Controllable commutation valve location method, device, storage medium and equipment
Patent Information
- Application Number
- CN202611444442.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-17
- Publication Date
- 2026-11-10
Smart Images

Figure CN123073906A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power electronic converter technology, and in particular to a method, apparatus, storage medium and device for selecting a controllable commutation converter valve. Background Technology
[0002] With the continuous construction of ultra-high voltage direct current (UHVDC) transmission projects in my country, the receiving-end power grid has formed a hybrid AC / DC interconnection pattern with multiple DC lines centrally fed in. As the core equipment of the DC transmission system, the commutation valve of the power grid relies on the AC grid voltage support for its commutation process. When a fault occurs in the AC grid, causing a voltage drop, it is very easy to trigger commutation failure, which in turn leads to DC power interruption, large-scale power flow transfer, and in severe cases, may cause cascading trips and system instability, threatening the safe and stable operation of the receiving-end power grid.
[0003] Controllable commutation converter valves employ a hybrid topology of thyristors and fully controlled devices, enabling them to actively complete controllable commutation without relying on AC grid voltage, effectively eliminating commutation failure issues. However, for existing DC projects, the number of converter stations across the network is large, and the investment in retrofitting is enormous. It is impossible to install controllable commutation converter valves on all converter stations simultaneously, necessitating the rational selection of converter stations for retrofitting.
[0004] Existing site selection methods mainly rely on the multi-infeed short-circuit ratio as an evaluation indicator, prioritizing the upgrading of converter stations with low multi-infeed short-circuit ratios. However, this method has a single evaluation dimension and low accuracy. Summary of the Invention
[0005] In view of this, the present invention provides a method, apparatus, storage medium and device for selecting the location of a controllable commutator, which can solve the technical problem of low location accuracy of the controllable commutator.
[0006] According to one aspect of the present invention, a method for selecting a controllable commutator valve is provided, the method comprising: Based on all converter stations, a simulation model of the receiving-end AC / DC hybrid power grid was constructed. In this model, no controllable commutation valves were installed at any of the converter stations. For any converter station, under the condition that the commutation of the converter station fails and all other converter stations are operating normally, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to determine the fault risk sequence corresponding to all converter stations. Obtain reactive power demand data for each converter station, and determine the reactive power demand subsequence for all converter stations based on the reactive power demand data and the fault risk subsequence. For any converter station, under the condition of applying a preset fault to the converter station, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to obtain the current power receiving capacity data of the converter station. A controllable phase-commutation converter valve is installed on the converter station. All other converter stations are not equipped with controllable phase-commutation converter valves. The receiving-end AC / DC hybrid power grid simulation model is reconstructed. Under the condition of applying the preset fault to the converter station after installation, simulation calculations are performed on the reconstructed receiving-end AC / DC hybrid power grid simulation model to obtain the power receiving capacity data of the converter station after installation. For the same converter station, based on its current power receiving capacity data, its corresponding power receiving capacity data after installation, and the reactive power demand sequence, the power receiving capacity improvement data sequence corresponding to all converter stations is determined. Based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable phase-commutation valves, the target converter station for the location of the controllable phase-commutation valves is determined.
[0007] According to another aspect of the present invention, a controllable commutation valve addressing device is provided, the device comprising: The module is used to build a simulation model of the receiving-end AC / DC hybrid power grid based on all converter stations, wherein no controllable commutation valves are installed in any of the converter stations; The fault risk sequence determination module is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition that the converter station fails to switch phase and all other converter stations are operating normally. This determines the fault risk sequence corresponding to all converter stations. The reactive power demand subsequence determination module is used to acquire the reactive power demand data of each converter station and determine the reactive power demand subsequence corresponding to all converter stations based on the reactive power demand data and the fault risk subsequence. The power receiving capacity enhancement amplitude data sequence determination module is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition of applying a preset fault to the converter station, to obtain the current power receiving capacity data of the converter station, to add a controllable phase-commutation converter valve to the converter station, and to reconstruct the receiving-end AC / DC hybrid power grid simulation model under the condition of applying the preset fault to the converter station after the addition, to obtain the power receiving capacity data of the converter station after the addition. For the same converter station, the module determines the power receiving capacity enhancement amplitude data sequence corresponding to all converter stations based on its current power receiving capacity data, its corresponding power receiving capacity data after the addition, and the reactive power demand sequence. The determination module is used to determine the target converter station for the selection of controllable commutation valves based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable commutation valves.
[0008] According to another aspect of the present invention, a storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the above-described controllable commutator valve addressing method.
[0009] According to another aspect of the present invention, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor, when executing the program, implements the above-described controllable commutator valve addressing method.
[0010] By means of the above technical solutions, the present invention provides a method, apparatus, storage medium and equipment for selecting a controllable commutation converter valve. Through the technical solutions of the present invention, firstly, by constructing a simulation model of a receiving-end AC / DC hybrid power grid without the installation of a controllable commutation converter valve, the faults of commutation failure at each converter station are simulated one by one, and the impact of the fault is quantified from multiple dimensions of the whole network to obtain a fault risk subsequence. This breaks through the limitation of the traditional single short-circuit ratio index, which only assesses the local risk of a single station, and realizes the unified quantification and ranking of the degree of cascading impact of commutation failure faults on the whole network. Second, by acquiring reactive power demand data from each converter station, a basic reactive power demand score is calculated. The higher the basic reactive power demand score, the weaker the voltage support at the converter station's location, the higher the proportion of new energy access, and the more prominent the voltage limitation problem. The greater the dynamic reactive power regulation benefit that can be achieved after installing controllable phase-commutation converter valves, the more it is corrected by combining the fault risk score sequence to obtain the reactive power demand score sequence. This achieves a unified quantitative ranking of reactive power voltage support demand and fault risk level, allowing converter stations that are both in high-risk fault positions across the entire network and have urgent reactive power needs to be prioritized for renovation. Third, by comparing the power receiving capacity data of each converter station before and after the installation of controllable commutation valves, the basic power receiving capacity improvement data is calculated. The larger the basic power receiving capacity improvement data, the greater the maximum power that the converter station can transmit under the same preset fault conditions after installing controllable commutation valves. The greater the contribution of the converter station to improving the overall power receiving capacity of the receiving-end grid, the higher the transmission capacity expansion benefit brought by upgrading the converter station under the same investment. The basic power receiving capacity improvement data is then adjusted by adding reactive power demand subsequence. Finally, by sorting the power receiving capacity improvement data of all converter stations, the corresponding power receiving capacity improvement data sequence for all converter stations is obtained. The converter station with the larger power receiving capacity improvement data should be given priority to install controllable commutation valves. Fourth, based on the power receiving capacity improvement data sequence and the preset number of controllable commutation valves, the target converter station is directly determined without relying on manual experience judgment, realizing the automated output and quantitative decision-making of the site selection scheme.
[0011] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, and in order to make the above and other objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description
[0012] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this invention, illustrate exemplary embodiments of the invention and are used to explain the invention, but do not constitute an undue limitation of this application. In the drawings: Figure 1 A flowchart illustrating a controllable commutator valve location method provided by an embodiment of the present invention is shown. Figure 2 A flowchart illustrating another controllable commutator valve location method provided by an embodiment of the present invention is shown. Figure 3 This diagram illustrates the structure of a controllable commutator valve addressing device according to an embodiment of the present invention. Figure 4 A schematic diagram of another controllable commutation valve addressing device provided in an embodiment of the present invention is shown. Detailed Implementation
[0013] The present invention will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other.
[0014] This embodiment provides a method for selecting the location of a controllable commutator valve, such as... Figure 1 As shown, the method includes: 101. Based on all converter stations, construct a simulation model of the receiving-end AC / DC hybrid power grid, in which none of the converter stations are equipped with controllable commutation valves.
[0015] In this embodiment, the statement that "no controllable phase-commutation converter valves have been installed in all converter stations" means that the converter valve type parameters of all converter stations are the same as those of grid phase-commutation converter valves. In other words, the constructed AC / DC hybrid grid simulation model at the receiving end has not undergone any modification to the controllable phase-commutation converter valves.
[0016] It should be noted that line-commutated converters (LCCs) are prone to commutation failure, while controllable line-commutated converters (CLCCs) can effectively eliminate the commutation failure problem. However, for DC projects in operation, there are a large number of converter stations across the network, and the scale of investment for the renovation is huge. The number of controllable line-commutated converters is limited, and it is not possible to install controllable line-commutated converters on all converter stations at the same time. Therefore, it is necessary to select the converter stations to be renovated in a reasonable manner.
[0017] 102. For any converter station, under the condition that the commutation of the converter station fails and all other converter stations are operating normally, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to determine the fault risk sequence corresponding to all converter stations.
[0018] In this embodiment, the failure of commutation at each converter station is simulated one by one, and the multi-dimensional impact of the failure on the entire network is summarized into a fault risk score. Each converter station corresponds to a fault risk score. The higher the fault risk score, the more severe the impact on the entire network, the wider the scope of the impact, and the higher the risk of system instability when the converter station experiences a commutation failure. Therefore, converter stations with higher fault risk scores need to be prioritized for the installation of controllable commutation valves.
