LKJ intelligent lifting method based on vehicle-ground wireless communication

By using vehicle-to-ground wireless communication and automated control technology, the intelligence level of LKJ equipment is improved, and the automation of the attendance process and operation during the journey is realized. This solves the problem of insufficient intelligence level of existing LKJ equipment and improves railway transportation efficiency and driving safety.

CN123130044APending Publication Date: 2026-11-20HENAN THINKER AUTOMATIC EQUIP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611315214.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing LKJ devices lack sufficient intelligence in data acquisition, positioning accuracy, and human-computer interaction, resulting in low attendance efficiency, cumbersome operation, poor information reliability, and potential driving safety hazards.

Method used

An intelligent upgrade method based on vehicle-to-ground wireless communication is adopted. By working collaboratively between onboard and ground equipment, the automating of the dispatching process and operations during the journey is achieved. Redundant communication links of 5G and GSM-R/400MHz are used, and a dynamic information processing unit and transponder transmission module are added to automatically identify and monitor train route information.

Benefits of technology

Reduce human intervention, simplify driver procedures, improve transportation efficiency and driving safety, reduce labor intensity, ensure data accuracy and system reliability, and avoid the risk of loss of control due to channel interruption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123130044A_ABST
    Figure CN123130044A_ABST
Patent Text Reader

Abstract

The application discloses an LKJ intelligent lifting method based on vehicle-ground wireless communication, which comprises a vehicle-mounted device and a ground device, and the vehicle-mounted device and the ground device are redundantly connected in communication, and the vehicle-mounted device and the ground device are cooperatively used for attendance link automation and in-transit operation automation; the attendance link automation comprises the following steps: establishing an LKJ temporary data file; obtaining an operation section; and obtaining the LKJ temporary data file; the in-transit operation automation comprises the following steps: obtaining station diagram data and station interlocking information; pre-burying a station transponder; automatically aligning a target by the LKJ vehicle-mounted device; registering the LKJ vehicle-mounted device; automatically shunting a train; automatically transferring a route; deregistering the LKJ vehicle-mounted device; and reducing human intervention operation, simplifying a driver operation process and reducing labor intensity, and meanwhile, LKJ automatic identification of front route information is realized, so that the railway transportation efficiency and the driving safety are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of railway transportation safety technology, specifically relating to an intelligent upgrade method for LKJ based on vehicle-to-ground wireless communication. Background Technology

[0002] LKJ (Locomotive Knob) is a key piece of equipment for ensuring safe train operation. It has been used in my country's railways for nearly 30 years and is widely installed on locomotives and EMUs. Currently, it is installed on more than 25,000 locomotives and more than 1,000 EMUs, operating on more than 110,000 kilometers of conventional railway lines and some high-speed railway lines across the country. It has made important contributions to ensuring railway traffic safety and supporting the development of railway-related technologies.

[0003] The basic function of LKJ is to collect speed, location, track parameters and dispatching commands in real time during train operation, and to achieve overspeed protection, overspeed protection and temporary speed limit control by comparing them with the onboard basic data file.

