A device for water-containing blast hole mining in deep concave open pit

By designing a blasting mining device for water-bearing boreholes in deep open-pit mines, a rotating platform and pre-assembled units are used to achieve rapid and safe loading of explosives, solving the problems of slow loading speed and low safety. This device is suitable for the high-risk operating environment of water-bearing boreholes in deep open-pit mines, ensuring blasting quality and safety.

CN123045162APending Publication Date: 2026-11-06KUNMING UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611382370.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-08
Publication Date
2026-11-06

AI Technical Summary

Technical Problem

In existing technologies, the charging process for water-bearing blast holes in deep open-pit mines requires multiple repetitions, resulting in slow charging speed, high physical exertion, and the risk of unstable blasting quality.

Method used

A deep-pitted open-pit mine water-bearing blasting mining device was designed, including a mobile chassis, a rotating platform, a pipe cover, a special pipe, and a pre-assembly unit. Several special pipes and detonators are overlapped and sealed together by a clamping plate and a lifting module, and directly filled into the blast hole, avoiding manual handling of explosives.

Benefits of technology

It enables rapid and safe loading of explosives, adapts to different borehole depths, isolates the effects of water immersion, improves the reliability and safety of blasting operations, avoids personnel contact with explosives, and is suitable for the high-risk environment of deep open-pit mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123045162A_ABST
    Figure CN123045162A_ABST
Patent Text Reader

Abstract

This invention provides a deep-pitted open-pit mine water-bearing blasting device, belonging to the field of open-pit mining technology. It includes a mobile chassis, a rotating platform, a first conveyor belt, a second conveyor belt, a transfer unit, a clamping plate, a temporary clamping module, a plug removal module, a first lifting module, a second lifting module, and a first lateral telescopic module. During operation, the mobile chassis moves to the location where explosives are to be inserted. After identifying the blast hole plug and reading the blast hole depth, the temporary clamping module and the plug removal module remove the blast hole plug from the blast hole. The rotating platform rotates 180 degrees. The transfer unit sequentially transfers the first special tube conveyed by the first conveyor belt and the second special tube conveyed by the second conveyor belt to directly above the blast hole. Under the action of the first lifting module, the second lifting module, and the first lateral telescopic module, the clamping plate, according to the blast hole depth, loads the plug, several first special tubes, and one second special tube into the blast hole in a closed, overlapping manner.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of open-pit mining technology, and in particular relates to a blasting mining device for deep open-pit mines with water-bearing blast holes. Background Technology

[0002] In open-pit mining, blasting is a key process for breaking rock and stripping overburden. Deep open-pit mines are the mainstream type of open-pit mining. As the mining depth increases, the terrain of the pit continues to decline, and the bottom of the pit is prone to the accumulation of groundwater, rainwater and surface runoff, which is the main area where water-bearing blasting conditions occur in open-pit mines.

[0003] Regarding the issue of loading explosives into water-bearing blast holes, the existing operating procedure typically involves workers transporting several explosives in waterproof packaging to the blasting site one by one. During loading, individual explosive cartridges must be placed into the blast holes sequentially. Since each blast hole requires multiple explosives, operators need to repeatedly grab and drop the explosives, which not only slows down the loading speed and reduces the overall efficiency of mining operations, but also causes enormous physical exertion for the workers. In severe cases, fatigue may lead to operational errors, further deteriorating the blasting quality and seriously affecting the overall construction effect of rock stripping and ore mining in deep open-pit mines. Summary of the Invention

[0004] In view of the shortcomings of the prior art described above, the purpose of this invention is to provide a deep open-pit mine water-bearing blasting mining device to solve the problem that the prior art cannot fill the blast hole with explosives in one go.

[0005] To achieve the above and other related objectives, the present invention provides a deep-pitted open-pit mine water-bearing blasting mining device, the blasting mining device comprising: A mobile chassis, wherein a rotating platform is rotatably provided on the upper surface of the mobile chassis; A plurality of pipe caps, a first special pipe and a second special pipe, wherein the plurality of pipe caps are all mounted on a rotating platform, and the plurality of first special pipes and second special pipes are all mounted on a rotating platform, wherein a support frame is installed at the bottom of each first special pipe, and explosives are placed on the support frame inside each first special pipe, wherein the bottom of each second special pipe is sealed, and a detonator and explosives are placed inside each second special pipe; The pre-assembly unit includes a clamping disc, a second lifting module, and a first transverse telescopic module. The clamping disc is mounted on the first transverse telescopic module, and the first transverse telescopic module is mounted on the second lifting module. The telescopic direction of the first transverse telescopic module is parallel to the upper surface of the rotating platform. The second lifting module is mounted on the rotating platform, and the telescopic direction of the second lifting module is perpendicular to the upper surface of the rotating platform. Under the action of the second lifting module and the first transverse telescopic module, the clamping disc can seal and splice the pipe cap onto the first special pipe. Under the action of the second lifting module, the clamping disc can seal and splice several first special pipes and one second special pipe overlapping vertically from top to bottom according to the depth of the blast hole. The explosive loading unit includes a first lifting module. The fixed end of the first lifting module is disposed on a first transverse telescopic module. The extended end of the first lifting module is fixedly connected to a clamping plate. The telescopic direction of the first lifting module is perpendicular to the upper surface of the rotating platform. Under the action of the first lifting module and the second lifting module, the clamping plate can load several first special tubes and one second special tube, which are closed and spliced ​​from top to bottom, into the blast hole.

[0006] As an optional solution, the blasting and mining device further includes a first conveyor belt, a first mounting frame, two first limiting blocks, two first stop blocks, two first mounting blocks, two first springs, and two first chutes; Each of the first special tubes has a plurality of first limiting modules arranged in a circular array along the circumferential direction of the central axis of the first special tube at its lower part. The number of first limiting modules on each first special tube is at least three. The first mounting frame is fixedly mounted on the upper end face of the rotating platform. The first conveyor belt is horizontally mounted inside the first mounting frame. The first limiting block is fixedly mounted on the upper end face of the first mounting frame. The two first limiting blocks are located at the two ends of the width direction of the first mounting frame, and the two first limiting blocks are parallel to each other. The relative distance between the two first limiting blocks is the same as the diameter of the first special tube. The relative distance between each first limiting block and the first conveyor belt is the same as the height of the first limiting module. When the first special tube is placed on the first conveyor belt, the first limiting module is located between the first limiting block and the first conveyor belt. Each of the first limiting blocks has a first mounting block fixedly connected to one end of its length away from the transfer unit. One end of the first mounting block is fixedly connected to one end of a first spring, which is horizontally positioned. The other end of the first spring is fixedly connected to a first stop block. Each of the first limiting blocks has a first sliding groove on its upper surface. The sliding guide direction of the first sliding groove is parallel to the width direction of the first limiting block. The first stop block is slidably positioned in the first sliding groove. The two first stop blocks are positioned opposite each other. The opposite end faces of the two first stop blocks each have a first guide slope for allowing the first special tube to enter the first conveyor belt.

[0007] As an optional solution, the blasting and mining device further includes a second conveyor belt, a second mounting frame, two second limiting blocks, two second stop blocks, two second mounting blocks, two second springs, and two second chutes; Each of the second special tubes has a plurality of second limiting modules arranged in a circular array along the circumferential direction of the central axis of the second special tube. The number of second limiting modules on each second special tube is at least three. The second mounting frame is fixedly mounted on the upper end face of the rotating platform. The second conveyor belt is horizontally mounted inside the second mounting frame. The second limiting block is fixedly mounted on the upper end face of the second mounting frame. The two second limiting blocks are located at the two ends of the width direction of the second mounting frame, and the two second limiting blocks are parallel to each other. The relative distance between the two second limiting blocks is the same as the diameter of the second special tube. The relative distance between each second limiting block and the second conveyor belt is the same as the height of the second limiting module. When the second special tube is placed on the second conveyor belt, the second limiting module is located between the second limiting block and the second conveyor belt. Each of the second limiting blocks has a second mounting block fixedly connected to one end of its length away from the transfer unit. One end of the second mounting block is fixedly connected to one end of a second spring, which is horizontally positioned. The other end of the second spring is fixedly connected to a second stop. Each of the second limiting blocks has a second sliding groove on its upper surface. The sliding guide direction of the second sliding groove is parallel to the width direction of the second limiting block. The second stop is slidably positioned in the second sliding groove. The two second stopes are positioned opposite each other. The opposite end faces of the two second stopes each have a second guide slope for allowing the second special tube to enter the second conveyor belt.

[0008] As an optional solution, the blasting and mining device also includes a transfer unit, which includes a first arc-shaped block, a second arc-shaped block, a first mounting base, a first telescopic power source, and a second telescopic power source. The first arc-shaped block is fixedly installed on the extended end of the first telescopic power source, the first telescopic power source is horizontally installed on the first mounting base, the telescopic direction of the first telescopic power source is perpendicular to the conveying direction of the first conveyor belt, and the first mounting base is fixedly installed on the rotating platform. The second arc-shaped block is fixedly installed on the extended end of the second telescopic power source, the second telescopic power source is horizontally installed on the first mounting base, and the telescopic direction of the first telescopic power source is parallel to the telescopic direction of the first telescopic power source. The lower end face of the first arc-shaped block is higher than the lower end face of the first limiting block, and the lower end face of the second arc-shaped block is higher than the lower end face of the second limiting block. The upper end faces of the first arc-shaped block and the second arc-shaped block are at the same height. The inner walls of the first arc-shaped block and the second arc-shaped block are arranged opposite to each other. The upper and lower end faces of the rotating platform are provided with a first through hole through which the first special tube and the second special tube can pass. The first arc-shaped block and the second arc-shaped block can clamp the first special tube conveyed by the first conveyor belt or the second special tube conveyed by the second conveyor belt directly above the first through hole.

