A low-temperature outdoor controllable artificial glaze preparation method
By using a small-particle nozzle and a 15:1 water-alcohol mixture to prepare rime ice, combined with a heat tracing device and dynamic control, the problems of icing blockage and unstable atomization in rime ice preparation at low temperatures have been solved, achieving continuous and uniform formation of outdoor rime ice and meeting the standardized preparation requirements for cultural and tourism landscapes.
Patent Information
- Application Number
- CN202611395275.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-09
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies cannot achieve large-scale production of continuous, stable, uniform, and aesthetically pleasing artificial frost outdoors at low temperatures, resulting in problems such as poor atomization, icing blockage, unstable air and water supply, and low forming rate.
Using a special nozzle for water-air two-phase flow with a particle size of less than 15 micrometers, combined with a 15:1 mixture of pure water and anhydrous ethanol, a heat tracing device is installed, and equipped with a submersible water supply pump and a gas storage tank. By dynamically adjusting the wind speed and angle, uniform adhesion of rime and stable air and water supply can be achieved.
It achieves fine and uniform frost formation in low-temperature environments, avoids icing and clogging of nozzles and pipelines, ensures continuous operation and high forming rate, and meets the needs of large-scale preparation of cultural and tourism landscapes.
Smart Images

Figure CN123128136A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of rime ice preparation technology, specifically relating to a low-temperature outdoor controllable artificial rime ice preparation method. Background Technology
[0002] As a unique natural landscape occurring in low-temperature environments, rime ice possesses extremely high ornamental value, leading to a growing demand in the cultural and tourism industry for artificially controlled outdoor rime ice. However, existing artificial rime ice preparation technologies suffer from the following core shortcomings: (1) Conventional nozzles produce coarse atomized particles that cannot quickly crystallize at low temperatures to form fine frost, and tend to form ice lumps (hard frost) rather than fluffy frost (soft frost), resulting in poor atomization effect; (2) In outdoor environments with temperatures below -10℃, water supply pipes, gas pipes and nozzles are prone to freezing and blockage, making continuous operation impossible; (3) The lack of a pressure-stabilizing gas storage device leads to fluctuations in gas supply pressure, and mismatched water pump parameters result in insufficient water supply, unstable gas / water supply, and loss of control over atomization effect; (4) The fan speed and spray angle are not matched with the control logic, which makes it easy to blow off the rime that has not been crystallized and attached, resulting in rime falling off and low forming rate; (5) The aqueous solution has no optimized ratio, and the preparation environment and operation process are not standardized, resulting in a low success rate and poor landscape effect of outdoor rime ice preparation.
[0003] Based on the above problems, existing technologies cannot achieve large-scale production of artificial frost that is low-temperature, continuous, stable, uniform, and aesthetically pleasing outdoors, and a targeted solution is urgently needed. Summary of the Invention
[0004] The purpose of this invention is to propose a low-temperature outdoor controllable artificial frost preparation method to solve the problems of poor frost effect, low-temperature icing blockage, and low forming rate in the existing technology.
[0005] To achieve the above objectives, the present invention provides a method for preparing low-temperature outdoor controllable artificial frost using a special nozzle for water-gas two-phase flow with atomized particles smaller than 15 micrometers in the preparation system. Water and gas are supplied through a water supply system and a gas supply system, respectively. The water inlet pipe, the gas inlet pipe, and the nozzle are equipped with heat tracing cables. The aqueous solution used is a mixture of pure water and anhydrous ethanol with a volume mixing ratio of 15:1. The preparation method includes the following steps: Step 1: Preheat the water inlet pipe, air inlet pipe, and nozzle to prevent freezing; Step 2: Start water supply; Step 3: Gas supply atomization. Turn on the air pump and air tank supply system. After the compressed gas is stabilized, it enters the nozzle. The nozzle sprays out a water-gas two-phase atomized air mass with a particle size of <15 microns. Step 4: Adjust the pitch and horizontal angles of the main unit of the fog cannon so that the water and air two-phase atomized air mass is sprayed onto the branches and twigs of the plants to be landscaped, or swing and adjust the main unit of the fog cannon to swing and spray. Step 5: Adjust the wind speed of the fog cannon main unit to prevent the rime from being blown off, based on the real-time temperature and wind speed. Step Six: Based on the growth state of the frost crystals on the tree branches, manually adjust the angle of the fog cannon machine to ensure that the branches and twigs of the plants to be landscaped are evenly covered with frost from all directions until the entire plant is covered with uniform frost, thus completing the preparation.
