Multi-station laser cutting machine parallel processing task intelligent scheduling system and method
By establishing a dust load and airflow coupling matrix in a multi-station laser cutting machine, predicting negative pressure values and optimizing task scheduling, the problem of dust removal negative pressure fluctuations was solved, improving processing efficiency and dust removal stability.
Patent Information
- Application Number
- CN202611282923.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-20
AI Technical Summary
When multi-station laser cutting machines process in parallel, fluctuations in the negative pressure of the dust removal system make it difficult to remove smoke and molten particles, which contaminate the protective lens and affect the cutting quality. Existing scheduling methods fail to effectively predict and adjust the task station and processing start time, resulting in reduced efficiency.
By acquiring the cutting trajectory and dust removal branch pipe parameters, a coupling matrix of smoke load and airflow is established to predict the negative pressure value, identify conflict time windows and optimize task scheduling, adjust the processing start time and workstation allocation, and reduce the key superposition of insufficient negative pressure.
It improves dust removal stability, reduces the probability of smoke and dust retention and slag buildup in the cutting seams, and enhances the processing efficiency of multi-station parallel cutting.
Smart Images

Figure CN123128737A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of laser cutting processing and intelligent scheduling technology, specifically to an intelligent scheduling system and method for parallel processing tasks of multi-station laser cutting machines. Background Technology
[0002] Multi-station laser cutting machines typically have multiple independent cutting stations, enabling simultaneous execution of multiple sheet metal processing tasks to improve equipment utilization and batch processing efficiency. Existing parallel processing task scheduling mainly allocates stations and arranges processing sequences based on task processing time, station idle status, task priority, or delivery time, focusing primarily on equipment load balancing and overall processing cycle time.
[0003] However, in some multi-station laser cutting equipment, the dust collection branch pipes of each cutting station are connected to the same main dust collection pipe. When multiple stations perform cutting tasks involving dense holes, short contours, or frequent perforations at similar times, the instantaneous smoke exhaust demand of each station will overlap. At the same time, due to the differences in length, pipe diameter, and connection position of different dust collection branch pipes, the smoke exhaust load change of one station may cause airflow coupling to other stations through the shared dust collection main pipe, resulting in insufficient negative pressure in some stations for a specific short period of time. This type of negative pressure fluctuation is characterized by short duration and is related to the specific cutting trajectory and task combination, and cannot be accurately reflected by conventional average processing load or total processing time.
[0004] When the local negative pressure is insufficient, the smoke and molten particles generated during the cutting process are difficult to remove in time, easily accumulating near the cutting head and contaminating the protective lens, resulting in attenuation of cutting energy, slag buildup in the kerf, and even localized breakage. While existing methods, such as fixing staggered processing or limiting the number of simultaneously operating stations, can mitigate these problems to some extent, they fail to predict and adjust the specific time periods where negative pressure conflicts might occur based on the perforation distribution, cutting length, and smoke load variations of each task along the processing time axis, combined with the airflow coupling relationship between different stations. This can easily lead to unnecessary station waiting and reduced parallel processing efficiency. Therefore, it is necessary to provide an intelligent scheduling method for parallel processing tasks of multi-station laser cutting machines that can balance dust removal negative pressure stability with overall processing efficiency. Summary of the Invention
[0005] The purpose of this invention is to provide an intelligent scheduling system and method for parallel processing tasks of multi-station laser cutting machines, so as to solve the shortcomings of the prior art.
[0006] To achieve the above objectives, the present invention provides the following technical solution: an intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine, comprising: Obtain the cutting trajectory, plate thickness, cutting speed, piercing parameters, and connection parameters of the dust removal branch pipes at each workstation for each task to be processed; The cutting trajectory is mapped to the processing time axis based on the cutting speed and piercing parameters. The number of piercings, piercing duration, cutting length and plate thickness are input into the dust load model according to the preset time window to obtain the dust load sequence that characterizes the dust removal demand intensity of each time window. Based on the connection parameters of each dust removal branch pipe, an airflow coupling matrix for each workstation is established. The dust load sequence allocated to each workstation is time-aligned according to the processing start time. The predicted negative pressure value of each time window is calculated in combination with the airflow coupling matrix of each workstation to obtain the predicted negative pressure sequence. The time window in which the predicted negative pressure value is lower than the preset allowable negative pressure value is determined as the conflict time window, and the negative pressure contribution value of each task is calculated based on the corresponding dust load value and airflow coupling parameters to form a scheduling conflict set; For the task generation workstation exchange scheme and the start time offset scheme with the largest negative pressure contribution in the scheduling conflict set, the predicted negative pressure sequence is recalculated respectively, and the scheme with the smallest increase in total completion time is selected from the schemes that eliminate the conflict time window to update the task scheduling. Based on the updated task-workstation correspondence and processing start time, parallel processing scheduling instructions are generated to control each workstation to execute the corresponding laser cutting task.
