Integrated forming and rapid construction method for prefabricated cable trench of energy storage power station

CN122992583APending Publication Date: 2026-10-27中国电建集团贵州工程有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202610963603.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-30
Publication Date
2026-10-27

AI Technical Summary

Technical Problem

[0002]储能电站的电缆需通过电缆沟进行铺设,现有技术(见中国专利公告号CN110808564B)采用现场浇筑工艺,虽然能对电缆沟进行制作,但是现场浇筑工艺制作电缆沟效率低,无法满足快速施工的要求

Benefits of technology

[0012]本发明的有益效果在于:由于多个预制电缆沟通过预制成型,而后预制电缆沟彼此通过公嵌块B、母槽B与嵌块A、母槽A进行嵌锁连接,解决了现场浇筑工艺制作电缆沟效率低,无法满足快速施工的要求的问题。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122992583A_ABST
    Figure CN122992583A_ABST
Patent Text Reader

Abstract

The application discloses a kind of integrated forming quick construction methods of energy storage power station prefabricated cable trench, comprising: the construction process of multiple prefabricated cable trenches through prefabricated forming and each other interlocking connection.As multiple prefabricated cable trenches are prefabricated, and then prefabricated cable trenches are interlocked by male interlocking block B, female groove B and interlocking block A, female groove A, the problem that site pouring process makes cable trench with low efficiency and cannot meet the requirements of quick construction is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to an integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations, belonging to the field of energy storage power station construction technology. Background Technology

[0002] The cables for energy storage power stations need to be laid through cable trenches. Existing technology (see Chinese Patent Announcement No. CN110808564B) uses on-site casting process. Although it can make cable trenches, the on-site casting process is inefficient and cannot meet the requirements of rapid construction. Summary of the Invention

[0003] To address the aforementioned technical problems, this invention provides an integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations.

[0004] The present invention is achieved through the following technical solutions.

[0005] This invention provides an integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations, comprising: The construction process involves multiple prefabricated cables being assembled and interlocked with each other after prefabrication.

[0006] The construction process includes rapid hoisting and interlocking connection steps. The precast cable trench is hoisted onto the pad layer by binding rope with threaded sleeves. Multiple precast cable trenches are assembled, with the front end of the previous precast cable trench section spliced ​​with the rear end of the next precast cable trench section. At this time, the male insert block B and female groove B at the rear end of the precast cable trench are interlocked with the corresponding insert block A and female groove A at the front end of the precast cable trench.

[0007] The male insert B at the rear end of the precast cable trench is diagonally offset from the insert A at the front end of the precast cable trench, so that the female groove B and the female groove A are also diagonally offset.

[0008] The construction process also includes two steps: the initial design and fabrication of standardized molds, and the integrated molding of prefabricated cable trench segments.

[0009] The standardized mold design and manufacturing steps are as follows: the mold for the precast cable trench consists of an inner mold body, an outer mold body, a front mold body, and a rear mold body; the front mold body is provided with a protrusion A and a recess A for forming the male insert A and female groove A at the front end of the precast cable trench; the rear mold body is provided with a protrusion B and a recess B for forming the male insert B and female groove B at the rear end of the precast cable trench.

[0010] The integrated molding steps of the prefabricated cable trench segment are as follows: the mold is laid and installed, the mold is detachably connected and assembled with components such as bolts and nuts, threaded sleeves are pre-embedded between the inner mold body and the outer mold body, concrete is poured into the mold and vibrated and then placed to solidify.

[0011] The construction process also includes a subsequent rapid installation step of the cable bracket, which involves fixing the cable bracket to the threaded sleeve embedded in the side of the precast cable trench using bracket bolts, and then laying the cable on the inner wall of the precast cable trench with support through the cable bracket.

[0012] The beneficial effects of this invention are as follows: since multiple prefabricated cable trenches are prefabricated and then interlocked with each other through male insert B and female groove B and insert A and female groove A, the problem of low efficiency in on-site casting process for making cable trenches and inability to meet the requirements of rapid construction is solved. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the prefabricated cable trench and the mold during disassembly in this invention; Figure 2 This is a schematic diagram of the prefabricated cable trench and the mold during mold closing according to the present invention; Figure 3 This is a schematic diagram of the prefabricated cable trench assembly process according to the present invention; In the diagram: 1-Mold; 11-Inner mold body; 12-Outer mold body; 13-Mold body; 14-Rear mold body; 2-Prefabricated cable trench; 21-Male insert B; 22-Female groove B; 3-Threaded sleeve; 4-Cable bracket; 41-Bracket bolt. Detailed Implementation

[0014] The technical solution of the present invention is further described below, but the scope of protection is not limited to what is described.

[0015] like Figures 1 to 3 As shown.

[0016] This application discloses an integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations, comprising the following steps.

[0017] Step 1, Standardized mold design and manufacturing: The mold 1 for the prefabricated cable trench consists of an inner mold body 11, an outer mold body 12, a front mold body 13, and a rear mold body 14; the front mold body 13 is provided with a protrusion A131 and a recess A132 for forming the male insert A and female groove A at the front end of the prefabricated cable trench 2; the rear mold body 14 is provided with a protrusion B141 and a recess B142 for forming the male insert B21 and female groove B22 at the rear end of the prefabricated cable trench 2.

