Integrated platform with one-side single-machine position, one-side double-machine position and built-in tower crane and construction method

CN122980667APending Publication Date: 2026-10-27BEIJING ACAD OF BUILDING ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610996026.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-06
Publication Date
2026-10-27

AI Technical Summary

Technical Problem

[0004]本发明提供了一侧单机位一侧双机位且内置塔吊的集成平台及施工方法,用以解决对于规格较大的核心筒,集成平台能够满足稳定,保证施工安全,但是常常会有空间比较狭小的情况,此空间在布置了塔吊之后只能布置三排液压集成平台,塔吊的一侧为单机位,塔吊的另一侧为双机位,双机位的一侧彼此之间连接比较稳定,但是单机位的一侧集成平台的结构稳定性较差,存在施工安全隐患的技术问题

Benefits of technology

[0016]本发明的有益效果体现在:本发明针对于核心筒较小时,此空间在布置了塔吊之后只能布置三排液压集成平台,塔吊的一侧为单机位,塔吊的另一侧为双机位的施工工况,

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122980667A_ABST
    Figure CN122980667A_ABST
Patent Text Reader

Abstract

The application discloses an integrated platform with one-side single-machine-position, one-side double-machine-position and built-in tower crane and a construction method, and is suitable for the construction condition that three rows of hydraulic integrated platforms can be arranged on one side of the tower crane and the other side of the tower crane is double-machine-position when the core tube is small, and replaces the conventional assembled upper frame body. The whole upper frame body is formed by the full-length vertical rods, and the single-machine-position integrated platform and the double-machine-position integrated platform are better in integrity due to the added reinforcing beams. The vertical rods of the upper frame body and the stable channel steel form an L-shaped groove, the reinforcing beams are embedded in the L-shaped groove and cannot be moved, so that the stability is ensured, a whole body with high structural stability is formed, the safety performance is sufficient, and the construction benefit is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building core tube construction, and specifically relates to an integrated platform and construction method with a single machine position on one side and a double machine position on the other side, and a built-in tower crane. Background Technology

[0002] Hydraulic climbing formwork, as an integrated platform, is used for the construction of core tubes in high-rise and super high-rise buildings. It is a relatively mature technology. The structure mainly includes wall anchors, guide rails, a main frame, an upper frame, and hanging brackets. The main frame is equipped with climbing boxes that cooperate with the guide rails. The guide rails have ladders. The climbing boxes, in conjunction with the ladders, allow the climbing formwork to ascend while the guide rails remain stationary. Even when the climbing boxes are fixed to the wall anchors, they still cooperate with the ladders to lift the guide rails, thus alternately enabling the hydraulic climbing formwork to construct the core tube. During core tube construction, multiple hydraulic climbing formwork units are connected end-to-end to surround the core tube for pouring and casting.

[0003] Tower cranes are needed for concrete delivery during pouring. In core tube construction, setting up tower cranes inside the core tube can effectively improve coverage and construction efficiency. Therefore, the practice of setting up tower cranes inside the core tube has gradually emerged. For larger core tubes, integrated platforms can meet the requirements of stability and ensure construction safety. However, there are often situations where the space is relatively small. After setting up tower cranes, only three rows of hydraulic integrated platforms can be arranged in this space. One side of the tower crane is a single machine position, and the other side is a double machine position. The connection between the double machine positions on one side is relatively stable, but the structural stability of the integrated platform on the single machine position side is poor, which poses a technical problem of construction safety hazards. Summary of the Invention

