Technical Problem

[0005]但是上述发明存在以下不足之处:仅依靠绳索拉结管桩,固定可靠性差,受水流、风浪作用易偏移晃动;浮箱占用渠道过水断面,干扰灌区输水,难以适配宽窄多变的梯形渠,适配性与重复利用率弱于外挂管桩式平台

Benefits of technology

[0013]其一:本发明依托现有PHC管桩吊挂架设,施工全程无需对渠道本体开槽打孔、浇筑预埋,规避了土建施工对渠道混凝土结构的破损隐患;挂钩增设缓冲垫层、抱箍内置防滑结构,搭配横向和竖向杆件与斜撑组成的三角稳固受力体系,可缓冲水位变化、施工振动产生的交变应力,抗滑移与抗倾覆性能优异,杆件可适配不同桩径与渠段跨度,场地适配范围更广。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122980397A_ABST
    Figure CN122980397A_ABST
Patent Text Reader

Abstract

The present application relates to a kind of operating platform, belong to photovoltaic installation technical field, specifically a kind of channel photovoltaic operating platform of external hanging in PHC pipe pile, including stand and transverse support rod, the transverse support rod is fixedly installed in the both sides of stand, still include hoop and hook: a pair of the hoop is fixedly installed in the bottom of stand;The present application reaches the effect that can effectively protect channel structure, significantly reduce high-altitude falling and drowning risk, solves the problem that only relying on rope tie pipe pile in prior art, poor fixing reliability, easy to deviate and sway under the action of water flow, storm;Floating box occupies channel water section, interferes irrigation area water delivery, difficult to adapt to wide and narrow variable trapezoidal channel, the adaptability and reusability are weaker than external hanging pipe pile type platform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of photovoltaic installation technology, and in particular to a channel photovoltaic operation platform externally mounted on PHC pipe piles. Background Technology

[0002] Photovoltaic components need to be installed near water. Photovoltaic brackets have various tilt angles and structural styles. The channels are 5-30m wide, the water depth is 1-3m and the cross-section is trapezoidal. The height difference of the construction location is significant, which reduces construction efficiency. Traditional ground scaffolding and floating work platforms are difficult to adapt to the construction requirements.

[0003] Patent document CN220786084U discloses a floating photovoltaic installation platform, including a flat-bottomed pontoon and a drive device mounted on the pontoon. A construction scaffolding system and ladders for ascending and descending the scaffolding system are built on the pontoon. Fixed anchor points are located at the four corners of the pontoon's top surface, and ropes for connecting photovoltaic power pipes are threaded through these anchor points. This technology features a simple structure, low manufacturing cost, and convenient assembly and disassembly, providing workers with a convenient and stable construction platform for floating photovoltaic installations. It solves the problem of high-altitude photovoltaic installations on water and greatly improves construction efficiency.

[0004] Based on the above search and existing technology, the following findings were made:

[0005] However, the above invention has the following shortcomings: relying solely on ropes to tie the pipe piles results in poor fixation reliability, and they are prone to shifting and swaying under the influence of water flow and waves; the floating box occupies the cross-section of the channel, interferes with water conveyance in the irrigation area, and is difficult to adapt to trapezoidal channels with varying widths, making its adaptability and reusability weaker than that of the external pipe pile platform. Summary of the Invention

[0006] To address the aforementioned technical issues, this invention proposes a channel photovoltaic operation platform externally mounted on PHC pipe piles. The platform frame has good forming quality, improving the first-time acceptance pass rate. After successful erection, the upper photovoltaic support components can be installed when there is water in the irrigation canal, accelerating the construction progress and saving construction time.

[0007] The technical solution for achieving the purpose of this invention is as follows: a channel photovoltaic operation platform externally mounted on a PHC pipe pile, comprising a column and a horizontal support rod, wherein the horizontal support rod is fixedly installed on both sides of the column, and also includes clamps and hooks.

[0008] Both of the aforementioned clamps are fixedly installed at the bottom of the column;

[0009] Preferably, the hook is fixedly installed on the top of the column, and a cushioning pad is fixedly installed inside the hook.

[0010] Preferably, each of the clamps has an anti-slip layer fixedly installed inside, and an inclined support rod is fixedly installed between the column and the horizontal support rod.

[0011] Each of the aforementioned transverse support rods is fixedly installed with an edge protection railing on one side of its top.

[0012] The significant advantages of this invention compared to existing technologies are:

[0013] Firstly, this invention relies on the existing PHC pipe pile suspension system, eliminating the need for trenching, drilling, pouring, and pre-embedding in the channel body during the entire construction process, thus avoiding the potential damage to the channel's concrete structure caused by civil construction. The hooks are equipped with a buffer pad layer, and the clamps have a built-in anti-slip structure. Combined with the triangular stable force system composed of horizontal and vertical rods and diagonal braces, it can buffer the alternating stress generated by water level changes and construction vibrations, exhibiting excellent anti-slip and anti-overturning performance. The rods can be adapted to different pile diameters and channel spans, making it more adaptable to various sites.