[0004] Although LKJ (Local Kinematics Controller) is already widely used, due to limitations of early technology, LKJ still relies primarily on manual operation in areas such as data acquisition (including route information), positioning accuracy, and human-computer interaction. This insufficient level of intelligence leads to problems such as "low attendance efficiency, cumbersome operations during transit, poor information reliability, and excessive human intervention," specifically manifested as follows: (1) Attendance process Currently, drivers follow the procedure below for attendance: ①Write card attendance: When the driver goes on duty at the dispatch room of the locomotive depot, the duty officer writes the LKJ temporary data file and attendance information into the IC card; ② Information verification: The driver inserts the IC card into the card verification device in the dispatch room of the locomotive depot to confirm whether the LKJ temporary data file and attendance information in the IC card are correct, so as to avoid the LKJ temporary data file being written incorrectly, which could lead to problems such as LKJ miscontrol or missed control of LKJ temporary data file and affect driving safety. ③ Parameter setting: After the driver gets on the vehicle, he loads the LKJ temporary data file and attendance information stored on the IC card into the LKJ and confirms it again. Then, the necessary conditions for the originating station to allow the vehicle to start are met. The attendance process relies on manual card writing and verification, which is lengthy; IC cards are easily damaged or have poor contact, causing data reading failures; when the number of LKJ records is large, the manual verification workload is heavy and prone to errors, making it impossible to guarantee data accuracy; it has the problems of low efficiency and poor reliability. (2) Operation during the journey ① Originating Station Operation: The driver operates the locomotive. When the locomotive passes the "starting benchmark point", the driver needs to press the [Start] button on the LKJ screen display. The LKJ monitors the train operation according to the line parameters and speed limit requirements of the LKJ on-board basic data file stored in the LKJ monitoring host. If the driver manually presses the [Start] button, and forgets or delays, the LKJ cannot call up the correct line data in time, resulting in monitoring failure. ②Side track reception operation en route: When a train receives another train / enters the station via a side track, the driver and the station jointly control the current side track number and input the side track number into the LKJ; the LKJ monitors the train's reception / entry into the station based on the corresponding track data in the LKJ onboard basic data file to prevent the train from speeding, which is due to excessively long information links and low reliability. When receiving a train on a siding, the driver must obtain and manually input the track number via radio. If the radio signal is poor, the track number cannot be obtained in time, and the LKJ can only run at the default speed limit, reducing transportation efficiency. If the wrong track number is input, the LKJ will call the wrong speed limit, and the train may be at risk of speeding, collision, or derailment. ③ Branch line transfer operation en route: Before reaching the point where the line diverges, the driver of the freight train needs to accurately and promptly input the "branch line number" on the LKJ screen display according to the train's direction of travel. This assists the LKJ in calling the corresponding branch line data in the LKJ onboard basic data file to monitor the train's operation and prevent the train from speeding. The branch line number must be manually entered before the branch line operation. If it is missed or entered incorrectly, the LKJ will call the main line or the wrong branch line data, causing the risk of speeding. The en route operation is cumbersome and relies on manual labor. Summary of the Invention

[0005] To address the aforementioned technical problems, this invention provides an intelligent upgrade method for LKJ based on vehicle-to-ground wireless communication.

[0006] The specific plan is as follows: A method for intelligent upgrading of LKJ based on vehicle-to-ground wireless communication includes vehicle-mounted equipment and ground equipment, with redundant communication connections between the vehicle-mounted equipment and the ground equipment, and the vehicle-mounted equipment and the ground equipment working together to automate the attendance process and the operation during the journey. The automation of the attendance process includes the following steps: S1): Create a temporary LKJ data file; The LKJ application server automatically creates a temporary LKJ data file, which includes obtaining temporary LKJ data and generating verification data; S2): Obtain the usage segment; The LKJ application server obtains the usage segment from the cross-segment card writing server. After the LKJ vehicle-mounted device is powered on, it automatically sends an application to the LKJ application server to obtain the usage segment information. S3): Obtain the LKJ temporary data file; The LKJ on-board unit sends an application to the LKJ application server based on the operating segment selected by the driver in order to obtain the LKJ temporary data file corresponding to the selected operating segment; The automated operation during the journey includes the following steps: T1): Obtain data for compiling station layout plans and station interlocking information; T2): Pre-embedded station transponders; embed corresponding departure transponders, registration transponders, and cancellation transponders at the corresponding locations in the station area; T3): LKJ onboard equipment automatically aligns with the target when starting; when the locomotive passes the target start transponder at the target location, the LKJ onboard equipment automatically performs the target alignment operation; T4): LKJ on-board equipment registration; After the train passes the registration transponder, the LKJ on-board equipment establishes a communication link with the LKJ application server and sends the train's location information to the LKJ application server in real time. T5): Automatic siding train reception; The LKJ application server automatically captures the siding train reception route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding siding track data to monitor train operation based on the siding train reception route information; T6): Automatic branch line transfer route; The LKJ application server automatically captures the branch line transfer route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding branch line transfer data to monitor train operation based on the branch line transfer route information; T7): LKJ onboard equipment deregistration; after the train passes the deregistration transponder, the LKJ application server disconnects the communication link with the LKJ onboard equipment.

[0007] The vehicle-mounted equipment and the ground equipment communicate redundantly by reusing the LKJ data wireless switching channel and the GSM-R / 400 MHz CIR vehicle-mounted host channel. The LKJ data wireless switching channel supports 5G transmission.

[0008] The on-board equipment is equipped with a dynamic information processing unit and a transponder transmission module (BTM). The dynamic information processing unit is used to process transponder information, train positioning information, and vehicle-to-ground communication data. The dynamic information processing unit is connected to the LKJ host via a data bus, and is also connected to the LKJ wireless data transponder and the CIR host via data interfaces. The dynamic information processing unit is also electrically connected to the transponder transmission module (BTM), which is used to receive information sent by the ground transponder and transmit the received information to the dynamic information processing unit.