[0004] This invention provides an integrated platform and construction method with a single-unit station on one side and a double-unit station on the other, and a built-in tower crane. This addresses the technical problem that while the integrated platform can ensure stability and construction safety for large-sized core tubes, there are often situations where space is limited. In such cases, after arranging the tower crane, only three rows of hydraulic integrated platforms can be arranged, with one side of the tower crane being a single-unit station and the other side being a double-unit station. The connection between the double-unit stations on one side is relatively stable, but the structural stability of the integrated platform on the single-unit station side is poor, posing a potential construction safety hazard.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: an integrated platform with a single-unit location on one side and a double-unit location on the other, and a built-in tower crane, is installed inside the core tube. The tower crane is arranged in a conventional manner, which will not be elaborated here. The integrated platform includes a single-unit integrated platform located on one side of the tower crane inside the core tube and a double-unit integrated platform located on the other side. The single-unit and double-unit integrated platforms have the same structure. The single-unit integrated platform includes a wall-mounted device, guide rails, lifting components, a main truss, a hanging frame, and an upper frame. The upper frame includes a continuous upper frame upright and top-level crossbeams, first-level crossbeams, and second-level crossbeams installed between the upper frame uprights. A connecting beam group is used to connect the single-unit integrated platform and the dual-unit integrated platform. A reinforcing beam is also used to connect the single-unit integrated platform and the dual-unit integrated platform. The reinforcing beam is set on the side of the upper frame upright closest to the wall-mounted device and is fixedly connected to the upper frame upright by bolts. There are four reinforcing beams in the height direction. The four reinforcing beams include reinforcing beam one located below and close to the top horizontal beam, reinforcing beam two located below and close to the first-floor horizontal beam of the upper frame, reinforcing beam three located at the top height of the second-floor horizontal beam of the upper frame, and reinforcing beam four located at the top of the bottom horizontal beam of the main truss.

[0006] Preferably, stabilizing channel steel is welded to the inner and outer sides of the bottom end of the reinforcing beam on the upper frame upright. The stabilizing channel steel is welded to the upper frame upright. The upper frame upright and the stabilizing channel steel form an L-shaped groove, and the reinforcing beam is fitted and embedded in the L-shaped groove and cannot move, thus ensuring stability.

[0007] Preferably, the reinforcing beam is a channel steel with an opening facing away from the upper frame upright.

[0008] Preferably, the main truss of both the single-station integrated platform and the dual-station integrated platform has a top crossbeam, a bottom crossbeam, and vertical bars. The upper frame is supported on the top of the top crossbeam of the main truss. The hanger includes hanger uprights and hanger crossbeams, and the hanger uprights are installed on the bottom crossbeam of the main truss.

[0009] Preferably, the connecting beam group is located at the top of the top beam, the first-floor beam, the second-floor beam, the top beam of the main truss, the bottom beam of the main truss, and the top of the hanging beam, and is correspondingly connected to the dual-position integrated platform. The connecting beam group is set outside the tower crane area.

[0010] Preferably, the first and second layer crossbeams of the dual-station integrated platform are both square structures formed by butt welding of channel steel, with both ends welded to the upper frame uprights. The connecting beam group is fixed and installed by U-bolts that pass through the square structure formed by butt welding of channel steel in the first layer crossbeam of the dual-station integrated platform. The first and second layer crossbeams of the single-station integrated platform are square structures formed by butt welding of channel steel, with back-to-back channel steel welded on both sides. The connecting beam group is fixed and installed by U-bolts that pass through the back-to-back channel steel on both sides of the channel steel in the first layer crossbeam of the single-station integrated platform. The bottom crossbeam of the main truss of the dual-station integrated platform is a single channel steel, and the connecting beam group is fixed and installed by U-bolts that pass through the single channel steel. The bottom crossbeam of the main truss (24) of the single-unit integrated platform is a square structure with butt welded channel steel and back-to-back channel steel welded on both sides. The connecting beam group is fixed by two U-bolts that pass through the back-to-back channel steel respectively. The hanging column of the double-unit integrated platform is a single channel steel and is fixed to the bottom crossbeam of the main truss of the double-unit integrated platform by bolts. The hanging column of the single-unit integrated platform is two columns that are respectively connected to the two sides of the square structure with butt welded channel steel by bolts. The hanging column of the double-unit integrated platform is a single channel steel and is fixed to the hanging column by bolts. The hanging column of the single-unit integrated platform has the same structure as the first-layer crossbeam of the single-unit integrated platform.

