continuous deployment. It can adapt to the needs of waterways of different widths and has a wide range of applications. Attached Figure Description
[0026] Figure 1 This is a structural diagram showing the connection between the insulation tower and the pontoon bridge of an insulation tower for underwater application according to the present invention.
[0027] Figure 2 This is a structural diagram of the load-bearing component of a floating bridge insulation tower for underwater application according to the present invention.
[0028] Figure 3 This invention relates to a floating bridge insulation tower for underwater application. Figure 2 Enlarged view of section A.
[0029] Figure 4 This is a structural diagram of a support component for a floating bridge insulation tower used in water, according to the present invention.
[0030] Figure 5 This is a structural diagram of the anchoring mechanism of a floating bridge insulation tower used in water according to the present invention.
[0031] Figure 6 This is a structural diagram of the anchor assembly of a floating bridge insulation tower for underwater application according to the present invention.
[0032] Figure 7 This is a structural diagram of the mooring mechanism for a floating bridge insulation tower used in water, according to the present invention.
[0033] Figure 8 This is a structural diagram of the connection between the insulating scaffolding and the pontoon bridge of an insulating tower for use in water, according to the present invention.
[0034] Figure 9 This is a side view of the insulated scaffolding for an insulated floating bridge tower used in water, according to the present invention.
[0035] Figure 10 This is a structural diagram of the roller assembly of a floating bridge insulation tower for underwater application according to the present invention.
[0036] Figure 11 This is a structural diagram of the clamping rod assembly of a floating bridge insulation tower for underwater application according to the present invention.
[0037] In the diagram: 100, pontoon bridge; 101, load-bearing component; 1011, load-bearing groove; 102, positioning component; 1021, positioning slot; 1022, vertical screw; 1023, pressure plate; 1024, fastening nut; 103, roller assembly; 1031, wheel groove; 1032, anti-rotation joint; 104, lever assembly; 1041, fixing block; 1042, clamp; 200, insulation tower; 201, support component; 2011, connecting rod; 300, anchoring mechanism; 30 1. Anchor hole; 302. Cover plate; 303. Anchor assembly; 3031. Support; 3032. Winch; 3033. Cable; 3034. Anchor; 3035. Electric motor; 3036. Hand crank; 304. Cable assembly; 3041. Reciprocating screw; 3042. Cable guide; 3043. Drive belt; 400. Mooring mechanism; 401. Anchorage; 402. Buoy; 403. Anchor chain; 500. Insulated scaffolding; 501. Roller; 502. Support rod. Detailed Implementation
[0038] The embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and should not be construed as limiting the scope of the invention.
[0039] This embodiment discloses a floating bridge insulation tower for use in water, which is preferably suitable for the erection of power transmission lines in rivers with a width of more than 500m and a flow velocity of ≤2.5m / s.
[0040] Please see Figure 1-6 A floating bridge insulation tower for underwater use includes a pontoon bridge 100. The pontoon bridge 100 has its own internal power system and can be folded for storage and unfolded for operation. The pontoon bridge's self-powered system and its ability to be folded and unfolded are basic functions of existing pontoon bridge equipment and will not be elaborated here. The inner surface of the pontoon bridge 100 is provided with a bearing component 101 for placing the insulating tower 200. The bearing component 101 includes a bearing groove 1011, which is recessed into the inner surface of the pontoon bridge 100. The insulating tower 200 is installed on the upper part of the pontoon bridge 100 in an unfolded state. A support component 201 is provided at the bottom of the insulating tower 200. The support component 201 includes multiple connecting rods 2011 arranged circumferentially. The two ends of the connecting rods 2011 are fixedly connected to the bottom of the insulating tower 200. The connecting rods 2011 and the bearing groove 1011 cooperate with each other. The insulating tower 200 is connected and fixed to the bearing component 101 through the support component 201. Anchoring mechanisms 300 are provided on all four sides of the pontoon bridge 100.
[0041] The inner surface of the pontoon bridge 100 is embedded with a load-bearing component 101, which consists of multiple nested, orifice-shaped load-bearing grooves 1011. Different sized load-bearing grooves 1011 can accommodate the installation requirements of insulation towers 200 of different specifications. Multiple circumferentially symmetrically arranged connecting rods 2011 are fixed to the bottom of the insulation tower 200. The connecting rods 2011 precisely engage with the load-bearing grooves 1011, achieving the initial positioning and installation of the insulation tower 200.
