Built-in pendant foamed ceramic curtain wall

Built-in bracket foamed ceramic curtain walls solve the complexity of installation and thermal bridging issues through a fully concealed load-bearing system, achieving integrated interior and exterior decoration and high energy efficiency, simplifying the construction process and reducing costs.

CN123044052APending Publication Date: 2026-11-06ZHEJIANG YASHA CURTAIN WALL
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611274197.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-06

AI Technical Summary

Technical Problem

The installation of existing foamed ceramic curtain walls requires the use of solid walls or additional interior finishing systems, which leads to the sequential or overlapping construction of interior and exterior finishing layers, extending the construction period, increasing material and labor costs, and creating continuous thermal bridges in the metal connectors, thus reducing the building's energy efficiency.

Method used

The structure adopts a built-in bracket foamed ceramic curtain wall, which forms a fully concealed load-bearing system through columns, connecting brackets and load-bearing brackets. The side end face of the foamed ceramic panel is provided with grooves, and the connecting brackets and load-bearing brackets are installed inside. A rubber strip is provided between the column and the foamed ceramic panel to achieve sealing, insulation and thermal bridging.

Benefits of technology

This allows for integrated construction of interior and exterior decoration, reducing construction procedures and overlapping operations, lowering costs, ensuring the continuity of thermal insulation in the building envelope, improving energy efficiency, and resulting in a clean and aesthetically pleasing facade.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123044052A_ABST
    Figure CN123044052A_ABST
Patent Text Reader

Abstract

The utility model provides a kind of built-in pendant foamed ceramic curtain wall, including stand and the foamed ceramic plate installed in the both sides of stand, the stand is equipped with positioning structure, positioning structure both sides are equipped with connecting pendant and load-bearing code piece, foamed ceramic plate side end surface is equipped with the slot of adaptation with connecting pendant and load-bearing code piece, connecting pendant and load-bearing code piece built-in installation between foamed ceramic plate and stand, form full hidden force system;Compared with prior art, when installing on site, only need to be fixed by the cooperation of pendant and positioning structure, insert slot, without additional troweling, brushing or adding independent finishing system on indoor side, realize the integrated construction of inside and outside decoration, significantly reduce construction procedure and cross operation, shorten building curtain wall engineering period;And because cancel indoor side secondary decoration or additional interior finishing system, avoid the repeated purchase of material and the repeated investment of labor, effectively reduce the total cost of project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building curtain wall technology, specifically to a foamed ceramic curtain wall with built-in hangers. Background Technology

[0002] Foamed ceramics are a type of high-porosity inorganic closed-cell ceramic material made primarily from inorganic solid waste such as clay tailings, ceramic fragments, river silt, and fly ash. They are formed through high-temperature firing and natural foaming within a kiln. Foamed ceramics possess a range of advantages, including lightweight and high strength (density approximately one-third that of traditional stone or concrete), excellent thermal insulation (low thermal conductivity), superior fire resistance (A1 grade non-combustible, melting point above 1200℃), good weather resistance and chemical stability, ease of processing, and environmental friendliness. Therefore, foamed ceramics are considered an excellent alternative to traditional curtain wall materials (such as aluminum panels and stone), and are of great significance in promoting the industrialization of construction and the development of green buildings.

[0003] Currently, foamed ceramic curtain walls are increasingly widely used in non-transparent building envelopes. In existing technologies, the installation methods for foamed ceramic curtain walls mainly fall into the following two typical scenarios.

[0004] The first type is a curtain wall system relying on a solid wall structure. Foamed ceramic curtain wall panels are fixed to the exterior of solid walls such as gable walls, shear walls, or masonry walls of a building using dry-hanging or a combination of adhesive and anchoring methods. The curtain wall panels, insulation layer, and solid wall together form the external envelope. In this type of construction, the interior side of the solid wall behind the curtain wall still requires interior finishing processes such as plastering, painting, or installation of decorative panels to achieve visual appeal and usability. This results in separate and overlapping construction of the interior and exterior decorative layers, extending the construction period and increasing project complexity and cost.

