AI Technical Summary
目前,许多体育馆幕墙仍以平面或简单曲面为主,视觉效果单一,难以展现建筑的个性与动感
S5: 面板安装:待所有单元骨架安装校正完毕后,将工厂预制的铝单板一和铝单板二通过铝合金角码和螺钉,固定在对应单元的铝型材龙骨上,完成封闭;
Smart Images

Figure CN122980596A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of building curtain walls, and specifically relates to a rhomboid composite curtain wall structure and its construction method. Background Technology
[0002] As important public buildings, stadiums are increasingly emphasizing artistic expression and visual impact in their facade design. Currently, many stadium curtain walls still primarily feature flat or simple curved surfaces, resulting in a monotonous visual effect and failing to showcase the building's individuality and dynamism. To achieve complex three-dimensional shapes, existing technologies largely rely on highly customized, complex heavy steel structure support systems paired with irregularly shaped panels, leading to bulky structures, extremely high requirements for processing and installation precision, long construction cycles, and high costs.
[0003] In particular, for large curtain walls that require different depths and levels of three-dimensional effects on the same building facade, such as a deep pyramid at the top and an inner and outer double-sided shell at the bottom, how to ensure the structural stability and reliable connection of each section, and achieve efficient modular prefabrication and on-site installation, is a technical problem that urgently needs to be solved in this field. Summary of the Invention
[0004] This invention provides a rhomboid composite curtain wall structure and its construction method to address the technical challenges in large curtain walls with a deep pyramidal top and inner and outer double-sided shells at the bottom. These challenges include ensuring the structural stability and reliable connection of each section, as well as achieving efficient modular prefabrication and on-site installation.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: a rhomboid composite curtain wall structure, comprising an upper pyramidal curtain wall area and a lower inner and outer double-prism curtain wall area. The upper pyramidal curtain wall area is composed of multiple rhomboid three-dimensional units arranged repeatedly along the circumference of the top of the stadium. Each rhomboid three-dimensional unit includes four inner steel pipes forming the rhombus and four apex protruding steel pipes. One end of the four apex protruding steel pipes converges and is fixed, and the other end is respectively fixed to the corner of the four inner steel pipes. The convergence point of the four apex protruding steel pipes extends beyond the plane of the four inner steel pipes. The inner steel pipes of adjacent rhomboid three-dimensional units are arranged parallel to each other. The lower inner and outer double-prism curtain wall area is composed of multiple inner and outer double-prism three-dimensional units arranged repeatedly along the circumference of the top of the stadium. The structure consists of an inner and outer double-prism three-dimensional unit, comprising four inner steel pipes, four outer steel pipes, and four connecting steel pipes. The four inner steel pipes form a prism shape, and the four outer steel pipes also form a prism shape that protrudes beyond the prism shape formed by the inner steel pipes. The two ends of the connecting steel pipes are respectively connected to the intersection corners of the inner and outer steel pipes. The inner steel pipes of adjacent inner and outer double-prism three-dimensional units are arranged in parallel. The inner steel pipes of adjacent upper pyramidal curtain wall areas and lower inner and outer double-prism curtain wall areas are arranged in parallel. Four triangular aluminum single panels are installed on the prism three-dimensional unit to form a three-dimensional prism shape, and four trapezoidal aluminum single panels are installed on the inner and outer double-prism three-dimensional units to form a three-dimensional shape with prisms on both the outer and inner sides.
[0006] By adopting the above technical solutions, this structure possesses the following advantages: 1. Rich three-dimensional visual effects: By combining the "pyramidal" three-dimensional units with the "inner and outer double-sided shell" three-dimensional units in upper and lower sections, a spatial shape of a four-sided pyramidal space is formed at the top and a four-sided frustum space at the bottom. This breaks the monotony of traditional curtain walls, creating a deep, multi-layered, and dynamically changing light and shadow effect, greatly enhancing the artistic expression and iconic status of the stadium's facade. 2. Reasonable structure and clear force distribution: Both types of units adopt the spatial truss principle to construct the main framework, with a clear force path. Through a unified force transmission system composed of inner steel pipes, connecting steel plates, and square tube connectors, the curtain wall load is effectively transferred to the main structure, ensuring high safety. 3. Standardized and modular design: Each three-dimensional unit can be prefabricated in a factory, decomposing the complex spatial shape into standard steel pipes, adapters, and panel modules, improving processing accuracy, quality consistency, and production efficiency. 4. Convenient construction and high fault tolerance: The unitized framework can be hoisted as a whole, significantly reducing the amount and time spent on high-altitude operations. The Z-shaped EPDM first adapter is flexible, absorbing installation errors and structural deformation. The L-shaped and T-shaped second and third adapters provide three-dimensional adjustment, reducing the stringent requirements for absolute precision on-site and making installation simple and quick. 5. Durability and Maintainability: The main metal components are coated with fluorocarbon, and the EPDM adapters effectively prevent steel-aluminum contact corrosion, improving overall durability. The modular design also facilitates future replacement and maintenance of individual panels. This design solves the technical challenges of ensuring structural stability and reliable connections in each section of a large curtain wall with a deep pyramidal top and inner and outer double-sided shells at the bottom, while achieving efficient modular prefabrication and on-site installation.
