Robot break-in operation method, electronic device, and readable storage medium

By automatically acquiring environmental and type information and intelligently recommending demolition strategies, the low accuracy and low efficiency problems caused by manual decision-making in existing technologies are solved, and efficient and intelligent decision-making for robotic demolition operations is achieved.

CN123127613APending Publication Date: 2026-11-20SANY AUTOMOBILE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610966370.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-30
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In complex indoor rescue environments, existing technologies rely on human experience to determine robot demolition strategies, resulting in long decision-making times, low accuracy, and low efficiency.

Method used

By acquiring environmental and type information of the object to be demolished, as well as robot cluster attribute information, the system automatically determines the target demolition mode and robot, outputs demolition operation information, and achieves intelligent recommendation.

Benefits of technology

It improves the accuracy and efficiency of demolition strategies, avoids the subjectivity and delays of human decision-making, and adapts to the complexity of different rescue scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123127613A_ABST
    Figure CN123127613A_ABST
Patent Text Reader

Abstract

The application provides a robot breaking and opening operation method, electronic equipment and a readable storage medium, relates to the technical field of robot control, and the method comprises the following steps: in the case that a breaking and opening instruction is received, environment information in which a to-be-broken object is located, type information of the to-be-broken object and attribute information set of a robot cluster in a rescue environment are acquired; a target breaking and opening mode is determined based on the environment information in which the to-be-broken object is located and the type information; then, a target robot is determined from the robot cluster based on the target breaking and opening mode and the attribute information set of the robot cluster; robot breaking and opening operation information is determined based on the target robot and the target breaking and opening mode, and the robot breaking and opening operation information is output. The technical scheme of the application can improve the breaking and opening strategy recommendation accuracy and improve the breaking and opening efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of robot control technology, specifically to a robot demolition operation method, electronic equipment, and readable storage medium. Background Technology

[0002] In complex indoor rescue environments, using robots to perform demolition tasks is a key step in opening up rescue channels and advancing the rescue process.

[0003] In related technologies, demolition strategies (such as robot allocation) mainly rely on the on-site commander's human experience and judgment to determine them. When faced with complex scenarios with multiple coupled factors, this human decision-making method may lead to various problems, such as decision-making taking a long time, assigned robots not having the corresponding demolition functions, or too few assigned robots leading to excessively long demolition time. The accuracy of the demolition strategy is low and the demolition efficiency is low. Summary of the Invention

[0004] This application provides a robotic demolition operation method, electronic device, and readable storage medium, which can improve the accuracy of demolition strategy recommendation and increase demolition efficiency.

[0005] To achieve the above objectives, the embodiments of this application adopt the following technical solutions: Firstly, a method for robotic demolition operations is provided. This method is applied to an electronic device and includes: upon receiving a demolition command, acquiring environmental information of the object to be demolished, type information of the object to be demolished, and a set of attribute information of a robot cluster in the rescue environment; determining a target demolition mode based on the environmental information and type information of the object to be demolished; identifying a target robot from the robot cluster based on the target demolition mode and the set of attribute information of the robot cluster; determining robot demolition operation information based on the target robot and the target demolition mode, and outputting the robot demolition operation information.

[0006] In this application, upon receiving a breaching command, environmental information, type information, and robot cluster attribute information are automatically acquired. Based on this, the target breaching mode and target robot are determined, and finally, robot breaching operation information is output. This method can adapt to the complexity of different rescue scenarios, realizes intelligent recommendation of breaching strategies, avoids the subjectivity and delay of manual decision-making, improves the accuracy of breaching strategy recommendations, and increases breaching efficiency.

[0007] In conjunction with the first aspect, in one possible design approach, determining the target demolition mode based on the environmental and type information of the object to be demolished includes: determining the target quantity based on the environmental information of the object to be demolished; wherein the target quantity includes the target number of robots that the demolition space corresponding to the object to be demolished can accommodate; determining the demolition operation type from a first preset mapping table based on the type information of the object to be demolished; wherein the first preset mapping table includes the correspondence between the type information of the object to be demolished and the demolition operation type of the object to be demolished, and the object type includes any one or more of independent operation type, serial operation type, and master-slave operation type; and determining the target demolition mode based on the target quantity and the demolition operation type.

[0008] In this application, the number of robot targets that can be accommodated in the demolition space is determined by environmental information, and the demolition operation type is determined from a preset mapping table by combining type information, thereby comprehensively judging the target demolition mode. This method fully considers the spatial constraints and the operational requirements of the object to be demolished, ensuring that the selection of the demolition mode not only conforms to the physical space limitations but also matches the characteristics of the object to be demolished, avoiding resource waste or conflicting operational requirements.

[0009] In conjunction with the first aspect, in one possible design approach, determining the target quantity based on the environmental information of the object to be demolished includes: determining first size information based on the environmental information of the object to be demolished; wherein the first size information includes the size information of the demolition space corresponding to the object to be demolished; determining second size information from a second preset mapping relationship based on the type information of the object to be demolished; wherein the second size information includes the size information of the workspace required by the robot to perform the demolition action, and the second preset mapping table includes the correspondence between the type information of the object to be demolished and the size information of the workspace required by the robot to perform the demolition action; and determining the target quantity based on the first size information and the second size information.