[0019] 103. Obtain the reactive power demand data for each converter station, and determine the reactive power demand subsequence for all converter stations based on the reactive power demand data and the fault risk subsequence.
[0020] In this embodiment, instead of performing simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model, existing reactive power demand data for each converter station is obtained. For any converter station, the basic reactive power demand score of the converter station is calculated based on its reactive power demand data. Then, the risk correction coefficient of the converter station is determined based on the fault risk score sequence. The basic reactive power demand score of the converter station is multiplied by the risk correction coefficient of the converter station to obtain the corrected reactive power demand score corresponding to the converter station. The reactive power demand scores of all converter stations are sorted to obtain the reactive power demand score sequence corresponding to all converter stations.
[0021] The higher the baseline reactive power demand score, the weaker the voltage support at the converter station's location, the higher the proportion of renewable energy integration, and the more prominent the voltage limitation problem. This indicates a greater dynamic reactive power regulation benefit after installing a controllable commutation converter valve. The baseline reactive power demand score is then adjusted by superimposing the fault risk score sequence. Finally, by ranking the reactive power demand scores of all converter stations, a reactive power demand score sequence for all converter stations is obtained. Therefore, converter stations with higher reactive power demand scores are more likely to prioritize the installation of controllable commutation converter valves. It should be noted that the adjusted reactive power demand score has the same meaning as the original reactive power demand score.
[0022] 104. For any converter station, under the condition of applying a preset fault to the converter station, perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model to obtain the current power receiving capacity data of the converter station. Add a controllable phase-commutation converter valve to the converter station. All other converter stations except this one do not have controllable phase-commutation converter valves added. Reconstruct the receiving-end AC / DC hybrid power grid simulation model. Under the condition of applying the preset fault to the converter station with the added valve, perform simulation calculations on the reconstructed receiving-end AC / DC hybrid power grid simulation model to obtain the power receiving capacity data of the converter station after the added valve. For the same converter station, determine the power receiving capacity improvement value data sequence corresponding to all converter stations based on its current power receiving capacity data, its corresponding power receiving capacity data after the added valve, and the reactive power demand sequence.
[0023] In this embodiment, all converter stations operate normally, whether before or after the installation of a controllable commutation valve at a particular converter station. It should be noted that the normal operation of all converter stations is unrelated to applying a preset fault to any particular converter station. This is because the normal operation of all converter stations refers to the working state of the converter stations themselves, without any commutation failure. Applying a preset fault to a converter station refers to disturbances on the AC grid side, used to test the system's disturbance immunity.
[0024] When a controllable phase-commutation converter valve is installed at any converter station, the corresponding simulation model of the receiving-end AC / DC hybrid power grid will be reconstructed. Specifically, in the receiving-end AC / DC hybrid power grid simulation model, one of the electrical parameter data for each converter station is the converter valve type parameter. In the receiving-end AC / DC hybrid power grid simulation model, the converter valve type parameters for all converter stations are the same as the grid phase-commutation converter valve type parameters. When a controllable phase-commutation converter valve is installed at a converter station, the operation of reconstructing the receiving-end AC / DC hybrid power grid simulation model is to change the converter valve type parameter of that converter station from the grid phase-commutation converter valve type parameter to the controllable phase-commutation converter valve type parameter. At the same time, the unique continuous active power support characteristic parameter and rapid reactive power regulation characteristic parameter of the controllable phase-commutation converter valve are incorporated into the electrical parameter data of that converter station. The converter valve type parameters of the other converter stations remain unchanged.
[0025] The preset fault refers to a typical severe fault as defined in the national power industry standards. Specifically, it is a three-phase short-circuit ground fault occurring at a certain distance from the AC busbar of the converter station, which is cleared by the circuit breaker after a certain duration. This fault is pre-set and standardized, and the same preset fault is used for all converter stations. This ensures the comparability of power receiving capacity improvement data between different converter stations.
[0026] The power receiving capacity of a converter station is defined as the maximum power it can transmit under the premise of meeting safety and stability constraints. These constraints include three categories: voltage stability constraints, thermal stability constraints, and power angle stability constraints. Voltage stability constraints and power angle stability constraints only manifest after the system is subjected to disturbances. If no preset fault is applied, the system operates in a steady state, and the voltage stability constraints and power angle stability constraints cannot be activated. The measured power receiving capacity is then determined solely by the thermal stability constraint, failing to reflect the system's true transmission limit under fault conditions. Therefore, a preset fault must be applied to the converter station to trigger the transient response process of the system. Using a simulation model of the AC / DC hybrid power grid at the receiving end, the maximum transmission power that the converter station can withstand to maintain voltage and power angle stability under fault conditions is calculated. Then, combined with the thermal stability limit, the minimum value among the three is taken as the current power receiving capacity data of the converter station. Furthermore, a preset fault must be applied to the converter station after the installation is completed to trigger the transient response process of the system. Using a reconstructed simulation model of the AC / DC hybrid power grid at the receiving end, the maximum transmission power that the converter station after the installation can withstand to maintain voltage and power angle stability under fault conditions is calculated. Then, combined with the thermal stability limit, the minimum value among the three is taken as the power receiving capacity data of the converter station after the installation is completed.
[0027] Specifically, the power receiving capacity data (current power receiving capacity data and power receiving capacity data after installation) of controllable commutation converter valves are compared at each converter station. The basic power receiving capacity improvement value of each converter station is quantified. Then, the reactive power demand correction coefficient of each converter station is determined according to the reactive power demand subsequence. For the same converter station, the basic power receiving capacity improvement value is multiplied by the reactive power demand correction coefficient to obtain the corrected power receiving capacity improvement value data corresponding to that converter station. The power receiving capacity improvement value data of all converter stations are sorted to obtain the power receiving capacity improvement value data sequence corresponding to all converter stations.
[0028] It should be noted that the reason why the power receiving capacity data after the installation of the controllable commutation valve is improved compared to the current power receiving capacity data before the installation is because after the installation of the controllable commutation valve, the converter station will not experience commutation failure. During the preset fault period, it can continuously output active power, provide inertial response and voltage support for the system, suppress generator rotor deceleration, and accelerate voltage recovery after the fault. Thus, the system can withstand greater transmission power without instability under fault conditions.
[0029] The larger the increase in basic power receiving capacity, the greater the maximum power that the converter station can transmit under the same preset fault conditions after installing controllable commutation valves. The greater the contribution of the converter station to improving the overall power receiving capacity of the receiving-end power grid, the higher the transmission capacity expansion benefits brought by upgrading the converter station under the same investment. The basic power receiving capacity increase data is superimposed with the reactive power demand subsequence correction. Finally, by sorting the power receiving capacity increase data of all converter stations, the power receiving capacity increase data sequence corresponding to all converter stations is obtained. Therefore, the converter station with the larger power receiving capacity increase data should be given priority to install controllable commutation valves.
[0030] 105. Based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable phase-commutation converter valves, determine the target converter station for the location of the controllable phase-commutation converter valves.
[0031] In this embodiment, as one implementation method, the converter stations with the first preset number of controllable commutation valves in the power receiving capacity enhancement amplitude data sequence are determined as the target converter stations for controllable commutation valve location. For example, if the preset number of controllable commutation valves is 5, then the first 5 converter stations in the power receiving capacity enhancement amplitude data sequence are determined as the target converter stations for controllable commutation valve location.
[0032] As another implementation method, in addition to the three dimensions in steps 102-104 of the embodiment, namely the dimension of fault risk, the dimension of reactive power demand, and the dimension of the increase in power receiving capacity, a fourth dimension, namely the dimension of economic efficiency and feasibility of the modification, also needs to be combined.
[0033] Specifically, the first step is to obtain data on the remaining operational lifespan of each converter station, the physical space adaptability of the valve hall, the amount of primary equipment modification work, the total initial construction investment, the annual operation and maintenance cost, and the investment payback period.
[0034] Among them, the remaining operational life data refers to the remaining usable years of core equipment such as converter valves and converter transformers in the converter station from the current moment until the end of their designed life. The longer the remaining operational life, the longer the converter station can continue to operate, the longer the utilization cycle of the upgraded equipment, the longer the amortization period of the upgrade investment, and the better the overall economic efficiency.
[0035] Valve hall physical space adaptability data refers to the degree of matching between the remaining physical space within the converter station's valve hall available for installing controllable commutation valves and their supporting equipment and the size requirements of the controllable commutation valve equipment. Better valve hall physical space adaptability indicates that the converter station can complete the installation of controllable commutation valves without expanding the valve hall or with only minor modifications, resulting in lower construction difficulty and less modification work.
[0036] The primary equipment modification project quantity data refers to the quantity of primary equipment and construction work required to replace or add when installing controllable commutation valves in a converter station. This includes the number of converter valve bodies to be replaced, the number of converter transformers to be replaced or modified, the number of AC filters to be modified, the number of DC filters to be modified, and the number of measuring devices to be replaced. The smaller the primary equipment modification project quantity, the simpler the modification construction, the shorter the construction period, and the smaller the impact on the normal operation of the converter station.