[0009] The ground equipment is equipped with an LKJ application server, a transponder, and a network gateway. The LKJ application server communicates with the computer interlocking system through the network gateway, and the LKJ application server communicates with the transponder.

[0010] In S1), obtaining LKJ temporary data and generating verification data includes the following steps: S11): The LKJ application server receives the LKJ temporary data file published by the cross-segment card writing server and saves it according to the application segment: S12): Calculate the check data of all LKJ temporary data files used in this bureau according to the CRC check algorithm, and store them after merging with the LKJ temporary data; at the same time, add timestamp and sequence number information.

[0011] In S3), the application information sent by LKJ to the LKJ application server includes the verification information stored by LKJ. When the LKJ application server receives the application information, it compares whether the received verification information is consistent with the locally stored verification information. If they are inconsistent, it sends the corresponding LKJ temporary data file to LKJ. If they are consistent, it sends a message to LKJ indicating that the information is consistent with the information stored by the LKJ application server and no transmission is required.

[0012] In T1), the station layout plan is compiled based on the station layout plan and is pre-stored in the LKJ application server; the station interlocking information is the station interlocking data obtained by the LKJ application server from the computer interlocking system.

[0013] In T2), the benchmarking transponder is buried at the benchmarking location, the registration transponder is buried at the station entrance, and the cancellation transponder is buried at the station exit.

[0014] In T5), the LKJ application server automatically captures lateral receiving route information, including the following steps: T51): The LKJ application server determines the train's current location and the information of the station ahead by sending the train location information from the LKJ onboard equipment. T52): The LKJ application server automatically identifies the siding track that the current train will connect to based on the station map data and station interlocking information of the station ahead; In step T52), the station map data includes siding reception route information configured according to LKJ vehicle data.

[0015] In T6), the LKJ application server automatically captures branch transfer route information through the following steps: T61): The LKJ application server determines the current location of the train and the information of the branching point ahead based on the train location information sent by the LKJ on-board equipment; T62): The LKJ application server automatically identifies the branch line that the train will run on based on the station map data and station interlocking information of the station ahead; In step T62), the station map data includes branch line transfer route information configured according to the LKJ vehicle data.

[0016] A method for improving the intelligence of the LKJ (Likely a vehicle-to-ground communication device) based on vehicle-to-ground wireless communication is proposed. This method enhances the intelligence level of the LKJ by using wireless communication, transponder positioning, and automated control technologies, thereby reducing human intervention, simplifying driver operation procedures, reducing labor intensity, and enabling the LKJ to automatically identify the route information ahead, effectively improving railway transportation efficiency and driving safety. Attached Figure Description

[0017] Figure 1 This is a diagram of the architecture of the present invention.

[0018] Figure 2 This is a schematic diagram of the principle of the present invention. Detailed Implementation

[0019] The technical solutions in the embodiments of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the implementation of the present invention, and not all of it. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0020] like Figure 1 As shown, an intelligent upgrade method for LKJ based on vehicle-to-ground wireless communication includes collaborative work between vehicle-mounted equipment and ground equipment; the vehicle-mounted equipment and ground equipment simultaneously reuse two mature links: the 5G LKJ data wireless switching channel and the GSM-R / 400MHz CIR vehicle host channel. When either link fails, the other link seamlessly takes over, ensuring both security and eliminating the need to build a new private network.

[0021] LKJ is short for Train Operation Monitoring System, which mainly consists of a main unit, LKJ screen display, speed sensor, pressure sensor, and dual-needle speedometer. Its working principle is to collect key information such as train speed, signal, and pressure, and compare it with the line parameters and speed limits pre-stored in the LKJ monitoring main unit. When the train speed exceeds the speed limit, it automatically takes measures such as emergency braking to prevent dangerous situations such as speeding and overtaking.

[0022] Onboard equipment includes the existing LKJ main unit, DMI, LKJ data wireless transponder and CIR main unit, and adds a dynamic information processing unit and BTM equipment; BTM is the transponder transmission module, which is the core onboard equipment in the train operation control system and is responsible for point-to-point wireless data communication between the train and the ground transponder.