[0010] In this application, environmental information is used to obtain the dimensions of the demolition space, and type information is combined to obtain the robot workspace dimensions from a preset mapping. The ratio of the two is used to accurately calculate the number of robots that can be accommodated. This method quantifies the space capacity and prevents demolition operations from failing due to insufficient space.

[0011] In conjunction with the first aspect, in one possible design approach, the target demolition mode is determined based on the target number and the type of demolition operation, including: if it is determined based on the first and second size information that the demolition space can accommodate one robot, the target demolition mode is determined to be a single-robot demolition mode; if it is determined based on the first and second size information that the demolition space can accommodate multiple robots, the target demolition mode is determined based on the type of demolition operation.

[0012] In this application, the system determines whether a single robot can be accommodated based on space capacity, thus directly establishing a single-robot demolition mode. When the space can accommodate multiple robots, further decisions are made based on the type of demolition operation. This hierarchical judgment logic simplifies the decision-making process while ensuring timely response when space is limited, thus improving the practicality and robustness of the strategy.

[0013] In conjunction with the first aspect, in one possible design approach, the target demolition mode is determined based on the type of demolition operation, including: when the demolition operation type is an independent operation type, the target demolition mode is determined to be a single-machine demolition mode; when the demolition operation type is a serial operation type, the target demolition mode is determined to be a single-machine demolition mode; when the demolition operation type is a master-slave operation type, the target demolition mode is determined to be a collaborative demolition mode.

[0014] In this application, a single-machine demolition mode is adopted for both independent job types (such as parallel independent tasks) and serial job types (such as sequentially dependent tasks), while a collaborative demolition mode is adopted for master-slave job types (such as collaborative control tasks). This classification decision accurately matches the demolition operation requirements of different objects to be demolished.

[0015] In conjunction with the first aspect, in one possible design approach, the method further includes: when the demolition operation type is a master-slave operation type and an independent operation type, or a master-slave operation type and a serial operation type, determining that the candidate demolition modes include a single-machine demolition mode and a collaborative demolition mode; determining a first duration corresponding to the single-machine demolition mode and a second duration corresponding to the collaborative demolition mode; and determining the demolition mode corresponding to the smaller duration of the first duration and the second duration as the target demolition mode.

[0016] In this application, for situations with two types of operations, the completion time in single-machine mode and collaborative mode is calculated separately, and the shorter one is selected as the target mode, thereby saving demolition time and improving demolition efficiency.

[0017] In conjunction with the first aspect, in one possible design approach, the attribute information set includes the power information and attachment information of each robot in the robot cluster. Based on the target demolition mode and the attribute information set of the robot cluster, the target robot is determined from the robot cluster, including: determining the target attachment based on the type information of the object to be demolished; determining a first candidate robot set with the target attachment based on the attachment information; determining a second candidate robot set that meets the preset power requirements based on the power information from the first candidate robot set; and determining the target robot based on the second candidate robot set and the target demolition mode.

[0018] In this application, the target attachment is determined by the type of the object to be demolished, robots equipped with the attachment are selected, a candidate set that meets the requirements is further selected based on battery power, and finally, the target robot is determined by combining the target demolition mode. This multi-level selection mechanism ensures that the selected robot has both the ability to perform the task (attachment matching) and the conditions for continuous operation (sufficient battery power), while also taking into account the requirements of the demolition mode, thus improving the reliability and feasibility of the demolition strategy recommendation.

[0019] In conjunction with the first aspect, in one possible design approach, the target robot is determined based on the second candidate robot set and the target demolition mode, including: when the target demolition mode is a single-machine demolition mode, obtaining a third duration set; wherein, the third duration set is the third duration corresponding to each second candidate robot in the second candidate robot set, and the third duration includes the sum of the time it takes for the robot to move from its current position to the object to be demolished and the demolition time of the robot demolishing the object to be demolished; determining the robot corresponding to the shortest third duration in the third duration set as the target robot; or; when the target demolition mode is a collaborative demolition mode, determining the first attachment corresponding to each subtask of the task to be demolished; determining a cluster of third candidate robots with the first attachment from the second candidate robot set; determining a fourth duration corresponding to the cluster of third candidate robots; wherein, the fourth duration set is the fourth duration corresponding to each third candidate robot in the third candidate robot set, and the fourth duration includes the sum of the time it takes for each third candidate robot to move from its current position to the object to be demolished and the demolition time of each third candidate robot demolishing the object to be demolished; determining the robot corresponding to the shortest fourth duration in the fourth duration set as the target robot.

[0020] In this application, for the single-machine demolition mode, the total time (movement time + demolition time) of each candidate robot is calculated, and the robot with the shortest time is selected as the target robot, thereby improving the efficiency of rescue response.

[0021] For the collaborative demolition mode, the task is broken down into sub-tasks, and each sub-task is matched with a candidate robot with corresponding attachments. The time taken by each candidate robot in each sub-task is calculated, and the combination with the shortest time can be selected. This approach not only achieves parallel optimization in collaborative operations, but also further shortens the overall demolition time and improves rescue response efficiency through task decomposition and personalized matching.

[0022] In a second aspect, embodiments of this application provide an electronic device, including: a processor; and a memory for storing processor-executable instructions, wherein the processor is used to execute the robotic demolition operation method described in the first aspect.

[0023] Thirdly, embodiments of this application provide a computer-readable storage medium storing a computer program for performing the robotic demolition method described in the first aspect.

