A method and apparatus related to transmit power used in a node for wireless communication
Patent Information
- Application Number
- CN202311810384.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2026-10-30
AI Technical Summary
这种半双工模式避免了自干扰并能够缓解跨链路干扰(Cross Link Interference,CLI)的影响,但是也带来了资源利用率下降和时延增大等问题
[0025]作为一个实施例,上述方法的好处包括:有利于充分利用被允许使用的发送功率来发送所述第一信号,从而提高所述第一信号的传输可靠性。
Smart Images

Figure CN123021323A_ABST
Abstract
Description
Technical Field
[0001] This application relates to transmission methods and apparatus in wireless communication systems, and more particularly to methods and apparatus for transmitting wireless signals in wireless communication systems supporting cellular networks. Background Technology
[0002] In existing NR (New Radio) systems, spectrum resources are statically divided into FDD (Frequency Division Duplex) and TDD (Time Division Duplex) spectrum. For TDD spectrum, both base stations and UEs (User Equipment) operate in half-duplex mode. This half-duplex mode avoids self-interference and mitigates the impact of cross-link interference (CLI), but it also leads to decreased resource utilization and increased latency. To address these issues, supporting flexible duplex modes or variable link directions (uplink, downlink, or flexible) on TDD or FDD spectrum has become a possible solution. At the 3GPP (3rd Generation Partner Project) RAN (Radio Access Network) 1#103e meeting, research on duplex technology was approved, particularly the proposal of Subband Non-Overlapping Full Duplex (SBFD) mode at the gNB (NR Node B) end. In this mode, the same symbol is used for uplink in some frequency resources and downlink in others, thus improving resource utilization and reducing latency. Summary of the Invention
[0003] In scenarios where symbols are configured as downlink signals indicated by uplink / downlink TDD configuration signaling and are usable for uplink transmission, determining the transmission power of signals on a cell group is a crucial issue. This application discloses a solution to this problem. It should be noted that this application is applicable to various wireless communication scenarios, such as scenarios using SBFD mode, scenarios using other types of full-duplex modes besides SBFD, scenarios using more flexible duplex modes, and scenarios supporting only half-duplex mode, achieving similar technical effects. Furthermore, using a unified solution for different scenarios (including but not limited to scenarios using SBFD mode, scenarios using other types of full-duplex modes besides SBFD, scenarios using more flexible duplex modes, and scenarios supporting only half-duplex mode) can help reduce hardware complexity and cost, or improve performance. Without conflict, embodiments and features in any node of this application can be applied to any other node. Without conflict, embodiments and features in any embodiment of this application can be arbitrarily combined with each other.
[0004] Where necessary, the interpretation of terms used in this application may be referenced to the descriptions in the 3GPP specification protocols TS36, TS37 and TS38 series.
[0005] This application discloses a method used in a first node of wireless communication, characterized by comprising:
[0006] Receive uplink and downlink TDD configuration signaling;
[0007] A first signal is transmitted on the first cell group, and the first power is the transmission power of the first signal;
[0008] Wherein, a first reference power is configured to the first node, and the first node determines whether the first power depends on the time domain resources of the first signal to overlap with at least one first type of symbol belonging to the first type of time domain resources, the first type of symbol being the symbol of the time slot of the second cell group, the second cell group being different from the first cell group, and the first type of time domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0009] As an example, the problem this application aims to solve includes: how to determine the transmission power of the first signal.
[0010] As an example, the problem this application aims to solve includes: how to enhance the power control of signal transmission under dual connectivity configuration in a scenario where symbols are configured as downlink and can be used for uplink transmission by the uplink / downlink TDD configuration signaling.
[0011] As an example, the problem this application aims to solve includes: how to optimize uplink interference control.
[0012] As an example, the above method is applicable to scenarios where symbols are configured as downlink and can be used for uplink transmission by the uplink / downlink TDD configuration signaling. The above method is beneficial for optimizing power control under dual connectivity configuration in such scenarios.
[0013] As an example, the advantages of the above method include: it facilitates the optimization of power control of the first signal.
[0014] As an example, the advantages of the above method include: it helps the UE save energy.
[0015] As an example, the advantages of the above method include: it helps to enhance uplink interference control.
[0016] As an example, the above method is beneficial for improving the performance of systems that support dual connectivity, including cell groups employing full-duplex mode.
[0017] As an example, the advantages of the above method include: it facilitates enhanced uplink interference control in systems employing full-duplex operation.
[0018] As an example, the advantages of the above method include: less work is required for standardization.
[0019] According to one aspect of this application, the above method is characterized in that,
[0020] When the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power.
[0021] As an example, the features of the above method include: when the time-domain resources of the first signal overlap with at least one of the first type of symbols indicated by the uplink / downlink TDD configuration signaling as downlink and available for uplink transmission, the first node uses the first reference power as the maximum transmit power to determine the first power; in scenarios where symbols indicated by the uplink / downlink TDD configuration signaling as downlink and available for uplink transmission are configured, this feature helps to ensure that the total transmit power of the first node in the first cell group and the second cell group does not exceed the maximum allowable transmit power, thereby optimizing spectrum efficiency.
[0022] As an example, the advantages of the above method include: it helps to reduce interference between uplink and downlink.
[0023] According to one aspect of this application, the above method is characterized in that,
[0024] When the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0025] As an example, the advantages of the above method include: it facilitates the full utilization of the permitted transmission power to transmit the first signal, thereby improving the transmission reliability of the first signal.
[0026] According to one aspect of this application, the above method is characterized in that,
[0027] The temporal resource of the first signal is the subframe in which the first signal is located.
[0028] According to one aspect of this application, the above method is characterized in that,
[0029] The first reference power is configured by RRC signaling.
[0030] According to one aspect of this application, the above method is characterized in that,
[0031] The first cell group is SCG, and the second cell group is MCG.
[0032] According to one aspect of this application, the above method is characterized in that,
[0033] The first cell group is MCG, and the second cell group is SCG.
[0034] According to one aspect of this application, the above method is characterized in that,
[0035] The uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0036] This application discloses a method used in a second node for wireless communication, characterized by comprising:
[0037] Send uplink and downlink TDD configuration signaling;
[0038] The first signal is received on the first cell group, and the first power is the transmission power of the first signal;
[0039] Wherein, a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmit power is used to determine whether the time domain resources on which the first power depends on the first signal overlap with at least one first type of symbol belonging to the first type of time domain resources. The first type of symbol is a symbol of the time slot of a second cell group, which is different from the first cell group. The first type of time domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
[0040] According to one aspect of this application, the above method is characterized in that,
[0041] When the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the second node may assume that the transmitting end of the first signal uses the first reference power as the maximum transmission power to determine the first power.
[0042] According to one aspect of this application, the above method is characterized in that,
[0043] When the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the second node may assume that the transmitting end of the first signal determines the first power without considering the first reference power as the maximum transmission power.
[0044] According to one aspect of this application, the above method is characterized in that,
[0045] The temporal resource of the first signal is the subframe in which the first signal is located.
[0046] According to one aspect of this application, the above method is characterized in that,
[0047] The first reference power is configured by RRC signaling.
[0048] According to one aspect of this application, the above method is characterized in that,
[0049] The first cell group is SCG, and the second cell group is MCG.
[0050] According to one aspect of this application, the above method is characterized in that,
[0051] The first cell group is MCG, and the second cell group is SCG.
[0052] According to one aspect of this application, the above method is characterized in that,
[0053] The uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0054] This application discloses a first node used for wireless communication, characterized in that it comprises:
[0055] The first receiver receives uplink and downlink TDD configuration signaling;
[0056] The first transmitter transmits a first signal on the first cell group, and the first power is the transmission power of the first signal;
[0057] Wherein, a first reference power is configured to the first node, and the first node determines whether the first power depends on the time domain resources of the first signal to overlap with at least one first type of symbol belonging to the first type of time domain resources, the first type of symbol being the symbol of the time slot of the second cell group, the second cell group being different from the first cell group, and the first type of time domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0058] This application discloses a second node used for wireless communication, characterized in that it comprises:
[0059] The second transmitter sends uplink and downlink TDD configuration signaling.
[0060] The second receiver receives the first signal on the first cell group, and the first power is the transmission power of the first signal;
[0061] Wherein, a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmit power is used to determine whether the time domain resources on which the first power depends on the first signal overlap with at least one first type of symbol belonging to the first type of time domain resources. The first type of symbol is a symbol of the time slot of a second cell group, which is different from the first cell group. The first type of time domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission. Attached Figure Description
[0062] Other features, objects, and advantages of this application will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:
[0063] Figure 1 A flowchart illustrating the processing of a first node according to an embodiment of this application is shown;
[0064] Figure 2 A schematic diagram of a network architecture according to an embodiment of this application is shown;
[0065] Figure 3 A schematic diagram of a wireless protocol architecture for the user plane and control plane according to an embodiment of this application is shown;
[0066] Figure 4 A schematic diagram of a first communication device and a second communication device according to an embodiment of this application is shown;
[0067] Figure 5 A signal transmission flowchart according to an embodiment of this application is shown;
[0068] Figure 6 A schematic diagram illustrating whether a first node, according to an embodiment of this application, uses a first reference power as the maximum transmit power to determine whether a time-domain resource that is a first power-dependent first signal overlaps with at least one first-class symbol belonging to a first-class time-domain resource;
[0069] Figure 7 A schematic diagram illustrating the determination of a first power by a first node according to an embodiment of this application is shown;
[0070] Figure 8 A schematic diagram illustrating the determination of a first power by a first node according to an embodiment of this application is shown;
[0071] Figure 9 P is shown as an embodiment according to this application. CMAX A diagram illustrating the settings;
[0072] Figure 10A schematic diagram illustrating a first type of time-domain resource according to an embodiment of this application is shown;
[0073] Figure 11 A structural block diagram of a processing apparatus in a first node device according to an embodiment of this application is shown;
[0074] Figure 12 A structural block diagram of a processing apparatus in a second node device according to an embodiment of this application is shown. Detailed Implementation
[0075] The technical solution of this application will be further described in detail below with reference to the accompanying drawings. It should be noted that, unless otherwise specified, the embodiments and features in the embodiments of this application can be arbitrarily combined with each other.
[0076] Example 1
[0077] Example 1 illustrates a processing flowchart of the first node according to an embodiment of this application, as shown in the attached diagram. Figure 1 As shown.
[0078] In Embodiment 1, the first node in this application receives uplink and downlink TDD configuration signaling in step 101 and sends a first signal on the first cell group in step 102.
