Power allocation system based on charging pile power supply megawatt cluster
By introducing a thermal coupling coefficient and an iterative update mechanism, the power distribution of modules in megawatt-level charging stations is optimized, solving the problem of unquantified thermal coupling effects, improving system stability and charging efficiency, and extending module lifespan.
Patent Information
- Application Number
- CN202611327286.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-20
AI Technical Summary
In megawatt-level charging stations, existing technologies have failed to effectively quantify the thermal coupling effects between modules, leading to deteriorated heat dissipation conditions, shortened module lifespan, and a lack of closed-loop feedback in allocation decisions, which affects user experience and the safety of power modules.
By introducing a thermal coupling coefficient and combining it with substrate temperature, the influence of adjacent modules, and vehicle requirements, an effective power upper limit and thermal sensing allocation coefficient for the power module are established. An iterative update mechanism is adopted to achieve bidirectional closed-loop iteration of thermal coupling constraints and total power constraints, thereby optimizing power allocation.
It achieves dynamic, bidirectional management of the thermal coupling effects between modules, improves system stability and charging experience, extends module lifespan, and maximizes output capacity while meeting safety constraints.
Smart Images

Figure CN123129772A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power distribution technology, specifically a power distribution system for a megawatt cluster powered by charging piles. Background Technology
[0002] With the rapid growth of electric vehicle ownership and the widespread adoption of high-voltage fast charging technology, megawatt-level charging stations have become an industry trend. These charging stations typically consist of dozens of power modules densely arranged in the same cabinet, with power dynamically allocated through a group control system.
[0003] In megawatt-level charging stations, dozens of power modules are densely installed in the same cabinet. Thermal coupling effects occur between modules through hot air recirculation, heat conduction from the base plate, and radiative heat exchange. Consequently, the high power output of one module can worsen the heat dissipation conditions of adjacent modules, thus compressing their safe output capacity. However, existing technologies do not quantify the mutual influence of thermal coupling between modules into calculable parameters when allocating power. This not only affects user experience but also shortens the lifespan of power modules due to frequent thermal cycling shocks. Secondly, in existing technologies, the thermal management of power modules relies entirely on a passive derating mechanism triggered by a temperature threshold. While it takes time for the temperature to rise from the normal range to the trigger threshold, once triggered, the power drop is drastic, severely impacting the charging experience. Furthermore, the same temperature value poses vastly different levels of danger in different environments, thus lacking environmental adaptability. In addition, the allocation results in existing technologies do not conversely affect allocation conditions. However, in megawatt clusters, there is a two-way coupling between allocation decisions and physical constraints. Without introducing mechanisms to capture this dynamic coupling, the allocation decisions lack a closed-loop feedback mechanism and are difficult to achieve self-stable convergence. Summary of the Invention
[0004] The purpose of this invention is to provide a power distribution system based on a megawatt cluster powered by charging piles, which solves the problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention provides the following technical solution, including: Based on the real-time substrate temperature of the power module and the influence of neighboring thermal interference generated by adjacent modules, combined with the rated output capacity of the power module, the effective power upper limit of the power module under the current thermal coupling constraint is determined. The effective power upper limit is related to the remaining ratio of the power module's own temperature to the safety threshold and the comprehensive compression degree of the load state of adjacent modules on the current module's heat dissipation conditions. Based on the power demand of the vehicle connected to the power module, the ratio of the effective power limit to the rated power, and the thermal sensitivity reflected by the current temperature of the power module relative to the ambient temperature, a thermal sensing allocation coefficient of the power module is determined. The thermal sensing allocation coefficient is used to comprehensively indicate the allocation priority of the power module under the total power constraint. Based on the positional relationship of the thermal sensing allocation coefficient of each power module relative to the average level of all modules, and the deviation of the current total allocated power from the station-level total power upper limit, the allocated power of each power module is iteratively updated, and the updated allocated power is substituted back into the process of determining the effective power upper limit, so as to converge to obtain the final allocated power of each power module under the combined action of thermal coupling constraints and total power constraints.
[0006] Optionally, the process of obtaining the effective power upper limit includes: Obtain the rated power, substrate temperature, temperature safety threshold, and ambient temperature of the power module; The remaining ratio is obtained based on the ratio of the difference between the substrate temperature and the temperature safety threshold to the difference between the temperature safety threshold and the ambient temperature. The remaining ratio is used to reflect the proportion of the remaining temperature rise space of the power module at the current temperature to the safety threshold to the total available temperature rise space. The ratio of the current allocated power to the rated power of each adjacent power module is obtained as the load rate of each adjacent module. Based on the product relationship between the load rate of each adjacent module and the preset thermal coupling coefficient, the degree of individual thermal interference of each adjacent module to the current module is obtained. The preset reference thermal interference value is multiplied by the difference of each individual thermal interference degree to obtain the comprehensive compression degree. The comprehensive compression degree is used to reflect the cumulative compression effect of the heat dissipation capacity of the current module through three mechanisms of hot air recirculation, base plate conduction and radiation heat exchange when multiple adjacent modules are running at the same time. Multiplying the rated power, the remaining ratio, and the overall compression degree yields the upper limit of the effective power of the power module under the current thermal coupling constraints.