[0007] Preferably, mapping the cutting trajectory to the processing time axis includes: taking the start time of the task to be processed as the relative time zero point, determining the cutting duration according to the execution order of the cutting trajectory based on the trajectory length of each cutting trajectory segment and the corresponding cutting speed, determining the piercing time period based on the piercing duration of each piercing point, and including the non-cutting movement time between adjacent cutting trajectory segments in the processing time axis, and sequentially determining the start and end times of each piercing point and each cutting trajectory segment.
[0008] Preferably, obtaining the dust load sequence includes: dividing continuous time windows along the processing time axis according to a preset window length; determining the number of piercing points located within the corresponding time window at the start of piercing as the number of piercings; accumulating the overlap duration of each piercing process with the corresponding time window to obtain the piercing duration; multiplying the overlap duration of each cutting trajectory segment with the corresponding time window by the corresponding cutting speed and then accumulating the result to obtain the cutting length; inputting the number of piercings, piercing duration, cutting length, and plate thickness into the dust load model to obtain the dust load value of each time window, and arranging them in chronological order to form a dust load sequence.
[0009] Preferably, the load coefficient in the dust load model is obtained through single-station calibration, including: with other stations stopped processing, executing a preset processing trajectory for different plate thicknesses and different perforation and cutting combinations, recording the branch pipe exhaust volume required to maintain the negative pressure amplitude of the predetermined station, and fitting the load coefficients corresponding to the cutting process, continuous perforation process and perforation initiation process according to the correspondence between the branch pipe exhaust volume and the cutting length, perforation duration and perforation number.
[0010] Preferably, establishing the workstation airflow coupling matrix includes: determining the airflow path from the dust removal inlet to the dust removal fan of each workstation based on the length, diameter, and connection position of each dust removal branch pipe to the common dust removal main pipe, and determining the common pipe section in the airflow path of any two workstations; determining the equivalent flow resistance based on the length, diameter, friction resistance parameters, and local resistance parameters of each pipe section, and determining the degree of influence of the equivalent incremental exhaust demand of one workstation on the negative pressure amplitude of another workstation based on the reference flow rate of the pipe section under the reference dust removal operating state, which serves as the corresponding airflow coupling coefficient, and forming the workstation airflow coupling matrix from the airflow coupling coefficients.
[0011] Preferably, time alignment includes: shifting the dust load sequence of each task to be processed to a unified equipment time axis according to the corresponding processing start time; determining the time alignment weight based on the proportion of the overlap between the task's relative time window and the equipment time window to the preset window length; and obtaining the task-level aligned dust load of each task within the equipment time window based on the time alignment weight; and summarizing the task-level aligned dust loads assigned to the same workstation to obtain the aligned dust load of the corresponding workstation.
[0012] Preferably, obtaining the predicted negative pressure sequence includes: for each equipment time window, combining and calculating the aligned dust load of each workstation with the workstation airflow coupling matrix to obtain the predicted negative pressure amplitude of each workstation relative to the reference negative pressure amplitude; selecting the workstation with the smallest predicted negative pressure amplitude from the workstations that are actually in the perforation or cutting state within the current equipment time window as the weak workstation, and determining its predicted negative pressure amplitude as the predicted negative pressure value of the equipment time window, forming a predicted negative pressure sequence according to the equipment time sequence.
[0013] Preferably, the formation of the scheduling conflict set includes: determining the equipment time window where the predicted negative pressure value is lower than the preset allowable negative pressure value as the conflict time window; for each conflict time window, the tasks participating in the load superposition of the time window are sequentially virtually removed, and the predicted negative pressure amplitude of the original weak workstation is recalculated while keeping the dust load of the remaining tasks, the workstation allocation relationship and the workstation airflow coupling matrix unchanged, and the difference between the predicted negative pressure amplitude before and after the virtual load removal is determined as the negative pressure contribution value of the corresponding task.
[0014] Preferably, the scheduling conflict set is formed by associating conflict time windows, weak workstations, task numbers, workstations where tasks are located, and negative pressure contribution values in descending order of negative pressure contribution value; the conflict record with the largest negative pressure contribution value is identified as the target task, and workstation exchange candidate schemes and start time offset candidate schemes are generated for the target task; for each candidate scheme, the dust load time is re-aligned according to the adjusted task-workstation correspondence or processing start time, and the complete predicted negative pressure sequence is recalculated using the workstation airflow coupling matrix; the candidate schemes in which all equipment time windows with processing tasks meet the preset allowable negative pressure value are identified as conflict-free candidate schemes, the increase in total completion time of each conflict-free candidate scheme relative to the task scheduling before adjustment is calculated, and the conflict-free candidate scheme with the smallest increase in total completion time is selected to update the task-workstation correspondence and processing start time.
[0015] The present invention also provides an intelligent scheduling system for parallel processing tasks of a multi-station laser cutting machine, comprising: a task parameter acquisition module, a dust load modeling module, an airflow coupling and negative pressure prediction module, a conflict identification and contribution assessment module, a task scheduling optimization module, and a parallel processing control module.
