Ore dressing flow transfer system, crushing and screening system and ore dressing plant
By merging the plant buildings for medium crushing, fine crushing, and ultrafine crushing processes, and adopting a unified conveyor system, the problems of large land area and high construction costs of ore dressing plants have been solved, resulting in a more compact layout and more efficient production management.
Patent Information
- Application Number
- CN202611197229.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-07
- Publication Date
- 2026-11-20
AI Technical Summary
Existing ore dressing plants often have numerous conveyor belt corridors, which occupy a large area, have high construction costs, and are inconvenient for production management.
An ore beneficiation transfer system is adopted, which combines the medium crushing, fine crushing and ultrafine crushing processes into a single crushing plant, reducing the number of plants, and uses a unified conveyor system for material transport, reducing the number of corridors.
It effectively reduces the footprint and construction costs, while improving production management efficiency and reducing the installation difficulty of conveyors and the footprint issues caused by material conveying height differences.
Smart Images

Figure CN123128094A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mineral processing technology, specifically to an ore beneficiation and transfer system, a crushing and screening system, and a mineral processing plant. Background Technology
[0002] Belt conveyors are mainly used in mineral processing plants for the continuous transfer and transport of ore materials between screening and crushing plants during screening and crushing operations. Belt conveyor corridors are enclosed or semi-enclosed channels built around the belt conveyors. In related technologies, mineral processing plants typically include medium and fine crushing plants, inspection and screening plants, and ultrafine crushing plants. Connecting these plants with single belt conveyor corridors requires at least four corridors to complete the medium crushing, screening, fine crushing, and ultrafine crushing processes. However, with three plants and at least four belt conveyor corridors, the construction area is large, the construction cost is high, and on-site production management is inconvenient. Summary of the Invention
[0003] The present invention aims to at least partially solve one of the technical problems in the related art.
[0004] Therefore, embodiments of the present invention propose an ore beneficiation and transfer system that reduces land area and construction costs.
[0005] An embodiment of the present invention provides a crushing and screening system.
[0006] An embodiment of the present invention provides a mineral processing plant.
[0007] According to an embodiment of the present invention, an ore beneficiation and transfer system includes a crushing plant, a screening plant, a first conveyor, a second conveyor, a third conveyor, a first corridor, a fourth conveyor, and a second corridor. The crushing plant is equipped with a medium crushing zone, a fine crushing zone, and an ultrafine crushing zone for respectively accommodating medium crushing units, fine crushing units, and ultrafine crushing units. The crushing plant has a first feeding layer on one side in a first direction and a first discharge layer on the other side in the first direction. The screening plant is used to house screening units and is equipped with an oversize zone and an undersize zone to respectively receive materials screened by the screening units. The screening plant has a second feeding layer on one side in the first direction and a second discharge layer on the other side in the first direction. The screening plant and the crushing plant are spaced apart in a second direction, which is perpendicular to the first direction. The first conveyor, the second conveyor, and the third conveyor are all coordinated. The first conveyor is described, with one end connected to the second discharge layer and the other end connected to the first feeding layer. One end of the first conveyor is located in the intermediate crushing zone to transport materials to the intermediate crushing zone. The second conveyor connects the over-screen zone and the fine crushing zone to transport materials to the fine crushing zone. The third conveyor connects the under-screen zone and the ultra-fine crushing zone to transport materials to the ultra-fine crushing zone. The fourth conveyor is equipped with the second conveyor, with one end connected to the first discharge layer and the other end connected to the second feeding layer. One end of the fourth conveyor covers the intermediate crushing zone and the fine crushing zone, and the other end of the fourth conveyor is located in the second feeding layer to transport materials from the intermediate crushing zone and the fine crushing zone to the second feeding layer.
[0008] The ore beneficiation and transfer system of this invention fulfills the transportation requirements of ore to the medium crushing unit, screening unit, fine crushing unit and ultrafine crushing unit, realizes the crushing and screening system for medium crushing, screening, fine crushing and ultrafine crushing of ore, and reduces the land area and construction cost.
[0009] In some embodiments, the first corridor has one, and the first conveyor, the second conveyor and the third conveyor are all located in the first corridor.