[0005] Category Two: Curtain wall systems for open facades or elevated areas without solid walls. In large buildings, the curtain wall is located on open facades, elevated areas, canopies, etc., where there are no solid walls to provide support and a backdrop. To conceal the curtain wall's frame structure, insulation layer, and any existing pipework, and to create a clean interior space interface, in practice, it is necessary to separately construct a complete interior finishing system (usually using materials such as aluminum panels, gypsum board, or metal panels) on the back of the foamed ceramic curtain wall. This finishing layer essentially constitutes an "interior wall" parallel to the external curtain wall, further increasing the complexity of the construction process and the repeated investment of materials and labor costs.

[0006] Chinese patent application number 201721880728.3 discloses a ceramic thin-plate curtain wall installation structure. The disclosed curtain wall installation structure includes a horizontal beam, an inner aluminum alloy bracket, an outer aluminum alloy bracket, and a calcium silicate ceramic composite plate made of calcium silicate board and ceramic thin plate bonded together. The calcium silicate board has a slot parallel to the horizontal beam. The inner aluminum alloy bracket is installed on the horizontal beam. The outer aluminum alloy bracket is inserted into the inner aluminum alloy bracket and can move along the axial direction of the horizontal beam. The calcium silicate ceramic composite plate is movably installed on the horizontal beam through the insertion of the outer aluminum alloy bracket into the slot. Chinese patent application number 202010425630.9 discloses a large-format energy-saving ceramic panel curtain wall structure and its construction method. The disclosed curtain wall structure includes a steel frame assembly, a horizontal fixing assembly, a vertical fixing assembly, a ceramic composite panel assembly, and an edge finishing assembly. The steel frame assembly includes a slotted embedded part and an aluminum alloy column connected to the slotted embedded part via a U-shaped adapter. The slotted embedded part includes an embedded plate and a first bolt assembly. The embedded plate is fixed to the main structure. The first bolt assembly is flexibly connected to the embedded plate. The U-shaped adapter is flexibly connected to the first bolt assembly. The aluminum alloy column is detachably connected to the U-shaped adapter.

[0007] The installation of existing foamed ceramic curtain walls requires the use of solid walls or additional interior finishing systems, leading to sequential or overlapping construction of interior and exterior finishing layers, making coordination between different trades difficult and extending the construction period. Solid walls still require plastering and painting on the interior side, or, in the absence of solid walls, the construction of independent interior finishing systems (such as aluminum panels or gypsum board) is necessary, resulting in duplicated material and labor costs and a significant increase in total project costs. Furthermore, metal connectors such as curtain wall columns and beams typically penetrate the insulation layer, connecting the interior and exterior environments and creating continuous thermal bridges. This disrupts the insulation continuity of the building envelope and reduces overall energy efficiency. Summary of the Invention

[0008] The present invention aims to overcome the defects in the prior art and provide a built-in hanging foamed ceramic curtain wall that can achieve integrated interior and exterior decoration, fully concealed stress, and thermal break.

[0009] To achieve the above-mentioned objectives, the present invention adopts the following technical solution: a foamed ceramic curtain wall with built-in hangers, comprising columns and foamed ceramic panels installed on both sides of the columns. The columns are provided with a positioning structure, and connecting hangers and load-bearing brackets are provided on both sides of the positioning structure. The side end faces of the foamed ceramic panels are provided with slots adapted to the connecting hangers and load-bearing brackets. The connecting hangers and load-bearing brackets are internally installed between the foamed ceramic panels and the columns, forming a fully concealed load-bearing system. The positioning structure is provided with limiting grooves on both sides, and the connecting hangers are provided with positioning elements adapted to the limiting grooves. Fixing elements are provided between the connecting hangers and the positioning structure, and between the load-bearing brackets and the connecting hangers, for fixing the connecting hangers to the positioning structure and the load-bearing brackets respectively. Adhesive strips are also provided between the columns and the foamed ceramic panels, and between the connecting hangers and the foamed ceramic panels, for sealing, insulation, noise reduction, and thermal bridging between the columns and the foamed ceramic panels, and between the connecting hangers and the foamed ceramic panels.