[0079] In Embodiment 1, the first power is the transmission power of the first signal; the first reference power is configured to the first node, and the first node determines whether the time domain resources of the first power dependent on the first signal overlap with at least one first type of symbol belonging to the first type of time domain resources by using the first reference power as the maximum transmission power. The first type of symbol is the symbol of the time slot of the second cell group, which is different from the first cell group. The first type of time domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
[0080] As an example, the first cell group includes at least one cell.
[0081] As one example, the second cell group includes at least one cell.
[0082] As an example, the first cell group includes only one cell.
[0083] As one example, the second cell group includes only one cell.
[0084] As an example, the advantages of the above method include: it helps to reduce the processing overhead of the UE.
[0085] As one example, the first cell group includes multiple cells.
[0086] As one example, the second cell group includes multiple cells.
[0087] As an example, the advantages of the above method include: it helps to improve the data transmission rate.
[0088] As an example, the first cell group is configurable.
[0089] As an example, the second cell group is configurable.
[0090] As an example, one of the cells included in the first cell group is a serving cell.
[0091] As an example, one of the cells included in the second cell group is a serving cell.
[0092] As an example, the first cell group and the second cell group are two cell groups under a dual connectivity configuration.
[0093] As an example, the second cell group is different from the first cell group in that the first cell group is an SCG (Secondary cell group), and the second cell group is an MCG (Master cell group).
[0094] As an example, the second cell group is different from the first cell group in that the second cell group is an SCG and the first cell group is an MCG.
[0095] As one embodiment, the first signal includes a wireless signal.
[0096] As an example, the first signal is an uplink signal.
[0097] As an example, the first signal is scheduled by DCI (Downlink control information).
[0098] As an example, the first signal is triggered by DCI.
[0099] As an example, the first signal is semi-statically configured.
[0100] As an example, when the first node transmits the first signal on one cell of the first cell group, the first node transmits the first signal on the first cell group.
[0101] As an example, the frequency domain resources occupied by signals transmitted on a cell group belong to the frequency domain resources allocated to at least one cell included in the cell group.
[0102] As an example, the first signal is PUSCH.
[0103] As an example, the first signal is PUSCH; sending the first signal means sending at least one of transport block(s) and CSI (Channel State Information) report(s) on the PUSCH.
[0104] As an example, the advantages of the above method include: it facilitates the optimization of power control in shared channels.
[0105] As an example, the first signal is PUCCH.
[0106] As an example, the first signal is PUCCH; sending the first signal means sending UCI (Uplink control information) on PUCCH.
[0107] As an example, the advantages of the above method include: it facilitates the optimization of power control of the control channel.
[0108] As an example, the first signal is PRACH.
[0109] As an example, the advantages of the above method include: it facilitates power control of the random access channel.
[0110] As an example, the first reference power is configured by p-MaxEUTRA.
[0111] As an example, the advantages of the above method include: it facilitates the application of the method disclosed in this application to NE-DC (New Radio E-UTRA Dual Connectivity).
[0112] As an example, the first reference power is configured by p-NR-FR1.
[0113] As an example, the first reference power is configured by p-NR-FR2.
[0114] As an example, the first reference power is configured by parameters defined in the NR (New Radio) RRC protocol specification.
[0115] As an example, combined with the above features, the method disclosed in this application has good compatibility with the 5G NR protocol specifications.
[0116] As an example, the first reference power is configured by RRC signaling.
[0117] As an example, semi-static-mode2 for nrdc-PCmode-FR1 is provided to the first node.
[0118] As an example, semi-static-mode2 for nrdc-PCmode-FR2 is provided to the first node.
[0119] As an example, the first cell group is SCG, the second cell group is MCG, and the second cell group is in FR1 (Frequency range 1).
[0120] As an example, the first cell group is one of SCG and MCG, and the second cell group is the other of SCG and MCG.
[0121] As an example, the total transmit power of the first node in the first cell group and the second cell group is limited, and the upper limit of the total transmit power is configurable.
[0122] As an example, when the total transmission power of the signals to be transmitted by the first node in the first cell group and the second cell group exceeds the upper limit, the first node reduces the transmission power of the signals in the second cell group to ensure that the total transmission power does not exceed the upper limit.
[0123] As an example, the first node is configured with a reference TDD configuration for E-UTRA; when a subframe on the first cell group is an uplink subframe in the reference TDD configuration, the first node does not want to transmit signals in the corresponding time slot on the second cell group.
[0124] As an example, from a time domain perspective, the time domain resources of the first signal are used for the transmission of the first signal.
[0125] As an example, the temporal resource of the first signal is the subframe in which the first signal is located.
[0126] As an example, the time-domain resource of the first signal is: symbols(s) for the first signal.
[0127] As an example, the time-domain resource of the first signal is: a symbol for the first signal that overlaps with a time slot of the first cell group.
[0128] As an example, a symbol in this application is a symbol in a time slot.
[0129] As an example, one of the symbols in this application is the OFDM (Orthogonal Frequency Division Multiplex) symbol.
[0130] As an example, one of the symbols in this application is the SC-FDMA (Single-carrier Frequency-Division Multiple Access) symbol.
[0131] As one example, the first signal overlaps with a time slot of the first cell group.
[0132] As an example, a time slot for a cell group is a time slot configured for one cell in that cell group.
[0133] As an example, a time slot for a cell group is a time slot configured for at least one cell in that cell group.
[0134] As an example, a cell group includes at least one serving cell.
[0135] As an example, the first type of symbol is an OFDM symbol.
[0136] As an example, the statement "whether the first node uses the first reference power as the maximum transmit power to determine whether the time-domain resource of the first power dependent on the first signal overlaps with at least one first-class symbol belonging to the first-class time-domain resource" includes:
[0137] When the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power.
[0138] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0139] As an example, the statement "whether the first node uses the first reference power as the maximum transmit power to determine whether the time-domain resource of the first power dependent on the first signal overlaps with at least one first-class symbol belonging to the first-class time-domain resource" includes:
[0140] When the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0141] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0142] As an example, if the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, then the first node uses the first reference power as the maximum transmission power to determine the first power; otherwise, the first node does not use the first reference power as the maximum transmission power to determine the first power.
[0143] As one embodiment, determining the first power without using the first reference power as the maximum transmission power includes: the first node determining the first power without considering the first reference power.
[0144] As one embodiment, the first node determining the first power without using the first reference power as the maximum transmission power includes: the first node determining the first power without considering the first reference power as the maximum transmission power.
[0145] As an example, if the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; otherwise, the first node determines the first power without considering the first reference power.
[0146] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0147] As an example, if the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; otherwise, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0148] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0149] As an example, when the time-domain resources of the first signal overlap with at least one of the first type of symbols indicated by the uplink / downlink TDD configuration signaling as downlink and available for uplink transmission, the first node uses the first reference power as the maximum transmit power to determine the first power.
[0150] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0151] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node does not use the first reference power as the maximum transmission power to determine the first power.
[0152] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0153] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power.
[0154] As an example, the meaning of "the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources" is that the time-domain resources of the first signal do not overlap with any of the first type of symbols belonging to the first type of time-domain resources.
[0155] As an example, the statement that the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources means that the condition that the time-domain resources of the first signal overlap with at least one of the first type of symbols belonging to the first type of time-domain resources is not satisfied.
[0156] As an example, the first type of time-domain resource is a symbol(s) that is indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
[0157] As an example, the first type of time-domain resources includes symbols indicated as uplinks by the uplink / downlink TDD configuration signaling.
[0158] As an example, the first type of time-domain resources includes symbols that are indicated as flexible by the uplink / downlink TDD configuration signaling.
[0159] As an example, the first type of time-domain resources includes symbols that are indicated as uplink or flexible by the uplink / downlink TDD configuration signaling.
[0160] As an example, whether a symbol indicated as downlink by the uplink / downlink TDD configuration signaling can be used for uplink transmission is configurable.
[0161] As an example, the advantages of the above method include: it helps to improve uplink capacity.
[0162] As an example, the advantages of the above method include: it facilitates support for full-duplex operation.
[0163] As an example, the statement "whether the first node uses the first reference power as the maximum transmit power to determine whether the time-domain resource of the first power dependent on the first signal overlaps with at least one first-class symbol belonging to the first-class time-domain resource" includes:
[0164] When the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering at least the first reference power; the first type of time-domain resources is a proper subset of the second type of time-domain resources.
[0165] As an example, the statement "whether the first node uses the first reference power as the maximum transmit power to determine whether the time-domain resource of the first power dependent on the first signal overlaps with at least one first-class symbol belonging to the first-class time-domain resource" includes:
[0166] When the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering at least the first reference power as the maximum transmission power; the first type of time-domain resources is a proper subset of the second type of time-domain resources.
[0167] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node does not use at least the first reference power as the maximum transmission power to determine the first power; the first type of time-domain resources is a proper subset of the second type of time-domain resources.
[0168] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering at least the first reference power; the first type of time-domain resources is a proper subset of the second type of time-domain resources.
[0169] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0170] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering at least the first reference power as the maximum transmission power; the first type of time-domain resources is a proper subset of the second type of time-domain resources.
[0171] As an example, the advantages of the above method include: it helps to optimize spectral efficiency.
[0172] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class that belongs to the second class of time-domain resources but does not belong to the first time-domain resources, the first node does not use the first reference power as the maximum transmission power to determine the first power.
[0173] As an example, when the time-domain resource of the first signal overlaps with at least one symbol of the first class that belongs to the second class of time-domain resources but does not belong to the first time-domain resource, the first node uses the second reference power as the maximum transmission power to determine the first power.
[0174] As an example, the advantages of the above method include: high configuration flexibility.
[0175] As one embodiment, the second reference power is configured to the first node.
[0176] As one example, the second reference power is configured by p-MaxEUTRA.
[0177] As a sub-example of the above embodiments, the first reference power is not configured by p-MaxEUTRA.
[0178] As one embodiment, the second reference power is configured by p-NR-FR1.
[0179] As a sub-example of the above embodiment, the first reference power is not configured by p-NR-FR1.
[0180] As one embodiment, the second reference power is configured by p-NR-FR2.
[0181] As a sub-example of the above embodiment, the first reference power is not configured by p-NR-FR2.
[0182] As an example, the second reference power is configured by parameters defined in the NR (New Radio) RRC protocol specification.
[0183] As one example, the second reference power is configured by RRC signaling.
[0184] As an example, the first reference power and the second reference power are respectively configured to the first node by different RRC signaling.
[0185] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node does not use the first reference power or the first reference power as the maximum transmission power to determine the first power.
