Novel assembled multi-layer energy-saving steel frame seedling greenhouse
By using a multi-layered covering structure and an automatic adjustment system, the problems of insufficient heat insulation and cumbersome operation of the covering layer in the seedling greenhouse have been solved. This has enabled precise control of the seedling environment and safe and efficient snow removal, and improved the wind resistance and heat preservation performance of the greenhouse.
Patent Information
- Application Number
- CN202611574366.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-12
- Publication Date
- 2026-11-20
AI Technical Summary
The existing seedling greenhouses have insufficient heat insulation capacity, large temperature fluctuations, and are difficult to adjust in a timely manner according to changes in light, temperature and humidity. The covering layer is cumbersome to operate, and in severe weather, it is easy to have the film lifted, air leaks, and snow removal difficulties, which pose safety hazards.
The system employs a multi-layered covering structure, with the outer layer providing lighting and ventilation, and the inner layer providing insulation. It features an automatic unfolding and rewinding mechanism, a pressing mechanism to ensure airtightness, prefabricated insulation wall panels to enhance insulation performance, and a snow removal structure for easy snow removal.
It enables precise control of the seedling environment, reduces energy consumption, improves wind resistance and the service life of covering materials, reduces labor intensity and costs, and ensures the stability and safety of the greenhouse environment.
Smart Images

Figure CN123126191A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of seedling greenhouse technology, and more specifically to a novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse. Background Technology
[0002] Most existing seedling greenhouses are single-layer steel-framed film-covered structures, which have limited heat insulation capabilities. When there are significant diurnal temperature variations, the internal temperature fluctuates considerably. In winter or early spring, seedling cultivation often requires additional heating equipment, resulting in high energy consumption, high operating costs, and difficulty in ensuring temperature uniformity. While some greenhouses employ multi-layer coverings, the unfolding and rewinding of each layer is cumbersome and labor-intensive, making it difficult to adjust according to changes in light, temperature, humidity, and weather. The efficiency of switching between ventilation, cooling, and insulation is also low.
[0003] Furthermore, if there is a lack of reliable compression and sealing structure between the fixed and movable covering layers, windy weather can easily lead to phenomena such as film lifting, air leakage, and film bulging, affecting the stability of the environment inside the greenhouse and shortening the service life of the covering materials. In rainy or snowy weather, clearing snow from the greenhouse roof is difficult; manual snow removal is not only inefficient and labor-intensive, but also poses safety hazards such as the collapse of the greenhouse frame and slips and falls. Therefore, it is necessary to provide a seedling greenhouse with good heat insulation performance, flexible opening and closing of the covering layer, reliable sealing, convenient snow removal, and a high degree of modularity. Summary of the Invention
[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse to solve the problems existing in the background art.
[0005] The present invention provides the following technical solution: a novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse, comprising an outer greenhouse body, wherein an inner greenhouse body is provided on the inner side of the outer greenhouse body.
[0006] The outer canopy includes a fixed frame, a fixed canopy film, a movable canopy film, a first motion component, a second motion component, and a pressing component. There are two fixed frames, and multiple main arches are arranged between the two fixed frames. The multiple main arches are fixedly connected to each other by main crossbars.
[0007] The inner canopy includes secondary arches, fixed insulation blankets, movable insulation blankets, a third motion component, and a fourth motion component. Multiple secondary arches are provided, and the multiple secondary arches are fixedly connected to each other by secondary crossbars.
[0008] Preferably, the bottom of the fixed frame is fixed to the ground, and the fixed frame is provided with multiple insertion areas. Prefabricated thermal insulation wall panels are installed in the insertion areas, and multiple main crossbars are provided, with both ends of the main crossbars fixedly connected to the fixed frame.
[0009] Preferably, the first motion component includes a stabilizing frame and a first rotating rod. A main motor is fixedly installed on the stabilizing frame, and a rotating rod is fixedly connected to the output end of the main motor. One end of the first rotating rod is provided with a bracket fixed to the ground. One end of the first rotating rod is hinged to the bracket, and the other end of the first rotating rod is fixedly connected to the stabilizing frame. A first roller is also rotatably installed on the stabilizing frame.
[0010] Preferably, the second motion component includes a positioning frame and a second rotating rod. The end of the rotating rod away from the main motor is rotatably connected to the positioning frame. One end of the second rotating rod is provided with a bracket fixed to the ground. One end of the second rotating rod is hinged to the bracket. The other end of the second rotating rod is fixedly connected to the positioning frame. A second roller is also rotatably installed on the positioning frame.
[0011] Preferably, the fixed greenhouse film covers a portion of the main arch rod and remains in a fixed position, one end of the movable greenhouse film is fixedly connected to the fixed greenhouse film, the other end of the movable greenhouse film is fixedly connected to the rotating rod, and the movable greenhouse film is wrapped around the surface of the rotating rod.
[0012] Preferably, the bottom of the main arch is fixed to the ground, and a triggering assembly is provided on the main arch. Multiple triggering assemblies are provided, each including a movable block and a firing pin. The firing pin is fixed to the movable block, and guide blocks are fixedly connected to both sides of the movable block. Guide rods are also provided on both sides of the movable block. The guide rods are fixed to the main arch through extension blocks. The guide blocks are sleeved on the surface of the guide rods, and compression springs are sleeved on the surface of the guide rods. A first inclined surface and a second inclined surface are provided on the movable block.
