A method of constructing a steel pipe inner lining polyethylene pipe

By breaking down the length of the external section into multiple independent parameters and combining them with flange specifications and construction conditions, the problem of insufficient precision in the construction of long-distance steel pipe lined with polyethylene pipe was solved, achieving efficient and precise flange welding and temperature deformation compensation, thus improving construction quality and efficiency.

CN123129472APending Publication Date: 2026-11-20SEPCO ELECTRIC POWER CONSTR CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611378200.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In existing technologies, during the construction of long-distance steel pipe lined with polyethylene pipes, the length of the outer section is estimated based on a percentage of the total pipe length, without comprehensively considering flange welding requirements, operational margins, and desert temperature differences. This results in poor calculation accuracy, leading to high on-site commissioning costs and low efficiency.

Method used

The length of the external section is broken down into three independent parameters: effective flange flange length, welding construction allowance, and thermal expansion compensation. These parameters are determined in conjunction with flange specifications, the allowance required for welding operations, and pipeline laying conditions. This method is suitable for the construction of long-distance lined pipelines ranging from hundreds to thousands of meters. By using clamps for limiting and expansion tools to control the shrinkage and expansion of the polyethylene pipe, the welding quality and temperature deformation compensation of the flange are ensured.

Benefits of technology

It improves the accuracy and efficiency of long-distance lining pipeline construction, reduces the probability of rework, reduces the consumption of manpower and material resources, improves construction quality and efficiency, and avoids flange weld cracking and pipe material waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123129472A_ABST
    Figure CN123129472A_ABST
Patent Text Reader

Abstract

The application relates to a construction method of a steel pipe lining polyethylene pipe, and belongs to the technical field of pipeline construction. The method comprises the following steps: cleaning the inside of the steel pipe by using a pipe cleaner; welding polyethylene pipe sections to form a polyethylene pipe; using a pipe reducing machine to reduce the diameter of the polyethylene pipe; inserting the reduced polyethylene pipe into the steel pipe, and forming an outer reserved section at the two ends of the polyethylene pipe, which is reserved outside the steel pipe; the length of the outer reserved section is determined by the formula L=A+B+C, A is the effective flange turning length of the polyethylene pipe, B is a welding construction allowance, and C is a thermal expansion compensation amount; using a clamp limiting tool to press the polyethylene pipe wall against the inner wall of the steel pipe opening, using a pipe expanding tool to expand the polyethylene pipe opening to the original diameter; welding a polyethylene flange at the polyethylene pipe opening; after the flange is welded, the pipe expanding tool and the clamp limiting tool are removed, the polyethylene pipe rebounds and expands until the outer wall of the polyethylene pipe is tightly attached to the inner wall of the steel pipe, and the polyethylene flange is tightly attached to the steel flange at the end of the steel pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of pipeline construction technology, and specifically relates to a construction method for lining a steel pipe with a polyethylene pipe.

[0002] In oil and gas extraction and seawater desalination projects, steel water pipelines transport saline media over long periods, making their inner walls prone to corrosion and failure. Reduced-diameter polyethylene (PE) liners are a commonly used steel pipe corrosion protection process, applicable to both newly constructed steel pipes and the repair of existing ones. The basic principle is as follows: a high-density polyethylene (HDPE) liner with an outer diameter larger than the inner diameter of the steel pipe to be lined is selected. The liner is then reduced in diameter using a reduction device, and subsequently pulled into the cleaned steel pipe cavity using a traction device. Due to the high-density polyethylene's characteristic of high molecular weight memory and resilience, the liner gradually expands after insertion, resulting in a tight fit between the outer wall of the liner and the inner wall of the steel pipe. This forms an anti-corrosion lining layer inside the steel pipe, preventing corrosive media from contacting the steel substrate.

[0003] After the diameter reduction and insertion operation is completed, the two ends of the polyethylene liner will form pipe sections that extend out of the steel pipe and are exposed to the outside of the steel pipe. These pipe sections are called the external sections. The external sections are the key structure for subsequent pipe end connection. The polyethylene hot-melt flange welding is carried out using these external sections to achieve a sealed connection between the liner and the external pipeline.