[0186] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering either the first reference power or the second reference power.
[0187] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the second type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power or the second reference power as the maximum transmission power.
[0188] As an example, whether the time-domain resources of the first signal overlap with at least one symbol of the first type belonging to the first type of time-domain resources is in terms of the time domain.
[0189] As one embodiment, the second type of time-domain resources includes symbols indicated as uplinks by the uplink / downlink TDD configuration signaling.
[0190] As an example, the second type of time-domain resources includes symbols that are indicated as flexible by the uplink / downlink TDD configuration signaling.
[0191] As an example, the first type of time-domain resources does not include symbols indicated as uplinks by the uplink / downlink TDD configuration signaling.
[0192] As an example, the first type of time-domain resources does not include symbols that are indicated as flexible by the uplink / downlink TDD configuration signaling.
[0193] As an example, the meaning of the first node not using a reference power as the maximum transmission power to determine the first power includes: the reference power is not used as the maximum transmission power to limit the magnitude of the first power.
[0194] As an example, the meaning of the first node determining the first power without considering a reference power includes: the reference power is not used as the maximum transmission power to limit the magnitude of the first power.
[0195] As an example, the meaning of the first node determining the first power without considering a reference power includes: the first node determining the first power without considering the reference power as the maximum transmission power.
[0196] As an example, the meaning of the first node determining the first power without considering a reference power as the maximum transmission power includes: the reference power is not used as the maximum transmission power to limit the magnitude of the first power.
[0197] Example 2
[0198] Example 2 illustrates a schematic diagram of a network architecture according to this application, as shown in the attached diagram. Figure 2 As shown.
[0199] Appendix Figure 2A diagram illustrating the network architecture 200 of 5G NR, LTE (Long-Term Evolution), and LTE-A (Long-Term Evolution Advanced) systems is provided. The 5G NR or LTE network architecture 200 may be referred to as EPS (Evolved Packet System) 200 or some other suitable term. EPS 200 may include one or more UE (User Equipment) 201, NG-RAN (Next Generation Radio Access Network) 202, EPC (Evolved Packet Core) / 5G-CN (5G-Core Network) 210, HSS (Home Subscriber Server) 220, and Internet service 230. EPS may interconnect with other access networks, but these entities / interfaces are not shown for simplicity. As shown in the diagram, EPS provides packet-switched services; however, those skilled in the art will readily understand that the various concepts presented throughout this application can be extended to networks providing circuit-switched services or other cellular networks. NG-RAN includes NR Node B (gNB) 203 and other gNBs 204. gNB 203 provides user and control plane protocol termination to UE 201. gNB 203 can connect to other gNBs 204 via the Xn interface (e.g., backhaul). gNB 203 may also be referred to as a base station, base transceiver station, radio base station, radio transceiver, transceiver function, Basic Service Set (BSS), Extended Service Set (ESS), TRP (Transmitter Receiver Node), or some other suitable term. gNB 203 provides UE 201 with access to EPC / 5G-CN 210. Examples of UE201 include cellular phones, smartphones, Session Initiation Protocol (SIP) phones, laptops, personal digital assistants (PDAs), satellite radios, non-terrestrial base station communications, satellite mobile communications, global positioning systems, multimedia devices, video devices, digital audio players (e.g., MP3 players), cameras, game consoles, drones, aircraft, narrowband IoT devices, machine-type communication devices, land vehicles, automobiles, wearable devices, or any other similar functional devices. Those skilled in the art may also refer to UE201 as a mobile station, subscriber station, mobile unit, subscriber unit, radio unit, remote unit, mobile device, radio device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, radio terminal, remote terminal, handheld device, user agent, mobile client, client, or any other suitable term. gNB203 connects to EPC / 5G-CN 210 via the S1 / NG interface.The EPC / 5G-CN 210 includes the MME (Mobility Management Entity), AMF (Authentication Management Field), and UPF (User Plane Function) 211, other MMEs, AMFs, and UPFs 214, the S-GW (Service Gateway) 212, and the P-GW (Packet Data Network Gateway) 213. The MME / AMF / UPF 211 is the control node that handles signaling between the UE 201 and the EPC / 5G-CN 210. Generally, the MME / AMF / UPF 211 provides bearer and connection management. All user IP (Internet Protocol) packets are transmitted through the S-GW 212, which is itself connected to the P-GW 213. The P-GW 213 provides UE IP address allocation and other functions. The P-GW 213 is connected to the Internet service 230. Internet services 230 include operator-compliant Internet protocol services, which may specifically include the Internet, intranets, IMS (IP Multimedia Subsystem), and packet-switched streaming services.
[0200] As an example, the UE201 corresponds to the first node in this application.
[0201] As an example, gNB203 corresponds to the second node in this application.
[0202] As an example, UE201 corresponds to the first node in this application, and gNB203 corresponds to the second node in this application.
[0203] As an example, the gNB203 is a macrocell base station.
[0204] As an example, the gNB203 is a microcell base station.
[0205] As an example, the gNB203 is a PicoCell base station.
[0206] As an example, the gNB203 is a femtocell.
[0207] As an example, the gNB203 is a base station device that supports large latency differences.
[0208] As one example, the gNB203 is a flight platform device.
[0209] As an example, the gNB203 is a satellite device.
[0210] Example 3
[0211] Example 3 illustrates a schematic diagram of an embodiment of a wireless protocol architecture for a user plane and a control plane according to this application, as shown in the attached diagram. Figure 3 As shown. Figure 3 This is a schematic diagram illustrating an embodiment of a radio protocol architecture for the user plane 350 and the control plane 300. Figure 3The radio protocol architecture for the control plane 300 between the first communication node device (UE, gNB, or RSU in V2X) and the second communication node device (gNB, UE, or RSU in V2X), or between two UEs, is illustrated using three layers: Layer 1, Layer 2, and Layer 3. Layer 1 (L1 layer) is the lowest layer and implements various PHY (Physical Layer) signal processing functions. L1 layer will be referred to herein as PHY301. Layer 2 (L2 layer) 305 sits above PHY301 and is responsible for the link between the first and second communication node devices and between the two UEs via PHY301. L2 layer 305 includes a MAC (Medium Access Control) sublayer 302, an RLC (Radio Link Control) sublayer 303, and a PDCP (Packet Data Convergence Protocol) sublayer 304, which terminate at the second communication node device. The PDCP sublayer 304 provides multiplexing between different radio bearers and logical channels. PDCP sublayer 304 also provides security through encrypted data packets and supports cross-cell mobility between second communication node devices and the first communication node device. RLC sublayer 303 provides upper layer data packet segmentation and reassembly, retransmission of lost data packets, and data packet reordering to compensate for out-of-order reception due to HARQ. MAC sublayer 302 provides multiplexing between the logical and transport channels. MAC sublayer 302 is also responsible for allocating various radio resources (e.g., resource blocks) within a cell between the first communication node devices. MAC sublayer 302 is also responsible for HARQ operations. The RRC (Radio Resource Control) sublayer 306 in Layer 3 (L3) of the control plane 300 is responsible for acquiring radio resources (i.e., radio bearers) and configuring the lower layer using RRC signaling between the second and first communication node devices. The radio protocol architecture of user plane 350 includes layer 1 (L1 layer) and layer 2 (L2 layer). The radio protocol architecture for the first and second communication node devices in user plane 350 is largely the same as the corresponding layers and sublayers in control plane 300 for physical layer 351, PDCP sublayer 354 in L2 layer 355, RLC sublayer 353 in L2 layer 355 and MAC sublayer 352 in L2 layer 355. However, PDCP sublayer 354 also provides header compression for upper layer data packets to reduce radio transmission overhead.The L2 layer 355 in the user plane 350 also includes an SDAP (Service Data Adaptation Protocol) sublayer 356, which is responsible for mapping between QoS streams and data radio bearers (DRBs) to support service diversity. Although not illustrated, the first communication node device may have several upper layers above the L2 layer 355, including a network layer (e.g., IP layer) terminating at the P-GW on the network side and an application layer terminating at the other end of the connection (e.g., a remote UE, server, etc.).
[0212] As an example, Appendix Figure 3 The wireless protocol architecture described herein is applicable to the first node in this application.
[0213] As an example, Appendix Figure 3 The wireless protocol architecture described herein is applicable to the second node in this application.
[0214] As an example, the uplink and downlink TDD configuration signaling in this application is generated in the RRC sublayer 306.
[0215] As an example, the configuration information of the first reference power in this application is generated in the RRC sublayer 306.
[0216] As an example, the configuration information of the second reference power in this application is generated in the RRC sublayer 306.
[0217] As an example, the first signal in this application is generated in the PHY301.
[0218] As an example, the first signal in this application is generated in the PHY351.
[0219] Example 4
[0220] Example 4 shows schematic diagrams of a first communication device and a second communication device according to this application, as shown in the appendix. Figure 4 As shown. Figure 4 This is a block diagram of a first communication device 410 and a second communication device 450 communicating with each other in an access network.
[0221] The first communication device 410 includes a controller / processor 475, a memory 476, a receiver processor 470, a transmitter processor 416, a multi-antenna receiver processor 472, a multi-antenna transmitter processor 471, a transmitter / receiver 418, and an antenna 420.
[0222] The second communication device 450 includes a controller / processor 459, a memory 460, a data source 467, a transmitting processor 468, a receiving processor 456, a multi-antenna transmitting processor 457, a multi-antenna receiving processor 458, a transmitter / receiver 454, and an antenna 452.
[0223] In the transmission from the first communication device 410 to the second communication device 450, at the first communication device 410, upper-layer data packets from the core network are provided to the controller / processor 475. The controller / processor 475 implements L2 layer functionality. In the transmission from the first communication device 410 to the second communication device 450, the controller / processor 475 provides header compression, encryption, packet segmentation and reordering, multiplexing between logical and transport channels, and radio resource allocation to the second communication device 450 based on various priority metrics. The controller / processor 475 is also responsible for retransmitting lost packets and signaling to the second communication device 450. The transmit processor 416 and the multi-antenna transmit processor 471 implement various signal processing functions for the L1 layer (i.e., the physical layer). Transmit processor 416 performs encoding and interleaving to facilitate forward error correction (FEC) at the second communication device 450, and mapping of signal clusters based on various modulation schemes (e.g., Binary Phase Shift Keying (BPSK), Quadrature Phase Shift Keying (QPSK), M-Phase Shift Keying (M-PSK), M-QAM). Multi-antenna transmit processor 471 performs digital spatial precoding on the encoded and modulated symbols, including codebook-based and non-codebook-based precoding, and beamforming processing, generating one or more spatial streams. Transmit processor 416 then maps each spatial stream to subcarriers, multiplexes it with a reference signal (e.g., a pilot) in the time and / or frequency domains, and subsequently uses inverse fast Fourier transform (IFFT) to generate a physical channel carrying the time-domain multicarrier symbol stream. Multi-antenna transmit processor 471 then performs transmit analog precoding / beamforming operations on the time-domain multicarrier symbol stream. Each transmitter 418 converts the baseband multicarrier symbol stream provided by the multi-antenna transmitter processor 471 into an radio frequency stream, which is then provided to different antennas 420.
