Method for building a u-section
By combining segmented independent construction with a dedicated jig, the problems of high lifting risks, difficulty in controlling structural deformation, and limited outfitting operations in the construction of U-shaped sections were solved, achieving efficient and safe construction of U-shaped sections and improving the construction quality and efficiency of chemical tankers.
Patent Information
- Application Number
- CN202611292518.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-20
AI Technical Summary
The existing U-shaped section construction process has problems such as high hoisting risks, difficulty in controlling structural deformation, limited outfitting operations, and long dock occupancy periods. In particular, in the construction of chemical tankers, the hoisting and outfitting installation of duplex stainless steel faces challenges, affecting construction accuracy, efficiency, and safety.
The method of segmented independent construction and special jigs is adopted. The outfitting components are installed in advance. Flexible and rigid fixing technology combining guy ropes and constraint welding is used. The special jigs and stainless steel pads are used for isolation and support to ensure accurate segment positioning and structural stability, avoiding deformation and material damage. After the segments are hoisted, they are welded together to form a U-shaped main section.
This significantly improved the construction efficiency of the U-shaped section, reduced the outfitting workload in the dry dock stage, ensured construction accuracy and safety, reduced hoisting risks, shortened the dry dock occupancy period, and improved the overall construction quality.
Smart Images

Figure CN123130179A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of shipbuilding technology, and specifically relates to a method for constructing a U-shaped section. Background Technology
[0002] In the field of chemical tanker construction, the U-shaped section of the cargo tank area is one of the core load-bearing structures of the ship. Essentially, it is the intermediate cargo tank on the actual ship, mainly assembled from the main deck, port and starboard longitudinal compartments, and transverse compartments, forming an inverted "U" shape. For a 49,000-ton chemical tanker, a typical U-shaped section measures 11m × 15m × 20m and weighs approximately 230t, making it a giant section in shipbuilding. The level of its construction technology directly affects the overall construction quality and efficiency of the ship.
[0003] However, the existing construction process for U-shaped sections faces numerous challenges, severely restricting construction accuracy, efficiency, and safety: Firstly, the U-shaped main section is large in volume and heavy in weight, which places extremely high demands on the load-bearing capacity of the slipway lifting equipment and poses a high risk for overall hoisting. At the same time, the special shape of this structure makes it relatively rigid and prone to deformation during overall construction, hoisting and transportation, resulting in great difficulty in precision control.
[0004] Secondly, the structures involving the liquid cargo tank surface in the U-shaped section are all made of duplex stainless steel. Although this material has excellent corrosion resistance, it is impossible to place lifting rings or additional reinforcing structures on the surface. Furthermore, during the lifting process, direct contact with lifting equipment such as wire ropes must be strictly avoided, otherwise it is easy to cause scratches and contamination of the material, affecting its corrosion resistance and structural safety, which brings great challenges to the design of the lifting process.
[0005] Thirdly, in the traditional construction model, after the U-shaped section is loaded onto the dry dock, the liquid cargo tank will form a closed space. At this time, the installation, debugging and maintenance of the internal outfitting components are carried out. The working space is extremely limited, which not only makes the operation difficult, but also makes it difficult to ensure the integrity and accuracy of the outfitting installation, and easily leaves safety hazards.
[0006] Fourth, due to the aforementioned problems, a large number of outfitting and subsequent adjustment operations are forced to be concentrated in the dock stage, resulting in long dock occupancy periods, numerous overlapping and interference operations, low overall construction efficiency, and inability to meet the needs of industrialized mass construction of ships.