[0024] Fourthly, embodiments of this application provide a computer program product, which includes a computer program. When the computer program is executed by the processor of a computer device, it enables the computer device to perform the robotic demolition operation method described in the first aspect.

[0025] The technical effects of any of the design methods in the second to fourth aspects can be found in the technical effects of different design methods in the first aspect, and will not be repeated here. Attached Figure Description

[0026] Figure 1 The diagram shown is an application scenario illustration of the robot demolition operation method provided in an exemplary embodiment of this application.

[0027] Figure 2 The diagram shown is an interface schematic of an electronic device 100 provided in an exemplary embodiment of this application.

[0028] Figure 3 The diagram shown is a flowchart illustrating a robotic demolition method provided in an exemplary embodiment of this application.

[0029] Figure 4 The diagram shown is a schematic representation of a robot demolition strategy recommendation device provided in an exemplary embodiment of this application. Detailed Implementation

[0030] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0031] Application Overview As mentioned in the background section, in related technologies, demolition strategies (such as robot allocation) mainly rely on the on-site commander's human experience and judgment to determine them. When faced with complex scenarios with multiple coupled factors, this manual decision-making method may lead to various problems, such as decision-making taking a long time, assigned robots not having the corresponding demolition functions, or too few assigned robots leading to excessively long demolition time. The accuracy of the demolition strategy is low and the demolition efficiency is low.

[0032] To address the aforementioned technical problems, this application provides a robot demolition operation method. The method includes: upon receiving a demolition command, an electronic device acquires environmental information about the object to be demolished, type information about the object, and a set of attribute information about a robot cluster in the rescue environment; then, based on the environmental and type information of the object, it determines a target demolition mode; then, based on the target demolition mode and the set of attribute information of the robot cluster, the electronic device identifies a target robot from the robot cluster; finally, based on the target robot and the target demolition mode, the electronic device determines robot demolition operation information and outputs the robot demolition operation information.

[0033] In this embodiment, upon receiving a breaching command, environmental information, type information, and robot cluster attribute information are automatically acquired. Based on this, the target breaching mode and target robot are determined, and finally, robot breaching operation information is output. This method can adapt to the complexity of different rescue scenarios, realizes intelligent recommendation of breaching strategies, avoids the subjectivity and delay of manual decision-making, improves the accuracy of breaching strategy recommendations, and increases breaching efficiency.

[0034] Exemplary scenario The following is an illustrative diagram illustrating an application scenario of a robotic demolition method. For example, Figure 1 The diagram illustrates an application scenario of a robotic demolition method provided in an exemplary embodiment of this application. Figure 1 As shown, this scenario includes electronic device 100 and robot cluster 210 (e.g., Figure 1 Robots 210-1 and 210-2 are shown in the diagram. Electronic device 100 establishes communication with robot cluster 210, and electronic device 100 is a remote command device for robot cluster 210.

[0035] Suppose a fire breaks out in a high-rise commercial building, and a robot is needed to first breach a steel fire door 220 at the end of a corridor on the 10th floor, and then enter through the entrance corresponding to fire door 220 to rescue trapped personnel. The commander determines the breaching operation of fire door 220 through the human-machine interface of electronic device 100. For example, the breaching operation could be that the commander clicks on the breaching space corresponding to fire door 220. In response to this operation, electronic device 100 generates a breaching command, acquires environmental information of the 10th floor, such as a corridor environment image, and obtains the type information of the object to be breached (fire door 220), as well as the attribute information set of the robot cluster 210, such as robot 210-1's attachment being a circular saw with 90% battery power, and robot 210-1's attachment being a gripper with 70% battery power, etc.

[0036] Based on the corridor environment image and the type information of the object to be breached (fire door 220), electronic device 100 determines the target breaching mode as a collaborative breaching mode. Then, based on this collaborative breaching mode, electronic device 100 identifies the target robots from the robot cluster 210: robots 210-1 (main breacher) and 210-2 (secondary breacher). It is understood that robot 210-1 has a circular saw for cutting the door closer, and robot 210-2 has grippers to further block the door. Electronic device 100 can then display the robot breaching operation information through a Human-Machine Interface (HMI). For example, Figure 2 The diagram shown is a human-machine interface schematic of an electronic device 100 provided in an exemplary embodiment of this application. Figure 2 As shown, interface A includes robot demolition operation information. This information includes a recommended collaborative demolition mode, and target robots 210-1 and 210-2. Interface A also includes confirmation and cancellation controls. After reviewing the information, the commander clicks the confirmation control on interface A, generating control commands and sending them to robots 210-1 and 210-2. Robot 210-1, acting as the master robot, initiates the cutting and pushing down fire door 220, then enters through the corresponding entrance to conduct rescue operations. Robot 210-2, acting as the slave robot, is responsible for blocking the door to prevent the fire from spreading.

[0037] The robotic demolition method provided in this application can be applied to various electronic devices. These electronic devices may include desktop computers, laptops, mobile phones, large central control equipment, etc. This application does not impose any special limitations on the specific form of the electronic device.

[0038] It should be understood that the above application scenario examples are only shown to facilitate understanding of the spirit and principles of this application, and the embodiments of this application are not limited thereto. Rather, the embodiments of this application can be applied to any applicable scenario.