[0013] Preferably, the pressing assembly includes pressing strips and mounting rods. Multiple pressing strips are provided, and two adjacent pressing strips are fixedly connected by hook rods. Guide inclined plates are fixedly connected to the bottom of the leftmost pressing strip and the bottom of the rightmost pressing strip. Sliding rods are fixedly connected to the leftmost pressing strip and the rightmost pressing strip. Two mounting rods are symmetrically arranged. One end of the mounting rod is fixed to the ground, and the other end of the mounting rod is sleeved on the surface of the sliding rod. An auxiliary spring is sleeved on the surface of the sliding rod.
[0014] Preferably, the third motion component includes a support frame and a third rotating rod. An auxiliary motor is fixedly installed on the support frame, and a transmission rod is fixedly connected to the output end of the auxiliary motor. One end of the third rotating rod is provided with a bracket fixed to the ground, and one end of the third rotating rod is hinged to the bracket. The other end of the third rotating rod is fixedly connected to the support frame, and a first rod seat is also fixedly connected to the other end of the third rotating rod. A first pressure plate is provided on the first rod seat.
[0015] Preferably, the fourth motion component includes a limiting frame and a fourth rotating rod. The end of the transmission rod away from the auxiliary motor is rotatably connected to the limiting frame. One end of the fourth rotating rod is provided with a bracket fixed to the ground. One end of the fourth rotating rod is hinged to the bracket. The other end of the fourth rotating rod is fixedly connected to the limiting frame. The other end of the fourth rotating rod is also fixedly connected to a second rod seat, and a second pressure plate is provided on the second rod seat.
[0016] Preferably, a trigger rod is provided between the first rod seat and the second rod seat, the fixed insulation blanket covers part of the secondary arch rod and keeps its position fixed, one end of the movable insulation blanket is fixedly connected to the fixed insulation blanket, the other end of the movable insulation blanket is fixedly connected to the transmission rod, and the movable insulation blanket is wrapped around the surface of the transmission rod.
[0017] The beneficial effects of this invention are: In this invention, a multi-layered covering structure is formed by two layers of greenhouses, an outer layer primarily responsible for lighting, ventilation, and external protection, while the inner layer primarily provides thermal insulation. These two layers work together and can be adjusted according to season, day / night cycle, temperature changes, and weather conditions. This enhances insulation and reduces heat loss at low temperatures, while allowing the covering layer to be opened promptly at high temperatures or when ventilation is needed, lowering the temperature and humidity inside the greenhouse. This improves the control of the seedling environment and energy efficiency, reducing energy consumption from additional heating. Both the movable outer greenhouse film and the movable inner insulation blanket can be automatically unfolded and rolled up via corresponding drive and retraction mechanisms. This allows for rapid opening when ventilation and cooling are needed, and timely closing in low temperatures, strong winds, or at night, ensuring timely and precise environmental control. The pressing mechanism automatically tightens the movable greenhouse film when unfolded and automatically loosens it when rolled up, maintaining a good overlap and seal between the movable and fixed films. This prevents the film from being lifted or creating large gaps in strong winds, enhancing the greenhouse's wind resistance and insulation effect, while also reducing frictional damage between the covering material and the greenhouse frame. Prefabricated insulated wall panels are easy to install quickly at the ends or sides of the greenhouse, improving its insulation performance and facilitating standardized production, disassembly, transportation, and reuse, thus shortening the construction cycle. The snow removal structure, in conjunction with the inner greenhouse structure, reciprocates by striking the inside of the greenhouse film during snowfall, causing snow to slide off the top of the film under its own weight. Snow removal is safe and labor-saving, and the snow removal components are detachable, ensuring the insulation blanket can be opened and closed normally when snow removal is not needed. The entire structure utilizes a steel frame and modular assembly, offering high strength and stability, reducing labor and energy costs, and meeting the comprehensive performance requirements of seedling production for insulation, energy saving, ventilation, lighting, and wind and snow resistance. Attached Figure Description
[0018] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention.
[0020] Figure 2 This is a schematic diagram of the outer canopy structure of the present invention.
[0021] Figure 3 This is a schematic diagram of the outer canopy structure of the present invention.
[0022] Figure 4 This is a schematic diagram of the pressing component structure of the present invention.
[0023] Figure 5 This is a schematic diagram of the main arch structure of the present invention.
[0024] Figure 6 For the present invention Figure 2 Enlarged view of the structure at point A in the image.
[0025] Figure 7 For the present invention Figure 3 Enlarged view of the structure at point B in the image.
[0026] Figure 8 For the present invention Figure 4 Enlarged view of the structure at point C.
[0027] Figure 9 For the present invention Figure 5 Enlarged view of the structure at point D in the image.
[0028] Figure 10 This is a schematic diagram of the fixed frame structure of the present invention.
[0029] Figure 11 This is a schematic diagram of the inner canopy structure of the present invention.
[0030] Figure 12 This is a schematic diagram of the inner canopy structure of the present invention.
[0031] Figure 13 For the present invention Figure 11 Enlarged view of the structure at point E in the image.
