New energy automobile thick film heater and electric compressor two-in-one controller
By coordinating the power distribution and switching edge adjustment of the compressor and thick film heater through the main control unit, the problems of bus current and voltage fluctuations and fault identification in the two-in-one controller of new energy vehicles are solved, and the effects of stable thermal management and fault response are achieved.
Patent Information
- Application Number
- CN202611598494.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-15
- Publication Date
- 2026-11-20
AI Technical Summary
When the electric compressor and thick film heater are working simultaneously, the current and voltage fluctuations of the busbar in the existing two-in-one controller for new energy vehicles are superimposed, which increases the burden on the busbar and power devices. Furthermore, it lacks timely identification and coordinated control of single-branch faults and overall system faults.
The main control unit coordinates the power distribution between the compressor and the thick film heater. By generating thick film heating PWM and adjusting the switching edge, it avoids high-impact periods, ensuring that the total power does not exceed the upper limit. It also combines temperature and status monitoring for coordinated control.
It reduces instantaneous current and voltage fluctuations in the busbar, improves the ability to identify and respond to faults, and ensures stable operation under thermal management requirements.
Smart Images

Figure CN123129669A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of thermal management and on-board high-voltage power control technology for new energy vehicles, and relates to a two-in-one controller for thick film heaters and electric compressors in new energy vehicles. Background Technology
[0002] In the processes of cooling, heating, defrosting, and rapid temperature rise, new energy vehicles typically require the coordinated operation of an electric compressor and an electric heater. While existing two-in-one controllers can integrate the drive functions of both devices, when the two power branches operate simultaneously, they usually primarily control the compressor output and heater power separately, lacking coordination of the total power and switching timing of the two branches. Since the two branches are connected to the same high-voltage DC bus, when the compressor inverter and heater switch on and off at similar times, the instantaneous current and voltage fluctuations on the bus can easily overlap, increasing the workload on the bus and power devices.
[0003] Furthermore, U-tube thick film heaters rely on medium flow to remove heat promptly during operation. When the medium is insufficient, flow is obstructed, or local heat exchange capacity decreases, existing protection methods typically wait until the temperature rises significantly or a dry-burning fault occurs before taking protective measures, making it difficult to detect the deterioration of the heat exchange condition in a timely manner. Additionally, when abnormalities occur in the compressor branch or thick film heating branch, the existing control methods still have room for improvement in distinguishing between single-branch faults and overall system faults, as well as in power replacement and recovery control after a fault. Summary of the Invention
[0004] To address the problems existing in the background technology, this invention proposes a two-in-one controller for thick film heaters and electric compressors in new energy vehicles.
[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows: a two-in-one controller for a new energy vehicle thick film heater and an electric compressor, including a main control unit, a compressor drive module and a U-tube thick film heating drive module, wherein the compressor drive module and the U-tube thick film heating drive module are connected to the same high-voltage DC bus; When the electric compressor and the U-tube thick film heater are running synchronously, the main control unit receives the upper limit of the total power of the two branches from the vehicle controller, determines the target power of the compressor and the target power of the thick film heater according to the thermal management requirements, and ensures that the sum of the target power of the compressor and the target power of the thick film heater does not exceed the upper limit of the total power of the two branches. Generate thick film heating PWM based on the target power of thick film heating; The high-impact switching period of the compressor bridge arm switch edges is determined based on the inverter PWM switching state of the compressor drive module. When the turn-on or turn-off edge of the thick film heating PWM falls into the high-impact period of the switch, while maintaining the total conduction time of the thick film heating PWM within the preset coordination period corresponding to the target power of the thick film heating, the turn-on or turn-off edge is shifted forward or backward within the preset coordination period so that the adjusted turn-on or turn-off edge avoids any high-impact period of the switch within the preset coordination period. The compressor drive module is controlled according to the compressor target power, and the U-tube thick film heating drive module is controlled by the thick film heating PWM.
[0006] Furthermore, the main control unit receives thermal management commands sent by the vehicle controller and acquires ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature.
[0007] Furthermore, the main control unit determines the current operating conditions based on the thermal management command, ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature; When the current operating condition is low-temperature defrosting or rapid heating, the electric compressor and the U-tube thick film heater are allowed to operate synchronously and enter a dual heat source coordinated control state.
[0008] Furthermore, the power branch where the compressor drive module is located is the compressor branch, and the power branch where the U-tube thick film heating drive module is located is the thick film heating branch; The main control unit determines the required output power of the compressor branch and the thick film heating branch when not subject to the upper limit of the total power of the two branches, based on the current heating or defrosting requirements. When the sum of the two required output powers is not higher than the upper limit of the total power of the dual branches, the required output power of the compressor branch is determined as the target power of the compressor, and the required output power of the thick film heating branch is determined as the target power of the thick film heating. When the sum of the two required output powers exceeds the upper limit of the total power of the dual branches, the current priority of the compressor branch and the thick film heating branch is determined according to the pre-defined correspondence between the heating or defrosting target and the branch priority relationship. The two required output powers are adjusted according to the current priority, and the required output power corresponding to the power branch with lower priority is reduced first, so as to obtain the target power of the compressor and the target power of the thick film heating, so that the sum of the target power of the compressor and the target power of the thick film heating does not exceed the upper limit of the total power of the dual branches.
[0009] Furthermore, the compressor drive module adopts a three-phase full-bridge inverter topology, including power switching devices and their gate drive circuits connected to the high-voltage DC bus; The U-tube thick film heating drive module adopts a PWM controllable power adjustment topology and is connected to the resistive load of the U-tube thick film heater.
[0010] Furthermore, the main control unit acquires the inverter PWM switching state of the compressor drive module, and determines the period when the switching edges of the compressor bridge arm are relatively concentrated based on the inverter PWM switching state, and defines the period as the high-impact period of the switch.
[0011] Furthermore, when a single thick-film heating pulse in the thick-film heating PWM cannot avoid the high-impact period of the switch simply by moving the switch edge, the main control unit, under the condition of satisfying the allowable switching frequency and minimum effective pulse width of the U-tube thick-film heating drive module, divides the single thick-film heating pulse into multiple sub-pulses and adjusts the switching edges of the multiple sub-pulses so that the switching edges of the multiple sub-pulses avoid the high-impact period of the switch.
[0012] Furthermore, when adjusting the switching edges of the multiple sub-pulses, the main control unit maintains that the total on-time of the thick film heating PWM within the preset coordination period corresponds to the target power of the thick film heating.
[0013] Furthermore, the main control unit adjusts the compressor inverter output frequency or speed command according to the compressor target power, and adjusts the duty cycle of the thick film heating PWM according to the thick film heating target power.
