Parallel bi-inertial path planning method based on volume finite state machine and polyhedral map

By employing a parallel dual-inertial path planning method based on V-FSM and p-graph, the problem of low efficiency in path planning for high-degree-of-freedom robots is solved, achieving efficient and rapid collision-free path generation. This method is applicable to path planning in complex environments such as self-reconfigurable modular robots, mobile manipulators, and quadrotors.

CN123129169APending Publication Date: 2026-11-20HARBIN INSTITUTE OF TECHNOLOGY (SHENZHEN) (INSTITUTE OF SCIENCE AND TECHNOLOGY INNOVATION HARBIN INSTITUTE OF TECHNOLOGY SHENZHEN)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611454751.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-18
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

When high-degree-of-freedom robots perform obstacle crossing, obstacle avoidance, and long-distance navigation tasks, traditional path planning methods are inefficient, collision detection is computationally expensive, and it is difficult to achieve linear complexity and asymptotic optimality. Furthermore, existing lazy evaluation methods have failed to effectively solve the problems of sampling delay and path loss.

Method used

We employ a volume finite state machine (V-FSM) for geometric deformation abstraction and dimensionality reduction modeling, combined with parallel construction of a polyhedral graph (p-graph), and generate the optimal path through distributed gradient optimization. This includes offline V-FSM construction, dimensionality reduction path optimization, polyhedral graph construction, parallel path search, and delayed sampling evaluation.

Benefits of technology

It significantly improves the efficiency of path planning for high-degree-of-freedom robots, reduces the computational load of collision detection and path search, and increases planning speed and scalability, enabling it to handle collision-free path planning in complex scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123129169A_ABST
    Figure CN123129169A_ABST
Patent Text Reader

Abstract

The application discloses a parallel double-inertial path planning method based on a volume finite state machine and a polyhedral graph, belongs to the technical field of robot motion planning, and comprises the following steps: constructing a volume finite state machine V-FSM offline to discretize and abstract the geometric deformation of a robot; reducing the dimension of a high-dimensional full-configuration space path planning problem to model an R-configuration path optimization problem in a reduced dimension configuration space; constructing a polyhedral graph p graph in parallel in a work space to complete connectivity representation of a collision-free region; searching and extracting a near-optimal p path candidate set satisfying a cost constraint in the p graph; distributing the candidate p path to a plurality of processors to perform distributed parallel path optimization; performing delay configuration sampling and delay distance evaluation based on an optimization gradient to generate a final feasible full-configuration space configuration path. The application adopts the above method, improves the path planning efficiency of a high-degree-of-freedom robot, and is suitable for a large-scale complex work space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of robot motion planning technology, and in particular to a parallel double-inertial path planning method based on volume finite state machines and polyhedral graphs. Background Technology

[0002] When high-degree-of-freedom robots, such as self-reconfigurable modular robots, mobile manipulators, and quadrotors with robotic arms, perform obstacle crossing, obstacle avoidance, and long-distance navigation tasks, the configuration space dimension increases with the degree of freedom exponent. Traditional sampling-based planning (SBP) methods face problems such as a sharp decline in sampling efficiency, expensive distance assessment and collision detection calculations, and the failure of Euclidean metrics in high-dimensional spaces.

[0003] Existing lazy evaluation methods only delay distance calculations but do not delay sampling; workspace-based hierarchical planning is prone to losing feasible paths; parallel planning methods have high communication overhead in graph structures, lack geometric deformation abstraction and gradient-guided sampling mechanisms, and are difficult to achieve linear complexity and asymptotic optimality.

[0004] To address the aforementioned shortcomings, this invention proposes an integrated path planning method that combines V-FSM geometric abstraction, p-graph parallel construction, dual-delay sampling evaluation, and distributed gradient optimization. Summary of the Invention

[0005] The purpose of this invention is to provide a parallel double-lazy path planning method based on a volume finite state machine and a polyhedral graph, so as to solve the problems existing in the background technology.