[0007] Preferably, the installation method of the inner steel pipes of the rhomboid solid unit and the inner and outer double rhomboid solid unit is the same. A connecting steel plate is fixed to the inner side of the inner steel pipe, and a square tube connector is set between the two connecting steel plates. The two connecting steel plates and the square tube connector are connected by bolts. The square tube connector is fixedly connected to the main steel structure. The main steel structure is the skeleton of the stadium. It is usually matched to the position of the curtain wall according to the shape of the curtain wall. This is a conventional construction method and will not be described in detail here. A Z-shaped transition is set on the outer side of the inner steel pipe. Part 1: The two sides of the Z-shaped adapter are attached to the inner steel pipe and fixed with screws. The middle of the Z-shaped adapter is spaced from the inner steel pipe and connected with an L-shaped adapter 2 by screws. Screws pass through and fix the inner steel pipe, adapter 1 and adapter 2 in sequence. The other side of adapter 2 is fixed with an aluminum profile keel by screws. A triangular aluminum single panel 1 is fixedly installed on the outside of the aluminum profile keel of the rhomboid three-dimensional unit. A trapezoidal aluminum single panel 2 is fixedly installed on the outside of the aluminum profile keel of the inner and outer double rhomboid three-dimensional unit.
[0008] By adopting the above technical solution, the inner steel pipe is connected to the main steel structure, and the outer aluminum profile keel and aluminum single panel are installed. The structure is reasonable, the stress is clear, the overall structural strength is high, and the stability is strong.
[0009] Preferably, the installation method of the top protruding steel pipe of the rhomboid solid unit and the connecting steel pipe of the inner and outer double rhomboid solid unit is the same. The outer side of the connecting steel pipe is also provided with a Z-shaped adapter. The two sides of the Z-shaped adapter are attached to the connecting steel pipe and fixed with screws. The middle of the Z-shaped adapter is spaced from the connecting steel pipe and connected with an L-shaped adapter two by screws. The screws fix the connecting steel pipe, adapter one and adapter two. The two adapter two are connected to the connecting steel pipe and are staggered. The other side of the adapter two is fixed with an aluminum profile keel by screws. The two waists of the trapezoidal aluminum single plate two are fixed to the aluminum profile keel connected to the connecting steel pipe. The two adapter two form an angle facing outward. The four triangular aluminum single plates one on the top protruding steel pipe of the rhomboid solid unit form a three-dimensional rhomboid. The four trapezoidal aluminum single plates two on the connecting steel pipe of the inner and outer double rhomboid solid unit form a three-dimensional shape with rhomboids on both the outer and inner sides.
[0010] By adopting the above technical solution, aluminum profile keel is also set on the outside of the top protruding steel pipe and the connecting steel pipe, resulting in high overall structural strength and strong stability.
[0011] Preferably, a T-shaped adapter three is provided on the outer side of the outer steel pipe. The horizontal plate of the adapter three is arc-shaped and attached to the outer steel pipe and fixed to the outer steel pipe by screws. The vertical plate of the adapter three is fixed to the aluminum profile keel by screws. The top edge of the trapezoidal aluminum single panel two is fixed to the aluminum profile keel connected to the outer steel pipe. The four trapezoidal aluminum single panels two form a three-dimensional shape with both the outer and inner sides being prismatic.
[0012] By adopting the above technical solution, aluminum profile keel is also set on the outside of the outer steel pipe, and the four sides of the trapezoid are fixedly installed, resulting in high overall structural strength and strong stability.
[0013] Preferably, the square tube connector is provided at three points on the inner steel tube, at both ends and in the middle, with a distance of 200mm between the ends and the apex.
