A method for renovating the appearance of a two-wheeled vehicle by using multiple materials in coordination without disassembling the vehicle
By employing a whole-vehicle non-destructive masking system, multi-material collaborative surface treatment, and a rapid curing system, the risks associated with vehicle disassembly, the instability of multi-material treatment, and the inconsistent quality of coating curing in the refurbishment of two-wheeled vehicles have been resolved, achieving efficient and stable refurbishment results.
Patent Information
- Application Number
- CN202611558022.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-09
- Publication Date
- 2026-11-20
Smart Images

Figure CN123129052A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of surface treatment technology, and more specifically, to a multi-material collaborative appearance renovation method for two-wheeled vehicles without disassembling the entire vehicle. Background Technology
[0002] With the continuous growth in the number of two-wheeled vehicles and the rapid development of industries such as shared mobility and on-demand delivery, the demand for exterior refurbishment and maintenance of two-wheeled vehicles is increasing. Currently, the exterior refurbishment of two-wheeled vehicles generally adopts a disassembly and classification processing mode: first, all plastic parts, metal parts, rubber parts, etc. of the whole vehicle are disassembled, and then surface treatment, coating spraying and curing operations are carried out according to material categories.
[0003] Existing technologies suffer from the following three intractable technical defects in practical applications: 1. Disassembly operations inherently carry assembly risks and efficiency bottlenecks. Conventional surface treatment processes such as sandblasting, shot blasting, and dry ice cleaning have strong impacts, which can damage precision components like headlights, dashboards, wheel bearings, charging ports, and wiring harness interfaces if applied directly to the vehicle. Therefore, disassembly is the common industry practice. However, disassembly is prone to problems such as stripped screws, broken clips, and missing or incorrectly installed parts. Reassembly can result in uneven gaps in the housing and abnormal noises during driving, compromising the original factory assembly precision. Furthermore, the disassembly and reassembly processes are time-consuming and labor-intensive, hindering the efficiency of refurbishment operations.
[0004] 2. The inability to coordinate the processing of multiple material components in a vehicle results in cumbersome procedures and high costs. Two-wheeled vehicles integrate components made of various materials: ABS or PC plastic parts are coated with the original factory paint, requiring the paint layer to be peeled off and the substrate activated; PP plastic parts have low surface energy and poor coating adhesion, requiring special primer and gentle roughening treatment; metal parts such as wheel hubs, shock absorbers, and frames have oxide layers or rust on their surfaces, requiring vigorous cleaning; rubber parts such as tires and sealing strips are not resistant to strong impacts and high temperatures. Existing technologies require separate process parameters and equipment for each material, resulting in complex procedures and long processing cycles. If uniform parameters are forcibly applied to the entire vehicle, a series of problems will occur, such as excessive roughening of PP plastic leading to cracks, damage and fuzzing of the ABS plastic substrate, incomplete removal of the metal oxide layer, and aging and cracking of rubber parts due to impact, making it impossible to achieve the desired processing effect for multiple materials.
[0005] 3. Coating curing quality is difficult to control consistently under on-site operating conditions. Traditional coating renovation relies on the constant temperature and humidity environment of a fixed paint booth to ensure curing effect. However, for scenarios such as shared electric bicycles and urban delivery vehicles that require batch on-site maintenance, only mobile on-site operations can be carried out. The temperature and humidity of the operating environment fluctuate greatly. Conventional coatings have problems such as slow curing speed, poor leveling, and easy generation of orange peel and sagging defects in such environments. The renovation quality is greatly affected by the environment and it is difficult to maintain a stable and consistent high quality.
[0006] To date, existing technologies have not yet formed a systematic vehicle exterior renovation solution that can solve the three core challenges of precision protection without disassembling the vehicle, multi-material collaborative processing, and on-site environmental curing quality. Summary of the Invention
[0007] This invention provides a multi-material collaborative appearance refurbishment method for two-wheeled vehicles without disassembling the entire vehicle. The problem to be solved is to achieve effective sealing and protection of the precision parts of the vehicle without disassembling any parts. By matching process parameters, the surface treatment of multiple material components is completed in the same process. An appropriate rapid curing system is used to ensure the coating quality of on-site operations. Thus, while ensuring the refurbishment effect, the work efficiency is greatly improved and the assembly risks caused by disassembly operations are avoided.
