Silicon-carbon negative electrode material preparation gas supply system and method
By designing a gas supply system for silicon-carbon anode material preparation and utilizing emergency shut-off valves and nitrogen protective purging, the safety hazards of combustion and explosion in the industrial production of silicon-carbon anode material vapor deposition were solved, achieving safe and stable large-scale and continuous production.
Patent Information
- Application Number
- CN202611310399.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-20
AI Technical Summary
The existing technology for industrial production of silicon-carbon anode materials by vapor deposition poses significant safety hazards related to combustion and explosion, affecting its large-scale and continuous safe production.
A gas supply system for the preparation of silicon-carbon anode materials was designed, including at least two parallel control components and an emergency stop component. By setting an emergency shut-off valve and nitrogen protection purging, the gas source is quickly shut off and the inert positive pressure inside the furnace is maintained under abnormal operating conditions to prevent air backflow from causing an explosion.
This effectively avoids the risk of combustion and explosion during the vapor deposition process of silicon-carbon anode materials, ensuring the safety and stability of production and supporting its large-scale and continuous production.
Smart Images

Figure CN123132840A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of silicon-carbon anode material preparation technology, specifically to a gas supply system and method for preparing silicon-carbon anode materials. Background Technology
[0002] In the vapor deposition process of silicon-carbon anode materials, nanoscale silicon needs to be deposited in the porous carbon pores of the raw material. Since nanoscale silicon is highly reactive and easily oxidized and burned in air, it needs to be protected by carbon coating before it can be used as a battery anode material.
[0003] During the reaction process, dust typically accumulates in pipelines and inside exhaust tanks along with the exhaust gas, easily causing pipeline blockage, affecting process stability, causing localized high temperatures, excessively rapid acetylene gas cracking, and the accumulation of combustible dust which, when exposed to high temperatures and even a small amount of open flame, can easily trigger a violent reaction and explosion, leading to a secondary dust explosion. Currently, mainstream rotary kiln production lines in the industry lack dedicated pressure relief protection structures, have no emergency pressure relief channels after pressure exceeds limits, and lack targeted explosion-proof dust collection structures, significantly increasing the safety risks of mass production of silicon-carbon anodes.
[0004] Therefore, there is an urgent need for a gas supply system and method for the preparation of silicon-carbon anode materials, in order to solve the problem that there are obvious safety hazards of combustion and explosion in the industrial production of silicon-carbon anode materials by vapor deposition, which affects the safe production of silicon-carbon anode materials on a large scale and continuously. Summary of the Invention
[0005] The purpose of this invention is to overcome the above-mentioned technical deficiencies and propose a gas supply system and method for the preparation of silicon-carbon anode materials, thereby solving the technical problem that the industrial production of silicon-carbon anode materials by vapor deposition has obvious safety hazards of combustion and explosion, which affects the safe production of silicon-carbon anode materials on a large scale and continuously.
[0006] To achieve the above-mentioned technical objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a gas supply system for the preparation of silicon-carbon anode materials, configured to be connected to the furnace body of a rotary kiln, comprising: At least three air intakes; At least two first control components and second control components are arranged in parallel. The first control component or the second control component respectively includes a first manual valve, a first pressure gauge, a first pressure regulating valve, a first pneumatic valve, a first flow controller, a first check valve and a second pneumatic valve, which are connected to the air inlet and arranged sequentially along the gas flow direction. The air outlet is connected to the furnace body, and the air outlet is connected to three second pneumatic valves respectively; The emergency shut-off valve is connected to all three second pneumatic valves and the outlet; and The emergency stop assembly is connected to the air inlet and the air outlet of the second control assembly and is configured for nitrogen protection purging.
[0007] In some embodiments, the second control component further includes a third pneumatic valve disposed between the first pressure regulating valve and the first pneumatic valve, for connecting or disconnecting the first pressure regulating valve and the first pneumatic valve.
[0008] In some embodiments, the gas supply system for preparing silicon-carbon anode materials further includes a calibration component, which includes a second manual valve, a second pressure regulating valve, a second pressure gauge, a flow meter, and a fourth pneumatic valve arranged in sequence. The second manual valve is connected to the first pneumatic valve of the second control component, and the fourth pneumatic valve is disposed between the first pressure regulating valve and the first pneumatic valve for connecting or disconnecting the flow meter and the first pneumatic valve.