[0014] By adopting the above technical solution, the structural connection is stable and the overall stability is strong.
[0015] Preferably, the included angle between adjacent aluminum single panel one and aluminum single panel two is 124°-165°. By adopting the above technical solution, the angle is reasonable and the visual effect is good.
[0016] Preferably, 5mm thick aluminum alloy angle brackets are fixed to the four sides of aluminum single panel one and aluminum single panel two, and the aluminum alloy angle brackets are fixed to the aluminum profile keel by screws.
[0017] By adopting the above technical solution, a gap is provided that facilitates installation and fixation.
[0018] Preferably, the first adapter is a 1mm thick EPDM profile, the second adapter is an aluminum alloy profile, and the third adapter is an aluminum alloy profile.
[0019] By adopting the above technical solutions, EPDM profiles effectively isolate the direct contact between steel pipes (steel) and aluminum alloy profiles, preventing corrosion caused by direct contact between the two different metals in a humid environment. They absorb minor displacements and vibrations caused by temperature changes, wind loads, or slight structural deformations, avoiding noise or stress concentration caused by hard collisions between metals. The excellent elasticity of EPDM allows it to perfectly fill all uneven gaps between the steel pipe and the aluminum alloy under the pressure of bolt pre-tightening force and the aluminum alloy profile, forming a continuous and reliable waterproof and airtight sealing barrier.
[0020] A construction method for a rhomboid composite curtain wall structure includes the following steps: S1. Measurement and layout and main structure verification: According to the design drawings, measure and lay out the installation control lines and elevation lines of each curtain wall unit on the main steel structure of the gymnasium, and verify the position of the embedded parts or connection points of the main steel structure. S2: Prefabrication of unit skeleton in factory: In the factory, steel pipe skeletons of rhomboid solid units and inner and outer double rhomboid solid units are processed and manufactured in batches, and the positioning and preliminary connection of connecting steel plates, adapters and aluminum profile keels on the corresponding steel pipes are completed to form unit skeleton modules; S3: Installation of connecting components: Fix the square tube connectors to the main steel structure according to the layout position; S4: Zoned hoisting and fixing: S4.1: Hoisting the inner and outer double-prism curtain wall units: Hoist the prefabricated inner and outer double-prism three-dimensional unit skeleton modules to the installation position, and fasten the connecting steel plates on the inner steel pipes to the two sides of the already installed square tube connectors with bolts to complete the fixing of the unit to the main structure; install all units in this area in sequence along the circumference in this way; S4.2: Hoisting the upper pyramidal curtain wall unit: After the lower area is installed, the prefabricated first pyramidal three-dimensional unit skeleton module is hoisted to the top installation position and fixed to the main steel structure through its connecting steel plate and square tube connector, and ensures that it is aligned and parallel with the inner steel tube of the adjacent inner and outer double pyramidal three-dimensional unit below. S5: Panel installation: After all unit frames are installed and aligned, the factory-prefabricated aluminum single panel one and aluminum single panel two are fixed to the aluminum profile keel of the corresponding unit using aluminum alloy angle brackets and screws to complete the enclosure; S6: Sealing and finishing treatment: Apply weather-resistant sealant to the joints of adjacent aluminum single panel one and aluminum single panel two, and perform edge finishing and finishing treatment on the top and bottom of the curtain wall and the junction with other building parts.
[0021] The beneficial effects of this invention are reflected in the following aspects: 1. Rich three-dimensional visual effects: By combining the "pyramidal" three-dimensional unit with the "inner and outer double-sided shell" three-dimensional unit in upper and lower sections, a spatial shape of a four-sided pyramidal space is formed in the upper part and a four-sided frustum space in the lower part. This breaks the monotony of traditional curtain walls and creates a deep, multi-layered, and dynamically changing light and shadow effect, greatly enhancing the artistic expression and iconic nature of the stadium's facade. 2. Reasonable structure and clear force distribution: Both types of units adopt the spatial truss principle to construct the main skeleton, with a clear force path. Through a unified force transmission system composed of inner steel pipes, connecting steel plates, and square tube connectors, the curtain wall load is effectively transferred to the main structure, ensuring high safety. 3. Standardized and modular design: Each three-dimensional unit can be prefabricated in a factory, decomposing the complex spatial shape into standard steel pipes, adapters, and panel modules, improving processing accuracy, quality consistency, and production efficiency. 4. Convenient construction and high fault tolerance: The unitized skeleton can be hoisted as a whole, significantly reducing the amount and time spent on high-altitude operations. The Z-shaped EPDM first adapter is flexible, absorbing installation errors and structural deformation. The L-shaped and T-shaped second and third adapters provide three-dimensional adjustment, reducing the stringent requirements for absolute precision on-site and making installation simple and quick. 5. Durability and Maintainability: The main metal components are coated with fluorocarbon, and the EPDM adapters effectively prevent steel-aluminum contact corrosion, improving overall durability. The modular design also facilitates future replacement and maintenance of individual panels. This design solves the technical challenges of ensuring structural stability and reliable connections in each section of a large curtain wall with a deep pyramidal top and inner and outer double-sided shells at the bottom, while achieving efficient modular prefabrication and on-site installation.