[0014] Furthermore, the main control unit outputs a frequency conversion control signal to the compressor drive module, outputs a PWM power adjustment signal to the U-tube thick film heating drive module, and receives the operating status and fault status feedback from the compressor drive module and the U-tube thick film heating drive module, respectively.
[0015] Compared with the prior art, the present invention has the following beneficial effects: By coordinating the allocation of the target power of the compressor and the target power of the thick film heating within the upper limit of the total power of the dual branches, and adjusting the edge of the thick film heating PWM switch according to the inverter PWM switch state of the compressor drive module, the present invention can reduce the occurrence of concentrated switching actions of the two power branches while meeting the thermal management requirements, and reduce the instantaneous impact on the shared high voltage DC bus. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the functional structure and power connection of the two-in-one controller of the present invention; Figure 2 This is a schematic diagram of the signal relationship of the two-in-one controller of the present invention; Figure 3 This is a schematic diagram of the dual-branch power constraint and switching timing coordination process of the present invention; Figure 4 This is a schematic diagram of the heat exchange anomaly precursor identification and linkage protection process of the present invention. Detailed Implementation
[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0018] This invention relates to a combined controller for a thick-film heater and an electric compressor in new energy vehicles. For ease of understanding of the subsequent control relationships, the power branch containing the compressor drive module is referred to as the compressor branch, and the power branch containing the U-tube thick-film heater drive module is referred to as the thick-film heater branch. The compressor branch and the thick-film heater branch are connected to the same high-voltage DC bus and are controlled and coordinated by the same main control unit.
[0019] The maximum total power of the dual branches in this specification represents the maximum allowable power of the compressor branch and the thick-film heating branch under the current thermal management conditions and vehicle power supply conditions. The target power of the compressor and the target power of the thick-film heating represent the control targets determined by the main control unit for the two branches, respectively. The preset coordination period represents the period during which the main control unit statistically analyzes the total on-time of the thick-film heating PWM and coordinates its switching edges. The high-impact switching period represents the time period during which the compressor arm switching edges are relatively concentrated, determined based on the inverter PWM switching state of the compressor drive module.
[0020] The operating condition discrimination threshold, vehicle power supply load threshold, extension width of high-impact switching period, allowable switching frequency of U-tube thick film heating drive module, minimum effective pulse width, heat exchange anomaly judgment threshold, recovery conditions and preset power change rate can all be calibrated according to the high-pressure platform, electric compressor parameters, rated power of U-tube thick film heater, temperature sensor arrangement and vehicle thermal management requirements of specific vehicle models. This invention does not use a certain fixed value as a necessary limitation.
[0021] Example 1: Structure and Signal Relationships of a Two-in-One Controller The new energy vehicle thick film heater and electric compressor two-in-one controller of this embodiment includes a controller housing, a main control unit, a compressor drive module, a U-shaped tube thick film heating drive module, an integrated liquid cooling heat dissipation structure, a high-voltage terminal block group and a low-voltage communication interface.
[0022] The controller housing is a one-piece metal casing, internally divided into high-voltage and low-voltage areas by a partition. The main control unit and low-voltage communication circuit are located in the low-voltage area, while the compressor drive module, U-tube thick film heating drive module, and high-voltage input / output components are located in the high-voltage area, thus physically isolating the low-voltage control and communication circuits from the high-voltage power circuits.
[0023] The controller housing is provided with mounting positions along the axial direction for connecting to the electric compressor and the U-tube thick film heater, so that the controller housing is located between the electric compressor and the U-tube thick film heater, and the three form an axially integrated assembly.
[0024] The high-voltage terminal block includes at least a high-voltage input terminal, a three-phase compressor output terminal, and a thick-film heater output terminal. The high-voltage input terminal is connected to the vehicle's high-voltage DC power supply, the three-phase compressor output terminal is connected to the electric compressor, and the thick-film heater output terminal is connected to the resistive load of the U-tube thick-film heater. The low-voltage communication interface is connected to the vehicle controller to receive thermal management commands and report operating status and fault information.
[0025] like Figure 1 As shown, the high-voltage DC bus is connected to the compressor drive module and the U-tube thick film heating drive module, respectively. The compressor drive module is connected to the electric compressor, and the U-tube thick film heating drive module is connected to the U-tube thick film heater.
[0026] like Figure 2 As shown, the main control unit outputs frequency conversion control signals to the compressor drive module and PWM power adjustment signals to the U-tube thick film heater drive module, and receives operating and fault status feedback from the two drive modules respectively. The main control unit can report the fault type, fault location, and fault level to the vehicle controller via the CAN communication bus or LIN communication bus.
[0027] The main control unit includes a processor, a sampling unit, a communication unit, and a fault storage unit. The processor performs functions such as operating condition discrimination, target power determination, thick-film heating PWM generation, switching timing coordination, heat exchange anomaly precursor identification, hierarchical fault protection, and power failover and recovery control. For operating quantities obtained from local sampling by the controller, the sampling unit provides the corresponding sampling results to the processor; for operating quantities provided by the vehicle controller or the two drive modules, the communication unit or corresponding feedback channel provides the corresponding information to the processor. The processor thereby acquires ambient temperature, cabin temperature, battery temperature, compressor operating status, U-tube thick-film heater temperature, high-voltage bus voltage, total output power, and load current of the compressor branch and thick-film heating branch. The specific sensors, acquisition devices, and interface types for the above operating quantities can be determined according to the vehicle model and controller configuration. The fault storage unit stores the fault type, fault location, and fault level.
[0028] The term "power branch in an available state" means that the power branch is not in a locked or disabled output state, and the operating status feedback from the corresponding drive module allows the main control unit to issue valid power control commands to the branch. When a power branch is in a derating state, it can still output within the limited power range and is not automatically considered unavailable due to the derating itself. A power branch is considered unavailable when it is in a locked state, disabled by protection logic, or when there is a fault requiring the branch to be stopped.
[0029] The compressor drive module adopts a three-phase full-bridge inverter topology, including power switching devices and their gate drive circuits connected to the high-voltage DC bus. The power switching devices can be SiC MOSFETs or IGBTs. The main control unit adjusts the compressor inverter output frequency or speed command according to the compressor's target power and acquires the inverter PWM switching state of the compressor drive module. The inverter PWM switching state is used to indicate the on / off switching state of each bridge arm of the compressor and is used to subsequently determine the high-impact switching period.
[0030] The U-tube thick-film heating drive module employs a PWM controllable power regulation topology and is connected to the resistive load of the U-tube thick-film heater. The main control unit generates a thick-film heating PWM based on the target power, adjusts the equivalent output of the thick-film heating branch by changing the duty cycle of the PWM, and monitors the status of the thick-film heating branch based on the load current of the thick-film heating branch, the temperature of the U-tube thick-film heater, and feedback from overcurrent, overvoltage, overtemperature, and dry-burning protection mechanisms. The U-tube thick-film heating drive module is equipped with overcurrent, overvoltage, overtemperature, and dry-burning protection functions.
