AI Technical Summary
一种是与塔筒现浇一体的钢筋混凝土悬挑结构,该方案施工周期长,高空湿作业量大,质量控制难度高,且需搭设大量临时支撑,无法满足快速装配化施工的需求
1、节点刚度高,传力路径明确。本发明采用双面组合节点板连接构造,斜撑梁腹板与组合连接板、双面连接板通过高强螺栓紧固连接,形成刚性双面组合节点。相比现有技术中采用焊接或钢丝绳柔性拉结的方案,本发明提升了节点抗剪承载力和转动刚度,传力路径清晰直接,避免了焊接残余应力或柔性拉结松弛带来的安全隐患。
Smart Images

Figure CN123006015A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of solar thermal power generation engineering technology, specifically to a large-span prefabricated cantilever platform for the conversion layer of a heat absorption tower. Background Technology
[0002] The receiver tower is a crucial structure in a tower-type solar thermal power plant. Its lower part is a reinforced concrete cylindrical tower, while the upper part is a steel receiver structure, connected by a transition layer. A cantilevered maintenance platform is installed on the outside of the tower at the transition layer location, which is essential for ensuring the safety of daily inspections and maintenance operations.
[0003] Currently, two main technical approaches are used for cantilever platforms on the outside of towers. One is a reinforced concrete cantilever structure integrated with the cast-in-place tower. This approach has a long construction period, involves a large amount of wet work at height, is difficult to control in terms of quality, and requires the erection of a large number of temporary supports, making it unsuitable for rapid assembly construction. The other approach uses steel cantilever platforms. Existing steel cantilever platforms often borrow design ideas from building scaffolding or temporary platforms for cylindrical structures. Their joint connections mostly use welding or flexible steel wire rope ties, resulting in limited joint stiffness and load-bearing capacity, making it difficult to meet the safety requirements of large-span, heavy-load permanent platforms. The platform plan often adopts a concentric circular arrangement of radial main beams and circumferential secondary beams, resulting in insufficient overall spatial stiffness and a lack of effective out-of-plane support systems. At the same time, these platforms lack triangular spatial support units formed by spatial diagonal bracing, making it difficult to guarantee torsional resistance and overall stability. Moreover, most components are welded on-site, making factory prefabrication and rapid on-site assembly impossible, leading to low construction efficiency.
[0004] Therefore, there is currently a lack of a cantilevered work platform for the heat absorption tower conversion layer that is suitable for large-span polygonal layouts, has high node bearing capacity, sufficient spatial stiffness, and can be prefabricated in the factory and quickly assembled on site. Summary of the Invention
[0005] The purpose of this invention is to provide a large-span prefabricated cantilever platform for the heat absorption tower conversion layer to solve the above-mentioned problems in the prior art, and to achieve high node stiffness, good overall spatial stability, and the ability to be prefabricated in the factory and quickly assembled on site.
[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A large-span prefabricated cantilevered platform for the conversion layer of a heat absorber tower, located on the outside of the tower cylinder at the location of the heat absorber tower conversion layer, includes: Multiple sets of tower embedded parts are evenly arranged circumferentially along the tower wall and embedded in concrete; each set of tower embedded parts includes an upper embedded part and a lower embedded part, and the upper embedded part and the lower embedded part are arranged correspondingly in the circumferential direction. Multiple sets of combined triangular bracing are arranged circumferentially along the tower. Each set of combined triangular bracing includes a cantilever beam and a bottom brace. The inner end of the cantilever beam is fixedly connected to the upper embedded part, and the outer end of the cantilever beam extends out of the tower. One end of the bottom brace is fixedly connected to the lower embedded part, and the other end is fixedly connected to the cantilever beam. The connection point between the bottom brace and the cantilever beam is close to the outer end of the cantilever beam. The connection between the bottom brace and the cantilever beam and the lower embedded part adopts a double-sided combined node plate connection structure. The edge sealing steel beam includes an inner edge sealing steel beam and an outer edge sealing steel beam. The inner edge sealing steel beam is fixedly connected to the inner end of each cantilever beam along the circumference of the tower, and the outer edge sealing steel beam is fixedly connected to the outer end of each cantilever beam along the circumference of the tower, together with the cantilever beams forming a polygonal closed space frame. Multiple spatial diagonal braces are placed between two adjacent sets of combined triangular braces, with their ends fixedly connected to the end of the bottom diagonal brace near the tower and the end of the bottom diagonal brace near the cantilever beam, respectively, forming a triangular spatial support unit.