[0010] In some embodiments, the ore beneficiation and transfer system further includes a feeding plant located on the side of the screening plant away from the crushing plant in the second direction. The feeding plant has a feeding area, and the other end of the first conveyor passes through the screening plant and is located in the feeding area.
[0011] In some embodiments, the ore feeding plant is further provided with a post-screening zone, and one end of the third conveyor passes through the screening plant and extends to the post-screening zone.
[0012] In some embodiments, the medium-sized fragmentation zone and the fine-sized fragmentation zone are opposite each other in the second direction.
[0013] In some embodiments, the intermediate crushing zone and the fine crushing zone are located on the side of the crushing plant adjacent to the screening plant in the second direction.
[0014] In some embodiments, the first corridor and the second corridor are arranged at intervals in a third direction, the third direction being orthogonal to the first direction and the second direction.
[0015] In some embodiments, the first conveyor, the second conveyor, and the third conveyor are arranged at intervals in a third direction, which is orthogonal to the first direction and the second direction.
[0016] The crushing and screening system of this invention includes a medium crushing unit, a fine crushing unit, an ultrafine crushing unit, a screening unit, and the aforementioned ore beneficiation and transfer system. The medium crushing unit is located in the medium crushing zone, the fine crushing unit is located in the fine crushing zone, the ultrafine crushing unit is located in the ultrafine crushing zone, and the screening unit is located in the screening plant.
[0017] The mineral processing plant in this embodiment of the invention includes the ore beneficiation and transfer system or the crushing and screening system. Attached Figure Description
[0018] Figure 1 This is one of the schematic diagrams of the ore beneficiation and transfer system according to an embodiment of the present invention; Figure 2 This is a second schematic diagram of the ore beneficiation and transfer system according to an embodiment of the present invention; Figure 3 This is one of the structural schematic diagrams of the crushing plant and its interior according to an embodiment of the present invention; Figure 4 This is the second schematic diagram of the crushing plant and its internal structure according to an embodiment of the present invention; Figure 5 This is a schematic diagram of the structure of the first corridor, the first conveyor, the second conveyor, and the third conveyor according to an embodiment of the present invention; Figure 6 This is a process flow diagram of the crushing and screening system according to an embodiment of the present invention.
[0019] Figure label: Ore beneficiation and transfer system 100, medium crushing unit 200, fine crushing unit 300, ultrafine crushing unit 400; Crushing plant 1, medium crushing zone 11, fine crushing zone 12, ultra-fine crushing zone 13, first feeding layer 14, first discharge layer 15; Screening plant 2, screen over section 21, screen under section 22, second feeding layer 23, second discharge layer 24; First conveyor 3, second conveyor 4, third conveyor 5, first corridor 6, fourth conveyor 7, second corridor 8, ore feed plant 9, ore feed area 91, post-screening area 92. Detailed Implementation
[0020] Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.
[0021] The following is a reference to the appendix. Figures 1 to 6 The ore beneficiation and transfer system 100, the crushing and screening system, and the beneficiation plant of this invention are described in detail in this embodiment.
[0022] An embodiment of the present invention provides a crushing and screening system comprising a medium crushing unit 200, a fine crushing unit 300, an ultrafine crushing unit 400, a screening unit (not shown in the figure), and an ore beneficiation transfer system 100.
[0023] The ore beneficiation and transfer system 100 of this invention includes a crushing plant 1, a screening plant 2, a first corridor 6, a first conveyor 3, a second conveyor 4, a third conveyor 5, a second corridor 8, and a fourth conveyor 7.
[0024] The crushing plant 1 is equipped with a medium crushing zone 11, a fine crushing zone 12, and an ultrafine crushing zone 13 for housing medium crushing unit 200, fine crushing unit 300, and ultrafine crushing unit 400, respectively. Specifically, the medium crushing unit 200 is located in the medium crushing zone 11, the fine crushing unit 300 in the fine crushing zone 12, and the ultrafine crushing unit 400 in the ultrafine crushing zone 13. The crushing plant 1 is located in the first direction (e.g., in the first direction). Figure 1 A first feeding layer 14 is provided on one side of the crushing plant 1 in the vertical direction, and a first discharge layer 15 is provided on the other side of the crushing plant 1 in the same vertical direction. The feed ends of the medium crushing unit 200, the fine crushing unit 300 and the ultrafine crushing unit 400 are all connected to the first feeding layer 14, and the discharge ends of the medium crushing unit 200, the fine crushing unit 300 and the ultrafine crushing unit 400 are all connected to the first discharge layer 15.