[0006] To achieve the above objectives, this invention provides a parallel doubly lazy path planning method based on a volume finite state machine and a polyhedral graph, comprising the following steps: S1. Offline construction of a volume finite state machine (V-FSM) to discretize and abstract the robot's geometric deformation; S2. The high-dimensional full configuration space path planning problem is reduced in dimension and modeled as an R-configuration path optimization problem in a reduced-dimensional configuration space. S3. Parallelize the construction of the polyhedral graph p within the workspace to complete the connectivity representation of collision-free regions; S4. Search and extract the near-optimal p-path candidate set that satisfies the cost constraint in the p-graph; S5. Assign candidate p paths to multiple processors and perform distributed parallel path optimization. S6. Based on optimized gradient execution, perform delay configuration sampling and delay distance evaluation to generate the final feasible full configuration space. Configuration path.

[0007] Preferably, in step S1, the V-FSM consists of a t-shaped set and a transition matrix, as follows: S11. For the target robot's operating scenario, select a key transition shape (T-shape) that can fully represent the changes in the robot's volume and shape, and form a set of all T-shapes. i I a A set of t-shaped indices; S12, For each t-shape Calculate the convex hull separately, and use the convex hull region as the spatial occupation and geometric boundary of the t-shape; S13. For any pair of t-shapes and Perform a convertibility determination: If a continuous path exists in the configuration space, allowing the robot to transition from... Deformed to And the entire deformation process is always located in and If the convex hull of the union is inside, then determine Convertable to ; S14. Construct the transition matrix T based on the convertibility results. Indicates convertibility. This indicates that it is not convertible; S15. Combine the t-shaped set with the transition matrix T to form a volume finite state machine V-FSM, store it offline and use it for geometric feasibility constraints in subsequent p-graph construction.

[0008] Preferably, step S2 contains the following: S21, Define the full configuration space Define a reduced-dimensional configuration space for the high-dimensional space consisting of all the robot's degrees of freedom. From position With T-index Joint composition; S22. Define the dimension reduction path r as a combination of a pose-continuous trajectory and a t-shaped piecewise constant sequence, used to simultaneously describe the robot's position and geometric shape changes. S23. Define a strong δ gap as a path that maintains a safe distance of not less than δ from obstacles throughout its entire length; define a weak δ gap as a path that can be converted into a strong δ gap path through homotopy deformation. S24. The original high-dimensional shortest path planning problem is transformed into a low-dimensional r-path optimization problem with the objective of minimizing the path length, including t-shaped transformation costs, start-end R-configuration constraints, and weak δ-gap collision-free constraints.

[0009] Preferably, step S3 is as follows: S31. Initialize two polyhedral fast search random trees (PRRT) and multiple polyhedral probability roadmaps (PPRM). The two PRRTs start from the polyhedrons containing the starting point and the target r configuration, respectively. All PRRTs and PPRMs are executed in parallel on multiprocessors / multithreaded systems. S32. Using a diffusion model to sample the centroid of a collision-free polyhedron, and combining it with a polyhedron expander, the centroid is expanded into a maximally collision-free convex polyhedron, forming p-edges. To satisfy all , The expansion process involves a localized sliding workspace of fixed dimensions. Completed within the time limit; S33. Define the non-empty overlapping region of two or more p-edges as a p-node. It is required that each p node contains at least one r configuration. This causes the robot to occupy a T-shaped area. ; S34. Parallel execution of PRRT and PPRM extensions, performing neighbor distance sorting, parent node selection, and rewiring operations on the new p node to maintain the asymptotic optimal connectivity of the graph; S35. Sequentially complete the dynamic connections between PPRMs, between PPRMs and PRRTs, and between PRRTs, gradually forming a globally connected p-graph. ; S36. Based on the effective resistance of the spectral graph theory, the p-graph is sparsified, retaining key p-nodes and p-edges, thereby reducing the communication overhead between processors.