[0016] The technical effects and advantages provided by the present invention in the above technical solution are as follows: This invention maps the cutting trajectory of each processing task to the processing time axis according to the cutting speed and piercing parameters, and extracts the number of piercings, piercing duration, and cutting length within a preset time window. Combined with the plate thickness, it forms a dust load sequence that changes over time. Simultaneously, based on the length, diameter, and main pipe connection position of each station's dust removal branch pipe, a station airflow coupling matrix is established. The dust load of different tasks is aligned according to the actual processing start time and then coupled for calculation. This directly reflects the mutual influence of negative pressure generated by the shared dust removal main pipe on multiple stations in short-term high-smoke scenarios such as dense piercing and short-contour continuous cutting. It can pre-identify specific conflict time windows and weak stations, avoiding the instantaneous negative pressure insufficiency that is difficult to identify using traditional average load or fixed peak-shifting methods. This reduces the probability of dust retention, protective lens contamination, slag buildup in the cut, and localized cut breaks, thereby improving the dust removal stability of multi-station parallel cutting processes.
[0017] Furthermore, this invention, for identified conflict time windows, does not simply limit the number of simultaneously operating workstations. Instead, it combines the dust load of a task with the airflow coupling relationship between its workstation and the weak workstation. By virtually eliminating the load of each task in its current time window and recalculating the negative pressure recovery of the weak workstation, it obtains the negative pressure contribution value of each task, and prioritizes the task with the greatest impact on the conflict. Subsequently, it changes the spatial coupling path of the task in the dust removal pipeline by workstation switching, changes the superposition position of its high dust load on the time axis by shifting the processing start time, and recalculates the complete predicted negative pressure sequence for each candidate scheme. This technique can effectively weaken the superposition of key loads causing insufficient negative pressure without uniformly delaying all tasks or reducing overall concurrency. Furthermore, by using the elimination of all conflict time windows as a constraint and minimizing the increase in total completion time as the selection criterion, it can reduce unnecessary waiting while maintaining allowable negative pressure conditions, thus balancing dust removal safety constraints with the efficiency of multi-workstation parallel processing. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this invention. For those skilled in the art, other drawings can be obtained based on these drawings.
[0019] Figure 1 This is a flowchart of the method of the present invention.
[0020] Figure 2 This is a flowchart of the system modules of the present invention.
[0021] Figure 3 This is a schematic diagram of the formation of dust load.
[0022] Figure 4 This is a schematic diagram of airflow coupling and negative pressure prediction.
[0023] Figure 5 This is a schematic diagram for conflict identification and scheduling optimization. Detailed Implementation
[0024] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0025] Example 1, please refer to Figure 1 , Figure 3 ,Figure 4 and Figure 5 As shown in this embodiment, the intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine includes: S100 acquires the cutting trajectory, plate thickness, cutting speed, piercing parameters, and connection parameters of the dust removal branch pipes for each processing task.
[0026] Specifically, the cutting trajectory corresponding to each processing task is read from the CNC machining file or layout file of the laser cutting machine. The cutting trajectory includes the spatial coordinates of the contour segment, the trajectory length, the trajectory execution order, and the position of each perforation point in the cutting trajectory. The thickness of the sheet material to be processed and the cutting speed corresponding to each trajectory segment are obtained from the task process parameter table.
[0027] Furthermore, the perforation parameters corresponding to each perforation point are extracted. The perforation parameters include at least the perforation location, perforation duration, and perforation power, which are used to characterize the instantaneous smoke exhaust demand caused by the perforation operation during task execution.
[0028] For each cutting station, the connection parameters of the corresponding dust removal branch pipe are obtained from the equipment dust removal pipeline configuration data. The connection parameters include the branch pipe length, branch pipe diameter, and the connection position of the branch pipe connecting to the common dust removal main pipe. The air inlet end or preset reference position of the dust removal main pipe is used as the position reference, and the distance along the airflow direction of the main pipe is used to represent the connection position.
[0029] S200 maps the cutting trajectory to the processing time axis according to the cutting speed and piercing parameters, and inputs the number of piercings, piercing duration, cutting length and plate thickness into the dust load model according to the preset time window to obtain the dust load sequence characterizing the dust removal demand intensity of each time window.
[0030] Specifically, for any task to be processed obtained in S100, the moment when the task begins execution is taken as the relative time zero point, and a processing time axis is established according to the execution order of the cutting trajectory. For the first... Each cutting trajectory segment, based on its trajectory length With corresponding cutting speed Determine the cutting duration: ;in, Indicates the first The cutting duration of each cutting trajectory segment. This indicates the length of the cutting trajectory segment. This indicates the cutting speed corresponding to the cutting trajectory segment. For each piercing point, the corresponding piercing time period is determined based on the piercing duration obtained in S100. For non-cutting movements between adjacent cutting trajectory segments, the estimated movement duration recorded in the CNC machining file is included in the machining time axis, but not in the dust load calculation. Thus, each piercing time period, cutting time period, and non-cutting movement time period are sequentially accumulated to determine the start and end times of each piercing point and each cutting trajectory segment on the machining time axis.