[0039] Exemplary methods Figure 3 The diagram shown is a flowchart illustrating a robotic demolition method provided in an exemplary embodiment of this application. Figure 3 The method can be performed by electronic devices, such as Figure 1 The electronic device 100 in the system performs the operation. For example... Figure 3 As shown, the robot demolition operation method may include the following steps: 310: Upon receiving a breaching command, obtain the environmental information of the object to be breached, the type information of the object to be breached, and the attribute information set of the robot cluster in the rescue environment.

[0040] A breaching order is used to instruct the breaching of an object. Breaching orders can originate from confirmation commands issued by the on-site commander via a human-machine interface (such as a touchscreen or voice input) on electronic devices.

[0041] The rescue environment can be a dangerous environment such as a fire or an explosion.

[0042] Environmental information may include image information of the rescue environment, used to subsequently determine the size of the demolition space corresponding to the object to be demolished. In some embodiments, the robot swarm is equipped with multimodal sensors such as LiDAR, millimeter-wave radar, and visible light cameras, which can transmit real-time acquired visible light images, infrared thermal imaging, or LiDAR point cloud data back to electronic devices. The environmental information can be generated based on one or more of the visible light images, infrared thermal imaging, or LiDAR point cloud data transmitted back by the robot swarm. This approach allows for the acquisition of accurate environmental data in the rescue environment, improving the accuracy of environmental information determination.

[0043] The type information of the object to be demolished can be carried by the demolition command. For example, the type information of the object to be demolished can include fire doors (including door closers), fire-resistant roller shutters, ordinary doors, fire-resistant glass, fire hydrant glass, etc., or it can cover other building components that are not listed but have similar demolition attributes.

[0044] The attribute information set of the robot swarm includes the real-time status parameters of each robot in the swarm, at least including power information and attachment information. For example, please continue reading. Figure 1 ,like Figure 1 As shown, Robot 200-1 reported the following attributes: attachment is a circular saw, battery level is 85%; Robot 200-2 reported the following attributes: attachment is a hydraulic breaker, battery level is 60%.

[0045] 320: Determine the target demolition mode based on the location and type information of the object to be demolished.

[0046] The target breaching mode can include single-machine breaching mode, collaborative breaching mode, and so on. Single-machine breaching mode refers to dispatching only one robot to independently complete all breaching operations; collaborative breaching mode refers to dispatching two or more robots to work together, where division of labor and collaboration can mean simultaneously performing breaching tasks on the target (parallel collaboration), or multiple robots performing different breaching tasks sequentially according to a preset time sequence (sequential collaboration). For example, one robot might perform the main breaching task while another assists with tasks such as closing doors.

[0047] The specific implementation method for determining the target demolition mode based on the location and type information of the object to be demolished will be introduced below.

[0048] 330: Based on the target demolition pattern and the attribute information set of the robot cluster, determine the target robot from the robot cluster.

[0049] The attribute information set includes, but is not limited to, the power information and attachment information of each robot in the robot cluster.

[0050] In some embodiments, a set of candidate robots that meet preset attribute requirements can be determined from the robot cluster based on the robot cluster's attribute information set. Then, the target robot is determined based on the candidate robot set and the target demolition mode. The preset attribute requirements can be that the robot has a target attachment or that the robot's remaining battery power is greater than a preset battery power threshold, but are not limited to these.

[0051] In some embodiments, the electronic device can determine the target attachment required to complete the demolition from a pre-set database based on the type information of the object to be demolished. For example, a circular saw is needed to demolish a steel fire door, and a hydraulic breaker is needed to demolish a concrete wall. This step ensures that the selected robot has the capability to perform the demolition task on the object to be demolished.

[0052] In this embodiment of the application, a set of candidate robots that meet the preset attribute requirements can be selected first to improve the reliability of demolition task execution.

[0053] Furthermore, the distance the robot travels from its current position to the object to be demolished can be used to determine the target robot, thereby reducing the target robot's movement time and improving demolition efficiency. Specifically, this can be achieved in the following ways: When the target demolition mode is single-machine demolition mode, obtain the third distance set; where the third distance set is the third distance corresponding to each candidate robot in the candidate robot set, the third distance includes the distance the robot moves from its current position to the object to be demolished; the robot corresponding to the shortest third distance is determined as the target robot; When the target demolition mode is a collaborative demolition mode, determine the first attachment corresponding to each sub-task of the task to be demolished; determine the third candidate robot cluster with the first attachment; determine the fourth distance set corresponding to the candidate robot cluster; wherein, the fourth distance set includes the fourth distance corresponding to each second candidate robot in the candidate robot cluster, and the fourth distance includes the distance the robot moves from its current position to the object to be demolished; determine the robot corresponding to the shortest fourth distance in the fourth distance set as the target robot.

[0054] 340: Determine robot demolition operation information based on target robot and target demolition mode, and output robot demolition operation information.

[0055] In some embodiments, robot demolition operation information may include the target demolition mode and the identification information of the target robot. For example, such as Figure 2 As shown, interface A includes robot demolition operation information. This information includes a recommended collaborative demolition mode, and target robots 210-1 and 210-2. Interface A also includes confirmation and cancellation controls. After reviewing the information, the commander clicks the confirmation control on interface A, generating control commands and sending them to robots 210-1 and 210-2. Robot 210-1, acting as the master robot, initiates the cutting and pushing down fire door 220, then enters through the corresponding entrance to conduct rescue operations. Robot 210-2, acting as the slave robot, is responsible for blocking the door to prevent the fire from spreading.