[0007] Optionally, the process of obtaining the thermal sensing allocation coefficient includes: The ratio of the power demand of the vehicle connected to the power module to the upper limit of the station's total power is obtained to obtain the demand ratio, which is used to reflect the weight of the vehicle's demand in the station's total capacity. The ratio of the effective power limit to the rated power of the power module is obtained to obtain the thermal margin normalized value. The thermal margin normalized value is used to reflect the proportion of the power module's safe output capability under the current thermal state to its rated capability. Based on the proportional relationship between the difference between the temperature safety threshold and the ambient temperature and the difference between the substrate temperature and the ambient temperature, a heat dissipation progress coefficient is obtained. The heat dissipation progress coefficient is used to reflect the heat dissipation progress of the current temperature of the power module relative to the ambient temperature. The heat dissipation progress coefficient has high sensitivity to temperature changes in the low temperature region and tends to saturate in the high temperature region. The heat perception allocation coefficient of the power module is obtained by multiplying the demand ratio, the normalized value of the heat margin, and the heat consumption progress coefficient.
[0008] Optionally, the process of iteratively updating the allocated power of each power module includes: Calculate the geometric mean of the thermal sensing allocation coefficients of all power modules. Based on the ratio of the thermal sensing allocation coefficients of each power module to the geometric mean, obtain the normalized allocation weight factor of each power module. The normalized allocation weight factor is used to reflect the positional relationship of the allocation priority of each power module relative to the average level of all modules. The sensitivity of the geometric mean to extremely low values causes the power of thermally limited modules to be transferred to thermally abundant modules more quickly. Obtain the ratio of the sum of the power allocated to all power modules in the current iteration step to the station-level total power limit to generate a total power compliance factor for correcting the total power of the cluster. The total power compliance factor is used to reflect the degree of deviation of the current total allocated power from the station-level limit. The allocated power of each power module in the current iteration step is multiplied by the corresponding normalized allocation weight factor and the total power compliance factor to obtain the temporary allocation value of each power module. The temporary allocation value of each power module is compared with the corresponding effective power limit and the vehicle's required power. The minimum value among the three is taken, and values less than zero are set to zero to obtain the allocation power of each power module in the next iteration step.
[0009] Optionally, the process of substituting the allocated power back to the effective power upper limit includes: The power allocated by each power module in the next iteration step is used as the new real-time output power of the adjacent module. The load rate of each adjacent module is recalculated. Based on the product relationship between the recalculated load rate of each adjacent module and the preset thermal coupling coefficient, the degree of individual thermal interference of each adjacent module to the current module is obtained again. The degree of individual thermal interference of each adjacent module is multiplied and aggregated to update the comprehensive compression degree. Based on the updated overall compression level, the effective power limit of each power module is recalculated; Determine whether the maximum difference between the allocated power of each power module in two adjacent iterations is less than the preset convergence threshold, until the final allocated power that converges under the combined action of thermal coupling constraint and total power constraint is obtained.
[0010] Optionally, the process of determining whether the maximum value of the difference in allocated power between two adjacent iterations of each power module is less than a preset convergence threshold includes: If the determination is negative, the thermal sensing allocation coefficient is re-determined based on the updated effective power upper limit and the iteration continues. If the determination is yes, then the allocated power of the current iteration step is output as the final allocated power of each power module.
[0011] Optionally, the process of obtaining the thermal coupling coefficient includes: After all power modules have reached thermal steady state under no-load operation, the substrate temperature of each power module is recorded as the temperature baseline. The target power module was operated at full load at rated power to reach thermal steady state, and the substrate temperature of each adjacent power module was recorded. Based on the ratio of the temperature change of the substrate of each adjacent power module after the target power module is fully loaded to the temperature change of the substrate of the target power module itself, the thermal coupling system of the target power module to each adjacent power module is obtained. By iterating through all power modules as target power modules, the thermal coupling coefficient matrix is obtained.
[0012] Optional, also includes: The substrate temperature of the power module is collected in real time by a temperature sensor installed at the center of the power module substrate. The ambient temperature is collected in real time by a temperature sensor installed at the air inlet of the cabinet. The real-time output power of the power module is acquired in real time by a power sensor; The vehicle's required power is obtained by the vehicle battery management system via a communication bus. The upper limit of the total power at the station level is determined based on the transformer capacity or the power grid dispatch instructions.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: I. In this invention, the power values of adjacent modules affect the heat dissipation conditions of the current module through three physical mechanisms: hot air recirculation, base plate conduction, and radiation heat transfer. By introducing a thermal coupling coefficient, the load rates of each adjacent module are weighted and aggregated using a multiplicative rather than summative method. Multi-source thermal interference exhibits a saturation effect; when the inlet air temperature has already increased due to the high load of one adjacent module, adding the load of a second adjacent module will have a diminishing effect on increasing the inlet air temperature. The multiplicative method describes the cumulative effect of these simultaneous independent events. This ensures that when the load of an adjacent module decreases, the effective power limit of that module automatically increases, thus ensuring that the effect of thermal coupling is dynamic and bidirectional, with all allocation decisions based on the effective power limit as a hard constraint.