[0007] Therefore, there is an urgent need for a construction method adapted to the characteristics of U-shaped main structure to solve problems such as the hoisting of giant structures, material protection and outfitting integrity, reduce the pressure of dock operations and improve construction efficiency and quality. Summary of the Invention
[0008] To achieve the above objectives, the present invention provides the following technical solution: A method for constructing a U-shaped section, the U-shaped section comprising a trough-shaped bulkhead section, a port longitudinal bulkhead section, a starboard longitudinal bulkhead section, and a deck section, the construction steps of the U-shaped section including: pre-completing the outfitting installation on the trough-shaped bulkhead section, the port longitudinal bulkhead section, the starboard longitudinal bulkhead section, and the deck section during independent construction stages; placing the deck section on the assembly jig and leveling it using the deck section as the construction base; hoisting the port longitudinal bulkhead section to a predetermined position perpendicular to the deck section and temporarily fixing the port longitudinal bulkhead section. Then weld it to the deck section; hoist the trough-shaped bulkhead to a position adjacent to the port side longitudinal bulkhead section and perpendicular to the deck section, temporarily fix the trough-shaped bulkhead, and then weld the trough-shaped bulkhead to the deck section and the port side section; hoist the starboard side longitudinal bulkhead section to a position opposite to the port side longitudinal bulkhead section and perpendicular to the deck section, temporarily fix the starboard side longitudinal bulkhead section, and complete the welding of the starboard side longitudinal bulkhead section to the trough-shaped bulkhead section, the port side longitudinal bulkhead section, and the deck section.
[0009] In some embodiments, the main assembly frame includes multiple dock piers and multiple ground piers, the dock piers being arranged corresponding to the longitudinal ribs on the outer wall of the deck section, and the ground piers being arranged corresponding to the T-shaped steel sections on the outer wall of the deck section.
[0010] In some embodiments, the temporary fixing method includes: tightening and fixing with guy ropes, and applying constraint welds at the connection between adjacent segments.
[0011] In some embodiments, the construction steps further include welding a spacer tube between the port side bulkhead section and the starboard side bulkhead section, the spacer tube being parallel to the deck section.
[0012] In some embodiments, the trough-shaped bulkhead section, the port side longitudinal bulkhead section, the starboard side longitudinal bulkhead section, and the deck section are all made of duplex stainless steel.
[0013] In some embodiments, the trough-shaped compartment segment is constructed using a special jig for trough-shaped compartments. The construction steps of the trough-shaped compartment segment include: placing the bow end face of the trough-shaped compartment segment on the special jig for trough-shaped compartments as a reference surface, and completing the welding and forming of the main structure; turning the trough-shaped compartment segment over for the first time, installing the pipes and supports on the bow end face of the trough-shaped compartment segment, and grinding the weld seams on the bow end face; turning the trough-shaped compartment segment over for the second time, installing the inclined ladder and working platform on the stern end face of the trough-shaped compartment segment, and grinding the weld seams on the bow end face again.
[0014] In some embodiments, the port side longitudinal bulkhead section and the starboard side longitudinal bulkhead section are constructed using a special jig for longitudinal bulkhead sections. Taking the port side longitudinal bulkhead section as an example, the construction steps include: using the port side longitudinal bulkhead of the port side longitudinal bulkhead section as a reference plane, placing it on the special jig for the longitudinal bulkhead section to complete the main structure construction and simultaneously install the outfitting components on the port side longitudinal bulkhead section; after grinding the welds of the port side longitudinal bulkhead section, turning it over, installing various outfitting components on the midship side longitudinal bulkhead section of the port side longitudinal bulkhead section, and grinding the welds of the midship side longitudinal bulkhead section.
[0015] In some embodiments, the deck section is constructed using a special deck section jig, and the construction steps include: placing it in a normal position on the special deck section jig and completing the welding of the main structure; After flipping the deck section to its reverse state, repairing the welds and welding defects, and installing the various outfitting components on the deck section.
[0016] In some embodiments, the special jig for the trough-shaped compartment, and / or the special jig for the longitudinal bulkhead section, and / or the special jig for the deck section are provided with stainless steel pads. During the construction of each section, the special jig for each section is isolated and supported from the section structure by the pre-installed stainless steel pads.
[0017] In some embodiments, the construction steps of the U-shaped section further include: after all segments of the U-shaped section have been welded together, the U-shaped section is hoisted and turned over to restore its designed mounting posture; temporary fixing devices are removed, and outfitting components at the joints between segments are installed in a concentrated manner.