[0031] Along the processing time axis according to the preset window length Divide into multiple continuous time windows, the first Each time window is recorded as The preset window length Based on the pre-calibration of the dynamic response time of the shared dust removal system to changes in smoke load, a time window can be used to distinguish short-term load changes caused by continuous perforation.
[0032] For time windows The number of perforation points that fall within the time window at the start of perforation is determined as the number of perforations. ; Combine each perforation process with a time window The overlapping durations are summed to obtain the perforation duration. ; Match each cutting trajectory segment with a time window The overlapping time is multiplied by the corresponding cutting speed and then summed to obtain the cutting length. Therefore, when a perforation process or cutting trajectory segment spans an adjacent time window, only the portion that actually overlaps with the current time window is included in the current time window to ensure that the obtained features correspond to the actual time period of smoke and dust occurrence.
[0033] Furthermore, the number of perforations Duration of perforation Cutting length and the plate thickness obtained by S100 Input the dust load model and calculate the time window. Corresponding dust load value One implementation method is shown as follows: ;in, Used to characterize time windows The equivalent incremental exhaust air demand relative to the baseline dust removal state, corresponding to the predetermined dust removal state. , and These represent the thickness of the sheet metal. The load coefficients for the cutting process, continuous piercing process, and piercing initiation process are calculated. These load coefficients are obtained through single-station calibration: with other stations stopped processing, a preset processing trajectory is executed for different plate thicknesses and different piercing / cutting combinations. The required branch pipe exhaust volume to maintain the predetermined negative pressure amplitude at each station is recorded, and the recorded exhaust volume is then compared with the corresponding... , and Fitting is performed to obtain the load factor for the corresponding plate thickness. When there are differences in perforation power, the load factor can be calibrated according to the perforation power range. and .
[0034] Arrange the dust load values according to the chronological order of each time window on the processing time axis to obtain the dust load sequence corresponding to the task to be processed: Among them, the dust load sequence It also characterizes the intensity of dust removal requirements for the task to be processed and its location on the task's relative time axis.
[0035] S300: Based on the connection parameters of each dust removal branch pipe, establish the workstation airflow coupling matrix, align the dust load sequence allocated to each workstation according to the processing start time, and calculate the predicted negative pressure value of each time window in combination with the workstation airflow coupling matrix to obtain the predicted negative pressure sequence.
[0036] Specifically, based on the length, diameter, and connection location of the dust removal branch pipes at each workstation obtained in S100, the dust removal pipeline is divided into multiple branch pipe sections and main pipe sections, and the airflow path from the dust removal inlet to the dust removal fan at each workstation is determined. The airflow path corresponding to each workstation is denoted as follows: Any two workstations and The set of pipe segments that the paths pass through together This is the shared airflow path for both; the longer the shared airflow path or the greater the resistance of the corresponding pipe section, the better the workstation. Changes in exhaust ventilation requirements affect workstations The more pronounced the negative pressure effect, the more obvious the effect.
[0037] For the Each pipe segment, based on the segment length Pipe diameter The equivalent flow resistance is determined by pre-stored frictional resistance and local resistance parameters. The pressure loss of the pipe section is expressed as: ;in, For the first Pressure loss in each pipe section This represents the gas flow rate through this pipe section. One way to determine the equivalent flow resistance is as follows: ;in, air density, For the first Friction coefficient of each pipe section This is the sum of the local resistance coefficients formed by elbows, tees, and connections. Therefore, the pipe geometry parameters in S100 are converted into pipe segment resistance parameters that characterize the pressure loss along each airflow path.
[0038] Furthermore, under the reference dust removal operating condition of the multi-station laser cutting machine, the reference flow rate of each pipe section is obtained. and the reference negative pressure amplitude of each workstation For workstations The equivalent incremental exhaust demand, which affects the workstation The impact is mainly caused by the change in pressure loss in the shared airflow path between the two, therefore the workstation The unit increase in exhaust ventilation demand has caused workstations The sensitivity to the decrease in negative pressure amplitude is determined by the airflow coupling coefficient: ;in, Indicates workstation The equivalent incremental exhaust demand for workstations The degree of influence of negative pressure amplitude; when hour, For workstation Its own complete airflow path, therefore Simultaneously, it characterizes the negative pressure effect generated by the workstation's own branch pipes and shared main pipes; when hour, This characterizes the cross-influence between two workstations through sharing a supervisor. (According to all) The workstation airflow coupling matrix is formed as follows: ;in, This represents the number of cutting stations. The above airflow coupling matrix is a negative pressure sensitivity matrix near the baseline operating state. It can be used to analyze the station flow rate changes and corresponding negative pressure changes obtained during equipment commissioning. Corrections are made to reduce prediction errors caused by differences in actual pipeline installation.