[0011] Preferably, the single-position integrated platform and the dual-position integrated platform are also provided with short beam groups. The short beam groups are set at both ends of the tower crane and separated by the tower crane. The short beam groups are respectively located at the top of the top beam, the first-floor beam, the second-floor beam, the top beam of the main truss, the bottom beam of the main truss, and the top of the hanging beam. The dual-position integrated platform is provided with corresponding short beam groups.

[0012] Preferably, a platform slab is laid on top of the connecting beam group and the short beam group.

[0013] Preferably, two connecting beams are provided on the top-level crossbeam, the first-level crossbeam, the top crossbeam of the main truss, and the hanging beam, and one connecting beam is provided at the top of the second-level crossbeam and the bottom crossbeam of the main truss. The connecting beams are I-beams or channel steel.

[0014] The construction method for an integrated platform with a single-machine station on one side and a double-machine station on the other, and a built-in tower crane, includes the following steps: S1. After the tower crane is installed in place, install the wall-mounted devices and guide rails for single-position and double-position cranes, and then install the main truss and lifting components. S2. Connect the continuous, integral upper frame uprights and crossbeams together, arrange stable channel steel, and then hoist and install the whole structure onto the main truss. S3. Install hangers on the main truss; S4. Install connecting beams and reinforcing beams. Set one connecting beam and one reinforcing beam at the top of the second-floor crossbeam and the bottom crossbeam of the main truss. Set two connecting beams on the top-floor crossbeam, the first-floor crossbeam, the top crossbeam of the main truss, and the hanging beam crossbeam. Set a reinforcing beam below and near the top-floor crossbeam, and set a reinforcing beam below and near the first-floor crossbeam of the upper frame. Other conventional structures not mentioned in the process are also installed, such as the four-sided formwork and auxiliary components. The erection and operation of the formwork is a mature and well-known technology in the climbing formwork industry, and its detailed structure and principle will not be described in detail here.

[0015] S5. Install short beam assemblies, which are located at the top of the top beam, the first-floor beam, the second-floor beam, the top beam of the main truss, the bottom beam of the main truss, and the top of the hanging beam. S6. A platform slab is laid on top of the connecting beam group and the short beam group. A guardrail is installed on the platform slab for protection. This structure is conventional and will not be described in detail here.

[0016] The beneficial effects of this invention are as follows: This invention addresses the situation where, when the core tube is relatively small, only three rows of hydraulic integrated platforms can be installed in the space after arranging tower cranes, with one side of the tower crane serving as a single-position and the other side as a double-position construction site. 1. In addition to the connecting beam group between the single-station integrated platform and the dual-station integrated platform, a reinforcing beam was added to improve the overall integrity of the single-station integrated platform and the dual-station integrated platform. 2. The upper frame uprights and stabilizing channel steel form an L-shaped groove, and the reinforcing beam is fitted and embedded in the L-shaped groove and cannot move, thus ensuring stability; 3. Based on the existing single connecting beam, two connecting beams are installed at the same height where there is no reinforcing beam, and a single connecting beam is maintained at the same height where there is a reinforcing beam. 4. The first and second layer beams of the upper frame of the single-unit integrated platform were redesigned, laid out, and reinforced. The structure was strengthened and widened, which enhanced the support effect on the connecting beam group and the short beam group, and ensured the strength and stability of the single-unit side of its own structure. 5. Double hangers are used for the single-unit mounting bracket, and the crossbeams of the mounting bracket are also reinforced to increase the structural strength and stability of the bottom of the single-unit integrated platform.