[0010] As a preferred embodiment of the present invention, the positioning structure is arranged along the length direction of the column, and the positioning structure is located on the side of the column that contacts the foamed ceramic plate.

[0011] In a preferred embodiment of the present invention, the limiting groove is provided along the length direction of the positioning structure, the positioning member is provided along the length direction of the connecting hanger, the positioning member is inserted into the limiting groove, and the width of the limiting groove is adapted to the width of the positioning member.

[0012] As a preferred embodiment of the present invention, the load-bearing bracket includes a plug and an abutment vertically connected to the plug. The connecting bracket is provided with an installation groove along the length direction of the connecting bracket. The plug is connected to the installation groove, and the abutment abuts against the upper / lower end face of the foamed ceramic plate.

[0013] As a preferred embodiment of the present invention, the limiting groove is provided with a plurality of first fixing holes distributed along the length direction of the limiting groove, and the positioning member is provided with a plurality of second fixing holes distributed along the length direction of the positioning member. The first fixing holes and the second fixing holes correspond to each other, and the fixing member is installed in the first fixing holes and the second fixing holes.

[0014] As a preferred embodiment of the present invention, the connector is provided with a plurality of third positioning holes distributed along the length direction of the connector, the positioning member is provided with a groove along its length direction, the second fixing hole is provided on the groove, the second fixing hole and the third positioning hole correspond to each other, and the fixing member is installed in the second fixing hole and the third positioning hole.

[0015] As a preferred embodiment of the present invention, the side of the column that contacts the foamed ceramic plate is provided with a first adhesive strip groove. The first adhesive strip groove is located on both sides of the positioning structure and is arranged along the length direction of the column. The adhesive strip is disposed in the first adhesive strip groove.

[0016] As a preferred embodiment of the present invention, the two sides of the connecting bracket that are in contact with the foamed ceramic plate are provided with a second adhesive strip groove along the length direction of the connecting bracket, and the adhesive strip is disposed in the second adhesive strip groove.

[0017] As a preferred embodiment of the present invention, the lower end of the connecting bracket is provided with a U-shaped hole, which is fixed to the column by a fastener to realize the post-installation function.

[0018] As a preferred embodiment of the present invention, the gaps between adjacent foamed ceramic plates are filled with sealant.

[0019] Compared with the prior art, the beneficial effects of the present invention are:

[0020] 1. A fully concealed load-bearing system is formed through built-in connecting brackets and load-bearing brackets, allowing the foamed ceramic panels to directly serve as the interior and exterior decorative interface. The side end faces of the foamed ceramic panels have matching grooves, and on-site installation only requires matching the brackets with the positioning structure and inserting them into the grooves to complete the fixation. There is no need for additional plastering, painting, or the addition of a separate finishing system on the interior side, realizing integrated construction of interior and exterior decoration, significantly reducing construction procedures and cross-operations, and shortening the construction cycle of building curtain wall projects. Furthermore, since the secondary decoration or additional interior finishing system on the interior side is eliminated, the repeated purchase of materials and repeated labor input are avoided, effectively reducing the total project cost.

[0021] 2. Adhesive strips are installed between the columns and the foamed ceramic panels, and between the connecting brackets and the foamed ceramic panels. These not only provide sealing, insulation, and noise reduction, but more importantly, they act as thermal bridges—blocking the direct heat conduction path between the columns and connecting brackets and the foamed ceramic panels. This prevents metal connectors from penetrating the insulation layer and forming continuous thermal bridges, ensuring the continuity of the building envelope insulation and significantly improving overall energy efficiency.