[0032] Figure 14 For the present invention Figure 12 Enlarged view of the structure at point F in the image.
[0033] The attached figures are labeled as follows: 1. Outer canopy body; 11. Fixed frame; 111. Insertion area; 112. Prefabricated insulated wall panel; 12. Main arch rod; 121. Trigger assembly; 1211. Movable block; 1212. Firing post; 1213. Guide block; 1214. Guide rod; 1215. Extension block; 1216. Compression spring; 1217. First inclined plane; 1218. Second inclined plane; 13. Main crossbar; 14. Fixed film; 15. Rotating rod; 16. Movable film; 17. First motion assembly; 171. Stabilizing frame; 172. Main motor; 173. No. 1 roller; 174. No. 1 rotating rod; 18. Second motion assembly; 181. Positioning frame; 18 2. No. 2 roller; 183. No. 2 rotating rod; 19. Pressing assembly; 191. Pressing strip; 192. Hook rod; 193. Guide inclined plate; 194. Mounting rod; 195. Sliding rod; 196. Auxiliary spring; 2. Inner canopy; 21. Secondary arch rod; 22. Secondary crossbar; 23. Fixed insulation blanket; 24. Transmission rod; 25. Movable insulation blanket; 26. Third motion assembly; 261. Support frame; 262. Secondary motor; 263. No. 3 rotating rod; 264. First rod seat; 265. First pressing plate; 27. Fourth motion assembly; 271. Limiting frame; 272. No. 4 rotating rod; 273. Second rod seat; 274. Second pressing plate; 28. Trigger rod. Detailed Implementation
[0034] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0035] Reference Figure 1 This invention provides a novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse, including an outer greenhouse body 1 and an inner greenhouse body 2 disposed inside the outer greenhouse body 1. When both the outer greenhouse body 1 and the inner greenhouse body 2 are closed, a static air layer is formed between the outer greenhouse body 1 and the inner greenhouse body 2, which reduces heat conduction, reduces heat loss, buffers external temperature differences, and improves greenhouse temperature stability.
[0036] Reference Figures 1 to 10 The outer canopy 1 includes a fixed frame 11, a fixed canopy film 14, a movable canopy film 16, a first motion component 17, a second motion component 18, and a pressing component 19. Two fixed frames 11 are provided, and multiple main arch rods 12 are arranged between the two fixed frames 11. The multiple main arch rods 12 are fixedly connected by main crossbars 13. The fixed frame 11, main arch rods 12, and main crossbars 13 constitute a prefabricated steel frame load-bearing system, which is beneficial for improving the strength, stability, and modular assembly degree of the canopy, and provides reliable support for the flexible adjustment of the fixed canopy film 14 and the movable canopy film 16.
[0037] The fixed frame 11 is fixed to the ground at its bottom. Multiple insertion areas 111 are provided on the fixed frame 111, and prefabricated insulated wall panels 112 are installed within each insertion area 111. Multiple main horizontal bars 13 are also provided, with both ends of each main horizontal bar 13 fixedly connected to the fixed frame 11. The fixed frame 11, with its fixed ground and the insertion areas 111 for installing prefabricated insulated wall panels 112, enhances the insulation performance of the ends and sides of the shed, improves the overall structural integrity, facilitates standardized production, and shortens the construction cycle.
[0038] The first motion component 17 includes a stabilizing frame 171 and a first rotating rod 174. A main motor 172 with a self-locking function is fixedly installed on the stabilizing frame 171. A rotating rod 15 is fixedly connected to the output end of the main motor 172. One end of the first rotating rod 174 is provided with a bracket fixed to the ground. One end of the first rotating rod 174 is hinged to the bracket, and the other end of the first rotating rod 174 is fixedly connected to the stabilizing frame 171. A first roller 173 is also rotatably installed on the stabilizing frame 171. The main motor 172 drives the rotating rod 15 to rotate, which can automatically roll up or unfold the movable greenhouse film 16. The hinge of the first rotating rod 174 to the bracket, the cooperation of the stabilizing frame 171 and the first roller 173, are conducive to achieving motion guidance and stable support.
[0039] The second motion component 18 includes a positioning frame 181 and a second rotating rod 183. The end of the rotating rod 15 away from the main motor 172 is rotatably connected to the positioning frame 181. One end of the second rotating rod 183 is provided with a bracket fixed to the ground, and one end of the second rotating rod 183 is hinged to the bracket. The other end of the second rotating rod 183 is fixedly connected to the positioning frame 181. A second roller 182 is also rotatably mounted on the positioning frame 181. The positioning frame 181, the second rotating rod 183, and the second roller 182 work together with the first motion component 17 to help support the other end of the rotating rod 15 and ensure the smooth opening and closing of the movable film 16, thereby improving the synchronization and stability of the movement.
[0040] The fixed greenhouse film 14 covers a portion of the main arch 12 and remains in a fixed position. One end of the movable greenhouse film 16 is fixedly connected to the fixed greenhouse film 14, and the other end of the movable greenhouse film 16 is fixedly connected to the rotating rod 15. The movable greenhouse film 16 is wrapped around the surface of the rotating rod 15. The fixed greenhouse film 14 maintains a fixed coverage, while the movable greenhouse film 16 can be rolled up and unrolled with the rotating rod 15. It allows for rapid ventilation and cooling when needed, and can be closed in time to retain heat and reduce heat loss in low temperatures, strong winds, or at night.