[0018] Compared with the prior art, the construction method of the U-shaped section provided by the present invention has the following beneficial effects: 1. The construction method of the U-shaped section provided by the present invention moves most of the outfitting component installation work to the independent construction stage of each section, effectively solving the problem of outfitting operation restriction caused by the closed space formed by the liquid cargo tank after the U-shaped section is installed, greatly reducing the outfitting workload in the dock stage, significantly shortening the dock occupation period, and improving the overall construction efficiency. 2. The deck sections of the present invention establish a stable installation reference surface through the construction measures of "precise horizontal adjustment + special jig support + rigid fixing", which provides a precise reference for the positioning of each subsequent section; 3. Each section is equipped with a dedicated jig, whose structure is precisely matched to the section's shape and stress characteristics, effectively restraining deformation during construction. Simultaneously, stainless steel pads are placed between the jig and the section structure, providing isolation and protection, preventing scratches and contamination that could easily occur from direct contact between the jig and the duplex stainless steel structure. Furthermore, an unpainted design is used for the liquid cargo tank surface, avoiding compatibility issues between the coating layer and the duplex stainless steel material, thus protecting the performance of the duplex stainless steel while meeting the safety requirements for liquid cargo tank use. 4. The present invention adds a spacer tube between the port and starboard longitudinal bulkhead sections, which locks the distance between the port and starboard longitudinal bulkheads through a rigid structure, avoiding the shrinking or opening deformation of the U-shaped section in the width direction during the assembly process, and effectively solving the problems of easy deformation and difficult precision control of the giant U-shaped structure. 5. After each segment is hoisted and positioned, a combination of guy rope traction and temporary constraint welding is used to ensure that the segments do not shift during subsequent welding. The guy ropes provide flexible constraints to resist external loads and hoisting sway; the constraint welding forms a rigid temporary connection, keeping the segment and adjacent structures relatively stable during welding. This dual constraint mechanism ensures structural stability and weld joint quality during welding operations. Furthermore, this design also addresses the risks associated with direct contact or rigid support between traditional hoisting tools and duplex stainless steel surfaces. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the trough-shaped compartment segment provided by the present invention; Figure 2 This is a structural schematic diagram of the port side longitudinal bulkhead section provided by the present invention; Figure 3 A schematic diagram of the deck segment provided by the present invention; Figure 4 The layout diagram of the dock piers and ground piers provided by the present invention; Figure 5 A cross-sectional view of the U-shaped section provided by the present invention; Figure 6 One of the construction schematic diagrams of the U-shaped section provided by the present invention; Figure 7 The second schematic diagram of the construction of the U-shaped main section provided by the present invention; Figure 8 The third schematic diagram of the construction of the U-shaped section provided by the present invention.
[0020] Explanation of icon numbers: 1—Trough-shaped compartment section; 11—Trough-shaped compartment section special jig; 2—Port side longitudinal bulkhead section; 21—Port side longitudinal bulkhead section special frame; 3—Starboard longitudinal bulkhead section; 4—Deck section; 41—Deck section special jig; 5—Stainless steel pad; 51—Stainless steel pad for trough-shaped compartments; 52—Stainless steel pad for longitudinal bulkheads; 53—Stainless steel pad for deck sections; 6—Dock pier; 7—Ground pier; 8—Constraint weld; 9—Guard rope; 10—Spacing pipe; 11—Liquid cargo deck; 12—Outfitting components. Detailed Implementation
[0021] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the drawings described below are merely some embodiments of the present invention. For those skilled in the art, other drawings and other implementation methods can be obtained based on these drawings without any creative effort.
[0022] To keep the drawings concise, only the parts relevant to the invention are shown schematically in each drawing; they do not represent the actual structure of the product. Furthermore, to facilitate understanding, in some drawings, only one of components with the same structure or function is shown schematically, or only one is labeled.
[0023] In this document, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0024] This invention provides a method for constructing a U-shaped section, which includes a trough-shaped bulkhead section 1, a longitudinal bulkhead section, and a deck section 4. The longitudinal bulkhead section includes a port longitudinal bulkhead section 2 and a starboard longitudinal bulkhead section 3 located on both sides of the deck section 4. The construction steps are as follows: S1. Pre-installation of outfitting components 12: During the independent construction phases of the trough-shaped bulkhead section 1, the port longitudinal bulkhead section 2, the starboard longitudinal bulkhead section 3, and the deck section 4, the outfitting components 12 on each section are installed in advance.
[0025] S2. Construction of the main assembly base and positioning of deck section 4: Using deck section 4 as the construction base, hoist it upside down 180° and place it on the preset main assembly jig. Adjust the level of deck section 4 to form a stable and accurate two-dimensional coordinate reference surface.