[0009] In some embodiments, the gas supply system for preparing silicon-carbon anode materials further includes a standby component, which includes at least one standby element, a fifth pneumatic valve and a pressure sensor. One end of the fifth pneumatic valve is connected to the third or fourth pneumatic valve, and the other end is connected to a first flow controller of at least one of the first control components. The pressure sensor is disposed on the fifth pneumatic valve.
[0010] In some embodiments, the standby component further includes a second one-way valve, which is disposed between the fifth pneumatic valve and the third or fourth pneumatic valve and is capable of connecting or disconnecting the fifth pneumatic valve and the third or fourth pneumatic valve.
[0011] In some embodiments, the number of standby devices is two, and the two fifth pneumatic valves are respectively connected to the first flow controllers of the two first control components.
[0012] In some embodiments, the emergency stop assembly includes a third one-way valve and a sixth pneumatic valve arranged in sequence. The third one-way valve is arranged in parallel with the first pneumatic valve of the second control assembly and is connected to the third or fourth pneumatic valve. The sixth pneumatic valve is connected to the air outlet.
[0013] In some embodiments, the gas supply system for preparing silicon-carbon anode materials further includes a temperature sensor connected to the gas outlet of the furnace body.
[0014] In some embodiments, the gas outlet has an explosion vent, and the gas supply system for preparing silicon-carbon anode materials further includes an explosion venting component. The explosion venting component includes a rupture disc and a dust collection bag. The rupture disc is detachably connected to the explosion venting opening for sealing the explosion venting opening, and the dust collection bag covers the explosion venting opening and is detachably connected to the gas outlet.
[0015] Secondly, the present invention provides a gas supply method for preparing silicon-carbon anode materials, using a gas supply system for preparing silicon-carbon anode materials as described in any of the above-mentioned methods, the specific steps of which are as follows: The gas supply is independent, with one first control component controlling the gas to be connected to the gas outlet in sequence along the gas inlet, first manual valve, first pressure gauge, first pressure regulating valve, first pneumatic valve, first flow controller, first check valve, second pneumatic valve and emergency shut-off valve, while the other first control component and second control component are both disconnected from the gas outlet. Simultaneously supplying gas, one first control component is disconnected from the gas outlet, and the other first control component and second control component control the gas to be connected to the gas outlet in sequence along the gas inlet, first manual valve, first pressure gauge, first pressure regulating valve, first pneumatic valve, first flow controller, first check valve, second pneumatic valve and emergency shut-off valve respectively; The calibration process involves the second control component controlling the gas to flow sequentially from the inlet end through the second manual valve, the second pressure regulating valve, the second pressure gauge, the flow meter, and the fourth pneumatic valve, and then connecting to the first pneumatic valve, the first flow controller, the first check valve, the second pneumatic valve, and the emergency shut-off valve to the outlet end. In standby mode, the second control component controls the gas to pass sequentially through the first manual valve, the first pressure gauge, the first pressure regulating valve, the third pneumatic valve, and the second check valve along the inlet end, and then through two fifth pneumatic valves and two pressure sensors to enter the first flow controller, the first check valve, and the second pneumatic valve of the two first control components, and finally connects to the outlet end through the emergency shut-off valve. In case of emergency stop, the second control component controls the gas to flow sequentially from the inlet end through the first manual valve, the first pressure gauge, the first pressure regulating valve, and the third pneumatic valve, and then connects to the outlet end through the third check valve and the sixth pneumatic valve.
[0016] Compared with the prior art, the beneficial effects of the silicon-carbon anode material preparation gas supply system and method provided by the present invention include: at least two first control components and second control components are arranged in parallel, the two first control components are used to control the supply of raw material gas into the furnace, the second control components are used to control the supply of inert protective gas into the furnace, and three second pneumatic valves are all connected to the gas outlet, and an emergency shut-off valve is provided between the three second pneumatic valves and the gas outlet of the furnace, and an emergency stop component is connected to the gas inlet and gas outlet connected to the second control components and configured for nitrogen protection purging. Compared to existing technologies, this method supplies raw material gas and inert protective gas to the furnace through at least two first control components and a second control component, respectively. Emergency shut-off valves are installed at the connections between the three gas inlets and outlets, which can quickly cut off the gas source in case of abnormal operating conditions. At the same time, the emergency stop component can purge the main output pipeline with nitrogen protection to maintain the inert positive pressure inside the furnace, effectively preventing air backflow that could cause an explosion inside the furnace. This method can solve the technical problem in existing technologies where there are obvious safety hazards of combustion and explosion in the industrial production of silicon-carbon anode materials through vapor deposition, which affects the safe production of silicon-carbon anode materials on a large scale and continuously. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode material according to an embodiment of the present invention; Figure 2 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode materials according to another embodiment of the present invention; Figure 3 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode material according to another embodiment of the present invention; Figure 4 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode materials according to another embodiment of the present invention; Figure 5 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode materials according to another embodiment of the present invention; Figure 6 This is a schematic diagram of a gas supply system for preparing silicon-carbon anode material according to another embodiment of the present invention; Figure 7 This is a schematic diagram showing the connection between a temperature sensor and a connecting body and an explosion relief assembly according to another embodiment of the present invention; Figure 8 This is a cross-sectional view of the temperature sensor connected to the connecting body and the explosion relief assembly according to another embodiment of the present invention.