[0004] Currently, the determination of the aforementioned external section length at construction sites is mostly based on industry-standard practices, using a percentage conversion of 1.5%-3% of the total length of the polyethylene liner pipe. This percentage conversion method is applicable to short-distance liner pipe construction: when the overall length of the polyethylene liner pipe is relatively small, the range of external section length obtained by conversion from 1.5%-3% is narrow, and the calculation results can meet the construction requirements for flange welding and pipe end retraction under short pipe conditions.

[0005] However, in oil well water injection and seawater desalination projects in desert areas, the length of a single section of polyethylene-lined pipe to be constructed can reach hundreds or even thousands of meters. In such cases, continuing to use the percentage standard of 1.5%-3% of the total pipe length to calculate the length of the exposed section will result in a wide range of length values, making it impossible to accurately determine the length of the exposed section. Furthermore, this traditional percentage calculation method uses only the total length of the liner pipe as the basis for calculation, without considering the actual on-site construction conditions, and failing to take into account key influencing factors such as the base material processing length required for flange hot-melt welding, operational allowances, and thermal deformation and residual stress release compensation of exposed pipe sections under the large temperature difference environment of the desert.

[0006] Current technology lacks a quantitative method for determining the external allowance section suitable for long-distance, reduced-diameter polyethylene-lined pipes. On-site, construction personnel must rely on experience to repeatedly adjust the allowance length: if the allowance is too short, insufficient base material for flange hot-melt welding will result in quality issues such as the polyethylene flange being pulled off or the weld cracking when the liner pipe springs back and retracts axially; if the allowance is too long, the pipe section exposed to the high temperatures of the desert is prone to creep deformation, causing unnecessary waste of polyethylene pipe material and increasing the workload of subsequent end-treatment. Repeatedly adjusting the pipe end allowance length not only consumes significant manpower and materials but also slows down on-site construction, hindering the efficient implementation of long-distance desert pipeline lining projects. Summary of the Invention

[0007] This invention provides a construction method for steel pipe lined with polyethylene pipe, which overcomes the shortcomings of existing long-distance steel pipe lining with polyethylene pipe construction, where the length of the outer section of the polyethylene pipe is estimated as a percentage of the total pipe length without comprehensively considering flange welding requirements, operating margins, desert temperature differences, poor calculation accuracy, and high on-site commissioning costs.

[0008] This invention is achieved through the following technical solution: a construction method for a steel pipe lined with a polyethylene pipe, comprising:

[0009] Step 1: Use a pipe cleaner to clean the oil, mud, and welding slag inside the steel pipe;

[0010] Step 2: Weld several short polyethylene pipe sections together to form the required polyethylene pipe;

[0011] Step 3: Use a diameter reduction machine to reduce the overall diameter of the polyethylene pipe obtained in Step 2;

[0012] Step 4: Insert the reduced-diameter polyethylene pipe into the cleaned steel pipe. Both ends of the polyethylene pipe form external sections outside the steel pipe. The length of the external sections is determined by the formula L=A+B+C, where L is the length of the external sections, A is the effective flange length of the polyethylene pipe welding flange, B is the welding construction allowance, and C is the thermal expansion compensation amount.

[0013] Step 5: Use clamping and limiting tools to press the wall of the reduced-diameter polyethylene pipe against the inner wall of the steel pipe opening to restrict the polyethylene pipe from axially shrinking into the steel pipe, and use pipe expansion tools to open the opening of the reduced-diameter polyethylene pipe back to its original diameter.

[0014] Step 6: Heat-melt weld a polyethylene flange at the opening of the expanded polyethylene pipe.

[0015] Step 7: After the polyethylene flange welding is completed, remove the expansion tool and the clamp limiting tool. The polyethylene pipe gradually rebounds and expands due to its own polymer memory effect until the outer wall of the polyethylene pipe is tightly attached to the inner wall of the steel pipe, and the polyethylene flange and the steel flange at the end of the steel pipe are tightly attached to each other.