[0224] In the transmission from the first communication device 410 to the second communication device 450, at the second communication device 450, each receiver 454 receives a signal through its corresponding antenna 452. Each receiver 454 recovers the information modulated onto the radio frequency carrier and converts the radio frequency stream into a baseband multicarrier symbol stream, which is then provided to the receiver processor 456. The receiver processor 456 and the multi-antenna receiver processor 458 implement various signal processing functions of the L1 layer. The multi-antenna receiver processor 458 performs receive analog precoding / beamforming operations on the baseband multicarrier symbol stream from the receiver 454. The receiver processor 456 uses a Fast Fourier Transform (FFT) to convert the baseband multicarrier symbol stream after the receive analog precoding / beamforming operations from the time domain to the frequency domain. In the frequency domain, the physical layer data signal and the reference signal are demultiplexed by the receiver processor 456, where the reference signal is used for channel estimation, and the data signal is recovered in the multi-antenna receiver processor 458 after multi-antenna detection to recover any spatial stream destined for the second communication device 450. Symbols on each spatial stream are demodulated and recovered in the receive processor 456, generating soft decisions. The receive processor 456 then decodes and deinterleaves the soft decisions to recover the upper-layer data and control signals transmitted by the first communication device 410 over the physical channel. The upper-layer data and control signals are then provided to the controller / processor 459. The controller / processor 459 implements the functions of Layer 2. The controller / processor 459 may be associated with a memory 460 storing program code and data. The memory 460 may be referred to as computer-readable media. In the transmission from the first communication device 410 to the second communication device 450, the controller / processor 459 provides multiplexing, packet reassembly, decryption, header decompression, and control signal processing between the transport and logical channels to recover upper-layer data packets from the core network. The upper-layer data packets are then provided to all protocol layers above Layer 2. Various control signals may also be provided to Layer 3 for Layer 3 processing.
[0225] In the transmission from the second communication device 450 to the first communication device 410, at the second communication device 450, a data source 467 is used to provide upper-layer data packets to the controller / processor 459. The data source 467 represents all protocol layers above the L2 layer. Similar to the transmission functions at the first communication device 410 described in the transmission from the first communication device 410 to the second communication device 450, the controller / processor 459 implements header compression, encryption, packet segmentation and reordering, and multiplexing between logical and transport channels based on radio resource allocation, implementing L2 layer functions for the user plane and control plane. The controller / processor 459 is also responsible for retransmitting lost packets and signaling to the first communication device 410. Transmit processor 468 performs modulation mapping and channel coding processing, while multi-antenna transmit processor 457 performs digital multi-antenna spatial precoding, including codebook-based and non-codebook-based precoding, and beamforming processing. Subsequently, transmit processor 468 modulates the generated spatial stream into a multi-carrier / single-carrier symbol stream. After analog precoding / beamforming operations in multi-antenna transmit processor 457, the stream is provided to different antennas 452 via transmitter 454. Each transmitter 454 first converts the baseband symbol stream provided by multi-antenna transmit processor 457 into a radio frequency symbol stream before providing it to antenna 452.
[0226] In the transmission from the second communication device 450 to the first communication device 410, the function at the first communication device 410 is similar to the receiving function at the second communication device 450 described in the transmission from the first communication device 410 to the second communication device 450. Each receiver 418 receives radio frequency signals through its corresponding antenna 420, converts the received radio frequency signals into baseband signals, and provides the baseband signals to the multi-antenna receiving processor 472 and the receiving processor 470. The receiving processor 470 and the multi-antenna receiving processor 472 jointly implement the L1 layer functions. The controller / processor 475 implements the L2 layer functions. The controller / processor 475 may be associated with a memory 476 that stores program code and data. The memory 476 may be referred to as computer-readable media. In the transmission from the second communication device 450 to the first communication device 410, the controller / processor 475 provides multiplexing between the transmission and logical channels, packet reassembly, decryption, header decompression, and control signal processing to recover upper-layer data packets from the UE 450. Upper-layer packets from the controller / processor 475 can be provided to the core network.
[0227] As an example, the first node in this application includes the second communication device 450, and the second node in this application includes the first communication device 410.
[0228] As a sub-implementation of the above embodiments, the first node is a user equipment and the second node is a relay node.
[0229] As a sub-implementation of the above embodiments, the first node is a user equipment and the second node is a base station equipment.
[0230] As a sub-implementation of the above embodiments, the first node is a relay node and the second node is a base station device.
[0231] As one embodiment, the second communication device 450 includes: at least one processor and at least one memory, the at least one memory including computer program code; the at least one memory and the computer program code are configured to be used with the at least one processor. The second communication device 450 includes at least: receiving uplink / downlink TDD configuration signaling; transmitting a first signal on a first cell group, the first power being the transmission power of the first signal; wherein a first reference power is configured for a first node, and the first node determines whether the time-domain resources dependent on the first power of the first signal overlap with at least one first-class symbol belonging to a first-class time-domain resource, the first-class symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, the first-class time-domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0232] As a sub-implementation of the above embodiments, the second communication device 450 corresponds to the first node in this application.
[0233] As one embodiment, the second communication device 450 includes: a memory storing a computer-readable instruction program that, when executed by at least one processor, produces actions including: receiving uplink / downlink TDD configuration signaling; transmitting a first signal on a first cell group, the first power being the transmission power of the first signal; wherein a first reference power is configured for the first node, and the first node determines whether the first power depends on whether a time-domain resource of the first signal overlaps with at least one first-class symbol belonging to a first-class time-domain resource, the first-class symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, the first-class time-domain resource including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0234] As a sub-implementation of the above embodiments, the second communication device 450 corresponds to the first node in this application.
[0235] As one embodiment, the first communication device 410 includes: at least one processor and at least one memory, the at least one memory including computer program code; the at least one memory and the computer program code are configured to be used with the at least one processor. The first communication device 410 includes at least: transmitting uplink / downlink TDD configuration signaling; receiving a first signal on a first cell group, the first power being the transmission power of the first signal; wherein a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmission power is used to determine whether the time-domain resources dependent on the first power overlap with at least one first-class symbol belonging to a first-class time-domain resource, the first-class symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, the first-class time-domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0236] As a sub-implementation of the above embodiments, the first communication device 410 corresponds to the second node in this application.
[0237] As one embodiment, the first communication device 410 includes: a memory storing a computer-readable instruction program that, when executed by at least one processor, generates actions including: transmitting uplink / downlink TDD configuration signaling; receiving a first signal on a first cell group, the first power being the transmission power of the first signal; wherein a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as a maximum transmission power is used to determine whether the time-domain resources of the first power dependent on the first signal overlap with at least one first-class symbol belonging to a first-class time-domain resource, the first-class symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, the first-class time-domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0238] As a sub-implementation of the above embodiments, the first communication device 410 corresponds to the second node in this application.
[0239] As an example, at least one of {the antenna 452, the receiver 454, the multi-antenna receiver processor 458, the receiver processor 456, the controller / processor 459, the memory 460, and the data source 467} is used to receive the uplink / downlink TDD configuration signaling in this application.
[0240] As an example, at least one of {the antenna 420, the transmitter 418, the multi-antenna transmitter processor 471, the transmitter processor 416, the controller / processor 475, and the memory 476} is used to transmit the uplink / downlink TDD configuration signaling in this application.
[0241] As an example, at least one of {the antenna 452, the receiver 454, the multi-antenna receiver processor 458, the receiver processor 456, the controller / processor 459, the memory 460, and the data source 467} is used to receive the configuration information of the first reference power in this application.
[0242] As an example, at least one of {the antenna 420, the transmitter 418, the multi-antenna transmitter processor 471, the transmitter processor 416, the controller / processor 475, and the memory 476} is used to transmit configuration information for the first reference power in this application.
[0243] As an example, at least one of {the antenna 452, the receiver 454, the multi-antenna receiver processor 458, the receiver processor 456, the controller / processor 459, the memory 460, and the data source 467} is used to receive the configuration information of the second reference power in this application.
[0244] As an example, at least one of {the antenna 420, the transmitter 418, the multi-antenna transmitter processor 471, the transmitter processor 416, the controller / processor 475, and the memory 476} is used to transmit configuration information for the second reference power in this application.
[0245] As an example, at least one of {the antenna 452, the transmitter 454, the multi-antenna transmitter processor 457, the transmitter processor 468, the controller / processor 459, the memory 460, and the data source 467} is used to transmit the first signal in this application.
[0246] As an example, at least one of {the antenna 420, the receiver 418, the multi-antenna receiver processor 472, the receiver processor 470, the controller / processor 475, and the memory 476} is used to receive the first signal in this application.
[0247] Example 5
[0248] Example 5 illustrates a signal transmission flowchart according to an embodiment of this application, as shown in the attached diagram. Figure 5As shown. In the appendix Figure 5 In this system, the first node U1 and the second node U2 communicate via an air interface.
[0249] The first node U1 receives uplink and downlink TDD configuration signaling in step S511; and sends a first signal on the first cell group in step S512.
[0250] The second node U2 sends uplink and downlink TDD configuration signaling in step S521; and receives the first signal on the first cell group in step S522.
[0251] In Embodiment 5, the first power is the transmission power of the first signal; a first reference power is configured for the first node U1, and the first node U1 determines whether the first power depends on whether the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources when the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources; when the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources, the first node U1 uses the first reference power as the maximum transmission power to determine the first power; the first-class symbol is the symbol of the time slot of the second cell group, the second cell group is different from the first cell group, and the first-class time domain resources include symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0252] As a sub-example of Example 5, when the time domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time domain resources, the first node U1 determines the first power without considering the first reference power.
[0253] As a sub-example of Example 5, when the time domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time domain resources, the first node U1 determines the first power without considering the first reference power as the maximum transmission power.
[0254] As an example, the first node U1 is the first node in this application.
[0255] As an example, the second node U2 is the second node in this application.