[0014] II. This invention uses a non-linear calculation method—the ratio of total available temperature rise to consumed temperature rise—to generate a heat consumption progress coefficient based on three conventional temperature parameters: substrate temperature, temperature safety threshold, and ambient temperature. This coefficient is extremely sensitive to temperature changes in the low-temperature region but relatively insensitive to temperature changes in the high-temperature region. This allows the system to issue a signal to reduce the allocation priority when the temperature just begins to rise and is far from reaching the safety threshold, enabling the system to proactively reduce the power allocation of that module while the temperature is still low, preventing further temperature increases. The denominator of this coefficient is the consumed temperature rise, and the numerator is the total available temperature rise, assigning different thermal urgency levels to the same temperature value under different environmental conditions. This achieves preventative rather than remedial thermal management.
[0015] Furthermore, the remaining ratio is a linear, static constraint indicator, reflecting how much capacity remains; while the heat consumption progress coefficient is a non-linear, dynamic adjustment signal, reflecting how fast the temperature rises. Both use the exact same three raw temperature parameters, but extract completely different physical information through different computational structures, thus playing different roles in the system. The remaining ratio sets a hard upper limit, while the heat consumption progress coefficient provides a sensitive control signal.
[0016] Third, this invention employs geometric mean normalization to achieve extreme sensitivity to extremely low values. In each iteration, the relative proportions between modules are first adjusted by normalizing the weighting factor, and then the total power compliance factor is used to uniformly scale the sum to equal the station-level upper limit (total power control). The mathematical form of multiplying these two factors is equivalent to redistributing power according to thermal priority while satisfying the total power constraint. Afterwards, a pruning operation ensures that the allocated value does not exceed the physical constraint; the pruned power is not lost but is redistributed in subsequent iterations through back-substitution closed-loop calculation. After each iteration, the new allocated value is substituted back into the calculation of the thermal coupling product factor to reassess the effective power upper limit of each module. This ensures that changes in the allocation result alter the heat dissipation conditions of each module through the thermal coupling path, thereby changing the effective power upper limit of each module. This closed-loop iteration of the invention can handle the bidirectional coupling relationship between allocation decisions and physical constraints, maximizing cluster output capacity while ensuring safety. Attached Figure Description
[0017] Figure 1 This is a flowchart of the power allocation method for a power allocation system based on a megawatt cluster powered by charging piles. Figure 2 This is a schematic diagram of the iterative update and closed-loop convergence process in this invention; Figure 3 This is a schematic diagram of the convergence determination in this invention. Detailed Implementation
[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] This embodiment provides a power allocation system based on a megawatt cluster of charging pile power supply. The overall idea is to introduce thermal coupling influence factors between modules and establish a two-way closed-loop iterative mechanism between power allocation and thermal state. Under the premise of meeting the total power constraint at the station level, this system can achieve refined and preventive thermal management of each power module and maximize the overall output capacity of the system.
[0020] This system is primarily used in megawatt-level charging stations for electric vehicles. These stations typically consist of multiple power modules densely integrated within a single cabinet, providing simultaneous fast charging services to multiple electric vehicles through a group control system. Due to the tight thermal coupling effect between the modules—that is, the heat generated by the power loss of one module can affect the heat dissipation conditions of adjacent modules through hot air recirculation, conduction through the base plate, and radiative heat transfer—this dynamic thermal interaction must be quantified as a controllable parameter and incorporated into the decision model when allocating power.
[0021] Example 1:
[0022] like Figures 1 to 3 As shown, this embodiment of the invention provides a power dispatching system based on a megawatt cluster powered by charging piles. Its core method includes the following steps: Step S1: Based on the real-time substrate temperature of the power module and the influence of neighboring thermal interference generated by adjacent modules, and combined with the rated output capacity of the power module, determine the effective power upper limit of the power module under the current thermal coupling constraints. The effective power upper limit is related to the remaining proportion of the power module's own temperature relative to the safety threshold, as well as the comprehensive compression degree of the current module's heat dissipation conditions by the load status of adjacent modules.
[0023] Step S2: Based on the power demand of the vehicle connected to the power module, the ratio of the effective power limit to the rated power, and the thermal sensitivity reflected by the current temperature of the power module relative to the ambient temperature, a thermal sensing allocation coefficient for the power module is determined. The thermal sensing allocation coefficient is used to comprehensively indicate the allocation priority of the power module under total power constraints.
[0024] Step S3: Based on the positional relationship of the thermal sensing allocation coefficient of each power module relative to the average level of all modules, and the deviation of the current total allocated power from the station-level total power limit, iteratively update the allocated power of each power module, and substitute the updated allocated power back into the process of determining the effective power limit, so as to converge to obtain the final allocated power of each power module under the combined action of thermal coupling constraint and total power constraint.
[0025] In the above embodiment, firstly, step S1 establishes a safety boundary for each power module. This boundary is not a fixed value but a physical constraint that dynamically changes with its own temperature and the operating state of surrounding modules. Next, step S2 constructs a multi-dimensional allocation priority index. This index not only considers user needs but also introduces a sensitive factor reflecting the thermal state to guide the power allocation direction. Finally, step S3 designs an iterative allocation mechanism with a feedback closed loop, enabling allocation decisions to respond in real-time to changes in the thermal state and achieving a balance between physical constraints and power requirements through repeated iterations.