[0042] The bearing groove 1011 and the connecting rod 2011 are shaped to match each other, and the support assembly 201 is provided with a positioning assembly 102 for fixing the connecting rod 2011.
[0043] The positioning component 102 includes a positioning groove 1021, the central axis of which coincides with the bearing groove 1011. Vertical screws 1022 are symmetrically fixed on both sides of the positioning groove 1021. The two vertical screws 1022 are located on both sides of the bearing groove 1011, and fastening nuts 1024 are screwed onto the outer sides of the two vertical screws 1022. A pressure plate 1023 is placed inside the positioning groove 1021. The pressure plate 1023 is provided with a through hole corresponding to the position of the vertical screw 1022 for the vertical screw 1022 to pass through.
[0044] A positioning component 102 is provided inside the bearing groove 1011. The positioning groove 1021 is coaxially arranged with the bearing groove 1011. During operation, the connecting rod 2011 is placed inside the bearing groove 1011, and the pressure plate 1023 is pressed against the upper part of the connecting rod 2011. The vertical screw 1022 passes through the through hole of the pressure plate 1023. By tightening the fastening nuts 1024 at both ends, the pressure plate 1023 is squeezed to lock and fix the connecting rod 2011, preventing the insulation tower 200 from shifting or shaking during operation and ensuring structural stability.
[0045] The bearing component 101 includes multiple sets of bearing grooves 1011 of different sizes. Each set of bearing grooves 1011 is shaped like an "U". The multiple sets of bearing grooves 1011 of different sizes are nested together for installing different models of insulation towers 200.
[0046] The anchoring mechanism 300 includes an anchor hole 301 and a cover plate 302. The cover plate 302 is detachably installed on the surface of the anchor hole 301, and an anchor assembly 303 is provided inside the anchor hole 301.
[0047] The anchor assembly 303 includes a bracket 3031 and a winch 3032. The central shaft of the winch 3032 is rotatably mounted inside the bracket 3031 via bearings. A cable 3033 is wound around the outer surface of the winch 3032, and an anchor 3034 is fixedly mounted at the end of the cable 3033. Further, the anchor 3034 is a barless anchor, preferably a Hall anchor.
[0048] A motor 3035 is fixedly installed on one side of the bracket 3031. The output end of the motor 3035 is fixedly connected to one end of the central shaft of the winch 3032. A hand crank 3036 is installed on the other side of the bracket 3031. The hand crank 3036 is fixedly connected to the other end of the central shaft of the winch 3032.
[0049] Anchoring mechanisms 300 are installed around the pontoon bridge 100. Under normal conditions, cover plates 302 seal the anchor holes 301 to prevent debris from entering. During mooring operations, cover plates 302 are removed, the anchor 3034 is manually thrown out, and the motor 3035 is started to drive the winch 3032 to rotate, causing the anchor 3034 to lock into the water. The cable 3033 is then tightened to complete the pontoon bridge positioning. In case of power failure or motor malfunction, the winch 3032 can be manually driven via a hand crank 3036. This dual-mode design ensures operational reliability. When it is necessary to retrieve the anchor 3034, a small boat is driven to the water surface directly above the anchor 3034, the angle of the anchor 3034 is adjusted, and the winch 3032 rotates in the opposite direction to retrieve the cable 3033 and the anchor 3034. The anchor hole cover plate 302 is then closed, and the pontoon bridge 100 is folded and stored, completing the overall equipment transfer and retrieval.
[0050] A cable guide assembly 304 is provided on the outside of the winch 3032. The cable guide assembly 304 includes a reciprocating screw 3041. Both ends of the reciprocating screw 3041 are rotatably mounted inside the bracket 3031 via bearings. A cable guide 3042 is screwed onto the outside of the reciprocating screw 3041. A cable 3033 passes through the inside of the cable guide 3042. Transmission gears are fixed to the outside of the reciprocating screw 3041 and the outside of the central shaft of the winch 3032. A transmission belt 3043 connects the two transmission gears.
[0051] During operation, the winch 3032 drives the reciprocating screw 3041 to rotate synchronously through the transmission gear and transmission belt 3043, which drives the cable guide 3042 to move back and forth, so as to realize the automatic straightening and laying of the cable 3033, avoid the cable from getting tangled or knotted, and extend the service life of the equipment.