[0056] In addition, the information on robot demolition operations can also include detailed data such as the estimated total working time and the allocation of each robot's procedures. This provides the commander with structured information on robot demolition operations, making it easier for the commander to review.

[0057] In this embodiment, after receiving a breaching command, environmental information, type information, and robot cluster attribute information are automatically acquired. Based on this, the target breaching mode and target robot are determined, and finally, robot breaching operation information is output. This method can adapt to the complexity of different rescue scenarios, realizes intelligent recommendation of breaching strategies, avoids the subjectivity and delay of manual decision-making, improves the accuracy of breaching strategy recommendations, and increases breaching efficiency.

[0058] The following describes a specific implementation method for determining the target demolition mode based on environmental information and the type information of the object to be demolished, namely, a specific implementation method of the aforementioned step 320. Specifically, in some embodiments, the target demolition mode can be determined through the following steps 3201 to 3203: 3201: Determine the target quantity based on the environmental information of the object to be demolished; wherein, the target quantity includes the target number of robots that the demolition space corresponding to the object to be demolished can accommodate.

[0059] In some embodiments, first size information is determined based on environmental information; then, second size information is determined from a second preset mapping relationship based on the type information of the object to be demolished. The second preset mapping table includes the correspondence between the type information of the object to be demolished and the size information of the workspace required by the robot to perform the demolition action. Then, the target quantity is determined based on the first size information and the second size information.

[0060] The first dimension information includes the dimension information of the demolition space corresponding to the object to be demolished. The second dimension information includes the dimensions of the workspace required for the robot to perform its demolition actions. For example, the minimum working width and height required to demolish a fire door. This second dimension information refers to the dimensions of the workspace required for the robot to perform demolition actions on this type of object. Then, by comparing the first and second dimension information, the maximum number of robots that can work simultaneously in this space can be calculated, thus determining the target number. This involves quantifying and comparing the actual available space dimensions with the necessary operating space dimensions for the robots to determine the maximum number of robots that can be accommodated. This target number is a specific integer, such as 1, 2, or more.

[0061] For example, for a fire door, the measured width of the demolition space is 2.5 meters and the height is 3.0 meters; while the minimum working space required for the robot to use a circular saw to demolish the fire door is 1.0 meter wide and 1.5 meters high. Therefore, by division, it can be found that 2 robots can be accommodated in the width direction and 2 robots can be accommodated in the height direction. Taking the minimum value, the target quantity is 2.

[0062] 3202: Based on the type information of the object to be demolished, determine the demolition operation type from the first preset mapping table.

[0063] The first preset mapping table includes the correspondence between the type information of the demolition object and the demolition operation type of the demolition object.

[0064] The types of objects to be demolished include any one or more of the following: independent operation type, serial operation type, and master-slave operation type. For example, the types of demolition operations may include, but are not limited to: any one of the following: independent operation type, serial operation type, and master-slave operation type, as well as any two of the following: independent operation type, serial operation type, and master-slave operation type. These operation types are classified according to the physical requirements of the demolition process of the object to be demolished on the robot's collaborative mode.

[0065] For example, fire-resistant glass, because its breaking process can be completed independently by a single robot, can be classified as either an independent operation or a sequential operation; fire doors (including door closers), because they require at least two robots to cooperate in completing different processes, can be classified as a master-slave operation; and fire-resistant roller shutters, because they can be operated by a single machine or by multiple machines working together, possess both types of operation.

[0066] 3203: Determine the target demolition mode based on the target quantity and demolition operation type.

[0067] In this embodiment, environmental information is used to analyze whether the on-site space allows multiple robots to operate, and how many robots can operate simultaneously or in shifts. The type information of the object to be demolished determines the specific requirements of the demolition process for the robot collaboration method. The electronic device can determine one or more feasible candidates from single-machine demolition modes and collaborative demolition modes based on the target demolition mode and the attribute information set of the robot cluster, and ultimately select one as the target demolition mode.

[0068] In some embodiments, if it is determined based on the first and second size information that the number of robots that can be accommodated in the demolition space is only one (i.e., the target number is 1), then regardless of the type of demolition operation, the electronic equipment determines the target demolition mode as a single-machine demolition mode. This is because physical space limits the possibility of any multi-machine collaboration.

[0069] When space allows for multiple robots, instead of directly adopting a collaborative mode, we further consider the physical characteristics of the task itself (such as whether master-slave cooperation is required or whether it can be completed independently), thereby avoiding unnecessary waste of collaborative resources or safety risks.

[0070] Specifically, in some embodiments, space capacity and job type can be used as a multi-condition joint decision logic, such as using a mapping table to directly output the target demolition mode. For example, if the number of targets is greater than or equal to 2 and the job type is master-slave job type, then the collaborative demolition mode is output; if the number of targets is greater than or equal to 2 and the job type is independent job type or serial job type, then the single-machine demolition mode is output.