[0039] Furthermore, the dust load value obtained from S200 This represents the equivalent incremental exhaust demand generated by the processing relative to the baseline dust removal state. Let the exhaust demand be allocated to the... The task set for each workstation is Among them, the task The processing start time is , its first The dust load value is Then, the task corresponding to the load value is shifted relative to the time window to the unified device time axis, resulting in: ; the first on the device timeline Each time window is recorded as ,according to and The overlap duration determines the time alignment weight: ;in, This represents the actual duration of the overlap between the two time windows. Therefore, the... The workstation is at the The aligned dust load within the time window of each device is: ; When the When there are no processing tasks at a workstation within the corresponding time window, Through the above processing, the relative time dust load sequence formed by each task in S200 is converted to the same equipment time reference according to its actual processing start time.
[0040] The first The aligned dust load of all workstations within a single equipment time window constitutes the load vector: T is the vector transpose; and the predicted negative pressure amplitude for each workstation is calculated using the aforementioned workstation airflow coupling matrix: ; in, This refers to the baseline negative pressure amplitude for each workstation under the baseline dust removal operating conditions. For the first The predicted negative pressure amplitude for each workstation within a time window. This invention uses the negative pressure amplitude to characterize the suction capacity of a workstation; that is, the smaller the negative pressure amplitude, the weaker the suction capacity available to the corresponding workstation.
[0041] Furthermore, determine the first The set of workstations actually in the perforation or cutting state within a time window. The minimum value among the predicted negative pressure amplitudes of each workstation within this set is determined as the predicted negative pressure value for that time window. Simultaneously, the workstation that achieves the minimum predicted negative pressure amplitude is designated as a weak workstation. Arrange the predicted negative pressure values for each time window sequentially according to the equipment's timeline to obtain the predicted negative pressure sequence: It also associates and saves the weak workstations corresponding to each predicted negative pressure value. The predicted negative pressure sequence and weak workstations are used by S400 to determine whether the predicted negative pressure amplitude is lower than the preset allowable negative pressure amplitude, and to determine the negative pressure contribution value of each parallel processing task to the conflict time window based on the airflow coupling relationship of the workstations.
[0042] S400 determines the time window when the predicted negative pressure value is lower than the preset allowable negative pressure value as the conflict time window, and calculates the negative pressure contribution value of each task based on the corresponding dust load value and airflow coupling parameters to form a scheduling conflict set.
[0043] Specifically, based on the predicted negative pressure sequence obtained from S300 The predicted negative pressure value corresponding to the k-th device time window. With preset allowable negative pressure value Compare, when satisfied At that time, the corresponding device time window The conflict time window is determined, and the predicted negative pressure value in S300 is... Corresponding workstation The workstations identified as vulnerable during this conflict window were determined. The present invention uses the negative pressure amplitude to characterize the suction capacity, which is a pre-determined and stored minimum allowable negative pressure amplitude that can maintain the current requirements for laser cutting smoke extraction. Therefore, the negative pressure amplitude is lower than the minimum allowable negative pressure amplitude. This indicates that the corresponding workstation has insufficient smoke extraction capacity.
[0044] To determine the specific task causing the conflict, the task-level aligned dust load of each task to be processed within the equipment time window is retained during time alignment in S300. For task a, its task-level aligned dust load within the k-th equipment time window is expressed as: ;in, The dust load value for task a in the m-th relative time window obtained from S200. The time overlap weight between the relative time window determined by S300 and the k-th device time window. If task a is assigned to a workstation... Then, the aligned dust load of workstation j in the k-th equipment time window is the sum of the aligned dust loads of each task level allocated to that workstation. This will satisfy... The tasks are identified as those participating in the dust removal load superposition within the current conflict time window, and a task set is formed. .
[0045] For task sets For any task 'a' in the schedule calculation, perform virtual load removal, that is, during the scheduling calculation, align the task level of this task with the dust load within the current conflict time window. The virtual load is set to zero, while the dust load of this task in other time windows, the dust load of other tasks, the current workstation allocation relationship, and the workstation airflow coupling matrix K established by S300 remain unchanged. The virtual load elimination is only used to evaluate the marginal impact of the task on the current negative pressure conflict and does not change the execution status of the actual processing task.
[0046] After virtual removal of task a, its workstation The aligned dust load for the current time window is updated as follows: The dust load of the remaining workstations remains unchanged, and the original weak workstations are recalculated according to the negative pressure calculation relationship of S300. Predicted negative pressure amplitude: ;in, For weak work positions The baseline negative pressure amplitude, The equivalent incremental exhaust demand for the j-th workstation is for the weak workstation. The degree of influence of negative pressure amplitude, This is for aligning the dust load at the j-th workstation after virtual removal of task a. Weak workstations are maintained during the recalculation process. This remains unchanged, ensuring that all tasks are evaluated using the same affected workstation as the evaluation object.