[0022] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention; the main objects and other advantages of the invention may be realized and obtained by means of the embodiments particularly pointed out in the description. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the overall effect structure of an embodiment of the present invention; Figure 2 This is a schematic diagram of the structure of four prismatic solid units according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of four inner and outer double-prism solid units according to an embodiment of the present invention; Figure 4 This is a front view of the lowest point where the inner steel pipes intersect, according to an embodiment of the present invention. Figure 5 This is a structural schematic diagram of an aluminum single-panel according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the structure of aluminum single panel two according to an embodiment of the present invention; Figure 7 yes Figure 2 A diagram of AA in the middle; Figure 8 This is an exploded view of the inner steel pipe installation according to an embodiment of the present invention; Figure 9 yes Figure 2 A schematic diagram of BB; Figure 10 yes Figure 3 A schematic diagram of CC in the diagram.
[0024] Attached reference numerals: 1. Upper pyramidal curtain wall area; 2. Lower inner and outer double-prism curtain wall area; 3. Inner steel pipe; 4. Top protruding steel pipe; 5. Outer steel pipe; 6. Connecting steel pipe; 7. Aluminum single panel one; 8. Aluminum single panel two; 9. Connecting steel plate; 10. Square tube connector; 11. Bolt; 12. Main steel structure; 13. Adapter one; 14. Screw; 15. Adapter two; 16. Aluminum profile keel; 17. Adapter three; 18. Aluminum alloy corner bracket. Detailed Implementation
[0025] The technical solutions of the present invention will be described in detail below through embodiments. The following embodiments are merely exemplary and can only be used to explain and illustrate the technical solutions of the present invention, and should not be construed as limiting the technical solutions of the present invention.
[0026] Combination Figure 1-10A rhomboid composite curtain wall structure includes an upper pyramidal curtain wall area 1 and a lower inner and outer double-prism curtain wall area 2. The upper pyramidal curtain wall area 1 is composed of multiple rhomboid three-dimensional units arranged repeatedly along the circumference of the top of the stadium. Each rhomboid three-dimensional unit includes four inner steel pipes 3 forming a rhombus and four pointed outward steel pipes 4. One end of the four pointed outward steel pipes 4 converges and is fixed, and the other end is fixed to the corner of the four inner steel pipes 3 respectively. The convergence point of the four pointed outward steel pipes 4 extends beyond the plane of the four inner steel pipes 3. The inner steel pipes 3 of adjacent rhomboid three-dimensional units are arranged parallel to each other. The lower inner and outer double-prism curtain wall area 2 is composed of multiple inner and outer double-prism three-dimensional units arranged repeatedly along the circumference of the top of the stadium. The unit includes four inner steel pipes 3, four outer steel pipes 5, and four connecting steel pipes 6. The four inner steel pipes 3 form a rhombus, and the four outer steel pipes 5 form a rhombus and protrude from the outside of the rhombus formed by the inner steel pipes 3. The two ends of the connecting steel pipes 6 are respectively connected to the intersection corners of the inner steel pipes 3 and the intersection corners of the outer steel pipes 5. The inner steel pipes 3 of the adjacent inner and outer double rhombus three-dimensional units are arranged in parallel. The inner steel pipes 3 of the upper pyramidal curtain wall area 1 and the lower inner and outer double rhombus curtain wall area 2 are arranged in parallel. Four triangular aluminum single panels 7 are installed on the rhombus three-dimensional unit to form a three-dimensional rhombus. Four trapezoidal aluminum single panels 8 are installed on the inner and outer double rhombus three-dimensional unit to form a three-dimensional shape with rhombuses on both the outer and inner sides.