[0071] If the demolition space is determined to accommodate multiple robots (i.e., the target number is greater than or equal to 2), the electronic equipment will further determine the demolition operation type. Specifically, when the demolition operation type is an independent operation, the target demolition mode is determined to be a single-machine demolition mode, because this type of object to be demolished can be efficiently completed by a single machine; when the demolition operation type is a serial operation, the target demolition mode is also determined to be a single-machine demolition mode, because although its procedures have a sequence, a single machine can handle it, and multi-machine collaboration may increase complexity; when the demolition operation type is a master-slave operation, the target demolition mode is determined to be a collaborative demolition mode, because its physical procedures require at least two robots to cooperate. This decision logic ensures that the solution meets both spatial feasibility and the technological requirements of the object itself.

[0072] The decision-making logic differs depending on whether the demolition operation type is a master-slave operation and an independent operation, or a master-slave operation and a serial operation. Specifically, when the demolition operation type is a master-slave operation and an independent operation, or a master-slave operation and a serial operation, and space allows for multiple robots, the electronic device lists both single-machine demolition mode and collaborative demolition mode as candidate demolition modes. Then, the electronic device calculates the first duration (total time) corresponding to the single-machine demolition mode and the second duration corresponding to the collaborative demolition mode. The electronic device determines the demolition mode corresponding to the smaller of the first and second durations as the target demolition mode. In this way, by comparing the durations, it ensures that the final demolition mode of the available options is the most time-efficient. For example, for a fireproof roller shutter, if the estimated time for single-machine demolition is 180 seconds, and the estimated time for collaborative demolition (two robots cutting simultaneously from the top and bottom) is 120 seconds, then the collaborative mode is selected. In this way, the method with the shortest demolition time can be selected, further improving demolition efficiency.

[0073] For independent operation types, the first duration can include the sum of the time it takes for the robot to move from its current position to the object to be demolished and the demolition time. The demolition time is the time it takes for the robot to complete the demolition task for the object to be demolished.

[0074] The first duration can be determined by the following formula (1): = + (1) in, Indicates the first duration. This indicates the time it takes for the robot to move from its current position to the object to be demolished. Indicates the duration of the demolition.

[0075] It can be determined by the following formula (2): (2) Table 1 below shows the physical meaning and brief explanation of each letter symbol in formula (2).

[0076] Table 1 It can be determined by the following formula (3): (3) in, Total homework effective power Material coefficient Electricity feasibility factor Table 2 below shows the physical meaning and brief explanation of each letter symbol in formula (3).

[0077] Table 2 For serial operation types, the second duration may include the sum of the time it takes for a robot to move from its current position to the object to be demolished and the demolition duration, where the demolition duration is the sum of the time it takes for a robot to complete each subtask in the demolition task for the object to be demolished.

[0078] For master-slave operation type, the second duration can include the sum of the time taken for multiple robots to move from their current position to the object to be demolished and the demolition duration. The demolition duration is the time taken for each robot to complete each subtask in the demolition task for the object to be demolished.

[0079] The following describes a specific implementation method for determining the target robot from the robot cluster based on the target demolition mode and the attribute information set of the robot cluster, namely, an implementation method of the aforementioned step 330, including the following steps 3301 to 3304: 3301: Determine the target attachment based on the type information of the object to be demolished.

[0080] In some embodiments, the target attachments required to complete the demolition can be determined from a preset database based on the type information of the object to be demolished.

[0081] 3302: Based on attachment information, determine the first candidate robot set with the target attachment from the robot cluster.

[0082] The electronic device can determine the target attachments needed to complete the demolition based on the type information of the object to be demolished, from a pre-set database. For example, a circular saw is needed to demolish a steel fire door, and a hydraulic breaker is needed to demolish a concrete wall. This step ensures that the selected robot has the capability to perform the demolition task on the object to be demolished.

[0083] 3303: Based on power information, determine a second set of candidate robots that meet the preset power requirements from the first set of candidate robots.

[0084] For example, the preset power requirement can be that the robot's remaining power is greater than a preset power threshold. For instance, the preset power threshold is set to 30%. Robots with power below this value will be excluded because they may not be able to complete long-term operations, which ensures the reliability of task execution.

[0085] In this embodiment of the application, a set of candidate robots that meet the preset attribute requirements can be selected first to improve the reliability of demolition task execution.

[0086] 3301: Determine the target robot based on the second candidate robot set and the target demolition mode.

[0087] The robot with the shortest travel time can be determined by summing the time it takes for the robot to move from its current position to the object to be demolished and the time it takes to demolish the object. This reduces the time spent by the target robot in both movement and demolition, thereby improving demolition efficiency. Specifically, this can be achieved in the following way: In some embodiments, when the target demolition mode is a single-machine demolition mode, a third duration set is obtained; wherein, the third duration set is the third duration corresponding to each second candidate robot in the second candidate robot set, and the third duration includes the sum of the time it takes for the robot to move from its current position to the object to be demolished and the demolition time of the robot demolishing the object to be demolished; the robot corresponding to the shortest third duration in the third duration set is determined as the target robot.

[0088] In some embodiments, when the target demolition mode is a collaborative demolition mode, a first attachment corresponding to each subtask of the demolition task corresponding to the collaborative demolition mode and the object to be demolished is determined; a third candidate robot cluster with the first attachment is determined from the second candidate robot set; a fourth duration corresponding to the third candidate robot cluster is determined; wherein, the fourth duration set is the fourth duration corresponding to each third candidate robot in the third candidate robot set, and the fourth duration includes the sum of the duration for each third candidate robot to move from its current position to the object to be demolished and the demolition time for each third candidate robot to demolish the object to be demolished; the robot corresponding to the shortest fourth duration in the fourth duration set is determined as the target robot.