[0047] The difference between the predicted negative pressure amplitude after virtual task removal and the predicted negative pressure amplitude of the weak workstation before removal is determined as the conflict time window for task a. Negative pressure contribution value: Based on the negative pressure calculation relationship of S300, the above formula can be further expressed as: ; in, The negative pressure contribution value for task (a), Characterize the workstation where the task is located For weak work positions The degree of airflow coupling, This represents the equivalent incremental exhaust demand generated by the task within the current conflict time window. Therefore, the negative pressure contribution value is not determined solely based on the task's own dust load, but also reflects the magnitude of the task's dust load and the coupling effect of the dust removal airflow between its workstation and the weak workstation; the larger the negative pressure contribution value, the more significant its effect on the current insufficient negative pressure state.
[0048] The above processing is performed sequentially for each conflict time window, and the conflict time window corresponding to each task is... Weak work positions Task number a, Task location and negative pressure contribution value The conflict records are linked and arranged in descending order of negative pressure contribution value to form a scheduling conflict set: Therefore, the first conflict record in the scheduling conflict set can determine the task to be adjusted first in the current negative pressure conflict, and directly transfer the task and its current workstation to the subsequent steps to generate the workstation exchange scheme and the processing start time offset scheme.
[0049] S500 generates workstation exchange schemes and start time offset schemes for tasks with the largest negative pressure contribution in the scheduling conflict set, recalculates the predicted negative pressure sequence, and selects the scheme with the smallest increase in total completion time from the schemes that eliminate conflict time windows to update the task scheduling.
[0050] Specifically, based on the scheduling conflict set formed by S400 Select the conflict record with the largest negative pressure contribution value, and determine the task corresponding to that conflict record as the target task. The corresponding negative pressure contribution value is denoted as The current workstation where the target task is located is denoted as The corresponding conflict time window is denoted as Therefore, the targets for subsequent scheduling adjustments can be directly determined based on the aforementioned negative pressure contribution analysis results.
[0051] First, generate candidate workstation exchange solutions. Then, define the target task. The processing start time is The expected processing time is The workstation occupies the following area: ; Select the tasks assigned to other workstations in sequence. Exchange tasks With the task The workstation numbers are assigned, and the original processing start times of the two tasks remain unchanged. After the swap, it is determined whether the workstation occupancy intervals of the two tasks overlap with the occupancy intervals of other tasks on the corresponding workstations; only swap results without time overlap are retained as candidate workstation swap schemes. This process makes the dust load sequence of the target task determined by the workstations. The workstations are moved to workstations with different airflow coupling coefficients, thereby changing the negative pressure effect they have on each weak workstation.
[0052] Furthermore, candidate offset schemes for the start time of the target task are generated. The workstation allocation for the target task remains unchanged, using the preset time window length adopted by S200. As the offset step size, the processing start time of the target task is set sequentially as follows: ; in, , To meet The smallest positive integer, This represents the total completion time of the task scheduling before the adjustment. For each offset workstation's occupied interval, it is determined whether it overlaps with the occupied intervals of other tasks at the workstation where the target task is located, and offset results without time overlap are used as candidate offset schemes for the starting time. Thus, the candidate starting time is searched at least up to the vicinity of the original total completion time, avoiding simply moving the current conflicting load to the adjacent conflicting time window.
[0053] For each workstation exchange candidate scheme and start time offset candidate scheme, the task dust load sequence obtained in S200 is not recalculated. Instead, based on the changed task-workstation correspondence or processing start time of the candidate scheme, time alignment is performed again according to S300 to obtain the aligned dust load of each workstation under the candidate scheme, and combined with the original workstation airflow coupling matrix. Recalculate the predicted negative pressure sequence: ;in, Indicates the candidate scheme number. Indicates the first The candidate scheme is the first The predicted negative pressure value for each equipment time window. If all equipment time windows with processing tasks in this candidate solution satisfy: If the above conditions are not met in any time window, the corresponding candidate solution is discarded. This determination is performed on the rescheduled complete predicted negative pressure sequence to avoid generating new negative pressure conflicts at other time points while eliminating the original conflict time window.
[0054] Furthermore, the total completion time is calculated for each conflict-free candidate solution: ;in, For the first The total completion time of each conflict-free candidate solution For the tasks in this plan The start time of processing The estimated processing duration for the task is determined based on the S200 processing timeline. The total completion time before adjustment will be used. As a baseline, calculate: ;in, This represents the increase in total completion time corresponding to the candidate solution. It is selected from all conflict-free candidate solutions. The minimum solution is taken as the target scheduling solution, and the task-workstation correspondence and the start time of each task processing are updated according to the solution, so as to generate parallel processing scheduling instructions in the future.
[0055] The S600 generates parallel processing scheduling instructions based on the updated task-station correspondence and processing start time, and controls each station to execute the corresponding laser cutting task.