[0022] 3. The connecting brackets and load-bearing brackets are all built-in between the foamed ceramic panels and the columns. All connecting components are not exposed on the curtain wall surface, forming a fully concealed load-bearing system. This avoids the visual clutter caused by the exposure of traditional brackets, making the building facade cleaner and more beautiful.

[0023] 4. The load-bearing brackets abut against the upper / lower surfaces of the foamed ceramic panel, primarily bearing the vertical load generated by the panel's own weight. The connecting brackets engage with the positioning slots on the positioning structure via positioning components, and are fixed to both the positioning structure and the load-bearing brackets via fasteners, primarily bearing horizontal wind loads and transferring loads. This clear division of labor avoids the complex stress distribution and stress concentration issues caused by the same component bearing both vertical and horizontal loads in traditional solutions, resulting in a clearer force path and a more stable and safer structure. Attached Figure Description

[0024] Figure 1This is a schematic diagram of the structure of the present invention;

[0025] Figure 2 This is a schematic diagram of the structure of the present invention after the column, foamed ceramic plate, connecting bracket and load-bearing bracket are installed;

[0026] Figure 3 This is a cross-sectional view of the column, foamed ceramic plate, connecting brackets and load-bearing brackets of the present invention after installation;

[0027] Figure 4 This is a cross-sectional view of the column, foamed ceramic plate, and connecting brackets of the present invention after installation;

[0028] Figure 5 This is a schematic diagram of the substructure of the column;

[0029] Figure 6 This is a cross-sectional view of the column;

[0030] Figure 7 This is a structural diagram of the connecting bracket;

[0031] Figure 8 This is a cross-sectional view of the connecting bracket;

[0032] Figure 9 This is a structural diagram of the load-bearing bracket.

[0033] Reference numerals: Column 1, Positioning structure 101, Limiting groove 1011, First fixing hole 1012, First adhesive strip groove 102, Foamed ceramic plate 2, Groove 201, Sealant 202, Connecting bracket 3, Positioning component 301, Second fixing hole 3011, Groove 3012, Mounting groove 302, Second adhesive strip groove 303, U-shaped hole 304, Load-bearing bracket 4, Insertion component 401, Third positioning hole 4011, Abutment component 402, Fixing component 5, Adhesive strip 6. Detailed Implementation

[0034] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0035] like Figures 1-9As shown, a foamed ceramic curtain wall with built-in hangers includes columns 1 and foamed ceramic panels 2 installed on both sides of the columns 1. The columns 1 are provided with a positioning structure 101, and connecting hangers 3 and load-bearing brackets 4 are provided on both sides of the positioning structure 101. The side end faces of the foamed ceramic panels 2 are provided with slots 201 adapted to the connecting hangers 3 and load-bearing brackets 4. The connecting hangers 3 and load-bearing brackets 4 are internally installed between the foamed ceramic panels 2 and the columns 1, forming a fully concealed load-bearing system. Limiting grooves 1011 are provided on both sides of the positioning structure 101. The connecting bracket 3 is provided with a positioning component 301 that is adapted to the limiting groove 1011; a fixing component 5 is provided between the connecting bracket 3 and the positioning structure 101, and between the load-bearing bracket 4 and the connecting bracket 3, for fixing the connecting bracket 3 to the positioning structure 101 and the load-bearing bracket 4 respectively; a rubber strip 6 is also provided between the column 1 and the foamed ceramic plate 2, and between the connecting bracket 3 and the foamed ceramic plate 2, for sealing, insulation, noise reduction and thermal bridging between the column 1 and the foamed ceramic plate 2, and between the connecting bracket 3 and the foamed ceramic plate 2.

[0036] The columns 1 are typically made of aluminum alloy or steel profiles and are arranged vertically or horizontally along the building to serve as the main load-bearing keel of the curtain wall. The foamed ceramic panels 2 are prefabricated lightweight, high-strength ceramic panels, the thickness and dimensions of which are determined according to design requirements.