[0016] Furthermore, to better realize the present invention, the diameter of the polyethylene pipe is D:

[0017] When D≤200mm, 50mm≤A<80mm;

[0018] When 200mm < D ≤ 400mm, 80mm ≤ A < 120mm;

[0019] When 400mm < D ≤ 800mm, 120mm ≤ A < 150mm;

[0020] When D > 800mm, 150mm ≤ A < 180mm.

[0021] Furthermore, in order to better realize the present invention, the value of the welding construction allowance B is between 50mm and 100mm.

[0022] Furthermore, in order to better realize the present invention, the value of the thermal expansion compensation C is between 50mm and 70mm.

[0023] Furthermore, in order to better realize the present invention, when the steel pipe is located underground or indoors, the value of the thermal expansion compensation C is 50mm;

[0024] When the steel pipe is located outdoors, the value of the thermal expansion compensation C is 60mm;

[0025] When the steel pipe is located in a high-temperature environment, the thermal expansion compensation C is 70 mm.

[0026] Furthermore, to better implement the present invention, the following step is included between step 1 and step 2:

[0027] Step 1.5: Insert the polyethylene pre-installed pipe, which is compatible with the inner diameter of the steel pipe, into the steel pipe. Use a pulling mechanism to pull the polyethylene pre-installed pipe so that it moves from one end of the steel pipe to the other end to check whether there are any hard protrusions remaining on the inner wall of the steel pipe. If there are hard protrusions, use a pipe cleaner to clean the inner wall of the steel pipe again.

[0028] Furthermore, to better implement the present invention, the following is also included between step 2 and step 3:

[0029] Step 2.5: Perform a gas pressure test on the polyethylene pipe obtained in Step 2 to check for leaks at the weld joints. If a leak is found, it needs to be repaired. If all weld joints are leak-free, use an edge planer to remove all hot-melt edges from the outer wall of the polyethylene pipe.

[0030] Furthermore, to better implement the present invention, the method further includes the following after step 7:

[0031] Step 8: Seal the polyethylene flanges at both ends of the polyethylene pipe with two plugs respectively. One plug is connected to a vent pipe and the other plug is connected to a pressure gauge. Then, air is introduced into the polyethylene pipe through the vent pipe to make the air pressure inside the polyethylene pipe reach 0.6MPa. Then, the pressure is maintained and the air pressure change inside the polyethylene pipe is observed through the pressure gauge.

[0032] Furthermore, in order to better realize the present invention, the pressure holding time in step 8 is 4 hours.

[0033] Furthermore, in order to better realize the present invention, the length of the steel pipe is 750 meters.

[0034] Compared with the prior art, the present invention has the following advantages:

[0035] This invention provides a construction method for steel pipe lined with polyethylene pipe. It abandons the traditional method of determining the length of the outer section based on a percentage of the total lining pipe length. Instead, it decomposes the total length of the outer section into three independent parameters: effective flange flange length, welding allowance, and thermal expansion compensation. These parameters are determined in conjunction with flange specifications, the allowance required for welding operations, and pipeline laying conditions. This method is suitable for long-distance lining pipeline construction ranging from hundreds to thousands of meters, solving the problem of excessively large value ranges and insufficient accuracy in long-pipe applications using the traditional percentage method. The aforementioned welding allowance also considers the axial shrinkage after pipe diameter reduction and the on-site welding operation space, avoiding insufficient flange base material and weld pull-out failure due to pipe end shrinkage. The effective flange flange length is matched to the hot-melt flange welding process for different pipe diameters, ensuring the quality of flange fusion forming. The thermal expansion compensation amount is selected in combination with the laying environment in desert areas, taking into account the temperature deformation of the exposed and reserved sections and the release of residual stress from the inner liner pipe diameter reduction, avoiding the risk of temperature stress cracking of the flange weld under the large temperature difference between day and night in the desert, and avoiding excessive reserved sections that lead to pipe creep and material waste.