[0041] The main arch 12 is fixed to the ground at its bottom. Multiple triggering components 121 are installed on the main arch 12, each including a movable block 1211 and a firing pin 1212. The firing pin 1212 is fixed to the movable block 1211. Guide blocks 1213 are fixedly connected to both sides of the movable block 1211. Guide rods 1214 are also installed on both sides of the movable block 1211. The guide rods 1214 are fixed to the main arch 12 via extension blocks 1215. The guide blocks 1213 are fitted onto the surface of the guide rods 1214. Compression springs 1216 are fitted onto the surface of the guide rods 1214. The movable block 1211 has a first inclined surface 1217 and a second inclined surface 1218. The triggering components 121, installed on the main arch 12, provide reliable triggering and automatic reset for snow removal by tapping the inside of the greenhouse film, improving snow removal safety, labor-saving, and timeliness, and reducing the risk of snow collapsing the greenhouse frame and requiring manual snow removal.
[0042] The pressing assembly 19 includes pressing strips 191 and mounting rods 194. Multiple pressing strips 191 are provided, and two adjacent pressing strips 191 are fixedly connected by hook rods 192. Guide inclined plates 193 are fixedly connected to the bottom of the leftmost pressing strip 191 and the bottom of the rightmost pressing strip 191. Sliding rods 195 are fixedly connected to the leftmost pressing strip 191 and the rightmost pressing strip 191. Two mounting rods 194 are symmetrically arranged. One end of the mounting rod 194 is fixed to the ground, and the other end of the mounting rod 194 is sleeved on the surface of the sliding rod 195. An auxiliary spring 196 is sleeved on the surface of the sliding rod 195. The pressing strip 191, hook rod 192, guide inclined plate 193, mounting rod 194, sliding rod 195 and auxiliary spring 196 work together to automatically press the movable greenhouse film 16 when it is unfolded and automatically loosen it when it is rolled up, so that the fixed greenhouse film 14 and the movable greenhouse film 16 maintain a good overlap and seal, enhance the wind resistance, prevent the film from being lifted and prevent air leakage, and reduce friction damage between the covering material and the greenhouse frame.
[0043] In use, when the movable greenhouse film 16 of the outer canopy 1 is opened, the main motor 172 drives the rotating rod 15 to rotate around its own axis. As the rotating rod 15 rotates, it gradually rolls the movable greenhouse film 16 onto its surface. Simultaneously, the stabilizing frame 171, main motor 172, first roller 173, and first rotating rod 174 rotate from bottom to top around the hinge axis between the first rotating rod 174 and the support. The positioning frame 181, second roller 182, and second rotating rod 183 rotate from bottom to top around the hinge axis between the second rotating rod 183 and the support. During this process, the first roller 173 and second roller 182 first roll along the guide ramp 193. When 93 is squeezed, it drives the pressing strip 191 and the sliding rod 195 to move along the axis of the sliding rod 195. The auxiliary spring 196 gradually stretches and the elastic force increases. The pressing strip 191 moves away from the movable greenhouse film 16 and releases the pressing and positioning of the movable greenhouse film 16. When the first roller 173 and the second roller 182 separate from the guide plate 193, the first roller 173 and the second roller 182 continue to roll upward along the pressing strip 191. After the pressing strip 191 is squeezed, it remains in a fixed position. The elastic force of the auxiliary spring 196 cannot be released. The rotating rod 15 gradually rolls the movable greenhouse film 16 all the way to the surface of the rotating rod 15, thereby opening the movable greenhouse film 16. When the movable greenhouse film 16 of the outer greenhouse body 1 is closed, the main motor 172 drives the rotating rod 15 to rotate in the opposite direction around its own axis. As the rotating rod 15 rotates, the movable greenhouse film 16 gradually loosens from the surface of the rotating rod 15. Simultaneously, the stabilizing frame 171, the main motor 172, the first roller 173, and the first rotating rod 174 rotate downwards around the hinge axis between the first rotating rod 174 and the support. The positioning frame 181, the second roller 182, and the second rotating rod 183 rotate downwards around the hinge axis between the second rotating rod 183 and the support. During this process, the first roller 17... Rollers 173 and 182 first roll down the pressing strip 191. After separating from the pressing strip 191, rollers 173 and 182 roll along the guide ramp 193. During this process, the elastic force of the auxiliary spring 196 is gradually released. The elastic force of the auxiliary spring 196 drives the pressing strip 191 and the sliding rod 195 to move along the axis of the sliding rod 195. The pressing strip 191 moves towards the movable greenhouse film 16 and presses the movable greenhouse film 16 into place. The movable greenhouse film 16 is completely released from the surface of the rotating rod 15, thereby closing the movable greenhouse film 16.