[0006] The preparation method further includes: Step 7: Shut down the equipment: Turn off the water supply system, and after five minutes, turn off the gas supply system and the heat tracing system to complete the equipment shutdown.
[0007] The antifreeze preheating described in step one specifically involves: turning on the heating tapes of all water inlet pipes, air inlet pipes, and nozzles, starting the heating system, and preheating the cavities of the water inlet pipes, air inlet pipes, and nozzles.
[0008] Turn on the heat tracing tape and start the heat tracing system for 5 minutes to preheat.
[0009] The water supply pneumatic process described in step two is as follows: After the preheating in step one is completed, start the submersible water supply pump, adjust the water supply pressure, and supply water to all nozzles until all nozzles have a continuous flow of mixed aqueous solution.
[0010] The preparation system further includes: The atomizing cannon main unit has multiple nozzles evenly arranged at the outlet of the atomizing cannon main unit; Water supply tank; A submersible water pump installed inside a water supply tank transmits the aqueous solution in the water supply tank to each nozzle through an inlet pipe; the water supply tank, the submersible water pump, and the inlet pipe constitute a water supply system. gas tank; And an air pump, which transmits the gas in the gas storage tank to each nozzle through the air inlet pipe, the air pump, the gas storage tank and the air inlet pipe constitute the gas supply system.
[0011] The beneficial effects of this invention are as follows: The low-temperature outdoor controllable artificial frost preparation method of this invention uses nozzles with a particle size of less than 15 micrometers for spraying, achieving rapid formation of fine frost at low temperatures, resulting in a good frost effect; the ultra-fine atomized particles of less than 15 micrometers, combined with a 15:1 water-to-alcohol ratio, rapidly crystallize at low temperatures, forming a fluffy, uniform, high-quality frost; the water inlet pipe, air inlet pipe, and nozzle are equipped with a heating system with a heating cable, fundamentally solving the problem of icing and blockage below -10℃, allowing for continuous long-term operation; the air supply pressure is greater than or equal to 0.8MPa and the air storage tank is greater than or equal to ≥10L with stable pressure; the submersible water supply pump has a head of 6m and a flow rate of 4500L / h, with a high flow rate and high head matching, ensuring continuous and stable water and air supply; through dynamic control of wind speed and angle, the frost crystals are prevented from being blown off, significantly improving the adhesion rate and integrity of outdoor frost; it is suitable for large-scale, standardized preparation of artificial frost in outdoor scenic spots, gardens, and cultural tourism projects. This invention solves the problem of nozzles and pipelines freezing and clogging under low outdoor temperatures, enabling continuous and uninterrupted fogging and frost formation; it optimizes atomization particles, air and water supply parameters to ensure fine droplets that easily crystallize, forming uniform and fluffy frost; it establishes standardized operating procedures and environmental control conditions to prevent frost crystals from being blown off, improving the quality of the formation; and it enables controllable outdoor artificial frost preparation, meeting the needs of cultural tourism landscape design. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the preparation system structure used in the low-temperature outdoor controllable artificial frost preparation method of the present invention; The components include: 1. Fog cannon main unit, 2. Water-air two-phase flow special nozzle, 3. Water inlet pipe, 4. Air inlet pipe, 5. Water supply tank, 6. Submersible water supply pump, 7. Air pump, and 8. Air storage tank. Detailed Implementation
[0013] The embodiments of the present invention will be further described below with reference to the accompanying drawings.