[0009] As an optional solution, the blasting and mining device further includes a first mounting cylinder; The first mounting cylinder is fixedly mounted on the rotating platform. The pipe cap is placed inside the first mounting cylinder, with the upper part of the pipe cap having a first circular groove and the lower part having a second circular groove. The upper diameter of the pipe cap is smaller than the diameter of the borehole, and the lower diameter of the pipe cap is smaller than the upper diameter. A first circular sealing ring is fixedly mounted on the top wall of the second circular groove. Several first sliding grooves are arrayed along the circumferential direction of the central axis of the pipe cap on the side wall of the second circular groove. The sliding guide direction of the first sliding groove is horizontal. One end of a third spring is fixedly connected in each first sliding groove. The third spring is horizontally connected. The other end of the third spring is fixedly connected to a first buckle. The first buckle is slidably disposed in the first sliding groove. A third guide slope is provided at the lower part of the first buckle away from the end face of the third spring. When the third spring is in the initial state, the first buckle part is located in the second circular groove. Both the first and second special tubes are length-graded telescopic structures. Each length-graded telescopic structure includes a first mounting tube, a first telescopic tube, a second circular sealing ring, a first pin, a first threaded through hole, and several second threaded holes. The lower inner diameter of the first mounting tube is smaller than its upper inner diameter, and the upper outer diameter of the first telescopic tube is smaller than its lower outer diameter. The upper outer diameter of the first telescopic tube is the same as the lower inner diameter of the first mounting tube, and the upper inner diameter of the first telescopic tube is the same as the upper inner diameter of the first mounting tube. A second circular sealing ring is embedded in the upper outer wall of the first telescopic tube, and the second circular sealing ring is pressed against the lower inner wall of the first mounting tube. The first threaded through hole is opened through the lower side wall of the first mounting tube. A plurality of second threaded holes are arrayed in the circumferential direction along the central axis of the first telescopic tube on the upper outer side wall of the first telescopic tube. When the first threaded through hole and one of the second threaded holes are connected, the first pin can be simultaneously turned into the first threaded through hole and the second threaded hole. The upper outer diameter of the first mounting tube is the same as the inner diameter of the second circular groove. The upper outer side wall of the first mounting tube is provided with a first snap-fit ​​groove. When the tube cover closes the upper opening of the first mounting tube, the first buckle is snapped into the first snap-fit ​​groove, and the first circular sealing ring is pressed and adhered to the upper end face of the first mounting tube. A first annular tube is fixedly installed at the bottom of the first telescopic tube. The inner diameter of the first annular tube is the same as the outer diameter of the upper part of the first mounting tube. A third circular sealing ring is fixedly installed on the upper inner wall of the first annular tube. The upper end face of the third circular sealing ring is fixedly connected to the lower end face of the first telescopic tube. A plurality of second sliding grooves are arrayed along the circumferential direction of the inner wall of the first annular tube along the central axis of the first annular tube. The sliding guide direction of the second sliding groove is horizontally set. One end of a fourth spring is fixedly connected in each second sliding groove. The fourth spring is horizontally set. The other end of the fourth spring is fixedly connected to a second buckle. The second buckle is slidably set in the second sliding groove. A fourth guide slope is opened at the lower part of the second buckle away from the end face of the fourth spring. When the first annular tube on one of the first special tubes or the second special tubes is sleeved on the upper part of the first mounting tube on another of the first special tubes or the second special tubes, the second buckle is snapped into the first snap groove, and the upper end face of the first mounting tube on the other of the first special tubes or the second special tubes is pressed and adhered to the third circular sealing ring. The support frame is installed on the bottom of the first telescopic tube on the first special tube, and the bottom of the first telescopic tube on the second special tube is closed.

[0010] As an optional solution, the pre-assembly unit further includes a third mounting block and a bidirectional telescopic power source, the second lifting module includes a second lifting power source and a mounting frame, and the first transverse telescopic module includes a first transverse telescopic power source and a sixth mounting block; There are two clamping discs, and the diameter of each clamping disc is the same as the diameter of the first circular groove. The two clamping discs are respectively fixedly installed on the protruding ends on both sides of the bidirectional telescopic power source. The fixed end of the bidirectional telescopic power source is horizontally installed on the third mounting block. Each clamping disc has a dovetail groove on its upper surface. The sliding extension direction of the dovetail groove is parallel to the extension direction of the bidirectional telescopic power source. A dovetail block is fixedly installed on the third mounting block, and the dovetail block is slidably disposed in the dovetail groove. The third mounting block is disposed on the extended end of the first transverse telescopic power source, the fixed end of the first transverse telescopic power source is fixedly mounted on the sixth mounting block, the telescopic direction of the first transverse telescopic power source is parallel to the upper end face of the rotating platform, the sixth mounting block is fixedly mounted on the extended end of the second lifting power source, the telescopic direction of the second lifting power source is perpendicular to the upper end face of the rotating platform, the fixed end of the second lifting power source is fixedly mounted on the mounting frame, and the mounting frame is fixedly mounted on the rotating platform. The first lateral telescopic power source can move the clamping disc to directly above the first mounting cylinder or the first through hole.

[0011] As an optional solution, the first lifting module includes a first lifting power source; The extended end of the first lifting power source is fixedly installed on the third mounting block. The extension direction of the first lifting power source is vertically downward. The extension and retraction direction of the first lifting power source is perpendicular to the upper surface of the rotating platform. The fixed end of the first lifting power source is fixedly installed on the extended end of the first transverse extension and retraction power source.

[0012] As an optional solution, the blasting and mining device also includes a third telescopic power source, a fourth mounting block, left and right rotating ball screws, a third arc block, and a fourth arc block; The third arc-shaped block is fixedly installed on the extended end of one end of the left and right rotating ball screws, the fourth arc-shaped block is fixedly installed on the extended end of the other end of the left and right rotating ball screws, the fixed end of the left and right rotating ball screws is horizontally installed on the fourth mounting block, the fourth mounting block is fixedly installed on the extended end of the third telescopic power source, the telescopic direction of the third telescopic power source is perpendicular to the upper end face of the rotating platform, and the fixed end of the third telescopic power source is fixedly installed on the rotating platform. The first mounting base is provided with a third sliding groove, the sliding guide direction of the third sliding groove is parallel to the extension direction of the third telescopic power source, and the fourth mounting block is slidably disposed in the third sliding groove; The upper surfaces of the third and fourth arc-shaped blocks are both higher than the upper surface of the first arc-shaped block. The inner walls of the third and fourth arc-shaped blocks are arranged opposite to each other. The third and fourth arc-shaped blocks can clamp the first or second special tube that is located directly above the first through hole and is closed and spliced. The length of the third chute is greater than the maximum height of the first or second special tube after it has been extended or retracted through the length-grading telescopic structure.

[0013] As an optional solution, both the first limiting module and the second limiting module include a fifth mounting block, a pressing block and a fifth spring; The fifth mounting block is fixedly installed at the lower part of the first or second special tube. A third sliding groove is provided at the end of the fifth mounting block away from the first or second special tube. The sliding guide direction of the third sliding groove is horizontal. One end of the fifth spring is fixedly connected in the third sliding groove. The fifth spring is horizontally set. A pressing block is fixedly connected to the other end of the fifth spring. The pressing block is slidably arranged in the third sliding groove. A fifth guide slope is provided at the lower part of the pressing block away from the end face of the fifth spring. When the first or second special tube is inserted into the blast hole, the pressing block compresses the fifth spring and presses it against the side wall of the blast hole.

[0014] As an optional embodiment, the blasting and mining device further includes a second mounting cylinder, a rotary power source, two temporary clamping modules, and two plug-removing modules. The two temporary clamping modules are arranged opposite each other with the central axis of the second mounting cylinder as the center. Each temporary clamping module includes a fourth telescopic power source and a first arc-shaped clamping block for temporarily clamping the blast hole mouth plug. The two plug-removing modules are arranged opposite each other with the central axis of the second mounting cylinder as the center. Each plug-removing module includes a fifth telescopic power source, a sixth telescopic power source, and a second arc-shaped clamping block for clamping the blast hole mouth plug. The second mounting cylinder is fixedly mounted on the rotating platform. The second mounting cylinder penetrates the upper and lower end faces of the rotating platform, and the upper and lower end faces of the second mounting cylinder are provided with a second through hole. The borehole muzzle plug is inserted into the borehole. The lower outer diameter of the borehole muzzle plug is the same as the diameter of the borehole. The upper outer diameter of the borehole muzzle plug is larger than the lower outer diameter of the borehole muzzle plug. The upper and lower inner diameters of the borehole muzzle plug are the same. The lower part of the borehole muzzle plug is located inside the borehole, and the upper part of the borehole muzzle plug is located above the borehole. The upper end face of the borehole muzzle plug near the inner diameter and the upper end face near the outer diameter are both marked with notches for borehole positioning. The first arc-shaped clamp is located below the second mounting cylinder. The height of the first arc-shaped clamp is the same as the height of the lower part of the borehole mouth plug. The first arc-shaped clamp is fixedly installed at the extended end of the fourth telescopic power source. The telescopic direction of the fourth telescopic power source is set horizontally. The fixed end of the fourth telescopic power source is fixedly installed on the rotating platform. Under the action of the fourth telescopic power source, the first arc-shaped clamp can clamp the lower part of the borehole mouth plug. The second arc-shaped clamp is located between the first arc-shaped clamp and the second mounting cylinder. The height of the second arc-shaped clamp is the same as the height of the upper part of the borehole mouth plug. The arc-shaped clamp is fixedly installed at the extended end of the fifth telescopic power source. The telescopic direction of the fifth telescopic power source is set horizontally, and the telescopic direction of the fifth telescopic power source is perpendicular to the telescopic direction of the fourth telescopic power source. Under the action of the fifth telescopic power source, the second arc-shaped clamp can clamp the upper part of the borehole mouth plug. The fixed end of the fifth telescopic power source is fixedly installed on the extended end of the sixth telescopic power source. The telescopic direction of the sixth telescopic power source is perpendicular to the upper end face of the rotating platform. The fixed end of the sixth telescopic power source is fixedly installed on the second mounting cylinder. Under the action of the sixth telescopic power source, the second arc-shaped clamp can remove the borehole plug on the borehole back into the second mounting cylinder. A camera is installed on the lower end face of the rotating platform, and the camera is used to capture the number of notches on the breech plug. The rotating platform is located above the mobile chassis. The rotating platform is fixedly installed on the rotating end of the rotating power source. The rotation axis of the rotating power source is perpendicular to the upper surface of the mobile chassis. The fixed end of the rotating power source is fixedly installed on the mobile chassis. The second through hole and the first through hole are symmetrically arranged about the rotation axis of the rotating power source.

[0015] As described above, the deep-pit open-pit mine water-bearing blasting mining device of the present invention has at least the following beneficial effects: 1. This invention uses a second lifting power source to drive a clamping plate to overlap and splice several first special tubes and one second special tube. The first and second lifting power sources can then be used to enclose and splice these overlapping first and second special tubes into the blast hole in one go. The number of first special tubes can be adjusted according to different blast hole depths, making it highly adaptable and solving the problem of limited adaptability in traditional devices. The overlapping and enclosed splicing of several first and second special tubes effectively isolates water inside the blast hole from contact with explosives and detonators, preventing blasting failure due to water immersion and ensuring the reliability of blasting operations. Furthermore, the entire process can be completed without manual handling of explosives, completely avoiding personnel contact with explosives and significantly improving operational safety. It is suitable for the high-risk operating environment of deep-pitted open-pit mines with water-bearing blast holes.