[0044] In summary, the outer canopy 1, through two fixed frames 11, multiple main arches 12, and main crossbars 13, forms a prefabricated steel frame load-bearing system. Combined with the prefabricated insulated wall panels 112 installed in the insertion area 111, this improves the insulation performance, structural strength, and modular assembly efficiency of the canopy's ends and sides. The fixed canopy film 14 and the movable canopy film 16 form a multi-layered covering system combining fixed and movable coverage. With the aid of the first motion component 17 and the second motion component 18, the movable canopy film 16 automatically unfolds and retracts, reducing... The manual operation intensity is reduced, and the timely and accurate switching between ventilation, lighting, and heat preservation is improved. The pressing component 19 can automatically press or loosen when the movable greenhouse film 16 is unfolded or rolled up, so that the fixed greenhouse film 14 and the movable greenhouse film 16 maintain a good overlap and seal, enhance the wind resistance, anti-lifting film and anti-air leakage capabilities, and reduce frictional damage between the covering material and the greenhouse frame. The triggering component 121 on the main arch rod 12 provides a reliable triggering base for knocking snow removal on the inside of the greenhouse film, which helps the snow to slide down under its own gravity without affecting normal covering adjustment.
[0045] Reference Figures 1 to 14 The inner canopy 2 includes secondary arches 21, fixed insulation blankets 23, movable insulation blankets 25, a third motion component 26, and a fourth motion component 27. Multiple secondary arches 21 are provided, and they are fixedly connected by secondary crossbars 22. The bottom of each secondary arch 21 is fixed to the ground. The secondary arches 21 and secondary crossbars 22 form an inner steel frame support system, which, together with the fixed insulation blankets 23 and movable insulation blankets 25, forms an inner insulation and heat-insulating covering structure.
[0046] The third motion component 26 includes a receiving frame 261 and a third rotating rod 263. A self-locking auxiliary motor 262 is fixedly mounted on the receiving frame 261. A transmission rod 24 is fixedly connected to the output end of the auxiliary motor 262. One end of the third rotating rod 263 is mounted on a bracket fixed to the ground, and one end of the third rotating rod 263 is hinged to the bracket. The other end of the third rotating rod 263 is fixedly connected to the receiving frame 261, and a first rod seat 264 is also fixedly connected to the other end of the third rotating rod 263. A first pressure plate 265 is mounted on the first rod seat 264. The auxiliary motor 262, transmission rod 24, receiving frame 261, and third rotating rod 263 work together to facilitate the automatic rolling and unfolding of the movable insulation blanket 25, reducing manual operation and improving the efficiency of switching between insulation and ventilation.
[0047] The fourth motion assembly 27 includes a limiting frame 271 and a fourth rotating rod 272. The end of the transmission rod 24 away from the auxiliary motor 262 is rotatably connected to the limiting frame 271. One end of the fourth rotating rod 272 is provided with a bracket fixed to the ground, and one end of the fourth rotating rod 272 is hinged to the bracket. The other end of the fourth rotating rod 272 is fixedly connected to the limiting frame 271. The other end of the fourth rotating rod 272 is also fixedly connected to a second rod seat 273, on which a second pressure plate 274 is provided. The fourth motion assembly 27 works in conjunction with the third motion assembly 26 to stabilize and support the transmission rod 24, ensuring that the movable thermal insulation blanket 25 can be smoothly extended and retracted, and that its movement is reliable.
[0048] A trigger rod 28 is provided between the first rod holder 264 and the second rod holder 273. The fixed insulation blanket 23 covers part of the secondary arch rod 21 and keeps its position fixed. One end of the movable insulation blanket 25 is fixedly connected to the fixed insulation blanket 23, and the other end of the movable insulation blanket 25 is fixedly connected to the transmission rod 24. The movable insulation blanket 25 is wrapped around the surface of the transmission rod 24. The trigger rod 28 can be selectively installed between the first rod holder 264 and the second rod holder 273, and can be reliably locked and easily disassembled with the help of the first pressure plate 265 and the second pressure plate 274. In snowy weather, it can cooperate with the trigger component 121 on the main arch rod 12 to knock snow on the inside of the greenhouse film. When snow removal is not required, it can be removed without affecting the normal opening and closing of the movable insulation blanket 25.