[0037] Furthermore, the column 1 is provided with a positioning structure 101. The positioning structure 101 is arranged along the length direction of the column 1 (i.e., the longitudinal direction of the column), and the positioning structure 101 is located on the side of the column 1 that contacts the foamed ceramic plate 2. Specifically, the positioning structure 101 can be a rib or boss protruding from the main body of the column 1 toward the foamed ceramic plate 2, and its cross-sectional shape can be rectangular or T-shaped, so as to form installation space on both sides.

[0038] The positioning structure 101 has connecting hangers 3 and load-bearing brackets 4 on both sides. The side end face of the foamed ceramic plate 2 (i.e., the end face corresponding to the positioning structure 101) has a slot 201 adapted to the connecting hangers 3 and load-bearing brackets 4. This slot 201 can be a through slot or a segmented slot extending along the length of the side end face of the foamed ceramic plate 2, and its cross-sectional shape matches the outer contour of the connecting hangers 3 and load-bearing brackets 4. After installation, the connecting hangers 3 and load-bearing brackets 4 are completely embedded in the space between the foamed ceramic plate 2 and the column 1, and no connecting parts are visible from the outside, forming a fully concealed load-bearing system.

[0039] The limiting groove 1011 is set along the length direction of the positioning structure 101, and the positioning member 301 is set along the length direction of the connecting hanger 3. The positioning member 301 is inserted into the limiting groove 1011, and the width of the limiting groove 1011 is adapted to the width of the positioning member 301.

[0040] The positioning structure 101 has limiting grooves 1011 on both sides. The limiting grooves 1011 are arranged along the length of the positioning structure 101, meaning a dovetail groove or rectangular groove is formed on each of the left and right sides of the positioning structure 101. In this example, the limiting grooves 1011 are rectangular grooves. The connecting hanger 3 has a positioning element 301 that matches the limiting groove 1011. The positioning element 301 is arranged along the length of the connecting hanger 3, and its cross-sectional shape is complementary to the limiting groove 1011. During installation, the positioning element 301 is inserted into the limiting groove 1011 from one end or the side, and the width of the limiting groove 1011 is closely matched with the width of the positioning element 301. A clearance fit can be used between the two for easy insertion, but the horizontal direction is constrained, thus achieving rapid positioning and horizontal limiting of the connecting hanger 3 relative to the column 1.

[0041] The load-bearing bracket 4 includes a plug 401 and an abutment 402 vertically connected to the plug 401. The connecting bracket 3 is provided with an installation groove 302 along the length of the connecting bracket 3. The plug 401 is connected to the installation groove 302, and the abutment 402 abuts against the upper / lower end face of the foamed ceramic plate 2.

[0042] The load-bearing component 4 includes a connector 401 and an abutment 402 vertically connected to the connector 401. For example... Figure 9 As shown, the connector 401 is flat, with its two long sides bent inward (towards the abutment 402). The abutment 402 is a plate extending horizontally perpendicular to the connector 401 (depending on the load-bearing direction, the upper foamed ceramic plate is supported from the lower end face by the abutment 402, and the lower foamed ceramic plate is pressed down from the upper end face by the abutment 402). The connecting bracket 3 has a mounting groove 302 along its length, the width of the groove opening being smaller than the width of the groove bottom. The connector 401 is inserted into the mounting groove 302 and can slide and adjust its position along the length of the mounting groove 302. The abutment 402 extends out of the connecting bracket 3 and abuts against the upper or lower end face of the foamed ceramic plate 2 to bear the self-weight load of the foamed ceramic plate 2.

[0043] The limiting groove 1011 is provided with a plurality of first fixing holes 1012 distributed along the length direction of the limiting groove 1011, and the positioning member 301 is provided with a plurality of second fixing holes 3011 distributed along the length direction of the positioning member 301. The first fixing holes 1012 correspond to the second fixing holes 3011, and the fixing member 5 is installed in the first fixing holes 1012 and the second fixing holes 3011.