[0256] As an example, the first node U1 is a UE.
[0257] As one example, the second node U2 is a base station.
[0258] As one embodiment, the air interface between the second node U2 and the first node U1 is the Uu interface.
[0259] As one embodiment, the air interface between the second node U2 and the first node U1 includes a cellular link.
[0260] As one embodiment, the air interface between the second node U2 and the first node U1 includes a wireless interface between the base station equipment and the user equipment.
[0261] As one embodiment, the air interface between the second node U2 and the first node U1 includes a wireless interface between satellite equipment and user equipment.
[0262] As one embodiment, the air interface between the second node U2 and the first node U1 includes a wireless interface between the relay device and the user equipment.
[0263] As an example, for the transmitting end of the first signal, whether the first reference power is used as the maximum transmission power is used to determine whether the time domain resources of the first power depending on the first signal overlap with at least one symbol of the first class belonging to the first class of time domain resources.
[0264] As an example, the receiving end of the first signal may make the following assumptions about the behavior of the transmitting end of the first signal: whether the transmitting end of the first signal uses the first reference power as the maximum transmission power to determine whether the time domain resources of the first power dependent on the first signal overlap with at least one of the first type of symbols belonging to the first type of time domain resources.
[0265] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the transmitting end of the first signal uses the first reference power as the maximum transmission power to determine the first power.
[0266] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the transmitting end of the first signal does not use the first reference power as the maximum transmission power to determine the first power.
[0267] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the transmitting end of the first signal determines the first power without considering the first reference power.
[0268] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the transmitting end of the first signal determines the first power without considering the first reference power as the maximum transmission power.
[0269] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the receiver of the first signal may assume that the transmitter of the first signal uses the first reference power as the maximum transmission power to determine the first power.
[0270] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal may assume that the transmitter of the first signal does not use the first reference power as the maximum transmission power to determine the first power.
[0271] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal may assume that the transmitter of the first signal determines the first power without considering the first reference power.
[0272] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal may assume that the transmitter of the first signal determines the first power without considering the first reference power as the maximum transmission power.
[0273] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the receiver of the first signal assumes that the transmitter of the first signal uses the first reference power as the maximum transmission power to determine the first power.
[0274] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal assumes that the transmitter of the first signal does not use the first reference power as the maximum transmission power to determine the first power.
[0275] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal assumes that the transmitter of the first signal determines the first power without considering the first reference power.
[0276] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the receiver of the first signal assumes that the transmitter of the first signal determines the first power without considering the first reference power as the maximum transmission power.
[0277] As an example, the first reference power is configured by the sender of the uplink / downlink TDD configuration signaling to the sender of the first signal.
[0278] As one embodiment, the second reference power is configured by the sender of the uplink / downlink TDD configuration signaling to the sender of the first signal.
[0279] In one embodiment, the second node sends configuration information of the first reference power, and the first node receives the configuration information of the first reference power.
[0280] In one embodiment, the second node sends configuration information for the second reference power, and the first node receives the configuration information for the second reference power.
[0281] As an example, the configuration information of the first reference power is sent / received before the configuration information of the second reference power.
[0282] As an example, the configuration information of the first reference power is sent / received after the configuration information of the second reference power.
[0283] As one embodiment, the configuration information of the first reference power and the configuration information of the second reference power are sent / received simultaneously.
[0284] As an example, the configuration information of the first reference power is sent / received before the uplink / downlink TDD configuration signaling.
[0285] As an example, the configuration information of the first reference power is sent / received after the uplink / downlink TDD configuration signaling.
[0286] As an example, the configuration information of the first reference power and the uplink / downlink TDD configuration signaling are sent / received simultaneously.
[0287] As an example, the configuration information of the second reference power is sent / received before the uplink / downlink TDD configuration signaling.
[0288] As one embodiment, the configuration information of the second reference power is sent / received after the uplink / downlink TDD configuration signaling.
[0289] As an example, the configuration information of the second reference power and the uplink / downlink TDD configuration signaling are sent / received simultaneously.
[0290] As an example, the transmission / reception of the configuration information of the first reference power precedes the reception / transmission of the first signal.
[0291] As one embodiment, the transmission / reception of the configuration information of the second reference power precedes the reception / transmission of the first signal.
[0292] Example 6
[0293] Example 6 illustrates a schematic diagram illustrating whether a first node, according to an embodiment of this application, uses a first reference power as the maximum transmit power to determine whether a time-domain resource that depends on a first power for a first signal overlaps with at least one first-class symbol belonging to a first-class time-domain resource, as shown in the attached diagram. Figure 6 As shown.
[0294] In Embodiment 6, if the time-domain resource of the first signal overlaps with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; otherwise, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0295] As an example, if the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; otherwise, the first node determines the first power without considering the first reference power.
[0296] Example 7
[0297] Example 7 illustrates a schematic diagram of a first node determining a first power according to an embodiment of this application, as shown in the attached diagram. Figure 7 As shown.
[0298] In Example 7:
[0299]
[0300] As an example, the P CMAX It is defined for the subframe in which the first signal is located.
[0301] As a sub-implementation of the above embodiments, the temporal resource of the first signal refers to the subframe in which the first signal is located.
[0302] As an example, the P CMAX It is defined for the serving cell where the first signal is located.
[0303] As one embodiment, the first signal is transmitted during a transmission occasion, wherein P CMAX It is defined in relation to the transmission opportunity in which the first signal is located.
[0304] As one embodiment, the first signal is transmitted during a PUSCH transmission occasion, wherein the P... CMAX It is defined for the PUSCH transmission opportunity where the first signal is located.
[0305] As one embodiment, the first signal is transmitted during a PUCCH transmission occasion, wherein the P CMAX It is defined for the PUCCH transmission opportunity where the first signal is located.
[0306] As an example, the P CMAX It is defined for the carrier of the serving cell where the first signal is located.
[0307] As one embodiment, the first node uses the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It is the first reference power.
[0308] As one embodiment, the first node uses the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It is the configured maximum output power, and the first reference power is the P. CMAX The setting is based on the maximum transmit power.
[0309] As one embodiment, the first node does not use the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It does not depend on the first reference power.
[0310] As one embodiment, the first node determines the first power without considering the first reference power, including: the P CMAX It does not depend on the first reference power.
[0311] As one embodiment, the first node determines the first power without considering the first reference power as the maximum transmission power, including: the P CMAX It does not depend on the first reference power.
[0312] As one embodiment, the first node uses the second reference power as the maximum transmit power to determine the first power, including: the P CMAX This is the second reference power.
[0313] As one embodiment, the first node uses the second reference power as the maximum transmit power to determine the first power, including: the P CMAX It is the configured maximum output power, and the second reference power is the P. CMAX The setting is based on the maximum transmit power.
[0314] As an example, the first node determining the first power without using the second reference power as the maximum transmission power includes: the P CMAX It does not depend on the second reference power.
[0315] As one embodiment, the first node determines the first power without considering the second reference power, including: the P CMAX It does not depend on the second reference power.
[0316] As one embodiment, the first node determines the first power without considering the second reference power as the maximum transmission power, including: the P CMAX It does not depend on the second reference power.
[0317] As an example, the P tmp1 Configuration depends on at least one parameter.
[0318] As an example, the P tmp1 It relies on downlink path loss estimation.
[0319] As an example, the P tmp1 It relies on TPC (Transmit power control) commands.
[0320] As an example, the P tmp1 It is equal to the sum of multiple components, at least one of which is configurable.
[0321] As an example, the P tmp1It equals the sum of multiple components, one of which is the downlink path loss estimate.
[0322] As an example, the P tmp1 It equals the sum of multiple components, one of which is α·PL, where α is a configurable parameter and PL is a downlink path loss estimate.
[0323] As an example, the P tmp1 It is equal to the sum of multiple components, one of which is the power control adjustment state.
[0324] As an example, the first signal is PUSCH, and the P... tmp1 yes: Wherein, P O These are configurable parameters, the aforementioned α is the bandwidth (represented by the number of resource blocks) allocated to the PUSCH transmission opportunity occupied by the first signal; PL is a configurable parameter; f is the downlink path loss estimate; and f is the PUSCH power control adjustment state for the PUSCH transmission opportunity occupied by the first signal. The K s =1.25, the stated The C is the number of code blocks transmitted on the first signal, and K r It is the size of the code block r, and N is... RE It is the number of resource particles that have been determined.
[0325] As an example, the first signal is PUCCH, and the P... tmp1 yes: Wherein, P O These are configurable parameters, the aforementioned PL is the bandwidth allocated for PUCCH resources (represented by the number of resource blocks), f is the downlink path loss estimate, f is the PUCCH power control adjustment state for the PUCCH transmission opportunity occupied by the first signal, and Δ is the bandwidth allocated for PUCCH resources (represented by the number of resource blocks). F Yes, it is configurable; the aforementioned The This refers to the number of symbols used in PUCCH format 0 for the first signal. Equal to 2, the Δ UCI It equals 0.
[0326] As an example, μ is configurable.
[0327] As an example, μ is the subcarrier spacing configuration.
[0328] As an example, μ is the subcarrier spacing configuration of the BWP (Bandwidth part) where the first signal is located.
[0329] As an example, μ is configured by RRC signaling.
[0330] As an example, the first signal is PUSCH, and the P... tmp1 yes: Wherein, P O These are configurable parameters, the aforementioned α is the bandwidth of the effective PUSCH resource allocation (expressed in terms of the number of resource blocks), PL is a configurable parameter, f is the downlink path loss estimate, and f is the current PUSCH power control adjustment state. The K s =1.25, the stated The C is the number of code blocks carried by the first signal, and K r It is the size of the code block r, and N is... RE It is the number of resource elements allocated to the initial PUSCH transmission for the same transport block.
[0331] As an example, the first signal is PUSCH, and the P... tmp1 yes: Wherein, P O These are configurable parameters, the aforementioned α is the bandwidth of the effective PUSCH resource allocation (expressed in terms of the number of resource blocks), PL is a configurable parameter, f is the downlink path loss estimate, and Δ is the current PUSCH power control adjustment state. TF =0.
[0332] As an example, the first signal is PUCCH, and the P... tmp1 Yes: P O +PL+h+Δ F +Δ T xD+f; where P OThese are configurable parameters, where PL is the downlink path loss estimate, f is the current PUSCH power control adjustment state, and Δ... F and the Δ TxD All are configurable; h equals 0.
[0333] As an example, in this application, The form represents taking the smaller of A and B.