[0008] To achieve the above objectives, the present invention provides the following technical solution: A method for non-disassembly multi-material collaborative exterior renovation of a two-wheeled vehicle includes the following steps: Step 1, Non-destructive masking: Without disassembling any parts of the vehicle, the electrical components, rotating parts, optical components, and rubber seals are masked and sealed to prevent surface treatment abrasives from intruding and causing damage to precision parts; Step 2, Multi-material collaborative surface treatment: Using wet sandblasting or dry ice treatment processes, with rounded glass beads or dry ice particles as abrasives, different blasting angles are used for different material parts of the vehicle to roughen the surface, completing the collaborative surface roughening treatment of multiple material parts of the vehicle in the same process; Step 3, Surface cleaning and drying: The treated surface of the entire vehicle is cleaned and dried to remove residual abrasives and oil stains; Step 4, Differentiated coating repair: According to the material properties of the substrate of each part of the vehicle body, appropriate coating repair is applied; Step 5, Rapid curing treatment: The repaired coating is cured using a light curing system or a two-component rapid curing system to achieve rapid curing of the coating under the on-site environment.
[0009] Furthermore, in step one, the shielding seal adopts a three-level sealing structure: the first level is a protective cover covering seal, which uses a protective cover to completely cover the electrical interface and rotating parts; the second level is an elastic lip fitting seal, where the edge of the protective cover is set with an elastic lip to fit against the surface of the vehicle body to form an airtight barrier; the third level is a gap filling seal, where a sealing strip is embedded in the gap of the vehicle body and fixed with a pressure strip to prevent abrasives from entering the gap and impacting the rubber parts.
[0010] Furthermore, electrical components are covered with a combination of PE tubing and silicone protective covers; the wheel hub bearings in rotating components are fitted with cylindrical bearing protective covers, and the brake discs are secured with C-shaped clamp-type protective covers; optical components are covered with PVC protective stickers; and rubber sealing parts are secured with T-shaped silicone strips embedded in the body gaps and fixed with magnetic pressure strips.
[0011] Furthermore, in step two, the spray pressure is controlled at 0.3–0.5 MPa, the spray distance at 200–300 mm, the spray angle for plastic parts at 45–75 degrees, the spray angle for metal parts at 75–90 degrees, the particle size of the rounded glass pellets at 0.3–0.8 mm, and the diameter of the dry ice particles at 2–4 mm; the total time for roughening the surface of the entire vehicle is 3–5 minutes.
[0012] Furthermore, the specific process of step three is as follows: (1) use high-pressure air of 0.4 to 0.6 MPa to blow away the residual abrasive and dust on the surface; (2) use anhydrous ethanol or isopropanol to wipe away the surface oil stains; (3) air dry naturally or use hot air of 40 to 60°C for drying, with a drying time of 10 minutes.
[0013] Furthermore, in step four, for ABS or PC plastic colored parts, high weather-resistant varnish is directly sprayed; for PP plastic gray parts, PP special primer is sprayed first, flash-dry, and then high weather-resistant varnish is sprayed; for metal parts, metal special varnish is sprayed.
[0014] Furthermore, the PP-specific primer is a chlorinated polypropylene primer with a solid content of 35%–40%, a film thickness of 15–20 μm, and a flash-off time of 5–8 min; the high-weather-resistant varnish is an acrylic polyurethane varnish or a UV varnish with a solid content of 45%–55% and a film thickness of 30–40 μm; the metal-specific varnish is a varnish containing aluminum powder or pearlescent powder, or a polyurethane varnish, with a film thickness of 20–30 μm.