[0031] The integrated liquid cooling structure includes a sealed liquid cooling cavity housed within the controller housing. The power devices of the compressor drive module and the U-tube thick-film heater drive module are arranged close to the heat transfer wall of the liquid cooling cavity, allowing the power devices of the two power branches to share a common liquid cooling circuit. The coolant flow channel of the liquid cooling cavity can be connected in series with or in parallel with the medium flow channel of the U-tube thick-film heater, utilizing the heat generated by the controller's power devices to preheat the medium entering the U-tube thick-film heater.
[0032] Example 2: Synergistic Thermal Management Control Process After the low-voltage power supply to the controller is established, the main control unit first completes a self-test, and then determines the current operating condition based on the vehicle controller's thermal management instructions and various operating parameters. When the electric compressor and the U-tube thick film heater are running synchronously, the main control unit follows... Figure 3 The process shown determines the target power of the compressor and the target power of the thick-film heater under the constraint of the total power limit of the dual branches, and coordinates the switching timing of the inverter PWM of the compressor drive module and the thick-film heater PWM. During operation, the main control unit continuously monitors the compressor branch and the thick-film heater branch, and follows the... Figure 4The process shown identifies early signs of heat exchange anomalies and performs derating, lockout, power takeover, fault reporting, and gradual recovery based on the abnormal state and fault type.
[0033] Since switching timing coordination requires comparing the timing positions of the compressor arm switching edge and the thick-film heating PWM edge, the main control unit uses a preset coordination period as a unified relative time range. Whether the inverter PWM switching state of the compressor drive module is directly controlled by the main control unit or fed back by the compressor drive module, its corresponding switching edge position within the current preset coordination period is used for comparison. The specific control clock frequency and timing accuracy can be determined based on the controller hardware platform.
[0034] The following step numbers are only used to distinguish different processing stages of the main control unit in a single control process, and do not mean that all steps must be executed only once in strict order under all circumstances. Operating condition judgment, operating status monitoring, target power update, and switching timing coordination can be repeated in subsequent control cycles based on the data dependencies between preceding and following steps; fault protection steps are executed first when the corresponding fault conditions are met.
[0035] S10: The system powers on, performs a self-test, and acquires the information required for control.
[0036] S101: After the low-voltage power supply is established, the main control unit performs a self-test on the communication status, sampling status, and drive status, and checks the status of the high-voltage bus, the compressor drive module, and the U-tube thick film heating drive module. If the self-test passes, the controller enters the thermal management command waiting state; if the self-test fails, the controller does not enter the normal power output process, continues to keep the corresponding power branch from outputting, and proceeds to step S104 to determine the operating status and fault status; when the fault can be classified as an independent branch fault or a common system fault, the corresponding protection processing described in step S90 is executed.
[0037] S102: The main control unit receives the thermal management command sent by the vehicle controller and acquires the ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature. This information is used to determine the operating conditions in step S20.
[0038] S103: The main control unit also acquires the high-voltage bus voltage, total output power, compressor branch load current, and thick-film heating branch load current. These operating parameters are used to monitor the actual power supply status of the entire vehicle and the actual operating status of the two power branches, and are used for subsequent power constraints, heat exchange anomaly precursor identification, and fault protection.
[0039] S104: The main control unit receives the operating status and fault status feedback from the compressor drive module and the U-tube thick film heating drive module, respectively. If an independent fault of a branch is detected during the self-test phase, the corresponding branch will not enter normal output; if a common system fault affecting the safe operation of two branches is detected, both power branches will remain in a stopped output state and proceed to step S90 for common system fault handling.
[0040] S20: Determine the current operating conditions based on thermal management requirements and equipment status.
[0041] S201: The main control unit determines the current operating condition based on thermal management commands, ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature. The current operating condition includes at least cooling mode, normal heating mode, low-temperature defrosting mode, and rapid heating mode.
[0042] S202: When the current operating condition is cooling, the main control unit keeps the U-tube thick film heater drive module in a stopped output state and adjusts the compressor inverter output according to the cabin temperature control requirements and compressor load status. If an independent fault occurs in the compressor branch, the main control unit locks the compressor drive and reports the fault, and does not start the U-tube thick film heater to replace the cooling function.
[0043] S203: When the current operating condition is conventional heating, the main control unit determines the heat source for heating based on the ambient temperature, cabin temperature deviation, battery temperature deviation, and compressor availability. When only the electric compressor participates in heat pump heating, the main control unit adjusts the compressor output through a temperature closed loop. When only the U-tube thick film heater provides heat, the main control unit adjusts the thick film heating PWM duty cycle through a temperature closed loop. When both heat sources participate in heating, the main control unit adjusts the compressor output and the thick film heating PWM duty cycle respectively.
[0044] S204: When the current operating condition is low-temperature defrosting or rapid heating, if both the compressor branch and the thick-film heating branch are available, the main control unit allows the electric compressor and the U-tube thick-film heater to operate synchronously and enter a dual-heat source coordinated control state; if one branch is unavailable, normal operating output is not allocated to that unavailable branch. If a branch is still available but is derated due to a recoverable anomaly, and the other branch meets the compensation conditions described in step S905 or step S906, then power substitution is performed according to step S90; if the power substitution conditions are not met, the output of the other branch is not forcibly increased due to the dual-heat source operating condition itself.
[0045] During operation, when thermal management commands, ambient temperature, cabin temperature, battery temperature, or the availability of two power branches change, the main control unit re-evaluates the operating conditions to ensure that subsequent branch start-up and shutdown relationships remain consistent with current thermal management requirements and equipment status.
[0046] S30: Determine the target power of the compressor and the target power of the thick film heating under the constraint of the upper limit of the total power of the dual branches.
[0047] S301: When the electric compressor and the U-tube thick film heater are running synchronously, the main control unit receives the upper limit of the total power of the two branches from the vehicle controller. The upper limit of the total power of the two branches serves as the total power constraint that both the compressor branch and the thick film heating branch must adhere to.
[0048] S302: The main control unit determines the available status of the compressor branch and the thick film heating branch, and uses the available status as the branch constraint for determining the target power of the compressor and the target power of the thick film heating in step S303; for power branches in the derating state, the determined target power does not exceed the power range allowed by the current derating state; for power branches in the locked or stopped output state, normal operation output is not allocated to the corresponding power branch.
[0049] S303: The main control unit determines the required output power of the compressor branch and the thick film heating branch when they are not limited by the total power limit of the two branches, based on the current heating or defrosting requirements, and compares the sum of the two required output powers with the total power limit of the two branches issued by the vehicle controller.