[0018] Explanation of reference numerals in the attached figures: First control component 100; air inlet 110; first manual valve 120; first pressure gauge 130; first pressure regulating valve 140; first pneumatic valve 150; first flow controller 160; first check valve 170; second pneumatic valve 180; second control component 200; third pneumatic valve 210; air outlet 300; emergency shut-off valve 400; emergency stop component 500; third check valve 510; sixth pneumatic valve 520; orifice gasket 530; calibration component 600; second manual valve 610; second pressure regulating valve 620; second pressure gauge 630; flow meter 640; fourth pneumatic valve 650; standby component 700; standby device 710; fifth pneumatic valve 711; pressure sensor 712; second check valve 720; temperature sensor 800; explosion relief component 900; rupture disc 910; dust collection bag 920; connecting body 1000. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0020] To address the significant safety hazards of combustion and explosion in the industrial production of silicon-carbon anode materials via vapor deposition, which affect the safe large-scale and continuous production of silicon-carbon anode materials, this invention provides a gas supply system and method for silicon-carbon anode material preparation. The system can supply raw material gas and inert protective gas to the furnace through at least two first control components 100 and a second control component 200, respectively. Emergency shut-off valves 400 are installed at the connections between the three inlet ends 110 and the outlet ends 300, which can quickly cut off the gas supply in case of abnormal operating conditions. Simultaneously, an emergency stop component 500 can perform nitrogen protection purging on the main output pipeline to maintain positive inert pressure inside the furnace, effectively preventing air backflow and subsequent furnace explosion.
[0021] Please see Figures 1 to 6 , Figure 1This is a schematic diagram of a gas supply system and method for preparing silicon-carbon anode materials according to an embodiment of the present invention. The gas supply system for preparing silicon-carbon anode materials is configured to be connected to the furnace body of a rotary kiln, including: at least two first control components 100 and second control components 200 arranged in parallel, a gas outlet 300, an emergency shut-off valve 400, and an emergency stop component 500. The first control component 100 or the second control component 200 includes a first manual valve 120 connected to the gas inlet 110 and arranged sequentially along the gas flow direction. The system includes a first pressure gauge 130, a first pressure regulating valve 140, a first pneumatic valve 150, a first flow controller 160, a first check valve 170, and a second pneumatic valve 180. The outlet end 300 is connected to the furnace body and is also connected to the three second pneumatic valves 180 respectively. The emergency shut-off valve 400 is connected to the three second pneumatic valves 180 and the outlet end 300. The emergency stop assembly 500 is connected to the inlet end 110 and the outlet end 300 of the second control assembly 200 and is configured for nitrogen protection purging.
[0022] Compared with the prior art, this device supplies raw material gas and inert protective gas to the furnace through at least two first control components 100 and a second control component 200, respectively. An emergency shut-off valve 400 is provided at the connection between the three gas inlet ends 110 and the gas outlet ends 300. In case of abnormal operating conditions, the gas source can be quickly cut off. At the same time, the emergency stop component 500 can purge the main output pipeline with nitrogen protection to maintain the inert positive pressure in the furnace and effectively prevent air backflow from causing an explosion in the furnace. This can solve the technical problem in the prior art that there are obvious safety hazards of combustion and explosion in the industrial production of silicon-carbon anode material vapor deposition, which affects the safe production of silicon-carbon anode material on a large scale and continuously.
[0023] Furthermore, the rotary kiln here is a common and readily available piece of equipment on the market. As a core material for breaking through the energy density bottleneck of lithium-ion batteries, the industrial preparation process of silicon-carbon anode material includes deposition and coating carried out in sequence. Typically, the production process of silicon-carbon anode material involves first depositing nanoscale silicon in porous carbon pores, and then coating carbon on the silicon. For example, the Chinese invention patent with publication number CN118345345A is entitled: A vapor deposition coating rotary kiln, which will not be elaborated here.