[0023] The Dynamic Information Processing Unit (DIT) is a newly added core processing unit responsible for processing transponder information, train positioning information, and vehicle-to-ground communication data. The DIT connects to the LKJ main unit via a data bus, to the BTM via a dedicated interface, and to the LKJ wireless data transceiver and CIR main unit via data interfaces. The BTM is responsible for receiving information from the ground transponder and transmitting the received information to the DIT.

[0024] The dynamic information processing unit combines the precise train position provided by the transponder with the real-time interlocking information provided by the computer interlocking system to achieve automatic train start-up alignment, automatic siding reception route identification, and automatic branch line transfer judgment, thereby avoiding safety control risks caused by drivers mis-entering or omitting route information.

[0025] Ground equipment includes existing LKJ data wireless transshipment servers, which support 5G, GRIS interface servers, DRTD interface servers, wireless train dispatching station equipment, cross-section card writing servers, computer interlocking systems, and other equipment, as well as newly added LKJ application servers, network gateways, and transponder equipment.

[0026] Among the ground equipment, the LKJ application server is the core processing device, responsible for generating, managing, and sending LKJ temporary data files, as well as processing station interlocking information. The LKJ application server connects to the cross-segment card writing server via a network gateway and to the computer interlocking system via a secure data channel. The network gateway is used to enable data exchange between networks of different security levels, ensuring system security.

[0027] The architecture of this embodiment makes full use of existing vehicle-mounted LKJ and CIR equipment, ground computer interlocking system and vehicle-to-ground wireless communication network, etc., with appropriate modifications. It adopts a verified and reliable vehicle-to-ground "redundant" wireless transmission channel, including LKJ data wireless switching channel and CIR vehicle-to-ground channel, to achieve integrated LKJ intelligent upgrade with optimal investment cost; the LKJ data wireless switching channel supports 5G, and the CIR vehicle-to-ground channel supports GSM-R / 400MHz.

[0028] like Figure 2 As shown, an intelligent upgrade method for LKJ based on vehicle-to-ground wireless communication includes automation of attendance procedures and automation of operations during transit. The automation of the attendance process includes the following steps: S1): Create a temporary LKJ data file; The LKJ application server automatically creates a temporary LKJ data file, which includes obtaining temporary LKJ data and generating verification data; In S1), obtaining LKJ temporary data and generating verification data includes the following steps: S11): The LKJ application server receives the LKJ temporary data file published by the cross-segment card writing server and saves it according to the application segment; The cross-segment card writing server issues LKJ temporary data files according to the operation disclosure scheduling command. The operation disclosure scheduling command refers to the scheduling command issued by the construction dispatcher based on the construction daily plan and the application submitted by the competent business department regarding disasters, faults involving speed limits, changes in driving modes and equipment.

[0029] LKJ temporary data files are data sets compiled and edited using specialized software based on operational instructions and dispatch commands. These data are loaded into the LKJ system to implement deceleration control, change train operation modes, or provide relevant operational prompts. In this article, LKJ temporary data files refer to LKJ display files generated based on operational instructions and dispatch commands, which can be directly used by the LKJ onboard equipment for identification and train control.

[0030] S12): Based on the CRC check algorithm, calculate the check data of all LKJ temporary data files used in this bureau, and store them after merging with the LKJ temporary data; at the same time, add timestamp and sequence number information to prevent errors and other problems that occur during data transmission. The timestamp is used to identify the data generation time, and the sequence number is used to identify the data version. The combination of the two can effectively prevent duplicate transmission and data confusion.

[0031] S2): Obtain the usage segment; The LKJ application server obtains the usage segment from the cross-segment card writing server. After the LKJ vehicle-mounted device is powered on, it automatically sends an application to the LKJ application server to obtain the usage segment information; The usage segment information includes basic information such as segment number, segment name, and segment range.

[0032] S3): Obtain the LKJ temporary data file; The LKJ on-board equipment sends an application to the LKJ application server based on the operating section selected by the driver to obtain the LKJ temporary data file corresponding to the selected operating section; The operating section is the information selected by the driver in the DMI menu after boarding the vehicle. The DMI displays a list of available operating sections, and the driver selects the corresponding operating section according to the current train number.

[0033] In S3), the application information sent by LKJ to the LKJ application server includes the verification information stored by LKJ. When the LKJ application server receives the application information, it compares the received verification information with the locally stored verification information. If they do not match, it sends the corresponding LKJ temporary data file to LKJ. After receiving it, LKJ performs a CRC check, and if the check passes, it is used to monitor train operation. If they match, it sends a message to LKJ indicating that the data is consistent with the LKJ application server's storage, and no further transmission is required. This incremental transmission mechanism can effectively reduce the amount of data transmitted and improve transmission efficiency.