[0016] 2. The length-graded telescopic structure of the present invention can flexibly adjust the length of a single first special tube or second special tube. The first special tube or second special tube is designed by splicing multiple tubes to adapt to boreholes of different depths, thus solving the problem that traditional explosive loading devices cannot adapt to boreholes of multiple depths.

[0017] 3. The third and fourth arc-shaped blocks of the present invention can assist in clamping the first and second special tubes with long splicing lengths, preventing the first and second special tubes from bending or falling off due to excessive length, ensuring the safety of the first and second special tubes during assembly. When the blast hole is deep, a second special tube can be spliced ​​at both the bottom and middle, which can shorten the time difference between the bottom and top blasting during blasting, so as to arrange and combine the first and second special tubes in combination with specific blasting methods. Attached Figure Description

[0018] Figure 1 The diagram shown is a three-dimensional structural schematic of the present invention. Figure 2 The diagram shown is an exploded view related to the rotary power source of the present invention. Figure 3 The diagram shown is an exploded view of the first special tube of the present invention; Figure 4 The diagram shown is an exploded view of the second special tube of the present invention; Figure 5 The diagram shown is an exploded view related to the first stop of the present invention. Figure 6 The diagram shown is an exploded view related to the first annular tube and the second snap-fit ​​of the present invention. Figure 7 The diagram shows the structural schematics related to the first arc-shaped block, the second arc-shaped block, the third arc-shaped block, and the fourth arc-shaped block of the present invention. Figure 8 The diagram shows a structural schematic related to the third telescopic power source of the present invention. Figure 9 The diagram shows the structure related to the second lifting power source and the first lateral telescopic power source of the present invention. Figure 10 The diagram shown is an exploded view of the clamping disk and the third mounting block of the present invention. Figure 11 The diagram shown is a structural schematic diagram related to the pipe cap of the present invention. Figure 12 The diagram shown is an exploded view related to the second stop of the present invention. Figure 13 The diagram shown is an exploded view of the pressing block and the fifth mounting block of the present invention. Figure 14 Shown is a partial cross-sectional view of the second mounting cylinder of the present invention; Figure 15 The diagram shows the structure of the first arc-shaped clamping block and the second arc-shaped clamping block of the present invention. Figure 16 The diagram shown is a structural schematic diagram related to the camera of this invention.

[0019] In the diagram: 101. Mobile chassis; 102. Rotating platform; 103. First through hole; 104. Rotation power source; 105. Counterweight; 201. Support frame; 202. First conveyor belt; 203. First mounting frame; 204. First limiting block; 205. First stop block; 206. First mounting block; 207. First spring; 208. First slide groove; 209. First guide slope; 210. First mounting tube; 211. First telescopic tube; 213. Second circular sealing ring; 214. First pin; 215. First threaded through hole; 216. Second threaded hole; 217. First snap-fit ​​groove; 218. First annular tube; 219. Third circular sealing ring; 220. Second sliding groove; 221. Fourth spring; 222. Second buckle; 223. Fourth guide slope; 301. First arc-shaped block; 302. Second arc-shaped block; 303. First mounting base; 304. First telescopic power source; 305. Second telescopic power source; 401. Clamping plate; 402. Third mounting block; 403. Bidirectional telescopic power source; 404. First lifting power source; 405. Second lifting power source; 406. First lateral telescopic power source; 407. Dovetail groove; 408. Dovetail block; 409. Mounting bracket; 410. Sixth mounting block; 501. Pipe cap; 502. First mounting sleeve; 503. First circular groove; 504. Second circular groove; 505. First circular sealing ring; 506. First sliding groove; 507. Third spring; 508. First buckle; 509. Third guide slope; 601. Second conveyor belt; 602. Second mounting frame; 603. Second limiting block; 604. Second stop block; 605. Second mounting block; 606. Second spring; 607. Second slide rail; 608. Second guide slope; 701. Third telescopic power source; 702. Fourth mounting block; 703. Left and right rotating ball screw; 704. Third arc-shaped block; 705. Fourth arc-shaped block; 706. Third sliding groove; 801. Fifth mounting block; 802. Pressing block; 803. Fifth spring; 804. Third sliding groove; 807. Fifth guide slope; 901. Second mounting cylinder; 902. Fourth telescopic power source; 903. First arc-shaped clamping block; 904. Fifth telescopic power source; 905. Second arc-shaped clamping block; 906. Second through hole; 907. Gun hole muzzle plug; 908. Notch; 909. Camera; 910. Sixth telescopic power source. Detailed Implementation

[0020] The following specific embodiments illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification.

[0021] Please see Figures 1 to 16 It should be understood that the structures, proportions, sizes, etc., depicted in the accompanying drawings are merely for illustrative purposes to aid those skilled in the art and to facilitate understanding. They are not intended to limit the scope of the invention and therefore have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to size, without affecting the effectiveness and purpose of the invention, should still fall within the scope of the technical content disclosed herein. Furthermore, the terms "upper," "lower," "left," "right," "middle," and "one" used in this specification are merely for clarity and not intended to limit the scope of the invention. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the invention.

[0022] The following embodiments are for illustrative purposes only. These embodiments can be combined and are not limited to the content shown in any single embodiment below.

[0023] Please see Figures 1 to 16 This invention provides a blasting mining device for deep-pitted open-pit mines with water-bearing blast holes, the blasting mining device comprising: A mobile chassis 101, wherein a rotating platform 102 is rotatably mounted on the upper surface of the mobile chassis 101; A plurality of pipe caps 501, a first special pipe and a second special pipe, wherein the plurality of pipe caps 501 are all disposed on a rotating platform, and the plurality of first special pipes and second special pipes are all disposed on a rotating platform 102, wherein a support frame 201 is installed at the bottom of each first special pipe, and explosives are placed on the support frame 201 inside each first special pipe, wherein the bottom of each second special pipe is sealed, and a detonator and explosives are placed inside each second special pipe; The pre-assembly unit includes a clamping plate 401, a second lifting module, and a first transverse telescopic module. The clamping plate 401 is disposed on the first transverse telescopic module, and the first transverse telescopic module is disposed on the second lifting module. The telescopic direction of the first transverse telescopic module is parallel to the upper end face of the rotating platform 102. The second lifting module is disposed on the rotating platform 102, and the telescopic direction of the second lifting module is perpendicular to the upper end face of the rotating platform 102. Under the action of the second lifting module and the first transverse telescopic module, the clamping plate 401 can close and splice the pipe cap 501 onto the first special pipe. Under the action of the second lifting module, the clamping plate 401 can close and splice several first special pipes and one second special pipe overlapping vertically from top to bottom according to the depth of the blast hole. The explosive loading unit includes a first lifting module. The fixed end of the first lifting module is disposed on the first transverse telescopic module. The extended end of the first lifting module is fixedly connected to the clamping plate 401. The telescopic direction of the first lifting module is perpendicular to the upper surface of the rotating platform 102. Under the action of the first lifting module and the second lifting module, the clamping plate 401 can load several first special tubes and one second special tube, which are closed and spliced ​​from top to bottom, into the blast hole.

[0024] In this embodiment, when explosives need to be filled during blasting mining of water-bearing boreholes in deep open-pit mines, the movable chassis 101 moves to the location where explosives are to be filled. Under the action of the second lifting module, the clamping plate 401 clamps out the pipe cover 501. Then, under the action of the second lifting module and the first lateral telescopic module, the clamping plate 401 seals and splices the pipe cover 501 onto the first special pipe. The first special pipe moves upward under the action of the second lifting module. Then, the first special pipe is followed by the next first special pipe and sealed and spliced ​​vertically. The above steps are repeated to seal and splice several first special pipes vertically and vertically according to the depth of the borehole. Under the action of the second lifting module, the bottommost first special pipe of the several vertically and vertically sealed and spliced ​​first special pipes is sealed and spliced ​​onto the second special pipe. Finally, the several sealed and spliced ​​first special pipes and one second special pipe are filled into the borehole under the action of the second lifting module and the first lifting module.

[0025] This invention uses a second lifting module to drive a clamping plate 401 to overlap and splice several first special tubes and one second special tube. The first and second lifting modules can then be used to enclose and splice these overlapping first and second special tubes into a blast hole in one go. The number of first special tubes can be adjusted according to different blast hole depths, making it highly adaptable and solving the problem of limited adaptability in traditional devices. The overlapping and enclosed splicing of the first and second special tubes effectively isolates water inside the blast hole from contact with explosives and detonators, preventing blasting failure due to water immersion and ensuring the reliability of blasting operations. Furthermore, the entire process can be completed without manual handling of explosives, completely avoiding personnel contact with explosives and significantly improving operational safety. It is suitable for the high-risk operating environment of deep-pitted open-pit mines with water-bearing blast holes.

[0026] Please see Figure 2 and Figure 5 The blasting mining device also includes a first conveyor belt 202, a first mounting frame 203, two first limiting blocks 204, two first stop blocks 205, two first mounting blocks 206, two first springs 207 and two first chutes 208; Each of the first special tubes has a plurality of first limiting modules arranged in a circular array along the circumferential direction of the central axis of the first special tube. The number of first limiting modules on each first special tube is at least three. The first mounting frame 203 is fixedly mounted on the upper end face of the rotating platform 102. The first conveyor belt 202 is horizontally mounted inside the first mounting frame 203. The first limiting block 204 is fixedly mounted on the upper end face of the first mounting frame 203. The two first limiting blocks 204 are located at the two ends of the width direction of the first mounting frame 203, and the two first limiting blocks 204 are parallel to each other. The relative distance between the two first limiting blocks 204 is the same as the diameter of the first special tube. The relative distance between each first limiting block 204 and the first conveyor belt 202 is the same as the height of the first limiting module. When the first special tube is placed on the first conveyor belt 202, the first limiting module is located between the first limiting block 204 and the first conveyor belt 202. Each of the first limiting blocks 204 has a first mounting block 206 fixedly connected to one end of its length away from the transfer unit. One end of the first mounting block 206 is fixedly connected to one end of a first spring 207, which is horizontally positioned. The other end of the first spring 207 is fixedly connected to a first stop block 205. Each of the first limiting blocks 204 has a first groove 208 on its upper surface. The sliding guide direction of the first groove 208 is parallel to the width direction of the first limiting block 204. The first stop block 205 is slidably positioned in the first groove 208. Two first stop blocks 205 are positioned opposite each other. The opposite end faces of the two first stop blocks 205 each have a first guide slope 209 for allowing the first special tube to enter the first conveyor belt 202.