[0024] In some embodiments, the air inlet 110, the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the first pneumatic valve 150, the first flow controller 160, the first check valve 170, and the second pneumatic valve 180 are respectively common and readily available manual valves, pressure gauges, pressure regulating valves, pneumatic valves, flow controllers, and check valves. Meanwhile, the inert protective gas here is a conventional setting known to those skilled in the art, and will not be described in detail here.
[0025] In this configuration, the first pneumatic valve 150 and the second pneumatic valve 180 of the first control component 100 and the second control component 200 are both in a normally closed state.
[0026] Furthermore, the two air inlets connected to the two first control components 100 are used to input raw material gas, while the air inlet connected to the second control component 200 is used to supply inert protective gas, which will not be described in detail here.
[0027] In one embodiment, such as Figure 1 , Figure 3 and Figure 4 As shown, the second control component 200 also includes a third pneumatic valve 210, which is disposed between the first pressure regulating valve 140 and the first pneumatic valve 150, and is used to connect or disconnect the first pressure regulating valve 140 and the first pneumatic valve 150.
[0028] By setting a third pneumatic valve 210, the inert protective gas can be controlled.
[0029] Furthermore, the third pneumatic valve 210 here is a common and readily available pneumatic valve on the market.
[0030] In some embodiments, the third pneumatic valve 210 is normally open.
[0031] In one embodiment, such as Figure 1 and Figure 5 As shown, the gas supply system for preparing silicon-carbon anode materials also includes a calibration component 600. The calibration component 600 includes a second manual valve 610, a second pressure regulating valve 620, a second pressure gauge 630, a flow meter 640, and a fourth pneumatic valve 650 arranged in sequence. The second manual valve 610 is connected to the first pneumatic valve 150 of the second control component 200. The fourth pneumatic valve 650 is disposed between the first pressure regulating valve 140 and the first pneumatic valve 150 and is used to connect or disconnect the flow meter 640 and the first pneumatic valve 150.
[0032] By setting a second manual valve 610, a second pressure regulating valve 620, a second pressure gauge 630, a flow meter 640, and a fourth pneumatic valve 650 on the second control component 200, a calibration function can be realized, which can improve the safety and stability of the gas supply system.
[0033] Furthermore, the second manual valve 610, the second pressure regulating valve 620, the second pressure gauge 630, the flow meter 640, and the fourth pneumatic valve 650 are common and readily available manual valves, pressure regulating valves, pressure gauges, flow meters, and pneumatic valves on the market, which will not be described in detail here.
[0034] In some embodiments, the fourth pneumatic valve 650 is normally closed.
[0035] In one embodiment, such as Figure 1 , Figure 4 As shown, the gas supply system for silicon-carbon anode material preparation also includes a standby component 700. The standby component 700 includes at least one standby element 710. The standby element 710 includes a fifth pneumatic valve 711 and a pressure sensor 712. One end of the fifth pneumatic valve 711 is connected to a third pneumatic valve 210 or a fourth pneumatic valve 650, and the other end is connected to a first flow controller 160 of at least one first control component 100. The pressure sensor 712 is disposed on the fifth pneumatic valve 711.
[0036] By setting a fifth pneumatic valve 711 and a pressure sensor 712 on the second control component 200, a standby function can be realized, thereby ensuring the stability and safety of other parts of the furnace during normal shutdown or standby.
[0037] Furthermore, the fifth pneumatic valve 711 and the pressure sensor 712 here are common and readily available pneumatic valves and pressure sensors 712 on the market, which will not be described in detail here.
[0038] Furthermore, in some embodiments, the fifth pneumatic valve 711 is normally closed.
[0039] In one embodiment, such as Figure 1 , Figure 4 As shown, the standby component 700 also includes a second one-way valve 720, which is disposed between the fifth pneumatic valve 711 and the third pneumatic valve 210 or the fourth pneumatic valve 650, and is capable of connecting or disconnecting the fifth pneumatic valve 711 and the third pneumatic valve 210 or the fourth pneumatic valve 650.
[0040] By setting a second one-way valve 720, the gas can be selectively controlled to enter standby mode or normal gas supply mode.
[0041] Furthermore, the second check valve 720 here is a common and readily available check valve on the market, and will not be described in detail here.
[0042] In one embodiment, such as Figure 4 As shown, there are two standby components 710, and the two fifth pneumatic valves 711 can be connected to the first flow controllers 160 of the two first control components 100 respectively.
[0043] By setting two standby components 710, both first control components 100 can accept the inert protective gas from the second control component 200, thereby improving the integrity and stability in the standby state.