[0026] Furthermore, deck section 4 has two sides. One side is the inner wall of the cargo tank (cargo tank surface 11) formed by the final U-shaped section, and the other side is the outer wall of the cargo tank. The outer wall has multiple longitudinal ribs and T-beams. The longitudinal ribs are densely arranged along the length of the ship (parallel to the center line of the deck). The T-beams are arranged along the width of the ship, perpendicular to the longitudinal ribs, to support the longitudinal ribs and bear and transmit the lateral loads of cargo, equipment and other items on deck section 4.
[0027] The aforementioned overall frame includes multiple dock piers 6 and multiple ground piers 7. The dock piers 6 are arranged at the longitudinal rib positions on the outer wall of the deck section 4, and the ground piers 7 are arranged at the T-shaped steel positions, respectively bearing the loads of the longitudinal ribs and T-shaped steel, ensuring that the support accurately matches the structural stress characteristics.
[0028] After the deck section 4 is positioned, channel steel is used to rigidly connect the end of the T-shaped steel to the pre-embedded iron in the ground, which effectively restricts the horizontal movement of the deck section 4 during the assembly process and ensures the stability of the reference plane.
[0029] S3, Port side longitudinal bulkhead section 2 assembly: The port side longitudinal bulkhead section 2 is hoisted and flipped 90°, and precisely hoisted to the preset installation position on the deck section 4, so that it is perpendicular to the deck section 4.
[0030] After positioning, the guy rope 9 is tightened and fixed to prevent the port side longitudinal bulkhead section 2 from deviating. First, a restraint weld 8 is applied between the port side longitudinal bulkhead section 2 and the deck section 4. After temporary fixation and stability, the crane can release the hook and complete the welding of the joint between the section and the deck section 4.
[0031] S4, Trough-shaped compartment section 1 assembly: Lift and rotate Trough-shaped compartment section 1 90° and move it to a preset position adjacent to port longitudinal compartment section 2, so that it is perpendicular to deck section 4.
[0032] After hoisting into place, use guy rope 9 to hold the end of the trough-shaped bulkhead section 1 near the starboard longitudinal bulkhead section 3 to prevent it from shifting. Immediately apply constraint weld 8 to the connection between the trough-shaped bulkhead section 1 and the port longitudinal bulkhead section 2 and the deck section 4 to achieve temporary fixation. After the crane releases the hook, complete the welding of the joint between the trough-shaped bulkhead section 1 and the deck section 4 and the port longitudinal bulkhead section 2.
[0033] S5, Starboard longitudinal bulkhead section 3 assembly: hoist and rotate starboard longitudinal bulkhead section 3 90°, and hoist it to a position opposite to port longitudinal bulkhead section 2, so that it is perpendicular to deck section 4.
[0034] After the starboard longitudinal bulkhead section 3 is positioned, it is tightened with guy ropes 9 to prevent deviation. Then, constraint welds 8 are quickly applied to the connection between the starboard longitudinal bulkhead section 3 and the adjacent trough-shaped bulkhead section 1 and deck section 4 for temporary fixation. After the crane is released, the joint between this section and other sections is completely welded.
[0035] Furthermore, a spacer tube 10 is welded between the port side bulkhead section 2 and the starboard side bulkhead section 3. The spacer tube 10 is parallel to the deck section 4 and is used to rigidly lock the width of the U-shaped section to prevent the U-shaped section from shrinking or opening during welding or hoisting.
[0036] S6. U-shaped section flipped over for mounting: After all the segments of the U-shaped section are fully assembled and welded, the whole section will be lifted and flipped 180° to restore it to the designed mounting posture, waiting for subsequent dock mounting operations.
[0037] S7. Finishing work: Remove all guy ropes 9, and complete the installation of outfitting components 12 at the cross-section joints, finally achieving the complete construction of the U-shaped section.
[0038] In some embodiments, the present invention also provides construction steps for the above four segments, specifically: Step S11, Construction of Trough-shaped Compartment Section 1: Construction is carried out using a customized special jig (Trough-shaped Compartment Section Special Jig 11). The special jig is equipped with a stainless steel pad 51 for the trough-shaped compartment, which contacts the section.
[0039] The main structure is constructed using the bow end face of the trough-shaped compartment section 1 as a reference surface.