[0027] In this embodiment, before the explosives are filled in during the blasting mining of water-bearing boreholes in deep open-pit mines, several first special tubes are placed sequentially onto the first conveyor belt 202. Specifically, the first special tubes are compressed from the end away from the transfer unit onto the first guide slope 209 and then enter the first conveyor belt 202. Several first limiting modules on the first special tubes entering the first conveyor belt 202 are located between the first limiting block 204 and the first conveyor belt 202, thereby restricting the first special tubes onto the first conveyor belt 202 through the first limiting modules, and waiting for the first conveyor belt 202 to transport the first special tubes.

[0028] The cooperation between the first limiting block 204 and the first conveyor belt 202 in this invention enables the axial positioning of the first special tube during the conveying process, preventing it from rolling off course, ensuring conveying accuracy, and providing a precise positioning basis for subsequent transfer and splicing.

[0029] Please see Figure 2 and Figure 12 The blasting mining device also includes a second conveyor belt 601, a second mounting frame 602, two second limiting blocks 603, two second stop blocks 604, two second mounting blocks 605, two second springs 606, and two second chutes 607. Each of the second special tubes has a plurality of second limiting modules arranged in a circular array along the circumferential direction of the central axis of the second special tube. The number of second limiting modules on each second special tube is at least three. The second mounting frame 602 is fixedly mounted on the upper end face of the rotating platform 102. The second conveyor belt 601 is horizontally mounted inside the second mounting frame 602. The second limiting block 603 is fixedly mounted on the upper end face of the second mounting frame 602. The two second limiting blocks 603 are located at the two ends of the width direction of the second mounting frame 602, and the two second limiting blocks 603 are parallel to each other. The relative distance between the two second limiting blocks 603 is the same as the diameter of the second special tube. The relative distance between each second limiting block 603 and the second conveyor belt 601 is the same as the height of the second limiting module. When the second special tube is placed on the second conveyor belt 601, the second limiting module is located between the second limiting block 603 and the second conveyor belt 601. Each second limiting block 603 has a second mounting block 605 fixedly connected to one end of its length away from the transfer unit. One end of the second mounting block 605 is fixedly connected to one end of a second spring 606, which is horizontally positioned. The other end of the second spring 606 is fixedly connected to a second stop block 604. Each second limiting block 603 has a second sliding groove 607 on its upper surface. The sliding guide direction of the second sliding groove 607 is parallel to the width direction of the second limiting block 603. The second stop block 604 is slidably positioned within the second sliding groove 607. Two second stop blocks 604 are positioned opposite each other. The opposite end faces of the two second stop blocks 604 each have a second guide slope 608 for allowing the second special tube to enter the second conveyor belt 601.

[0030] In this embodiment, before the explosives are filled in during the blasting mining of water-bearing boreholes in deep open-pit mines, several second special tubes are placed sequentially onto the second conveyor belt 601. Specifically, the second special tubes are compressed from the end away from the transfer unit onto the second guide slope 608 and then enter the second conveyor belt 601. Several second limiting modules on the second special tubes entering the second conveyor belt 601 are located between the second limiting block 603 and the second conveyor belt 601, thereby restricting the second special tubes onto the second conveyor belt 601 through the second limiting modules, waiting for the second conveyor belt 601 to transport the second special tubes.

[0031] The cooperation between the second limiting block 603 and the second conveyor belt 601 in this invention enables the axial positioning of the second special tube during the conveying process, preventing it from rolling off course, ensuring conveying accuracy, and providing a precise positioning basis for subsequent transfer and splicing.

[0032] Please see Figure 1 , Figure 2 and Figure 7The blasting and mining device also includes a transfer unit, which includes a first arc block 301, a second arc block 302, a first mounting base 303, a first telescopic power source 304, and a second telescopic power source 305. The first telescopic power source 304 and the second telescopic power source 305 are not limited here. Their function is to provide telescopic power, and they can be ball screws, sliding screws, etc. The first arc-shaped block 301 is fixedly installed on the extended end of the first telescopic power source 304. The first telescopic power source 304 is horizontally installed on the first mounting base 303. The telescopic direction of the first telescopic power source 304 is perpendicular to the conveying direction of the first conveyor belt 202. The first mounting base 303 is fixedly installed on the rotating platform 102. The second arc-shaped block 302 is fixedly installed on the extended end of the second telescopic power source 305. The second telescopic power source 305 is horizontally installed on the first mounting base 303. The telescopic direction of the first telescopic power source 304 is parallel to the telescopic direction of the first telescopic power source 304. The lower end face of the first arc-shaped block 301 is higher than the lower end face of the first limiting block 204, and the lower end face of the second arc-shaped block 302 is higher than the lower end face of the second limiting block 603. The upper end faces of the first arc-shaped block 301 and the second arc-shaped block 302 are at the same height. The inner walls of the first arc-shaped block 301 and the second arc-shaped block 302 are arranged opposite to each other. The upper and lower end faces of the rotating platform 102 are provided with a first through hole 103 through which the first special tube and the second special tube can pass. The first arc-shaped block 301 and the second arc-shaped block 302 can clamp the first special tube conveyed by the first conveyor belt 202 or the second special tube conveyed by the second conveyor belt 601 directly above the first through hole 103.

[0033] In this embodiment, when the first conveyor belt 202 transports one of the first special tubes to a designated position, the second arc-shaped block 302 moves toward the first special tube under the action of the second telescopic power source 305, and the first arc-shaped block 301 moves toward the first special tube under the action of the first telescopic power source 304, until the first arc-shaped block 301 and the second arc-shaped block 302 simultaneously clamp the first special tube. Then, under the action of the first telescopic power source 304, the first arc-shaped block 301 and the second arc-shaped block 302 move together to directly above the first through hole 103, waiting for subsequent operations. When the second conveyor belt 601 transports one of the second special tubes to the designated position, the first arc-shaped block 301 moves toward the second special tube under the action of the first telescopic power source 304, and the second arc-shaped block 302 moves toward the second special tube under the action of the second telescopic power source 305, until the first arc-shaped block 301 and the second arc-shaped block 302 simultaneously clamp the second special tube. Then, under the action of the first telescopic power source 304 and the second arc-shaped block 302, together they move the second special tube to directly above the first through hole 103, waiting for subsequent operations.

[0034] The first arc-shaped block 301 and the second arc-shaped block 302 of the present invention can fit and clamp the outer walls of the first special tube and the second special tube, clamping firmly while avoiding damage to the surface of the first special tube and the second special tube. At the same time, through the horizontal telescopic driving method of the first telescopic power source 304 and the second telescopic power source 305, the transfer path is precise and controllable, thereby ensuring that the first special tube and the second special tube can be accurately delivered above the first through hole 103.

[0035] Please see Figure 1 , Figure 3 , Figure 4 , Figure 6 and Figure 11 The blasting mining device also includes a first mounting cylinder 502; The first mounting cylinder 502 is fixedly mounted on the rotating platform 102. The pipe cover 501 is placed overlappingly inside the first mounting cylinder 502. The upper part of the pipe cover 501 has a first circular groove 503, and the lower part of the pipe cover 501 has a second circular groove 504. The upper diameter of the pipe cover 501 is smaller than the diameter of the borehole, and the lower diameter of the pipe cover 501 is smaller than the upper diameter. A first circular sealing ring 505 is fixedly mounted on the top wall of the second circular groove 504. The sidewalls of the second circular groove 504 are also arrayed with [missing information - likely related to the pipe cover 501] along the circumferential direction of the central axis of the pipe cover 501. A plurality of first sliding grooves 506 are provided, the sliding guide direction of the first sliding grooves 506 is horizontally arranged, and one end of a third spring 507 is fixedly connected in each first sliding groove 506. The third spring 507 is horizontally arranged, and the other end of the third spring 507 is fixedly connected to a first buckle 508. The first buckle 508 is slidably arranged in the first sliding groove 506. A third guide slope 509 is provided on the lower part of the first buckle 508 away from the end face of the third spring 507. When the third spring 507 is in the initial state, the first buckle 508 is partially located in the second circular groove 504. Both the first and second special tubes are length-graded telescopic structures. Each length-graded telescopic structure includes a first mounting tube 210, a first telescopic tube 211, a second circular sealing ring 213, a first pin 214, a first threaded through hole 215, and several second threaded holes 216. The lower inner diameter of the first mounting tube 210 is smaller than its upper inner diameter, and the upper outer diameter of the first telescopic tube 211 is smaller than its lower outer diameter. The upper outer diameter of the first telescopic tube 211 is the same as the lower inner diameter of the first mounting tube 210, and the upper inner diameter of the first telescopic tube 211 is the same as the upper inner diameter of the first mounting tube 210. A second circular sealing ring 213 is embedded in the upper outer wall of the first telescopic tube 211, and the second circular sealing ring 213 is pressed against the lower inner wall of the first mounting tube 210. The first threaded through hole 215... Hole 215 is formed through the lower side wall of the first mounting tube 210. A plurality of second threaded holes 216 are arrayed in the circumferential direction along the central axis of the first telescopic tube 211 on the upper outer side wall of the first telescopic tube 211. When the first threaded through hole 215 and one of the second threaded holes 216 are connected, the first pin 214 can be simultaneously rotated into the first threaded through hole 215 and the second threaded hole 216. The upper outer diameter of the first mounting tube 210 is the same as the inner diameter of the second circular groove 504. The upper outer side wall of the first mounting tube 210 is provided with a first snap-fit ​​groove 217. When the tube cover 501 closes the upper opening of the first mounting tube 210, the first buckle 508 is snapped into the first snap-fit ​​groove 217, and the first circular sealing ring 505 is pressed and adhered to the upper end face of the first mounting tube 210. A first annular tube 218 is fixedly installed at the bottom of the first telescopic tube 211. The inner diameter of the first annular tube 218 is the same as the upper outer diameter of the first mounting tube 210. A third circular sealing ring 219 is fixedly installed on the upper inner wall of the first annular tube 218. The upper end face of the third circular sealing ring 219 is fixedly connected to the lower end face of the first telescopic tube 211. A plurality of second sliding grooves 220 are arrayed along the circumferential direction of the central axis of the first annular tube 218 on the inner wall of the first annular tube 218. The sliding guide direction of the second sliding grooves 220 is horizontally arranged. One end of a fourth spring 221 is fixedly connected in each second sliding groove 220. Four springs 221 are horizontally arranged, and the other end of each spring 221 is fixedly connected to a second buckle 222. The second buckle 222 is slidably arranged in the second sliding groove 220. The lower part of the second buckle 222 away from the end face of the fourth spring 221 is provided with a fourth guide slope 223. When the first annular tube 218 on one of the first special tubes or the second special tubes is sleeved on the upper part of the first mounting tube 210 on the other first special tube or the second special tube, the second buckle 222 is engaged in the first snap-fit ​​groove 217, and the upper end face of the first mounting tube 210 on the other first special tube or the second special tube is pressed and adhered to the third circular sealing ring 219. The support frame 201 is installed at the bottom of the first telescopic tube 211 on the first special tube, and the bottom of the first telescopic tube 211 on the second special tube is closed.