[0017] This application, combining improvements 1, 2, 3, 4, and 5, can form a whole with high structural stability and sufficient safety performance. This eliminates the need to externally mount the tower crane for safety reasons in situations where the core tube houses the tower crane and only three rows of hydraulic integrated platforms can be arranged. It retains the construction efficiency of an internal tower crane while ensuring construction safety. It also solves the problem of limited space, where only three rows of hydraulic integrated platforms can be arranged after the tower crane is installed, with one side of the tower crane being a single-position platform and the other side a double-position platform. While the connection between the double-position platforms on one side is relatively stable, the structural stability of the integrated platform on the single-position side is poor, posing a technical risk to construction safety.

[0018] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention; the main objects and other advantages of the invention may be realized and obtained by means of the embodiments particularly pointed out in the description. Attached Figure Description

[0019] Figure 1 This is a side view of the overall structure of an embodiment of the present invention; Figure 2 This is a top view of the structure of an embodiment of the present invention; Figure 3 This is a schematic diagram of the top of the upper frame uprights according to an embodiment of the present invention; Figure 4 This is a diagram showing the fit between the reinforcing beam and the stabilizing channel steel in an embodiment of the present invention. Figure 5 This is a schematic diagram of the main truss in an embodiment of the present invention; Figure 6 This is a schematic diagram of the hanging bracket according to an embodiment of the present invention; Figure 7 yes Figure 2 A schematic diagram of the structure of CC; Figure 8 yes Figure 7 A structural diagram of the first-layer beam at point D, which represents the dual-station integrated platform; Figure 9 yes Figure 7 A structural diagram of a single-layer beam at point E, used to illustrate the single-unit integrated platform; Figure 10 yes Figure 7 The connection diagram at point F in the middle shows the bottom crossbeam of the main truss of the dual-station integrated platform; Figure 11 yes Figure 7 The diagram at point G in the middle illustrates the connection at the bottom crossbeam of the main truss of the single-unit integrated platform; Figure 12 This is a structural schematic diagram of the crossbeam of the hanging frame used to illustrate the dual-station integrated platform; Figure 13 This is a structural diagram of the hanging beam used to illustrate the single-unit integrated platform.

[0020] Reference numerals: 1. Tower crane; 2. Single-position integrated platform; 21. Wall-mounted device; 22. Guide rail; 23. Lifting assembly; 24. Main truss; 25. Hanging frame; 251. Hanging frame upright; 252. Hanging frame crossbeam; 26. Upper frame; 261. Upper frame upright; 262. Top floor crossbeam; 263. First floor crossbeam; 264. Second floor crossbeam; 3. Dual-position integrated platform; 4. Connecting beam group; 5. Reinforcing beam; 51. Reinforcing beam one; 52. Reinforcing beam two; 53. Reinforcing beam three; 54. Reinforcing beam four; 6. Stabilizing channel steel; 7. Short beam group. Detailed Implementation

[0021] The technical solutions of the present invention will be described in detail below through embodiments. The following embodiments are merely exemplary and can only be used to explain and illustrate the technical solutions of the present invention, and should not be construed as limiting the technical solutions of the present invention.

[0022] Combination Figure 1-13 An integrated platform with a single-unit configuration on one side and a double-unit configuration on the other, and a built-in tower crane, is installed inside the core tube. Tower crane 1 is installed inside the core tube in a conventional arrangement, which will not be described in detail here. The integrated platform includes a single-unit integrated platform 2 located on one side of tower crane 1 inside the core tube and a double-unit integrated platform 3 located on the other side of tower crane 1 inside the core tube. The single-unit integrated platform 2 and the double-unit integrated platform 3 have the same structure. The single-unit integrated platform 2 includes a wall-mounted device 21, a guide rail 22, a lifting assembly 23, a main truss 24, a hanging frame 25, and an upper frame 26. The upper frame 26 includes a continuous upper frame upright 261 and a top-level crossbeam 262, a first-level crossbeam 263, and a second-level crossbeam 264 installed between the upper frame uprights 261. The single-unit integrated platform 2 and the double-unit integrated platform 3 have the same structure. A connecting beam group 4 is connected between the platforms 3. A reinforcing beam 5 is also connected between the single-position integrated platform 2 and the dual-position integrated platform 3. The reinforcing beam 5 is located on the side of the upper frame upright 261 closest to the wall-mounted device 21 and is fixedly connected to the upper frame upright 261 by bolts. There are four reinforcing beams 5 in the height direction. The four reinforcing beams 5 include reinforcing beam 1 51 located below and close to the top horizontal beam 262, reinforcing beam 2 52 located below and close to the first-level horizontal beam 263 of the upper frame 26, reinforcing beam 3 53 located at the top height of the second-level horizontal beam 264 of the upper frame 26, and reinforcing beam 4 54 located at the top of the bottom horizontal beam of the main truss 24.