[0040] After the main structure is stabilized, the first turning is carried out to install the tubes and supporting brackets on the bow end. At the same time, the stainless steel welds on the bow end are thoroughly ground to remove black spots and stains from the welding area and prevent impurities from affecting subsequent processes.
[0041] After completing the above operations, a second turning is performed, during which outfitting components 12, such as the inclined ladder and working platform on the stern end face, are installed. This installation sequence avoids interference from the inclined ladder and platform on subsequent section placement after the first turning, ensuring sufficient working space. After all outfitting components 12 are installed during the second turning, the stainless steel welds on the bow end face need to be checked and ground again to ensure that the welds are smooth and free of residual impurities, ultimately guaranteeing the structural integrity and precision of the trough-shaped bulkhead section 1 as an intermediate product.
[0042] Step S12: Construction of longitudinal bulkhead sections: The port side longitudinal bulkhead section 2 and the starboard side longitudinal bulkhead section 3 share a special frame for the bulkhead section adapted to their structure (the port side longitudinal bulkhead section special frame 21 and the starboard side longitudinal bulkhead section special frame), and the stainless steel pad 52 of the longitudinal bulkhead is installed on the special frame.
[0043] During construction, the frame is built on the midship longitudinal bulkhead as the reference surface, and various outfitting components 12 on the midship longitudinal bulkhead are installed simultaneously.
[0044] Before turning over, the stainless steel welds on the longitudinal bulkheads facing the side must be finely ground to remove black spots and stains produced by welding, so as to avoid impurities adhering to or damaging the welds during the turning over process.
[0045] Then, a turning operation was performed, switching to the midship side, and various outfitting components 12 facing midship were installed. After the outfitting components 12 were installed, the stainless steel welds on the midship longitudinal bulkhead, as well as the new black spots and welding slag generated during the welding process of the outfitting components 12, were thoroughly ground and cleaned to ensure the weld quality and structural integrity of the longitudinal bulkhead sections.
[0046] Step S13, Construction of Deck Section 4: Deck section 4 is constructed using a special jig (deck section special jig 41). Initially, it is hoisted onto the jig in a normal position (i.e., the exposed side for personnel to walk or work is facing upwards). Stainless steel pads 53 for the deck section are installed on the special jig.
[0047] Complete the large-scale welding of the main structure; since some welding blind spots are difficult to handle under normal posture, the sections need to be turned to reverse posture to repair the welds and welding defects.
[0048] After the welding repair is completed, the stainless steel welds on one side of the cargo tank are finely ground to completely remove black spots, stains, and welding slag residue from the welded areas, ensuring the flatness and corrosion resistance of the cargo tank surface 11. Finally, various outfitting components 12 on the deck section 4 are installed.
[0049] It should be noted that the construction processes of the aforementioned trough-shaped bulkhead section 1, port longitudinal bulkhead section 2, starboard longitudinal bulkhead section 3, and deck section 4 can be carried out in parallel without having to proceed sequentially, thereby effectively shortening the overall assembly cycle of the U-shaped section and improving the overall construction efficiency.
[0050] Furthermore, both the port side longitudinal bulkhead section 2 and the starboard side longitudinal bulkhead section 3 are coated with a surface coating based on the hull surface to ensure uniform coverage of the non-liquid cargo tank area and improve corrosion resistance.
[0051] Deck section 4 is coated in a normal orientation, meaning the exposed side for workers to walk or work on faces upwards. Areas of deck section 4 that are not on the cargo hold surface 11 do not require coating. Tank-shaped compartment section 1 does not require coating.
[0052] The aforementioned trough-shaped bulkhead section 1, port side longitudinal bulkhead section 2, starboard side longitudinal bulkhead section 3, and deck section 4 are all made of duplex stainless steel, a material with excellent corrosion resistance. During the construction of each section, direct contact between the jig and the section structure is strictly prohibited. Therefore, stainless steel pads 5 must be pre-installed at the contact points of the jig. These pads provide isolation and support, preventing scratches caused by friction between the jig and the section structure, and also preventing the jig material from contaminating the surface of the duplex stainless steel.