[0052] In this embodiment, the entire device can be folded and stored, resulting in a compact size that facilitates vehicle and ship transport. After the equipment is transported to the shore of the work area, the folded pontoon bridge 100 is hoisted or slid onto the water surface. The built-in power system of the pontoon bridge 100 is then activated to unfold and level the pontoon bridge 100. Using the pontoon bridge 100's own power system, it is autonomously navigated to the target work location. Once the pontoon bridge 100 reaches the preset work location, the anchor hole cover plate 302 is removed, and the anchor 3034 is manually thrown to the bottom of the water. The motor 3035 is then started to drive the winch 3032 to tighten the cable 3033. The cable arrangement assembly 304 is used to neatly wind and unwind the cable 3033, completing the single-point anchoring and positioning. In the event of a power outage or malfunction of the motor 3035, the winch 3032 can be manually driven via the hand crank 3036 to complete the anchoring operation. In routine power transmission construction scenarios, fixed insulating towers are selected for assembly. Insulating tower 200 is built on the surface of pontoon bridge 100. The connecting rods 2011 arranged circumferentially at the bottom of the insulating tower 200 are precisely inserted into the bearing grooves 1011 of the corresponding specifications. Then, the pressure plate 1023 is passed through the vertical screw 1022 and pressed against the upper surface of the connecting rod 2011. The fastening nut 1024 is tightened, and the connecting rod 2011 is locked and fixed by the positioning component 102 to prevent the insulating tower 200 from shifting or loosening under force.
[0053] After the structure is installed and inspected for stability, a waterborne power transmission support structure is built based on the 200-meter insulating tower. This enables the erection of cross-water power transmission lines, emergency line repairs, and the opening of power channels. It can be used stably for a long time in waterborne power transmission construction and emergency power supply scenarios.
[0054] like Figure 7As shown, in another embodiment, to increase the stability of the pontoon bridge 100 on the water surface, at least two sets of mooring mechanisms 400 are added around the pontoon bridge 100. Anchors 401 are sunk to the bottom and fixed in place. Anchor chains 403 connect the buoys 402 to the pontoon bridge 100, further mitigating the impact of water flow and waves on the pontoon bridge 100, significantly improving the stability of operations on water. The anchor chains 403 tighten the buoys 402 to the pontoon bridge 100, and multiple sets of mooring mechanisms form multi-point limiting constraints, mitigating the impact of water flow and wave disturbances, completely locking the pontoon bridge's operating position, and preventing drifting and swaying during operations.
[0055] like Figure 8-11 As shown, in another embodiment, based on the same inventive concept, this embodiment discloses an emergency operation implementation method for the device, applicable to the scenario of rapid construction of temporary power channels on water after floods. In this embodiment, the fixed insulating tower 200 is replaced with a prefabricated insulating scaffold 500, enabling rapid assembly, disassembly, and deployment.
[0056] The insulated scaffold 500 is equipped with rollers 501 with brake pads at the bottom and foldable telescopic support rods 502 on the outside. When transporting and storing, the support rods are retracted and the brake pads are released, allowing the insulated scaffold 500 to move flexibly. When positioning and installing, the rollers 501 are pushed into the wheel grooves 1031 on the surface of the pontoon bridge 100, and the brake pads are locked, so that the rollers 501 are engaged in the anti-rotation joints 1032, restricting the rotation of the rollers. At the same time, the insulated scaffold 501 can be double-locked by the positioning component 102 to complete the bottom positioning.
[0057] The telescopic support rod 502 is deployed simultaneously, and the clamp 1042 is clamped between the support rod 502 and the fixed block 1041 of the pontoon bridge. The clamp 1042 is locked and fixed by bolts to achieve stable positioning of the support rod 502 and complete the rapid assembly of the insulated scaffold 501.
[0058] During the operation, the insulated scaffolding 500 can be assembled on the shore first, and then moved to the upper part of the pontoon bridge by the rollers 501 for fixation. Using the pontoon bridge 100's own power system, it can be quickly moved to the target water area in the disaster area. The platform is fixed by the anchoring mechanism 300 and the mooring mechanism 400. The temporary power transmission support structure can be quickly built by relying on the insulated scaffolding 500 to quickly restore the power supply in the disaster area of the water area and meet the timeliness requirements of emergency rescue.