[0036] In this embodiment, since the depth data of all blast holes has been recorded when the blast holes are dug, the first and second special tubes can be extended to a suitable length through a length-graded telescopic structure based on the known depth data of all blast holes. This allows the combination of the first and second special tubes to adapt to all blast hole depths. Specifically, before loading the first special tube with explosives, the first telescopic tube 211 is stretched from the first mounting tube 210 to a designated position. Then, the first pin 214 is simultaneously rotated into the first threaded through hole 215 and the second threaded hole 216 at that position. Explosives are then loaded into the first special tube. Before loading the second special tube with explosives, the first telescopic tube 211 is stretched from the first mounting tube 210 to a designated position. Then, the first pin 214 is simultaneously rotated into the first threaded through hole 215 and the second threaded hole 216 at that position. Then, a detonator is first loaded into the second special tube. The junction between the detonator lead and the outer wall of the first tube is sealed with sealant. Explosives are then loaded into the second special tube. When the pipe cap 501 is closed and spliced ​​on the first special pipe, the pipe cap 501 is snapped into the first snap groove 217 on the first special pipe by the first buckle 508, and at the same time, the first circular sealing ring 505 on the pipe cap 501 is pressed and adhered to the upper end face of the first mounting tube 210 on the first special pipe. When one of the first special tubes is spliced ​​onto the other first special tube, one of the first special tubes is snapped into the first snap groove 217 on the other first special tube by the second snap 222, and at the same time, the second circular sealing ring 213 on one of the first special tubes is pressed and adhered to the upper end face of the first mounting tube 210 on the other first special tube. When the first special tube is spliced ​​onto the second special tube, the first special tube is snapped into the first snap groove 217 on the second special tube by the second buckle 222, and at the same time, the second circular sealing ring 213 on the first special tube is pressed and adhered to the upper end face of the first mounting tube 210 on the second special tube. When the second special tube is spliced ​​onto the first special tube, the second special tube is snapped into the first snap groove 217 on the first special tube by the second buckle 222, and at the same time, the second circular sealing ring 213 on the second special tube is pressed and adhered to the upper end face of the first mounting tube 210 on the first special tube.

[0037] The length-graded telescopic structure of this invention can flexibly adjust the length of a single first or second special tube. The first or second special tube is designed by splicing multiple tubes to adapt to boreholes of different depths, thus solving the problem that traditional explosive loading devices cannot adapt to boreholes of multiple depths.

[0038] Please see Figure 1 , Figure 9 and Figure 10 The pre-assembly unit also includes a third mounting block 402 and a bidirectional telescopic power source 403; the second lifting module includes a second lifting power source 405 and a mounting frame 409; and the first transverse telescopic module includes a first transverse telescopic power source 406 and a sixth mounting block 410. The bidirectional telescopic power source 403 is not limited here; its function is to provide telescopic power, and it can be a double-headed cylinder, a double-headed hydraulic cylinder, etc. The second lifting power source 405 and the first lateral telescopic power source 406 are not limited here. Their function is to provide telescopic power, and they can be ball screws, sliding screws, etc. There are two clamping discs 401, and the diameter of each clamping disc 401 is the same as the diameter of the first circular groove 503. The two clamping discs 401 are respectively fixedly installed on the protruding ends on both sides of the bidirectional telescopic power source 403. The fixed end of the bidirectional telescopic power source 403 is horizontally installed on the third mounting block 402. Each clamping disc 401 has a dovetail groove 407 on its upper end face. The sliding extension direction of the dovetail groove 407 is parallel to the extension direction of the bidirectional telescopic power source 403. A dovetail block 408 is fixedly installed on the third mounting block 402. The dovetail block 408 is slidably disposed in the dovetail groove 407. The third mounting block 402 is disposed on the extended end of the first transverse telescopic power source 406. The fixed end of the first transverse telescopic power source 406 is fixedly mounted on the sixth mounting block 410. The telescopic direction of the first transverse telescopic power source 406 is parallel to the upper end face of the rotating platform 102. The sixth mounting block 410 is fixedly mounted on the extended end of the second lifting power source 405. The telescopic direction of the second lifting power source 405 is perpendicular to the upper end face of the rotating platform 102. The fixed end of the second lifting power source 405 is fixedly mounted on the mounting bracket 409. The mounting bracket 409 is fixedly mounted on the rotating platform 102. The first lateral telescopic power source 406 can move the clamping plate 401 to directly above the first mounting cylinder 502 or the first through hole 103.

[0039] In this embodiment, when the pipe cap 501 needs to be spliced ​​onto the first special pipe, the second lifting power source 405 first moves the clamping plate 401 downward into the first circular groove 503 of the uppermost pipe cap 501 inside the first mounting cylinder 502. Then, the bidirectional telescopic power source 403 extends so that the side wall of the clamping plate 401 presses against the side wall of the first circular groove 503, that is, the clamping plate 401 clamps the pipe cap 501. Then, the second lifting power source 405 moves the pipe cap 501 clamped by the clamping plate 401 upward. After that, the first lateral telescopic movement... The power source 406 moves the pipe cap 501 clamped by the clamping plate 401 to directly above the first through hole 103. When the first special tube is clamped between the first through hole 103 and the pipe cap 501 clamped by the clamping plate 401 under the clamping of the first arc block 301 and the second arc block 302, the second lifting power source 405 will move the clamping plate 401 downward until the first buckle 508 on the pipe cap 501 is engaged in the first snap-fit ​​groove 217 on the first special tube, that is, the pipe cap 501 is sealed and spliced ​​on the first special tube, waiting for subsequent operations.

[0040] Please see Figure 1 , Figure 9 and Figure 10 The first lifting module includes a first lifting power source 404; The first lifting power source 404 is not limited here; its function is to provide extension and retraction power, and it can be a cylinder, hydraulic cylinder, etc. The extended end of the first lifting power source 404 is fixedly installed on the third mounting block 402. The extension direction of the first lifting power source 404 is vertically downward. The extension direction of the first lifting power source 404 is perpendicular to the upper surface of the rotating platform 102. The fixed end of the first lifting power source 404 is fixedly installed on the extended end of the first transverse extension power source 406.

[0041] In this embodiment, when a number of first special tubes and a second special tube are overlapped and sealed together and need to be filled into the borehole, the first special tubes and the second special tube are filled into the borehole from bottom to top under the action of the extension of the first lifting power source 404 and the action of the second lifting power source 405.

[0042] Please see Figure 1 , Figure 7 and Figure 8 The blasting and mining device also includes a third telescopic power source 701, a fourth mounting block 702, a left and right rotating ball screw 703, a third arc block 704, and a fourth arc block 705; The third telescopic power source 701 is not limited here; its function is to provide telescopic power, and it can be a cylinder, hydraulic cylinder, etc. The third arc-shaped block 704 is fixedly installed on the extended end of one end of the left and right rotating ball screw 703, the fourth arc-shaped block 705 is fixedly installed on the extended end of the other end of the left and right rotating ball screw 703, the fixed end of the left and right rotating ball screw 703 is horizontally installed on the fourth mounting block 702, the fourth mounting block 702 is fixedly installed on the extended end of the third telescopic power source 701, the telescopic direction of the third telescopic power source 701 is perpendicular to the upper end face of the rotating platform 102, and the fixed end of the third telescopic power source 701 is fixedly installed on the rotating platform 102. The first mounting base 303 is provided with a third sliding groove 706, the sliding guide direction of the third sliding groove 706 is parallel to the extension direction of the third telescopic power source 701, and the fourth mounting block 702 is slidably disposed in the third sliding groove 706. The upper surfaces of the third arc-shaped block 704 and the fourth arc-shaped block 705 are both higher than the upper surface of the first arc-shaped block 301. The inner walls of the third arc-shaped block 704 and the fourth arc-shaped block 705 are arranged opposite to each other. The third arc-shaped block 704 and the fourth arc-shaped block 705 can clamp the first special tube or the second special tube that is located directly above the first through hole 103 and is closed and spliced. The length of the third chute 706 is greater than the maximum height of the first or second special tube after it has been extended or retracted through the length-grading telescopic structure.