[0037] The initial total investment refers to the total one-time investment required to install controllable phase-commutation valves in a converter station, including equipment procurement costs, construction and installation costs, commissioning costs, and other related expenses. A lower initial total investment indicates a lower financial threshold for the upgrade, and allows for the upgrade of more converter stations with the same investment scale.
[0038] Annual operation and maintenance cost data refers to the annual operating and maintenance expenses required after the converter station is equipped with controllable commutation valves. This includes equipment inspection costs, cooling system maintenance costs, spare parts replacement costs, and control and protection system upgrade costs. The lower the annual operation and maintenance cost, the lighter the long-term operating burden after the modification, and the better the economic efficiency throughout the entire life cycle.
[0039] The payback period refers to the number of years required for the increased power transmission revenue resulting from the improved power receiving capacity after the addition of controllable commutation valves to a converter station to recoup the initial total construction investment. A shorter payback period indicates a faster recovery of the investment and higher capital utilization efficiency.
[0040] Second, the six evaluation indicators—residual operating life, adaptability of valve hall physical space, amount of primary equipment modification work, initial total investment, annual operation and maintenance cost, and investment recovery period—are compared in pairs. The relative importance between each pair of indicators is determined according to the preset scoring scale, and a judgment matrix is constructed.
[0041] For example, the preset rating scale is a nine-level scale: 1 is the value when two indicators are equally important, 3 is the value when the former is slightly more important than the latter, 5 is the value when the former is significantly more important than the latter, 7 is the value when the former is strongly more important than the latter, 9 is the value when the former is extremely more important than the latter, and the intermediate values are 2, 4, 6, and 8. For the same converter station, the six evaluation indicators are compared pairwise. The importance of the former relative to the latter is taken as the above rating scale value, and the importance of the latter relative to the former is taken as the reciprocal of the rating scale value of the former relative to the latter, thus constructing a judgment matrix.
[0042] Third, calculate the consistency ratio of the judgment matrix. If the consistency ratio is less than the preset consistency threshold, the judgment matrix meets the consistency requirements. Solve for the largest eigenvalue of the judgment matrix and its corresponding eigenvector. Normalize the eigenvector and use it as the weight vector for each indicator. If the consistency ratio is greater than or equal to the preset consistency threshold, readjust the judgment matrix until the consistency requirements are met.
[0043] The consistency ratio of the judgment matrix is calculated by: finding the largest eigenvalue of the judgment matrix, subtracting the order of the judgment matrix from the largest eigenvalue, and then dividing by the order of the judgment matrix minus one to obtain the consistency index. The consistency index is then divided by the preset average random consistency index to obtain the consistency ratio.
[0044] Fourth, for the same converter station, its remaining operational life data, valve hall physical space adaptability data, primary equipment renovation project data, initial total investment data, annual operation and maintenance cost data, and investment payback period data are normalized respectively. Among them, the remaining operational life data and valve hall physical space adaptability data are positive indicators, while the primary equipment renovation project data, initial total investment data, annual operation and maintenance cost data, and investment payback period data are negative indicators. The complement value of the negative indicators is taken. The normalized remaining operational life data is multiplied by the remaining operational life data. The following six weighted results are added together to obtain the comprehensive basic renovation score of the converter station: the weight corresponding to the lifespan, the normalized valve hall physical space adaptability data multiplied by the weight corresponding to the valve hall physical space adaptability, the normalized primary equipment modification engineering quantity data multiplied by the weight corresponding to the primary equipment modification engineering quantity, the normalized initial construction total investment data multiplied by the weight corresponding to the initial construction total investment, the normalized annual operation and maintenance cost data multiplied by the weight corresponding to the annual operation and maintenance cost, and the normalized investment payback period data multiplied by the weight corresponding to the investment payback period.
[0045] Fifth, based on the obtained data sequence of power receiving capacity improvement amplitude, determine the power receiving capacity improvement level of each converter station, obtain the power receiving capacity improvement correction coefficient corresponding to the power receiving capacity improvement level, and calculate the corrected comprehensive renovation score of the same converter station based on the power receiving capacity improvement correction coefficient and the basic comprehensive renovation score.
[0046] Sixth, all converter stations are ranked in descending order of their comprehensive renovation scores. A higher comprehensive renovation score indicates a longer remaining operational lifespan, better adaptability of the valve hall's physical space, smaller primary equipment renovation workload, lower initial total investment, lower annual operation and maintenance costs, shorter investment payback period, greater improvement in power receiving capacity, higher feasibility of the renovation project, better overall economic efficiency, and greater technical benefits. These stations are given priority in the renovation plan. A renovation priority sequence is output based on the revised comprehensive renovation scores, ranked from highest to lowest. Converter stations with the highest pre-set number of controllable phase-commutation valves in the renovation priority sequence are identified as target converter stations for controllable phase-commutation valve site selection.
[0047] As another implementation method, the converter station with the highest comprehensive renovation score in the renovation priority sequence is selected as the target converter station for the first round of renovation in steps 101-105 of the embodiment, or the converter station with the highest power receiving capacity improvement data in the power receiving capacity improvement data sequence is selected as the target converter station for the first round of renovation in steps 101-104 of the embodiment. The target converter station for the first round of renovation is included in the renovation plan. The number of controllable phase-commutation valves is preset to be the same as the number of rounds. If the preset number of controllable phase-commutation valves is 3, then three rounds are performed, and one target converter station for the renovation of that round is obtained in each round.
[0048] Next, taking the converter station with the highest comprehensive upgrade score from the upgrade priority sequence as the target converter station for each round of upgrades, i.e., executing steps 102-105 of the implementation example, for the second round: The converter valve type parameters of the target converter station selected in the first round are replaced from the grid-side phase-commutation converter valve type parameters to the controllable phase-commutation converter valve type parameters. Simultaneously, the continuous active power support characteristic parameters and rapid reactive power regulation characteristic parameters unique to the controllable phase-commutation converter valve are incorporated into the electrical parameter data of this converter station. The converter valve type parameters of the remaining converter stations remain unchanged. A receiving-end AC / DC hybrid grid simulation model is reconstructed and named the first receiving-end AC / DC hybrid grid simulation model. For the first receiving-end AC / DC hybrid grid simulation model, the calculations in steps 102-105 of the embodiment are executed again. However, the target converter station with the added controllable phase-commutation converter valve still operates normally in the first receiving-end AC / DC hybrid grid simulation model, but it does not participate in the sorting of fault risk sub-sequences, reactive power demand sub-sequences, power receiving capacity improvement amplitude data sequences, or upgrade priority sequences. That is, for steps 102-105 of the embodiment, "any converter station" refers to any other converter station excluding the target converter station.
[0049] Similarly, once the target converter station for the second round of upgrades is obtained, it should also be included in the upgrade plan.
[0050] For the third round: The converter valve type parameters of the target converter stations selected in the second round are also replaced from the grid-commutated converter valve type parameters to the controllable commutated converter valve type parameters. At the same time, the continuous active power support characteristic parameters and rapid reactive power regulation characteristic parameters unique to the controllable commutated converter valve are incorporated into the electrical parameter data of the converter station. The converter valve type parameters of the other converter stations remain unchanged. The simulation model of the first receiving-end AC / DC hybrid grid is reconstructed and named the second receiving-end AC / DC hybrid grid simulation model. For the second receiving-end AC / DC hybrid grid simulation model, the calculations of steps 102-105 of the embodiment are executed again. However, the two target converter stations that have been equipped with controllable commutated converter valves are still operating normally in the second receiving-end AC / DC hybrid grid simulation model, but they do not participate in the sorting of fault risk subsequence, reactive power demand subsequence, power receiving capacity improvement amplitude data sequence, or renovation priority sequence. That is, for steps 102-105 of the embodiment, "any converter station" means any other converter station except for the two target converter stations.
[0051] Similarly, once the target converter station for the third round of upgrades is obtained, it should also be included in the upgrade plan.
[0052] At this point, there are three target converter stations in the renovation plan. The controllable commutation converter valve is located at these three target converter stations. Through iterative updates and multiple simulation convergences, a dynamic optimal location scheme is obtained, forming a closed-loop planning system that can be continuously optimized with the development of the power grid, which is different from the traditional one-time static location analysis method.
[0053] Existing technologies cannot quantify the systemic risks of commutation failure across the entire network, cannot quantify the reactive power and voltage reinforcement requirements of each DC bus, cannot calculate the increase in the power grid transmission limit after the upgrade, and cannot uniformly quantify multiple indicators such as upgrade investment, construction conditions, operation and maintenance costs, and equipment lifespan. Implementation steps 101-105 overcome the shortcomings of existing technologies.