[0089] Exemplary device Figure 4 The diagram shown is a structural schematic of a robot demolition strategy recommendation device provided in an exemplary embodiment of this application. Figure 4 As shown, the robot demolition strategy recommendation device 400 includes: an acquisition module 410, a first determination module 420, a second determination module 430, and an output module 440.

[0090] The acquisition module 410 is used to acquire, upon receiving a breaching command, the environmental information of the object to be breached, the type information of the object to be breached, and the attribute information set of the robot cluster in the rescue environment; wherein, the attribute information set includes the power information and attachment information of each robot in the robot cluster; the first determination module 420 is used to determine the target breaching mode based on the location and type information of the object to be breached; the second determination module 430 is used to determine the target robot from the robot cluster based on the target breaching mode and the attribute information set of the robot cluster; the output module 440 is used to determine the robot breaching operation information based on the target robot and the target breaching mode, and output the robot breaching operation information.

[0091] According to one embodiment of this application, a first determining module 420 is used to determine a target quantity based on the environmental information of the object to be demolished; wherein the target quantity includes the target number of robots that can be accommodated in the demolition space corresponding to the object to be demolished; and to determine the demolition operation type from a first preset mapping table based on the type information of the object to be demolished; wherein the first preset mapping table includes the correspondence between the type information of the object to be demolished and the demolition operation type of the object to be demolished, and the type of the object to be demolished includes any one or more of independent operation type, serial operation type and master-slave operation type; and to determine a target demolition mode based on the target quantity and the demolition operation type.

[0092] According to one embodiment of this application, a first determining module 420 is configured to determine first size information based on environmental information of the object to be demolished; wherein the first size information includes size information of the demolition space corresponding to the object to be demolished; determine second size information from a second preset mapping relationship based on the type information of the object to be demolished; wherein the second size information includes size information of the workspace required for the robot to perform demolition actions, and the second preset mapping table includes the correspondence between the type information of the object to be demolished and the size information of the workspace required for the robot to perform demolition actions; and determine the target quantity based on the first size information and the second size information.

[0093] According to one embodiment of this application, the first determining module 420 is used to determine the target demolition mode as a single-robot demolition mode when it is determined based on the first size information and the second size information that the demolition space can accommodate one robot; and to determine the target demolition mode based on the demolition operation type when it is determined based on the first size information and the second size information that the demolition space can accommodate multiple robots.

[0094] According to one embodiment of this application, the first determining module 420 is used to determine the target selection demolition mode as a single-machine demolition mode when the demolition operation type is an independent operation type; to determine the target selection demolition mode as a single-machine demolition mode when the demolition operation type is a serial operation type; and to determine the target selection demolition mode as a collaborative demolition mode when the demolition operation type is a master-slave operation type.

[0095] According to an embodiment of this application, the first determining module 420 is further configured to determine, when the demolition operation type is a master-slave operation type and an independent operation type, or a master-slave operation type and a serial operation type, to determine that the candidate demolition modes include a single-machine demolition mode and a collaborative demolition mode; to determine the first duration corresponding to the single-machine demolition mode and the second duration corresponding to the collaborative demolition mode; and to determine the demolition mode corresponding to the smaller duration of the first duration and the second duration as the target demolition mode.

[0096] According to one embodiment of this application, the second determining module 430 is used to determine a first candidate robot set with target attachments from the robot cluster based on attachment information; determine a second candidate robot set that meets preset power requirements from the first candidate robot set based on power information; and determine the target robot based on the second candidate robot set and the target demolition mode.

[0097] According to one embodiment of this application, the second determining module 430 is configured to: obtain a third duration set when the target demolition mode is a single-machine demolition mode; wherein the third duration set is the third duration corresponding to each second candidate robot in the second candidate robot set, and the third duration includes the sum of the time it takes for the robot to move from its current position to the object to be demolished and the demolition time of the robot demolishing the object to be demolished; determine the robot corresponding to the shortest third duration in the third duration set as the target robot; or; when the target demolition mode is a collaborative demolition mode, determine the first attachment corresponding to each subtask of the demolition task corresponding to the collaborative demolition mode and the object to be demolished; determine a cluster of third candidate robots with the first attachment from the second candidate robot set; determine a fourth duration corresponding to the cluster of third candidate robots; wherein the fourth duration set is the fourth duration corresponding to each third candidate robot in the third candidate robot set, and the fourth duration includes the sum of the time it takes for each third candidate robot to move from its current position to the object to be demolished and the demolition time of each third candidate robot demolishing the object to be demolished; determine the robot corresponding to the shortest fourth duration in the fourth duration set as the target robot.

[0098] This application also provides a computer-readable storage medium storing a computer program for executing the robotic demolition method provided in any of the above embodiments.

[0099] This application also provides a computer program product, which includes a computer program. When the computer program is executed by the processor of a computer device, it enables the computer device to perform the robotic demolition operation method provided in any of the above embodiments.

[0100] All of the above-mentioned optional technical solutions can be combined in any way to form the optional embodiments of this application, and will not be described in detail here.

[0101] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0102] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0103] In the embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or units may be electrical, mechanical, or other forms.

[0104] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0105] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0106] If a function is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program verification codes, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0107] It should be noted that in the description of this application, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Furthermore, in the description of this application, unless otherwise stated, "a plurality of" means two or more.