[0027] This structure boasts: 1. Rich three-dimensional visual effects: By combining "pyramidal" and "double-sided shell" three-dimensional units in upper and lower sections, a spatial shape of upper quadrangular pyramid and lower quadrangular truncated pyramid is formed, breaking the monotony of traditional curtain walls and creating a deep, multi-layered, and dynamically changing light and shadow effect, greatly enhancing the artistic expression and iconic status of the stadium's facade. 2. Rational structure and clear force distribution: Both types of units adopt the spatial truss principle to construct the main framework, with a clear force path. Through a unified force transmission system composed of inner steel pipes 3, connecting steel plates 9, and square tube connectors 10, the curtain wall load is effectively transferred to the main structure, ensuring high safety. 3. Standardized and modular design: Each three-dimensional unit can be prefabricated in a factory, decomposing the complex spatial shape into standard steel pipes, adapters, and panel modules, improving processing accuracy, quality consistency, and production efficiency. 4. Convenient construction and high fault tolerance: The unitized framework allows for overall hoisting, significantly reducing the amount and time spent on high-altitude work. The Z-shaped EPDM first adapter is flexible and can absorb installation errors and structural deformation. The L-shaped and T-shaped second and third adapters provide three-dimensional adjustment, reducing the stringent requirements for absolute precision on site and making installation simple and quick. 5. Durability and Maintainability: The main metal components are coated with fluorocarbon, and the EPDM adapters effectively prevent steel-aluminum contact corrosion, improving overall durability. The modular design also facilitates future replacement and maintenance of individual panels.
[0028] The installation method of the inner steel pipe 3 of the rhomboid solid unit and the inner and outer double rhomboid solid unit is the same. The inner side of the inner steel pipe 3 is fixed with a connecting steel plate 9. A square tube connector 10 is set between the two connecting steel plates 9. The two connecting steel plates 9 and the square tube connector 10 are connected by bolts 11. The square tube connector 10 is fixedly connected to the main steel structure 12. The main steel structure 12 is the skeleton of the stadium. It is usually matched and arranged according to the shape of the curtain wall. It is a conventional construction method and will not be described in detail here. The outer side of the inner steel pipe 3 is provided with a Z-shaped adapter 13. The two sides of the Z-shaped adapter 13 are attached to the inner steel pipe 3. The components are secured by screws 14. The center of the Z-shaped adapter 13 is spaced from the inner steel pipe 3 and connected to an L-shaped adapter 15 via screws 14. Screws 14 pass through and secure the inner steel pipe 3, adapter 13, and adapter 15 sequentially. Screws 14 are common mechanical parts used to connect and fix two or more parts; details are omitted here. On the other side of adapter 15, an aluminum profile keel 16 is fixed via screws 14. A triangular aluminum single panel 7 is fixedly installed on the outer side of the aluminum profile keel 16 of the rhomboid three-dimensional unit, and a trapezoidal aluminum single panel 8 is fixedly installed on the outer side of the aluminum profile keel 16 of the inner and outer double rhomboid three-dimensional unit. The inner steel pipe 3 is internally connected to the main steel structure 12, and externally fitted with the aluminum profile keel 16 and aluminum single panels. The structure is reasonable, the stress distribution is clear, and the overall structural strength and stability are high.
[0029] The installation method of the apex-protruding steel pipe 4 of the rhomboid solid unit and the connecting steel pipe 6 of the inner and outer double rhomboid solid units is the same. A U-shaped adapter 13 is also provided on the outer side of the connecting steel pipe 6. The two sides of the U-shaped adapter 13 are attached to the connecting steel pipe 6 and fixed by screws 14. The middle of the U-shaped adapter 13 is spaced from the connecting steel pipe 6 and connected to an L-shaped adapter 2 15 by screws 14. The screws 14 fix the connecting steel pipe 6, adapter 13, and adapter 2 15. The two adapters 2 15 are connected to the connecting steel pipe 6 and are staggered. On the other side, an aluminum profile keel 16 is fixed by screws 14. The two waists of the trapezoidal aluminum single panel 8 are fixed to the aluminum profile keel 16 connected by the connecting steel pipe 6. The two adapters 15 form an angle facing outward. The four triangular aluminum single panels 7 on the top protruding steel pipe 4 of the rhomboid three-dimensional unit form a three-dimensional rhombus. The four trapezoidal aluminum single panels 8 on the connecting steel pipe 6 of the inner and outer double rhomboid three-dimensional unit form a three-dimensional shape with rhomboids on both the outer and inner sides. The top protruding steel pipe 4 and the outer side of the connecting steel pipe 6 are also equipped with aluminum profile keels 16. The overall structure has high strength and strong stability.