[0054] This invention provides a method, apparatus, storage medium, and device for selecting controllable commutation converter valves. Through the technical solution of this invention, firstly, by constructing a simulation model of a receiving-end AC / DC hybrid power grid without controllable commutation converter valves, commutation failures at each converter station are simulated one by one. The impact of the failures is quantified from multiple dimensions across the entire network, resulting in a fault risk sub-sequence. This overcomes the limitation of traditional single short-circuit ratio indicators, which only assess the local risk of a single station, and achieves a unified quantification and ranking of the cascading impact of commutation failures on the entire network. Secondly, by acquiring reactive power demand data from each converter station, a basic reactive power demand score is calculated. A higher basic reactive power demand score indicates weaker voltage support, a higher proportion of renewable energy integration, and more prominent voltage limitations at the converter station's location. This indicates a greater dynamic reactive power regulation benefit after installing controllable commutation converter valves. This score is then corrected using the fault risk sub-sequence to obtain a reactive power demand sub-sequence. This achieves a unified quantitative ranking of reactive power voltage support demand and fault risk level, prioritizing converter stations that are both in high-risk fault positions across the network and have urgent reactive power needs for upgrades. Third, by comparing the power receiving capacity data of each converter station before and after the installation of controllable commutation valves, the basic power receiving capacity improvement data is calculated. The larger the basic power receiving capacity improvement data, the greater the maximum power that the converter station can transmit under the same preset fault conditions after installing controllable commutation valves. The greater the contribution of the converter station to improving the overall power receiving capacity of the receiving-end grid, the higher the transmission capacity expansion benefit brought by upgrading the converter station under the same investment. The basic power receiving capacity improvement data is then adjusted by adding reactive power demand subsequence. Finally, by sorting the power receiving capacity improvement data of all converter stations, the corresponding power receiving capacity improvement data sequence for all converter stations is obtained. The converter station with the larger power receiving capacity improvement data should be given priority to install controllable commutation valves. Fourth, based on the power receiving capacity improvement data sequence and the preset number of controllable commutation valves, the target converter station is directly determined without relying on manual experience judgment, realizing the automated output and quantitative decision-making of the site selection scheme.
[0055] Furthermore, as a refinement and extension of the specific implementation methods of the above embodiments, and to fully illustrate the specific implementation process in this embodiment, another method for selecting the location of a controllable commutator valve is provided, such as... Figure 2 As shown, the method includes: 201. Based on all converter stations, construct a simulation model of the receiving-end AC / DC hybrid power grid, in which controllable commutation valves are not installed in any converter station.
[0056] In this embodiment, the construction of the receiving-end AC / DC hybrid power grid simulation model based on all converter stations includes: constructing the receiving-end AC / DC hybrid power grid simulation model based on the obtained electrical parameter data of each converter station, the grid topology connection relationship between different converter stations, the output data of each generator set and the regional load data. In this model, the converter valve type parameter in the electrical parameter data of all converter stations is the grid commutation converter valve type parameter.
[0057] Specifically, electrical parameter data for each converter station is obtained, including converter valve type parameters, converter valve rated capacity, converter transformer turns ratio and short-circuit impedance, AC filter configuration parameters, and DC control and protection system parameters. Among these, the converter valve type parameters for all converter stations are the same as those for grid-connected phase-commutation converter valves.
[0058] Obtain the grid topology connections between different converter stations, including the transmission line connections between AC buses of each converter station, transformer connections, and connections between buses of different voltage levels.
[0059] Obtain the output data for each generator set, including generator rated capacity, inertia time constant, direct-axis reactance, quadrature-axis reactance, and automatic voltage regulator parameters.
[0060] Obtain regional load data, including the active power demand and reactive power demand of each load node.
[0061] The electrical parameter data of each converter station, the grid topology connection relationship between different converter stations, the output data of each generator set and the regional load data are entered into the simulation software to establish the electrical connection relationship between each component, set the operating parameters of each component, and complete the construction of the AC / DC hybrid power grid simulation model at the receiving end.
[0062] 202. For any converter station, under the condition that the commutation of the converter station fails and all other converter stations are operating normally, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to determine the fault risk sequence corresponding to all converter stations.
[0063] In this embodiment, the step of performing simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model to determine the fault risk score sequence corresponding to all converter stations includes: performing simulations based on the receiving-end AC / DC hybrid power grid simulation model to obtain the maximum power deficit data, AC bus voltage drop amplitude data, post-fault voltage recovery time data, overloaded line number data, and system power angle oscillation amplitude data corresponding to the converter station; determining the power supply stability dimension score of the converter station according to the system power angle oscillation amplitude data and a preset power angle stability scoring mapping table; determining the power flow dimension score of the converter station according to the overloaded line number data and a preset power flow impact scoring mapping table; determining the power quality dimension score of the converter station according to the AC bus voltage drop amplitude data, the post-fault voltage recovery time data, and a preset power quality scoring mapping table; calculating the fault risk score corresponding to the converter station according to the power supply stability dimension score, the power flow dimension score, and the power quality dimension score; and sorting the fault risk scores corresponding to all converter stations to obtain the fault hazard risk score sequence corresponding to all converter stations.
[0064] Among them, the maximum power deficit data of the entire network is the maximum active power lost by the entire network at the moment of the fault after the DC power interruption caused by commutation failure. The larger the maximum power deficit data of the entire network, the more severe the power deficit is, and the greater the impact on the system frequency and power angle.
[0065] AC bus voltage sag amplitude data: The depth of the AC bus voltage sag during commutation failure, equal to the rated voltage minus the lowest value of the AC bus voltage sag during the commutation failure. A larger AC bus voltage sag amplitude indicates a deeper voltage sag and a greater impact on the user's power supply quality.
[0066] Post-fault voltage recovery time data: The time required from the time of commutation failure to disconnection to the time the AC bus voltage recovers to within the allowable deviation range of the rated value. The longer the post-fault voltage recovery time data, the weaker the system voltage recovery capability.
[0067] Overload line count data: The number of lines whose transmission power exceeds the thermal stability limit due to large-scale power flow shift after commutation failure. The larger the overload line count data, the more severe the power flow shift and the higher the risk of cascading trips.
[0068] System power angle oscillation amplitude data: The maximum swing of the generator rotor power angle relative to the steady-state value before the fault after commutation failure. The larger the system power angle oscillation amplitude data, the worse the system power angle stability.
[0069] Since the impact of commutation failure on the entire network is threefold: power shortage on the power supply side leading to power angle instability (power supply stability dimension), power flow shift on the grid side leading to line overload (grid power flow dimension), and voltage drop on the power supply side leading to power quality degradation (power quality dimension), the above five data points can cover these three dimensions, thus demonstrating the impact of commutation failure on the entire network.
[0070] Specifically, the power stability dimension score of the converter station is determined based on the system power angle oscillation amplitude data and a preset power angle stability scoring mapping table. The preset power angle stability scoring mapping table is a pre-defined table showing the correspondence between system power angle oscillation amplitude data and power stability dimension scores. A larger system power angle oscillation amplitude indicates more severe generator rotor oscillation and poorer system power angle stability, resulting in a higher corresponding power stability dimension score. The power flow dimension score of the converter station is determined based on the overload line count data and a preset power flow impact scoring mapping table. Specifically, the preset power flow impact scoring mapping table is a pre-defined correspondence table between the overload line count data and the power flow dimension score. The larger the overload line count data, the more severe the power flow transfer after the fault and the higher the risk of cascading tripping, and the higher the corresponding power flow dimension score.
[0071] The power quality score of the converter station is determined based on the AC bus voltage dip amplitude data, the post-fault voltage recovery time data, and a preset power quality scoring mapping table. Specifically, the preset power quality scoring mapping table is a pre-defined table showing the correspondence between the AC bus voltage dip amplitude data, the post-fault voltage recovery time data, and the power quality score. This table is two-dimensional; as one implementation, the horizontal axis represents the AC bus voltage dip amplitude range, the vertical axis represents the post-fault voltage recovery time range, and the table interior displays the power quality score. A larger AC bus voltage dip amplitude and a longer post-fault voltage recovery time result in a higher power quality score.
[0072] Based on the power supply stability dimension score, the power grid flow dimension score, and the power quality dimension score, the fault risk score corresponding to the converter station is calculated. Specifically, the fault risk score is calculated as follows: the first preset weight corresponding to the power supply stability dimension score multiplied by the power supply stability dimension score + the first preset weight corresponding to the power grid flow dimension score multiplied by the power grid flow dimension score + the first preset weight corresponding to the power quality dimension score multiplied by the power quality dimension score.
[0073] The fault risk scores of all converter stations are sorted in descending order to obtain a fault hazard risk score sequence for all converter stations. The higher the fault risk score of a certain converter station, the more severe the impact on the entire network when a commutation failure occurs at that converter station, and the more necessary it is to prioritize the installation of controllable commutation valves.
[0074] 203. Obtain the reactive power demand data for each converter station, and determine the reactive power demand subsequence for all converter stations based on the reactive power demand data and the fault risk subsequence.