[0015] Furthermore, the photocuring system is a UV-LED photocuring system, employing a wavelength of 395nm and a power density of 80–120W / cm². 2 The UV-LED light source has a single-area curing time of 30-60 seconds; the two-component rapid curing system includes a main agent and a curing agent. The main agent is hydroxy acrylic resin and the curing agent is aliphatic isocyanate. The mass ratio of the main agent to the curing agent is 4:1 to 5:1. 0.5% to 1% of organotin catalyst is added to the system.
[0016] Furthermore, a portable infrared curing lamp is used for auxiliary heating during the curing process. The infrared wavelength is 1.5 to 3 m, the curing temperature is controlled at 60-80℃, and the curing time is 5 to 8 min.
[0017] Furthermore, it also includes quality inspection steps, with inspection standards as follows: under D65 standard light source, the gloss of the whole vehicle at 60 degrees is 85GU, the color difference is E1.0, and there are no defects such as sagging, orange peel, or bubbling; in the cross-cut adhesion test, the adhesion of the coating of each material reaches level 0-1; after UV 500h test, the gloss retention rate is 80%, and there is no bubbling or peeling phenomenon after 500h salt spray test.
[0018] The beneficial effects of this invention are as follows: This invention provides all-round protection for electrical components, rotating components, optical components, and rubber seals through a three-level shielding and sealing structure. It allows for vehicle surface treatment without disassembling any parts, fully preserving the original factory assembly precision of the vehicle and eliminating the sequelae such as stripped screws, uneven housing gaps, and abnormal noises caused by disassembly. At the same time, it saves the labor and time costs of disassembly and assembly.
[0019] This invention, through a combination of differentiated spraying angles and matching process parameters, simultaneously completes the surface roughening treatment of PP plastic, ABS plastic, and metal components in the same process and with the same set of equipment, breaking through the technical prejudice in this field that requires vehicle disassembly and sorting. The whole vehicle refurbishment cycle is shortened by more than 80% compared with the traditional vehicle disassembly and sorting process, and can support large-scale batch refurbishment operations.
[0020] This invention employs a light-curing system or a two-component rapid curing system, enabling rapid and stable curing of the coating in a wide temperature and humidity range, eliminating the reliance on a fixed paint booth. Furthermore, it utilizes differentiated coating systems for different materials, achieving coating adhesion, gloss, and weather resistance that meet or exceed the standards of traditional paint booth operations. This results in a uniform and consistent vehicle appearance and a stable and controllable refurbishment effect.
[0021] The overall process of this invention can be equipped with mobile processing equipment to realize on-site refurbishment operations. It is applicable to the batch maintenance and refurbishment scenarios of shared electric bicycles and delivery electric vehicles, and can also meet the personalized refurbishment needs of civilian motorcycles and electric bicycles, combining high efficiency and versatility. Attached Figure Description
[0022] The present invention will be further described below with reference to the accompanying drawings: Figure 1 This is a flowchart of a multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembling the entire vehicle, according to the present invention. Detailed Implementation
[0023] The present application will now be described in further detail with reference to the accompanying drawings. It should be noted that the following specific embodiments are only used to further illustrate the present application and should not be construed as limiting the scope of protection of the present application. Those skilled in the art can make some non-essential improvements and adjustments to the present application based on the above application content.
[0024] The core process parameters involved in this application are shown in the table below. These core process parameters were determined through a large number of experiments. Parameters Setting value Setting basis Handling method Wet blasting (water-sand mixture) or dry ice treatment Wet blasting reduces impact and protects rubber parts; dry ice treatment leaves no residue and is more circuit-friendly. Abrasive type Glass pellets (rounded corners) or dry ice pellets Rounded abrasive particles have less impact on plastics and are less likely to produce burrs. Abrasive particle size 0.3-0.8mm When the particle size is 0.8mm, the surface of PP plastic is uniformly roughened without causing penetrating damage; when the particle size is 0.3mm, the metal oxide layer can be effectively removed. Injection pressure 0.3-0.5MPa At a pressure of 0.5 MPa, the paint on the ABS plastic can be peeled off evenly without damaging the substrate; at a pressure of 0.3 MPa, the metal oxide layer can be effectively peeled off. Spray distance 200-300mm At a distance of 200mm, the impact force decreases to a level that the rubber parts can withstand; at a distance of 300mm, processing efficiency is guaranteed. Spray angle 45-75 (for plastic parts); 75-90 (for metal parts) Plastic parts are angled to avoid stress concentration caused by vertical impact; metal parts are angled vertically to improve the efficiency of oxide layer removal. Processing time The whole vehicle takes 3-5 minutes Within this timeframe, various materials can achieve their optimal roughening state without excessive processing.