[0030] A T-shaped adapter 17 is provided on the outer side of the outer steel pipe 5. The horizontal plate of the adapter 17 is arc-shaped and attached to the outer steel pipe 5 and fixed to the outer steel pipe 5 by screws 14. The vertical plate of the adapter 17 is fixed to the aluminum profile keel 16 by screws 14. The top edge of the trapezoidal aluminum single panel 28 is fixed to the aluminum profile keel 16 connected to the outer steel pipe 5. The four trapezoidal aluminum single panels 28 form a three-dimensional shape with both the outer and inner sides being prismatic. The outer side of the outer steel pipe 5 is also provided with aluminum profile keel 16. All four sides of the trapezoid are fixedly installed, resulting in high overall structural strength and strong stability.
[0031] The square tube connector 10 is set at three points on the inner steel tube 3 at both ends and in the middle, with a distance of 200mm between the two ends and the apex. The structure is stable and the overall stability is strong.
[0032] The included angle between adjacent aluminum single panel 7 and aluminum single panel 8 is 124°-165°, which is reasonable and has a good visual effect.
[0033] Aluminum single panel 7 and aluminum single panel 8 are each fixed with a 5mm thick aluminum alloy corner bracket 18 on their four sides. The aluminum alloy corner bracket 18 is fixed to the aluminum profile keel 16 by screws 14, and has a gap for easy installation and fixing. Conventional structures such as light holes can also be opened on aluminum single panel 7 and aluminum single panel 8 according to actual use, which will not be described in detail here.
[0034] Adapter 1 (13) is made of 1mm thick EPDM profile, Adapter 2 (15) is made of aluminum alloy profile, and Adapter 3 (17) is made of aluminum alloy profile. The EPDM profile effectively isolates the steel pipe (steel) from direct contact with the aluminum alloy profile, preventing corrosion caused by direct contact between the two different metals in a humid environment. It absorbs minor displacements and vibrations caused by temperature changes, wind loads, or slight structural deformations, and avoids noise or stress concentration caused by hard collisions between metals. The excellent elasticity of EPDM allows it to perfectly fill all uneven gaps between the steel pipe and the aluminum alloy profile under the pre-tightening force of bolt 11 and the extrusion of the aluminum alloy profile, forming a continuous and reliable waterproof and airtight sealing barrier.
[0035] A construction method for a rhomboid composite curtain wall structure includes the following steps: S1. Measurement and layout and main structure verification: According to the design drawings, measure and lay out the installation control lines and elevation lines of each curtain wall unit on the main steel structure 12 of the gymnasium, and verify the position of the embedded parts or connection points of the main steel structure 12. S2: Prefabrication of unit skeleton in factory: In the factory, steel pipe skeletons of rhomboid solid units and inner and outer double rhomboid solid units are processed and manufactured in batches, and the positioning and preliminary connection of connecting steel plates 9, adapters and aluminum profile keels 16 on the corresponding steel pipes are completed to form unit skeleton modules. S3: Installation of connecting components: Fix the square tube connector 10 to the main steel structure 12 according to the layout position; S4: Zoned hoisting and fixing: S4.1: Hoisting the inner and outer double-prism curtain wall units: Hoist the prefabricated inner and outer double-prism three-dimensional unit skeleton modules to the installation position, and use bolts 11 to fasten the connecting steel plates 9 on the inner steel pipe 3 to both sides of the already installed square tube connectors 10, thus completing the fixation of the unit to the main structure; install all units in this area in sequence along the circumference in this way; S4.2: Hoisting the upper pyramidal curtain wall unit 1: After completing the installation of the lower area, the prefabricated first pyramidal three-dimensional unit skeleton module is hoisted to the top installation position and fixed to the main steel structure 12 through its connecting steel plate 9 and square tube connector 10, and ensured that it is aligned and parallel with the inner steel tube 3 of the adjacent inner and outer double pyramidal three-dimensional unit below. S5: Panel installation: After all unit frames are installed and aligned, the factory-prefabricated aluminum single panel 7 and aluminum single panel 8 are fixed to the aluminum profile keel 16 of the corresponding unit using aluminum alloy angle brackets 18 and screws 14 to complete the enclosure. S6: Sealing and finishing treatment: Apply weather-resistant sealant to the joints of adjacent aluminum single panel 7 and aluminum single panel 8, and perform edge finishing and finishing treatment on the top, bottom and junctions with other building parts of the curtain wall.