[0044] A plurality of first fixing holes 1012 are spaced apart along the length of the limiting groove 1011. Correspondingly, a plurality of second fixing holes 3011 are spaced apart along the length of the positioning member 301. The positions of the first fixing holes 1012 and the second fixing holes 3011 correspond one-to-one. The fixing member 5 (e.g., stainless steel self-tapping screws or machine bolts) passes through the first fixing holes 1012 and the second fixing holes 3011, firmly connecting the positioning member 301 to the positioning structure 101, preventing the connecting hanger 3 from moving along the length.

[0045] The connector 401 is provided with a plurality of third positioning holes 4011 distributed along the length direction of the connector 401, and the positioning member 301 is provided with a groove 3012 along its length direction. The second fixing hole 3011 is provided on the groove 3012, and the second fixing hole 3011 and the third positioning hole 4011 correspond to each other. The fixing member 5 is installed in the second fixing hole 3011 and the third positioning hole 4011.

[0046] Meanwhile, the connector 401 is provided with several third positioning holes 4011 distributed along its length. The positioning member 301 is provided with a groove 3012 arranged along its length, and the aforementioned second fixing hole 3011 is opened on the bottom surface of the groove 3012. The depth of the groove 3012 allows the head of the fixing member 5 to sink into it without protruding. When the connector 401 is inserted into the mounting groove 302, the second fixing hole 3011 corresponds to the third positioning hole 4011. Another set of fixing members 5 (shorter in length) passes through the second fixing hole 3011 and the third positioning hole 4011, fixing the connector 401 to the connecting hanger 3 together. Through this double fixing, the load-bearing bracket 4, the connecting hanger 3, and the column 1 form a rigid connection whole.

[0047] To achieve thermal bridging, insulation, and noise reduction, adhesive strips 6 are provided between the column 1 and the foamed ceramic plate 2, and between the connecting bracket 3 and the foamed ceramic plate 2. Specifically:

[0048] A first adhesive strip groove 102 is provided on the side of the column 1 that contacts the foamed ceramic board 2. The first adhesive strip groove 102 is located on both sides of the positioning structure 101 and is arranged along the length direction of the column 1. The adhesive strip 6 is disposed in the first adhesive strip groove 102. Furthermore, a first adhesive strip groove 102 is provided on the side of the column 1 that contacts the foamed ceramic board 2 (i.e., the surface of the column 1 facing the foamed ceramic board 2). The first adhesive strip groove 102 is located on both sides of the positioning structure 101 and is arranged along the length direction of the column 1. The adhesive strip 6 (usually made of EPDM or silicone rubber) is embedded in the first adhesive strip groove 102 and slightly compressed against the inner surface of the foamed ceramic board 2. This avoids noise caused by direct rigid contact between the column 1 and the foamed ceramic board 2, blocks heat conduction from the metal column to the foamed ceramic board, and also provides an airtight and waterproof function.

[0049] Both sides of the connecting bracket 3 that contact the foamed ceramic plate 2 are provided with second adhesive strip grooves 303 arranged along the length of the connecting bracket 3, and the adhesive strip 6 is disposed in the second adhesive strip grooves 303. Furthermore, both sides of the connecting bracket 3 that contact the foamed ceramic plate 2 are provided with second adhesive strip grooves 303 arranged along the length of the connecting bracket 3. The adhesive strip 6 is also embedded in the second adhesive strip grooves 303, making elastic contact with the inner wall of the groove 201 of the foamed ceramic plate 2. This creates a flexible contact between the connecting bracket 3 and the foamed ceramic plate 2, further enhancing the thermal bridging effect and absorbing minor displacements caused by temperature changes or wind vibration, reducing wear.

[0050] The lower end of the connecting bracket 3 is provided with a U-shaped hole 304, which is fixed to the column 1 by the fastener 5 to realize the rear installation function.