[0026] Understandably, in megawatt-level charging scenarios, there is a strong coupling relationship between the power output of a power module and its temperature rise. Existing methods typically employ a passive protection mode of allocating power first, then detecting, and derating if the temperature exceeds a certain threshold. This approach not only suffers from response lag but also easily leads to drastic power fluctuations. This embodiment directly embeds the thermal coupling effect into the calculation of the power limit and the generation of the allocation coefficient in the form of a quantitative formula, achieving a shift from passive response to active prevention, fundamentally improving the system's operational stability and output capability under thermal constraints.
[0027] Thus, through steps S1 to S3, the core logical framework of this system has been constructed.
[0028] Example 2:
[0029] like Figure 1 As shown, based on Example 1, this example will elaborate on the specific process of obtaining the effective power upper limit in step S1.
[0030] In the above embodiments, the process of obtaining the effective power upper limit specifically includes the following steps: Step S1-1: Obtain basic physical quantities and rated parameters. For the i-th power module, first obtain its rated power P. R,i Real-time substrate temperature T B,i Preset temperature safety threshold T th,i and the ambient temperature T inside the server rack amb Among them, the substrate temperature T B,i The ambient temperature T can be collected in real time by an NTC thermistor or thermocouple mounted at the center of the power module substrate. amb It can be obtained through a digital temperature sensor installed at the air inlet of the cabinet.
[0031] Step S1-2: Calculate the remaining temperature margin ratio. Based on the substrate temperature T... B,i With temperature safety threshold T th,i The difference between them relative to the temperature safety threshold T th,i With ambient temperature T amb The remaining proportion is obtained by calculating the proportional relationship between the differences between them. The specific quantification method is as follows: , among which, T th,i >T B,i >T amb This remaining percentage reflects the proportion of the power module's remaining temperature rise margin from the safe threshold at the current temperature, relative to the total available temperature rise margin. When T... B,i Approaching T amb When T approaches 1, it indicates that the module has sufficient thermal margin and the potential to output full power; when T... B,i Rise and approach T th,iWhen this ratio approaches 0, it indicates that the module is nearing its thermal limit and derating protection must be implemented. This factor quantifies the module's thermal state as a power derating ratio, achieving proactive preventative derating.
[0032] Steps S1-3: Calculate the overall compression degree of neighborhood thermal interference. First, obtain the current allocated power P of each adjacent power module. R,j And calculate its relationship with the rated power P. R,i The ratio of these ratios is used as the load rate of each adjacent module. The load rate of each adjacent module is then compared with the preset thermal coupling coefficient K. cp,ij The product relationship yields the degree of individual thermal interference of each adjacent module to the current module, i.e. Subsequently, the preset baseline thermal interference value (set to 1 here) is aggregated with the difference in the degree of each individual thermal interference through a multiplication operation to obtain the overall compression degree. The specific quantification method is as follows: , among which, ∏ j≠i The multiplication operation represents a traversal multiplication of all modules j adjacent to module i. This comprehensive compression degree reflects the cumulative compression effect on the current module's heat dissipation capacity caused by three physical mechanisms when multiple adjacent modules are running simultaneously: increased intake air temperature due to hot air recirculation, heat conduction through a shared heat sink, and increased ambient air temperature through radiative heat transfer. The aggregation method using multiplication rather than summation is based on the physical characteristics of heat conduction: multi-source heat interference exhibits a saturation effect. For example, when module j is running at full load (P... A,j =P R,j When the intake air temperature has already risen, and the second adjacent module adds load, causing 1-K... cp,ij ×1=1-K cp,ij This indicates the maximum impact of module j on module i, reducing the available power of module i to 1-K times its original value. cp,ij The increase in intake air temperature decreases with each subsequent time step; conversely, when module j is not running (P... A,j When =0): 1-K cp,ij ×0=1 indicates that module j has no effect on module i. Since thermal coupling is a compression effect, not an amplification effect, the high load on adjacent modules will compress the available space of the current module, rather than amplify it. Therefore, the result is always ≤1, expressed as 1 - the disturbance amount, indicating compression. Multiplication can accurately describe the cumulative probability effect of this simultaneous occurrence of independent events.
[0033] Steps S1-4: Generate the effective power upper limit. The rated power P... R,i Multiplying the remaining percentage and the overall compression level yields the upper limit of the effective power of the power module under the current thermal coupling constraints. The calculation formula is as follows: ; Among them, PR,i The rated power of module i is also the baseline value. The temperature margin factor derates it from the rated value, while the thermal coupling product factor further compresses the derated value based on the neighboring load conditions; P E,i T represents the upper limit of the effective and safe output power of module i under the current thermal state and the influence of neighborhood thermal coupling, and is also the hard constraint upper limit for all subsequent allocation decisions; th,i T represents the temperature safety threshold for module i; B,i T represents the substrate temperature of module i. amb For ambient temperature; P A,j The current power allocation for module j; P R,j This is the rated power of module j.