[0025] Screening plant 2 is equipped with screening units. Screening plant 2 has an oversize zone 21 and an undersize zone 22 to respectively receive the materials screened by the screening units. Screening plant 2 has a second feeding layer 23 on one side of this first direction, and a second discharge layer 24 on the other side of this first direction. Screening plant 2 and crushing plant 1 are connected in the second direction (e.g.) Figure 1 The two directions are separated by a left-right direction, and the second direction is perpendicular to the first direction. The feed end of the screening unit is connected to the second feeding layer 23, the over-screen discharge end of the screening unit is connected to the over-screen area 21 of the second discharge layer 24, and the under-screen discharge end of the screening unit is connected to the under-screen area 22 of the second discharge layer 24.
[0026] The first conveyor 3, the second conveyor 4, and the third conveyor 5 are all equipped with a first corridor 6. One end of the first corridor 6 is connected to the second discharge layer 24, and the other end of the first corridor 6 is connected to the first feeding layer 14. One end of the first conveyor 3 is located in the medium crushing zone 11 to transport materials to the medium crushing zone 11. The second conveyor 4 is connected to the over-screen zone 21 and the fine crushing zone 12 to transport materials to the fine crushing zone 12. The third conveyor 5 is connected to the under-screen zone 22 and the ultra-fine crushing zone 13 to transport materials to the ultra-fine crushing zone 13.
[0027] The fourth conveyor 7 is equipped with a second corridor 8. One end of the second corridor 8 is connected to the first discharge layer 15, and the other end of the second corridor 8 is connected to the second feeding layer 23. One end of the fourth conveyor 7 covers the medium crushing zone 11 and the fine crushing zone 12, and the other end of the fourth conveyor 7 is located in the second feeding layer 23 to transport the materials from the medium crushing zone 11 and the fine crushing zone 12 to the second feeding layer 23.
[0028] In the ore beneficiation and transfer system 100 of this embodiment of the invention, the first direction is the same as the up and down direction, the first feeding layer 14 is located on the upper side of the crushing plant 1, the first discharge layer 15 is located on the lower side of the crushing plant, the second feeding layer 23 is located on the upper side of the screening plant 2, and the second discharge layer 24 is located on the lower side of the screening plant 2.
[0029] In operation, the ore beneficiation and transfer system 100 of this embodiment of the invention delivers ore to the intermediate crushing zone 11 of the first feeding layer 14 of the crushing plant 1 via a first conveyor 3. The intermediate crushing unit 200 receives the ore conveyed by the first conveyor 3. After being crushed by the intermediate crushing unit 200, the ore is discharged from the intermediate crushing unit 200 and discharged to the intermediate crushing zone 11 of the first discharge layer 15, and then conveyed to the second feeding layer 23 via a fourth conveyor 7. A screening unit receives the intermediately crushed ore conveyed by the fourth conveyor 7 and screens the ore, separating it into undersize ore and oversize ore. The oversize ore is discharged from the oversize discharge end and discharged to the oversize zone 21 of the second discharge layer 24, and then conveyed to the fine crushing zone 12 of the first feeding layer 14 via a second conveyor 4. The fine crushing unit 300 receives the oversize ore conveyed by the second conveyor 4. After being crushed by the fine crushing unit 300, the ore is discharged from the fine crushing unit 300 and sent to the fine crushing zone 12 of the first discharge layer 15, and then conveyed to the second feeding layer 23 by the fourth conveyor 7. The undersize ore is discharged from the undersize discharge end of the screening unit and sent to the undersize zone 22 of the second discharge layer 24, and then conveyed to the ultrafine crushing zone 13 of the first feeding layer 14 by the third conveyor 5. The ultrafine crushing unit 400 receives the undersize ore conveyed by the third conveyor 5 and performs ultrafine crushing on the ore. After being crushed by the ultrafine crushing unit 400, the ore is discharged from the discharge end of the ultrafine crushing unit 400 and can then be stored or sent to other processing steps. The process flow diagram of the crushing and screening system is as follows: Figure 6 As shown.