[0051] To facilitate on-site installation and adjustment, a U-shaped hole 304 is provided at the lower end of the connecting bracket 3 (i.e., the side closest to the base of the column 1). The opening of the U-shaped hole 304 faces downwards. During installation, the connecting bracket 3 can be inserted into the limiting groove 1011 through the positioning piece 301, but the fixing piece 5 is not tightened yet; then, the vertical or horizontal position of the connecting bracket 3 is adjusted, and then the fixing piece 5 (e.g., a screw) is driven into the U-shaped hole 304 to fix the lower end of the connecting bracket 3 to the column 1 (or the base of the positioning structure 101). Because the U-shaped hole 304 has a certain length, it allows the connecting bracket 3 to be finely adjusted in position before it is fully fixed, realizing the "post-installation" function and reducing the accuracy requirements for pre-embedded or on-site drilling.

[0052] The gaps between adjacent foamed ceramic panels 2 are filled with sealant 202. Gaps are pre-drilled between adjacent foamed ceramic panels 2, and these gaps are filled with sealant 202 (such as weather-resistant silicone sealant). The sealant 202 ensures both the overall water tightness and air tightness of the curtain wall, while also allowing the panels to expand and contract freely under temperature changes.

[0053] Installation process:

[0054] Column 1 is fixed to the main structure of the building according to the designed spacing.

[0055] Insert the adhesive strips 6 into the first adhesive strip groove 102 of the column 1 and the second adhesive strip groove 303 of the connecting bracket 3, respectively.

[0056] Insert the connector 401 of the load-bearing bracket 4 into the mounting groove 302 of the connecting bracket 3. After adjusting the vertical position according to the design elevation, use another set of fasteners 5 to pass through the second fixing hole 3011 in the groove 3012 and the third positioning hole 4011 on the connector 401 to lock the load-bearing bracket 4 and the connecting bracket 3.

[0057] Slide the positioning piece 301 of the connecting hanger 3 into the limiting groove 1011 of the positioning structure 101 from one end or side. After initial positioning, use the fixing piece 5 to pass through the first fixing hole 1012 and the second fixing hole 3011, but do not lock it completely.

[0058] Lift the foamed ceramic plate 2 so that the groove 201 on its side end face aligns with the connecting hanger 3 and the load-bearing bracket 4. Then push the connecting hanger 3 so that it is fully inserted into the groove 201. The abutment 402 of the load-bearing bracket 4 should just abut against the upper end face (for the upper plate) or the lower end face (for the lower plate) of the foamed ceramic plate 2.

[0059] Adjust the flatness and grid width of the foamed ceramic board 2, then tighten all the fasteners 5, and use the U-shaped holes 304 to fix the lower end of the connecting bracket 3 to the column 1.

[0060] Fill the gaps between adjacent foamed ceramic panels 2 with backing material (such as foam rods), and then apply sealant 202.

[0061] Repeat the above steps to complete the installation of all curtain wall panels.

[0062] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention; therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

[0063] Although this document frequently uses reference numerals from the figures, such as column 1, positioning structure 101, limiting groove 1011, first fixing hole 1012, first adhesive strip groove 102, foamed ceramic plate 2, groove 201, sealant 202, connecting bracket 3, positioning component 301, second fixing hole 3011, groove 3012, mounting groove 302, second adhesive strip groove 303, U-shaped hole 304, load-bearing bracket 4, plug-in component 401, third positioning hole 4011, abutment component 402, fixing component 5, and adhesive strip 6, the possibility of using other terms is not excluded. The use of these terms is merely for the convenience of describing and explaining the essence of the invention; interpreting them as any additional limitation would contradict the spirit of the invention.