[0050] When the sum of the two required output powers is not higher than the upper limit of the total power of the two branches, the main control unit determines the required output power of the compressor branch as the target power of the compressor, and determines the required output power of the thick film heating branch as the target power of the thick film heating.
[0051] When the sum of the two required output power values exceeds the upper limit of the total power of the dual-branch system, the main control unit determines the priority of the compressor branch and the thick-film heating branch under the current heating or defrosting target based on the pre-defined correspondence between the heating or defrosting target and the branch priority relationship. It then adjusts the two required output power values according to the priority, prioritizing the reduction of the required output power corresponding to the lower-priority power branch, thus obtaining the compressor target power and the thick-film heating target power, ensuring that the sum of the compressor target power and the thick-film heating target power does not exceed the upper limit of the total power of the dual-branch system. This correspondence can be calibrated according to the thermal management strategy of a specific vehicle model; the compressor branch and the thick-film heating branch are not fixed to always have a higher priority under all operating conditions.
[0052] The high-voltage bus voltage, total output power, and load current of each power branch are used to monitor the actual power supply and actual output status to confirm that the two power branches still meet the upper limit of the total power of the two branches after operating according to the target power of the compressor and the target power of the thick film heating.
[0053] S304: When the vehicle's power supply conditions, thermal management requirements, or branch line availability change, the main control unit redetermines the target power for the compressor and the target power for the thick-film heater. The two redistributed target powers must still meet the upper limit of the total power of the two branches to ensure that the target power used for subsequent modulation is consistent with the current power supply conditions.
[0054] S40: Generates the corresponding drive control quantity based on the two target power values.
[0055] S401: The main control unit adjusts the compressor inverter output frequency or speed command according to the compressor target power and outputs a frequency conversion control signal to the compressor drive module. The compressor drive module drives the three-phase full-bridge inverter topology according to the frequency conversion control signal, so that the electric compressor operates according to the corresponding output frequency or speed.
[0056] S402: The main control unit determines the duty cycle of the thick-film heating PWM based on the target power of the thick-film heating and generates the thick-film heating PWM. The thick-film heating PWM consists of an on-state and an off-state, and its duty cycle represents the proportion of conduction time within the corresponding PWM cycle. A preset coordination period is used for subsequent unified statistics of the total conduction time of the thick-film heating PWM, which can cover one or more thick-film heating pulses. Therefore, the duty cycle of the thick-film heating PWM is used to determine the conduction relationship of each pulse, and the preset coordination period is used to count and maintain the cumulative conduction time corresponding to the target power of the thick-film heating.
[0057] S403: Within a preset coordination period, the main control unit adds up the effective conduction duration of each thick-film heating pulse falling within that coordination period to obtain the total conduction time of the thick-film heating PWM. The main control unit formulates a corresponding duty cycle and conduction arrangement based on the target power of the thick-film heating, so that the total conduction time corresponds to the target power of the thick-film heating. Subsequent switching timing coordination only changes the time position of the relevant pulses or sub-pulses within the preset coordination period, without changing the total conduction time required to achieve the target power of the thick-film heating.
[0058] The specific correspondence between the target power of the thick-film heating and the PWM duty cycle can be calibrated based on the vehicle's high-voltage platform, the current high-voltage bus voltage, the rated power of the U-tube thick-film heater, and the vehicle's thermal management requirements. This correspondence is used to convert the power target into a PWM power adjustment signal, and the switching timing coordination is performed after the power target and the corresponding total on-time have been determined. When the high-voltage bus voltage or the target power of the thick-film heating changes, the main control unit re-determines the corresponding PWM duty cycle and the total on-time within the preset coordination period in subsequent control cycles, updating the power target and PWM power adjustment relationship according to the current power supply conditions.
[0059] Steps S50 and S60 are executed only when the electric compressor and the U-tube thick film heater are operating synchronously, and when there is a valid switching edge in the thick film heating PWM that requires timing comparison. When only one power branch is operating, or when the target power of the thick film heating is zero and the thick film heating branch remains stopped outputting, the switching edge avoidance between the two power branches is not executed.
[0060] S50: Determine the high-impact period of the switch based on the inverter PWM switching state.
[0061] S501: The main control unit obtains the inverter PWM switching status of the compressor drive module and identifies the time position of each bridge arm changing from the off state to the on state or from the on state to the off state, and uses these state change positions as the compressor bridge arm switching edges.
[0062] S502: The main control unit determines the time distribution of the compressor arm switch edges within the current preset coordination cycle, and identifies the time period in which multiple switch edges are relatively concentrated as the high-impact period of the switch. As a specific implementation, the width can be expanded according to the calibrated high-impact period of the switch to form an edge influence time range near the relevant switch edges; when multiple edge influence time ranges overlap or are continuously connected, the corresponding continuous time range is taken as the period in which the compressor arm switch edges are relatively concentrated.
[0063] S503: In another implementation, the main control unit can also combine the high-voltage bus voltage fluctuation to assist in confirming the above-mentioned peak edge periods, thereby determining the risk periods that the thick-film heating PWM should prioritize avoiding. Regardless of the implementation method, the determined periods are used as the high-impact switching periods for subsequent steps to determine whether the turn-on or turn-off edges of the thick-film heating PWM need to be adjusted.
[0064] S504: If there is no high-impact switching period to be avoided within the current preset coordination period, or if all switching edges of the thick-film heating PWM do not fall into the high-impact switching period, then maintain the thick-film heating PWM timing generated in step S40. If at least one switching edge of the thick-film heating PWM falls into the high-impact switching period, then proceed to step S60.
[0065] S60: Adjust the PWM switch edge of the thick film heating and, if necessary, distribute a single pulse into multiple sub-pulses.
[0066] S601: The main control unit compares the timing of each turn-on and turn-off edge of the thick-film heating PWM with the high-impact switching period. When a turn-on edge or turn-off edge falls within the high-impact switching period, it is determined that the edge needs to be avoided. Edges that do not fall within the high-impact switching period are not adjusted due to this timing conflict.
[0067] S602: For the edge of a thick-film heating PWM switch that needs to be avoided, "moving forward" means the available time before moving the edge to the original edge within the current preset coordination period, and "moving backward" means the available time after moving the edge to the original edge within the current preset coordination period. The available time is within the current preset coordination period and does not belong to any high-impact period of the switch within the current preset coordination period.
[0068] The first adjustment method is to move the thick film heating pulse as a whole: when there is a usable time interval within the current preset coordination period that can accommodate the complete pulse, the main control unit moves the turn-on edge and turn-off edge of the pulse forward or backward by the same time offset, so that the effective width of the pulse remains unchanged, and the adjusted turn-on edge and turn-off edge avoid any high-impact switching period within the current preset coordination period.