[0334] Example 8
[0335] Example 8 illustrates a schematic diagram of a first node determining a first power according to an embodiment of this application, as shown in the attached diagram. Figure 8 As shown.
[0336] In Example 8, the first signal is PUSCH.
[0337] As an example, the P CMAX,1 It is P CMAX The linear value.
[0338] As an example, the P CMAX It is defined for the subframe in which the first signal is located.
[0339] As a sub-implementation of the above embodiments, the temporal resource of the first signal refers to the subframe in which the first signal is located.
[0340] As an example, the P CMAX It is defined for the serving cell where the first signal is located.
[0341] As one embodiment, the first signal is transmitted during a transmission occasion, wherein P CMAX It is defined in relation to the transmission opportunity in which the first signal is located.
[0342] As one embodiment, the first signal is transmitted during a PUSCH transmission occasion, wherein the P... CMAX It is defined for the PUSCH transmission opportunity where the first signal is located.
[0343] As one embodiment, the first signal is transmitted during a PUCCH transmission occasion, wherein the P CMAX It is defined for the PUCCH transmission opportunity where the first signal is located.
[0344] As an example, the P CMAX It is defined for the carrier of the serving cell where the first signal is located.
[0345] As one embodiment, the first node uses the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It is the first reference power.
[0346] As one embodiment, the first node uses the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It is the configured maximum output power, and the first reference power is the P. CMAX The setting is based on the maximum transmit power.
[0347] As one embodiment, the first node does not use the first reference power as the maximum transmission power to determine the first power, including: the P CMAX It does not depend on the first reference power.
[0348] As one embodiment, the first node determines the first power without considering the first reference power, including: the P CMAX It does not depend on the first reference power.
[0349] As one embodiment, the first node determines the first power without considering the first reference power as the maximum transmission power, including: the P CMAX It does not depend on the first reference power.
[0350] As one embodiment, the first node uses the second reference power as the maximum transmit power to determine the first power, including: the P CMAX This is the second reference power.
[0351] As one embodiment, the first node uses the second reference power as the maximum transmit power to determine the first power, including: the P CMAX It is the configured maximum output power, and the second reference power is the P. CMAX The setting is based on the maximum transmit power.
[0352] As an example, the first node determining the first power without using the second reference power as the maximum transmission power includes: the P CMAX It does not depend on the second reference power.
[0353] As one embodiment, the first node determines the first power without considering the second reference power, including: the P CMAX It does not depend on the second reference power.
[0354] As one embodiment, the first node determines the first power without considering the second reference power as the maximum transmission power, including: the P CMAX It does not depend on the second reference power.
[0355] As an example, the first signal is a PUSCH, and the first node simultaneously sends the first signal and a PUCCH for a serving cell.
[0356] As an example, the P PUCCH,1 It is a linear value of the transmission power of the PUCCH that is transmitted simultaneously with the first signal for the same serving cell.
[0357] As an example, the P tmp1 Configuration depends on at least one parameter.
[0358] As an example, the P tmp1 It relies on downlink path loss estimation.
[0359] As an example, the P tmp1 Depends on TPC command(s).
[0360] As an example, the P tmp1 It is equal to the sum of multiple components, at least one of which is configurable.
[0361] As an example, the P tmp1 It equals the sum of multiple components, one of which is the downlink path loss estimate.
[0362] As an example, the P tmp1 It equals the sum of multiple components, one of which is α·PL, where α is a configurable parameter and PL is a downlink path loss estimate.
[0363] As an example, the P tmp1 yes: Wherein, PO These are configurable parameters, the aforementioned α is the bandwidth of the effective PUSCH resource allocation (expressed in terms of the number of resource blocks), PL is a configurable parameter, f is the downlink path loss estimate, and f is the current PUSCH power control adjustment state. The K s =1.25, the stated The C is the number of code blocks carried by the first signal, and K r It is the size of the code block r, and N is... RE It is the number of resource elements allocated to the initial PUSCH transmission for the same transport block.
[0364] As an example, Ptmp1 is: Wherein, P O These are configurable parameters, the aforementioned α is the bandwidth of the effective PUSCH resource allocation (expressed in terms of the number of resource blocks), PL is a configurable parameter, f is the downlink path loss estimate, and Δ is the current PUSCH power control adjustment state. TF =0.
[0365] Example 9
[0366] Example 9 illustrates an embodiment of P according to this application. CMAX An illustrated diagram illustrating the settings is attached. Figure 9 As shown.
[0367] In embodiment 9, the first node is allowed to set P. CMAX And the P CMAX It is set within the following range: the first lower limit power value ≤ the P CMAX ≤ First upper limit power value.
[0368] As an example, the first lower limit power value is represented by P. CMAX_L,f,c It means that the P CMAX_L,f,c =MIN{P EMAX,c –ΔT C,c , (P PowerClass –ΔP PowerClass)–MAX(MAX(MPR c +ΔMPR c A-MPR c )+ΔT IB,c +ΔT C,c +ΔT RxSRS P-MPR c )}.
[0369] As an example, the first lower limit power value is represented by P. CMAX_L,f,c It means that the P CMAX_L,f,c =MIN{P EMAX,c –ΔT C,c , (P PowerClass –ΔP PowerClass )–MAX(MAX(MPR c +ΔMPR c A-MPR c )+ΔT IB,c +ΔT C,c P-MPR c )}.
[0370] As an example, the first upper limit power value is represented by P. CMAX_H,f,c It means that the P CMAX_H,f,c =MIN{P EMAX,c P PowerClass –ΔP PowerClass}
[0371] As an example, the first lower limit power value is represented by P. CMAX_L,c It means that the P CMAX_L,c =MIN{P EMAX,c –ΔT C,c P PowerClass –MAX(MPR c +A-MPR c +ΔT IB,c +ΔT C,c +ΔT ProSe P-MPR c )}.
[0372] As an example, the first upper limit power value is represented by P. CMAX_H,c It means that the P CMAX_H,c =MIN{P EMAX,c P PowerClass}
[0373] As an example, the first node automatically sets the P value within a range bounded by the first lower limit power value and the first upper limit power value. CMAX .
[0374] As an example, the PCMAX The first node is randomly selected with equal probability within a range bounded by the first lower power limit value and the first upper power limit value.
[0375] As an example, MIN means taking the smaller of the two.
[0376] As an example, MAX means taking the larger of the two.
[0377] As an example, the P CMAX The unit is dBm.
[0378] As an example, the P EMAX,c It is defined for a specific service cell.
[0379] As an example, the first node uses the first reference power as the maximum transmission power to determine the first power, wherein P EMAX,c It is the first reference power.
[0380] As one embodiment, the first node uses the first reference power as the maximum transmission power to determine the first power, including: the P EMAX,c It is the first reference power.
[0381] As an example, the first node does not use the first reference power as the maximum transmission power to determine the first power, the P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0382] As an example, the first node determines the first power without considering the first reference power, wherein P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0383] As an example, the first node determines the first power without considering the first reference power as the maximum transmission power, wherein P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0384] As an example, the first node does not use the first reference power as the maximum transmission power to determine the first power, the P EMAX,c It is the value given by the information element P-Max.
[0385] As an example, the first node determines the first power without considering the first reference power, wherein P EMAX,c It is the value given by the information element P-Max.
[0386] As an example, the first node determines the first power without considering the first reference power as the maximum transmission power, wherein P EMAX,c It is the value given by the information element P-Max.
[0387] As an example, the first node uses the second reference power as the maximum transmission power to determine the first power, wherein P EMAX,c This is the second reference power.
[0388] As one embodiment, the first node uses the second reference power as the maximum transmission power to determine the first power, including: the P EMAX,c This is the second reference power.
[0389] As an example, the first node does not use the first reference power nor uses the first reference power as the maximum transmission power to determine the first power, the P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0390] As an example, the first node determines the first power without considering either the first reference power or the second reference power, wherein P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0391] As an example, the first node determines the first power without considering either the first reference power as the maximum transmission power or the second reference power as the maximum transmission power, wherein P EMAX,c It is the value given by the additionalPmax field in the information element p-Max or the information element NR-NS-PmaxList.
[0392] As an example, the first node does not use the first reference power nor uses the first reference power as the maximum transmission power to determine the first power, the P EMAX,c It is the value given by the information element P-Max.
[0393] As an example, the first node determines the first power without considering either the first reference power or the second reference power, wherein P EMAX,c It is the value given by the information element P-Max.
[0394] As an example, the first node determines the first power without considering either the first reference power as the maximum transmission power or the second reference power as the maximum transmission power, wherein P EMAX,c It is the value given by the information element P-Max.
[0395] As an example, the P PowerClass It equals 23dBm.
[0396] As an example, the P PowerClass It equals 26dBm.
[0397] As an example, the P PowerClass It equals 29dBm.
[0398] As an example, the P PowerClass It equals 31dBm.
[0399] As an example, the P PowerClass This is the maximum UE power without considering tolerance.
[0400] As an example, the ΔP PowerClass It is configurable.
[0401] As an example, the ΔP PowerClass It equals -3dB.
[0402] As an example, the ΔP PowerClass It equals 3dB.
[0403] As an example, the ΔP PowerClass It equals 0dB.
[0404] As an example, the ΔT C,c It is configurable.
[0405] As an example, the ΔT C,c It equals 0dB.
[0406] As an example, the ΔT C,c It equals 1.5dB.
[0407] As an example, the ΔT IB,c It is configurable.
[0408] As an example, the ΔT IB,c It is an additional tolerance.
[0409] As an example, the ΔT IB,c It equals 0dB.
[0410] As an example, the MPR c It is Maximum Power Reduction.
[0411] As an example, the A-MPR c It is Additional Maximum Power Reduction.
[0412] As an example, the MPR c It is for a specific service area.
[0413] As an example, the A-MPR c It is targeted at a specific service community.
[0414] As an example, the ΔMPR c It is for a specific service area.
[0415] As an example, the ΔMPR c It equals 0.
[0416] As an example, the ΔMPR c The value is related to the relative channel bandwidth.
[0417] As an example, the ΔT RxSRS It equals 0.
[0418] As an example, the ΔT RxSRS It equals 4.5dB.
[0419] As an example, the ΔT RxSRS It equals 7.5dB.
[0420] As an example, the P-MPR c It is power management maximum power reduction.
[0421] As an example, the P-MPR c It equals 0dB.
[0422] As an example, the P-MPR c It is configurable.
[0423] As an example, the P-MPR c This refers to the allowed maximum output power reduction, which at least ensures compliance with applicable electromagnetic energy absorption requirements.