[0023] The wall-mounted device 21, guide rail 22, lifting component 23, and main truss 24 are all conventional structures, and their climbing principle is the same as that described in the background technology introduction. Specific details will not be repeated here.

[0024] On the upper frame upright 261, stabilizing channel steel 6 is welded to both the inner and outer sides of the bottom end of the reinforcing beam 5. The stabilizing channel steel 6 is welded to the upper frame upright 261. The upper frame upright 261 and the stabilizing channel steel 6 form an L-shaped groove. The reinforcing beam 5 is fitted and embedded in the L-shaped groove and cannot move, thus ensuring stability. The reinforcing beam 5 is a channel steel with its opening facing away from the upper frame upright 261. There must be space at the bottom end of the stabilizing channel steel 6. If there is no space on the other side of the upper frame upright 261, it is not provided.

[0025] Both the single-station integrated platform 2 and the dual-station integrated platform 3 have a top crossbeam, a bottom crossbeam, and vertical bars on their main trusses 24. The upper frame 26 is supported on the top of the top crossbeam of the main truss 24. The hanger 25 includes a hanger upright 251 and a hanger crossbeam 252. The hanger upright 251 is installed on the bottom crossbeam of the main truss 24.

[0026] The connecting beam group 4 is located at the top of the top beam 262, the first-floor beam 263, the second-floor beam 264, the top beam of the main truss 24, the bottom beam of the main truss 24, and the top of the hanging beam 252, and is connected to the dual-position integrated platform 3. The connecting beam group 4 is set outside the area of ​​the tower crane 1.

[0027] The first-layer crossbeam 263 and second-layer crossbeam 264 of the dual-station integrated platform 3 are both square structures formed by butt welding of channel steel, with both ends welded to the upper frame uprights 261. The connecting beam group 4 is fixedly installed by U-bolts that pass through the square structure formed by butt welding of channel steel through the first-layer crossbeam 263 of the dual-station integrated platform 3. The first-layer crossbeam 263 and second-layer crossbeam 264 of the single-station integrated platform 2 are square structures formed by butt welding of channel steel, with back-to-back channel steel welded on both sides. The connecting beam group 4 is fixedly installed by U-bolts that pass through the back-to-back channel steel on both sides of the butt-welded channel steel through the first-layer crossbeam 263 of the single-station integrated platform 2. The bottom crossbeam of the main truss 24 of the dual-station integrated platform 3 is a single channel steel, and the connecting beam group 4 is fixedly installed by U-bolts that pass through the single channel steel. For the fixed single-unit integrated platform 2, the bottom crossbeam of the main truss 24 is a square structure formed by butt welding of channel steel, with back-to-back channel steel welded on both sides. The connecting beam group 4 is fixed by two U-bolts that pass through the back-to-back channel steel respectively. The hanging upright 251 of the double-unit integrated platform 3 is a single channel steel and is fixed to the bottom crossbeam of the main truss 24 of the double-unit integrated platform 3 by bolts. The hanging upright 251 of the single-unit integrated platform 2 consists of two uprights, each connected to both sides of the square structure formed by butt welding of channel steel by bolts. The hanging crossbeam 252 of the double-unit integrated platform 3 is a single channel steel and is fixed to the hanging upright 251 by bolts. The hanging crossbeam 252 of the single-unit integrated platform 2 has the same structure as the first-layer crossbeam 263 of the single-unit integrated platform 2. Other parts not mentioned retain the conventional climbing formwork structure. U-bolts are common parts of climbing formwork and will not be described in detail here.