[0069] The second adjustment method involves shifting the conflicting single on or off edge: When shifting only one edge would change the effective on-time of the pulse, the main control unit compensates within the same preset coordination period by adjusting another non-conflicting edge of the pulse, or by adjusting the effective on-time of other thick-film heating pulses, ensuring that the total on-time of the thick-film heating PWM within the current preset coordination period still corresponds to the target power of the thick-film heating. The compensated switching edge remains within the current preset coordination period and does not fall into any high-impact switching period within the current preset coordination period, while also satisfying the minimum effective pulse width and allowable switching frequency constraints.
[0070] S603: When a single thick film heating pulse cannot complete the avoidance by the edge movement described in step S602 alone, the main control unit, under the condition that the U-tube thick film heating drive module allows the switching frequency and minimum effective pulse width, allocates the single thick film heating pulse into multiple sub-pulses.
[0071] The situations in which avoidance cannot be achieved solely by edge movement include: there is no continuous available time interval within the current preset coordination period that can accommodate a complete pulse; or although the conflicting edge can be moved, the altered conduction duration cannot be compensated within the same preset coordination period after the movement; or continued movement will cause a certain effective pulse to be lower than the minimum effective pulse width, generate new edge conflicts, or cause the total conduction time to no longer meet the correspondence between the target power and the thick film heating.
[0072] S604: When performing pulse distribution, the main control unit first determines the effective conduction duration of the original single thick-film heating pulse, and then distributes the effective conduction duration to multiple sub-pulses. The effective pulse width of each sub-pulse from the turn-on edge to the turn-off edge is not less than the minimum effective pulse width. After splitting, the actual switching frequency of the thick-film heating PWM is recalculated, and the increase in switching frequency caused by the newly added sub-pulses is also included in the verification to ensure that the actual switching frequency does not exceed the allowable switching frequency of the U-tube thick-film heating drive module.
[0073] The main control unit adjusts the turn-on and turn-off edges of each sub-pulse to ensure these switching edges are outside the high-impact period of the switch. It should be noted that this step requires avoiding the switching edges of the sub-pulses. As long as neither the turn-on nor the turn-off edge falls within the high-impact period, the duration of the sub-pulse's continuous conduction can span the high-impact period; it is not required that the entire conduction range of the sub-pulse be completely outside the high-impact period.
[0074] S605: After completing edge shifting or pulse allocation, the main control unit recalculates the total on-time of all thick-film heating pulses and sub-pulses within the current preset coordination period, and rechecks the positions of each turn-on and turn-off edge. The adjusted thick-film heating PWM is only used when the adjusted switching edges satisfy the aforementioned avoidance relationship, the total on-time of the thick-film heating PWM still corresponds to the target power of the thick-film heating, each effective pulse meets the minimum effective pulse width, and the actual switching frequency does not exceed the allowable switching frequency. This maintains the equivalent heating output within the current preset coordination period while adjusting the switching timing.
[0075] S606: When step S605 confirms that the adjusted thick film heating PWM meets the constraints of switch edge avoidance, total conduction time, minimum effective pulse width and allowable switching frequency, the main control unit confirms that the adjustment result is valid and proceeds to step S70.
[0076] S70: Controls two drive modules according to the target power and the currently determined thick film heating PWM, and monitors the operating status.
[0077] S701: The main control unit controls the compressor drive module according to the frequency conversion control signal corresponding to the compressor target power; when step S504 determines that neither the turn-on edge nor the turn-off edge of the thick film heating PWM falls within the high-impact period of the switch, the thick film heating PWM generated in step S40 controls the U-tube thick film heating drive module; when there is a switch edge falling within the high-impact period of the switch, and step S606 confirms that the adjustment result is valid, the adjusted thick film heating PWM controls the U-tube thick film heating drive module.
[0078] S702: The main control unit continuously receives the operating status and fault status feedback from the compressor drive module, as well as the operating status and fault status feedback from the U-tube thick film heating drive module, and continuously acquires the high-voltage bus voltage, total output power, and load current of the two power branches.
[0079] S703: When changes occur that affect the current control result, such as thermal management requirements, the maximum total power of the dual branches, the available status of the branches, the high-voltage bus voltage, the total output power, or the inverter PWM switching status of the compressor drive module, the main control unit will re-execute the corresponding operating condition judgment, target power allocation, PWM generation, or switching timing coordination in subsequent control cycles, so that the dual-branch power constraints and PWM timing coordination are updated with the current operating status.
[0080] S80: such as Figure 4 As shown, the mismatch between heating input and temperature rise change can be used to identify early signs of heat transfer abnormalities.
[0081] S801: During the operation of the U-tube thick film heater, the main control unit acquires high-voltage bus voltage, thick film heating branch load current, thick film heating PWM duty cycle, and U-tube thick film heater temperature sampling information according to a preset observation period. The preset observation period is used to compare the heating input status and temperature changes within the same time range.
[0082] S802: For each preset observation period, the main control unit determines the average heating input state based on the high-voltage bus voltage, the load current of the thick-film heating branch, and the duty cycle of the thick-film heating PWM within that period. In one specific embodiment, the main control unit obtains multiple sets of high-voltage bus voltage and thick-film heating branch load current according to the sampling sequence within the observation period. The product of the high-voltage bus voltage and the load current of the thick-film heating branch at the same sampling moment is taken as the instantaneous electrical input power at that sampling moment. Combined with the actual conduction relationship of the thick-film heating PWM, the instantaneous electrical input power within the entire observation period is accumulated and averaged over time to obtain the average heating input state of that observation period. The duty cycle of the thick-film heating PWM is used to characterize the effective conduction ratio within the observation period and, together with the actual conduction relationship, is used to confirm the statistical range of the heating input. The resulting average heating input state is used to characterize the average electrical power level of the input U-tube thick-film heater within the observation period, rather than using a single instantaneous sample value to represent the entire observation period. The specific sampling frequency, number of sampling points, and discrete averaging method can be determined according to the sampling capability of the controller; this embodiment does not impose a unique limitation.
[0083] S803: The main control unit determines the temperature rise trend based on the temperature changes of the U-tube thick film heater in adjacent observation periods. For preset observation periods of the same length, the temperature rise rate of that period can be characterized by the temperature change within one observation period, and compared by the temperature changes in consecutive observation periods. A positive temperature change indicates a temperature increase, a temperature change falling within a preset stability criterion range indicates a temperature stabilization, and a negative temperature change indicates a temperature decrease. If the temperature increase in the subsequent observation period is higher than that in the previous comparison period, it indicates an accelerated temperature rise rate; if it is lower than that in the previous comparison period, it indicates a slowed temperature rise rate. Therefore, the temperature rise trend simultaneously includes changes in both the direction and rate of temperature change.