[0043] In this embodiment, when assembling explosives according to the depth of the borehole, the second lifting power source 405 first moves the clamping plate 401 downward into the first circular groove 503 of the uppermost tube cap 501 inside the first mounting cylinder 502. Then, the bidirectional telescopic power source 403 extends so that the side wall of the clamping plate 401 presses against the side wall of the first circular groove 503, that is, the clamping plate 401 clamps the tube cap 501. Then, the second lifting power source 405 moves the tube cap 501 clamped by the clamping plate 401 upward. After that, the first transverse telescopic power source 406 moves the tube cap 501 clamped by the clamping plate 401 to directly above the first through hole 103. At this time, the first special tube conveyed by the first conveyor belt 202 is in the first arc block 301 and the second arc block 302. The first special tube is clamped between the first through hole 103 and the clamping plate 401. The second lifting power source 405 moves the clamping plate 401 downward until the first buckle 508 on the pipe cover 501 engages with the first snap-fit ​​groove 217 on the first special tube, thus sealing the pipe cover 501 onto the first special tube. Then, the first arc block 301 and the second arc block 302 release the first special tube. After that, the second lifting power source 405 moves the pipe cover 501 and the first special tube clamped by the clamping plate 401 upward to the height of the first special tube. Then, the second special tube conveyed by the first conveyor belt 202 is clamped between the first arc block 301 and the second arc block 302 and the pipe cover 501 located between the first through hole 103 and the clamping plate 401. Between the first special tube and the second special tube, the third arc block 704 and the fourth arc block 705, driven by the left and right rotating ball screw 703, release the first special tube. Then, the second lifting power source 405 moves the clamping plate 401 downward until the second buckle 222 on the first special tube engages with the first engaging groove 217 on the second special tube, thus sealing the first special tube onto the second special tube. Afterward, the third arc block 704 and the fourth arc block 705, driven by the left and right rotating ball screw 703, clamp the first special tube. Then, the first arc block 301 and the second arc block 302 release the second special tube. The first and second special tubes are then connected by the second lifting power source 405. Under the action of the third telescopic power source 701, the first special tube rises synchronously to the height of the first special tube. Then, the third first special tube, conveyed by the first conveyor belt 202, is clamped between the first through hole 103 and the second first special tube by the clamping of the first arc block 301 and the second arc block 302. Then, the second lifting power source 405 moves the clamping plate 401 downward until the second buckle 222 on the second first special tube engages in the first engaging groove 217 on the third first special tube. At this time, the third arc block 704 and the fourth arc block 705 move downward synchronously under the action of the third telescopic power source 701. Afterward, the third arc block 704 and the fourth arc block 705 release the first first special tube under the action of the left and right rotating ball screw 703.Then, under the action of the third telescopic power source 701, the third arc-shaped block 704 and the fourth arc-shaped block 705 move downwards by the height of one first special tube. Then, under the action of the left and right rotating ball screw 703, the third arc-shaped block 704 and the fourth arc-shaped block 705 clamp the second first special tube. Then, the first arc-shaped block 301 and the second arc-shaped block 302 release the third first special tube. The first, second, and third first special tubes then rise synchronously to the height of one first special tube under the action of the second lifting power source 405 and the third telescopic power source 701. The above steps are repeated to create a sealed combination of several first special tubes and several second special tubes. If the borehole depth is shallow, only one second special tube is joined at the bottom, with the rest being first special tubes. If the borehole depth is deep, a second special tube is joined at both the bottom and the middle, achieving combined blasting.

[0044] The third arc-shaped block 704 and the fourth arc-shaped block 705 of the present invention can assist in clamping the first and second special tubes with long splicing lengths, preventing the first and second special tubes from bending or falling off due to excessive length, ensuring the safety of the first and second special tubes during assembly. When the blast hole depth is deep, a second special tube can be spliced ​​at both the bottom and the middle, which can shorten the time difference between the bottom and the top during blasting, so as to arrange and combine the first and second special tubes in combination with specific blasting methods.

[0045] Please see Figure 13 The first limiting module and the second limiting module both include a fifth mounting block 801, a pressing block 802 and a fifth spring 803; The fifth mounting block 801 is fixedly installed at the lower part of the first special tube or the second special tube. The end of the fifth mounting block 801 away from the first special tube or the second special tube is provided with a third sliding groove 804. The sliding guide direction of the third sliding groove 804 is set horizontally. One end of the fifth spring 803 is fixedly connected in the third sliding groove 804. The fifth spring 803 is set horizontally. The other end of the fifth spring 803 is fixedly connected with a pressing block 802. The pressing block 802 is slidably arranged in the third sliding groove 804. The lower part of the pressing block 802 away from the end face of the fifth spring 803 is provided with a fifth guide slope 807. When the first special tube or the second special tube is inserted into the blast hole, the pressing block 802 compresses the fifth spring 803 and presses it against the side wall of the blast hole.

[0046] In this embodiment, after assembling several first and second special tubes, the third arc-shaped block 704 and the fourth arc-shaped block 705 clamp the second-to-last first special tube from bottom to top, while the first arc-shaped block 301 and the second arc-shaped block 302 clamp the lowest second special tube. At this point, the assembled first and second special tubes need to be filled into the borehole. Specifically, the third arc-shaped block 704 and the fourth arc-shaped block 705 release the second-to-last first special tube from bottom to top, and under the action of the third telescopic power source 701, the third arc-shaped block 704 and the fourth arc-shaped block 705 move upwards... After reaching the height of the first special tube, the third arc-shaped block 704 and the fourth arc-shaped block 705 clamp the third-to-last first special tube from bottom to top. Then, the first arc-shaped block 301 and the second arc-shaped block 302 release the bottommost second special tube. Subsequently, several first and second special tubes move down synchronously by the second lifting power source 405 and the third telescopic power source 701, reaching the height of one first special tube. Then, the first arc-shaped block 301 and the second arc-shaped block 302 clamp the second-to-last first special tube from bottom to top, and the third arc-shaped block 704 and the fourth arc-shaped block 705 release the third-to-last first special tube from bottom to top. The third first special tube, the third arc block 704, and the fourth arc block 705, under the action of the third telescopic power source 701, move upward by the height of one first special tube. Then, the third arc block 704 and the fourth arc block 705 clamp the fourth first special tube from the bottom up. Next, the first arc block 301 and the second arc block 302 release the second-to-last first special tube from the bottom up. Afterwards, several first and second special tubes, under the action of the second lifting power source 405 and the third telescopic power source 701, synchronously move downward by the height of one first special tube, repeating the above steps. During the process, when the second lifting power source 405 reaches its lowest extension stroke, the first lifting power source 404 replaces the second lifting power source 405 to drive several first special tubes and second special tubes into the borehole until all the first special tubes and second special tubes are placed into the borehole. When the first special tube or the second special tube enters the borehole, the pressing block 802 on the first special tube or the second special tube contacts the side wall of the borehole and compresses the fifth spring 803 and presses it against the side wall of the borehole. During the process of filling the borehole with explosives, the workers pull the fuse of the detonator in the second special tube to the ground.

[0047] The third arc-shaped block 704 and the fourth arc-shaped block 705 of this invention can assist in clamping the first and second special tubes, which have a relatively long splicing length, when the explosive is filled into the borehole. This prevents the first and second special tubes from bending or falling off due to their excessive length, ensuring the integrity and safety of the first and second special tubes during the filling process. In addition, multiple pressing blocks 802 are circumferentially distributed on the first and second special tubes, providing uniform radial support force for the first and second special tubes. This ensures that the first and second special tubes remain centered and stable in the borehole and will not be blown out by the water pressure in the borehole after being placed in. The structure is ingeniously designed.

[0048] Please see Figure 1 , Figure 2 , Figures 14 to 16 The blasting and mining device further includes a second mounting cylinder 901, a rotary power source 104, two temporary clamping modules, and two plug-removing modules. The two temporary clamping modules are arranged opposite each other with the central axis of the second mounting cylinder 901 as the center. Each temporary clamping module includes a fourth telescopic power source 902 and a first arc-shaped clamping block 903 for temporarily clamping the blast hole mouth plug 907. The two plug-removing modules are arranged opposite each other with the central axis of the second mounting cylinder 901 as the center. Each plug-removing module includes a fifth telescopic power source 904, a sixth telescopic power source 910, and a second arc-shaped clamping block 905 for clamping the blast hole mouth plug 907. The rotary power source 104 is not limited here; its function is to provide rotary power, and it can be an AC motor, a stepper motor, etc. The fourth telescopic power source 902, the fifth telescopic power source 904, and the sixth telescopic power source 910 are not limited here. Their function is to provide telescopic power, and they can be cylinders, hydraulic cylinders, etc. The second mounting cylinder 901 is fixedly mounted on the rotating platform 102. The second mounting cylinder 901 penetrates the upper and lower end faces of the rotating platform 102, and the upper and lower end faces of the second mounting cylinder 901 are provided with a second through hole 906. The borehole muzzle plug 907 is inserted into the borehole. The lower outer diameter of the borehole muzzle plug 907 is the same as the diameter of the borehole. The upper outer diameter of the borehole muzzle plug 907 is larger than the lower outer diameter of the borehole muzzle plug 907. The upper and lower inner diameters of the borehole muzzle plug 907 are the same. The lower part of the borehole muzzle plug 907 is located inside the borehole, and the upper part of the borehole muzzle plug 907 is located above the borehole. The upper end face of the borehole muzzle plug 907 near the inner diameter and the upper end face near the outer diameter are both marked with notches 908 for borehole positioning. The first arc-shaped clamping block 903 is located below the second mounting cylinder 901. The height of the first arc-shaped clamping block 903 is the same as the height of the lower part of the borehole muzzle plug 907. The first arc-shaped clamping block 903 is fixedly installed on the extended end of the fourth telescopic power source 902. The telescopic direction of the fourth telescopic power source 902 is set horizontally. The fixed end of the fourth telescopic power source 902 is fixedly installed on the rotating platform 102. Under the action of the fourth telescopic power source 902, the first arc-shaped clamping block 903 can clamp the lower part of the borehole muzzle plug 907. The second arc-shaped clamping block 905 is located between the first arc-shaped clamping block 903 and the second mounting cylinder 901. The height of the second arc-shaped clamping block 905 is the same as the height of the upper part of the borehole muzzle plug 907. The arc-shaped clamping block is fixedly installed at the extended end of the fifth telescopic power source 904. The telescopic direction of the fifth telescopic power source 904 is horizontal, and the telescopic direction of the fifth telescopic power source 904 is perpendicular to the telescopic direction of the fourth telescopic power source 902. Under the action of the fifth telescopic power source 904, the second arc-shaped clamping block 905 can clamp the upper part of the borehole muzzle plug 907. The fixed end of the fifth telescopic power source 904 is fixedly installed on the extended end of the sixth telescopic power source 910. The telescopic direction of the sixth telescopic power source 910 is perpendicular to the upper end face of the rotating platform 102. The fixed end of the sixth telescopic power source 910 is fixedly installed on the second mounting cylinder 901. Under the action of the sixth telescopic power source 910, the second arc-shaped clamp 905 can remove the borehole muzzle plug 907 on the borehole back into the second mounting cylinder 901. A camera 909 is installed on the lower end face of the rotating platform 102. The camera 909 is used to capture the number of notches 908 on the borehole muzzle plug 907. The rotating platform 102 is located above the mobile chassis 101. The rotating platform 102 is fixedly installed on the rotating end of the rotating power source 104. The rotation axis of the rotating power source 104 is perpendicular to the upper end face of the mobile chassis 101. The fixed end of the rotating power source 104 is fixedly installed on the mobile chassis 101. A counterweight 105 is also fixedly connected to the upper end face of the rotating platform 102; The second through hole 906 and the first through hole 103 are symmetrically arranged with respect to the rotation axis of the rotating power source 104.