[0075] In this embodiment, obtaining the reactive power demand data for each converter station and determining the reactive power demand sequence for all converter stations based on the reactive power demand data and the fault risk sequence includes: obtaining the reactive power demand data for each converter station, wherein the reactive power demand data includes: the total renewable energy grid-connected capacity data of the provincial power grid where the converter station is located, the total power generation capacity data of the provincial power grid where the converter station is located, the measured short-circuit capacity data, and the recorded number of voltage exceedances during a preset historical period; for the same converter station, calculating the total renewable energy grid-connected capacity data of its provincial power grid divided by the total power generation capacity data of its provincial power grid. The renewable energy penetration rate of the converter station is obtained; for each converter station, its measured short-circuit capacity data is used as its short-circuit capacity ratio; for each converter station, its voltage deviation coefficient is calculated based on the recorded number of voltage over-limit and over-standard times in a preset historical period and a preset scaling factor; the basic reactive power demand score of each converter station is calculated based on the renewable energy penetration rate, the short-circuit capacity ratio, and the voltage deviation coefficient; the basic reactive power demand score is corrected based on the fault risk score sequence to obtain the corrected reactive power demand score for each converter station; the reactive power demand scores of all converter stations are sorted to obtain the reactive power demand score sequence for all converter stations.
[0076] The data on the total grid-connected capacity of new energy sources in the provincial power grid where the converter station is located refers to the total installed capacity of wind power and photovoltaic power generation that has been connected and is in operation in the power grid of the province where the converter station is located. It reflects the overall scale of new energy power generation in the provincial power grid where the converter station is located.
[0077] The total power generation capacity data of the provincial power grid where the converter station is located refers to the total installed capacity of all types of generating units (including thermal power, hydropower, wind power, photovoltaic, nuclear power, etc.) in the power grid of the province where the converter station is located. It reflects the overall scale of the power generation capacity of the provincial power grid where the converter station is located.
[0078] The measured short-circuit capacity data refers to the measured short-circuit capacity at the AC bus of the converter station. Short-circuit capacity characterizes the strength of the AC power grid to which the converter station is connected. The larger the short-circuit capacity, the stronger the AC power grid and the better the voltage disturbance immunity. The smaller the short-circuit capacity, the weaker the AC power grid and the worse the voltage disturbance immunity.
[0079] The recorded number of voltage exceedances within a preset historical period refers to the number of times the AC bus voltage of a converter station exceeded the allowable deviation range specified by national power industry standards and reached the level of exceeding the standard within a pre-set historical period (e.g., the past year). A higher number of voltage exceedances indicates more frequent historical voltage support problems at the converter station and a more urgent need for dynamic reactive power compensation.
[0080] Specifically, for each converter station, its voltage deviation coefficient is calculated based on the recorded number of voltage exceedances during a preset historical period and a preset scaling factor. For example, if the preset scaling factor is 0.1, the voltage deviation coefficient is equal to the recorded number of voltage exceedances during the preset historical period multiplied by 0.1. The reason for multiplying by 0.1 is that the numerical range of the recorded number of voltage exceedances during the preset historical period is much larger than the numerical range of renewable energy penetration rate and short-circuit capacity ratio. If the recorded number of voltage exceedances during the preset historical period is directly used to calculate the basic reactive power demand score by weighted averaging with renewable energy penetration rate and short-circuit capacity ratio, the recorded number of voltage exceedances during the preset historical period will dominate among the three items, resulting in a significant weakening of the impact of renewable energy penetration rate and short-circuit capacity ratio on the basic reactive power demand score.
[0081] The basic reactive power demand of each converter station is calculated based on the new energy penetration rate, the short-circuit capacity ratio, and the voltage deviation coefficient. Specifically, the basic reactive power demand of the converter station is calculated as follows: the second preset weight corresponding to the new energy penetration rate multiplied by the new energy penetration rate - the second preset weight corresponding to the short-circuit capacity ratio multiplied by the short-circuit capacity ratio + the second preset weight corresponding to the voltage deviation coefficient multiplied by the voltage deviation coefficient.
[0082] The step of correcting the basic reactive power demand score based on the fault risk score sequence to obtain the corrected reactive power demand score for each converter station includes: determining the risk level of each converter station based on the fault risk score sequence; obtaining the risk correction coefficient corresponding to the risk level; and calculating the corrected reactive power demand score for the same converter station based on the risk correction coefficient and the basic reactive power demand score.
[0083] The fault risk score sequence is arranged in descending order of fault risk score. For example, each converter station is classified into risk levels according to its ranking: the top 30% of converter stations are high-risk, the middle 40% are medium-risk, and the bottom 30% are low-risk. Each risk level corresponds to a pre-defined risk correction coefficient. For example, high-risk level corresponds to a risk correction coefficient of 1.2, medium-risk level corresponds to a risk correction coefficient of 1, and low-risk level corresponds to a risk correction coefficient of 0.8. For the same converter station, the corrected reactive power demand score is obtained by multiplying the risk correction coefficient by the basic reactive power demand score.
[0084] The reactive power demand of all converter stations is sorted to obtain the reactive power demand sequence of all converter stations. Specifically, the reactive power demand of all converter stations is sorted in descending order to obtain the reactive power demand sequence of all converter stations.
[0085] It should be noted that the higher the basic reactive power demand score, the weaker the voltage support at the location of the converter station, the higher the proportion of new energy access, and the more prominent the voltage limitation problem. The greater the dynamic reactive power regulation benefit that can be achieved after installing a controllable phase-commutation converter valve.
[0086] Specifically, the basic reactive power demand comprehensively reflects information from three dimensions: The higher the penetration rate of new energy sources, the larger the proportion of wind and solar power in the region. These power sources have weak reactive power regulation capabilities, and the more urgent the system's demand for dynamic reactive power resources.
[0087] The lower the short-circuit capacity ratio, the weaker the AC grid connected to the converter station, the worse its voltage disturbance immunity, and the greater the need for controllable commutation converter valves to provide rapid dynamic reactive power support.
[0088] The larger the voltage deviation coefficient, the more frequent the historical voltage limit problem of the converter station, the larger the voltage support gap in actual operation, and the more obvious the improvement effect after the renovation.
[0089] After further adjustments based on the fault risk score sequence, the station with the higher final score indicates that it is both a station with a high fault risk across the entire network and a station with an urgent need for local reactive power, and thus has the highest overall urgency to install a controllable commutator valve.
[0090] 204. For any converter station, under the condition of applying a preset fault to the converter station, simulation is performed based on the receiving end AC / DC hybrid power grid simulation model to obtain the voltage stability limit data, thermal stability limit data and power angle stability limit data of the converter station. The minimum value among the voltage stability limit data, thermal stability limit data and power angle stability limit data of the converter station is taken as the current power receiving capacity data of the converter station.
[0091] In this embodiment, the voltage stability limit data and power angle stability limit data can only be activated after the system is subjected to a disturbance. If no preset fault is applied, the system is in steady-state operation, and the voltage stability constraint and power angle stability constraint cannot be activated. The measured power receiving capacity is determined only by the thermal stability limit data, which cannot reflect the true power transmission limit of the system under fault conditions.
[0092] For any converter station, after a preset fault is applied, the system enters a transient response process. The simulation software gradually increases the transmission power of the converter station, applying a preset fault with each increase, and observes whether the system can maintain stability. When the power increases to a certain value, the system cannot maintain stability due to voltage collapse after the fault is applied. The previous power value is the limit value under the voltage stability constraint, i.e., the voltage stability limit data. When the power increases to a certain value, the system cannot maintain stability due to power angle instability after the fault is applied. The previous power value is the limit value under the power angle stability constraint, i.e., the power angle stability limit data.
[0093] Among them, the thermal stability limit data are the limit values corresponding to the thermal stability constraints.
[0094] Thermal stability constraints: During long-term operation, the power transmitted by equipment such as power transmission lines or transformers must not exceed the thermal stability limits specified on the equipment nameplate; otherwise, the equipment will be damaged due to overheating.
[0095] Thermal stability limit data: This refers to the maximum power that can be transmitted under thermal stability constraints, as specified on the equipment nameplate.
[0096] Voltage stability limit data: These are the limit values corresponding to voltage stability constraints.
[0097] Voltage stability constraints: After a disturbance, the voltage at each node must remain within the allowable range; otherwise, voltage collapse will occur. The transmission power of transmission lines cannot exceed the maximum value that the system can withstand to maintain voltage stability.
[0098] Voltage stability limit data: This is the maximum power that the converter station is allowed to transmit under voltage stability constraints, obtained through simulation calculations.
[0099] Power angle stability limit data: These are the limit values corresponding to the power angle stability constraints.
[0100] Power angle stability constraint: After the system is subjected to a disturbance, the relative power angles between the generator rotors must remain synchronized; otherwise, generator loss of synchronism will occur. The transmission power of the transmission line cannot exceed the maximum value that the system can withstand to maintain power angle stability.
[0101] Power angle stability limit data: The maximum power that the converter station is allowed to transmit under power angle stability constraints, obtained through simulation calculations.
[0102] Power receiving capacity data: The maximum power that the converter station can transmit under the premise of meeting safety and stability constraints.
[0103] There are three types of safety and stability constraints: voltage stability constraints, thermal stability constraints, and power angle stability constraints. These three types of constraints are related as follows: if any one of these constraints is breached, the system will become unstable, and power transmission will be impossible.