[0044] In one embodiment, such as Figure 1 , Figure 6As shown, the emergency stop assembly 500 includes a third check valve 510 and a sixth pneumatic valve 520 arranged in sequence. The third check valve 510 is arranged in parallel with the first pneumatic valve 150 of the second control assembly 200 and is connected to the third pneumatic valve 210 or the fourth pneumatic valve 650. The sixth pneumatic valve 520 is connected to the air outlet 300.
[0045] By setting the third one-way valve 510 and the sixth pneumatic valve 520, nitrogen protection purging can be performed on the main output pipeline when the emergency shut-off valve 400 is working, maintaining the inert positive pressure inside the furnace and effectively preventing air backflow from causing an explosion inside the furnace.
[0046] Furthermore, the third check valve 510 and the sixth pneumatic valve 520 are common and readily available devices on the market, and will not be described in detail here.
[0047] In some embodiments, the sixth pneumatic valve 520 is normally open.
[0048] In addition, in some implementations, such as Figure 1 , Figure 6 As shown, a small hole gasket 530 is also provided between the third one-way valve 510 and the sixth pneumatic valve 520. The small hole gasket 530 has a small hole of a preset size, which can effectively achieve low flow purging through the flow limiting orifice plate, maintain the inert positive pressure in the furnace, and prevent air backflow.
[0049] Furthermore, the small hole gasket 530 here is a common and readily available perforated gasket on the market. Users can choose the appropriate type according to the specific application scenario, which will not be elaborated here.
[0050] In one embodiment, such as Figure 7 , Figure 8 As shown, the gas supply system for silicon-carbon anode material preparation also includes a temperature sensor 800, which is connected to the gas outlet 300 of the furnace body.
[0051] By monitoring the exhaust gas temperature at the furnace outlet in real time at 300°C, runaway faults such as abnormal reactions and carbon powder accumulation inside the furnace can be quickly identified, thus avoiding product scrapping and preventing safety accidents caused by overheating and overpressure.
[0052] Furthermore, the furnace tail temperature detected by the temperature sensor 800 is positively correlated with the furnace internal temperature. When the furnace tail temperature exceeds the preset value, the furnace internal temperature will be abnormal, which will not be elaborated here.
[0053] In another embodiment, the temperature sensor 800 is a common and readily available device on the market, and will not be described in detail here.
[0054] In one embodiment, such as Figure 7 , Figure 8As shown, the gas outlet 300 has an explosion vent. The gas supply system for preparing silicon-carbon anode materials also includes an explosion vent component 900, which includes a rupture disc 910 and a dust collection bag 920. The rupture disc 910 is detachably connected to the explosion vent and is used to seal the explosion vent. The dust collection bag 920 covers the explosion vent and is detachably connected to the gas outlet 300.
[0055] By installing a rupture disc 910, in the event of a flash explosion inside the furnace, the rupture disc 910 will rupture before the joint, thus preventing an explosion inside the furnace.
[0056] Furthermore, by installing a dust collection hood at the explosion vent opening, dust and gas leaking out along the explosion vent opening can be collected after a flash explosion, thus preventing secondary damage.
[0057] In some embodiments, the tail of the furnace body is provided with a connecting body 1000. The connecting body 1000 is hollow inside and has a first opening that communicates with the tail of the rotary kiln and a second opening that communicates with the hopper. The connecting body 1000 also has a third opening that communicates with its interior. This third opening is an explosion relief opening.
[0058] Furthermore, the rupture disc 910 is positioned relative to the third opening and is detachably connected to the connecting body 1000 to seal the third opening. When the pressure inside the rotary kiln exceeds a preset value, the rupture disc 910 can rupture preferentially before the kiln body, so that the pressure inside the rotary kiln can be released outward along the third opening.
[0059] In some embodiments, the first opening, the second opening and the third opening are respectively extended in a direction away from the connecting body 1000 and are respectively formed with a first extension, a second extension and a third extension. The explosion relief assembly 900 also includes a collection bag, the open end of which is sleeved on the third extension and the rupture disc 910 and is detachably connected to the connecting body 1000.
[0060] Furthermore, the gas supply system for preparing silicon-carbon anode materials also includes a connector, which includes a fixing ring and multiple connecting parts. The fixing ring is concentrically arranged with the third extension and is fixedly connected to the third extension. The multiple connecting parts are spaced apart along the circumferential direction of the third opening and are connected to both the fixing ring and the opening end of the collection bag.