[0049] In this embodiment, the blast holes drilled in the blasting area are first arranged in rows and columns. A notch 908 for hole positioning is marked on the upper end face of the blast hole plug 907 near its inner diameter, indicating that the blast hole is in the first row. Two notches 908 for hole positioning are marked on the upper end face of the blast hole plug 907 near its inner diameter, indicating that the blast hole is in the second row, and so on. Similarly, a notch 908 for hole positioning is marked on the upper end face of the blast hole plug 907 near its outer diameter, indicating that the blast hole is in the first column, and two notches 908 for hole positioning are marked on the upper end face of the blast hole plug 907 near its outer diameter, indicating that the blast hole is in the second column, and so on. Each blast hole plug... The notch 908 on the muzzle plug 907 corresponds to the depth of the borehole at that location. Before the explosive is loaded, the movable chassis 101 is first moved until the second mounting cylinder 901 is directly above one of the borehole muzzle plugs 907. The camera 909 identifies the number of notches 908 on the borehole muzzle plug 907, thus determining the depth of the borehole. Then, two opposing fifth telescopic power sources 904 move the corresponding second arc-shaped clamping blocks 905 downwards to the position to clamp the borehole muzzle plug 907. Then, two opposing sixth telescopic power sources 910 move the second arc-shaped clamping blocks 905 relative to each other to the upper part of clamping the borehole muzzle plug 907. Finally, the two opposing fifth telescopic power sources 904 move the corresponding second arc-shaped clamping blocks 905 downwards... After moving upwards to the initial position, the two opposing fourth telescopic power sources 902 move the corresponding first arc-shaped clamping blocks 903 relative to each other to clamp the lower part of the borehole muzzle plug 907, thus removing the borehole muzzle plug 907 from the borehole. When it is necessary to remove the next borehole muzzle plug 907, firstly, the two opposing sixth telescopic power sources 910 move the second arc-shaped clamping blocks 905 away from each other to release the upper part of the borehole muzzle plug 907. Then, the two opposing fifth telescopic power sources 904 move the corresponding second arc-shaped clamping blocks 905 downwards to the position to clamp the next borehole muzzle plug 907. Then, the two opposing sixth telescopic power sources 910 move the second arc-shaped clamping blocks 905 relative to each other to clamp the borehole muzzle plug 907. The upper part of the borehole muzzle plug 907 is then moved upward by two opposing fifth telescopic power sources 904, which move the corresponding second arc-shaped clamping block 905 upward to below the previous borehole muzzle plug 907, so that the upper end face of the borehole muzzle plug 907 is in contact with the lower end face of the previous borehole muzzle plug 907. Then, two opposing fourth telescopic power sources 902 move the corresponding first arc-shaped clamping block 903 away from each other to release the lower part of the borehole muzzle plug 907 and move it away from directly above the borehole muzzle plug 907. Then, the two opposing fifth telescopic power sources 904 continue to move the corresponding second arc-shaped clamping block 905 upward to the initial position, so that both of the overlapping borehole muzzle plugs 907 are moved into the second mounting cylinder 901.During the removal of each borehole muzzle plug 907, the first and second special tubes are sealed and spliced ​​in corresponding numbers according to the depth of the borehole. After the borehole muzzle plug 907 is removed, the rotating platform 102 rotates 180 degrees under the action of the rotating power source 104, so that the first through hole 103 is located directly above the borehole. After the first and second special tubes are sealed and spliced, they can be inserted into the borehole.

[0050] The temporary clamping module and the plug removal module of this invention work together to realize the automated removal and placement of the borehole muzzle plug 907 without manual operation, avoiding the risk of personnel falling near the edge of the borehole. At the same time, it protects the borehole muzzle plug 907 from damage and can be reused. Furthermore, while removing the borehole muzzle plug 907, this invention can simultaneously seal and splice the first and second special tubes in the corresponding number according to the depth of the borehole, reducing the time required for work and increasing the efficiency of explosive loading.

[0051] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.

Claims

1. A device for blasting and mining deep open-pit mines with water-bearing boreholes, characterized in that, The blasting and mining device includes: A mobile chassis, wherein a rotating platform is rotatably provided on the upper surface of the mobile chassis; A plurality of pipe caps, a first special pipe and a second special pipe, wherein the plurality of pipe caps are all mounted on a rotating platform, and the plurality of first special pipes and second special pipes are all mounted on a rotating platform, wherein a support frame is installed at the bottom of each first special pipe, and explosives are placed on the support frame inside each first special pipe, wherein the bottom of each second special pipe is sealed, and a detonator and explosives are placed inside each second special pipe; The pre-assembly unit includes a clamping disc, a second lifting module, and a first transverse telescopic module. The clamping disc is mounted on the first transverse telescopic module, and the first transverse telescopic module is mounted on the second lifting module. The telescopic direction of the first transverse telescopic module is parallel to the upper surface of the rotating platform. The second lifting module is mounted on the rotating platform, and the telescopic direction of the second lifting module is perpendicular to the upper surface of the rotating platform. Under the action of the second lifting module and the first transverse telescopic module, the clamping disc can seal and splice the pipe cap onto the first special pipe. Under the action of the second lifting module, the clamping disc can seal and splice several first special pipes and one second special pipe overlapping vertically from top to bottom according to the depth of the blast hole. The explosive loading unit includes a first lifting module. The fixed end of the first lifting module is disposed on a first transverse telescopic module. The extended end of the first lifting module is fixedly connected to a clamping plate. The telescopic direction of the first lifting module is perpendicular to the upper surface of the rotating platform. Under the action of the first lifting module and the second lifting module, the clamping plate can load several first special tubes and one second special tube, which are closed and spliced ​​from top to bottom, into the blast hole.

2. The deep-pit open-pit mine water-bearing blasting mining device according to claim 1, characterized in that: The blasting and mining device also includes a first conveyor belt, a first mounting frame, two first limiting blocks, two first stop blocks, two first mounting blocks, two first springs, and two first chutes; Each of the first special tubes has a plurality of first limiting modules arranged in a circular array along the circumferential direction of the central axis of the first special tube at its lower part. The number of first limiting modules on each first special tube is at least three. The first mounting frame is fixedly mounted on the upper end face of the rotating platform. The first conveyor belt is horizontally mounted inside the first mounting frame. The first limiting block is fixedly mounted on the upper end face of the first mounting frame. The two first limiting blocks are located at the two ends of the width direction of the first mounting frame, and the two first limiting blocks are parallel to each other. The relative distance between the two first limiting blocks is the same as the diameter of the first special tube. The relative distance between each first limiting block and the first conveyor belt is the same as the height of the first limiting module. When the first special tube is placed on the first conveyor belt, the first limiting module is located between the first limiting block and the first conveyor belt. Each of the first limiting blocks has a first mounting block fixedly connected to one end of its length away from the transfer unit. One end of the first mounting block is fixedly connected to one end of a first spring, which is horizontally positioned. The other end of the first spring is fixedly connected to a first stop block. Each of the first limiting blocks has a first sliding groove on its upper surface. The sliding guide direction of the first sliding groove is parallel to the width direction of the first limiting block. The first stop block is slidably positioned in the first sliding groove. The two first stop blocks are positioned opposite each other. The opposite end faces of the two first stop blocks each have a first guide slope for allowing the first special tube to enter the first conveyor belt.

3. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 2, characterized in that: The blasting and mining device also includes a second conveyor belt, a second mounting frame, two second limiting blocks, two second stop blocks, two second mounting blocks, two second springs, and two second chutes; Each of the second special tubes has a plurality of second limiting modules arranged in a circular array along the circumferential direction of the central axis of the second special tube. The number of second limiting modules on each second special tube is at least three. The second mounting frame is fixedly mounted on the upper end face of the rotating platform. The second conveyor belt is horizontally mounted inside the second mounting frame. The second limiting block is fixedly mounted on the upper end face of the second mounting frame. The two second limiting blocks are located at the two ends of the width direction of the second mounting frame, and the two second limiting blocks are parallel to each other. The relative distance between the two second limiting blocks is the same as the diameter of the second special tube. The relative distance between each second limiting block and the second conveyor belt is the same as the height of the second limiting module. When the second special tube is placed on the second conveyor belt, the second limiting module is located between the second limiting block and the second conveyor belt. Each of the second limiting blocks has a second mounting block fixedly connected to one end of its length away from the transfer unit. One end of the second mounting block is fixedly connected to one end of a second spring, which is horizontally positioned. The other end of the second spring is fixedly connected to a second stop. Each of the second limiting blocks has a second sliding groove on its upper surface. The sliding guide direction of the second sliding groove is parallel to the width direction of the second limiting block. The second stop is slidably positioned in the second sliding groove. The two second stopes are positioned opposite each other. The opposite end faces of the two second stopes each have a second guide slope for allowing the second special tube to enter the second conveyor belt.

4. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 3, characterized in that: The blasting and mining device also includes a transfer unit, which includes a first arc-shaped block, a second arc-shaped block, a first mounting base, a first telescopic power source, and a second telescopic power source. The first arc-shaped block is fixedly installed on the extended end of the first telescopic power source, the first telescopic power source is horizontally installed on the first mounting base, the telescopic direction of the first telescopic power source is perpendicular to the conveying direction of the first conveyor belt, and the first mounting base is fixedly installed on the rotating platform. The second arc-shaped block is fixedly installed on the extended end of the second telescopic power source, the second telescopic power source is horizontally installed on the first mounting base, and the telescopic direction of the first telescopic power source is parallel to the telescopic direction of the first telescopic power source. The lower end face of the first arc-shaped block is higher than the lower end face of the first limiting block, and the lower end face of the second arc-shaped block is higher than the lower end face of the second limiting block. The upper end faces of the first arc-shaped block and the second arc-shaped block are at the same height. The inner walls of the first arc-shaped block and the second arc-shaped block are arranged opposite to each other. The upper and lower end faces of the rotating platform are provided with a first through hole through which the first special tube and the second special tube can pass. The first arc-shaped block and the second arc-shaped block can clamp the first special tube conveyed by the first conveyor belt or the second special tube conveyed by the second conveyor belt directly above the first through hole.

5. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 1, characterized in that: The blasting and mining device also includes a first mounting cylinder; The first mounting cylinder is fixedly mounted on the rotating platform. The pipe cap is placed inside the first mounting cylinder, with the upper part of the pipe cap having a first circular groove and the lower part having a second circular groove. The upper diameter of the pipe cap is smaller than the diameter of the borehole, and the lower diameter of the pipe cap is smaller than the upper diameter. A first circular sealing ring is fixedly mounted on the top wall of the second circular groove. Several first sliding grooves are arrayed along the circumferential direction of the central axis of the pipe cap on the side wall of the second circular groove. The sliding guide direction of the first sliding groove is horizontal. One end of a third spring is fixedly connected in each first sliding groove. The third spring is horizontally connected. The other end of the third spring is fixedly connected to a first buckle. The first buckle is slidably disposed in the first sliding groove. A third guide slope is provided at the lower part of the first buckle away from the end face of the third spring. When the third spring is in the initial state, the first buckle part is located in the second circular groove. Both the first and second special tubes are length-graded telescopic structures. Each length-graded telescopic structure includes a first mounting tube, a first telescopic tube, a second circular sealing ring, a first pin, a first threaded through hole, and several second threaded holes. The lower inner diameter of the first mounting tube is smaller than its upper inner diameter, and the upper outer diameter of the first telescopic tube is smaller than its lower outer diameter. The upper outer diameter of the first telescopic tube is the same as the lower inner diameter of the first mounting tube, and the upper inner diameter of the first telescopic tube is the same as the upper inner diameter of the first mounting tube. A second circular sealing ring is embedded in the upper outer wall of the first telescopic tube, and the second circular sealing ring is pressed against the lower inner wall of the first mounting tube. The first threaded through hole is opened through the lower side wall of the first mounting tube. A plurality of second threaded holes are arrayed in the circumferential direction along the central axis of the first telescopic tube on the upper outer side wall of the first telescopic tube. When the first threaded through hole and one of the second threaded holes are connected, the first pin can be simultaneously turned into the first threaded through hole and the second threaded hole. The upper outer diameter of the first mounting tube is the same as the inner diameter of the second circular groove. The upper outer side wall of the first mounting tube is provided with a first snap-fit ​​groove. When the tube cover closes the upper opening of the first mounting tube, the first buckle is snapped into the first snap-fit ​​groove, and the first circular sealing ring is pressed and adhered to the upper end face of the first mounting tube. A first annular tube is fixedly installed at the bottom of the first telescopic tube. The inner diameter of the first annular tube is the same as the outer diameter of the upper part of the first mounting tube. A third circular sealing ring is fixedly installed on the upper inner wall of the first annular tube. The upper end face of the third circular sealing ring is fixedly connected to the lower end face of the first telescopic tube. A plurality of second sliding grooves are arrayed along the circumferential direction of the inner wall of the first annular tube along the central axis of the first annular tube. The sliding guide direction of the second sliding groove is horizontally set. One end of a fourth spring is fixedly connected in each second sliding groove. The fourth spring is horizontally set. The other end of the fourth spring is fixedly connected to a second buckle. The second buckle is slidably set in the second sliding groove. A fourth guide slope is opened at the lower part of the second buckle away from the end face of the fourth spring. When the first annular tube on one of the first special tubes or the second special tubes is sleeved on the upper part of the first mounting tube on another of the first special tubes or the second special tubes, the second buckle is snapped into the first snap groove, and the upper end face of the first mounting tube on the other of the first special tubes or the second special tubes is pressed and adhered to the third circular sealing ring. The support frame is installed on the bottom of the first telescopic tube on the first special tube, and the bottom of the first telescopic tube on the second special tube is closed.

6. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 5, characterized in that: The pre-assembly unit also includes a third mounting block and a bidirectional telescopic power source; the second lifting module includes a second lifting power source and a mounting frame; and the first transverse telescopic module includes a first transverse telescopic power source and a sixth mounting block. There are two clamping discs, and the diameter of each clamping disc is the same as the diameter of the first circular groove. The two clamping discs are respectively fixedly installed on the protruding ends on both sides of the bidirectional telescopic power source. The fixed end of the bidirectional telescopic power source is horizontally installed on the third mounting block. Each clamping disc has a dovetail groove on its upper surface. The sliding extension direction of the dovetail groove is parallel to the extension direction of the bidirectional telescopic power source. A dovetail block is fixedly installed on the third mounting block, and the dovetail block is slidably disposed in the dovetail groove. The third mounting block is disposed on the extended end of the first transverse telescopic power source, the fixed end of the first transverse telescopic power source is fixedly mounted on the sixth mounting block, the telescopic direction of the first transverse telescopic power source is parallel to the upper end face of the rotating platform, the sixth mounting block is fixedly mounted on the extended end of the second lifting power source, the telescopic direction of the second lifting power source is perpendicular to the upper end face of the rotating platform, the fixed end of the second lifting power source is fixedly mounted on the mounting frame, and the mounting frame is fixedly mounted on the rotating platform. The first lateral telescopic power source can move the clamping disc to directly above the first mounting cylinder or the first through hole.

7. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 6, characterized in that: The first lifting module includes a first lifting power source; The extended end of the first lifting power source is fixedly installed on the third mounting block. The extension direction of the first lifting power source is vertically downward. The extension and retraction direction of the first lifting power source is perpendicular to the upper surface of the rotating platform. The fixed end of the first lifting power source is fixedly installed on the extended end of the first transverse extension and retraction power source.

8. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 4, characterized in that: The blasting and mining device also includes a third telescopic power source, a fourth mounting block, left and right rotating ball screws, a third arc-shaped block, and a fourth arc-shaped block; The third arc-shaped block is fixedly installed on the extended end of one end of the left and right rotating ball screws, the fourth arc-shaped block is fixedly installed on the extended end of the other end of the left and right rotating ball screws, the fixed end of the left and right rotating ball screws is horizontally installed on the fourth mounting block, the fourth mounting block is fixedly installed on the extended end of the third telescopic power source, the telescopic direction of the third telescopic power source is perpendicular to the upper end face of the rotating platform, and the fixed end of the third telescopic power source is fixedly installed on the rotating platform. The first mounting base is provided with a third sliding groove, the sliding guide direction of the third sliding groove is parallel to the extension direction of the third telescopic power source, and the fourth mounting block is slidably disposed in the third sliding groove; The upper surfaces of the third and fourth arc-shaped blocks are both higher than the upper surface of the first arc-shaped block. The inner walls of the third and fourth arc-shaped blocks are arranged opposite to each other. The third and fourth arc-shaped blocks can clamp the first or second special tube that is located directly above the first through hole and is closed and spliced. The length of the third chute is greater than the maximum height of the first or second special tube after it has been extended or retracted through the length-grading telescopic structure.

9. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 4, characterized in that: Both the first limiting module and the second limiting module include a fifth mounting block, a pressing block, and a fifth spring; The fifth mounting block is fixedly installed at the lower part of the first or second special tube. A third sliding groove is provided at the end of the fifth mounting block away from the first or second special tube. The sliding guide direction of the third sliding groove is horizontal. One end of the fifth spring is fixedly connected in the third sliding groove. The fifth spring is horizontally set. A pressing block is fixedly connected to the other end of the fifth spring. The pressing block is slidably arranged in the third sliding groove. A fifth guide slope is provided at the lower part of the pressing block away from the end face of the fifth spring. When the first or second special tube is inserted into the blast hole, the pressing block compresses the fifth spring and presses it against the side wall of the blast hole.

10. The deep-pitted open-pit mine water-bearing blasting mining device according to claim 4, characterized in that: The blasting and mining device also includes a second mounting cylinder, a rotary power source, two temporary clamping modules, and two plug-removing modules. The two temporary clamping modules are arranged opposite each other with the central axis of the second mounting cylinder as the center. Each temporary clamping module includes a fourth telescopic power source and a first arc-shaped clamping block for temporarily clamping the blast hole mouth plug. The two plug-removing modules are arranged opposite each other with the central axis of the second mounting cylinder as the center. Each plug-removing module includes a fifth telescopic power source, a sixth telescopic power source, and a second arc-shaped clamping block for clamping the blast hole mouth plug. The second mounting cylinder is fixedly mounted on the rotating platform. The second mounting cylinder penetrates the upper and lower end faces of the rotating platform, and the upper and lower end faces of the second mounting cylinder are provided with a second through hole. The borehole muzzle plug is inserted into the borehole. The lower outer diameter of the borehole muzzle plug is the same as the diameter of the borehole. The upper outer diameter of the borehole muzzle plug is larger than the lower outer diameter of the borehole muzzle plug. The upper and lower inner diameters of the borehole muzzle plug are the same. The lower part of the borehole muzzle plug is located inside the borehole, and the upper part of the borehole muzzle plug is located above the borehole. The upper end face of the borehole muzzle plug near the inner diameter and the upper end face near the outer diameter are both marked with notches for borehole positioning. The first arc-shaped clamp is located below the second mounting cylinder. The height of the first arc-shaped clamp is the same as the height of the lower part of the borehole mouth plug. The first arc-shaped clamp is fixedly installed at the extended end of the fourth telescopic power source. The telescopic direction of the fourth telescopic power source is set horizontally. The fixed end of the fourth telescopic power source is fixedly installed on the rotating platform. Under the action of the fourth telescopic power source, the first arc-shaped clamp can clamp the lower part of the borehole mouth plug. The second arc-shaped clamp is located between the first arc-shaped clamp and the second mounting cylinder. The height of the second arc-shaped clamp is the same as the height of the upper part of the borehole mouth plug. The arc-shaped clamp is fixedly installed at the extended end of the fifth telescopic power source. The telescopic direction of the fifth telescopic power source is set horizontally, and the telescopic direction of the fifth telescopic power source is perpendicular to the telescopic direction of the fourth telescopic power source. Under the action of the fifth telescopic power source, the second arc-shaped clamp can clamp the upper part of the borehole mouth plug. The fixed end of the fifth telescopic power source is fixedly installed on the extended end of the sixth telescopic power source. The telescopic direction of the sixth telescopic power source is perpendicular to the upper end face of the rotating platform. The fixed end of the sixth telescopic power source is fixedly installed on the second mounting cylinder. Under the action of the sixth telescopic power source, the second arc-shaped clamp can remove the borehole plug on the borehole back into the second mounting cylinder. A camera is installed on the lower end face of the rotating platform, and the camera is used to capture the number of notches on the breech plug. The rotating platform is located above the mobile chassis. The rotating platform is fixedly installed on the rotating end of the rotating power source. The rotation axis of the rotating power source is perpendicular to the upper surface of the mobile chassis. The fixed end of the rotating power source is fixedly installed on the mobile chassis. The second through hole and the first through hole are symmetrically arranged about the rotation axis of the rotating power source.