[0028] The single-position integrated platform 2 and the dual-position integrated platform 3 are also equipped with short beam groups 7. The short beam groups 7 are set at both ends of the tower crane 1 and are separated by the tower crane 1. The short beam groups 7 are located at the top of the top beam 262, the first-floor beam 263, the second-floor beam 264, the top beam of the main truss 24, the bottom beam of the main truss 24, and the top of the hanging beam 252. The dual-position integrated platform 3 is equipped with corresponding short beam groups 7. The platform plate is laid on the top of the connecting beam group 4 and the short beam group 7.

[0029] Two connecting beams are respectively installed on the top beam 262, the first-floor beam 263, the top beam of the main truss 24, and the hanging beam 252. A connecting beam is installed at the top of the second-floor beam 264 and the bottom beam of the main truss 24. The connecting beams are I-beams or channel steel.

[0030] The construction method for an integrated platform with a single-machine station on one side and a double-machine station on the other, and a built-in tower crane 1, includes the following steps: S1. After the tower crane 1 is installed in place, install the single-position and double-position wall-mounted devices 21 and guide rails 22, and then install the main truss 24 and lifting components 23. S2. Connect the continuous, integral upper frame uprights 261 and crossbeams together, and arrange the sturdy channel steel 6, and then hoist and install the whole assembly onto the main truss 24. S3. Install the hanger 25 on the main truss 24; S4. Install the connecting beam group 4 and the reinforcing beam 5. Set a connecting beam and a reinforcing beam 5 at the top of the second-floor crossbeam 264 and the bottom crossbeam of the main truss 24. Set two connecting beams on the top-floor crossbeam 262, the first-floor crossbeam 263, the top crossbeam of the main truss 24, and the hanging beam 252. Set the reinforcing beam 5 below and near the top-floor crossbeam 262, and set the reinforcing beam 5 below and near the first-floor crossbeam 263 of the upper frame 26. Other conventional structures not mentioned in the process are also installed together, such as the support of the four-sided formwork and auxiliary components. The support and operation of the formwork is a mature and well-known technology in the climbing formwork industry, and its detailed structure and principle will not be described in detail here.

[0031] S5. Install short beam group 7, which is located at the top of top beam 262, first-floor beam 263, second-floor beam 264, top beam of main truss 24, bottom beam of main truss 24 and top of hanging beam 252 respectively. Platform slabs are laid on top of S6, connecting beam group 4, and short beam group 7. Guardrails are installed on the platform slabs for protection. This structure is conventional and will not be described in detail here; only a small door needs to be opened in the top guardrail to allow the tower crane to enter.

[0032] The above structural description is used to describe the differences between this embodiment and conventional solutions. Other structural information not described in detail can be arranged in the conventional manner.

[0033] The beneficial effects of this invention are as follows: This invention addresses the situation where, when the core tube is small, only three rows of hydraulic integrated platforms can be arranged in this space after the tower crane is installed, with one side of the tower crane being a single-position and the other side being a double-position construction condition. 1. In addition to the connecting beam group between the single-station integrated platform and the dual-station integrated platform, a reinforcing beam was added to improve the overall integrity of the single-station integrated platform and the dual-station integrated platform. 2. The upper frame uprights and stabilizing channel steel form an L-shaped groove, and the reinforcing beam is fitted and embedded in the L-shaped groove and cannot move, thus ensuring stability; 3. Based on the existing single connecting beam, two connecting beams are installed at the same height where there is no reinforcing beam, and a single connecting beam is maintained at the same height where there is a reinforcing beam. 4. The first and second layer beams of the upper frame of the single-unit integrated platform were redesigned, laid out, and reinforced. The structure was strengthened and widened, which enhanced the support effect on the connecting beam group and the short beam group, and ensured the strength and stability of the single-unit side of its own structure. 5. Double hangers are used for the single-unit mounting bracket, and the crossbeams of the mounting bracket are also reinforced to increase the structural strength and stability of the bottom of the single-unit integrated platform.