[0034] Furthermore, in this embodiment, the thermal coupling coefficient K cp,ij The process of obtaining the temperature baseline is a crucial calibration step before system commissioning. Specifically, firstly, all power modules are allowed to reach thermal steady state under no-load operation, and the substrate temperature of each module at this point is recorded as a temperature baseline. Then, the target power module j is operated at full load with its rated power. After it reaches a new thermal steady state, the substrate temperature of each adjacent module i is recorded. Based on the ratio of the substrate temperature change of each adjacent power module after the target power module operates at full load to the substrate temperature change of the target power module itself, the thermal coupling coefficient of the target power module j to each adjacent power module i is obtained: K. cp,ij =ΔT B,i / ΔT B,j By traversing all power modules as target modules, a complete thermal coupling coefficient matrix can be obtained. This matrix reflects the inherent thermal interaction topology within the cluster and forms the basis for subsequent dynamic calculation of neighborhood thermal interference.
[0035] Understandably, this effective power upper limit P E,i It is a dynamic value, which varies with the power P allocated to adjacent modules. A,j The overall compression degree changes with the load of adjacent modules. When the load of a module decreases, the overall compression degree increases (because the factor in the multiplication term becomes larger), thus leading to P. E,i Automatic recovery. This design ensures that the effects of thermal coupling are dynamic and bidirectional, providing a physical basis for subsequent closed-loop iterations.
[0036] Thus, the effective power upper limit P of each power module at the current moment, constrained by its own temperature and neighboring thermal interference, has been obtained. E,i .
[0037] Example 3:
[0038] like Figure 1As shown in Example 2, this example will elaborate on the specific process of obtaining the thermal sensing allocation coefficient in step S2.
[0039] In the above embodiments, the process of obtaining the thermal sensing allocation coefficient specifically includes the following steps: Step S2-1: Calculate the demand percentage. Obtain the power demand P of the vehicle connected to the power module. dem,i This requirement is reported in real time to the charging station controller by the vehicle's battery management system (BMS) via CAN bus or PLC power line carrier communication. The station-level total power limit P is obtained. Smax This upper limit is determined jointly by the transformer capacity and the grid dispatch instructions. Calculate the required power P. dem,i With the upper limit of total power at the station level P Smax The ratio of these values yields the demand share, i.e. This demand percentage reflects the weight of the vehicle's demand in the total station capacity and is the driving force behind allocation decisions. Theoretically, modules with greater demand should receive higher allocation priority.
[0040] Step S2-2: Calculate the normalized heat margin value. Obtain the upper limit of effective power P. E,i With the rated power P of the power module R,i The ratio of these values yields the normalized value of the heat margin, i.e. Because of P E,i In the ideal maximum case, it equals P. R,i Therefore, the normalized value ranges from (0,1). This value reflects the proportion of the power module's safe output capability under current thermal conditions to its rated capability. When the result is close to 1, it indicates that the module has sufficient thermal margin; when When the result is close to 0, it indicates that the module is nearing its thermal limit and needs to be restricted in its allocation. This is the upper limit of effective power P. E,i The allocation coefficient is the most direct physical feedback.
[0041] Step S2-3: Calculate the heat consumption progress coefficient. Based on the temperature safety threshold T... th,i With ambient temperature T amb The difference between them relative to the substrate temperature T B,i With ambient temperature T amb The proportional relationship between the differences between them yields the heat consumption progress coefficient. Its specific quantification method is as follows: Where δ is a preset, extremely small positive number (e.g., 0.01) to prevent the denominator from being zero. This heat dissipation rate coefficient reflects the rate of heat dissipation of the power module relative to the ambient temperature. This coefficient has non-linear physical characteristics: in the low-temperature region (i.e., T... B,i Approaching T ambWhen the denominator is very small, the coefficient is very large, indicating that the module temperature is low and the heat capacity is sufficient to withstand high power allocation. As the temperature rises, the coefficient decreases rapidly, showing extremely high sensitivity to temperature changes. When the temperature approaches the safety threshold, the coefficient approaches 1, indicating that the heat margin is almost exhausted and power increments must be strictly limited. This nonlinear characteristic makes the coefficient an extremely sensitive early warning signal, capable of proactively reducing allocation priority before the temperature reaches the safety threshold, thus truly achieving preventative thermal management.
[0042] Step S2-4: Generate the heat sensing allocation coefficient. Multiply the demand ratio, the normalized value of the heat margin, and the heat consumption progress coefficient to obtain the heat sensing allocation coefficient of the power module. The comprehensive calculation formula is as follows: ; In the formula: P dem,i P represents the power requirement of the vehicle connected to module i. Smax α is the upper limit of the total power of the station level. i The thermal sensing allocation coefficient α is used to determine the actual allocation ratio of each module under the total power constraint. i It is a dimensionless comprehensive index that simultaneously carries three layers of physical information: demand information (from the vehicle), static thermal margin information (from the effective power limit), and dynamic thermal sensitivity information (from the temperature consumption progress). The higher the value of this coefficient, the higher the allocation priority of the module under the total power constraint.