[0030] The ore beneficiation transfer system 100 of this embodiment of the invention includes a medium crushing zone 11, a fine crushing zone 12, and an ultrafine crushing zone 13 within the crushing plant 1, for respectively housing medium crushing unit 200, fine crushing unit 300, and ultrafine crushing unit 400. This effectively combines the medium and fine crushing plant (containing medium crushing unit 200 and fine crushing unit 300) and the ultrafine crushing plant (containing ultrafine crushing unit 400) found in related technologies. On one hand, this reduces the number of buildings required for the crushing and screening system and the beneficiation plant, thereby reducing the land area and construction costs of these buildings. On the other hand, it enables... The first conveyor 3, which feeds material to the medium crusher unit 200, the second conveyor 4, which feeds material to the fine crusher unit 300, and the third conveyor 5, which feeds material to the ultrafine crusher unit 400, all have the same material conveying direction and similar material conveying path. This makes the layout of the first conveyor 3, the second conveyor 4, and the third conveyor 5 more compact, reducing the land occupation problem caused by the height difference of material conveying and the need for a certain distance between plant buildings and a certain length of conveyor. This further reduces the area occupied to ensure material conveying, thereby further reducing the land area and construction cost of the crushing and screening system and the mineral processing plant.
[0031] The ore beneficiation and transfer system 100 of this invention fulfills the transportation requirements of ore to the medium crushing unit 200, screening unit, fine crushing unit 300 and ultrafine crushing unit 400, realizing the crushing and screening system for medium crushing, screening, fine crushing and ultrafine crushing of ore, reducing the land area and construction cost.
[0032] In some embodiments, the first corridor 6 is a single structure, and the first conveyor 3, the second conveyor 4, and the third conveyor 5 are all located in the first corridor 6. The ore beneficiation transfer system 100 of this embodiment of the invention installs the first conveyor 3, the second conveyor 4, and the third conveyor 5 all within a single corridor (i.e., the first corridor 6). This not only facilitates the production management of the first conveyor 3, the second conveyor 4, and the third conveyor 5, but also reduces the number of corridors compared to the related art where each conveyor is equipped with its own corridor. This reduces the floor space occupied by the corridors in the crushing and screening system and the beneficiation plant, thereby further reducing the construction costs of the ore beneficiation transfer system 100, the crushing and screening system, and the beneficiation plant of this embodiment of the invention.
[0033] Specifically, the first conveyor 3, the second conveyor 4, the third conveyor 5, and the fourth conveyor 7 are all belt conveyors.
[0034] Furthermore, the ore beneficiation circulation system 100 includes a feed plant 9, which is located on the side of the screening plant 2 away from the crushing plant 1 in the second direction. The feed plant 9 has a feed area 91, and the other end of the first conveyor 3 passes through the screening plant 2 and is located in the feed area 91.
[0035] like Figure 1 and Figure 2 As shown, the feed plant 9 is located to the right of the screening plant 2. The crushing plant 1, screening plant 2, and feed plant 9 are arranged sequentially from left to right, allowing the first conveyor 3 to extend to the feed plant 9 in the left-right direction. This enables the ore raw materials in the feed plant 9 to be transported to the intermediate crushing unit 200 via the first conveyor 3. Therefore, the feed plant 9 is located on the side of the screening plant 2 away from the crushing plant 1. This facilitates the transport of ore raw materials to the intermediate crushing zone 11 while also allowing for the convenient placement of the first conveyor 3. The first conveyor 3 can extend in the same direction as the second conveyor 4 and the third conveyor 5 within the first corridor 6, resulting in a more compact layout. This reduces the construction space required for the first corridor 6, thereby reducing its footprint and construction costs. Consequently, it further reduces the footprint and construction costs of the ore beneficiation circulation system 100, the crushing and screening system, and the beneficiation plant in this embodiment of the invention.