[0010] Preferably, the PRRT extension specifically involves: calculating all adjacent p nodes for the new p node and sorting them by centroid distance, selecting the node that minimizes the path cost to the root node as the parent node, and rewiring adjacent nodes to optimize the path cost. The PPRM extension specifically involves connecting the new p node to its k nearest neighbor p nodes to construct a local route map, performing rewiring operations, reducing local path costs, and improving connectivity reliability.

[0011] Preferably, when the PPRM and PRRT are connected by overlapping p edges, the Prim algorithm is first used to convert the PPRM into a minimum spanning tree (MST), then the entire MST is incorporated into the PRRT, and then rerouting is performed to update the path cost and parent-child relationship.

[0012] Preferably, step S4 includes: S41. Using the Euclidean distance between the centroids of adjacent p nodes as an approximation of the path cost, calculate the total cost of path p: S42. Construct a candidate set of p paths This will satisfy the total cost All p paths of e are included in the candidate set, where To minimize the current cost, Where is the number of path nodes, and e is the upper limit of the maximum distance estimation error; S43. Output the p-path sequence from the candidate set. This serves as input for subsequent distributed optimization.

[0013] Preferably, step S5 contains the following: S51, global full configuration space The path is divided into H consecutive path segments according to the sequence of p nodes, and each segment is allocated to a different processor and thread for independent optimization. S52. Construct a local optimization objective function and a convex polyhedron constraint for the corresponding p node for each path segment, decomposing the global path optimization into multiple constrained local quadratic optimization problems. S53. A distributed dual subgradient descent algorithm is used to solve the problem in parallel, with each processor independently updating the path variables for its own segment. S54. By sharing Lagrange multipliers to transmit inter-segment boundary information, adjacent path segments are forced to have a continuous and consistent configuration at the connection point. S55. Iterate and update until convergence, and output the optimal path structure that satisfies global consistency and constraints.

[0014] Preferably, step S6 contains the following: S61. Transform the full configuration space path planning into a linear convex constraint optimization problem derived from the geometry of p nodes, with the constraint form as follows: ; S62. Use the gradient direction obtained from solving the optimization problem as the configuration sampling guidance direction, and perform lazy sampling along the gradient direction to avoid random redundant exploration; S63. Completely delay configuration sampling, collision detection, and distance evaluation calculations during the p-graph construction and path search phases, and execute them only on demand during the distributed optimization phase. S64. Generate an optimal system in the full configuration space that satisfies weak delta gap, collision-free operation, start and end point constraints, and is practically executable. path.

[0015] Therefore, the parallel doubly lazy path planning method based on volume finite state machine and polyhedral graph described above has the following beneficial effects: (1) By using the volume finite state machine V-FSM, the volume deformation of the robot is abstracted and the configuration space is reduced, transforming continuous, high-dimensional and complex geometric deformation into discrete t-shape and state transition, which greatly reduces the computational load of collision detection and path search, and significantly improves the path planning efficiency of high-degree-of-freedom robots. (2) The architecture is constructed using parallelized polyhedral graphs (p-graphs), and multiple P-RRT trees are extended simultaneously. With P-PRM It reduces inter-processor communication overhead by merging minimum spanning trees and sparsifying effective resistance, achieves high scalability on multi-core and multi-processor platforms, and significantly improves planning speed with the number of threads, making it adaptable to large-scale complex workspaces. (3) Configuration sampling, distance calculation and collision detection are not performed at all in the p-graph construction and path search stages. They are only performed as needed in the distributed optimization stage. Combined with optimization gradient-guided sampling, redundant samples and invalid calculations are greatly reduced, and planning time is significantly reduced. (4) It can be directly applied to various high-degree-of-freedom platforms such as self-reconfigurable modular robots, mobile manipulators, and quadcopters with robotic arms. It can stably handle complex scenarios such as narrow passages, long load obstacle avoidance, and three-dimensional chaotic environments, while meeting practical engineering requirements such as no collision, weak δ gap, and start and stop constraints.