[0036] The method provided by this invention can significantly reduce the probability of rework in long-distance lining construction, reduce the consumption of manpower and material resources for repeated on-site adjustments based on experience, and improve the operation quality and construction efficiency of desert seawater desalination and oil well water injection pipeline lining construction. Attached Figure Description

[0037] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0038] Figure 1 This is a flowchart of the construction method for steel pipe lined with polyethylene pipe provided in the embodiments of the present invention;

[0039] Figure 2 This is a schematic diagram of the structure of the pig in an embodiment of the present invention;

[0040] Figure 3 This is a schematic diagram of the clamp limiting tool in an embodiment of the present invention;

[0041] Figure 4 This is a schematic diagram of the tube expansion tool in an embodiment of the present invention;

[0042] Figure 5 yes Figure 4 A cross-sectional view of the tube expansion fixture shown;

[0043] Figure 6 yes Figure 5 The diagram shows the structure of the piston rod and sliding piston in the tube expansion tool.

[0044] In the picture:

[0045] 1-Central shaft, 2-Circular steel plate, 3-Wire brush, 4-Circular scraper, 5-Hook;

[0046] 10 - Curved plate, 20 - Frame, 30 - Jack;

[0047] 100-Oil separator, 110-Oil inlet pipe, 120-Oil outlet pipe, 200-Valve, 300-Hydraulic cylinder, 310-Sliding piston, 320-Piston rod, 330-End cap, 400-Expansion spring ring, 500-Connecting ring. Detailed Implementation

[0048] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be described in detail below. Obviously, the described embodiments are merely some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other implementation methods obtained by those skilled in the art without creative effort are within the scope of protection of this invention.

[0049] Example:

[0050] like Figure 1 As shown, this embodiment provides a construction method for lining steel pipes with polyethylene pipes, used in oil and gas extraction and seawater desalination projects in desert areas, where polyethylene pipes are lined with steel water pipelines. The aforementioned steel water pipeline is composed of multiple steel pipe sections spliced ​​together, with each section having a total length of 750 meters and a polyethylene pipe diameter of 900 mm. The method includes the following steps:

[0051] Step 1: Use a pipe cleaner to thoroughly clean the inside of the steel pipe of grease, silt, and welding slag. Optionally, such as... Figure 2 As shown, the above-mentioned pigging device includes a central shaft 1, a circular steel plate 2, a wire brush 3, and a circular scraper 4 made of polyurethane elastomer. The circular steel plate 2, the wire brush 3, and the circular scraper 4 are respectively fixed to the front, middle, and rear of the central shaft 1. A hook 5 is fixed to the front end of the central shaft 1.

[0052] During pipe cleaning, the traction rope is passed through the steel pipe and connected to the winch. Then, the pipe cleaner is placed inside one end of the steel pipe. The outer diameter of the circular steel plate 2 is matched with the steel pipe, while the outer diameter of the circular scraper 4 is slightly larger than the inner diameter of the steel pipe, so that the hook 5 is connected to the traction rope. Then, the winch is started to pull the pipe cleaner forward in the steel pipe. The circular steel plate 2 scrapes off the protrusions (such as weld beads) on the inner wall of the steel pipe, and the advancing wire brush 3 cleans the inner wall of the steel pipe. Some impurities generated during the cleaning process are carried away by the wire brush. The circular scraper 4 can further scrape off the dust, oil, and mud remaining on the inner wall of the steel pipe. Moreover, the circular scraper 4 can also push the dust generated during the cleaning process forward, and finally push the impurities out of the steel pipe.