[0053] The above are merely preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A method for constructing a U-shaped main section, characterized in that, The U-shaped section includes trough-shaped bulkhead sections, port side longitudinal bulkhead sections, starboard side longitudinal bulkhead sections, and deck sections. The construction steps of the U-shaped section include: During the independent construction phases of the trough-shaped bulkhead section, the port longitudinal bulkhead section, the starboard longitudinal bulkhead section, and the deck section, the outfitting components on them are installed in advance. Using the aforementioned deck sections as the construction base, they are placed on the main assembly frame and leveled; The port side bulkhead section is hoisted to a preset position perpendicular to the deck section, the port side bulkhead section is temporarily fixed, and then welded to the deck section. The trough-shaped bulkhead is hoisted to a position adjacent to the port side longitudinal bulkhead section and perpendicular to the deck section. The trough-shaped bulkhead is temporarily fixed and then welded to the deck section and the port side section. The starboard bulkhead section is hoisted to a position opposite to the port side bulkhead section and perpendicular to the deck section. After the starboard bulkhead section is temporarily fixed, the welding of the starboard bulkhead section to the trough-shaped bulkhead section, the port side bulkhead section, and the deck section is completed.
2. The construction method of the U-shaped section according to claim 1, characterized in that, The overall assembly frame includes multiple dock piers and multiple ground piers. The dock piers are arranged corresponding to the longitudinal ribs on the outer wall of the deck section, and the ground piers are arranged corresponding to the T-shaped steel on the outer wall of the deck section.
3. The construction method of the U-shaped section according to claim 1, characterized in that, The temporary fixing methods include: tightening and fixing with guy ropes, and welding constraint welds at the connection points of adjacent segments.
4. The construction method of the U-shaped section according to claim 1, characterized in that, The construction steps also include welding a spacer tube between the port side bulkhead section and the starboard side bulkhead section, the spacer tube being parallel to the deck section.
5. The construction method of the U-shaped section according to claim 1, characterized in that, The trough-shaped bulkhead section, the port side longitudinal bulkhead section, the starboard side longitudinal bulkhead section, and the deck section are all made of duplex stainless steel.
6. The construction method of the U-shaped section according to claim 1, characterized in that, The trough-shaped compartment sections are constructed using a special trough-shaped compartment jig, and the construction steps for the trough-shaped compartment sections include: Using the bow end face of the trough-shaped compartment segment as a reference surface, the main structure is placed on the special jig for the trough-shaped compartment to complete the welding and forming of the main structure; The trough-shaped compartment section is turned over for the first time, the pipes and supports on the bow end face of the trough-shaped compartment section are installed, and the welds on the bow end face are ground. The trough-shaped compartment section is flipped over a second time, and the inclined ladder and working platform on the stern end face of the trough-shaped compartment section are installed. The weld seam on the bow end face is then ground again.
7. The construction method of the U-shaped section according to claim 1, characterized in that, The port side longitudinal bulkhead section and the starboard side longitudinal bulkhead section are constructed using a special jig for longitudinal bulkhead sections. Taking the port side longitudinal bulkhead section as an example, the construction steps include: Using the port side longitudinal bulkhead of the longitudinal bulkhead section as the reference plane, the main structure is constructed and the outfitting components on the port side longitudinal bulkhead are installed simultaneously on the special jig for the longitudinal bulkhead section. After grinding the welds on the midships longitudinal bulkhead, the structure is turned over, and various outfitting components on the midships longitudinal bulkhead of the port side longitudinal bulkhead are installed. The welds on the midships longitudinal bulkhead are then ground.
8. The construction method of the U-shaped section according to claim 1, characterized in that, The deck sections are constructed using a special deck section jig, and the construction steps include: The main structure is welded together by placing it in a normal orientation onto the special jig for the deck section. After flipping the deck section to its reverse state, repairing the welds and welding defects, and installing the various outfitting components on the deck section.
9. The construction method of the U-shaped section according to claim 8, characterized in that, The special jig for the trough-shaped compartment, and / or the special jig for the longitudinal bulkhead section, and / or the special jig for the deck section are equipped with stainless steel pads. During the construction of each section, the special jig for each section is isolated and supported from the section structure by the pre-installed stainless steel pads.
10. The method for constructing the U-shaped section according to claim 1, characterized in that, The construction steps of the U-shaped section also include: after all the sub-sections of the U-shaped section are fully assembled and welded, the U-shaped section is hoisted and turned over to restore its designed mounting posture; Remove temporary fixing devices and complete the installation of outfitting components at the cross-section joints.