[0007] Furthermore, the upper and lower embedded parts in each group of tower embedded parts are aligned axially in the tower.
[0008] Furthermore, both the bottom brace and the cantilever beam are steel structural members with webs and flanges; The double-sided composite node plate connection structure includes a composite connecting plate, two double-sided connecting plates, and stiffening ribs, wherein: The combined connecting plate is fixed to the lower embedded part or cantilever beam, and is arranged end-to-end with the web of the bottom brace of the beam. The double-sided connecting plates are symmetrically arranged on both sides of the web of the bottom brace of the beam, and cover the mating area between the combined connecting plate and the web of the bottom brace of the beam. They are fixedly connected to the combined connecting plate and the web of the bottom brace of the beam by a group of high-strength bolts. The stiffening rib is a rectangular steel plate, which is welded perpendicularly to the free edge of the combined connecting plate.
[0009] Furthermore, the thickness of the combined connecting plate and the thickness of the double-sided connecting plate are both greater than or equal to the thickness of the web of the bottom brace of the beam.
[0010] Furthermore, the cross-sectional height of the cantilever beam is greater than the cross-sectional height of the bottom brace, and the cross-sectional height of the bottom brace is greater than the cross-sectional height of the spatial brace.
[0011] Furthermore, the number of the tower embedded parts, the number of the combined triangular braces, and the number of the spatial diagonal braces are equal, and they are all arranged correspondingly along the circumferential direction of the tower.
[0012] Furthermore, it also includes a composite floor slab, which is laid on top of the cantilever beam and the edge-sealing steel beam. The composite floor slab includes a profiled steel sheet and a cast-in-place concrete layer, and the profiled steel sheet is fixedly connected to the cantilever beam by studs.
[0013] Furthermore, the profiled steel sheet is also used as a permanent formwork during the construction phase of the cast-in-place concrete layer and as a load-bearing plate during the service phase of the composite floor slab.
[0014] Furthermore, it also includes a reinforced concrete edge guard, which is located at the outer periphery of the composite floor slab and is integrally cast with the composite floor slab.
[0015] Furthermore, both the upper and lower embedded parts include embedded anchor plates and anchor bars. The embedded anchor plates are attached to the outer side of the steel reinforcement skeleton of the tower wall. One end of the anchor bar is fixedly connected to the embedded anchor plate, and the other end is anchored into the concrete of the tower wall.
[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. High node stiffness and clear force transmission path. This invention adopts a double-sided composite node plate connection structure. The web of the diagonal bracing beam is fastened to the composite connecting plate and the double-sided connecting plate by high-strength bolts to form a rigid double-sided composite node. Compared with the existing technology that uses welding or flexible wire rope connection, this invention improves the shear bearing capacity and rotational stiffness of the node, and the force transmission path is clear and direct, avoiding the safety hazards caused by welding residual stress or loosening of flexible connection.
[0017] 2. Sufficient overall spatial stiffness and good stability. This invention connects the cantilever beams with inner and outer double-ring edge-sealing steel beams to form a polygonal closed spatial frame, creating a closed force system in the horizontal plane, effectively improving the overall in-plane stiffness of the platform. Simultaneously, spatial diagonal bracing between adjacent cantilever beams forms triangular spatial support units, providing reliable out-of-plane support for the platform, enhancing torsional resistance and lateral displacement stability, and solving the problem of insufficient spatial stiffness in existing concentric circular arrangement schemes.