Claims

1. A foamed ceramic curtain wall with built-in hanging components, characterized in that, The system includes a column (1) and foamed ceramic plates (2) installed on both sides of the column (1). The column (1) is provided with a positioning structure (101). The positioning structure (101) is provided with connecting hangers (3) and load-bearing brackets (4) on both sides. The side end face of the foamed ceramic plate (2) is provided with a groove (201) that is compatible with the connecting hangers (3) and load-bearing brackets (4). The connecting hangers (3) and load-bearing brackets (4) are installed between the foamed ceramic plate (2) and the column (1) to form a fully concealed force-bearing system. The positioning structure (101) is provided with limiting grooves (1011) on both sides. The connecting hangers (3) are provided with... A positioning component (301) is adapted to the limiting groove (1011); a fixing component (5) is provided between the connecting bracket (3) and the positioning structure (101), and between the load-bearing bracket (4) and the connecting bracket (3), for fixing the connecting bracket (3) to the positioning structure (101) and the load-bearing bracket (4) respectively; a rubber strip (6) is also provided between the column (1) and the foamed ceramic plate (2), and between the connecting bracket (3) and the foamed ceramic plate (2), for sealing, insulation, noise reduction and thermal break of the column (1) and the foamed ceramic plate (2), and the connecting bracket (3) and the foamed ceramic plate (2).

2. The foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The positioning structure (101) is arranged along the length of the column (1), and the positioning structure (101) is located on the side of the column (1) that is in contact with the foamed ceramic plate (2).

3. A foamed ceramic curtain wall with built-in hanging components according to claim 2, characterized in that, The limiting groove (1011) is arranged along the length direction of the positioning structure (101), and the positioning member (301) is arranged along the length direction of the connecting hanger (3). The positioning member (301) is inserted into the limiting groove (1011), and the groove width of the limiting groove (1011) is adapted to the width of the positioning member (301).

4. A foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The load-bearing bracket (4) includes a plug (401) and an abutment (402) vertically connected to the plug (401). The connecting bracket (3) is provided with an installation groove (302) along the length of the connecting bracket (3). The plug (401) is connected to the installation groove (302), and the abutment (402) abuts against the upper / lower end face of the foamed ceramic plate (2).

5. A foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The limiting groove (1011) is provided with a plurality of first fixing holes (1012) distributed along the length direction of the limiting groove (1011), and the positioning member (301) is provided with a plurality of second fixing holes (3011) distributed along the length direction of the positioning member (301). The first fixing holes (1012) correspond to the second fixing holes (3011), and the fixing member (5) is installed in the first fixing holes (1012) and the second fixing holes (3011).

6. A foamed ceramic curtain wall with built-in hanging components according to claim 5, characterized in that, The connector (401) is provided with a plurality of third positioning holes (4011) distributed along the length direction of the connector (401), and the positioning member (301) is provided with a groove (3012) along its length direction. The second fixing hole (3011) is provided on the groove (3012). The second fixing hole (3011) and the third positioning hole (4011) correspond to each other. The fixing member (5) is installed in the second fixing hole (3011) and the third positioning hole (4011).

7. A foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The column (1) is provided with a first adhesive strip groove (102) on the side that contacts the foamed ceramic plate (2). The first adhesive strip groove (102) is located on both sides of the positioning structure (101) and is arranged along the length direction of the column (1). The adhesive strip (6) is arranged in the first adhesive strip groove (102).

8. A foamed ceramic curtain wall with built-in hanging components according to claim 7, characterized in that, The two sides of the connecting bracket (3) that are in contact with the foamed ceramic plate (2) are provided with a second adhesive strip groove (303) along the length direction of the connecting bracket (3), and the adhesive strip (6) is provided in the second adhesive strip groove (303).

9. A foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The lower end of the connecting bracket (3) is provided with a U-shaped hole (304), which is fixed to the column (1) by a fastener (5) to realize the post-installation function.

10. A foamed ceramic curtain wall with built-in hanging components according to claim 1, characterized in that, The gaps between adjacent foamed ceramic panels (2) are filled with sealant (202).

Citation Information

Patent Citations

  • Large-specification energy-saving ceramic plate curtain wall structure and construction method thereof

    CN111456306A

  • Ceramic sheet curtain mounting structure

    CN207959637U