[0034] This application, combining improvements 1, 2, 3, 4, and 5, can form a whole with high structural stability and sufficient safety performance. This eliminates the need to externally mount the tower crane for safety reasons in situations where the core tube houses the tower crane and only three rows of hydraulic integrated platforms can be arranged. It retains the construction efficiency of an internal tower crane while ensuring construction safety. It also solves the problem of limited space, where only three rows of hydraulic integrated platforms can be arranged after the tower crane is installed, with one side of the tower crane being a single-position platform and the other side a double-position platform. While the connection between the double-position platforms on one side is relatively stable, the structural stability of the integrated platform on the single-position side is poor, posing a technical risk to construction safety.

[0035] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. An integrated platform with a single-unit station on one side and a double-unit station on the other, and a built-in tower crane, characterized in that: Installed inside the core tube, the core tube is equipped with a tower crane (1). The integrated platform includes a single-position integrated platform (2) located on one side of the tower crane (1) inside the core tube and a double-position integrated platform (3) located on the other side of the tower crane (1) inside the core tube. The single-position integrated platform (2) and the double-position integrated platform (3) have the same structure. The single-position integrated platform (2) includes a wall-mounted device (21), a guide rail (22), a lifting assembly (23), a main truss (24), a hanging frame (25), and an upper frame (26). The upper frame (26) includes a continuous upper frame upright (261) and a top-level crossbeam (262), a first-level crossbeam (263), and a second-level crossbeam (264) installed between the upper frame uprights (261). A connecting beam group (4) is connected between the single-position integrated platform (2) and the double-position integrated platform (3). 2) A reinforcing beam (5) is also connected between the dual-position integrated platform (3). The reinforcing beam (5) is located on the side of the upper frame upright (261) closest to the wall-mounted device (21) and is fixedly connected to the upper frame upright (261) by bolts. The reinforcing beam (5) has four beams in the height direction. The four reinforcing beams (5) include the first reinforcing beam (51) located below and close to the top beam (262), the second reinforcing beam (52) located below and close to the first beam (263) of the upper frame (26), the third reinforcing beam (53) located at the top height of the second beam (264) of the upper frame (26), and the fourth reinforcing beam (54) located at the top of the bottom beam of the main truss (24).

2. The integrated platform with a single-position machine on one side and a double-position machine on the other side, and a built-in tower crane, as described in claim 1, is characterized in that: On the upper frame upright (261), stabilizing channel steel (6) is welded to the inner and outer sides of the bottom end of the reinforcing beam (5), and the stabilizing channel steel (6) is welded to the upper frame upright (261).

3. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 2, is characterized in that: The reinforcing beam (5) is a channel steel with an opening facing away from the upper frame upright (261).

4. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 3, is characterized in that: The main truss (24) of the single-station integrated platform (2) and the dual-station integrated platform (3) both have a top crossbeam, a bottom crossbeam, and vertical bars. The upper frame (26) is supported on the top of the top crossbeam of the main truss (24). The hanging frame (25) includes a hanging frame upright (251) and a hanging frame crossbeam (252). The hanging frame upright (251) is installed on the bottom crossbeam of the main truss (24).

5. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 4, is characterized in that: The connecting beam group (4) is located at the top of the top beam (262), the first-floor beam (263), the second-floor beam (264), the top beam of the main truss (24), the bottom beam of the main truss (24), and the top of the hanging beam (252), and is connected to the dual-position integrated platform (3). The connecting beam group (4) is set outside the tower crane (1) area.

6. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 5, is characterized in that: The first-layer crossbeam (263) and second-layer crossbeam (264) of the dual-station integrated platform (3) are both square structures formed by butt welding of channel steel, with both ends welded to the upper frame uprights (261). The connecting beam group (4) is fixedly installed by U-bolts that pass through the square structure formed by butt welding of channel steel through the first-layer crossbeam (263) of the dual-station integrated platform (3). The first-layer crossbeam (263) and second-layer crossbeam (264) of the single-station integrated platform (2) are square structures formed by butt welding of channel steel, with back-to-back channel steel welded on both sides. The connecting beam group (4) is fixedly installed by U-bolts that pass through the back-to-back channel steel on both sides of the channel steel of the first-layer crossbeam (263) of the single-station integrated platform (2). The bottom crossbeam of the main truss (24) of the dual-station integrated platform (3) is a single channel steel. The connecting beam group (4) is fixedly installed by U-bolts that pass through the single channel steel. The bottom crossbeam of the main truss (24) of the single-unit integrated platform (2) is a square structure with butt welded channel steel and back-to-back channel steel welded on both sides. The connecting beam group (4) is fixed by two U-bolts that pass through the back-to-back channel steel respectively. The hanging pole (251) of the double-unit integrated platform (3) is a single channel steel and is fixed to the bottom crossbeam of the main truss (24) of the double-unit integrated platform (3) by bolts. The hanging pole (251) of the single-unit integrated platform (2) consists of two poles that are respectively connected to the two sides of the square structure with butt welded channel steel by bolts. The hanging beam (252) of the double-unit integrated platform (3) is a single channel steel and is fixed to the hanging pole (251) by bolts. The hanging beam (252) of the single-unit integrated platform (2) has the same structure as the first-layer beam (263) of the single-unit integrated platform (2).

7. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 6, is characterized in that: The single-position integrated platform (2) and the dual-position integrated platform (3) are also equipped with short beam groups (7). The short beam groups (7) are set at both ends of the tower crane (1) and are separated by the tower crane (1). The short beam groups (7) are located at the top of the top beam (262), the first-floor beam (263), the second-floor beam (264), the top beam of the main truss (24), the bottom beam of the main truss (24), and the top of the hanging beam (252). The dual-position integrated platform (3) is equipped with corresponding short beam groups (7).

8. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 7, is characterized in that: Platform slabs are laid on top of the connecting beam group (4) and the short beam group (7).

9. The integrated platform with a single-unit station on one side and a double-unit station on the other side, and a built-in tower crane, as described in claim 8, is characterized in that: Two connecting beams are respectively provided on the top beam (262), the first-layer beam (263), the top beam of the main truss (24), and the hanging beam (252). A connecting beam is provided at the top of the second-layer beam (264) and the bottom beam of the main truss (24). The connecting beams are I-beams or channel steel.

10. A construction method for an integrated platform with a single-machine position on one side and a double-machine position on the other side, and a built-in tower crane, as described in any one of claims 1-9, characterized in that: Includes the following steps, S1. After the tower crane (1) is installed in place, install the single-position and double-position wall-mounted devices (21) and guide rails (22), and then install the main truss (24) and lifting components (23). S2. Connect the continuous, integral upper frame uprights (261) and crossbeams together, and arrange stable channel steel (6), and then hoist and install them as a whole on the main truss (24); S3. Install the hanger (25) on the main truss (24); S4. Install the connecting beam group (4) and the reinforcing beam (5). Set a connecting beam and a reinforcing beam (5) at the top of the second-floor beam (264) and the bottom beam of the main truss (24). Set two connecting beams on the top-floor beam (262), the first-floor beam (263), the top beam of the main truss (24), and the hanging beam (252). Set a reinforcing beam (5) below and near the top-floor beam (262) and below and near the first-floor beam (263) of the upper frame (26). S5. Install short beam groups (7), which are located at the top of the top beam (262), the first-floor beam (263), the second-floor beam (264), the top beam of the main truss (24), the bottom beam of the main truss (24), and the top of the hanging beam (252). S6, a platform slab is laid on top of the connecting beam group (4) and the short beam group (7).