[0104] Therefore, the maximum power that the converter station can transmit cannot exceed the most stringent one of the three constraints. Thus, the minimum value among the three is taken as the limit value corresponding to the most stringent constraint, which is used as the current power receiving capacity data of the converter station.
[0105] 205. A controllable phase-commutation converter valve is installed in the converter station. All other converter stations are not equipped with controllable phase-commutation converter valves. The receiving-end AC / DC hybrid power grid simulation model is reconstructed. Under the condition of applying the preset fault to the converter station after installation, the reconstructed receiving-end AC / DC hybrid power grid simulation model is simulated to obtain the power receiving capacity data of the converter station after installation.
[0106] In this embodiment, all converter stations operate normally, whether before or after the installation of a controllable commutation valve at a particular converter station. It should be noted that the normal operation of all converter stations is unrelated to applying a preset fault to any particular converter station. This is because the normal operation of all converter stations refers to the working state of the converter stations themselves, without any commutation failure. Applying a preset fault to a converter station refers to disturbances on the AC grid side, used to test the system's disturbance immunity.
[0107] When a controllable phase-commutation converter valve is installed at any converter station, the corresponding simulation model of the receiving-end AC / DC hybrid power grid will be reconstructed. Specifically, in the receiving-end AC / DC hybrid power grid simulation model, one of the electrical parameter data for each converter station is the converter valve type parameter. In the receiving-end AC / DC hybrid power grid simulation model, the converter valve type parameters for all converter stations are the same as the grid phase-commutation converter valve type parameters. When a controllable phase-commutation converter valve is installed at a converter station, the operation of reconstructing the receiving-end AC / DC hybrid power grid simulation model is to change the converter valve type parameter of that converter station from the grid phase-commutation converter valve type parameter to the controllable phase-commutation converter valve type parameter. At the same time, the unique continuous active power support characteristic parameter and rapid reactive power regulation characteristic parameter of the controllable phase-commutation converter valve are incorporated into the electrical parameter data of that converter station. The converter valve type parameters of the other converter stations remain unchanged.
[0108] The process of performing simulation calculations on the reconstructed receiving-end AC / DC hybrid power grid simulation model to obtain the power receiving capacity data of the added converter station includes: performing simulations based on the reconstructed receiving-end AC / DC hybrid power grid simulation model to obtain the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the added converter station; and taking the minimum value among the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the added converter station as the power receiving capacity data of the added converter station.
[0109] The principle of obtaining the power receiving capacity data of the converter station after the installation is the same as the principle of obtaining the current power receiving capacity data in step 204 of the embodiment, and will not be repeated here.
[0110] 206. For the same converter station, based on its current power receiving capacity data, its corresponding power receiving capacity data after installation, and the reactive power demand sequence, determine the power receiving capacity improvement data sequence for all converter stations.
[0111] In this embodiment, determining the power receiving capacity enhancement data sequence for all converter stations based on their current power receiving capacity data, their corresponding power receiving capacity data after installation, and the reactive power demand subsequence includes: determining the basic power receiving capacity enhancement data for the same converter station based on its current power receiving capacity data and its corresponding power receiving capacity data after installation; determining the reactive power demand level for each converter station based on the reactive power demand subsequence; obtaining the reactive power demand correction coefficient corresponding to the reactive power demand level; calculating the corrected power receiving capacity enhancement data for the same converter station based on the reactive power demand correction coefficient and the basic power receiving capacity enhancement data; and sorting the corrected power receiving capacity enhancement data for all converter stations to obtain the power receiving capacity enhancement data sequence for all converter stations.
[0112] Specifically, for the same converter station, the basic power receiving capacity improvement value is determined based on its current power receiving capacity data and its corresponding power receiving capacity data after the installation. Specifically, the basic power receiving capacity improvement value = power receiving capacity data after installation - current power receiving capacity data. The larger the basic power receiving capacity improvement value, the more power the converter station can transmit after installing the controllable phase-commutation converter valve, and the greater its contribution to improving the overall power receiving capacity of the receiving end power grid.
[0113] Based on the reactive power demand sequence, the reactive power demand level of each converter station is determined. A reactive power demand correction coefficient corresponding to each reactive power demand level is obtained. The reactive power demand sequence is arranged from largest to smallest reactive power demand. For example, reactive power demand levels are divided according to their ranking: the top 30% of converter stations are classified as high reactive power demand level, the middle 40% as medium reactive power demand level, and the bottom 30% as low reactive power demand level. Each reactive power demand level corresponds to a pre-defined reactive power demand correction coefficient. For example, high reactive power demand level corresponds to a correction coefficient of 1.2, medium reactive power demand level corresponds to a correction coefficient of 1, and low reactive power demand level corresponds to a correction coefficient of 0.8.
[0114] For the same converter station, the corrected power receiving capacity improvement data is obtained by multiplying the reactive power demand correction factor by the basic power receiving capacity improvement data.
[0115] The corrected power receiving capacity improvement values of all converter stations are sorted in descending order to obtain a sequence of power receiving capacity improvement values for all converter stations.
[0116] 207. Based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable phase-commutation converter valves, determine the target converter station for the location of the controllable phase-commutation converter valves.
[0117] In this embodiment, as one implementation method, the converter stations with the first preset number of controllable commutation valves in the power receiving capacity enhancement amplitude data sequence are determined as the target converter stations for controllable commutation valve location. For example, if the preset number of controllable commutation valves is 5, then the first 5 converter stations in the power receiving capacity enhancement amplitude data sequence are determined as the target converter stations for controllable commutation valve location.
[0118] This invention provides a method, apparatus, storage medium, and device for selecting controllable commutation converter valves. Through the technical solution of this invention, firstly, by constructing a simulation model of a receiving-end AC / DC hybrid power grid without controllable commutation converter valves, commutation failures at each converter station are simulated one by one. The impact of the failures is quantified from multiple dimensions across the entire network, resulting in a fault risk sub-sequence. This overcomes the limitation of traditional single short-circuit ratio indicators, which only assess the local risk of a single station, and achieves a unified quantification and ranking of the cascading impact of commutation failures on the entire network. Secondly, by acquiring reactive power demand data from each converter station, a basic reactive power demand score is calculated. A higher basic reactive power demand score indicates weaker voltage support, a higher proportion of renewable energy integration, and more prominent voltage limitations at the converter station's location. This indicates a greater dynamic reactive power regulation benefit after installing controllable commutation converter valves. This score is then corrected using the fault risk sub-sequence to obtain a reactive power demand sub-sequence. This achieves a unified quantitative ranking of reactive power voltage support demand and fault risk level, prioritizing converter stations that are both in high-risk fault positions across the network and have urgent reactive power needs for upgrades. Third, by comparing the power receiving capacity data of each converter station before and after the installation of controllable commutation valves, the basic power receiving capacity improvement data is calculated. The larger the basic power receiving capacity improvement data, the greater the maximum power that the converter station can transmit under the same preset fault conditions after installing controllable commutation valves. The greater the contribution of the converter station to improving the overall power receiving capacity of the receiving-end grid, the higher the transmission capacity expansion benefit brought by upgrading the converter station under the same investment. The basic power receiving capacity improvement data is then adjusted by adding reactive power demand subsequence. Finally, by sorting the power receiving capacity improvement data of all converter stations, the corresponding power receiving capacity improvement data sequence for all converter stations is obtained. The converter station with the larger power receiving capacity improvement data should be given priority to install controllable commutation valves. Fourth, based on the power receiving capacity improvement data sequence and the preset number of controllable commutation valves, the target converter station is directly determined without relying on manual experience judgment, realizing the automated output and quantitative decision-making of the site selection scheme.
[0119] Furthermore, as Figure 1 and Figure 2 The specific implementation of the method shown in this invention provides a controllable commutation valve addressing device, such as... Figure 3 As shown, the device includes: a construction module 31, a fault risk subsequence determination module 32, a reactive power demand subsequence determination module 33, a power receiving capacity enhancement amplitude data sequence determination module 34, and a determination module 35; Module 31 is used to build a simulation model of the receiving-end AC / DC hybrid power grid based on all converter stations, wherein no controllable commutation valves are installed in any of the converter stations; The fault risk sequence determination module 32 is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition that the commutation of the converter station fails and all other converter stations are operating normally. The reactive power demand subsequence determination module 33 is used to acquire the reactive power demand data of each converter station and determine the reactive power demand subsequence corresponding to all converter stations based on the reactive power demand data and the fault risk subsequence. The power receiving capacity enhancement amplitude data sequence determination module 34 is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition of applying a preset fault to the converter station, to obtain the current power receiving capacity data of the converter station, to add a controllable phase-commutation converter valve to the converter station, and to reconstruct the receiving-end AC / DC hybrid power grid simulation model under the condition of applying the preset fault to the converter station after the addition, to obtain the power receiving capacity data of the converter station after the addition. For the same converter station, the module determines the power receiving capacity enhancement amplitude data sequence corresponding to all converter stations based on its current power receiving capacity data, its corresponding power receiving capacity data after the addition, and the reactive power demand sequence. The determination module 35 is used to determine the target converter station for the selection of controllable commutation valves based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable commutation valves.