[0084] S804: After the U-tube thick film heater enters stable heating, the main control unit records the normal correspondence between the average heating input status and the temperature rise trend. Stable heating means that the thick film heating branch has completed the start-up phase and entered a relatively stable heating output operation phase, and remains in heating control state within the observation period used to establish a reference, without any ongoing thick film heating branch derating, cut-off, or fault protection actions.
[0085] The main control unit records the average heating input state formed during the stabilization phase and its corresponding temperature rise trend as a reference for subsequent observation periods to determine whether the temperature rise response has deviated under the same or similar heating input levels. Observation records that have been identified as precursors to heat transfer anomalies or are in the fault protection process are not used to update the normal correspondence to avoid abnormal states reverse-changing the reference used for anomaly judgment. The specific duration and allowable fluctuation range of stable heating can be determined as vehicle model calibration parameters.
[0086] S805: In subsequent observation periods, the main control unit compares the current average heating input status and temperature rise trend with the aforementioned normal correspondence or the previous stable observation period. For cases where the average heating input has not increased but the temperature rise continues to accelerate, the main control unit confirms, according to the heat transfer anomaly judgment threshold, that the current average heating input has not effectively increased relative to the comparison period, and simultaneously confirms that the temperature rise rate shows an accelerating trend within the continuous observation period. When both conditions are met, it is determined that there is an abnormal mismatch between the heating input and the temperature rise change.
[0087] For cases where the thick-film heating output has been reduced but the temperature rise trend has not slowed down, the main control unit first confirms that the target power of the thick-film heating or the corresponding PWM power adjustment output has been reduced, and then compares the temperature rise trend before and after the output reduction. If the temperature rise rate after the output reduction does not slow down according to the judgment condition, an abnormal mismatch is also judged. The number of continuous observation cycles, input change tolerance, temperature rise change amplitude, and slowdown criterion are all used as thresholds for judging heat transfer abnormalities. This embodiment does not use a fixed value as a necessary limitation.
[0088] S806: When the above mismatch conditions are met, the main control unit determines that the U-tube thick film heater has signs of heat exchange abnormality or a risk of dry burning, and uses this determination result as the triggering basis for step S90 to perform hierarchical fault identification and linkage protection. This determination result is used to characterize that the heat input to the U-tube thick film heater has not been properly removed, and is not used to further distinguish the specific causes of insufficient medium, bubble accumulation, flow obstruction, or local heat exchange capacity reduction.
[0089] S90: Performs hierarchical fault protection, power switching, fault reporting, and gradual recovery.
[0090] S901: The main control unit classifies faults into independent faults in the compressor branch, independent faults in the thick film heating branch, and common faults in the system. Fault classification first determines the range of power branches affected by the fault, and then determines the corresponding derating, lockout, or dual-branch power-off actions according to the severity of the fault.
[0091] S902: When the thick film heating branch shows signs of heat exchange abnormality, dry burning, or overheating, the main control unit reduces or cuts off the output of the thick film heating branch according to the severity of the abnormality, and retains the compressor's operating authority if the current operating conditions permit and the compressor branch is available. For recoverable states such as signs of heat exchange abnormality or short-term temperature abnormalities, the main control unit can first implement derating of the thick film heating branch and continuously monitor it. If the abnormality persists or worsens, the thick film heating branch will be further cut off.
[0092] S903: When an overcurrent, inverter malfunction, or speed instability occurs in the compressor branch, the main control unit reduces or locks the compressor drive output, while retaining the operating privileges of the thick film heating branch under permissible heating or defrosting conditions. For recoverable malfunctions, the main control unit can first derate the compressor branch; when the malfunction persists or worsens, the compressor branch is locked according to the hierarchical fault protection logic.
[0093] S904: When a common system fault occurs, such as high-voltage bus overvoltage, low-voltage power supply undervoltage, overall controller overheating, or other faults affecting the safe operation of the two power branches, the main control unit cuts off the power output of the compressor branch and the thick-film heating branch, and does not perform power takeover between individual branches. For states requiring lockout or dual-branch power disconnection, such as compressor inverter malfunction, branch overcurrent, severe overheating, or common system faults, subsequent restarts will be performed according to the vehicle controller's fault clearing or restart instructions.
[0094] S905: Under the dual-heat source coordinated operation where both the compressor and the U-tube thick film heater can meet the same heating or defrosting target, when the U-tube thick film heater shows signs of heat exchange abnormality and is derated, the main control unit first reduces the thick film heating output, and then increases the compensation power borne by the compressor, provided that the vehicle power supply load does not exceed the preset threshold, the compressor branch has available power margin, and the total power limit of the two branches is allowed.
[0095] S906: When a compressor branch experiences a recoverable anomaly and is derated under heating or defrosting conditions, the main control unit increases the thick-film heating output within the safe power range of the U-tube thick-film heater. The increased total power of the two branches is still constrained by the upper limit of the total power of the two branches. If the available power of the other branch is insufficient to fully compensate, the available compensation power is provided only within its permissible range.
[0096] S907: When the anomaly is resolved and the operating parameters corresponding to the anomaly continuously meet the recovery conditions, the main control unit gradually restores the original branch power according to the preset power change rate, and simultaneously reduces the compensation power of the other branch.
[0097] In this embodiment, continuously meeting the recovery conditions means that the triggering conditions corresponding to the current anomaly no longer occur within consecutive observation or control cycles, and the corresponding power branch is not in a locked or disabled output state. When recovery also requires confirmation based on temperature, voltage, current, or drive feedback status, the corresponding recovery threshold and the number of consecutive cycles are calibrated according to the specific vehicle model. The preset power change rate is used to limit the rate of increase of the original branch power during the recovery process, so that the original branch power gradually recovers from the derating state, rather than directly jumping to the output level before recovery.
[0098] S908: During each control phase of the recovery process, the main control unit rechecks the total power of the compressor branch and the thick film heating branch to ensure that it does not exceed the upper limit of the total power of the two branches. If the same abnormality reappears or the degree of abnormality worsens during the recovery process, the recovery process is stopped, and the corresponding derating, lockout, or disconnection procedures are re-executed.
[0099] S909: The main control unit classifies, stores, and grades faults, writing the fault type, location, and level into the fault storage unit and reporting it to the vehicle controller via the CAN or LIN communication bus. The fault location indicates whether the fault is in the compressor branch, the thick-film heating branch, or is a common system fault. The fault level indicates the protection level corresponding to the current fault, enabling the vehicle controller to distinguish between different protection states such as branch derating, branch locking, and dual-branch power failure. Specific fault code values and the corresponding thresholds for each level can be calibrated according to the vehicle model diagnostic strategy.
[0100] Example 3: Complete operation process under low temperature defrosting or rapid heating conditions To illustrate the connection between the above steps in the same operation, the following explanation will take low-temperature defrosting or rapid heating as an example.