[0018] 3. High degree of prefabrication, significantly improving construction efficiency. All platform components are prefabricated in the factory and assembled on-site with high-strength bolts, eliminating the need for on-site welding. This avoids high-altitude wet work and the erection of numerous temporary supports, resulting in fast construction speed and controllable quality, meeting the requirements of rapid prefabricated construction. Compared to cast-in-place reinforced concrete cantilever structures, this significantly shortens the construction cycle.
[0019] 4. The node area has a reasonable structure and low construction difficulty. The cantilever platform of this invention still achieves connection and load transfer through the embedded parts on the outside of the cylinder wall. Compared with the traditional embedded brackets or embedded plate connectors, the thickness correlation design of the double-sided combined node plate of this invention eliminates the need for dense reinforcement in the node area, avoiding the problem of concrete pouring difficulties caused by the interference between the steel bars and the connectors; the stiffening rib design of the combined connecting plate further enhances the local stability of the node and significantly improves the convenience of construction.
[0020] 5. Wide applicability and high safety redundancy. The polygonal closed space frame can be flexibly adapted to the outer diameter of the tower, and the closed boundary formed by the inner and outer double-ring sealing steel beams provides reliable safety protection for maintenance personnel; the combination of triangular space support units and high-strength bolt rigid nodes ensures that the platform has sufficient safety reserves when subjected to maintenance loads, wind loads and temperature effects. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the overall structure of the cantilever platform in an embodiment of the present invention; Figure 2 This is a bottom view of the cantilever platform in an embodiment of the present invention; Figure 3 This is a partial structural schematic diagram of the spatial support system of the cantilever platform in an embodiment of the present invention; Figure 4 This is a radial cross-sectional view of the cantilever platform in an embodiment of the present invention; In the picture: 100-Tower, 200-Tower embedded parts, 210 Upper embedded parts, 220 Lower embedded parts, 300-Combined triangular brace, 310-Cantilever beam, 320-Beam bottom brace, 330-Double-sided combined node plate connection structure, 331-Combined connecting plate, 332-Double-sided connecting plate, 333-Stiffening rib, 400-Edge sealing steel beam, 410-Inner edge sealing steel beam, 420-Outer edge sealing steel beam, 500-Spatial brace, 600-Combined floor slab, 601-Corrugated steel sheet, 602-Cast-in-place concrete layer, 700-Reinforced concrete edge protection. Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.
[0023] This embodiment provides a large-span prefabricated cantilever platform for the heat absorption tower's conversion layer, located on the outside of the tower cylinder 100 at the location of the heat absorption tower's conversion layer.Figures 1-2 As shown, it includes multiple sets of tower embedded parts 200, multiple sets of combined triangular braces 300, edge sealing steel beams 400, and multiple spatial diagonal braces 500. A detailed description is provided below with reference to specific embodiments.
[0024] This embodiment uses a tower-type molten salt solar thermal power generation project as an application background. The total height of the absorber tower is approximately 210m, and the conversion layer is located at a height of approximately 190m at the top of the tower. The lower part is a reinforced concrete cylindrical tower structure, and the upper part is a steel absorber structure. A cantilevered platform as described in this invention is set on the outside of the tower cylinder 100 at the location of the conversion layer. The cantilever length is 2.2m, and it is divided into 24 polygonal units along the circumference of the tower cylinder 100.
[0025] The multiple sets of tower embedded parts 200 are evenly arranged circumferentially along the tower wall of the tower 100 and embedded in the concrete. For example... Figures 3-4 As shown, each group of tower embedded parts 200 includes an upper embedded part 210 and a lower embedded part 220, which are arranged correspondingly in the circumferential direction. The upper embedded part 210 and the lower embedded part 220 in each group of tower embedded parts 200 are aligned axially in the tower 100, i.e., located on the same vertical line. In this embodiment, 24 groups of tower embedded parts 200 are evenly arranged circumferentially at the height of the transfer layer of the reinforced concrete tower 100.