[0014] The method for preparing low-temperature outdoor controllable artificial frost in this invention uses a special nozzle 2 for water-gas two-phase flow with atomized particles smaller than 15 micrometers in the preparation system. Water and gas are supplied through a water supply system and a gas supply system, respectively. The water inlet pipe 3, the air inlet pipe 4, and the nozzle are equipped with heat tracing tape. The aqueous solution used is a mixture of pure water and anhydrous ethanol with a volume mixing ratio of 15:1. The preparation method includes the following steps: Step 1: Preheat the water inlet pipe 3, air inlet pipe 4, and nozzle to prevent freezing; Step 2: Start water supply; Step 3: Air supply atomization. The air supply system of air pump 7 and air tank 8 is turned on. The compressed gas enters the nozzle after pressure stabilization. The nozzle sprays out water-gas two-phase atomized air clouds with a particle size of <15 microns. When there is only an air pump and no air tank, the pressure fluctuates violently with the output of the air compressor when using air. The air compressor starts and stops frequently, and the pressure fluctuates. This application adopts the form of air pump plus air tank. The pressure still changes between the set upper and lower limits, but the rate of pressure change is slower and the peaks are filtered out. Step 4: Adjust the pitch and horizontal angles of the main unit 1 of the fog cannon so that the water and air two-phase atomized air mass is sprayed onto the branches and twigs of the plants to be landscaped, or swing and adjust the main unit 1 of the fog cannon to swing and spray to expand the atomization area. Step 5: Adjust the wind speed of the fog cannon main unit 1 according to the real-time temperature and wind force to prevent the rime from being blown off; Step Six: Based on the growth state of the frost crystals on the branches, manually adjust the angle of the fog cannon main unit 1 to ensure that the branches and twigs of the plant to be landscaped are evenly covered with frost from all directions until the entire plant is covered with uniform frost, thus completing the preparation. This application cannot complete the preparation of frost on the entire plant in one go; it can only be done part by part. The purpose of Step Six is: when a part of the plant has reached the required frost level, the angle of the fog cannon can be adjusted to spray the areas of the plant where no frost has formed. After completion, the spraying position is changed again, and so on until the entire plant is completed.
[0015] The preparation method further includes: Step 7: Shut down the equipment: Turn off the water supply system, use the air pump 7 pressure to blow away the residual water solution in the nozzle to prevent rust and nozzle blockage, and after five minutes turn off the air supply system and the heating system to complete the equipment shutdown.
[0016] The antifreeze preheating described in step one specifically involves: turning on the heat tracing tapes of all water inlet pipes 3, air inlet pipes 4, and nozzles, starting the heat tracing system, and preheating the cavities of water inlet pipes 3, air inlet pipes 4, and nozzles.
[0017] Turn on the heat tracing tape and start the heat tracing system for 5 minutes to preheat.
[0018] The water supply pneumatic process described in step two is as follows: After the preheating in step one is completed, start the submersible water supply pump 6, adjust the water supply pressure, and supply water to all nozzles until all nozzles have a continuous flow of mixed aqueous solution.
[0019] See Figure 1 The preparation system further includes: The atomizing cannon host has multiple nozzles evenly arranged at the outlet of the atomizing cannon host; the fog cannon host 1 is a conventional fog cannon as the basic carrier, and all nozzles are replaced with water-air two-phase flow special nozzles 2 with atomization particle size <15 microns. Six water-air two-phase flow special nozzles 2 are fixedly installed on a single fog cannon. Water supply tank 5; A submersible water pump 6 is installed inside the water supply tank 5. The submersible water pump 6 transmits the aqueous solution in the water supply tank 5 to each nozzle through the inlet pipe 3. The water supply tank 5, the submersible water pump 6 and the inlet pipe 3 constitute a water supply system. The submersible water pump 6 is used. The pump's technical parameters are: head ≥ 4m, rated flow ≥ 4500L / h. The aqueous solution is provided by the independent water supply tank 5 and the water supply system. Gas storage tank 8; And an air pump 7, which transmits the gas in the air storage tank 8 to each nozzle through the air inlet pipe 4. The air pump 7, the air storage tank 8 and the air inlet pipe 4 constitute an air supply system.
[0020] An independent air pump 7 is configured to provide compressed gas, with a rated working pressure ≥0.8MPa; to ensure continuous and stable gas supply, a matching air storage tank 8 with a volume of 10L is installed.