[0101] After the controller is powered on, the main control unit completes communication, sampling, and drive status self-checks, and confirms that the high-voltage bus, compressor drive module, and U-tube thick film heater drive module are in a permissible working state. After the vehicle controller issues a low-temperature defrosting command or a rapid heating command, the main control unit acquires the ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature, determines that the current operating condition allows for simultaneous operation of both heat sources, and enters the dual-heat source collaborative control state.
[0102] The main control unit receives the total power limit of the two branches from the vehicle controller, and determines the target power of the compressor and the target power of the thick film heater based on the current defrosting or heating requirements, ensuring that the sum of the two target powers does not exceed the total power limit of the two branches. Subsequently, the main control unit generates a frequency converter control signal based on the compressor target power, and determines the PWM duty cycle of the thick film heater and the total on-time required for the current preset coordination cycle based on the thick film heater target power.
[0103] The main control unit reads the inverter PWM switching status of the compressor drive module, determines the high-impact switching periods where the compressor arm switching edges are relatively concentrated, and then compares the positional relationship between the turn-on and turn-off edges of the thick-film heating PWM and the high-impact switching periods. If there is no edge conflict, the original thick-film heating PWM is maintained. If a turn-on or turn-off edge falls into a high-impact switching period, while maintaining the total conduction time of the thick-film heating PWM within the current preset coordination period corresponding to the target power of the thick-film heating, the conflicting turn-on or turn-off edge is shifted forward or backward within the current preset coordination period, so that the adjusted turn-on or turn-off edge avoids any high-impact switching period within the current preset coordination period.
[0104] If a thick-film heating pulse that meets the constraints cannot be obtained by edge movement, the main control unit, under the condition of satisfying the allowable switching frequency and minimum effective pulse width, divides the pulse into multiple sub-pulses and adjusts the turn-on and turn-off edges of each sub-pulse to ensure that the switching edges of each sub-pulse avoid the high-impact switching period. The continuous conduction interval of the sub-pulse itself can span the high-impact switching period. After the adjustment is completed, the main control unit rechecks the adjusted switching edges, the total conduction time of the thick-film heating PWM within the current preset coordination period, the minimum effective pulse width, and the actual switching frequency. When the adjusted switching edges avoid the high-impact switching period, the total conduction time still corresponds to the target power of the thick-film heating, each effective pulse meets the minimum effective pulse width, and the actual switching frequency does not exceed the allowable switching frequency, the U-tube thick-film heating drive module is controlled by the adjusted thick-film heating PWM.
[0105] During continuous operation of the dual-branch system, the main control unit continuously monitors the high-voltage bus voltage, total output power, load current of the two power branches, compressor operating status, and U-tube thick-film heater temperature, and updates the average heating input status and temperature rise trend within each preset observation period. If the operating status is normal, the dual-branch power allocation and switching timing coordination continue. When thermal management requirements change, or when the sum of the two required output powers determined based on the current heating or defrosting requirements exceeds the current upper limit of the total power of the dual branches, the main control unit redetermines the target power of the compressor and the target power of the thick-film heater, and adjusts the output of the two power branches according to the redetermined target power of the compressor and the thick-film heater, so that the sum of the output power of the two power branches does not exceed the current upper limit of the total power of the dual branches.
[0106] Example 4: Figure 4 The diagram shows the precursors to heat exchange anomalies, power replacement, and the gradual recovery process. Under the above dual heat source synergy conditions, when the main control unit detects that the average heating input has not increased while the temperature rise of the U-tube thick film heater continues to accelerate, or that the thick film heating output has been reduced but the temperature rise trend has not slowed down, the main control unit determines that there are signs of heat exchange abnormality or risk of dry burning.
[0107] The main control unit first reduces the output of the thick-film heating branch to decrease the electrical power input to the U-tube thick-film heater. Under the conditions that the compressor branch can continue to operate, the vehicle's power supply load does not exceed a preset threshold, the compressor branch has available power margin, and the total power limit of the two branches is allowed, the compensation power borne by the compressor is increased. After increasing the compressor compensation power, the total power of the compressor branch and the thick-film heating branch must still not exceed the total power limit of the two branches.
[0108] After the thick film heating branch is derated, the main control unit continues to update the average heating input status and temperature rise trend. If the abnormality persists or worsens, the thick film heating branch is disconnected; if the aforementioned heat exchange mismatch condition no longer holds, and the operating parameters corresponding to the abnormality continuously meet the recovery conditions, then a gradual recovery process begins.
[0109] During the gradual recovery process, the main control unit progressively increases the power of the original thick-film heating branch according to a preset power change rate, while simultaneously decreasing the compensation power previously borne by the compressor branch. After each adjustment, the total power of both branches is checked to ensure that the recovery process always meets the upper limit of the total power of both branches. If heat exchange abnormalities reappear during the recovery process, the recovery is stopped, and the thick-film heating branch derating or disconnection process is repeated.
[0110] When a recoverable anomaly occurs in the compressor branch, the power replacement direction is reversed: the main control unit reduces the compressor branch output and increases the thick film heating output within the safe power range of the U-tube thick film heater. After the anomaly is resolved and the relevant operating parameters continuously meet the recovery conditions, the compressor power is gradually restored according to the preset power change rate, while the compensation power of the thick film heating branch is reduced simultaneously.
[0111] Through the above-mentioned process of heat exchange anomaly precursor identification and linkage control, the main control unit identifies heat exchange anomalies by comparing the average heating input state of the U-tube thick film heater with the temperature rise trend, and performs power branch derating or disconnection, power replacement and slow recovery according to the abnormal state, thereby improving the continuity and safety of thermal management control under abnormal conditions.
[0112] Example 5: Other Operating Conditions and Troubleshooting In cooling mode, the main control unit keeps the U-tube thick film heating drive module off the output and only controls the electric compressor to complete the cooling. When an independent fault occurs in the compressor branch, the main control unit locks the compressor drive and reports the fault, and does not use the U-tube thick film heater to replace the cooling function.
[0113] Under normal heating conditions, the main control unit determines the heat source for heating based on ambient temperature, cabin temperature, battery temperature, and compressor availability. When only the U-tube thick-film heater provides heat, the main control unit adjusts the PWM duty cycle of the thick-film heater according to the temperature deviation and continuously judges whether the average heating input status matches the temperature rise trend. When the compressor participates in heat pump heating and works together with the U-tube thick-film heater, the output of the two branches is still constrained by the total power limit of the two branches.