[0053] It is worth noting that after the pig is pulled out of the steel pipe, proceed to step 1.5:

[0054] Insert a pre-installed polyethylene (PE) pipe, matching the inner diameter of the steel pipe, into the steel pipe. Use a pulling mechanism (i.e., a traction rope and the aforementioned winch) to pull the PE pipe from one end of the steel pipe to the other and pull it out. Then, check the surface of the PE pipe for scratches to see if any hard protrusions remain on the inner wall of the steel pipe. If there are scratches on the surface of the PE pipe that are more than 10% deeper than the wall thickness, it indicates that there are still hard protrusions on the inner wall of the steel pipe. In this case, use a pipe cleaning tool to clean the inner wall of the steel pipe again until the inner wall of the steel pipe is clean.

[0055] Step 2: Several short polyethylene pipe sections are heat-fused and welded together to form the desired polyethylene pipe. It is important to note that after the polyethylene pipe sections are transported to the desert construction site, they are stored in a temporary warehouse. When needed, the polyethylene pipe sections are retrieved and moved to the construction site, where multiple sections are heat-fused and welded together to form the required polyethylene pipe. This step can be performed using existing construction methods, so it will not be described in detail here.

[0056] Step 2.5: Perform a gas pressure test on the polyethylene pipe obtained in Step 2 to check for leaks at the weld joints. If leaks are found, repair welding is required. If all welds are leak-free, remove all hot-melt edges from the outer wall of the polyethylene pipe using a planer. The specific method for performing the gas pressure test on the polyethylene pipe in this step can refer to existing technology, so it will not be described in detail here.

[0057] Step 3: Use a pipe reducer to reduce the overall diameter of the polyethylene pipe obtained in Step 2. The pipe reducer and the pipe reduction method used in this step are existing technologies, so they will not be described in detail here. The diameter of the polyethylene pipe becomes smaller after pipe reduction.

[0058] Step 4: Insert the reduced-diameter polyethylene pipe into the cleaned steel pipe. Both ends of the polyethylene pipe form external sections outside the steel pipe. The length of the external sections is determined by the formula L=A+B+C, where L is the length of the external sections, A is the effective flange length of the polyethylene pipe welding flange, B is the welding construction allowance, and C is the thermal expansion compensation amount.

[0059] It should be noted that the diameter of the polyethylene pipe is defined as D. When D≤200mm, 50mm≤A<80mm; when 200mm<D≤400mm, 80mm≤A<120mm; when 400mm<D≤800mm, 120mm≤A<150mm; when D>800mm, 150mm≤A<180mm.

[0060] The value of the welding allowance B is between 50mm and 100mm. Moreover, the larger the diameter of the polyethylene pipe, the larger the value of the welding allowance B.

[0061] The aforementioned thermal expansion compensation amount C is between 50mm and 70mm. This thermal expansion compensation amount applies to the aforementioned external section and is not for the entire polyethylene pipe. Specifically, when the steel pipe is located underground or indoors, the thermal expansion compensation amount C is 50mm; when the steel pipe is located outdoors, the thermal expansion compensation amount C is 60mm; and when the steel pipe is located in a high-temperature environment, the thermal expansion compensation amount C is 70mm.

[0062] Through this step, since the diameter of the polyethylene pipe D=900mm, the value of A is 150mm≤A<180mm, and on site A=160mm is taken, with a welding allowance B=90mm. If the steel pipe is located underground or indoors, with a small temperature difference, the thermal expansion compensation C=50mm. Therefore, the length of the aforementioned external section L=160mm+90mm+50mm=300mm. If the steel pipe is located outdoors, with a larger temperature difference, the thermal expansion compensation C=60mm. Therefore, the length of the aforementioned external section L=160mm+90mm+60mm=310mm. If the steel pipe is exposed to direct sunlight or high temperatures, with a large temperature difference, the thermal expansion compensation C=70mm. Therefore, the length of the aforementioned external section L=160mm+90mm+70mm=320mm.

[0063] Step 5: Use a clamping device to press the reduced-diameter polyethylene pipe wall tightly against the inner wall of the steel pipe opening to prevent the polyethylene pipe from axially retracting into the steel pipe. Then, use a pipe expander to open the reduced-diameter polyethylene pipe opening back to its original diameter so that a polyethylene flange can be welded to the outer section of the polyethylene pipe later. It should be noted that the polyethylene flange interface is compatible with the original size polyethylene pipe, so after the reduced-diameter pipe is inserted, the pipe expander needs to be used to open the outer section of the pipe opening back to its original size.