[0026] Each set of tower embedded parts 200 includes an upper embedded part 210 and a lower embedded part 220, both of which include embedded anchor plates and anchor bars. The embedded anchor plates are attached to the outside of the steel reinforcement skeleton of the tower wall 100. One end of the anchor bar is fixedly connected to the embedded anchor plate, and the other end is anchored into the concrete of the tower wall 100. The tower embedded parts 200 are installed and positioned before the concrete of the tower 100 is poured, and are used to transfer the entire load of the cantilever structure to the tower 100.
[0027] The multiple sets of combined triangular braces 300 are arranged circumferentially along the tower 100. Each set of combined triangular braces 300 includes a cantilever beam 310 and a bottom brace 320. The inner end of the cantilever beam 310 is fixedly connected to the upper embedded part 210, and the outer end of the cantilever beam 310 extends out of the tower. One end of the bottom brace 320 is fixedly connected to the lower embedded part 220, and the other end is fixedly connected to the cantilever beam 310. The connection point between the bottom brace 320 and the cantilever beam 310 is close to the outer end of the cantilever beam 310. The fixed connection between the bottom brace 320 and the cantilever beam 310 and the lower embedded part 220 adopts a double-sided combined node plate connection structure 330.
[0028] In this embodiment, the combined triangular braces 300 are installed circumferentially along the tower 100 at each set of tower embedded parts 200, for a total of 24 sets. Each set of combined triangular braces 300 includes a cantilever beam 310 and a bottom brace 320. Both the cantilever beam 310 and the bottom brace 320 are steel structural members with webs and flanges.
[0029] The cantilever beam 310 is made of WH500×300×10×20 welded H-beams, arranged radially along the tower 100. Its inner end is fixedly connected to the corresponding upper embedded part 210 by high-strength bolts, and its outer end extends out of the tower 100 to the designed cantilever length of 2.2m. Among them, the embedded anchor plate of the upper embedded part 210 is welded with a connecting node plate, which is distributed on both sides of the web of the cantilever beam 310. Bolt holes are opened at the corresponding positions of the inner end of the cantilever beam 310, and it is directly fixedly connected by high-strength bolts.
[0030] The bottom diagonal brace 320 is made of WH300×300×10×15 welded H-beam and is located below the cantilever beam 310. The lower end of the bottom diagonal brace 320 is fixedly connected to the corresponding lower embedded part 220 using high-strength bolts, and the upper end is fixedly connected to the cantilever beam 310 using high-strength bolts, with the connection point close to the outer end of the cantilever beam 310. The connection between the bottom diagonal brace 320, the cantilever beam 310, and the lower embedded part 220 adopts a double-sided combined node plate connection structure 330, such as... Figure 4 As shown, it specifically includes: The combined connecting plate 331, with a thickness of t=14mm, is welded and fixed to the embedded anchor plate of the lower embedded part 220 or welded to the flange plate of the cantilever beam 310. The combined connecting plate 331 and the web plate of the bottom brace 320 are arranged in an end-to-end contact arrangement. Double-sided connecting plate 332, with a thickness of t=12mm, is symmetrically arranged on both sides of the web of the bottom brace of the beam and covers the docking area of the web of the combined connecting plate 331 and the bottom brace of the beam 320. It is fixedly connected to the combined connecting plate 331 and the web of the bottom brace of the beam by 12 M24 high-strength bolts. The stiffening rib 333 consists of an L-shaped steel plate and a rectangular steel plate, which are respectively welded vertically to the side of the combined connecting plate 331 to enhance the local stability of the node.
[0031] The combined connecting plate 331 and the stiffening rib 333 form a structure similar to an H-shaped steel beam. The height of the combined connecting plate 331 at the bottom of the main beam is determined according to the stress requirements. The free edge of the combined connecting plate 331 forms a mating surface with the web of the bottom brace 320. The closing dimension of this mating surface, i.e., the H-shaped height, is matched with the cross-sectional height of the bottom brace 320 to ensure the flatness of the connection surface and direct force transmission.