[0049] When in use, when the movable insulation blanket 25 of the inner canopy 2 is opened, the auxiliary motor 262 drives the transmission rod 24 to rotate around its own axis. As the transmission rod 24 rotates, it gradually rolls the movable insulation blanket 25 to the surface of the transmission rod 24. At the same time, the receiving frame 261, the auxiliary motor 262 and the third rotating rod 263 rotate from bottom to top around the hinge axis between the third rotating rod 263 and the bracket. The limiting frame 271 and the fourth rotating rod 272 rotate from bottom to top around the hinge axis between the fourth rotating rod 272 and the bracket. During this process, the transmission rod 24 gradually rolls the movable insulation blanket 25 completely to the surface of the transmission rod 24, thereby opening the movable insulation blanket 25. When the movable insulation blanket 25 of the inner canopy 2 is closed, the auxiliary motor 262 drives the transmission rod 24 to rotate in the opposite direction around its own axis. As the transmission rod 24 rotates, the movable insulation blanket 25 gradually loosens from the surface of the transmission rod 24. At the same time, the support frame 261, the auxiliary motor 262 and the third rotating rod 263 rotate from top to bottom around the hinge axis between the third rotating rod 263 and the bracket. The limiting frame 271 and the fourth rotating rod 272 rotate from top to bottom around the hinge axis between the fourth rotating rod 272 and the bracket. During this process, the movable insulation blanket 25 is completely loosened from the surface of the transmission rod 24, thereby closing the movable insulation blanket 25. When snow falls and excessive snow accumulates on the top of the movable canopy 16, the staff places both ends of the trigger rod 28 into the first rod seat 264 and the second rod seat 273 respectively. Using bolts, they lock the first pressure plate 265 and the first rod seat 264, and the second pressure plate 274 and the second rod seat 273. At this point, the trigger rod 28, the third rotating rod 263, and the fourth rotating rod 272 remain fixed. The staff controls the auxiliary motor 262 to rotate back and forth. As the third rotating rod 263 and the fourth rotating rod 272 rotate from top to bottom, the trigger rod 28... The trigger rod 28 first contacts the first inclined surface 1217 of the movable block 1211. After the movable block 1211 is squeezed, it drives the guide block 1213 to slide along the guide rod 1214. The compression spring 1216 contracts and increases its elastic force under the compression of the guide block 1213. The movable block 1211 moves and drives the firing pin 1212 to strike the inner side of the movable membrane 16. When the trigger rod 28 separates from the first inclined surface 1217, the trigger rod 28 moves along the second inclined surface 1218. The elastic force of the compression spring 1216 is released and drives the movable block 1211 back to the initial position. When the third rotating rod 263 and the fourth rotating rod 272 rotate from bottom to top, the trigger rod 28 first contacts the second inclined surface 1218 of the movable block 1211. Similarly, the movable block 1211 moves and drives the firing pin 1212 to strike the inside of the movable greenhouse film 16. When the trigger rod 28 separates from the second inclined surface 1218, the trigger rod 28 moves along the first inclined surface 1217. The elastic force of the compression spring 1216 is released and drives the movable block 1211 back to the initial position. Through the continuous striking of the movable greenhouse film 16 by the firing pin 1212, the snow slides off the top of the movable greenhouse film 16 under its own gravity. When snow removal is not required, the staff removes the trigger lever 28 from the first lever seat 264 and the second lever seat 273. At this time, during the normal operation of the auxiliary motor 262, the movable block 1211 does not come into contact with any parts and does not move. It only completes the normal opening and closing of the movable insulation blanket 25.
[0050] In summary, the inner shed 2 forms a stable inner steel frame support system through multiple secondary arches 21 and secondary crossbars 22, and together with the fixed insulation blanket 23 and the movable insulation blanket 25, it constitutes an inner insulation and heat-insulating covering structure. This, combined with the outer shed 1, forms a multi-layered covering, improving the temperature uniformity inside the shed, enhancing insulation capacity during nighttime and low-temperature periods, and reducing additional heating energy consumption. The third motion component 26 and the fourth motion component 27 work together to enable the movable insulation blanket 25 to automatically and smoothly roll up and unroll, reducing manual operation, improving the efficiency of switching between insulation and ventilation, and ensuring that the inner shed 2 has good insulation when closed and good ventilation when open. It provides good ventilation and cooling effect; the trigger rod 28 can be selectively installed between the first rod seat 264 and the second rod seat 273, and can be reliably locked and easily disassembled through the first pressure plate 265 and the second pressure plate 274. In snowy weather, it can cooperate with the trigger component 121 on the main arch rod 12 to reciprocate and knock on the inside of the movable greenhouse film 16, so that the snow can slide off the top of the movable greenhouse film 16 under its own weight, thereby improving the safety, labor saving and timeliness of snow removal, and reducing the risk of snow collapsing the greenhouse frame and slipping during manual snow removal; when snow removal is not required, the trigger rod 28 can be removed without affecting the normal opening and closing of the movable insulation blanket 25.
[0051] The working principle of this invention: When the movable greenhouse film 16 of the outer greenhouse body 1 is opened, the main motor 172 drives the rotating rod 15 to rotate around its own axis. As the rotating rod 15 rotates, it gradually rolls the movable greenhouse film 16 to the surface of the rotating rod 15. Simultaneously, the stabilizing frame 171, the main motor 172, the first roller 173, and the first rotating rod 174 rotate from bottom to top around the hinge axis between the first rotating rod 174 and the support. The positioning frame 181, the second roller 182, and the second rotating rod 183 rotate from bottom to top around the hinge axis between the second rotating rod 183 and the support. During this process, the first roller 173 and the second roller 182 first roll along the guide ramp 193, guiding the ramp... When the plate 193 is squeezed, it drives the pressing strip 191 and the sliding rod 195 to move along the axis of the sliding rod 195. The auxiliary spring 196 gradually stretches and the elastic force increases. The pressing strip 191 moves away from the movable greenhouse film 16 and releases the pressing and positioning of the movable greenhouse film 16. When the first roller 173 and the second roller 182 separate from the guide plate 193, the first roller 173 and the second roller 182 continue to roll upward along the pressing strip 191. After the pressing strip 191 is squeezed, it remains in a fixed position. The elastic force of the auxiliary spring 196 cannot be released. The rotating rod 15 gradually rolls the movable greenhouse film 16 all the way to the surface of the rotating rod 15, thereby opening the movable greenhouse film 16.