[0064] In this step, the aforementioned clamp limiting fixture is as follows: Figure 3 As shown, it includes two arc-shaped plates 10 with frames 20 and a jack 30, with the jack 30 installed between the frames 20 of the two arc-shaped plates 10. In use, the clamp limiting device is placed inside the reduced-diameter polyethylene pipe and corresponding to the opening of the steel pipe. Then, the jack 30 is used to separate the two arc-shaped plates 10. After separation, the two arc-shaped plates 10 press the polyethylene pipe wall at the opening of the steel pipe against the inner wall of the steel pipe opening from both sides, thereby restricting the reduced-diameter polyethylene pipe from axially retracting into the steel pipe.

[0065] The above-mentioned tube expansion tooling, such as Figures 4-6As shown, it includes an oil distribution block 100, several hydraulic cylinders 300, and a bulging spring ring 400 made of polyurethane elastomer. The oil distribution block 100 has an oil collecting chamber inside, and an oil inlet pipe 110 and an oil outlet pipe 120 connected to the oil collecting chamber are provided on the end wall of the oil distribution block 100. Both the oil inlet pipe 110 and the oil outlet pipe 120 are equipped with valves 200 for controlling the on / off state. Several oil holes are opened on the circumferential side wall of the oil distribution block 100, and these oil holes are evenly distributed along the circumference of the oil distribution block 100. These oil holes are located on the side wall of the oil collecting chamber and communicate with the oil collecting chamber. Hydraulic cylinders 300 extend radially along the oil distribution block 100, and one end of the hydraulic cylinder 300 is welded and fixed to the outer wall of the oil distribution block 100. Several hydraulic cylinders 300 are connected to several corresponding oil holes. Each hydraulic cylinder 300 is equipped with a sliding piston 310, and each sliding piston 310 is connected to a piston rod 320. Each hydraulic cylinder 300 also has an end cap 330 installed at its free end. The end cap 330 has a through hole, and the piston rod 320 is slidably inserted into the corresponding through hole. A sealing ring is installed in the through hole, and the piston rod 320 is slidably inserted into the inner hole of the sealing ring. The sealing ring is used to seal the gap between the outer wall of the piston rod 320 and the wall of the through hole. In this way, the hydraulic cylinder 300, the sliding piston 310, the piston rod 320, and the end cap 330 form a hydraulic push rod assembly. Hydraulic oil enters the oil collection chamber of the oil distribution block 100 from the oil inlet pipe 110, and then enters the hydraulic cylinder 300, pushing the sliding piston 310 and the piston rod 320 to extend. An expansion spring ring 400 is sleeved around the oil distributor 100 and coaxially arranged with the oil distributor 100. The free ends of several piston rods 320 are respectively connected to different positions on the inner ring wall of the expansion spring ring 400. Moreover, all hydraulic cylinders 300 are fixedly connected to a connecting ring 500. In this way, the connecting ring 500 can better support and fix all hydraulic cylinders 300, improving the structural strength and rigidity of the tooling. Specifically, the connecting ring 500 has several through holes that penetrate the connecting ring 500 radially. A hydraulic cylinder 300 is inserted into each through hole, and the hydraulic cylinder 300 is welded and fixed to the connecting ring 500.