[0036] Furthermore, a post-screening zone 92 is also provided within the feed plant 9. The crushing and screening system of this embodiment further includes screening equipment located within the feed plant 9. One end of the third conveyor 5 passes through the screening plant 2 and extends to the post-screening zone 92. The screening equipment is used for primary screening of the ore raw materials entering the concentrator. The fine-grained ore raw materials after primary screening are discharged to the post-screening zone 92 and then conveyed by the third conveyor 5 to the ultrafine crushing unit 400 within the crushing plant 1. The coarse-grained ore raw materials after primary screening are discharged to the other end of the first conveyor 3 and then conveyed by the first conveyor 3 to the medium crushing unit 200 within the crushing plant 1.
[0037] The crushing and screening system of this embodiment of the invention is equipped with screening equipment, which can directly transport fine-particle ore that meets the requirements to the ultrafine crushing unit 400, thereby avoiding the fine-particle ore from flowing through the medium crushing unit 200 and the screening unit. This reduces the operation of the first conveyor 3, the medium crushing unit 200, the second conveyor 4 and the screening unit on the fine-particle ore, which not only helps to reduce energy consumption, but also improves the screening and operation efficiency of the crushing and screening system of this embodiment of the invention.
[0038] In some embodiments, the intermediate crushing zone 11 and the fine crushing zone 12 are opposite each other in the second direction, and the intermediate crushing zone 11 and the fine crushing zone 12 are located on the side of the crushing plant 1 adjacent to the screening plant 2 in the second direction. Figure 1 Only Figure 4 As shown, the medium crushing zone 11 and the fine crushing zone 12 are opposite each other in the left-right direction, and the medium crushing zone 11 and the fine crushing zone 12 are located on the right side of the crushing plant 1.
[0039] The intermediate crushing zone 11 and the fine crushing zone 12 are opposite each other in the left-right direction. Therefore, the intermediate crushing unit 200 and the fine crushing unit 300 are also opposite each other in the left-right direction (arranged). This allows the discharge ends of the intermediate crushing unit 200 and the fine crushing unit 300 to be aligned in the left-right direction, facilitating the fourth conveyor 7 to transport the ore crushed by the intermediate crushing unit 200 and the fine crushing unit 300 to the screening unit. Thus, the left-right orientation of the intermediate crushing zone 11 and the fine crushing zone 12 fully utilizes the ease of extending the conveying distance of the conveyor, improves the convenience of setting up the fourth conveyor 7, and enhances the compactness of the conveying equipment layout of the ore beneficiation circulation system 100 of this embodiment of the invention.
[0040] The medium crushing zone 11 and the fine crushing zone 12 are located on the right side of the crushing plant 1. Therefore, the medium crushing unit 200 and the fine crushing unit 300 are located on the right side of the crushing plant 1, and the ultrafine crushing unit 400 is located on the left side of the crushing plant 1. Correspondingly, the lengths of the first conveyor 3, the second conveyor 4, and the fourth conveyor 7 are all shorter than the length of the third conveyor 5. This layout helps to reduce the total length of the conveying equipment, thereby further reducing the construction costs of the ore beneficiation circulation system 100, the crushing and screening system, and the beneficiation plant in this embodiment of the invention.
[0041] In some embodiments, such as Figure 2 , Figure 3 and Figure 5 As shown, the first conveyor 3, the second conveyor 4, and the third conveyor 5 are arranged at intervals in a third direction (front-to-back direction), and the third direction is orthogonal to the first and second directions. The interval arrangement of the first conveyor 3, the second conveyor 4, and the third conveyor 5 in the front-to-back direction facilitates the installation of the three conveyors in the first corridor 6, reduces the installation difficulty of the three conveyors, and also facilitates the production management of the three conveyors.
[0042] In some embodiments, the first corridor 6 and the second corridor 8 are arranged at an interval in the third direction. The first corridor 6 and the second corridor 8 are spaced apart, thereby facilitating the installation of the two corridors and reducing the installation difficulty of the two corridors.
[0043] The following describes a mineral processing plant according to an embodiment of the present invention.
[0044] The mineral processing plant of this invention includes any of the ore beneficiation transfer systems 100 or crushing and screening systems.