[0424] As an example, the P-MPR c This refers to the allowed maximum output power reduction for the following requirements:
[0425] a) In the case of simultaneous transmission on multiple RATs in scenarios not covered by the 3GPP RAN specification, ensure compliance with applicable electromagnetic energy absorption requirements and address unwanted emission / self desense requirements.
[0426] b) Ensure compliance with applicable electromagnetic energy absorption requirements in the first scenario; wherein, in the first scenario, proximity detection is used to address such requirements, and such requirements necessitate lower maximum output power.
[0427] As an example, the ΔT ProSe =0.1dB.
[0428] As an example, the ΔT ProSe =0dB.
[0429] Example 10
[0430] Example 10 illustrates a schematic diagram of a first type of time-domain resource according to an embodiment of this application, as shown in the attached diagram. Figure 10 As shown.
[0431] In Embodiment 10, the first type of time-domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
[0432] As an example, a symbol that is indicated as a downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission is indicated as a downlink by the uplink / downlink TDD configuration signaling, and this symbol can be used for uplink transmission.
[0433] As an example, the first type of time-domain resource is a symbol that is indicated by the uplink / downlink TDD configuration signaling as a downlink and can be used for uplink transmission.
[0434] As an example, the first type of time-domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission, as well as symbols that are indicated as uplink or flexible by the uplink / downlink TDD configuration signaling.
[0435] As an example, at least one symbol indicated by the uplink / downlink TDD configuration signaling as a downlink does not belong to the first type of time domain resource.
[0436] As an example, whether a symbol indicated by the uplink / downlink TDD configuration signaling as a downlink can be used for uplink transmission is configurable.
[0437] As an example, whether a symbol indicated by the uplink / downlink TDD configuration signaling as a downlink can be used for uplink transmission is configured by the RRC signaling.
[0438] As an example, the first type of time-domain resources does not include symbols that are indicated by the uplink / downlink TDD configuration signaling as downlink and cannot be used for uplink transmission.
[0439] As an example, whether a flexible symbol belongs to the first type of time-domain resource is configurable.
[0440] As an example, whether a flexible symbol belongs to the first type of time-domain resource is configured by RRC signaling.
[0441] As an example, the first type of time-domain resources includes those configured for SBFD operations.
[0442] As an example, the first type of time-domain resources includes those configured for full-duplex operation.
[0443] As an example, the statement "can be used for uplink transmission" means that it can be used at least for PUCCH (Physical Uplink Control Channel) transmission(s).
[0444] As an example, the statement "can be used for uplink transmission" means that it can be used at least for PUSCH (Physical Uplink SharedCHannel) transmission(s).
[0445] As an example, the statement "can be used for uplink transmission" means that it can be used for at least PUSCH and PUCCH transmission.
[0446] As an example, combined with the above features, the method disclosed in this application is beneficial to significantly improve the uplink data capacity of the system.
[0447] As an example, the statement "can be used for uplink transmission" means that it can be used at least for SRS (Sounding Reference Signal) transmission(s).
[0448] As an example, the statement "can be used for uplink transmission" means that it can be used for at least one of PUSCH transmission, PUCCH transmission, PRACH (Physical Random Access Channel) transmission, and SRS transmission.
[0449] As an example, the statement "can be used for uplink transmission" means that it can be used for at least two of PUSCH transmission, PUCCH transmission, PRACH transmission, and SRS transmission.
[0450] As an example, the statement "can be used for uplink transmission" means that it can be used for at least three of PUSCH transmission, PUCCH transmission, PRACH transmission, and SRS transmission.
[0451] As an example, the statement "can be used for uplink transmission" means that it can be used for PUSCH transmission, PUCCH transmission, PRACH transmission and SRS transmission.
[0452] As an example, the statement "can be used for uplink transmission" means that it can be used for transmission of UL-SCH (Uplink Shared Channel(s)).
[0453] As an example, the Uplink / Downlink TDD (Time Division Duplex) configuration signaling is signaling indicating the link direction of the symbol.
[0454] As an example, the uplink / downlink TDD configuration signaling indicates at least one symbol as a downlink.
[0455] As an example, the uplink / downlink TDD configuration signaling indicates at least one symbol as uplink.
[0456] As an example, the uplink / downlink TDD configuration signaling is RRC signaling.
[0457] As an example, the advantages of the above method include: high transmission reliability of the uplink and downlink TDD configuration signaling.
[0458] As an example, the uplink and downlink TDD configuration signaling is tdd-UL-DL-ConfigurationCommon.
[0459] As an example, the uplink and downlink TDD configuration signaling is tdd-UL-DL-ConfigurationDedicated.
[0460] As one example, the uplink and downlink TDD configuration signaling includes tdd-UL-DL-ConfigurationCommon or tdd-UL-DL-ConfigurationDedicated.
[0461] As an example, the uplink and downlink TDD configuration signaling includes tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0462] As an example, the advantages of the above method include: it facilitates the optimization of transmission resource allocation when at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated is configured.
[0463] Example 11
[0464] Example 11 illustrates a structural block diagram of a processing device in a first node device according to an embodiment, as shown in the attached diagram. Figure 11 As shown. In the appendix Figure 11 In the first node device processing unit A00, there are a first receiver A01 and a first transmitter A02.
[0465] As an example, the first node device A00 is a user equipment.
[0466] As an example, the first node device A00 is a relay node.
[0467] As an example, the first node device A00 is a vehicle-mounted communication device.
[0468] As an example, the second node device B00 is a device that supports full-duplex operation.
[0469] As an example, the second node device B00 is a device that supports subband non-overlapping full-duplex mode.
[0470] As one embodiment, the first receiver A01 includes the appendix to this application. Figure 4 The antenna 452, receiver 454, multi-antenna receiver processor 458, receiver processor 456, controller / processor 459, memory 460, and data source 467 are at least one of them.
[0471] As one embodiment, the first receiver A01 includes the appendix to this application. Figure 4 The antenna 452, receiver 454, multi-antenna receiver processor 458, receiver processor 456, controller / processor 459, memory 460, and data source 467 are at least the first five of the following:
[0472] As one embodiment, the first receiver A01 includes the appendix to this application. Figure 4 At least four of the following: antenna 452, receiver 454, multi-antenna receiver processor 458, receiver processor 456, controller / processor 459, memory 460, and data source 467.
[0473] As one embodiment, the first receiver A01 includes the appendix to this application. Figure 4 At least three of the following: antenna 452, receiver 454, multi-antenna receiver processor 458, receiver processor 456, controller / processor 459, memory 460, and data source 467.
[0474] As one embodiment, the first receiver A01 includes the appendix to this application. Figure 4At least two of the following: antenna 452, receiver 454, multi-antenna receiver processor 458, receiver processor 456, controller / processor 459, memory 460, and data source 467.
[0475] As one embodiment, the first transmitter A02 includes the appendix to this application. Figure 4 The antenna 452, transmitter 454, multi-antenna transmission processor 457, transmission processor 468, controller / processor 459, memory 460 and data source 467 are at least one of them.
[0476] As one embodiment, the first transmitter A02 includes the appendix to this application. Figure 4 The antenna 452, transmitter 454, multi-antenna transmission processor 457, transmission processor 468, controller / processor 459, memory 460, and data source 467 are at least the first five of the following:
[0477] As one embodiment, the first transmitter A02 includes the appendix to this application. Figure 4 The antenna 452, transmitter 454, multi-antenna transmission processor 457, transmission processor 468, controller / processor 459, memory 460 and data source 467 are at least the first four of them.
[0478] As one embodiment, the first transmitter A02 includes the appendix to this application. Figure 4 At least three of the following: antenna 452, transmitter 454, multi-antenna transmitter processor 457, transmitter processor 468, controller / processor 459, memory 460, and data source 467.
[0479] As one embodiment, the first transmitter A02 includes the appendix to this application. Figure 4 At least two of the following: antenna 452, transmitter 454, multi-antenna transmitter processor 457, transmitter processor 468, controller / processor 459, memory 460, and data source 467.
[0480] As one embodiment, the first receiver A01 receives uplink / downlink TDD configuration signaling; the first transmitter A02 transmits a first signal on a first cell group, the first power being the transmission power of the first signal; wherein, a first reference power is configured for the first node, and the first node determines whether the time domain resources of the first power dependent on the first signal overlap with at least one first-class symbol belonging to a first-class time domain resource by using the first reference power as the maximum transmission power, the first-class symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, and the first-class time domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0481] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power.
[0482] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power.
[0483] As an example, the temporal resource of the first signal is the subframe in which the first signal is located.
[0484] As an example, the first reference power is configured by RRC signaling.
[0485] As an example, the first cell group is SCG and the second cell group is MCG.
[0486] As an example, the first cell group is MCG and the second cell group is SCG.
[0487] As an example, the uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0488] As one embodiment, the first receiver A01 receives uplink / downlink TDD configuration signaling; the first transmitter A02 transmits a first signal on a first cell group, where the first power is the transmission power of the first signal; wherein, a first reference power is configured for the first node, and the first node determines whether the first power depends on whether the time-domain resources of the first signal overlap with at least one first-class symbol belonging to a first-class time-domain resource when it uses the first reference power as the maximum transmission power; when the time-domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time-domain resource, the first node uses the first reference power as the maximum transmission power. The first power is determined by the maximum transmit power; when the time domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time domain resources, the first node determines the first power without considering the first reference power as the maximum transmit power; the first type of symbols are symbols of the time slots of the second cell group, which is different from the first cell group, where the first cell group is an SCG and the second cell group is an MCG; the first type of time domain resources include symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission; the time domain resources of the first signal are: the subframe in which the first signal is located.
[0489] As a sub-implementation of the above embodiments, the uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0490] As a sub-implementation of the above embodiments, the first reference power is configured by p-MaxEUTRA, and the uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0491] As a sub-implementation of the above embodiments, the first type of time-domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission, as well as symbols that are indicated as uplink or flexible by the uplink / downlink TDD configuration signaling.
[0492] As a sub-implementation of the above embodiments, the first type of time-domain resources includes symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission, and symbols indicated by the uplink / downlink TDD configuration signaling as uplink or flexible; the first reference power is configured by p-MaxEUTRA, and the uplink / downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0493] As one embodiment, the first receiver A01 receives uplink / downlink TDD configuration signaling; the first transmitter A02 transmits a first signal on a first cell group, and the first power is the transmission power of the first signal; wherein, a first reference power is configured for the first node, and the first node determines whether the first power depends on whether the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources when the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources; when the time domain resources of the first signal overlap with at least one first-class symbol belonging to the first-class time domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power; when the time domain resources of the first signal do not overlap with the first-class symbol belonging to the first-class time domain resources, the first node determines the first power without considering the first reference power; the first-class symbol is a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, and the first-class time domain resources include symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission; the time domain resources of the first signal are: symbols(s) for the first signal.