[0066] In use, first insert the tool into the end port of the reduced-diameter polyethylene pipe, ensuring that the expansion spring ring 400 is coaxial with and abuts against the polyethylene pipe. Then, keep the valve 200 of the oil inlet pipe 110 open and the valve 200 of the oil outlet pipe 120 closed. Next, connect the corresponding oil pipes to the oil inlet pipe 110 and the oil outlet pipe 120. Then, start the oil pump to send hydraulic oil through the oil inlet pipe 110 into the oil collection chamber of the oil distribution block 100. Under high pressure, the hydraulic oil synchronously enters all the oil holes and the hydraulic cylinder 300, driving the sliding piston 310 and the piston rod 320 synchronously. Simultaneously, the piston rods 320 move outward from the hydraulic cylinder 300 at the same speed, pushing the expansion spring ring 400 outward. When all piston rods 320 extend synchronously and at the same speed, they drive the expansion spring ring 400 to expand, thereby widening the end opening of the polyethylene pipe. Then, the valve 200 of the oil inlet pipe 110 is closed to maintain pressure for flange welding. Afterward, the valve 200 of the oil outlet pipe 120 is opened, and the hydraulic oil in the oil collection chamber of the oil distribution block 100 flows out. At this time, under the elastic force of the expansion spring ring 400, the piston rods 320 retract into the hydraulic cylinder 300. Of course, the extension length of the piston rods 320 needs to be preset so that the tooling can just open the end of the reduced-diameter polyethylene pipe to its original size before reduction.

[0067] Step 6: Heat-melt weld a polyethylene flange to the opened polyethylene pipe end. The welding method for the polyethylene flange at the polyethylene pipe end can refer to existing technology, so it will not be described in detail here.

[0068] Step 7: After the polyethylene flange welding is completed, remove the expansion tool and the clamp limiting tool. The polyethylene pipe gradually rebounds and expands due to its own polymer memory effect until the outer wall of the polyethylene pipe is tightly attached to the inner wall of the steel pipe, and the polyethylene flange and the steel flange at the end of the steel pipe are tightly attached to each other.

[0069] Step 8: Seal the polyethylene flanges at both ends of the polyethylene pipe with two plugs. Connect one plug to a vent pipe and the other plug to a pressure gauge. Then, introduce air into the polyethylene pipe through the vent pipe until the pressure inside the polyethylene pipe reaches 0.6 MPa. Then, maintain the pressure for 4 hours and observe the pressure change inside the polyethylene pipe through the pressure gauge to determine whether the lining of the polyethylene pipe is leaking.

[0070] The construction method for steel pipe lined with polyethylene pipe provided in this embodiment abandons the traditional method of determining the length of the outer section based on a percentage of the total length of the lining pipe. Instead, it decomposes the total length of the outer section into three independent parameters: the effective flange flange length, the welding allowance, and the thermal expansion compensation. These parameters are determined in conjunction with the flange specifications, the allowance required for welding operations, and the pipeline laying conditions. This method is suitable for the construction of long-distance lined pipelines ranging from hundreds to thousands of meters, solving the problem of excessively large value ranges and insufficient accuracy in long-pipe applications using the traditional percentage method. The aforementioned welding allowance also takes into account the axial shrinkage after pipe diameter reduction and the on-site welding operation space, avoiding insufficient flange base material and weld pull-out failure due to pipe end shrinkage. The effective flange flange length is matched with the hot-melt flange welding process for different pipe diameters, ensuring the quality of flange fusion forming. The thermal expansion compensation amount is selected in combination with the laying environment in desert areas, taking into account the temperature deformation of the exposed and reserved sections and the release of residual stress from the inner liner pipe diameter reduction, avoiding the risk of temperature stress cracking of the flange weld under the large temperature difference between day and night in the desert, and avoiding excessive reserved sections that lead to pipe creep and material waste.

[0071] The method provided in this embodiment can significantly reduce the probability of rework in long-distance lining construction, reduce the consumption of manpower and material resources for repeated on-site adjustments based on experience, and improve the operation quality and construction efficiency of desert seawater desalination and oil well water injection pipeline lining construction.