[0016] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0017] Figure 1 This is a flowchart illustrating the parallel double-lazy path planning method based on a volume finite state machine and a polyhedral graph according to the present invention. Figure 2 This is a schematic diagram illustrating an example of the T-shaped structure of the mobile robotic arm in an embodiment of the present invention; Figure 3 This is a schematic diagram of the parallel construction of graph p in an embodiment of the present invention; Figure 4 This is a schematic diagram of a polyhedron generator according to an embodiment of the present invention; Figure 5 This is a schematic diagram of the sparsification process of the p-image in an embodiment of the present invention; Figure 6 This is an embodiment of the present invention. Schematic diagram of path optimization, lazy sampling, and evaluation integration; Figure 7 This is a schematic diagram of the distributed path call architecture according to an embodiment of the present invention; Figure 8 This is a schematic diagram of a self-reconfigurable modular robot and its array candidate scheme according to an embodiment of the present invention; Figure 9 A schematic diagram of a quadcopter drone equipped with a robotic arm, as shown in an embodiment of the present invention; Figure 10 This is a schematic diagram illustrating an example of a self-reconfigurable modular robot path according to an embodiment of the present invention; Figure 11This is a schematic diagram of the large-scale experimental results of an embodiment of the present invention; wherein, (a) is the P-RRT of the initial polyhedron; (b) is the P-RRT of the target polyhedron; (c) is the P-PRM of the initial polyhedron; and (d) is the P-PRM of the target polyhedron. Figure 12 This is a schematic diagram of the optimized r-path according to an embodiment of the present invention; Figure 13 This is a schematic diagram of the optimization process of path r in an embodiment of the present invention; wherein, (a) is the path after the first iteration. Path; (b) is the path after the first iteration. The path is iterated twice; (c) is after 10 iterations. Path; (d) is the path after 00 iterations. path; Figure 14 This is a schematic diagram illustrating the evolution of the local objective function in an embodiment of the present invention; Figure 15 This is a schematic diagram of the planned path of a quadcopter UAV in a large workspace according to an embodiment of the present invention; Figure 16 This is a schematic diagram illustrating the computation time of using PLL under different numbers of threads in an embodiment of the present invention; Figure 17 This is a schematic diagram illustrating the computation time of MPP under different numbers of threads in an embodiment of the present invention. Detailed Implementation

[0018] The following detailed description of embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.

[0019] Please see Figure 1 A parallel do-lazy path planning method based on volume finite state machines and polyhedral graphs includes: 1. Offline construction of a finite-size state machine (V-FSM).

[0020] Select key transition shapes (T-shapes) to characterize the changes in the robot's volume and shape, forming a set: ; in It is a T-shaped index set. For example... Figure 2 For mobile robotic arms, the T-shape includes arm retraction, left arm extension, and right arm extension.

[0021] Calculate the convex hull of the t-shape for each t-shape Calculate the convex hull and use it to represent the space occupied by the convex hull.

[0022] Transformability determination for any pair of t-shapes and If there exists a continuous path in configuration space that allows the robot to move from... Deformed to And the entire deformation process is always located in and If the convex hull of the union is inside, then determine Convertable to .

[0023] Construct the transition matrix T. Construct the binary transition matrix. The matrix elements satisfy: .

[0024] Output the V-FSM model. Transform the t-shaped set... With transition matrix The combined structures form a volumetric finite state machine (V-FSM), which is stored offline and used for geometric feasibility constraints in subsequent p-graph construction.

[0025] 2. Dimensionality reduction modeling of high-dimensional path planning problems.

[0026] Define configuration space Full configuration space The high-dimensional space consisting of all the robot's degrees of freedom; the reduced-dimensional configuration space: ; in For pose space, It is a t-shaped index set.

[0027] Define the r path. The r path is a mapping: ; in pose space Inner continuous trajectory, from To T-shaped index set A piecewise constant right-continuous function.