[0043] Understandably, although the normalized heat margin value in step S2-2 and the heat consumption progress coefficient in step S2-3 are both calculated based on temperature parameters, they play distinctly different and complementary roles in the system. The normalized heat margin value is a linear, static constraint indicator that defines a hard upper limit through a ratio relationship; while the heat consumption progress coefficient is a non-linear, dynamic adjustment signal that extracts the urgency of temperature changes through a reciprocal relationship. The combination of the two ensures that the allocation coefficient can both guarantee that power does not exceed physical limits and respond quickly to slight increases in temperature, thereby achieving fine-grained control.
[0044] Thus, the thermal sensing allocation coefficient α for each power module, taking into account demand, thermal margin, and thermal sensitivity, was obtained. i .
[0045] Example 4:
[0046] like Figure 1 and Figure 2 As shown in Example 3, this example will elaborate on the specific process of iteratively updating the power allocation of each power module in step S3.
[0047] In the above embodiments, the process of iteratively updating the allocated power of each power module is a cyclical process that involves joint adjustment of the normalized weighting factor and the total power compliance factor, and ultimately satisfies hard constraints through a pruning operation. Specifically, it includes the following steps: Step S3-1: Calculate the normalized allocation weighting factor. First, calculate the thermal sensing allocation coefficient α for all power modules in the current iteration step. i geometric mean α avg Then, based on the thermal sensing allocation coefficient α of each power module... i With geometric mean α avg The ratio relationship is used to obtain the normalized allocation weight factor for each power module, i.e. The normalized allocation weighting factor is used to reflect the relative position of each power module's allocation priority to the average level of all modules. When α i >α avg When the factor is greater than 1, it indicates that the module should receive more power than it currently receives; conversely, when it is less than 1, it indicates that it should be reduced. The geometric mean is more sensitive to extreme values: when the α of a module is greater than 1, it indicates that the module should receive more power than it currently receives; conversely, when it is less than 1, it indicates that the module should receive less power. i At very small (thermal limit) values, the geometric mean decreases significantly, causing a relative increase in the normalization factor of other modules, thus enabling a faster transfer of power from thermally limited modules to modules with sufficient thermal margin. This results in better convergence speed and stability than the arithmetic mean.
[0048] Step S3-2: Calculate the total power compliance factor. Obtain the sum of the power allocated to all power modules in the current iteration step. The superscript t indicates the iteration step. Calculate the upper limit of the total station-level power P. Smax Compared with the current total allocated power The ratio of these values yields the total power compliance factor, i.e. The total power compliance factor reflects the degree of deviation of the current total allocated power from the station-level upper limit. When the total allocated power exceeds P... Smax When the factor is less than 1, all modules are compressed proportionally; when the total allocated power is less than P... Smax When this factor is greater than 1, it is scaled up proportionally. This ensures that the total power of the cluster does not exceed the station-level upper limit in any iteration step, satisfying the grid security constraints.
[0049] Step S3-3: Generate temporary allocation values. Multiply the allocated power of each power module in the current iteration step by the corresponding normalized allocation weight factor and the total power compliance factor to obtain the temporary allocation value for each power module, i.e.: ; Among them, P (t+1) temp,i P is a temporary value to be assigned. (t) A,i The power allocated to module i in the current iteration step, i.e., PA,i α avg Let α be the geometric mean of all modules. This multiplication operation allocates the total power to all modules in the current iteration step. Under the premise of strictly satisfying the total power constraint, it redistributes the total power according to the thermal priority of each module. This is a joint adjustment strategy that satisfies both global total power control and local physical constraints.
[0050] Step S3-4 involves hard constraint pruning. To ensure physical safety, the temporary allocation value of each power module is compared with the corresponding effective power limit and the vehicle's required power. The minimum value among the three is taken as the allocation power for the next iteration, i.e.: P (t+1) A,i =min(P (t+1) A,i ,P E,i ,P dem,i ); Meanwhile, to prevent numerical anomalies, values less than zero are reset to zero. At this point, the allocated power P for each power module in the next iteration is obtained. (t+1) A,i .
[0051] Understandably, the pruning operation is the last line of defense for system safety. It ensures that, under any circumstances, the power allocated to a module will not exceed the physical limit (P0) that its current thermal state can withstand. E,i ), and will not exceed the actual needs of the vehicle (P) dem,i This avoids power waste and safety hazards.
[0052] Example 5:
[0053] like Figures 1 to 3 As shown in Example 4, this example will elaborate in detail the process of determining the allocation power back to the effective power upper limit, as well as the overall convergence judgment logic of the system.
[0054] In the above embodiments, the process of determining the allocated power back to the effective power upper limit specifically includes the following steps: Step S4-1, update the overall compression level. Allocate the power P of each power module in the next iteration. (t+1) A,i As the new real-time output power of adjacent modules, the load rate P of each adjacent module is recalculated. (t+1) A,j / P R,j Based on the recalculated load rate and the preset thermal coupling coefficient K cp,ij The product relationship is used to re-obtain the degree of individual thermal interference of each adjacent module to the current module, and the overall compression degree is updated through a series of product operations. .
[0055] Step S4-2: Update the effective power limit. Based on the updated overall compression level, combined with the unchanged rated power and remaining ratio (the substrate temperature is considered quasi-static for a short period of time), recalculate the effective power limit P of each power module. (t +1) E,i At this point, the new effective power upper limit already reflects the thermal coupling state under the latest power allocation. If the power allocation changes, the thermal coupling state will inevitably change, and thus P E,i It will also change accordingly.