[0034] The automated operation during the journey includes the following steps: T1): Obtain station layout data and station interlocking information; the station layout data includes detailed data such as the location of station turnouts, the status of signals, and track information, while the interlocking data reflects the current status of station turnouts, signals, routes, and other equipment in real time.

[0035] In T1), the station layout plan is compiled based on the station layout plan and is pre-stored in the LKJ application server; the station interlocking information is the station interlocking data obtained by the LKJ application server from the computer interlocking system.

[0036] Computerized Interlocking System (CBI) is the core safety equipment of railway signaling system. It uses computer technology to replace traditional relay circuits to perform logical operations and centralized control on the safety interlocking relationships between equipment such as switches, signals, and routes within the station. It has key interlocking information such as switch position, signal status, track circuit occupancy, and route status.

[0037] T2): Pre-embedded station transponders; aligning start-up transponders, registration transponders, and deregistration transponders are embedded at corresponding locations in the station yard; the aligning start-up transponders are embedded at the alignment point, which is located at an appropriate position in the departure direction from the originating station. The function of the aligning start-up transponders is to enable the LKJ to automatically perform alignment start-up operations when the locomotive passes the "aligning point" after the driver has set the parameters; the transponders store the alignment point location information, and the LKJ automatically executes the alignment operation after reading the information through the transponders. The registration transponder is installed at the station entrance. The function of the registration transponder is that when the locomotive passes the transponder, the LKJ on-board equipment sends a registration application to the LKJ application server. After receiving the application, the LKJ application server establishes a communication link with the LKJ on-board equipment. The registration transponder is the starting point for LKJ to start receiving ground route information.

[0038] The cancellation transponder is installed at the station exit. Its function is to send cancellation information to the LKJ onboard equipment when the locomotive passes the transponder. After receiving the information, the LKJ application server disconnects the communication link with the LKJ onboard equipment. The cancellation transponder is the termination point for LKJ to end communication with the ground.

[0039] Transponder positioning technology has been successfully applied in high-speed railway sections; 5G and other wireless technologies are mature and capable of stably transmitting large amounts of data in high-speed train scenarios; cloud computing, edge computing and other technologies have been validated in railway locomotive and passenger transport fields and are ready to be extended to onboard safety equipment.

[0040] T3): The LKJ onboard equipment automatically aligns the locomotive with the starting target. When the locomotive passes the starting target transponder at the target location, the LKJ onboard equipment automatically performs the alignment operation. After the driver completes the parameter settings at the originating station, including inputting the train number, driver number, and train formation, the locomotive starts departure after the departure signal is given. When the driver maneuvers the locomotive past the starting target location, the LKJ achieves automatic starting alignment, the DMI displays the track data ahead and monitors train operation, and the automatic alignment function eliminates the risk of the driver forgetting to press the start button.

[0041] T4): LKJ on-board equipment registration; after the train passes the registration transponder, the LKJ on-board equipment establishes a communication link with the LKJ application server through the dynamic information processing unit, and sends the train location information to the LKJ application server in real time; the train location information includes data such as the current kilometer marker, running speed, and running direction.

[0042] T5): Automatic siding train reception; The LKJ application server automatically captures the siding train reception route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding siding track data to monitor train operation based on the siding train reception route information; Sideline track data includes monitoring parameters such as speed limit information and distance information for that track; The route information mainly includes information such as the siding number and branch line entered by the driver during train operation, which assists LKJ in calling LKJ onboard basic data files to monitor train operation; In T5), the LKJ application server automatically captures lateral receiving route information, including the following steps: T51): The LKJ application server determines the train's current location and the information of the station ahead by sending the train location information from the LKJ onboard equipment. T52): The LKJ application server automatically identifies the siding track that the current train will access based on the station map data and station interlocking information of the station ahead; the station map data provides siding track configuration information, and the interlocking information provides the current actual route status. The combination of the two can accurately determine the track number that the train will access.

[0043] In step T52), the station map data includes siding reception route information configured according to LKJ vehicle data.

[0044] T6): Automatic branch line transfer route; The LKJ application server automatically captures branch line transfer route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding branch line transfer data to monitor train operation based on the branch line transfer route information; The branch line transfer data includes monitoring data such as the line parameters and speed limit information of the branch line.