[0028] Define a strong gap constraint δ gap: ; Weak delta gap: Homotopy exists Make It has a strong δ gap.

[0029] Establish the optimization problem. The original high-dimensional path planning problem (Problem 1): ; constraint: ; Problem after dimensionality reduction (Problem 2): Finding an r-path that satisfies start and end constraints, is collision-free, and has a weak delta gap. Minimize the sum of path length and T-shaped transformation cost.

[0030] 3. Parallelize the construction of the polyhedral graph p.

[0031] like Figure 3 Initialize the parallel structure and initialize two PRRT trees. With multiple PPRMs: Two PRRTs start from the polyhedra containing the starting and target r configurations, respectively; all PRRTs* and PPRMs Execute in parallel on multiple processors / multithreaded systems. For example... Figure 4 Generate p edges. It is a collision-free convex polyhedron that satisfies: ; A diffusion model is used to sample the centroid of a collision-free polyhedron. Combined with a polyhedron expander, the centroid is expanded into a maximally collision-free convex polyhedron. The expansion process occurs within a locally sliding workspace of fixed dimensions. Completed within the specified time.

[0032] Generate a p node. p node It is a non-empty overlapping region with two or more p edges, and satisfies: ; Parallel Extended PRRT With PPRM .

[0033] PRRT Extensions: Neighbor sorting; selecting the parent node that minimizes the path cost to the root node; rewiring.

[0034] PPRM Extension: Connect the k nearest neighbor p nodes; construct a local route map; rewire to optimize path cost.

[0035] Three types of dynamic connections.

[0036] 1. If edges overlap, they will be merged. 2. The Prim algorithm is used to transform the PPRM into a minimum spanning tree (MST), which is then incorporated into the PRRT. When edges p overlap, the starting point and the target node p are connected, forming a path p.

[0037] like Figure 5p-graph sparsification. Based on the effective resistance of the spectral graph theory, the p-graph is sparsified, retaining key p-nodes and p-edges, reducing inter-processor communication overhead, and obtaining a globally connected p-graph: .

[0038] 4. Extract the nearest candidate set of optimal p paths.

[0039] Distance and Cost Definition: The distance between adjacent p nodes is defined as the centroid Euclidean distance. p path Total cost: ; in This represents the number of nodes in the path.

[0040] Constructing a candidate set Paths p that satisfy the following formula are included in the candidate set: ; in To minimize the current cost, This represents the upper limit of the maximum error in distance estimation.

[0041] Output candidate p paths. The output p path sequence Φ serves as input for subsequent distributed optimization.

[0042] 5. Distributed parallel path optimization.

[0043] Path segmentation. The global χ path is divided into H consecutive path segments according to the sequence of p nodes, and each segment is allocated to a different processor / thread for independent optimization.

[0044] Local optimization problem. Objective function for segment h: ; constraint: .

[0045] Distributed dual gradient descent.

[0046] Iteration formula: ; ; ; .

[0047] like Figure 6 Continuity constraint. Adjacent path segments satisfy: ; Global configuration continuity is ensured by sharing Lagrange multipliers.

[0048] The output is iteratively updated until convergence, and the output is the optimal path structure that satisfies global consistency and constraints.

[0049] 6. Dual-delay sampling and evaluation.

[0050] Convex constraint optimization. The full configuration space path planning is transformed into a linear convex constraint optimization problem: .

[0051] like Figure 7 Gradient-guided lazy sampling. The optimal gradient direction is used as the sampling guide direction, and lazy sampling is performed along the gradient to avoid random redundant exploration.

[0052] Delayed execution strategy. Configuration sampling, collision detection, and distance evaluation are completely delayed during the p-graph construction and path search phases, and are only executed on demand during the distributed optimization phase.

[0053] Output the final χ-path. Generate the optimal χ-path that satisfies weak delta-gap, collision-free, start and end point constraints, and is practically executable.

[0054] 7. Numerical simulation and experimental results.