[0036] The main construction method is that it can be reasonably segmented according to the prismatic solid unit and the inner and outer double prismatic solid unit. The rest of the construction content can be carried out using conventional and mature construction methods. Only the general process is described and the details will not be repeated.
[0037] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.
Claims
1. A rhomboid composite curtain wall structure, characterized in that: The structure includes an upper pyramidal curtain wall area (1) and a lower inner and outer double-prism curtain wall area (2). The upper pyramidal curtain wall area (1) is composed of multiple prismatic three-dimensional units arranged repeatedly along the circumference of the top of the stadium. Each prismatic three-dimensional unit includes four inner steel pipes (3) forming a prism and four apex protruding steel pipes (4). One end of the four apex protruding steel pipes (4) converges and is fixed, and the other end is fixed to the corner of the four inner steel pipes (3). The convergence point of the four apex protruding steel pipes (4) extends beyond the plane of the four inner steel pipes (3). The inner steel pipes (3) of adjacent prismatic three-dimensional units are arranged in parallel. The lower inner and outer double-prism curtain wall area (2) is composed of multiple inner and outer double-prism three-dimensional units arranged repeatedly along the circumference of the top of the stadium. Each inner and outer double-prism three-dimensional unit includes four inner steel pipes (3) 3) Four outer steel pipes (5) and four connecting steel pipes (6), four inner steel pipes (3) form a rhombus, four outer steel pipes (5) form a rhombus and protrude outside the rhombus formed by the inner steel pipes (3), the two ends of the connecting steel pipes (6) are respectively connected to the intersection corner of the inner steel pipes (3) and the intersection corner of the outer steel pipes (5), the inner steel pipes (3) of the adjacent inner and outer double rhombus three-dimensional units are arranged in parallel, the inner steel pipes (3) of the upper pyramidal curtain wall area (1) and the lower inner and outer double rhombus curtain wall area (2) are arranged in parallel, four triangular aluminum single panels (7) are installed on the rhombus three-dimensional unit to form a three-dimensional rhombus, and four trapezoidal aluminum single panels (8) are installed on the inner and outer double rhombus three-dimensional unit to form a three-dimensional shape with rhombuses on both the outer and inner sides.
2. The prismatic composite curtain wall structure according to claim 1, characterized in that: The installation method of the inner steel pipe (3) of the rhomboid solid unit and the inner and outer double rhomboid solid unit is the same. The inner side of the inner steel pipe (3) is fixed with a connecting steel plate (9). A square tube connector (10) is set between the two connecting steel plates (9). The two connecting steel plates (9) and the square tube connector (10) are connected by bolts (11). The square tube connector (10) is fixedly connected to the main steel structure (12). A Z-shaped adapter (13) is set on the outer side of the inner steel pipe (3). The two sides of the Z-shaped adapter (13) are attached to the inner steel pipe (3) and fixed by screws (14). The middle part of the T-shaped adapter (13) is spaced from the inner steel pipe (3) and connected to the L-shaped adapter (15) by screws (14). The screws (14) pass through and fix the inner steel pipe (3), adapter (13) and adapter (15) in sequence. The other side of adapter (15) is fixed with an aluminum profile keel (16) by screws (14). A triangular aluminum single plate (7) is fixedly installed on the outside of the aluminum profile keel (16) of the rhomboid three-dimensional unit. A trapezoidal aluminum single plate (8) is fixedly installed on the outside of the aluminum profile keel (16) of the inner and outer double rhomboid three-dimensional unit.
3. The prismatic composite curtain wall structure according to claim 2, characterized in that: The installation method of the apex protruding steel pipe (4) of the rhomboid solid unit and the connecting steel pipe (6) of the inner and outer double rhomboid solid unit is the same. The outer side of the connecting steel pipe (6) is also provided with a Z-shaped adapter (13). The two sides of the Z-shaped adapter (13) are attached to the connecting steel pipe (6) and fixed by screws (14). The middle part of the Z-shaped adapter (13) is spaced from the connecting steel pipe (6) and connected by an L-shaped adapter (2) (15) by screws (14). The screws (14) fix the connecting steel pipe (6), adapter (13) and adapter (2) (15). The two adapters (12) (13) are connected by screws (14). 5) They are connected together on the connecting steel pipe (6) and staggered. The other side of the adapter part (15) is fixed with an aluminum profile keel (16) by screws (14). The two waist sides of the trapezoidal aluminum single plate (8) are fixed on the aluminum profile keel (16) connected by the connecting steel pipe (6). The two adapter parts (15) form an angle facing outward. The four triangular aluminum single plates (7) on the top protruding steel pipe (4) of the rhomboid three-dimensional unit form a three-dimensional rhombus. The four trapezoidal aluminum single plates (8) on the connecting steel pipe (6) of the inner and outer double rhomboid three-dimensional unit form a three-dimensional shape with rhombuses on both the outer and inner sides.