[0061] In some embodiments, the connector also includes a pressure ring, which is detachably connected to a fixing ring via multiple connecting parts. The open end of the collection bag is located between the pressure ring and the fixing ring and is pressed against both the pressure ring and the fixing ring.
[0062] Furthermore, the fixing ring has multiple threaded holes along its circumference, and the opening ends of the pressure ring and the collection bag have a first connecting hole and a second connecting hole respectively relative to the threaded holes. The connecting part has a large diameter section and a threaded section. The threaded section of the connecting part passes through the second connecting hole and the first connecting hole in sequence and is detachably connected to the threaded hole.
[0063] In some embodiments, the fixing ring has at least one groove relative to the pressure ring, and the connector also includes at least one abutment block, which is disposed relative to the groove and connected to the pressure ring, and the pressure ring can push the open end portion of the collection bag into the groove.
[0064] Furthermore, there are multiple grooves, which are spaced apart along the circumference of the fixing ring, and the abutment block is configured to cooperate with the groove.
[0065] Furthermore, in some embodiments, the length of the collection bag is extendable.
[0066] Furthermore, the explosion relief assembly 900 also includes a guide rod and multiple slip rings. One end of the guide rod is connected to the third extension and the other end is arranged along the extension direction of the third extension. The multiple slip rings are slidably sleeved on the guide rod and are all connected to the collection bag for extending along the direction of the collection bag along the guide rod.
[0067] This invention also provides a method for preparing a gas supply system using silicon-carbon anode material, and the specific steps are as follows: With independent gas supply, one first control component 100 controls the gas to be connected to the gas outlet 300 in sequence along the gas inlet 110, the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180 and the emergency shut-off valve 400, while the other first control component 100 and the second control component 200 are both disconnected from the gas outlet 300; Simultaneously, gas is supplied, with one first control component 100 disconnected from the gas outlet 300, and the other first control component 100 and second control component 200 controlling the gas to be connected to the gas outlet 300 in sequence along the gas inlet 110, the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180 and the emergency shut-off valve 400; During calibration, the second control component 200 controls the gas to flow along the inlet end 110 sequentially through the second manual valve 610, the second pressure regulating valve 620, the second pressure gauge 630, the flow meter 640, and the fourth pneumatic valve 650, and connects with the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180, and the emergency shut-off valve 400 to the outlet end 300; In standby mode, the second control component 200 controls the gas to flow sequentially along the inlet end 110 through the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the third pneumatic valve 210, and the second check valve 720. The gas then enters the first flow controller 160, the first check valve 170, and the second pneumatic valve 180 of the two first control components 100 through the two fifth pneumatic valves 711 and the two pressure sensors 712, respectively. Finally, the gas is connected to the outlet end 300 through the emergency shut-off valve 400. In case of emergency stop, the second control component 200 controls the gas to flow sequentially along the inlet end 110 through the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, and the third pneumatic valve 210, and then connects to the outlet end 300 through the third check valve 510 and the sixth pneumatic valve 520.
[0068] In this embodiment, production safety issues are addressed through improvements to the gas supply process and process safety formula, the addition of furnace tail gas temperature detection to the discharge pipe, the addition of explosion relief diaphragms and dust collection bags (920 structure) to the discharge pipe, and the implementation of a standardized safety process flow including inert gas dilution and replacement, pressure monitoring, temperature monitoring, and shutdown purging. This addresses three aspects: gas flow rate and process intervention control, overpressure explosion relief, and dust collection to prevent disasters. The core improvements to the entire process include regulating the process gas flow rate based on feedback from the furnace tail gas phase temperature, inert gas dilution and cooling, purging carbon powder accumulation, and controlling the reaction intensity.
[0069] Furthermore, explosion relief diaphragms are installed at key locations such as the rotary kiln discharge pipe and tail gas tank to achieve automatic pressure relief in case of overpressure; high-temperature glass fiber dust collection bags are installed at the explosion relief vents to capture combustible dust and prevent its spread; and a dedicated temperature sensor 800 is installed at the tail of the furnace to monitor the tail gas temperature in real time and quickly identify runaway faults such as abnormal reactions and carbon powder accumulation in the furnace, which not only avoids product scrapping but also prevents safety accidents caused by overheating and overpressure.