[0056] Step S4-3, Convergence Determination and Iteration. After each iteration update, the system will execute convergence determination logic. Specifically, it will determine whether the maximum value of the difference between the allocated power of each power module in two adjacent iterations is less than a preset convergence threshold ε (for example, ε can be 0.1kW or 0.5kW, set according to engineering accuracy requirements). The determination condition is: max i |P (t+1) A,i -P (t) A,i |<ε; If the judgment is negative, meaning the power difference is still greater than the threshold, it indicates that the system has not yet reached equilibrium. At this point, based on the updated effective power upper limit P... (t+1) E,i Then, repeat step S2 to determine the new thermal sensing allocation coefficients, and continue with step S3 and this step to enter the next iteration cycle.
[0057] If the determination is yes, meaning the change in allocated power of all power modules in two consecutive iterations is less than the threshold, it indicates that the entire system has converged under the combined effect of thermal coupling constraints and total power constraints. At this point, the allocated power P of the current iteration step is output. (t+1) E,i The final power allocation command is sent to each power module through the controller and then sent to the execution unit of each power module to complete the power allocation.
[0058] Thus, through steps S4-1 to S4-3, a closed-loop interaction between power allocation and thermal coupling constraints has been achieved. During this iteration, the excess power removed by the pruning operation does not disappear. Instead, through back-substitution and closed-loop processing, it creates new usable space for itself or other modules in the next iteration by reducing thermal interference, thereby maximizing the cluster's output capacity while ensuring safety.
[0059] Example 6:
[0060] like Figure 2As shown in the figure, based on the above embodiment 5, this embodiment will briefly explain the method of obtaining key physical quantities in the system.
[0061] The system of this invention relies on a high-precision, low-latency sensor network. Specifically: The substrate temperature T of the power module B,i Real-time temperature data is collected via a surface-mount PT100 platinum resistance temperature sensor installed at the center of the power module substrate.
[0062] Ambient temperature T amb Real-time data is collected via a digital temperature and humidity sensor installed at the air inlet of the server rack.
[0063] Real-time output power P of the power module A,j It is obtained in real time through a built-in Hall effect power sensor or by collecting bus voltage and current and calculating.
[0064] Vehicle power demand P dem,i The vehicle battery management system (BMS) reports to the charging station controller via high-speed CAN bus or PLC communication.
[0065] Station-level total power limit P Smax The value is dynamically determined based on the rated capacity of the transformer on site or the dispatch instructions issued by the power grid dispatch center.
[0066] All the sensor data mentioned above are connected to the central controller via hardwired connections or a communication bus. The central controller contains a microprocessor or digital signal processor (DSP) with high-speed floating-point arithmetic capabilities, used to execute the iterative calculation logic in all the aforementioned embodiments. The controller also outputs the final allocated power obtained after iterative convergence to the driver board of each power module in the form of PWM (pulse width modulation) or analog signals to precisely control its output power.
[0067] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A power distribution system based on a megawatt cluster powered by charging piles, characterized in that, include: Based on the real-time substrate temperature of the power module and the influence of neighboring thermal interference generated by adjacent modules, combined with the rated output capacity of the power module, the effective power upper limit of the power module under the current thermal coupling constraint is determined. The effective power upper limit is related to the remaining ratio of the power module's own temperature to the safety threshold and the comprehensive compression degree of the load state of adjacent modules on the current module's heat dissipation conditions. Based on the power demand of the vehicle connected to the power module, the ratio of the effective power limit to the rated power, and the thermal sensitivity reflected by the current temperature of the power module relative to the ambient temperature, a thermal sensing allocation coefficient of the power module is determined. The thermal sensing allocation coefficient is used to comprehensively indicate the allocation priority of the power module under the total power constraint. Based on the positional relationship of the thermal sensing allocation coefficient of each power module relative to the average level of all modules, and the deviation of the current total allocated power from the station-level total power upper limit, the allocated power of each power module is iteratively updated, and the updated allocated power is substituted back into the process of determining the effective power upper limit, so as to converge to obtain the final allocated power of each power module under the combined action of thermal coupling constraints and total power constraints.
2. The power distribution system based on a megawatt cluster powered by charging piles according to claim 1, characterized in that, The process of obtaining the effective power upper limit includes: Obtain the rated power, substrate temperature, temperature safety threshold, and ambient temperature of the power module; The remaining ratio is obtained based on the ratio of the difference between the substrate temperature and the temperature safety threshold to the difference between the temperature safety threshold and the ambient temperature. The remaining ratio is used to reflect the proportion of the remaining temperature rise space of the power module at the current temperature to the safety threshold to the total available temperature rise space. The ratio of the current allocated power to the rated power of each adjacent power module is obtained as the load rate of each adjacent module. Based on the product relationship between the load rate of each adjacent module and the preset thermal coupling coefficient, the degree of individual thermal interference of each adjacent module to the current module is obtained. The preset reference thermal interference value is multiplied by the difference of each individual thermal interference degree to obtain the comprehensive compression degree. The comprehensive compression degree is used to reflect the cumulative compression effect of the heat dissipation capacity of the current module through three mechanisms of hot air recirculation, base plate conduction and radiation heat exchange when multiple adjacent modules are running at the same time. Multiplying the rated power, the remaining ratio, and the overall compression degree yields the upper limit of the effective power of the power module under the current thermal coupling constraints.