4. The prismatic composite curtain wall structure according to claim 3, characterized in that: The outer side of the outer steel pipe (5) is provided with a T-shaped adapter three (17). The horizontal plate of the adapter three (17) is arc-shaped and attached to the outer steel pipe (5) and fixed to the outer steel pipe (5) by screws (14). The vertical plate of the adapter three (17) is fixed to the aluminum profile keel (16) by screws (14). The top edge of the trapezoidal aluminum single plate two (8) is fixed to the aluminum profile keel (16) connected to the outer steel pipe (5). The four trapezoidal aluminum single plates two (8) form a three-dimensional shape with both the outer and inner sides being prismatic.
5. A rhomboid composite curtain wall structure according to claim 4, characterized in that: The square tube connector (10) is provided at three points on the inner steel tube (3) at both ends and in the middle, with a distance of 200mm between the two ends and the apex.
6. A rhomboid composite curtain wall structure according to claim 5, characterized in that: The included angle between adjacent aluminum single panel one (7) and aluminum single panel two (8) is 124°-165°.
7. A rhomboid composite curtain wall structure according to claim 6, characterized in that: The four sides of the aluminum single panel one (7) and aluminum single panel two (8) are respectively fixed with 5mm thick aluminum alloy corner brackets (18), and the aluminum alloy corner brackets (18) are fixed to the aluminum profile keel (16) by screws (14).
8. A rhomboid composite curtain wall structure according to claim 7, characterized in that: The first adapter (13) is a 1mm thick EPDM profile, the second adapter (15) is an aluminum alloy profile, and the third adapter (17) is an aluminum alloy profile.
9. A construction method for a rhomboid composite curtain wall structure as described in any one of claims 1-8, characterized in that: Includes the following steps, S1. Measurement and layout and main structure verification: According to the design drawings, measure and lay out the installation control lines and elevation lines of each curtain wall unit on the main steel structure (12) of the gymnasium, and verify the position of the embedded parts or connection points of the main steel structure (12). S2: Prefabrication of unit skeleton in factory: In the factory, steel pipe skeletons of rhomboid solid units and inner and outer double rhomboid solid units are processed and manufactured in batches, and the positioning and preliminary connection of connecting steel plates (9), adapters and aluminum profile keels (16) on the corresponding steel pipes are completed to form unit skeleton modules; S3: Installation of connecting components: Fix the square tube connector (10) to the main steel structure (12) according to the layout position; S4: Zoned hoisting and fixing: S4.1: Hoisting the inner and outer double-prism curtain wall units: Hoist the prefabricated inner and outer double-prism three-dimensional unit skeleton modules to the installation position, and fasten the connecting steel plate (9) on the inner steel pipe (3) to both sides of the installed square tube connector (10) with bolts (11) to complete the fixing of the unit to the main structure; install all units in this area in sequence along the circumference in this way; S4.2: Hoisting the upper pyramidal curtain wall area (1) unit: After completing the installation of the lower area, the prefabricated first pyramidal three-dimensional unit skeleton module is hoisted to the top installation position and fixed to the main steel structure (12) through its connecting steel plate (9) and square tube connector (10), and ensures that it is aligned and parallel with the inner steel pipe (3) of the adjacent inner and outer double pyramidal three-dimensional unit below; S5: Panel installation: After all unit frames are installed and corrected, the factory-prefabricated aluminum single panel one (7) and aluminum single panel two (8) are fixed to the aluminum profile keel (16) of the corresponding unit through aluminum alloy corner brackets (18) and screws (14) to complete the enclosure; S6: Sealing and finishing treatment: Apply weather-resistant sealant to the joints of adjacent aluminum single panel one (7) and aluminum single panel two (8), and perform edge finishing and finishing treatment on the top, bottom and junctions of the curtain wall with other building parts.