[0494] As a sub-implementation of the above embodiments, the uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0495] As a sub-example of the above embodiment, the first reference power is configured by p-NR-FR1.
[0496] As a sub-example of the above embodiment, the first reference power is configured by p-NR-FR2.
[0497] As a sub-implementation of the above embodiments, the first type of time-domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission, as well as symbols that are indicated as uplink or flexible by the uplink / downlink TDD configuration signaling.
[0498] As a sub-implementation of the above embodiments, the first cell group is SCG and the second cell group is MCG.
[0499] As a sub-implementation of the above embodiments, the first cell group is MCG and the second cell group is SCG.
[0500] As a sub-implementation of the above embodiments, the uplink / downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated; the first type of time-domain resources includes symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission, and symbols indicated by the uplink / downlink TDD configuration signaling as uplink or flexible; the uplink / downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated; the first cell group is SCG, and the second cell group is MCG.
[0501] As a sub-implementation of the above embodiments, the uplink / downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated; the first type of time-domain resources includes symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission, and symbols indicated by the uplink / downlink TDD configuration signaling as uplink or flexible; the uplink / downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated; the first cell group is MCG, and the second cell group is SCG.
[0502] Example 12
[0503] Example 12 illustrates a structural block diagram of a processing device in a second node device according to an embodiment, as shown in the attached diagram. Figure 12 As shown. In the appendix Figure 12 In the process, the second node equipment processing device B00 includes a second transmitter B01 and a second receiver B02.
[0504] As one example, the second node device B00 is a base station.
[0505] As one example, the second node device B00 is a satellite device.
[0506] As one embodiment, the second node device B00 is a relay node.
[0507] As an example, the second node device B00 is one of the testing apparatus, testing equipment, and testing instruments.
[0508] As an example, the second node device B00 is a device that supports full-duplex operation.
[0509] As an example, the second node device B00 is a device that supports subband non-overlapping full-duplex mode.
[0510] As one embodiment, the second transmitter B01 includes the appendix to this application. Figure 4 The antenna 420, transmitter 418, multi-antenna transmission processor 471, transmission processor 416, controller / processor 475, and memory 476 are at least one of them.
[0511] As one embodiment, the second transmitter B01 includes the appendix to this application. Figure 4 The antenna 420, transmitter 418, multi-antenna transmission processor 471, transmission processor 416, controller / processor 475, and memory 476 are at least the first five of the following:
[0512] As one embodiment, the second transmitter B01 includes the appendix to this application. Figure 4 At least four of the following: antenna 420, transmitter 418, multi-antenna transmission processor 471, transmission processor 416, controller / processor 475, and memory 476.
[0513] As one embodiment, the second transmitter B01 includes the appendix to this application. Figure 4 At least three of the following: antenna 420, transmitter 418, multi-antenna transmission processor 471, transmission processor 416, controller / processor 475, and memory 476.
[0514] As one embodiment, the second transmitter B01 includes the appendix to this application. Figure 4At least two of the following: antenna 420, transmitter 418, multi-antenna transmission processor 471, transmission processor 416, controller / processor 475, and memory 476.
[0515] As one embodiment, the second receiver B02 includes the appendix to this application. Figure 4 The antenna 420, receiver 418, multi-antenna receiver processor 472, receiver processor 470, controller / processor 475, and memory 476 are at least one of them.
[0516] As one embodiment, the second receiver B02 includes the appendix to this application. Figure 4 The antenna 420, receiver 418, multi-antenna receiver processor 472, receiver processor 470, controller / processor 475, and memory 476 are at least the first five of the following:
[0517] As one embodiment, the second receiver B02 includes the appendix to this application. Figure 4 At least four of the following: antenna 420, receiver 418, multi-antenna receiver processor 472, receiver processor 470, controller / processor 475, and memory 476.
[0518] As one embodiment, the second receiver B02 includes the appendix to this application. Figure 4 At least three of the following: antenna 420, receiver 418, multi-antenna receiver processor 472, receiver processor 470, controller / processor 475, and memory 476.
[0519] As one embodiment, the second receiver B02 includes the appendix to this application. Figure 4 At least two of the following: antenna 420, receiver 418, multi-antenna receiver processor 472, receiver processor 470, controller / processor 475, and memory 476.
[0520] As one embodiment, the second transmitter B01 transmits uplink / downlink TDD configuration signaling; the second receiver B02 receives a first signal on a first cell group, where the first power is the transmission power of the first signal; wherein, a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmission power is used to determine whether the time domain resources of the first power depending on the first signal overlap with at least one first type of symbol belonging to a first type of time domain resource, the first type of symbol being a symbol of a time slot in a second cell group, the second cell group being different from the first cell group, and the first type of time domain resource including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
[0521] As an example, when the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the second node may assume that the transmitting end of the first signal uses the first reference power as the maximum transmission power to determine the first power.
[0522] As an example, when the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the second node may assume that the transmitting end of the first signal determines the first power without considering the first reference power as the maximum transmission power.
[0523] As an example, the temporal resource of the first signal is the subframe in which the first signal is located.
[0524] As an example, the first reference power is configured by RRC signaling.
[0525] As an example, the first cell group is SCG and the second cell group is MCG.
[0526] As an example, the first cell group is MCG and the second cell group is SCG.
[0527] As an example, the uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
[0528] Those skilled in the art will understand that all or part of the steps in the above methods can be implemented by a program instructing related hardware, and the program can be stored in a computer-readable storage medium, such as a read-only memory, hard disk, or optical disk. Optionally, all or part of the steps in the above embodiments can also be implemented using one or more integrated circuits. Correspondingly, each module unit in the above embodiments can be implemented in hardware or in the form of software functional modules. This application is not limited to any specific combination of software and hardware. The first node device in this application includes, but is not limited to, wireless communication devices such as mobile phones, tablets, laptops, network cards, low-power devices, eMTC devices, NB-IoT devices, vehicle communication devices, aircraft, airplanes, drones, and remote-controlled airplanes. The second node device in this application includes, but is not limited to, wireless communication devices such as mobile phones, tablets, laptops, network cards, low-power devices, eMTC devices, NB-IoT devices, vehicle communication devices, aircraft, airplanes, drones, and remote-controlled airplanes. The user equipment or UE or terminal in this application includes, but is not limited to, wireless communication devices such as mobile phones, tablets, laptops, network cards, low-power devices, eMTC devices, NB-IoT devices, vehicle communication devices, aircraft, airplanes, drones, and remote-controlled airplanes. The base station equipment or base station or network-side equipment in this application includes, but is not limited to, macrocell base stations, microcell base stations, home base stations, relay base stations, eNB, gNB, Transmitter Receiver Node (TRP), GNSS, relay satellite, satellite base station, airborne base station, testing device, testing equipment, testing instruments, and other equipment.
[0529] Those skilled in the art will understand that the present invention can be practiced in other specified forms without departing from its core or essential characteristics. Therefore, the embodiments disclosed herein should in any way be considered descriptive rather than restrictive. The scope of the invention is defined by the appended claims rather than the foregoing description, and all modifications within their equivalent meaning and scope are considered to be included therein.
Claims
1. A first node used for wireless communication, characterized in that, include: The first receiver receives uplink and downlink TDD configuration signaling; The first transmitter transmits a first signal on the first cell group, and the first power is the transmission power of the first signal; Wherein, a first reference power is configured to the first node, and the first node determines whether the first power depends on the time domain resources of the first signal to overlap with at least one first type of symbol belonging to the first type of time domain resources, the first type of symbol being the symbol of the time slot of the second cell group, the second cell group being different from the first cell group, and the first type of time domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
2. The first node according to claim 1, characterized in that, When the time-domain resources of the first signal overlap with at least one symbol of the first class belonging to the first class of time-domain resources, the first node uses the first reference power as the maximum transmission power to determine the first power.
3. The first node according to claim 1 or 2, characterized in that, When the time-domain resources of the first signal do not overlap with the first type of symbols belonging to the first type of time-domain resources, the first node determines the first power without considering the first reference power as the maximum transmission power.
4. The first node according to any one of claims 1 to 3, characterized in that, The temporal resource of the first signal is the subframe in which the first signal is located.
5. The first node according to any one of claims 1 to 4, characterized in that, The first reference power is configured by RRC signaling.
6. The first node according to any one of claims 1 to 5, characterized in that, The first cell group is SCG, and the second cell group is MCG.
7. The first node according to any one of claims 1 to 6, characterized in that, The uplink and downlink TDD configuration signaling includes at least one of tdd-UL-DL-ConfigurationCommon and tdd-UL-DL-ConfigurationDedicated.
8. A second node used for wireless communication, characterized in that, include: The second transmitter sends uplink and downlink TDD configuration signaling. The second receiver receives the first signal on the first cell group, and the first power is the transmission power of the first signal; Wherein, a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmit power is used to determine whether the time domain resources on which the first power depends on the first signal overlap with at least one first type of symbol belonging to the first type of time domain resources. The first type of symbol is a symbol of the time slot of a second cell group, which is different from the first cell group. The first type of time domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
9. A method used in a first node of wireless communication, characterized in that, include: Receive uplink and downlink TDD configuration signaling; A first signal is transmitted on the first cell group, and the first power is the transmission power of the first signal; Wherein, a first reference power is configured to the first node, and the first node determines whether the first power depends on the time domain resources of the first signal to overlap with at least one first type of symbol belonging to the first type of time domain resources, the first type of symbol being the symbol of the time slot of the second cell group, the second cell group being different from the first cell group, and the first type of time domain resources including symbols indicated by the uplink / downlink TDD configuration signaling as downlink and usable for uplink transmission.
10. A method used in a second node for wireless communication, characterized in that, include: Send uplink and downlink TDD configuration signaling; The first signal is received on the first cell group, and the first power is the transmission power of the first signal; Wherein, a first reference power is configured for the transmitter of the first signal, and whether the first reference power is used as the maximum transmit power is used to determine whether the time domain resources on which the first power depends on the first signal overlap with at least one first type of symbol belonging to the first type of time domain resources. The first type of symbol is a symbol of the time slot of a second cell group, which is different from the first cell group. The first type of time domain resources includes symbols that are indicated as downlink by the uplink / downlink TDD configuration signaling and can be used for uplink transmission.