[0025] Example 1: Wet sandblasting and UV-LED curing for complete vehicle refurbishment of shared electric bicycles This embodiment uses a certain brand of shared electric bicycle as the subject of processing. This shared electric bicycle has been in use for two years. The body includes blue ABS plastic parts, gray parts such as black PP plastic mudguards, aluminum alloy wheels, steel shock absorbers, and rubber tires. The method of this invention is used to perform a complete exterior refurbishment of the bicycle without disassembly. The specific steps are as follows: 1. Undamaged masking of the entire vehicle Without disassembling any components, a three-level sealing structure is used to cover the precision parts of the entire vehicle: Rotating components: Cylindrical bearing protective covers are fitted on the two wheel hub bearings, and C-shaped clamp-type protective covers are clamped on the outer edge of the two brake discs to achieve the first level of encapsulation and sealing; Electrical components: The charging port is fitted with a thickened silicone plug, and the front and rear shock absorbers are respectively fitted with PE sleeves, which are fully covered by silicone protective covers. The elastic lips of the protective covers fit against the body surface to form an airtight barrier, achieving a second level of fit and seal. Optical components: Thickened PVC protective films are affixed to the headlights, taillights, and instrument panel; Rubber sealing parts: T-shaped silicone strips are embedded in the gaps of the vehicle body and fixed with magnetic pressure strips to prevent abrasives from entering the gaps and impacting the rubber parts, thus achieving a third-level gap filling and sealing.
[0026] After the masking was completed, a 0.8MPa air pressure test was conducted, and the amount of abrasive entering the precision parts was 0.1g. This step took 2 minutes.
[0027] II. Multi-material synergistic surface treatment A mobile wet blasting machine was used for synergistic surface treatment, employing 0.5mm rounded glass beads as abrasive and controlling the blasting pressure at 0.4MPa. For plastic parts (ABS colored parts, PP gray parts), a 60° angled blasting angle was used with a blasting distance of 250mm; for metal parts (wheel hubs, shock absorbers), a near-vertical 85° angled blasting angle was used with a blasting distance of 200mm. The rubber tires were naturally shielded and protected from direct impact. The total surface roughening treatment time for the entire vehicle was 4 minutes.
[0028] 3. Surface cleaning and drying First, use 0.5MPa high-pressure air to blow away residual abrasive and dust from the entire vehicle surface. Then, wipe away surface oil stains with anhydrous ethanol. Finally, use a mobile hot air gun to dry the surface at 50℃ for 5 minutes to complete the surface cleaning and drying.
[0029] IV. Differentiated Coating Repair ABS plastic colored parts: Directly spray with UV-LED high weather-resistant varnish, controlling the film thickness to 35 μm; PP plastic gray parts: First, spray with chlorinated polypropylene type PP special primer, solid content 38%, film thickness 18μm, flash dry for 5 minutes, then spray with the same type of UV-LED high weather-resistant varnish as the colored parts, film thickness 35μm. Metal parts: Spray with special UV varnish for metal, film thickness 25 μm.
[0030] V. Rapid Curing Process A portable UV-LED curing lamp was used for curing. The light source wavelength was 395nm, the power density was 100W / cm, the irradiation time for a single area was 45 seconds, and the total curing time for the whole vehicle was 2 minutes.