[0072] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope described in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A construction method for lining a steel pipe with a polyethylene pipe, characterized in that, include: Step 1: Use a pipe cleaner to clean the oil, mud, and welding slag inside the steel pipe; Step 2: Weld several short polyethylene pipe sections together to form the required polyethylene pipe; Step 3: Use a diameter reduction machine to reduce the overall diameter of the polyethylene pipe obtained in Step 2; Step 4: Insert the reduced-diameter polyethylene pipe into the cleaned steel pipe. Both ends of the polyethylene pipe form external sections outside the steel pipe. The length of the external sections is determined by the formula L=A+B+C, where L is the length of the external sections, A is the effective flange length of the polyethylene pipe welding flange, B is the welding construction allowance, and C is the thermal expansion compensation amount. Step 5: Use clamping and limiting tools to press the wall of the reduced-diameter polyethylene pipe against the inner wall of the steel pipe opening to restrict the polyethylene pipe from axially shrinking into the steel pipe, and use pipe expansion tools to open the opening of the reduced-diameter polyethylene pipe back to its original diameter. Step 6: Heat-melt weld a polyethylene flange at the opening of the expanded polyethylene pipe. Step 7: After the polyethylene flange welding is completed, remove the expansion tool and the clamp limiting tool. The polyethylene pipe gradually rebounds and expands due to its own polymer memory effect until the outer wall of the polyethylene pipe is tightly attached to the inner wall of the steel pipe, and the polyethylene flange and the steel flange at the end of the steel pipe are tightly attached to each other.

2. The construction method of steel pipe lined with polyethylene pipe according to claim 1, characterized in that, The diameter of the polyethylene pipe is D: When D≤200mm, 50mm≤A<80mm; When 200mm < D ≤ 400mm, 80mm ≤ A < 120mm; When 400mm < D ≤ 800mm, 120mm ≤ A < 150mm; When D > 800mm, 150mm ≤ A < 180mm.

3. The construction method of the steel pipe lined with polyethylene pipe according to claim 1, characterized in that: The welding allowance B is between 50mm and 100mm.

4. The construction method of the steel pipe lined with polyethylene pipe according to claim 1, characterized in that: The value of the thermal expansion compensation C is between 50 mm and 70 mm.

5. The construction method of the steel pipe lined with polyethylene pipe according to claim 4, characterized in that: When the steel pipe is located underground or indoors, the thermal expansion compensation C is 50mm. When the steel pipe is located outdoors, the value of the thermal expansion compensation C is 60mm; When the steel pipe is located in a high-temperature environment, the thermal expansion compensation C is 70 mm.

6. The construction method of a steel pipe lined with a polyethylene pipe according to any one of claims 1-5, characterized in that, Between step 1 and step 2, the following is also included: Step 1.5: Insert the polyethylene pre-installed pipe, which is compatible with the inner diameter of the steel pipe, into the steel pipe. Use a pulling mechanism to pull the polyethylene pre-installed pipe so that it moves from one end of the steel pipe to the other end to check whether there are any hard protrusions remaining on the inner wall of the steel pipe. If there are hard protrusions, use a pipe cleaner to clean the inner wall of the steel pipe again.

7. The construction method of a steel pipe lined with a polyethylene pipe according to any one of claims 1-5, characterized in that, Between step 2 and step 3, the following is also included: Step 2.5: Perform a gas pressure test on the polyethylene pipe obtained in Step 2 to check for leaks at the weld joints. If a leak is found, it needs to be repaired. If all weld joints are leak-free, use an edge planer to remove all hot-melt edges from the outer wall of the polyethylene pipe.

8. The construction method of a steel pipe lined with a polyethylene pipe according to any one of claims 1-5, characterized in that, Step 7 is followed by: Step 8: Seal the polyethylene flanges at both ends of the polyethylene pipe with two plugs respectively. One plug is connected to a vent pipe and the other plug is connected to a pressure gauge. Then, air is introduced into the polyethylene pipe through the vent pipe to make the air pressure inside the polyethylene pipe reach 0.6MPa. Then, the pressure is maintained and the air pressure change inside the polyethylene pipe is observed through the pressure gauge.

9. The construction method of steel pipe lined with polyethylene pipe according to claim 8, characterized in that: In step 8, the pressure holding time is 4 hours.

10. The construction method of the steel pipe lined with polyethylene pipe according to claim 1, characterized in that: The steel pipe is 750 meters long.