[0108] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, use and processing of the relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and corresponding operation entry points are provided for users to choose to authorize or refuse.

[0109] The above are merely preferred embodiments of this application and are not intended to limit this application. Any modifications or equivalent substitutions made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A method for robotic demolition operations, characterized in that, The method includes: Upon receiving a breaching command, the system acquires environmental information about the object to be breached, type information about the object, and attribute information set of the robot cluster in the rescue environment; wherein, the attribute information set includes the battery information and attachment information of each robot in the robot cluster. The target demolition mode is determined based on the environmental information and type information of the object to be demolished. Based on the target demolition mode and the attribute information set of the robot cluster, the target robot is determined from the robot cluster; Based on the target robot and the target demolition mode, the robot demolition operation information is determined and output.

2. The robotic demolition method according to claim 1, characterized in that, The determination of the target demolition mode based on the environmental information and type information of the object to be demolished includes: The target quantity is determined based on the environmental information of the object to be demolished; wherein, the target quantity includes the target number of robots that the demolition space corresponding to the object to be demolished can accommodate; Based on the type information of the object to be demolished, the demolition operation type is determined from the first preset mapping table; wherein, the first preset mapping table includes the correspondence between the type information of the demolition object and the demolition operation type of the demolition object, and the demolition object type includes any one or more of the following: independent operation type, serial operation type, and master-slave operation type; Based on the target quantity and the type of demolition operation, the target demolition mode is determined.

3. The robotic demolition method according to claim 2, characterized in that, Determining the target quantity based on the environmental information of the object to be demolished includes: First size information is determined based on the environmental information of the object to be demolished; wherein, the first size information includes the size information of the demolition space corresponding to the object to be demolished; Based on the type information of the object to be demolished, the second size information is determined from the second preset mapping relationship; wherein, the second size information includes the size information of the workspace required for the robot to perform the demolition action, and the second preset mapping table includes the correspondence between the type information of the object to be demolished and the size information of the workspace required for the robot to perform the demolition action; The target quantity is determined based on the first size information and the second size information.

4. The robotic demolition operation method according to claim 3, characterized in that, The determination of the target demolition mode based on the target quantity and the demolition operation type includes: If, based on the first size information and the second size information, it is determined that the demolition space can accommodate one robot, the target demolition mode is determined to be a single-robot demolition mode. If, based on the first size information and the second size information, it is determined that the demolition space can accommodate multiple robots, a target demolition mode is determined based on the demolition operation type.

5. The robotic demolition method according to any one of claims 2-4, characterized in that, The determination of the target demolition mode based on the demolition operation type includes: If the demolition operation type is an independent operation type, the target selection demolition mode is determined to be a single-machine demolition mode; When the demolition operation type is a serial operation type, the target selection demolition mode is determined to be a single-machine demolition mode; When the demolition operation type is a master-slave operation type, the target selection demolition mode is determined to be a collaborative demolition mode.

6. The robotic demolition method according to claim 2, characterized in that, The method further includes: When the demolition operation type is the master-slave operation type and the independent operation type, or the master-slave operation type and the serial operation type, the candidate demolition modes are determined to include single-machine demolition mode and collaborative demolition mode; Determine the first duration corresponding to the single-machine demolition mode and the second duration corresponding to the collaborative demolition mode; The breaching pattern corresponding to the smaller of the first duration and the second duration is determined as the target breaching pattern.

7. The robotic demolition operation method according to claim 1, characterized in that, The step of determining the target robot from the robot cluster based on the target demolition pattern and the attribute information set of the robot cluster includes: The target attachment is determined based on the type information of the object to be demolished; Based on the attachment information, a first set of candidate robots with the target attachment is determined from the robot cluster; Based on the power information, a second set of candidate robots that meets the preset power requirements is determined from the first set of candidate robots. The target robot is determined based on the second candidate robot set and the target demolition pattern.

8. The robotic demolition operation method according to claim 7, characterized in that, The step of determining the target robot based on the second candidate robot set and the target demolition pattern includes: When the target demolition mode is a single-machine demolition mode, a third duration set is obtained; wherein, the third duration set is the third duration corresponding to each second candidate robot in the second candidate robot set, and the third duration includes the sum of the duration for each second candidate robot to move from its current position to the object to be demolished and the demolition time for each second candidate robot to demolish the object to be demolished; The robot corresponding to the shortest third duration in the third duration set is identified as the target robot; or; When the target demolition mode is a collaborative demolition mode, determine the first attachment corresponding to each sub-task of the demolition task; A third candidate robot cluster with the first attachment is determined from the second candidate robot set; Determine the fourth duration corresponding to the third candidate robot cluster; wherein, the fourth duration set is the fourth duration corresponding to each third candidate robot in the third candidate robot cluster, and the fourth duration includes the sum of the duration of each third candidate robot moving from its current position to the object to be demolished and the demolition time of each third candidate robot demolishing the object to be demolished; The robot corresponding to the shortest fourth duration in the fourth duration set is identified as the target robot.

9. An electronic device, characterized in that, include: processor; Memory used to store the processor's executable instructions. The processor is used to execute the robotic demolition operation method according to any one of claims 1 to 8.

10. A computer-readable storage medium, characterized in that, The storage medium stores a computer program for executing the robotic demolition operation method according to any one of claims 1 to 8.