[0114] For recoverable conditions such as precursors to heat exchange anomalies, short-term temperature anomalies, or limited power supply load, the main control unit first implements branch derating and continuous monitoring. When the relevant operating parameters continuously meet the recovery conditions, the branch output is gradually restored. For compressor inverter anomalies, branch overcurrent, severe overtemperature, or common system faults, the main control unit executes corresponding branch lockout or dual-branch power cutoff, and determines subsequent startup based on the vehicle controller's fault clearing or restart command.
[0115] Example 6: Optional Implementation Methods and Equivalent Replacements In one implementation, the high-impact switching period is determined based on the inverter PWM switching state of the compressor drive module generated or monitored by the main control unit. In another implementation, the main control unit determines the compressor arm switching edge based on the commutation information fed back by the compressor drive module, which characterizes the inverter PWM switching state, and can further confirm the determined edge concentration period by combining it with high-voltage bus voltage fluctuations.
[0116] The main control flow in the above embodiment adopts the method of directly issuing the total power limit of the two branches from the vehicle controller. In another optional embodiment, the total power limit of the two branches can also be determined by the main control unit based on the vehicle power supply load threshold, the high-voltage bus status, and the occupancy of other high-voltage loads. The only difference between the two methods is the different entities that form the total power limit of the two branches. Once this power limit is formed, it will subsequently constrain the combined output of the compressor branch and the thick film heating branch, without changing the subsequent relationship of target power allocation and switching timing coordination.
[0117] Precursors to heat transfer anomalies can be identified by comparing the average heating input and temperature rise trends over a continuous observation period, or by comparing the current observation period with the previous stable observation period. Regardless of the comparison method used, a mismatch between the heating input and the temperature rise response is considered a precursor to heat transfer anomalies.
[0118] The main control unit, compressor drive module, and U-tube thick-film heating drive module can be located on the same circuit board or on different circuit boards. CAN communication and LIN communication can be selected individually or simultaneously. The power switching devices of the compressor drive module can be different types of automotive-grade switching devices depending on the specific high-voltage platform. The above replacements do not change the core control relationship where the two power branches are connected to the same high-voltage DC bus, and the main control unit performs power constraints and switching timing coordination.
[0119] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit the scope of protection of the present invention. For those skilled in the art, without changing the core technical relationships such as the two power branches being connected to the same high-voltage DC bus, the main control unit performing target power constraints and switching timing coordination, etc., the specific deployment form, communication form and parameter calibration method in the above embodiments can be adjusted accordingly.
[0120] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A combined controller for a thick-film heater and an electric compressor in new energy vehicles, characterized in that, It includes a main control unit, a compressor drive module, and a U-tube thick film heating drive module, wherein the compressor drive module and the U-tube thick film heating drive module are connected to the same high-voltage DC bus; When the electric compressor and the U-tube thick film heater are running synchronously, the main control unit receives the upper limit of the total power of the two branches from the vehicle controller, determines the target power of the compressor and the target power of the thick film heater according to the thermal management requirements, and ensures that the sum of the target power of the compressor and the target power of the thick film heater does not exceed the upper limit of the total power of the two branches. Generate thick film heating PWM based on the target power of thick film heating; The high-impact switching period of the compressor bridge arm switch edges is determined based on the inverter PWM switching state of the compressor drive module. When the turn-on or turn-off edge of the thick film heating PWM falls into the high-impact period of the switch, while maintaining the total conduction time of the thick film heating PWM within the preset coordination period corresponding to the target power of the thick film heating, the turn-on or turn-off edge is shifted forward or backward within the preset coordination period so that the adjusted turn-on or turn-off edge avoids any high-impact period of the switch within the preset coordination period. The compressor drive module is controlled according to the compressor target power, and the U-tube thick film heating drive module is controlled by the thick film heating PWM.
2. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The main control unit receives thermal management commands sent by the vehicle controller and acquires ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature.
3. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 2, characterized in that, The main control unit determines the current operating conditions based on the thermal management command, ambient temperature, cabin temperature, battery temperature, compressor operating status, and U-tube thick film heater temperature. When the current operating condition is low-temperature defrosting or rapid heating, the electric compressor and the U-tube thick film heater are allowed to operate synchronously and enter a dual heat source coordinated control state.
4. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The power branch where the compressor drive module is located is the compressor branch, and the power branch where the U-shaped tube thick film heating drive module is located is the thick film heating branch. The main control unit determines the required output power of the compressor branch and the thick film heating branch when not subject to the upper limit of the total power of the two branches, based on the current heating or defrosting requirements. When the sum of the two required output powers is not higher than the upper limit of the total power of the dual branches, the required output power of the compressor branch is determined as the target power of the compressor, and the required output power of the thick film heating branch is determined as the target power of the thick film heating. When the sum of the two required output powers exceeds the upper limit of the total power of the dual branches, the current priority of the compressor branch and the thick film heating branch is determined according to the pre-defined correspondence between the heating or defrosting target and the branch priority relationship. The two required output powers are adjusted according to the current priority, and the required output power corresponding to the power branch with lower priority is reduced first, so as to obtain the target power of the compressor and the target power of the thick film heating, so that the sum of the target power of the compressor and the target power of the thick film heating does not exceed the upper limit of the total power of the dual branches.
5. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The compressor drive module adopts a three-phase full-bridge inverter topology, including power switching devices and their gate drive circuits connected to the high-voltage DC bus. The U-tube thick film heating drive module adopts a PWM controllable power adjustment topology and is connected to the resistive load of the U-tube thick film heater.
6. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The main control unit acquires the inverter PWM switching state of the compressor drive module, and determines the period when the switching edges of the compressor bridge arm are relatively concentrated based on the inverter PWM switching state, and defines the period as the high-impact period of the switch.
7. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 6, characterized in that, When a single thick-film heating pulse in the thick-film heating PWM cannot avoid the high-impact period of the switch simply by moving the switch edge, the main control unit, under the condition of satisfying the allowable switching frequency and minimum effective pulse width of the U-tube thick-film heating drive module, divides the single thick-film heating pulse into multiple sub-pulses and adjusts the switching edges of the multiple sub-pulses so that the switching edges of the multiple sub-pulses avoid the high-impact period of the switch.
8. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 7, characterized in that, When adjusting the switching edges of the multiple sub-pulses, the main control unit maintains that the total conduction time of the thick film heating PWM within the preset coordination period corresponds to the target power of the thick film heating.
9. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The main control unit adjusts the compressor inverter output frequency or speed command according to the compressor target power, and adjusts the duty cycle of the thick film heating PWM according to the thick film heating target power.
10. The integrated controller for a thick-film heater and an electric compressor for new energy vehicles according to claim 1, characterized in that, The main control unit outputs a frequency conversion control signal to the compressor drive module and a PWM power adjustment signal to the U-tube thick film heating drive module. It also receives the operating status and fault status feedback from the compressor drive module and the U-tube thick film heating drive module, respectively.