[0070] To better understand this invention, the following is combined with... Figures 1 to 8 The technical solution of the present invention will be described in detail below: At least two first control components 100 and a second control component 200 are arranged in parallel. The two first control components 100 are used to supply raw material gas into the furnace body, and the second control component 200 is used to supply inert protective gas into the furnace body. All three second pneumatic valves 180 are connected to the gas outlet 300, and an emergency shut-off valve 400 is provided between the three second pneumatic valves 180 and the gas outlet 300 of the furnace body. An emergency stop component 500 is connected to the gas inlet 110 and the gas outlet 300 of the second control component 200 and is configured for nitrogen protective purging. Compared to existing technologies, the furnace supplies raw material gas and inert protective gas to the furnace through at least two first control components 100 and a second control component 200 respectively, and an emergency shut-off valve 400 is provided at the connection between the three gas inlet ends 110 and the gas outlet ends 300. In case of abnormal operating conditions, the gas source can be quickly cut off. At the same time, the emergency stop component 500 can purge the main output pipeline with nitrogen protection to maintain the inert positive pressure in the furnace and effectively prevent air backflow from causing an explosion in the furnace.
[0071] In the specific working process of this invention, gas is supplied separately. One first control component 100 controls the gas to be connected to the gas outlet 300 in sequence through the gas inlet 110, the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180 and the emergency shut-off valve 400. Meanwhile, the other first control component 100 and the second control component 200 are both disconnected from the gas outlet 300. Simultaneously, gas is supplied, with one first control component 100 disconnected from the gas outlet 300, and the other first control component 100 and second control component 200 controlling the gas to be connected to the gas outlet 300 in sequence along the gas inlet 110, the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180 and the emergency shut-off valve 400; During calibration, the second control component 200 controls the gas to flow along the inlet end 110 sequentially through the second manual valve 610, the second pressure regulating valve 620, the second pressure gauge 630, the flow meter 640, and the fourth pneumatic valve 650, and connects with the first pneumatic valve 150, the first flow controller 160, the first check valve 170, the second pneumatic valve 180, and the emergency shut-off valve 400 to the outlet end 300; In standby mode, the second control component 200 controls the gas to flow sequentially along the inlet end 110 through the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, the third pneumatic valve 210, and the second check valve 720. The gas then enters the first flow controller 160, the first check valve 170, and the second pneumatic valve 180 of the two first control components 100 through the two fifth pneumatic valves 711 and the two pressure sensors 712, respectively. Finally, the gas is connected to the outlet end 300 through the emergency shut-off valve 400. In case of emergency stop, the second control component 200 controls the gas to flow sequentially along the inlet end 110 through the first manual valve 120, the first pressure gauge 130, the first pressure regulating valve 140, and the third pneumatic valve 210, and then connects to the outlet end 300 through the third check valve 510 and the sixth pneumatic valve 520.
[0072] This application addresses production safety issues through improvements to the gas supply process and process safety formula, the addition of furnace tail gas temperature detection to the discharge pipe, the addition of explosion relief diaphragms and dust collection bags (920 structure) to the discharge pipe, and the implementation of a standardized safety process flow including compatible inert gas dilution and replacement, pressure monitoring, temperature monitoring, and shutdown purging. It focuses on three aspects: gas flow rate and process intervention control, overpressure explosion relief, and dust collection to prevent disasters. The core improvements to the entire process include regulating the process gas flow rate based on furnace tail gas phase temperature feedback, inert gas dilution and cooling, purging carbon powder accumulation, and controlling reaction intensity.
[0073] This application, through the aforementioned system and method, can solve the technical problem in the prior art where the industrial production of silicon-carbon anode materials by vapor deposition presents significant safety hazards related to combustion and explosion, thus affecting the safe large-scale and continuous production of silicon-carbon anode materials.
[0074] The specific embodiments of the present invention described above do not constitute a limitation on the scope of protection of the present invention. Any other corresponding changes and modifications made in accordance with the technical concept of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A gas supply system for the preparation of silicon-carbon anode materials, configured to be connected to the furnace body of a rotary kiln, characterized in that, include: At least three air intakes; At least two first control components and second control components are arranged in parallel. The first control component or the second control component respectively includes a first manual valve, a first pressure gauge, a first pressure regulating valve, a first pneumatic valve, a first flow controller, a first check valve and a second pneumatic valve, which are connected to the air inlet and arranged sequentially along the gas flow direction. The air outlet is connected to the furnace body, and the air outlet is connected to three second pneumatic valves respectively; The emergency shut-off valve is connected to all three second pneumatic valves and the outlet; and The emergency stop assembly is connected to the air inlet and the air outlet of the second control assembly and is configured for nitrogen protection purging.
2. The gas supply system for preparing silicon-carbon anode materials according to claim 1, characterized in that, The second control component further includes a third pneumatic valve, which is disposed between the first pressure regulating valve and the first pneumatic valve and is used to connect or disconnect the first pressure regulating valve and the first pneumatic valve.