[0055] Experimental platform. For example... Figure 8 A self-reconfigurable modular robot (4 modules, each module measuring 0.3m × 0.3m); such as Figure 9 Quadcopter with robotic arm (including long pole load transport mission).

[0056] Experimental scenario: The self-reconfigurable modular robot system comprises four identical modules. The robot can dynamically select from multiple candidate formation configurations to adjust its geometry based on workspace constraints. The planning objective is to generate a collision-free trajectory from the initial configuration to the target configuration, while jointly optimizing the formation transition sequence to minimize the total path length and maintaining feasibility at each stage of workspace traversal. Figure 10 A representative small workspace scenario is presented. The environment is a two-dimensional space measuring 4m × 2m, with each module measuring 0.3m × 0.3m. The modular robot starts from the left and needs to reach the target point on the right by navigating a narrow passage. The proposed PLL framework can efficiently compute feasible paths in this constrained environment. For comparison, MPLP was also tested, and all methods completed planning within 0.32 seconds, demonstrating similar performance in this relatively simple scenario.

[0057] Large scenes ( Figure 11 (20m × 16m, with randomly distributed obstacles). To further evaluate the scalability and parallel efficiency of the proposed PLL framework, we... Figure 11The experiment was conducted in a larger workspace scenario, measuring 20 meters by 16 meters, with obstacles randomly distributed within. Each modular robot unit was equipped with a dual-core processor, and the planning system employed an 8-thread architecture: four threads independently extended two P-RRT path planners and two P-PRM path planning modules, a fifth thread handled data coordination and inter-thread communication, and the remaining threads handled auxiliary tasks such as monitoring and optimization. All modular robots were assumed to have a complete understanding of the obstacle distribution.

[0058] In this configuration, Figure 11 The P-RRT shown in figure a initializes from the initial configuration, while Figure 11 The P-RRT in d expands gradually from the target configuration. The initial positions of the two P-PRMs are determined by the sampling criteria based on coverage

[33] , thereby promoting diverse and efficient workspace exploration. This parallel architecture demonstrates excellent performance and efficient path planning capabilities in complex large-scale environments, fully showcasing the scalability and effectiveness of the PLL framework. As the P graph structure expands, when the sampling polyhedra overlap, a connection is established between the P-RRT and the P-PRM. After such a connection is completed, the corresponding P-PRM is transformed into a minimum spanning tree and integrated into the P-RRT, thereby improving connectivity and coverage. When the two P-RRTs are finally fully connected, a complete P path is formed, which is then further optimized by adding P nodes and edges. The optimized R path is as follows: Figure 12 As shown.

[0059] The optimization process is in Figure 13 The diagram further details the evolution of the χ path across multiple iterations. After 1500 iterations (taking less than 1.6 seconds), the distributed optimization algorithm finally converges to the optimal path. During this process, each thread optimizes its assigned path segment and coordinates with other threads using Lagrange multipliers to ensure that continuity and consistency constraints at path segment boundaries are met. The Lagrange multipliers among the threads also reach a consensus, and the evolution of the local objective function is shown below. Figure 14 As shown, as the global objective function approaches the optimal solution, the local objective functions generally exhibit a decreasing trend. It is worth noting that although some local objective functions may experience temporary increases, the overall trend still ensures that the system converges to the global optimum.

[0060] The second case validated the proposed method on a simulated quadcopter drone equipped with a robotic arm, whose task was to transport a long pole. This scenario presented a challenging path planning problem: the quadcopter drone and the robotic arm must coordinate their trajectories to navigate from the starting position to the target position while ensuring that the extended load avoids collisions with obstacles. Figure 15The presentation showcases representative planning trajectory diagrams, clearly demonstrating the system's ability to dynamically adjust configuration parameters and efficiently traverse complex environments. The PLL framework supports deferred configuration sampling and parallel optimization, significantly improving planning efficiency and solution quality compared to traditional methods.