[0031] In this embodiment, the total processing time for a single vehicle is 22 minutes (including masking, treatment, spraying, curing, and removing the masking). A single team of 6 people can process an average of 200 vehicles per day.
[0032] This embodiment conducts performance testing according to a unified testing standard, which is as follows: (1) Appearance and gloss performance: Under the D65 standard light source, the gloss of the whole vehicle coating at 60 degrees is 85GU, the overall color difference is E1.0, and there are no appearance defects such as drips, orange peel, or bubbles on the coating surface. (2) Coating adhesion: According to GB / T9286 standard, the cross-cut test was used to test the coating adhesion of ABS plastic parts, PP plastic parts and metal parts, and the coating adhesion all reached level 0 to 1; (3) Weather resistance and corrosion resistance: After 500 hours of QUV accelerated ultraviolet aging test, the coating gloss retention rate is 80%; after 500 hours of neutral salt spray test, the coating does not blister or peel off.
[0033] The performance test results of this embodiment are compared with those of traditional vehicle disassembly processing, as shown in the table below: Testing items Colored parts (ABS) Gray parts (PP) Metal parts (aluminum alloy) Traditional car dismantling Adhesion (cross-cut test) Level 0 Level 1 Level 0 Level 0-1 Gloss (60GU) 92 88 95 90-93 Roughness Ra (m) 4.2 5.8 8.5 3.5-10 Processing time (min / vehicle) Collaborative processing Collaborative processing Collaborative processing 120-180 Disassembly risks none none none Screw stripping rate: 15% Supplementary testing showed that the vehicle's exterior had no defects such as drips, orange peel, or bubbling, and the overall color difference was E=0.8. After 500 hours of QUV accelerated aging, the coating gloss retention rate was 87%, and the coating showed no bubbling or peeling during the 500-hour neutral salt spray test. All indicators met the above-mentioned unified inspection standards.
[0034] In this embodiment, PP parts and ABS parts undergo surface treatment in the same process. The coating adhesion of PP parts reaches level 1, breaking through the traditional technical limitation that PP parts must be treated separately, otherwise the adhesion level is level 2. The whole vehicle processing time is shortened by more than 80% compared with traditional vehicle disassembly processing. Precision parts such as rubber parts, bearings, and circuits are treated with zero damage.
[0035] Example 2: Dry ice treatment and two-component rapid curing system for whole-vehicle refurbishment of electric motorcycles This embodiment uses a certain brand of electric motorcycle as the subject of treatment. This electric motorcycle has been in use for 3 years, and the frame and outer shell are severely oxidized, metal parts are corroded, and PP parts show signs of aging. The method of this invention is used to perform a complete exterior refurbishment of the motorcycle without disassembly. The specific steps are as follows: 1. Undamaged masking of the entire vehicle The shielding method is the same as in Example 1, using a three-level sealing structure to protect electrical components, rotating components, optical components and rubber sealing parts. This step takes 6 minutes.
[0036] II. Multi-material synergistic surface treatment A mobile dry ice cleaning machine was used for collaborative surface treatment. The abrasive used was 3mm diameter dry ice particles, and the spray pressure was controlled at 0.35MPa. For plastic parts, a 55° tilt spray angle was used with a spray distance of 280mm; for metal parts, an 80° near-vertical spray angle was used with a spray distance of 220mm. The total surface roughening treatment time for the entire vehicle was 5 minutes.
[0037] 3. Surface cleaning and drying The cleaning and drying process is the same as in Example 1, which completes the removal and drying of residual abrasive, dust and oil on the surface.
[0038] IV. Differentiated Coating Repair ABS plastic colored parts: Directly spray two-component fast-drying high weather-resistant varnish, the main agent is hydroxyl acrylic resin, the curing agent is aliphatic isocyanate, the mass ratio is 4.5:1, add 0.8% organotin catalyst, and control the film thickness to 35 μm; PP plastic gray parts: First, spray with chlorinated polypropylene type PP special primer, solid content 38%, film thickness 18 μm, flash dry for 6 minutes, then spray with the same two-component fast drying high weather resistance varnish, film thickness 35 μm. Metal parts: Spray with a two-component fast-drying metal varnish containing aluminum powder, with a film thickness of 25 μm.