[0045] In T6), the LKJ application server automatically captures branch transfer route information through the following steps: T61): The LKJ application server determines the current location of the train and the information of the branch point ahead based on the train location information sent by the LKJ on-board equipment; the station map data provides branch line configuration information, and the interlocking information provides the current actual route direction. The combination of the two can accurately determine the branch line on which the train will run. T62): The LKJ application server automatically identifies the branch line to which the train will run based on the station map data and station interlocking information of the station ahead.

[0046] In step T62), the station map data includes branch line transfer route information configured according to the LKJ vehicle data.

[0047] T7): LKJ onboard equipment deregistration; after the train passes the deregistration transponder, the LKJ application server disconnects the communication link with the LKJ onboard equipment and releases communication resources.

[0048] In this embodiment, it is not necessary to assign duty officers to each locomotive depot to complete card writing, card verification, data checking, and anomaly handling, thus reducing labor costs and minimizing errors. Furthermore, it enables dynamic locomotive management, achieving automatic start-up alignment and automatic train route identification without manual intervention; compared to existing technologies, it has the following significant advantages: (1) Enhanced security; By using a dual-channel redundant wireless link between the vehicle and the ground and a regionalized LKJ temporary data file upload mechanism for the operational section, the risk of loss of control due to channel interruption is reduced. CRC information, timestamps, sequence numbers, and other information are added to the LKJ temporary data file in the operational section to prevent errors during data transmission; the risk of loss of control due to channel interruption is reduced by using a redundant wireless link and a regionalized LKJ temporary data file upload mechanism for the "operational section".

[0049] (2) Efficiency and cost win-win; the process of writing cards, verifying cards and handling abnormalities by the locomotive depot duty officer is eliminated, saving labor costs; the purchase and maintenance costs of special card verification equipment are eliminated, reducing operation and maintenance costs; and the existing 5G and GSM-R / 400MHz networks are utilized, eliminating the need to build a new ground private network or carry out large-scale transformation.

[0050] (3) The automation level of LKJ is significantly improved; the system can automatically identify train routes, including siding and branch line transfers, and the operation is completed autonomously, reducing the number of steps for the driver and greatly reducing labor intensity.

[0051] (4) System reliability and maintainability; all new equipment is connected in an “external” manner, and can bypass and restore the existing mode in case of failure without affecting driving safety; in addition, the relevant software can be upgraded remotely, and the maintenance window is short.

[0052] (5) Data accuracy and consistency; differential positioning error <1m, combined with interlocking information for real-time correction, to ensure that the LKJ distance is highly consistent with the actual ground data, and to prevent emergency braking due to data deviation.

[0053] This invention aims to propose an integrated intelligent upgrade method for LKJ (Locomotive Control Unit) based on vehicle-to-ground wireless communication. It comprehensively utilizes advanced technologies such as wireless communication, transponder positioning, and automated control to enhance the intelligence level of the LKJ. This method is compatible with existing LKJ systems and achieves a new generation of "wireless, automated, and intelligent" technical solutions. It addresses the long-standing bottleneck of manual operation that has plagued transportation efficiency and safety, reduces human intervention, simplifies driver procedures, lowers labor intensity, and enables the LKJ to automatically identify the route ahead, effectively improving railway transportation efficiency and driving safety. Simultaneously, this invention can also solve the problem of heavy workload for ground personnel in various locomotive depots of the railway bureau.

[0054] The technical means disclosed in this invention are not limited to those disclosed in the above embodiments, but also include technical solutions composed of any combination of the above technical features. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of this invention, and these improvements and modifications are also considered within the scope of protection of this invention.