[0052] When the movable greenhouse film 16 of the outer greenhouse body 1 is closed, the main motor 172 drives the rotating rod 15 to rotate in the opposite direction around its own axis. As the rotating rod 15 rotates, the movable greenhouse film 16 gradually loosens from the surface of the rotating rod 15. Simultaneously, the stabilizing frame 171, the main motor 172, the first roller 173, and the first rotating rod 174 rotate downwards around the hinge axis between the first rotating rod 174 and the support. The positioning frame 181, the second roller 182, and the second rotating rod 183 rotate downwards around the hinge axis between the second rotating rod 183 and the support. During this process, the first roller 17... Rollers 173 and 182 first roll down the pressing strip 191. After separating from the pressing strip 191, rollers 173 and 182 roll along the guide ramp 193. During this process, the elastic force of the auxiliary spring 196 is gradually released. The elastic force of the auxiliary spring 196 drives the pressing strip 191 and the sliding rod 195 to move along the axis of the sliding rod 195. The pressing strip 191 moves towards the movable greenhouse film 16 and presses the movable greenhouse film 16 into place. The movable greenhouse film 16 is completely released from the surface of the rotating rod 15, thereby closing the movable greenhouse film 16.
[0053] When the movable insulation blanket 25 of the inner canopy 2 is opened, the auxiliary motor 262 drives the transmission rod 24 to rotate around its own axis. As the transmission rod 24 rotates, it gradually rolls the movable insulation blanket 25 onto the surface of the transmission rod 24. At the same time, the receiving frame 261, the auxiliary motor 262, and the third rotating rod 263 rotate from bottom to top around the hinge axis between the third rotating rod 263 and the bracket. The limiting frame 271 and the fourth rotating rod 272 rotate from bottom to top around the hinge axis between the fourth rotating rod 272 and the bracket. During this process, the transmission rod 24 gradually rolls the movable insulation blanket 25 completely onto the surface of the transmission rod 24, thereby opening the movable insulation blanket 25.
[0054] When the movable insulation blanket 25 of the inner canopy 2 is closed, the auxiliary motor 262 drives the transmission rod 24 to rotate in the opposite direction around its own axis. As the transmission rod 24 rotates, the movable insulation blanket 25 gradually loosens from the surface of the transmission rod 24. At the same time, the receiving frame 261, the auxiliary motor 262, and the third rotating rod 263 rotate from top to bottom around the hinge axis between the third rotating rod 263 and the bracket. The limiting frame 271 and the fourth rotating rod 272 rotate from top to bottom around the hinge axis between the fourth rotating rod 272 and the bracket. During this process, the movable insulation blanket 25 is completely loosened from the surface of the transmission rod 24, thereby closing the movable insulation blanket 25.
[0055] When snow falls and excessive snow accumulates on the top of the movable canopy 16, the staff places both ends of the trigger rod 28 into the first rod seat 264 and the second rod seat 273 respectively. Using bolts, they lock the first pressure plate 265 and the first rod seat 264, and the second pressure plate 274 and the second rod seat 273. At this point, the trigger rod 28, the third rotating rod 263, and the fourth rotating rod 272 remain fixed. The staff controls the auxiliary motor 262 to rotate back and forth. As the third rotating rod 263 and the fourth rotating rod 272 rotate from top to bottom, the trigger rod 28... The trigger rod 28 first contacts the first inclined surface 1217 of the movable block 1211. After the movable block 1211 is squeezed, it drives the guide block 1213 to slide along the guide rod 1214. The compression spring 1216 contracts and increases its elasticity under the compression of the guide block 1213. The movable block 1211 moves and drives the firing pin 1212 to strike the inner side of the movable membrane 16. When the trigger rod 28 separates from the first inclined surface 1217, the trigger rod 28 moves along the second inclined surface 1218. The elasticity of the compression spring 1216 is released and drives the movable block 1211 back to the initial position.
[0056] When the third rotating rod 263 and the fourth rotating rod 272 rotate from bottom to top, the trigger rod 28 first contacts the second inclined surface 1218 of the movable block 1211. Similarly, the movable block 1211 moves and drives the firing pin 1212 to strike the inside of the movable greenhouse film 16. After the trigger rod 28 separates from the second inclined surface 1218, the trigger rod 28 moves along the first inclined surface 1217. The elastic force of the compression spring 1216 is released and drives the movable block 1211 back to the initial position. Through the continuous striking of the movable greenhouse film 16 by the firing pin 1212, the snow slides off the top of the movable greenhouse film 16 under its own gravity.
[0057] When snow removal is not required, the staff removes the trigger lever 28 from the first lever seat 264 and the second lever seat 273. At this time, during the normal operation of the auxiliary motor 262, the movable block 1211 does not come into contact with any parts and does not move. It only completes the normal opening and closing of the movable insulation blanket 25.
[0058] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse, comprising an outer greenhouse body (1), characterized in that, An inner shed (2) is provided on the inner side of the outer shed (1); The outer canopy (1) includes a fixed frame (11), a fixed canopy film (14), a movable canopy film (16), a first motion component (17), a second motion component (18), and a pressing component (19). There are two fixed frames (11), and multiple main arch rods (12) are provided between the two fixed frames (11). The multiple main arch rods (12) are fixedly connected to each other by a main crossbar (13). The inner canopy (2) includes a secondary arch (21), a fixed insulation blanket (23), a movable insulation blanket (25), a third motion component (26), and a fourth motion component (27). Multiple secondary arches (21) are provided, and the multiple secondary arches (21) are fixedly connected to each other by secondary crossbars (22).