[0032] The thickness of the combined connecting plate 331 and the double-sided connecting plate 332 are both greater than or equal to the thickness of the web of the bottom brace. Furthermore, the cross-sectional height of the cantilever beam 310 (500mm) is greater than the cross-sectional height of the bottom brace 320 (300mm), and the cross-sectional height of the bottom brace 320 is greater than the cross-sectional height of the spatial brace 500. The spatial brace 500 uses WH200×200×8×12 welded H-beams with a cross-sectional height of 200mm, forming a reasonable stiffness gradient.
[0033] The aforementioned double-sided combined node plate connection structure 330 achieves multi-path force transmission of the bolt group through symmetrically arranged double-sided connecting plates 332, the combined connecting plate 331 provides continuous support, and the stiffening ribs 333 prevent local buckling, thereby improving the node bearing capacity and stiffness.
[0034] The edge-sealing steel beam 400 includes an inner edge-sealing steel beam 410 and an outer edge-sealing steel beam 420. The inner edge-sealing steel beam 410 is fixedly connected to the inner end of each cantilever beam 310 in a circumferential direction along the tower 100, and the outer edge-sealing steel beam 420 is fixedly connected to the outer end of each cantilever beam 310 in a circumferential direction along the tower 100, together with the cantilever beams 310 forming a polygonal closed spatial frame.
[0035] Specifically, the inner edge-sealing steel beams 410 are arranged circumferentially along the cantilever beams 310 near the tower wall 100, and the outer edge-sealing steel beams 420 are arranged circumferentially along the outer ends of the cantilever beams 310. Both the inner and outer edge-sealing steel beams 410 and 420 are composed of multiple straight steel beam segments connected sequentially along the tower 100, with each segment's ends fixed to the corresponding ends of two adjacent cantilever beams 310 using high-strength bolts. The two rings of edge-sealing steel beams 400 and the 24 cantilever beams 310 together form a polygonal closed spatial frame, providing in-plane stiffness and boundary constraints, and providing support and construction boundaries for the composite floor slab 600.
[0036] The multiple spatial diagonal braces 500 are located between two adjacent sets of combined triangular braces 300. In this embodiment, there are a total of 24 braces, which are made of WH200×200×8×12 welded H-beams. The two ends of the spatial diagonal braces 500 are respectively fixedly connected to the end of the beam bottom diagonal brace 320 near the tower 100 and the end of the beam bottom diagonal brace 320 near the cantilever beam 310. Specifically, they are fixedly connected to the web of the beam bottom diagonal brace 320 in the adjacent triangular brace through node plates and high-strength bolts, forming a triangular spatial support unit to enhance the out-of-plane stiffness and overall stability of the platform.
[0037] In addition, the number of sets of tower embedded parts 200, the number of sets of combined triangular braces 300, and the number of spatial diagonal braces 500 are all equal, all being 24, and all are arranged one-to-one in the circumferential direction of tower 100.
[0038] The cantilever beam 310, as the main load-bearing component, bears significant bending moments and shear forces; therefore, welded H-beams with a cross-sectional height of 500mm are used to ensure bending stiffness. The bottom diagonal brace 320 primarily bears axial pressure, and a cross-sectional height of 300mm is sufficient to meet stability requirements. The spatial diagonal brace 500, as an out-of-plane support, experiences less stress and is constructed using welded H-beams with a cross-sectional height of 200mm. These three components form a stepped stiffness gradient, ensuring overall stability while avoiding material waste.
[0039] Furthermore, the cantilever platform also includes a composite floor slab 600, which is laid on top of the cantilever beam 310 and the edge-sealing steel beam 400. The composite floor slab 600 includes a profiled steel sheet 601 and a cast-in-place concrete layer 602. The profiled steel sheet 601 is fixedly connected to the cantilever beam 310 by studs, and the studs are welded to the flange plates of the cantilever beam 310. The profiled steel sheet 601 serves both as a permanent formwork during the construction of the cast-in-place concrete layer 602 and as a load-bearing plate during the use of the composite floor slab 600, eliminating the need for formwork removal.