Claims

1. A method for intelligent upgrading of LKJ based on vehicle-to-ground wireless communication, characterized in that, It includes vehicle-mounted equipment and ground equipment, with redundant communication connections between the vehicle-mounted equipment and ground equipment, and the vehicle-mounted equipment and ground equipment work together to automate the attendance process and the operation during the journey. The automation of the attendance process includes the following steps: S1): Create a temporary LKJ data file; The LKJ application server automatically creates a temporary LKJ data file, which includes obtaining temporary LKJ data and generating verification data; S2): Obtain the usage segment; The LKJ application server obtains the usage segment from the cross-segment card writing server. After the LKJ vehicle-mounted device is powered on, it automatically sends an application to the LKJ application server to obtain the usage segment information. S3): Obtain the LKJ temporary data file; The LKJ on-board unit sends an application to the LKJ application server based on the operating segment selected by the driver in order to obtain the LKJ temporary data file corresponding to the selected operating segment; The automated operation during the journey includes the following steps: T1): Obtain data for compiling station layout plans and station interlocking information; T2): Pre-embedded station transponders; embed corresponding departure transponders, registration transponders, and cancellation transponders at the corresponding locations in the station area; T3): LKJ onboard equipment automatically aligns with the target when starting; when the locomotive passes the target start transponder at the target location, the LKJ onboard equipment automatically performs the target alignment operation; T4): LKJ on-board equipment registration; After the train passes the registration transponder, the LKJ on-board equipment establishes a communication link with the LKJ application server and sends the train's location information to the LKJ application server in real time. T5): Automatic siding train reception; The LKJ application server automatically captures the siding train reception route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding siding track data to monitor train operation based on the siding train reception route information; T6): Automatic branch line transfer route; The LKJ application server automatically captures the branch line transfer route information and sends it to the LKJ onboard equipment; The LKJ onboard equipment automatically calls the corresponding branch line transfer data to monitor train operation based on the branch line transfer route information; T7): LKJ onboard equipment deregistration; after the train passes the deregistration transponder, the LKJ application server disconnects the communication link with the LKJ onboard equipment.

2. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: The vehicle-mounted equipment and the ground equipment communicate redundantly by reusing the LKJ data wireless switching channel and the GSM-R / 400 MHz CIR vehicle-mounted host channel. The LKJ data wireless switching channel supports 5G transmission.

3. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: The on-board equipment is equipped with a dynamic information processing unit and a transponder transmission module (BTM). The dynamic information processing unit is used to process transponder information, train positioning information, and vehicle-to-ground communication data. The dynamic information processing unit is connected to the LKJ host via a data bus, and is also connected to the LKJ wireless data transponder and the CIR host via data interfaces. The dynamic information processing unit is also electrically connected to the transponder transmission module (BTM), which is used to receive information sent by the ground transponder and transmit the received information to the dynamic information processing unit.

4. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: The ground equipment is equipped with an LKJ application server, a transponder, and a network gateway. The LKJ application server communicates with the computer interlocking system through the network gateway, and the LKJ application server communicates with the transponder.

5. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In S1), obtaining LKJ temporary data and generating verification data includes the following steps: S11): The LKJ application server receives the LKJ temporary data file published by the cross-segment card writing server and saves it according to the application segment: S12): Calculate the check data of all LKJ temporary data files used in this bureau according to the CRC check algorithm, and store them after merging with the LKJ temporary data; at the same time, add timestamp and sequence number information.

6. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In S3), the application information sent by LKJ to the LKJ application server includes the verification information stored by LKJ. When the LKJ application server receives the application information, it compares whether the received verification information is consistent with the locally stored verification information. If they are inconsistent, it sends the corresponding LKJ temporary data file to LKJ. If they are consistent, it sends a message to LKJ indicating that the information is consistent with the information stored by the LKJ application server and no transmission is required.

7. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In T1), the station layout plan is compiled based on the station layout plan and is pre-stored in the LKJ application server; the station interlocking information is the station interlocking data obtained by the LKJ application server from the computer interlocking system.

8. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In T2), the benchmarking transponder is buried at the benchmarking location, the registration transponder is buried at the station entrance, and the cancellation transponder is buried at the station exit.

9. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In T5), the LKJ application server automatically captures lateral receiving route information, including the following steps: T51): The LKJ application server determines the train's current location and the information of the station ahead by sending the train location information from the LKJ onboard equipment. T52): The LKJ application server automatically identifies the siding track that the current train will connect to based on the station map data and station interlocking information of the station ahead; In step T52), the station map data includes siding reception route information configured according to LKJ vehicle data.

10. The LKJ intelligent enhancement method based on vehicle-to-ground wireless communication according to claim 1, characterized in that: In T6), the LKJ application server automatically captures branch transfer route information through the following steps: T61): The LKJ application server determines the current location of the train and the information of the branching point ahead based on the train location information sent by the LKJ on-board equipment; T62): The LKJ application server automatically identifies the branch line that the train will run on based on the station map data and station interlocking information of the station ahead; In step T62), the station map data includes branch line transfer route information configured according to the LKJ vehicle data.