[0120] Accordingly, in order to construct a receiving-end AC / DC hybrid power grid simulation model based on all converter stations, the construction module 31 is used to construct the receiving-end AC / DC hybrid power grid simulation model according to the acquired electrical parameter data of each converter station, the grid topology connection relationship between different converter stations, the output data of each generator set and the regional load data. In this model, the converter valve type parameter in the electrical parameter data of all converter stations is the grid commutation converter valve type parameter.
[0121] Accordingly, in order to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model and determine the fault risk sequence corresponding to all converter stations, the fault risk sequence determination module 32 is used to perform simulations based on the receiving-end AC / DC hybrid power grid simulation model to obtain the maximum power deficit data, AC bus voltage drop amplitude data, voltage recovery time data after a fault, number of overloaded lines data, and system power angle oscillation amplitude data corresponding to the converter station; and to determine the power supply stability of the converter station based on the system power angle oscillation amplitude data and the preset power angle stability scoring mapping table. The system calculates the following: Dimensional scores; Based on the overload line count data and a preset power flow impact scoring mapping table, the power flow dimension score of the converter station is determined; Based on the AC bus voltage drop amplitude data, the post-fault voltage recovery time data, and a preset power quality scoring mapping table, the power quality dimension score of the converter station is determined; Based on the power supply stability dimension score, the power flow dimension score, and the power quality dimension score, the corresponding fault risk score of the converter station is calculated; The fault risk scores of all converter stations are sorted to obtain a fault hazard risk score sequence for all converter stations.
[0122] Accordingly, in order to obtain the reactive power demand data for each converter station, a reactive power demand subsequence is determined for all converter stations based on the reactive power demand data and the fault risk subsequence. The reactive power demand subsequence determination module 33 is used to obtain the reactive power demand data for each converter station. The reactive power demand data includes: the total renewable energy grid-connected capacity data of the provincial power grid where the converter station is located, the total power generation capacity data of the provincial power grid where the converter station is located, the measured short-circuit capacity data, and the recorded number of voltage over-limit violations in a preset historical period. For the same converter station, the total renewable energy grid-connected capacity data of its provincial power grid is calculated by dividing the total power generation capacity of its provincial power grid by the total power generation capacity of its provincial power grid. The renewable energy penetration rate of the converter station is obtained from the power capacity data. For each converter station, its measured short-circuit capacity data is used as its short-circuit capacity ratio. For each converter station, its voltage deviation coefficient is calculated based on the recorded number of voltage over-limit and over-limit times in a preset historical period and a preset scaling factor. The basic reactive power demand score of each converter station is calculated based on the renewable energy penetration rate, the short-circuit capacity ratio, and the voltage deviation coefficient. The basic reactive power demand score is corrected based on the fault risk score sequence to obtain the corrected reactive power demand score for each converter station. The reactive power demand scores of all converter stations are sorted to obtain the reactive power demand score sequence for all converter stations.
[0123] Accordingly, in order to correct the basic reactive power demand score based on the fault risk score sequence to obtain the corrected reactive power demand score for each converter station, the reactive power demand score sequence determination module 33 is used to determine the risk level of each converter station based on the fault risk score sequence; obtain the risk correction coefficient corresponding to the risk level; and calculate the corrected reactive power demand score for the same converter station based on the risk correction coefficient and the basic reactive power demand score.
[0124] Accordingly, in order to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model and obtain the current power receiving capacity data of the converter station, the power receiving capacity improvement amplitude data sequence determination module 34 is used to perform simulations based on the receiving-end AC / DC hybrid power grid simulation model to obtain the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station; and the minimum value among the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station is taken as the current power receiving capacity data of the converter station.
[0125] Accordingly, in order to perform simulation calculations on the reconstructed AC / DC hybrid power grid simulation model and obtain the power receiving capacity data of the added converter station, the power receiving capacity enhancement amplitude data sequence determination module 34 is used to perform simulation based on the reconstructed AC / DC hybrid power grid simulation model to obtain the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the added converter station; the minimum value among the added voltage stability limit data, thermal stability limit data, and power angle stability limit data of the added converter station is taken as the power receiving capacity data of the added converter station.
[0126] Accordingly, in order to determine the power receiving capacity enhancement data sequence for all converter stations based on their current power receiving capacity data, their corresponding power receiving capacity data after installation, and the aforementioned reactive power demand sequence, such as... Figure 4 As shown, the power receiving capability enhancement amplitude data sequence determination module 34 includes: a determination unit 341 and a calculation unit 342; The determining unit 341 is used to determine the basic power receiving capacity improvement value of the same converter station based on its current power receiving capacity data and its corresponding power receiving capacity data after the installation. The calculation unit 342 is used to determine the reactive power demand level of each converter station according to the reactive power demand sequence; obtain the reactive power demand correction coefficient corresponding to the reactive power demand level; for the same converter station, calculate the corrected power receiving capacity improvement value data of the converter station according to the reactive power demand correction coefficient and the basic power receiving capacity improvement value data; sort the corrected power receiving capacity improvement value data of all converter stations to obtain the power receiving capacity improvement value data sequence of all converter stations.
[0127] It should be noted that other corresponding descriptions of the functional units involved in the controllable commutation valve addressing device provided in this embodiment can be found in [reference]. Figures 1 to 2 The corresponding description will not be repeated here.
[0128] Based on the above, Figures 1 to 2 Accordingly, this embodiment also provides a storage medium, which may be volatile or non-volatile, storing a computer program that, when executed by a processor, implements the above-described method. Figures 1 to 2 The method for selecting the location of a controllable commutator valve is shown.
[0129] Based on this understanding, the technical solution of the present invention can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (such as a CD-ROM, USB flash drive, portable hard drive, etc.) and includes several instructions to cause a computer device (such as a personal computer, server, or network device, etc.) to execute the methods of various implementation scenarios of the present invention.
[0130] Based on the above, Figures 1 to 2 The method shown and Figure 3 , Figure 4 To achieve the above objectives, the present application also provides a computer device, specifically a personal computer, server, network device, etc., as shown in the illustrated embodiment. This computer device includes a storage medium and a processor; the storage medium stores a computer program; the processor executes the computer program to achieve the above-described objectives. Figure 1 and Figure 2 The method for selecting the location of a controllable commutator valve is shown.
[0131] Optionally, the computer device may also include a user interface, a network interface, a camera, radio frequency (RF) circuitry, sensors, audio circuitry, a Wi-Fi module, etc. The user interface may include a display screen, input units such as a keyboard, etc., and optional user interfaces may also include USB interfaces, card reader interfaces, etc. The network interface may optionally include standard wired interfaces, wireless interfaces (such as Wi-Fi interfaces), etc.
[0132] Those skilled in the art will understand that the computer device structure provided in this embodiment does not constitute a limitation on the physical device, and may include more or fewer components, or combine certain components, or have different component arrangements.
[0133] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages the hardware and software resources of the aforementioned computer device, supporting the operation of information processing programs and other software and / or programs. The network communication module is used to enable communication between the various components within the non-volatile storage medium, as well as communication with other hardware and software in the information processing entity device.
[0134] Through the above description of the embodiments, those skilled in the art can clearly understand that the present invention can be implemented by means of software plus necessary general-purpose hardware platform, or it can be implemented by hardware.
[0135] This invention provides a method, apparatus, storage medium, and device for selecting controllable commutation converter valves. Through the technical solution of this invention, firstly, by constructing a simulation model of a receiving-end AC / DC hybrid power grid without controllable commutation converter valves, commutation failures at each converter station are simulated one by one. The impact of the failures is quantified from multiple dimensions across the entire network, resulting in a fault risk sub-sequence. This overcomes the limitation of traditional single short-circuit ratio indicators, which only assess the local risk of a single station, and achieves a unified quantification and ranking of the cascading impact of commutation failures on the entire network. Secondly, by acquiring reactive power demand data from each converter station, a basic reactive power demand score is calculated. A higher basic reactive power demand score indicates weaker voltage support, a higher proportion of renewable energy integration, and more prominent voltage limitations at the converter station's location. This indicates a greater dynamic reactive power regulation benefit after installing controllable commutation converter valves. This score is then corrected using the fault risk sub-sequence to obtain a reactive power demand sub-sequence. This achieves a unified quantitative ranking of reactive power voltage support demand and fault risk level, prioritizing converter stations that are both in high-risk fault positions across the network and have urgent reactive power needs for upgrades. Third, by comparing the power receiving capacity data of each converter station before and after the installation of controllable commutation valves, the basic power receiving capacity improvement data is calculated. The larger the basic power receiving capacity improvement data, the greater the maximum power that the converter station can transmit under the same preset fault conditions after installing controllable commutation valves. The greater the contribution of the converter station to improving the overall power receiving capacity of the receiving-end grid, the higher the transmission capacity expansion benefit brought by upgrading the converter station under the same investment. The basic power receiving capacity improvement data is then adjusted by adding reactive power demand subsequence. Finally, by sorting the power receiving capacity improvement data of all converter stations, the corresponding power receiving capacity improvement data sequence for all converter stations is obtained. The converter station with the larger power receiving capacity improvement data should be given priority to install controllable commutation valves. Fourth, based on the power receiving capacity improvement data sequence and the preset number of controllable commutation valves, the target converter station is directly determined without relying on manual experience judgment, realizing the automated output and quantitative decision-making of the site selection scheme.