[0040] A reinforced concrete guardrail 700 is installed at the outer perimeter of the composite floor slab 600. It is a permanent protective structure that is cast integrally with the composite floor slab 600 to provide safety protection for maintenance personnel.
[0041] Based on the above platform structure, the specific construction method of this cantilever platform is as follows: Step 1: Before pouring concrete for tower 100, install, position and fix the tower embedded parts 200 along the circumferential direction, including upper embedded parts 210 and lower embedded parts 220. The combined connecting plate 331 welded on the embedded anchor plate of the lower embedded part 220 is positioned together with the embedded parts. Pour concrete for tower 100 and complete curing.
[0042] Step 2: Complete the prefabrication and anti-corrosion coating of all steel components in the factory and transport them to the site; among them, the combined connecting plate 331 and stiffening rib 333 on the flange of the cantilever beam 310, the combined connecting plate 331 and stiffening rib 333 on the lower embedded part 220, and the node plate for connecting the spatial diagonal brace on the web of the bottom diagonal brace 320 are all welded in the factory prefabrication stage.
[0043] Step 3: Hoist the cantilever beams 310 one by one, and fix the inner end to the corresponding upper embedded part 210 with high-strength bolts.
[0044] Step 4: Install the bottom brace 320. Connect the lower end of the bottom brace 320 to the combined connecting plate 331 on the lower embedded part 220 and the upper end to the combined connecting plate 331 on the cantilever beam 310. Then fasten the double-sided connecting plate 332 and secure it with 12 M24 high-strength bolts to complete the assembly of the combined triangular brace 300.
[0045] Step 5: Install the inner edge sealing steel beam 410 and the outer edge sealing steel beam 420, and connect the root and outer end of each cantilever beam 310 with high-strength bolts to form an inner and outer double-ring polygonal closed frame.
[0046] Step 6: Install spatial bracing 500 between adjacent combined triangular bracing 300, and fasten the two ends of spatial bracing 500 to the preset node plate on the web of beam bottom bracing 320 with high-strength bolts to complete the connection of all steel structures; this polygonal spatial steel structure system can bear load during the construction stage and can also serve as a construction support for the transfer layer, replacing traditional temporary supports.
[0047] Step 7: Lay the profiled steel sheet 601 and fix it to the cantilever beam 310 with studs, wherein the studs and the flange plate of the cantilever beam 310 are welded together.
[0048] Step 8: Tie the reinforcing mesh and install the protective formwork.
[0049] Step 9: Pour concrete, simultaneously forming the composite floor slab 600 and the reinforced concrete retaining wall 700, completing the platform construction.
[0050] Among the aforementioned components, the tower embedded part 200, the combined triangular brace 300, the edge sealing steel beam 400, and the spatial diagonal brace 500 are all prefabricated in the factory. On-site, only hoisting, bolt assembly, and concrete pouring are required, realizing the construction method of factory prefabrication and on-site rapid assembly.
[0051] Contents not described in detail in this specification are prior art known to those skilled in the art. It is hereby indicated that the above description is intended to help those skilled in the art understand this invention, but does not limit the scope of protection of this invention. Any equivalent substitutions, modifications, improvements, or simplifications of the above descriptions that do not depart from the essential content of this invention fall within the scope of protection of this invention.