3. The power distribution system based on a megawatt cluster powered by charging piles according to claim 1, characterized in that, The process of obtaining the thermal sensing distribution coefficient includes: The ratio of the power demand of the vehicle connected to the power module to the upper limit of the station's total power is obtained to obtain the demand ratio, which is used to reflect the weight of the vehicle's demand in the station's total capacity. The ratio of the effective power limit to the rated power of the power module is obtained to obtain the thermal margin normalized value. The thermal margin normalized value is used to reflect the proportion of the power module's safe output capability under the current thermal state to its rated capability. Based on the proportional relationship between the difference between the temperature safety threshold and the ambient temperature and the difference between the substrate temperature and the ambient temperature, a heat dissipation progress coefficient is obtained. The heat dissipation progress coefficient is used to reflect the heat dissipation progress of the current temperature of the power module relative to the ambient temperature. The heat dissipation progress coefficient has high sensitivity to temperature changes in the low temperature region and tends to saturate in the high temperature region. The heat perception allocation coefficient of the power module is obtained by multiplying the demand ratio, the normalized value of the heat margin, and the heat consumption progress coefficient.
4. The power distribution system based on a megawatt cluster powered by charging piles according to claim 1, characterized in that, The process of iteratively updating the allocated power of each power module includes: Calculate the geometric mean of the thermal sensing allocation coefficients of all power modules. Based on the ratio of the thermal sensing allocation coefficients of each power module to the geometric mean, obtain the normalized allocation weight factor of each power module. The normalized allocation weight factor is used to reflect the positional relationship of the allocation priority of each power module relative to the average level of all modules. The sensitivity of the geometric mean to extremely low values causes the power of thermally limited modules to be transferred to thermally abundant modules more quickly. Obtain the ratio of the sum of the power allocated to all power modules in the current iteration step to the station-level total power limit to generate a total power compliance factor for correcting the total power of the cluster. The total power compliance factor is used to reflect the degree of deviation of the current total allocated power from the station-level limit. The allocated power of each power module in the current iteration step is multiplied by the corresponding normalized allocation weight factor and the total power compliance factor to obtain the temporary allocation value of each power module. The temporary allocation value of each power module is compared with the corresponding effective power limit and the vehicle's required power. The minimum value among the three is taken, and values less than zero are set to zero to obtain the allocation power of each power module in the next iteration step.
5. The power distribution system based on a megawatt cluster powered by charging piles according to claim 4, characterized in that, The process of determining the allocated power back to the effective power upper limit includes: The power allocated by each power module in the next iteration step is used as the new real-time output power of the adjacent module. The load rate of each adjacent module is recalculated. Based on the product relationship between the recalculated load rate of each adjacent module and the preset thermal coupling coefficient, the degree of individual thermal interference of each adjacent module to the current module is obtained again. The degree of individual thermal interference of each adjacent module is multiplied and aggregated to update the comprehensive compression degree. Based on the updated overall compression level, the effective power limit of each power module is recalculated; Determine whether the maximum difference between the allocated power of each power module in two adjacent iterations is less than the preset convergence threshold, until the final allocated power that converges under the combined action of thermal coupling constraint and total power constraint is obtained.
6. The power distribution system based on a megawatt cluster powered by charging piles according to claim 5, characterized in that, The process of determining whether the maximum difference in the allocated power between two adjacent iterations of each power module is less than a preset convergence threshold includes: If the determination is negative, the thermal sensing allocation coefficient is re-determined based on the updated effective power upper limit and the iteration continues. If the determination is yes, then the allocated power of the current iteration step is output as the final allocated power of each power module.
7. The power distribution system based on a megawatt cluster powered by charging piles according to claim 2, characterized in that, The process of obtaining the thermal coupling coefficient includes: After all power modules have reached thermal steady state under no-load operation, the substrate temperature of each power module is recorded as the temperature baseline. The target power module was operated at full load at rated power to reach thermal steady state, and the substrate temperature of each adjacent power module was recorded. Based on the ratio of the temperature change of the substrate of each adjacent power module after the target power module is fully loaded to the temperature change of the substrate of the target power module itself, the thermal coupling system of the target power module to each adjacent power module is obtained. By iterating through all power modules as target power modules, the thermal coupling coefficient matrix is obtained.
8. The power distribution system based on a megawatt cluster powered by charging piles according to claim 1, characterized in that, Also includes: The substrate temperature of the power module is collected in real time by a temperature sensor installed at the center of the power module substrate. The ambient temperature is collected in real time by a temperature sensor installed at the air inlet of the cabinet. The real-time output power of the power module is acquired in real time by a power sensor; The vehicle's required power is obtained by the vehicle battery management system via a communication bus. The upper limit of the total power at the station level is determined based on the transformer capacity or the power grid dispatch instructions.