[0056] Specifically, based on the target scheduling scheme, the target workstation number and target processing start time corresponding to each task to be processed are obtained, and the tasks are arranged in order of their target processing start times to form a parallel processing execution sequence. For any task, the task number, target workstation number, target processing start time, and the cutting trajectory and process parameters corresponding to the task are associated to generate a corresponding task scheduling instruction; wherein, the process parameters include the cutting speed and piercing parameters obtained in S100. Each task scheduling instruction is sent to the CNC control unit of the corresponding workstation, and the unified equipment clock of the multi-station laser cutting machine is used as the execution time reference.
[0057] When the equipment clock reaches the target processing start time, the corresponding workstation calls the cutting trajectory and process parameters associated with the task, and sequentially performs piercing and trajectory cutting operations. For tasks with overlapping time relationships and assigned to different workstations, each workstation executes in parallel according to its own target processing start time. During task execution, the workstation correspondence and processing sequence determined by S500 remain unchanged, so that the distribution of dust load of each task on the equipment time axis during actual processing is consistent with the scheduling result that has been re-predicted and confirmed by S300 to meet the allowable negative pressure requirements.
[0058] After each workstation completes its corresponding task, the actual completion time is recorded, and the task occupancy status of that workstation is released. When all tasks in the target scheduling scheme are completed, the current round of parallel processing scheduling ends. Thus, the negative pressure-free conflict scheduling result obtained by S500 is converted into control instructions that can be actually executed by each workstation, realizing the collaborative parallel processing of multi-workstation laser cutting tasks.
[0059] Example 2, please refer to Figure 2 As shown in this embodiment, the intelligent scheduling system for parallel processing tasks of a multi-station laser cutting machine includes: The task parameter acquisition module acquires the cutting trajectory, plate thickness, cutting speed, perforation parameters, and connection parameters of the dust removal branch pipes at each workstation for each task to be processed. The dust load modeling module maps the cutting trajectory to the processing time axis based on the cutting speed and piercing parameters, and inputs the number of piercings, piercing duration, cutting length and plate thickness into the dust load model according to the preset time window to obtain the dust load sequence that represents the dust removal demand intensity of each time window; The airflow coupling and negative pressure prediction module establishes a station airflow coupling matrix based on the connection parameters of each dust removal branch pipe, aligns the dust load sequence allocated to each station according to the processing start time, and calculates the predicted negative pressure value of each time window in combination with the station airflow coupling matrix to obtain the predicted negative pressure sequence. The conflict identification and contribution assessment module determines the time window when the predicted negative pressure value is lower than the preset allowable negative pressure value as the conflict time window, and calculates the negative pressure contribution value of each task based on the corresponding dust load value and airflow coupling parameters to form a scheduling conflict set; The task scheduling optimization module recalculates the predicted negative pressure sequence for the task generating workstation exchange scheme and start time offset scheme with the largest negative pressure contribution value in the scheduling conflict set, and selects the scheme with the smallest increase in total completion time from the schemes that eliminate conflict time windows to update the task scheduling. The parallel processing control module generates parallel processing scheduling instructions based on the updated task-station correspondence and processing start time, and controls each station to execute the corresponding laser cutting task.
[0060] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.
Claims
1. A method for intelligent scheduling of parallel processing tasks in a multi-station laser cutting machine, characterized in that, include: Obtain the cutting trajectory, plate thickness, cutting speed, piercing parameters, and connection parameters of the dust removal branch pipes at each workstation for each task to be processed; The cutting trajectory is mapped to the processing time axis based on the cutting speed and piercing parameters. The number of piercings, piercing duration, cutting length and plate thickness are input into the dust load model according to the preset time window to obtain the dust load sequence that characterizes the dust removal demand intensity of each time window. Based on the connection parameters of each dust removal branch pipe, an airflow coupling matrix for each workstation is established. The dust load sequence allocated to each workstation is time-aligned according to the processing start time. The predicted negative pressure value of each time window is calculated in combination with the airflow coupling matrix of each workstation to obtain the predicted negative pressure sequence. The time window in which the predicted negative pressure value is lower than the preset allowable negative pressure value is determined as the conflict time window, and the negative pressure contribution value of each task is calculated based on the corresponding dust load value and airflow coupling parameters to form a scheduling conflict set; For the task generation workstation exchange scheme and the start time offset scheme with the largest negative pressure contribution in the scheduling conflict set, the predicted negative pressure sequence is recalculated respectively, and the scheme with the smallest increase in total completion time is selected from the schemes that eliminate the conflict time window to update the task scheduling. Based on the updated task-workstation correspondence and processing start time, parallel processing scheduling instructions are generated to control each workstation to execute the corresponding laser cutting task.
2. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 1, characterized in that, Mapping the cutting trajectory to the processing time axis includes: taking the start time of the task to be processed as the relative time zero point, determining the cutting duration according to the execution order of the cutting trajectory based on the trajectory length of each cutting trajectory segment and the corresponding cutting speed, determining the piercing time period based on the piercing duration of each piercing point, and including the non-cutting movement time between adjacent cutting trajectory segments in the processing time axis, and sequentially determining the start and end times of each piercing point and each cutting trajectory segment.
3. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 2, characterized in that, The dust load sequence is obtained by dividing the continuous time window along the processing time axis according to the preset window length, determining the number of piercing points located in the corresponding time window at the start of piercing as the number of piercings, summing the overlap time of each piercing process with the corresponding time window to obtain the piercing duration, multiplying the overlap time of each cutting trajectory segment with the corresponding time window by the corresponding cutting speed and summing them to obtain the cutting length; inputting the number of piercings, piercing duration, cutting length and plate thickness into the dust load model to obtain the dust load value of each time window, and arranging them in chronological order to form the dust load sequence.
4. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 3, characterized in that, The load coefficient in the dust load model is obtained through single-station calibration, including: with other stations stopped processing, executing preset processing trajectories for different plate thicknesses and different perforation and cutting combinations, recording the branch pipe exhaust volume required to maintain the negative pressure amplitude of the predetermined station, and fitting the load coefficients corresponding to the cutting process, continuous perforation process and perforation initiation process based on the correspondence between the branch pipe exhaust volume and the cutting length, perforation duration and perforation number.
5. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 1, characterized in that, Establishing the workstation airflow coupling matrix includes: determining the airflow path from the dust removal inlet to the dust removal fan of each workstation based on the length, diameter, and connection position of each dust removal branch pipe to the common dust removal main pipe, and determining the common pipe section in the airflow path of any two workstations; determining the equivalent flow resistance based on the length, diameter, friction resistance parameters, and local resistance parameters of each pipe section; and determining the degree of influence of the equivalent incremental exhaust demand of one workstation on the negative pressure amplitude of another workstation based on the reference flow rate of the pipe section under the reference dust removal operating state, which serves as the corresponding airflow coupling coefficient. The workstation airflow coupling matrix is composed of each airflow coupling coefficient.
6. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 5, characterized in that, Time alignment includes: shifting the dust load sequence of each task to be processed to a unified equipment time axis according to the corresponding processing start time; determining the time alignment weight based on the proportion of the overlap between the task's relative time window and the equipment time window to the preset window length; and obtaining the task-level aligned dust load of each task within the equipment time window based on the time alignment weight; and summarizing the task-level aligned dust loads assigned to the same workstation to obtain the aligned dust load of the corresponding workstation.
7. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 6, characterized in that, The acquisition of the predicted negative pressure sequence includes: for each equipment time window, combining and calculating the aligned dust load of each workstation with the workstation airflow coupling matrix to obtain the predicted negative pressure amplitude of each workstation relative to the reference negative pressure amplitude; selecting the workstation with the smallest predicted negative pressure amplitude from the workstations that are actually in the piercing or cutting state within the current equipment time window as the weak workstation, and determining its predicted negative pressure amplitude as the predicted negative pressure value of the equipment time window, forming a predicted negative pressure sequence according to the equipment time sequence.
8. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 7, characterized in that, The formation of the scheduling conflict set includes: determining the equipment time window where the predicted negative pressure value is lower than the preset allowable negative pressure value as the conflict time window; for each conflict time window, the tasks participating in the load superposition of the time window are virtually removed in sequence; under the condition that the dust load of the remaining tasks, the workstation allocation relationship and the workstation airflow coupling matrix remain unchanged, the predicted negative pressure amplitude of the original weak workstation is recalculated, and the difference between the predicted negative pressure amplitude before and after the virtual load removal is determined as the negative pressure contribution value of the corresponding task.
9. The intelligent scheduling method for parallel processing tasks of a multi-station laser cutting machine according to claim 8, characterized in that, The scheduling conflict set is formed by associating conflict time windows, weak workstations, task numbers, task locations, and negative pressure contribution values according to the negative pressure contribution value from largest to smallest. The conflict record with the largest negative pressure contribution value is identified as the target task, and workstation exchange candidate schemes and start time offset candidate schemes are generated for the target task. For each candidate scheme, the dust load time is re-aligned according to the adjusted task-workstation correspondence or processing start time, and the complete predicted negative pressure sequence is recalculated using the workstation airflow coupling matrix. The candidate schemes in which all equipment time windows with processing tasks meet the preset allowable negative pressure value are identified as conflict-free candidate schemes. The increase in total completion time of each conflict-free candidate scheme relative to the task scheduling before adjustment is calculated, and the conflict-free candidate scheme with the smallest increase in total completion time is selected to update the task-workstation correspondence and processing start time.
10. A multi-station laser cutting machine parallel processing task intelligent scheduling system, used to implement the multi-station laser cutting machine parallel processing task intelligent scheduling method according to any one of claims 1-9, characterized in that, include: The system includes a task parameter acquisition module, a dust load modeling module, an airflow coupling and negative pressure prediction module, a conflict identification and contribution assessment module, a task scheduling optimization module, and a parallel processing control module.