2. The novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The bottom of the fixed frame (11) is fixed to the ground. The fixed frame (11) is provided with an insertion area (111). Multiple insertion areas (111) are provided. Prefabricated thermal insulation wall panels (112) are installed in the insertion areas (111). Multiple main crossbars (13) are provided. Both ends of the main crossbars (13) are fixedly connected to the fixed frame (11).
3. The novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The first motion component (17) includes a stabilizing frame (171) and a first rotating rod (174). A main motor (172) is fixedly installed on the stabilizing frame (171). A rotating rod (15) is fixedly connected to the output end of the main motor (172). A bracket fixed to the ground is provided at one end of the first rotating rod (174). One end of the first rotating rod (174) is hinged to the bracket. The other end of the first rotating rod (174) is fixedly connected to the stabilizing frame (171). A first roller (173) is also rotatably installed on the stabilizing frame (171).
4. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 3, characterized in that, The second motion component (18) includes a positioning frame (181) and a second rotating rod (183). The end of the rotating rod (15) away from the main motor (172) is rotatably connected to the positioning frame (181). One end of the second rotating rod (183) is provided with a bracket fixed to the ground. One end of the second rotating rod (183) is hinged to the bracket. The other end of the second rotating rod (183) is fixedly connected to the positioning frame (181). A second roller (182) is also rotatably installed on the positioning frame (181).
5. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The fixed greenhouse film (14) covers part of the main arch rod (12) and keeps its position fixed. One end of the movable greenhouse film (16) is fixedly connected to the fixed greenhouse film (14), and the other end of the movable greenhouse film (16) is fixedly connected to the rotating rod (15). The movable greenhouse film (16) is wrapped around the surface of the rotating rod (15).
6. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The bottom of the main arch rod (12) is fixed to the ground. A trigger assembly (121) is provided on the main arch rod (12). Multiple trigger assemblies (121) are provided. The trigger assembly (121) includes a movable block (1211) and a firing pin (1212). The firing pin (1212) is fixed on the movable block (1211). Guide blocks (1213) are fixedly connected to both sides of the movable block (1211). Guide rods (1214) are also provided on both sides of the movable block (1211). The guide rods (1214) are fixed to the main arch rod (12) through extension blocks (1215). The guide blocks (1213) are sleeved on the surface of the guide rods (1214). A compression spring (1216) is sleeved on the surface of the guide rods (1214). A first inclined surface (1217) and a second inclined surface (1218) are provided on the movable block (1211).
7. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The pressing assembly (19) includes pressing strips (191) and mounting rods (194). Multiple pressing strips (191) are provided. Two adjacent pressing strips (191) are fixedly connected by hook rods (192). Guide inclined plates (193) are fixedly connected to the bottom of the leftmost pressing strip (191) and the bottom of the rightmost pressing strip (191). Sliding rods (195) are fixedly connected to the leftmost pressing strip (191) and the rightmost pressing strip (191). Two mounting rods (194) are symmetrically arranged. One end of the mounting rod (194) is fixed to the ground, and the other end of the mounting rod (194) is sleeved on the surface of the sliding rod (195). An auxiliary spring (196) is sleeved on the surface of the sliding rod (195).
8. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 1, characterized in that, The third motion component (26) includes a support frame (261) and a third rotating rod (263). An auxiliary motor (262) is fixedly installed on the support frame (261). A transmission rod (24) is fixedly connected to the output end of the auxiliary motor (262). A bracket fixed to the ground is provided at one end of the third rotating rod (263). One end of the third rotating rod (263) is hinged to the bracket. The other end of the third rotating rod (263) is fixedly connected to the support frame (261). A first rod seat (264) is also fixedly connected to the other end of the third rotating rod (263). A first pressure plate (265) is provided on the first rod seat (264).
9. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 8, characterized in that, The fourth motion component (27) includes a limiting frame (271) and a fourth rotating rod (272). The end of the transmission rod (24) away from the auxiliary motor (262) is rotatably connected to the limiting frame (271). One end of the fourth rotating rod (272) is provided with a bracket fixed to the ground. One end of the fourth rotating rod (272) is hinged to the bracket. The other end of the fourth rotating rod (272) is fixedly connected to the limiting frame (271). The other end of the fourth rotating rod (272) is also fixedly connected to a second rod seat (273). A second pressure plate (274) is provided on the second rod seat (273).
10. A novel prefabricated multi-layer covered energy-saving steel frame seedling greenhouse according to claim 9, characterized in that, A trigger rod (28) is provided between the first rod seat (264) and the second rod seat (273). The fixed insulation blanket (23) covers part of the secondary arch rod (21) and keeps its position fixed. One end of the movable insulation blanket (25) is fixedly connected to the fixed insulation blanket (23), and the other end of the movable insulation blanket (25) is fixedly connected to the transmission rod (24). The movable insulation blanket (25) is wrapped around the surface of the transmission rod (24).