Claims
1. A large-span prefabricated cantilever platform for the conversion layer of a heat absorber tower, located on the outside of the tower cylinder (100) at the location of the heat absorber tower conversion layer, characterized in that, include: Multiple sets of tower tube embedded parts (200) are evenly arranged circumferentially along the tower tube (100) wall and embedded in concrete; Each set of tower embedded parts (200) includes an upper embedded part (210) and a lower embedded part (220), and the upper embedded part (210) and the lower embedded part (220) are arranged correspondingly in the circumferential direction; Multiple sets of combined triangular bracing (300) are arranged circumferentially along the tower (100). Each set of combined triangular bracing (300) includes a cantilever beam (310) and a bottom bracing (320). The inner end of the cantilever beam (310) is fixedly connected to the upper embedded part (210), and the outer end of the cantilever beam (310) extends out of the tower. One end of the bottom bracing (320) is fixedly connected to the lower embedded part (220), and the other end is fixedly connected to the cantilever beam (310). The connection point between the bottom bracing (320) and the cantilever beam (310) is close to the outer end of the cantilever beam (310). The connection between the bottom bracing (320) and the cantilever beam (310) and the lower embedded part (220) adopts a double-sided combined node plate connection structure (330). The edge sealing steel beam (400) includes an inner edge sealing steel beam (410) and an outer edge sealing steel beam (420). The inner edge sealing steel beam (410) is fixedly connected to the inner end of each cantilever beam (310) in the circumferential direction along the tower (100). The outer edge sealing steel beam (420) is fixedly connected to the outer end of each cantilever beam (310) in the circumferential direction along the tower (100). Together with the cantilever beam (310), they form a polygonal closed space frame. Multiple spatial braces (500) are arranged between two adjacent sets of combined triangular braces (300), and their ends are respectively fixedly connected to the end of the beam bottom brace (320) near the tower (100) and the end of the beam bottom brace (320) near the cantilever beam (310), forming a triangular spatial support unit.
2. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 1, characterized in that, The upper embedded part (210) and the lower embedded part (220) in each group of tower embedded parts (200) are arranged aligned in the axial direction of the tower (100).
3. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 1, characterized in that: The bottom brace (320) and the cantilever beam (310) are both steel structural members with webs and flanges; The double-sided combined node plate connection structure (330) includes a combined connecting plate (331), two double-sided connecting plates (332), and stiffening ribs (333), wherein: The combined connecting plate (331) is fixed to the lower embedded part (220) or the cantilever beam (310), and is arranged end-to-end with the web of the beam bottom brace (320); The double-sided connecting plate (332) is symmetrically arranged on both sides of the web of the bottom brace (320) and covers the docking area between the combined connecting plate (331) and the web of the bottom brace (320). It is fixedly connected to the web of the combined connecting plate (331) and the bottom brace (320) by a group of high-strength bolts. The stiffening rib (333) is a rectangular steel plate, which is vertically welded to the free side of the combined connecting plate (331).
4. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 3, characterized in that, The thickness of the combined connecting plate (331) and the thickness of the double-sided connecting plate (332) are both greater than or equal to the thickness of the web of the beam bottom brace (320).
5. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 3, characterized in that, The cross-sectional height of the cantilever beam (310) is greater than the cross-sectional height of the bottom brace (320), and the cross-sectional height of the bottom brace (320) is greater than the cross-sectional height of the spatial brace (500).
6. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 1, characterized in that, The number of sets of the tower embedded parts (200), the combined triangular braces (300), and the number of the spatial diagonal braces (500) are equal, and they are all arranged circumferentially along the tower (100).
7. The large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 1, characterized in that, It also includes a composite floor slab (600), which is laid on the upper part of the cantilever beam (310) and the edge-sealing steel beam (400). The composite floor slab (600) includes a profiled steel sheet (601) and a cast-in-place concrete layer (602). The profiled steel sheet (601) is fixedly connected to the cantilever beam (310) by studs.
8. A large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 7, characterized in that, The profiled steel sheet (601) is also used as a permanent formwork during the construction phase of the cast-in-place concrete layer (602) and as a load-bearing plate during the service phase of the composite floor slab (600).
9. A large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 7, characterized in that, It also includes a reinforced concrete guardrail (700), which is located at the outer periphery of the composite floor slab (600) and is integrally cast with the composite floor slab (600).
10. A large-span prefabricated cantilever platform for the heat absorption tower conversion layer according to claim 1, characterized in that, Both the upper embedded part (210) and the lower embedded part (220) include embedded anchor plates and anchor bars. The embedded anchor plates are attached to the outside of the steel reinforcement skeleton of the tower wall (100). One end of the anchor bar is fixedly connected to the embedded anchor plate, and the other end is anchored into the concrete of the tower wall (100).