[0014] Secondly, this invention adopts factory prefabrication and modular processing, and all components are assembled structures. On the construction site, only the hook hanging, clamp locking, and assembly of guardrails and scaffold boards need to be completed, eliminating complex processes such as on-site cutting and welding, and the construction speed is fast. After completion, each component can be quickly disassembled and transported to other construction sites for repeated use, which greatly reduces the consumption of disposable building materials and effectively controls the overall cost of the edge work platform. Attached Figure Description

[0015] The present invention will be further explained below with reference to the accompanying drawings and embodiments:

[0016] Figure 1 This is a three-dimensional structural schematic diagram provided in one embodiment of the present invention;

[0017] Figure 2 This is a front structural diagram provided in one embodiment of the present invention;

[0018] Figure 3 This is a bottom-view structural diagram provided in two embodiments of the present invention;

[0019] Figure 4 This is a side view structural diagram provided in two embodiments of the present invention.

[0020] Explanation of reference numerals in the attached figures:

[0021] 1. Upright post; 2. Horizontal support bar; 3. Hoop; 301 anti-slip layer; 4. Hook; 401 buffer pad; 5. Edge protection railing; 6. Diagonal support bar. Detailed Implementation

[0022] The present invention will now be described in detail, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0023] This invention provides an improved channel photovoltaic operation platform that is externally mounted on a PHC pipe pile. The technical solution of this invention is as follows:

[0024] Example 1

[0025] like Figures 1-2 As shown, a channel photovoltaic operating platform externally mounted on PHC pipe piles includes a column 1 and a horizontal support rod 2. The horizontal support rod 2 is fixedly installed on both sides of the column 1. It also includes clamps 3 and hooks 4. The equipment is reusable and can be reused. The aluminum alloy material is lightweight and has high strength, ensuring the stability of the overall frame.

[0026] A pair of clamps 3 are fixedly installed at the bottom of column 1;

[0027] Hook 4 is fixedly installed on the top of column 1, and a buffer pad 401 is fixedly installed inside hook 4.

[0028] Example 2:

[0029] Based on the channel photovoltaic operation platform externally mounted on PHC pipe piles provided in the first embodiment of this application, the second embodiment of this application proposes another channel photovoltaic operation platform externally mounted on PHC pipe piles. The second embodiment is merely a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the separate implementation of the first embodiment.

[0030] The second embodiment of the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0031] like Figures 3-4 As shown, each clamp 3 has an anti-slip layer 301 fixedly installed inside, and an inclined support rod 6 is fixedly installed between the column 1 and the horizontal support rod 2.

[0032] Furthermore, each horizontal support rod 2 is fixedly installed with an edge protection railing 5 on one side of its top. The required labor cost is low, and it can be installed in a short time by two people working together. Disassembly is also extremely convenient.

[0033] The specific working method is as follows: the overall frame is prefabricated in the factory, horizontal support rods 2 are assembled on both sides of the upright 1, and diagonal support rods 6 are installed between the upright 1 and the horizontal support rods 2. The bottom of the upright 1 is equipped with a clamp 3 with an internal anti-slip layer 301, and the top is fixed with a hook 4 with a buffer pad 401. After the components are transported to the construction site, the hook 4 is hung on the PHC pipe pile body, the clamp 3 is tightened and locked in position, and finally the edge protection railing 5 is installed above the horizontal support rods 2 and the scaffold boards are laid to complete the platform construction.

[0034] The technical means disclosed in this invention are not limited to those described above, but also include technical solutions composed of equivalent substitutions of the above technical features. Matters not covered in this invention are common knowledge to those skilled in the art.

Claims

1. A channel photovoltaic operating platform externally mounted on a PHC pipe pile, comprising a column (1) and a horizontal support rod (2), characterized in that: The transverse support rod (2) is fixedly installed on both sides of the column (1), and also includes: Clamps (3), a pair of clamps (3) are fixedly installed at the bottom of the column (1); Hook (4), the hook (4) is fixedly installed on the top of the column (1), and a buffer pad (401) is fixedly installed inside the hook (4).

2. The channel photovoltaic operation platform externally mounted on a PHC pipe pile according to claim 1, characterized in that: Each of the clamps (3) is fixedly installed with an anti-slip layer (301), and a diagonal support rod (6) is fixedly installed between the column (1) and the transverse support rod (2).

3. A channel photovoltaic operation platform externally mounted on a PHC pipe pile according to any one of claims 1-2, characterized in that: Each of the transverse support rods (2) is fixedly installed with an edge guardrail (5) on one side of its top.

Citation Information

Patent Citations

  • Overwater photovoltaic installation construction platform

    CN220786084U