[0018] Step 2, integrated molding of precast cable trench segments: After the mold 1 is laid and installed, the mold 1 is detachably connected and assembled with components such as bolts and nuts. Threaded sleeves 3 are pre-embedded between the inner mold body 11 and the outer mold body 12. C40 concrete is poured into the mold 1 and vibrated before being placed to solidify, so that the precast cable trench 2 segments are solidified and formed in the mold 1. After curing to a design strength of more than 75%, the mold is removed, and the precast cable trench 2 is precast. Steps 1 and 2 are repeated to obtain multiple precast cable trench 2 segments.

[0019] Step 3, on-site foundation preparation: excavate the foundation trench according to the design drawings at the construction site and pour the foundation layer.

[0020] Step 4, rapid hoisting and interlocking connection: Using threaded sleeves 3 and ropes, the prefabricated cable trench 2 is hoisted onto the padding layer. Multiple prefabricated cable trenches 2 are assembled, with the front end of the previous section of prefabricated cable trench 2 connected to the rear end of the next section. At this time, the male insert block B21 and female groove B22 at the rear end of the prefabricated cable trench 2 are interlocked with the corresponding insert block A and female groove A at the front end of the prefabricated cable trench 2. Step 4 is repeated to assemble multiple prefabricated cable trenches 2. The male insert block B21 at the rear end of the prefabricated cable trench 2 is diagonally staggered with the insert block A at the front end of the prefabricated cable trench 2, and the female groove B22 is also diagonally staggered with the female groove A.

[0021] Since multiple prefabricated cable trenches 2 are prefabricated and then interlocked with each other through male insert B21 and female groove B22, the problem of low efficiency in on-site casting of cable trenches and inability to meet the requirements of rapid construction is solved.

[0022] Step 5, quick installation of cable brackets: The cable bracket 4 is fixed to the threaded sleeve 3 embedded on the side of the prefabricated cable trench 2 by the bracket bolt 41. The cable is supported by the cable bracket 4 and laid on the inner wall of the prefabricated cable trench 2.

[0023] Step 6, Cover plate installation and backfilling: Install the cover plate on the top of the prefabricated cable trench 2 (this is existing technology and will not be described in detail), and then backfill soil is compacted to bury the prefabricated cable trench 2 with the laid cables underground.

Claims

1. A rapid construction method for integrated molding of prefabricated cable trenches for energy storage power stations, characterized in that, include: The construction process of connecting multiple prefabricated cable trenches (2) by assembling and interlocking them after prefabrication.

2. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 1, characterized in that: The construction process includes a rapid hoisting and interlocking connection step, in which the prefabricated cable trench (2) is hoisted onto the pad layer by binding rope with threaded sleeve (3), and multiple prefabricated cable trenches (2) are assembled. The front end of the previous section of the prefabricated cable trench (2) is spliced ​​with the rear end of the next section of the prefabricated cable trench (2). At this time, the male insert block B (21) and female groove B (22) at the rear end of the prefabricated cable trench (2) are correspondingly interlocked with the front insert block A and female groove A at the front end of the prefabricated cable trench (2).

3. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 2, characterized in that: The male insert B (21) at the rear end of the prefabricated cable trench (2) is diagonally offset from the insert A at the front end of the prefabricated cable trench (2), so that the female groove B (22) and the female groove A are also diagonally offset.

4. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 2, characterized in that: The construction process also includes two steps: the initial design and fabrication of standardized molds, and the integrated molding of prefabricated cable trench segments.

5. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 4, characterized in that: The standardized mold design and manufacturing steps are as follows: the mold (1) of the prefabricated cable trench is composed of an inner mold body (11), an outer mold body (12), a front mold body (13) and a rear mold body (14); the front mold body (13) is provided with a protrusion A (131) and a recess A (132) for forming the male insert A and female groove A at the front end of the prefabricated cable trench (2); the rear mold body (14) is provided with a protrusion B (141) and a recess B (142) for forming the male insert B (21) and female groove B (22) at the rear end of the prefabricated cable trench (2).

6. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 4, characterized in that: The integrated molding steps of the prefabricated cable trench segment are as follows: the mold (1) is laid and installed, the mold (1) is detachably connected and assembled with components such as bolts and nuts, a threaded sleeve (3) is pre-embedded between the inner mold body (11) and the outer mold body (12), concrete is poured into the mold (1) and vibrated and then placed to solidify.

7. The integrated molding and rapid construction method for prefabricated cable trenches in energy storage power stations as described in claim 4, characterized in that: The construction process also includes a subsequent rapid installation step of the cable bracket, which is as follows: the cable bracket (4) is fixed to the threaded sleeve (3) embedded on the side of the prefabricated cable trench (2) by the bracket bolt (41), and the cable is supported by the cable bracket (4) and laid on the inner wall of the prefabricated cable trench (2).

Citation Information

Patent Citations

  • Construction process of concrete cable trench

    CN110808564B