[0061] To further evaluate the impact of parallelization, experiments were conducted using different numbers of threads. For example... Figure 16 As shown, the x-axis represents the number of threads used, and each configuration was tested in an environment with 100 randomly generated obstacles. The results show that increasing the number of threads generally improves planning efficiency, with significant improvements still achieved when the number of threads reaches four. However, the marginal benefit gradually diminishes beyond four threads because the overhead of parallelization and coordination mechanisms begins to offset the advantage—especially when the workspace size is insufficient to fully utilize additional parallel planning resource modules (P-PRMs). In smaller environments (such as...) Figure 10 As shown in the figure, the advantages of parallelization are limited, and a small number of threads may be more appropriate in this case.

[0062] By comparison Figure 16 and Figure 17 It can be seen that in high-dimensional robot motion planning tasks, the PLL framework consistently outperforms the MPLP method in terms of computational efficiency, achieving faster planning speeds while maintaining comparable path lengths.

[0063] The method in this embodiment has a significantly shorter computation time than MPLP, while maintaining optimal path length. This method outperforms existing lazy and parallel planning methods in terms of computational efficiency, path quality, and parallel scalability.

[0064] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A parallel doubly lazy path planning method based on volume finite state machine and polyhedral graph, characterized in that, Includes the following steps: S1. Offline construction of a volume finite state machine (V-FSM) to discretize and abstract the robot's geometric deformation; S2. The high-dimensional full configuration space path planning problem is reduced in dimension and modeled as an R-configuration path optimization problem in a reduced-dimensional configuration space. S3. Parallelize the construction of the polyhedral graph p within the workspace to complete the connectivity representation of collision-free regions; S4. Search and extract the near-optimal p-path candidate set that satisfies the cost constraint in the p-graph; S5. Assign candidate p paths to multiple processors and perform distributed parallel path optimization. S6. Based on optimized gradient execution, perform delay configuration sampling and delay distance evaluation to generate the final feasible full configuration space. Configuration path.

2. The parallel doubly lazy path planning method based on a volume finite state machine and a polyhedral graph as described in claim 1, characterized in that, In step S1, the V-FSM consists of a t-shaped set and a transition matrix, as follows: S11. For the target robot's operating scenario, select a key transition shape (T-shape) that can fully represent the changes in the robot's volume and shape, and form a set of all T-shapes. i I a A set of t-shaped indices; S12, For each t-shape Calculate the convex hull separately, and use the convex hull region as the spatial occupation and geometric boundary of the t-shape; S13. For any pair of t-shapes and Perform a convertibility determination: If a continuous path exists in the configuration space, allowing the robot to transition from... Deformed to And the entire deformation process is always located in and If the convex hull of the union is inside, then determine Convertable to ; S14. Construct the transition matrix T based on the convertibility results. Indicates convertibility. This indicates that it is not convertible; S15. Combine the t-shaped set with the transition matrix T to form a volume finite state machine V-FSM, store it offline and use it for geometric feasibility constraints in subsequent p-graph construction.

3. The parallel doubly lazy path planning method based on volume finite state machine and polyhedral graph according to claim 2, characterized in that, The content of step S2 is as follows: S21, Define the full configuration space Define a reduced-dimensional configuration space for the high-dimensional space consisting of all the robot's degrees of freedom. From position With T-index Joint composition; S22. Define the dimension reduction path r as a combination of a pose-continuous trajectory and a t-shaped piecewise constant sequence, used to simultaneously describe the robot's position and geometric shape changes. S23. Define a strong δ gap as a path that maintains a safe distance of not less than δ from obstacles throughout its entire length; define a weak δ gap as a path that can be transformed into a strong δ gap path through homotopy deformation. S24. The original high-dimensional shortest path planning problem is transformed into a low-dimensional r-path optimization problem with the objective of minimizing the path length, including t-shaped transformation costs, start-end R-configuration constraints, and weak δ-gap collision-free constraints.

4. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 3, characterized in that, Step S3 is as follows: S31. Initialize two polyhedral fast search random trees (PRRT) and multiple polyhedral probability roadmaps (PPRM). The two PRRTs start from the polyhedrons containing the starting point and the target r configuration, respectively. All PRRTs and PPRMs are executed in parallel on multiprocessors / multithreaded systems. S32. Using a diffusion model to sample the centroid of a collision-free polyhedron, and combining it with a polyhedron expander, the centroid is expanded into a maximally collision-free convex polyhedron, forming p-edges. To satisfy all , The expansion process involves a localized sliding workspace of fixed dimensions. Completed within the time limit; S33. Define the non-empty overlapping region of two or more p-edges as a p-node. It is required that each p node contains at least one r configuration. This causes the robot to occupy a T-shaped area. ; S34. Parallel execution of PRRT and PPRM extensions, performing neighbor distance sorting, parent node selection, and rewiring operations on the new p node to maintain the asymptotic optimal connectivity of the graph; S35. Sequentially complete the dynamic connections between PPRMs, between PPRMs and PRRTs, and between PRRTs, gradually forming a globally connected p-graph. ; S36. Based on the effective resistance of the spectral graph theory, the p-graph is sparsified, retaining key p-nodes and p-edges, thereby reducing the communication overhead between processors.

5. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 4, characterized in that: The PRRT extension is as follows: For the new p node, calculate all adjacent p nodes and sort them by centroid distance, select the node that minimizes the path cost to the root node as the parent node, and rewire the adjacent nodes to optimize the path cost. The PPRM extension specifically involves connecting the new p node to its k nearest neighbor p nodes to construct a local route map, performing rewiring operations, reducing local path costs, and improving connectivity reliability.

6. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 5, characterized in that: When the PPRM and PRRT establish a connection through p-edge overlap, the Prim algorithm is first used to convert the PPRM into a minimum spanning tree (MST). Then, the entire MST is incorporated into the PRRT, and rerouting is performed to update the path cost and parent-child relationship.

7. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 6, characterized in that, Step S4 includes: S41. Using the Euclidean distance between the centroids of adjacent p nodes as an approximation of the path cost, calculate the total cost of path p: S42. Construct a candidate set of p paths This will satisfy the total cost All p paths of e are included in the candidate set, where To minimize the current cost, Where is the number of path nodes, and e is the upper limit of the maximum distance estimation error; S43. Output the p-path sequence from the candidate set. This serves as input for subsequent distributed optimization.

8. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 7, characterized in that, Step S5 is as follows: S51, global full configuration space The path is divided into H consecutive path segments according to the sequence of p nodes, and each segment is allocated to a different processor and thread for independent optimization. S52. Construct a local optimization objective function and a convex polyhedron constraint for the corresponding p node for each path segment, decomposing the global path optimization into multiple constrained local quadratic optimization problems. S53. A distributed dual subgradient descent algorithm is used to solve the problem in parallel, with each processor independently updating the path variables for its own segment. S54. By sharing Lagrange multipliers to transmit segment boundary information, adjacent path segments are forced to have a continuous and consistent configuration at the connection point. S55. Iterate and update until convergence, and output the optimal path structure that satisfies global consistency and constraints.

9. The parallel double-lazy path planning method based on volume finite state machine and polyhedral graph according to claim 8, characterized in that, Step S6 is as follows: S61. Transform the full configuration space path planning into a linear convex constraint optimization problem derived from the geometry of p nodes, with the constraint form as follows: ; S62. Use the gradient direction obtained from solving the optimization problem as the configuration sampling guidance direction, and perform lazy sampling along the gradient direction to avoid random redundant exploration; S63. Completely delay configuration sampling, collision detection, and distance evaluation calculations during the p-graph construction and path search phases, and execute them only on demand during the distributed optimization phase. S64. Generate an optimal system in the full configuration space that satisfies weak delta gap, collision-free conditions, start and end point constraints, and is practically executable. path.