[0045] Therefore, compared with the mineral processing plants in related technologies, the mineral processing plant of this invention has one less plant building and two fewer corridors, reducing the plant area, construction investment, and production management.
[0046] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0047] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0048] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0049] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.
[0050] In this invention, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0051] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.
Claims
1. An ore beneficiation and transfer system (100), characterized in that, include: The crushing plant (1) is provided with a medium crushing zone (11), a fine crushing zone (12) and an ultra-fine crushing zone (13) for setting up a medium crushing unit (200), a fine crushing unit (300) and an ultra-fine crushing unit (400) respectively. The crushing plant (1) has a first feeding layer (14) on one side in the first direction and a first discharge layer (15) on the other side in the first direction. The screening plant (2) is used to set up screening units. The screening plant (2) is provided with an over-screen area (21) and an under-screen area (22) to hold the materials screened by the screening units. The screening plant (2) has a second feeding layer (23) on one side of the first direction and a second discharge layer (24) on the other side of the first direction. The screening plant (2) and the crushing plant (1) are spaced apart in the second direction, which is perpendicular to the first direction. A first conveyor (3), a second conveyor (4), a third conveyor (5), and a first corridor (6), each of which is equipped with the first corridor (6). One end of the first corridor (6) is connected to the second discharge layer (24), and the other end is connected to the first feeding layer (14). One end of the first conveyor (3) is located in the intermediate crushing zone (11) to transport materials to the intermediate crushing zone (11). The second conveyor (4) is connected to the over-screen zone (21) and the fine crushing zone (12) to transport materials to the fine crushing zone (12). The third conveyor (5) is connected to the under-screen zone (22) and the ultra-fine crushing zone (13) to transport materials to the ultra-fine crushing zone (13). The fourth conveyor (7) and the second corridor (8) are provided. The fourth conveyor (7) is equipped with the second corridor (8). One end of the second corridor (8) is connected to the first discharge layer (15), and the other end of the second corridor (8) is connected to the second feeding layer (23). One end of the fourth conveyor (7) covers the medium crushing zone (11) and the fine crushing zone (12), and the other end of the fourth conveyor (7) is located on the second feeding layer (23) to transport the materials of the medium crushing zone (11) and the fine crushing zone (12) to the second feeding layer (23).
2. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, The first corridor (6) has one, and the first conveyor (3), the second conveyor (4) and the third conveyor (5) are all located in the first corridor (6).
3. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, It further includes a feeding plant (9), which is located on the side of the screening plant (2) away from the crushing plant (1) in the second direction. The feeding plant (9) has a feeding area (91) inside it, and the other end of the first conveyor (3) passes through the screening plant (2) and is located in the feeding area (91).
4. The ore beneficiation and transfer system (100) according to claim 3, characterized in that, The feeding plant (9) is also equipped with a screening area (92), and one end of the third conveyor (5) passes through the screening plant (2) and extends to the screening area (92).
5. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, The medium-sized fragmentation zone (11) and the fine-sized fragmentation zone (12) are opposite each other in the second direction.
6. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, The medium crushing zone (11) and the fine crushing zone (12) are located on the side of the crushing plant (1) adjacent to the screening plant (2) in the second direction.
7. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, The first corridor (6) and the second corridor (8) are arranged at intervals in a third direction, which is orthogonal to the first direction and the second direction.
8. The ore beneficiation and transfer system (100) according to claim 1, characterized in that, The first conveyor (3), the second conveyor (4) and the third conveyor (5) are arranged at intervals in a third direction, which is orthogonal to the first direction and the second direction.
9. A crushing and screening system, characterized in that, The system includes a medium crushing unit (200), a fine crushing unit (300), an ultrafine crushing unit (400), a screening unit, and an ore beneficiation transfer system (100) as described in any one of claims 1 to 8. The medium crushing unit (200) is located in the medium crushing zone (11), the fine crushing unit (300) is located in the fine crushing zone (12), the ultrafine crushing unit (400) is located in the ultrafine crushing zone (13), and the screening unit is located in the screening plant (2).
10. A mineral processing plant, characterized in that, Includes the ore beneficiation and transfer system (100) according to any one of claims 1 to 8 or the crushing and screening system according to claim 9.