[0039] V. Rapid Curing Process A portable infrared curing lamp was used to assist curing. The infrared wavelength was 2m, the power was 2kW, the irradiation distance was 300mm, the curing temperature was controlled at 705℃, and the total curing time was 15 minutes.
[0040] In this embodiment, the total processing time for a single vehicle was 39 minutes. Testing revealed that the coating adhesion for colored parts was grade 0, for gray parts it was grade 1, and for metal parts it was grade 0. Under ambient conditions of 18℃ and 65% humidity, the surface drying time of the coating was 12 minutes, and the complete drying time was 1.5 hours. A neutral salt spray test according to GB / T10125 was conducted, and no blistering or peeling was observed after 500 hours. Supplementary testing showed that the average gloss level at 60° angles of the entire vehicle was 90 GU, the overall color difference E=0.9, and there were no defects such as runs, orange peel, or blistering. After 500 hours of QUV accelerated aging, the coating gloss retention rate was 84%, and all performance indicators met the unified inspection standards described in Example 1.
[0041] Comparative Example 1: Traditional vehicle dismantling and sorting process Using standard industry processes, the entire vehicle body was disassembled and processed according to its materials: ABS colored parts: Sandblasted separately with 0.6MPa pressure and 1.0mm steel shot, then coated with clear varnish and baked at 80℃ for 30 minutes; PP gray parts: Sandblasted separately with 0.3MPa pressure and 0.5mm glass shot, then coated with PP primer and clear coat, and baked at 60℃ for 45 minutes; Metal parts: Shot blasted with 0.8mm steel shot, then coated with a coating and baked at 120℃ for 30 minutes.
[0042] The results showed that the total processing time for a single vehicle was 180 minutes (including disassembly and assembly); four screws were stripped during the disassembly and assembly process, and two cases of uneven gaps occurred after the housing was reassembled; the overall cost, including labor for disassembly and assembly, labor for sorting and processing, and energy consumption from multiple baking processes, was far higher than that of the process of this invention.
[0043] Comparative Example 2: Unified parameter processing without disassembling the vehicle The entire vehicle is sandblasted without any masking, using 0.8MPa pressure, 1.0mm steel shot, and a vertical angle.
[0044] The results showed that: penetrating cracks appeared on the surface of the PP gray parts, indicating excessive roughening; the substrate of the ABS colored parts was damaged, and burrs appeared on the surface; the oxide layer of the metal parts was completely removed; aging and cracking appeared on the surface of the tire rubber; and abrasive particles entered the wheel hub bearings, causing abnormal noise during rotation. These results demonstrate that using uniform parameters cannot simultaneously address the processing effects of components made of multiple materials; therefore, disassembly and classification processing are necessary, or the synergistic process parameter combination of this invention should be used.
[0045] The above embodiments merely illustrate several implementation methods of the present invention, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these all fall within the protection scope of the present invention.
Claims
1. A method for multi-material collaborative exterior renovation of a two-wheeled vehicle without disassembling the entire vehicle, characterized in that, Includes the following steps: Step 1: Non-destructive vehicle masking: Without disassembling any vehicle parts, electrical components, rotating parts, optical components, and rubber seals are masked and sealed to prevent abrasive particles from intruding and damaging precision parts. Step 2: Multi-material synergistic surface treatment: Using wet sandblasting or dry ice treatment processes with rounded glass beads or dry ice particles as abrasives, different blasting angles are applied to roughen the surfaces of different material components throughout the vehicle, completing the synergistic surface roughening treatment of multiple material components in the same process. Step 3: Surface cleaning and drying: The treated vehicle surface is cleaned and dried to remove residual abrasives and oil. Step 4: Differentiated coating repair: Appropriate coating repair is applied according to the material properties of the substrate of each part of the vehicle body. Step 5: Rapid curing treatment: The repaired coating is cured using a light-curing system or a two-component rapid curing system to achieve rapid curing of the coating under the on-site environment.
2. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, is characterized in that... In step one, the shielding seal adopts a three-level sealing structure: the first level is the protective cover covering seal, which uses a protective cover to completely cover the electrical interface and rotating parts; the second level is the elastic lip fitting seal, which sets an elastic lip on the edge of the protective cover to fit against the surface of the vehicle body to form an airtight barrier; the third level is the gap filling seal, which uses a sealing strip to be embedded in the gap of the vehicle body and fixed with a pressure strip to prevent abrasives from entering the gap and impacting the rubber parts.
3. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 2, is characterized in that: Electrical components are covered with a combination of PE tubing and silicone protective covers; the wheel hub bearings in rotating components are covered with cylindrical bearing protective covers, and the brake discs are secured with C-shaped clamp-type protective covers; optical components are covered with PVC protective stickers; rubber sealing parts are secured with T-shaped silicone strips embedded in the body gaps and fixed with magnetic pressure strips.
4. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, is characterized in that: In step two, the spray pressure is controlled at 0.3–0.5 MPa, the spray distance at 200–300 mm, the spray angle at 45–75 degrees for plastic parts, and the spray angle at 75–90 degrees for metal parts. The particle size of the rounded glass pellets is 0.3–0.8 mm, and the diameter of the dry ice particles is 2–4 mm. The total time for roughening the surface of the entire vehicle is 3–5 minutes.
5. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, is characterized in that... The specific process of step three is as follows: (1) Use high-pressure air of 0.4 to 0.6 MPa to blow away the residual abrasive and dust on the surface; (2) Use anhydrous ethanol or isopropanol to wipe away the surface oil stains; (3) Let it air dry naturally or use hot air of 40 to 60℃ to dry for 10 minutes.
6. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, is characterized in that: In step four, for ABS or PC plastic colored parts, spray high weather-resistant varnish directly; for PP plastic gray parts, first spray PP special primer, flash dry and then spray high weather-resistant varnish; for metal parts, spray metal special varnish.
7. A multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 6, is characterized in that: The PP-specific primer is a chlorinated polypropylene primer with a solid content of 35%–40%, a film thickness of 15–20 μm, and a flash-drying time of 5–8 min; the high weather-resistant varnish is an acrylic polyurethane varnish or a UV varnish with a solid content of 45%–55% and a film thickness of 30–40 μm; the metal-specific varnish is a varnish containing aluminum powder or pearlescent powder, or a polyurethane varnish, with a film thickness of 20–30 μm.
8. The multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, is characterized in that: The photocuring system is a UV-LED photocuring system, using a wavelength of 395nm and a power density of 80-120W / cm². 2 The UV-LED light source has a single-area curing time of 30-60 seconds; the two-component rapid curing system includes a main agent and a curing agent, the main agent is hydroxy acrylic resin, the curing agent is aliphatic isocyanate, the mass ratio of the main agent to the curing agent is 4:1-5:1, and 0.5%-1% of organotin catalyst is added to the system.
9. A multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 8, characterized in that: During the curing process, a portable infrared curing lamp is used for auxiliary heating. The infrared wavelength is 1.5-3m, the curing temperature is controlled at 60-80℃, and the curing time is 5-8min.
10. A multi-material collaborative appearance renovation method for a two-wheeled vehicle without disassembly, as described in claim 1, characterized in that... It also includes quality inspection steps, with the following inspection standards: under D65 standard light source, the gloss of the whole vehicle at 60 degrees is 85GU, the color difference is E1.0, and there are no defects such as sagging, orange peel, or bubbling; in the cross-cut adhesion test, the adhesion of each material coating reaches level 0-1; after UV 500h test, the gloss retention rate is 80%, and there is no bubbling or peeling phenomenon after 500h salt spray test.