3. The gas supply system for preparing silicon-carbon anode materials according to claim 2, characterized in that, The gas supply system for preparing silicon-carbon anode materials also includes a calibration component. The calibration component includes a second manual valve, a second pressure regulating valve, a second pressure gauge, a flow meter, and a fourth pneumatic valve arranged in sequence. The second manual valve is connected to the first pneumatic valve of the second control component. The fourth pneumatic valve is located between the first pressure regulating valve and the first pneumatic valve and is used to connect or disconnect the flow meter and the first pneumatic valve.
4. The silicon-carbon negative electrode material preparation gas supply system according to claim 3, characterized by, The gas supply system for preparing silicon-carbon anode materials also includes a standby component, which includes at least one standby element. The standby element includes a fifth pneumatic valve and a pressure sensor. One end of the fifth pneumatic valve is connected to the third or fourth pneumatic valve, and the other end is connected to a first flow controller of at least one of the first control components. The pressure sensor is disposed on the fifth pneumatic valve.
5. The silicon-carbon negative electrode material preparation gas supply system according to claim 4, characterized by, The standby component further includes a second one-way valve, which is disposed between the fifth pneumatic valve and the third or fourth pneumatic valve, and is capable of connecting or disconnecting the fifth pneumatic valve and the third or fourth pneumatic valve.
6. The silicon-carbon negative electrode material preparation gas supply system according to claim 5, characterized by, The number of standby components is two, and the two fifth pneumatic valves are respectively connected to the first flow controllers of the two first control components.
7. The silicon-carbon negative electrode material preparation gas supply system according to claim 5, characterized by, The emergency stop assembly includes a third one-way valve and a sixth pneumatic valve arranged in sequence. The third one-way valve is arranged in parallel with the first pneumatic valve of the second control assembly and is connected to the third or fourth pneumatic valve. The sixth pneumatic valve is connected to the air outlet.
8. The silicon-carbon negative electrode material preparation gas supply system of claim 1, wherein, The gas supply system for preparing silicon-carbon anode materials also includes a temperature sensor, which is connected to the gas outlet of the furnace body.
9. The silicon-carbon anode material preparation gas supply system of claim 1, wherein, The gas outlet has an explosion vent, and the gas supply system for preparing silicon-carbon anode material also includes an explosion vent component. The explosion vent component includes a rupture disc and a dust collection bag. The rupture disc is detachably connected to the explosion vent and is used to seal the explosion vent. The dust collection bag covers the explosion vent and is detachably connected to the gas outlet.
10. A method for preparing a silicon-carbon negative electrode material for gas supply, characterized by, The gas supply system is prepared using the silicon-carbon anode material as described in any one of claims 1 to 9, and the specific steps are as follows: The gas supply is independent, with one first control component controlling the gas to be connected to the gas outlet in sequence along the gas inlet, first manual valve, first pressure gauge, first pressure regulating valve, first pneumatic valve, first flow controller, first check valve, second pneumatic valve and emergency shut-off valve, while the other first control component and second control component are both disconnected from the gas outlet. Simultaneously supplying gas, one first control component is disconnected from the gas outlet, and the other first control component and second control component control the gas to be connected to the gas outlet in sequence along the gas inlet, first manual valve, first pressure gauge, first pressure regulating valve, first pneumatic valve, first flow controller, first check valve, second pneumatic valve and emergency shut-off valve respectively; The calibration process involves the second control component controlling the gas to flow sequentially from the inlet end through the second manual valve, the second pressure regulating valve, the second pressure gauge, the flow meter, and the fourth pneumatic valve, and then connecting to the first pneumatic valve, the first flow controller, the first check valve, the second pneumatic valve, and the emergency shut-off valve to the outlet end. In standby mode, the second control component controls the gas to pass sequentially through the first manual valve, the first pressure gauge, the first pressure regulating valve, the third pneumatic valve, and the second check valve along the inlet end, and then through two fifth pneumatic valves and two pressure sensors to enter the first flow controller, the first check valve, and the second pneumatic valve of the two first control components, and finally connects to the outlet end through the emergency shut-off valve. In case of emergency stop, the second control component controls the gas to flow sequentially from the inlet end through the first manual valve, the first pressure gauge, the first pressure regulating valve, and the third pneumatic valve, and then connects to the outlet end through the third check valve and the sixth pneumatic valve.
Citation Information
Patent Citations
Vapor deposition coated rotary furnace
CN118345345A