[0059] In one embodiment, two or more pontoon bridges 100 can be spliced together for use. The splicing of pontoon bridges together is a basic function of existing pontoon bridge equipment, which will not be described in detail here.
[0060] In one embodiment, for ultra-wide waterways, multiple sets of pontoon bridges 100 can be continuously arranged to expand the operating range.
[0061] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A floating bridge insulation tower for underwater use, comprising a pontoon bridge, the pontoon bridge having its own internal power system, and the pontoon bridge having folding and unfolding states, characterized in that: A load-bearing assembly for placing an insulating tower is arranged on the inner surface of the pontoon bridge, the load-bearing assembly includes a load-bearing groove, the load-bearing groove is recessed in the inner surface of the pontoon bridge, the insulating tower is mounted on the upper part of the pontoon bridge in the unfolded state, a support assembly is arranged at the bottom of the insulating tower, the support assembly includes a plurality of connecting rods arranged symmetrically in the circumferential direction, both ends of the connecting rod are fixedly connected to the bottom of the insulating tower, the connecting rod and the load-bearing groove are mutually matched, the insulating tower is connected and fixed to the load-bearing assembly through the support assembly, and anchoring stopping mechanisms are arranged on all peripheral sides of the pontoon bridge.
2. The floating bridge insulation tower for underwater application as described in claim 1, characterized in that: The load-bearing groove and the connecting rod are mutually matched in shape, and a positioning assembly for fixing the connecting rod is arranged inside the support assembly.
3. A floating bridge insulation tower for underwater application as described in claim 2, characterized in that: The positioning assembly includes a positioning groove, the central axis of the positioning groove coincides with the load-bearing groove, vertical screws are symmetrically and fixedly arranged on both sides of the positioning groove, the two vertical screws are respectively located on both sides of the load-bearing groove, fastening nuts are screwed on the outer sides of the two vertical screws, a pressing piece is placed inside the positioning groove, and a through hole for the vertical screw to pass through is formed in the position of the pressing piece corresponding to the vertical screw.
4. A floating bridge insulation tower for underwater application as described in claim 3, characterized in that: The load-bearing assembly includes multiple sets of load-bearing grooves with different sizes, each set of load-bearing grooves is in a square shape, and the multiple sets of load-bearing grooves with different sizes are nested with each other for mounting insulating towers of different models.
5. A floating bridge insulation tower for underwater application as described in claim 1, characterized in that: The anchoring stopping mechanism includes an anchor cavity and a cover plate, the cover plate is detachably mounted on the surface of the anchor cavity, and an anchor assembly is arranged inside the anchor cavity.
6. A floating bridge insulation tower for underwater application as described in claim 5, characterized in that: The anchor assembly includes a bracket and a winch, the central shaft of the winch is rotatably arranged inside the bracket through a bearing, a cable is wound on the outer surface of the winch, and an anchor is fixedly arranged at the end of the cable.
7. A floating bridge insulation tower for underwater application as described in claim 6, characterized in that: An electric motor is fixedly arranged on one side of the bracket, the output end of the electric motor is fixedly connected to one end of the central shaft of the winch, a hand crank wheel is arranged on the other side of the bracket, and the hand crank wheel is fixedly connected to the other end of the central shaft of the winch.
8. A floating bridge insulation tower for underwater application as described in claim 7, characterized in that: A cable arranging assembly is arranged on the outer side of the winch, the cable arranging assembly includes a reciprocating screw rod, both ends of the reciprocating screw rod are rotatably arranged inside the bracket through bearings, a cable arranger is screwed on the outer side of the reciprocating screw rod, the cable passes through the inside of the cable arranger, transmission gears are fixedly arranged on the outer part of the reciprocating screw rod and the outer part of the central shaft of the winch, and a transmission belt is connected between the two transmission gears.
9. A floating bridge insulation tower for underwater application as described in claim 1, characterized in that: A mooring mechanism is arranged on the outer part of the pontoon bridge, the mooring mechanism includes an anchor and a buoy, and the anchor and the buoy, as well as the buoy and the pontoon bridge, are connected through anchor chains.
10. A floating bridge insulation tower for underwater application as described in claim 9, characterized in that: The number of the mooring mechanisms is at least two.