[0021] The outdoor natural environment required for this invention to simultaneously meet the following conditions: Ambient temperature: -10℃ to -25℃; Weather conditions: Outdoor wind force is below level 2.
[0022] In this embodiment, the outdoor temperature is -18℃ and the wind force is level 1, which meets the preparation conditions; a conventional fog cannon is selected and six 12-micron water-air two-phase flow nozzles are installed; a 0.8MPa air pump 7 and a 10L air storage tank 8 are provided; the parameters of the submersible water supply pump 6 are 6m head and 4500L / h flow rate; and all water inlet pipes 3, air inlet pipes 4 and nozzles are equipped with heat tracing cables.
Claims
1. A method for preparing low-temperature outdoor controllable artificial frost, characterized in that, The nozzles used in the preparation system are water-gas two-phase flow special nozzles (2) with atomization particle size of less than 15 micrometers. Water and gas are supplied through water supply system and gas supply system respectively. The water inlet pipe (3), air inlet pipe (4) and nozzle are equipped with heat tracing tape. The aqueous solution used is a mixture of pure water and anhydrous ethanol with a volume mixing ratio of 15:
1. The preparation method includes the following steps: Step 1: Preheat the water inlet pipe (3), air inlet pipe (4) and nozzle to prevent freezing; Step 2: Start water supply; Step 3: Gas supply atomization. Turn on the gas pump (7) and the gas storage tank (8) gas supply system. After the compressed gas is stabilized, it enters the nozzle and the nozzle sprays out water and gas two-phase atomized gas cloud with a particle size of <15 microns. Step 4: Adjust the pitch and horizontal angles of the main unit (1) of the fog cannon so that the water and air two-phase atomized air mass is sprayed onto the branches and twigs of the plants to be landscaped, or swing and adjust the main unit (1) of the fog cannon to swing and spray. Step 5: Adjust the wind speed of the fog cannon main unit (1) according to the real-time temperature and wind force so that the frost is not blown off; Step 6: Based on the growth state of the frost crystals on the tree branches, manually adjust the angle of the main unit (1) of the fog cannon so that the branches and twigs of the plants to be landscaped are evenly covered with frost all over the whole, until the whole plant is covered with uniform frost, and the preparation is completed.
2. The method for preparing low-temperature outdoor controllable artificial frost according to claim 1, characterized in that, The preparation method further includes: Step 7: Shut down the equipment: Turn off the water supply system, and after five minutes, turn off the gas supply system and the heat tracing system to complete the equipment shutdown.
3. The method for preparing low-temperature outdoor controllable artificial frost according to claim 1, characterized in that, The antifreeze preheating described in step one is as follows: turn on the heat tracing tapes of all water inlet pipes (3), air inlet pipes (4) and nozzles, start the heat tracing system, and preheat the cavities of water inlet pipes (3), air inlet pipes (4) and nozzles.
4. The method for preparing low-temperature outdoor controllable artificial frost according to claim 3, characterized in that, Turn on the heating tape and start the heating system for 5 minutes to preheat.
5. The method for preparing low-temperature outdoor controllable artificial frost according to claim 1, characterized in that, The water supply pneumatic process described in step two is as follows: After the preheating in step one is completed, start the submersible water supply pump (6), adjust the water supply pressure, and supply water to all nozzles until all nozzles have a continuous flow of mixed aqueous solution.
6. The method for preparing low-temperature outdoor controllable artificial frost according to claim 1, characterized in that, The preparation system further includes: The atomizing cannon main unit has multiple nozzles evenly arranged at the outlet of the atomizing cannon main unit; Water supply tank (5); A submersible water pump (6) is installed inside the water supply tank (5). The submersible water pump (6) transmits the aqueous solution in the water supply tank (5) to each nozzle through the inlet pipe (3). The water supply tank (5), the submersible water pump (6) and the inlet pipe (3) constitute a water supply system. Gas storage tank (8); And an air pump (7), which transmits the gas in the gas storage tank (8) to each nozzle through the air inlet pipe (4). The air pump (7), the gas storage tank (8) and the air inlet pipe (4) constitute an air supply system.