[0136] Those skilled in the art will understand that the accompanying drawings are merely schematic diagrams of a preferred embodiment, and the modules or processes shown in the drawings are not necessarily essential for implementing the present invention. Those skilled in the art will understand that the modules in the apparatus of the embodiment can be distributed within the apparatus of the embodiment as described, or they can be located in one or more apparatuses different from this embodiment, with corresponding changes. The modules of the above-described embodiment can be combined into one module, or further divided into multiple sub-modules.
[0137] The serial numbers used above are for descriptive purposes only and do not represent the superiority or inferiority of the implementation scenarios. The above disclosures are merely a few specific implementation scenarios of the present invention; however, the present invention is not limited thereto, and any variations conceived by those skilled in the art should fall within the protection scope of the present invention.
Claims
1. A method for selecting the location of a controllable commutator valve, characterized in that, The method includes: Based on all converter stations, a simulation model of the receiving-end AC / DC hybrid power grid was constructed. In this model, no controllable commutation valves were installed at any of the converter stations. For any converter station, under the condition that the commutation of the converter station fails and all other converter stations are operating normally, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to determine the fault risk sequence corresponding to all converter stations. Obtain reactive power demand data for each converter station, and determine the reactive power demand subsequence for all converter stations based on the reactive power demand data and the fault risk subsequence. For any converter station, under the condition of applying a preset fault to the converter station, simulation calculations are performed based on the receiving-end AC / DC hybrid power grid simulation model to obtain the current power receiving capacity data of the converter station. A controllable phase-commutation converter valve is installed on the converter station. All other converter stations are not equipped with controllable phase-commutation converter valves. The receiving-end AC / DC hybrid power grid simulation model is reconstructed. Under the condition of applying the preset fault to the converter station after installation, simulation calculations are performed on the reconstructed receiving-end AC / DC hybrid power grid simulation model to obtain the power receiving capacity data of the converter station after installation. For the same converter station, based on its current power receiving capacity data, its corresponding power receiving capacity data after installation, and the reactive power demand sequence, the power receiving capacity improvement data sequence corresponding to all converter stations is determined. Based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable phase-commutation valves, the target converter station for the location of the controllable phase-commutation valves is determined.
2. The method according to claim 1, characterized in that, The simulation model of the receiving-end AC / DC hybrid power grid, based on all converter stations, includes: Based on the electrical parameter data of each converter station, the grid topology connection relationship between different converter stations, the output data of each generator set and the regional load data, a simulation model of the receiving-end AC / DC hybrid power grid is constructed. Among them, the converter valve type parameters in the electrical parameter data of all converter stations are the grid commutation converter valve type parameters.
3. The method according to claim 1, characterized in that, The simulation calculation based on the receiving-end AC / DC hybrid power grid simulation model determines the fault risk sequence corresponding to all converter stations, including: Simulation was performed based on the AC / DC hybrid power grid simulation model at the receiving end, and the following data were obtained for the converter station: the maximum power deficit of the entire network, the AC bus voltage drop amplitude, the voltage recovery time after the fault, the number of overloaded lines, and the system power angle oscillation amplitude. The power angle oscillation amplitude data of the system and the preset power angle stability scoring mapping table are used to determine the power stability dimension score of the converter station. The power flow dimension score of the converter station is determined based on the data on the number of overloaded lines and the preset power flow impact scoring mapping table. The power quality dimension score of the converter station is determined based on the AC bus voltage drop amplitude data, the voltage recovery time data after the fault, and the preset power quality scoring mapping table. The fault risk score corresponding to the converter station is calculated based on the power supply stability dimension score, the power grid flow dimension score and the power quality dimension score. The fault risk scores of all converter stations are sorted to obtain the fault hazard risk score sequence of all converter stations.
4. The method according to claim 1, characterized in that, The process of acquiring reactive power demand data for each converter station, and determining the reactive power demand subsequence for all converter stations based on the reactive power demand data and the fault risk subsequence, includes: Acquire reactive power demand data for each converter station, wherein the reactive power demand data includes: total grid-connected capacity of new energy sources in the provincial power grid where the converter station is located, total power generation capacity of the provincial power grid where the converter station is located, measured short-circuit capacity data, and recorded data of voltage over-limit and over-standard times in a preset historical period. For the same converter station, the total grid-connected capacity of new energy sources in the province where it is located is calculated and divided by the total power generation capacity of the province where it is located to obtain the new energy penetration rate of the converter station. For each converter station, its measured short-circuit capacity data is used as its short-circuit capacity ratio; For each converter station, its voltage deviation coefficient is calculated based on the recorded data of the number of times the voltage exceeded the limit in the preset historical period and the preset scaling factor. Based on the new energy penetration rate, the short-circuit capacity ratio, and the voltage deviation coefficient, calculate the basic reactive power demand of each converter station; The basic reactive power demand score is corrected according to the fault risk score sequence to obtain the corrected reactive power demand score for each converter station. The reactive power demand of all converter stations is sorted to obtain the reactive power demand sequence for all converter stations.
5. The method according to claim 4, characterized in that, The step of correcting the basic reactive power demand score based on the fault risk score sequence to obtain the corrected reactive power demand score for each converter station includes: Based on the aforementioned fault risk classification sequence, the risk level of each converter station is determined; Obtain the risk correction coefficient corresponding to the risk level; For the same converter station, the corrected reactive power demand score is calculated based on the risk correction coefficient and the basic reactive power demand score.
6. The method according to claim 1, characterized in that, The simulation calculation based on the AC / DC hybrid power grid simulation model at the receiving end yields the current power receiving capacity data of the converter station, including: Simulations were performed based on the AC / DC hybrid power grid simulation model at the receiving end to obtain the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station. The minimum value among the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station is taken as the current power receiving capacity data of the converter station. The simulation calculation of the reconstructed AC / DC hybrid power grid model at the receiving end yields data on the power receiving capacity of the added converter station, including: Simulations were performed based on the reconstructed AC / DC hybrid power grid simulation model at the receiving end to obtain the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station after installation. The minimum value among the voltage stability limit data, thermal stability limit data, and power angle stability limit data of the converter station after installation shall be used as the power receiving capacity data of the converter station after installation.
7. The method according to claim 1, characterized in that, For the same converter station, based on its current power receiving capacity data, its corresponding power receiving capacity data after installation, and the reactive power demand sequence, a power receiving capacity improvement data sequence for all converter stations is determined, including: For the same converter station, the basic power receiving capacity improvement value of the converter station is determined based on its current power receiving capacity data and its corresponding power receiving capacity data after the installation is completed. Based on the reactive power demand sequence, the reactive power demand level of each converter station is determined; Obtain the reactive power demand correction coefficient corresponding to the reactive power demand level; For the same converter station, the corrected power receiving capacity improvement data of the converter station is calculated based on the reactive power demand correction coefficient and the basic power receiving capacity improvement data. The corrected power receiving capacity improvement data of all converter stations are sorted to obtain the power receiving capacity improvement data sequence of all converter stations.
8. A controllable commutation valve location device, characterized in that, The device includes: The module is used to build a simulation model of the receiving-end AC / DC hybrid power grid based on all converter stations, wherein no controllable commutation valves are installed in any of the converter stations; The fault risk sequence determination module is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition that the converter station fails to switch phase and all other converter stations are operating normally. This determines the fault risk sequence corresponding to all converter stations. The reactive power demand subsequence determination module is used to acquire the reactive power demand data of each converter station and determine the reactive power demand subsequence corresponding to all converter stations based on the reactive power demand data and the fault risk subsequence. The power receiving capacity enhancement amplitude data sequence determination module is used to perform simulation calculations based on the receiving-end AC / DC hybrid power grid simulation model for any converter station under the condition of applying a preset fault to the converter station, to obtain the current power receiving capacity data of the converter station, to add a controllable phase-commutation converter valve to the converter station, and to reconstruct the receiving-end AC / DC hybrid power grid simulation model under the condition of applying the preset fault to the converter station after the addition, to obtain the power receiving capacity data of the converter station after the addition. For the same converter station, the module determines the power receiving capacity enhancement amplitude data sequence corresponding to all converter stations based on its current power receiving capacity data, its corresponding power receiving capacity data after the addition, and the reactive power demand sequence. The determination module is used to determine the target converter station for the selection of controllable commutation valves based on the power receiving capacity enhancement amplitude data sequence and the preset number of controllable commutation valves.
9. A storage medium having a computer program stored thereon, characterized in that, When the program is executed by the processor, it implements the controllable commutator valve addressing method according to any one of claims 1 to 7.
10. A computer device comprising a memory, a processor, and a computer program stored on a storage medium and executable on the processor, characterized in that, When the processor executes the program, it implements the controllable commutator valve addressing method according to any one of claims 1 to 7.