Hydrogen production line with double hydrogen sources

By introducing a thermal management system into the dual-hydrogen-source hydrogen production line, and using a thermal oil heater and a chiller to achieve centralized heating and cooling, the problems of high energy consumption and high safety risks in the existing technology are solved, and the energy consumption and cost of the hydrogen production line are reduced.

CN123132908APending Publication Date: 2026-11-20SUZHOU KEVOS HYDROGEN ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611154208.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing dual-hydrogen-source hydrogen production lines lack a unified thermal management system, resulting in high energy consumption, high costs, and safety risks, especially the high cost and high risk of the electric heating equipment for the adsorption tower.

Method used

The dual-source hydrogen production line with a thermal management system includes a water electrolysis hydrogen production line and a methanol hydrogen production line. It combines a heat transfer oil heater, a chiller unit, and a control module. The heat transfer oil is centrally heated through the oil outlet and return pipes, and the cooling water is centrally cooled through the water outlet and return pipes, thus precisely controlling the temperature of each processing tower and processor.

Benefits of technology

Centralized heating and cooling have been achieved, reducing the energy consumption and cost of the hydrogen production line, improving safety, and avoiding problems such as uneven temperature and slow initial heating.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123132908A_ABST
    Figure CN123132908A_ABST
Patent Text Reader

Abstract

The application provides a hydrogen production line with double hydrogen sources, which comprises a water electrolysis hydrogen production line and a methanol hydrogen production line, and a heat management system composed of a heat-conducting oil heating furnace, a cold water unit and a control module; the heat-conducting oil heating furnace is connected with an oil outlet pipe and an oil return pipe; the heat-conducting oil is provided to a temperature swing adsorption deoxygenation tower and a temperature swing adsorption dehydration tower of the water electrolysis hydrogen production line and a cracking furnace of the methanol hydrogen production line through the oil outlet pipe, and the heat-conducting oil is recycled through the oil return pipe, so that centralized heating can be realized, the heating temperature is stable, the heating speed is fast, and the safety is good; the cold water unit is connected with a water outlet pipe and a water return pipe; cooling water is provided to a pre-deoxygenation gas cooler, a post-deoxygenation gas cooler, a post-dehydration gas cooler of the water electrolysis hydrogen production line and an outlet gas cooler of the methanol hydrogen production line through the water outlet pipe, and the cooling water is recycled through the water return pipe, so that centralized cooling can be realized, and the temperature of each treatment tower and processor can be accurately controlled; the number of cold and heat sources is small, the energy consumption is small, and the cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of hydrogen production technology, specifically relating to a dual-hydrogen-source hydrogen production line with a thermal management system. Background Technology

[0002] As is well known, hydrogen production by water electrolysis is a clean method of hydrogen production, but its cost remains high due to electricity prices. Methanol-to-hydrogen production has a high yield and readily available raw materials, but the process generates carbon dioxide, which is detrimental to the environment.

[0003] To meet carbon emission standards, many end-users simultaneously set up methanol-to-hydrogen production lines and water electrolysis-to-hydrogen production lines to achieve dual hydrogen source production, thus balancing hydrogen production stability, economy, and carbon reduction targets. However, these production lines lack a unified thermal management system, with each processing tower on the line being heated independently, resulting in high energy consumption and significant waste. For some adsorption towers, the electric heating equipment also needs to have explosion-proof capabilities, which is costly and risky. Summary of the Invention

[0004] The purpose of this invention is to overcome one or more drawbacks in the prior art and provide a dual-hydrogen source hydrogen production line with a thermal management system.

[0005] To achieve the above objectives, the technical solution adopted by this invention is a dual-hydrogen-source hydrogen production line, comprising: A water electrolysis hydrogen production line equipped with an electrolyzer, gas-liquid separator, pre-deoxygenation gas cooler, temperature-switching adsorption deoxygenation tower, post-deoxygenation gas cooler, temperature-switching adsorption dehydration tower, and post-dehydration gas cooler; A methanol-to-hydrogen production line equipped with a raw material tank, preheater, vaporizer, cracking furnace, outlet gas cooler, and pressure swing adsorption tower; It also includes a thermal management system consisting of a thermal oil heater, a chiller unit, and a control module; The heat transfer oil heater is connected to an oil outlet pipe and an oil return pipe. The oil outlet pipe is used to supply heat transfer oil to the temperature-switching adsorption deoxygenation tower, the temperature-switching adsorption dehydration tower, and the pyrolysis furnace. The oil return pipe is used to recover the heat transfer oil from the temperature-switching adsorption deoxygenation tower, the temperature-switching adsorption dehydration tower, and the vaporization furnace. The heat transfer oil outlet of the pyrolysis furnace and the heat transfer oil inlet of the vaporization furnace are connected through a heat transfer oil pipe. The chiller unit is connected to an outlet pipe and a return pipe. The outlet pipe is used to supply cooling water to the pre-deoxygenation gas cooler, the post-deoxygenation gas cooler, the post-dehydration gas cooler, and the outlet gas cooler. The return pipe is used to recover the cooling water from the pre-deoxygenation gas cooler, the post-deoxygenation gas cooler, the post-dehydration gas cooler, and the outlet gas cooler. The control module is electrically connected to the controllers of the thermal oil heater and the chiller unit to achieve thermal management.

[0006] Preferably, the oil outlet pipe is connected to a first branch pipe, a second branch pipe, and a third branch pipe. The first branch pipe is connected to the heat transfer oil inlet of the temperature-switching adsorption deoxygenation tower, the second branch pipe is connected to the heat transfer oil inlet of the temperature-switching adsorption dehydration tower, and the third branch pipe is connected to the heat transfer oil inlet of the pyrolysis furnace. The oil return pipe is connected to a fourth branch pipe, a fifth branch pipe, and a sixth branch pipe. The fourth branch pipe is connected to the heat transfer oil outlet of the temperature-switching adsorption deoxygenation tower, the fifth branch pipe is connected to the heat transfer oil outlet of the temperature-switching adsorption dehydration tower, and the sixth branch pipe is connected to the heat transfer oil outlet of the vaporization furnace.

[0007] More preferably, a first shut-off valve and a first flow regulating valve are sequentially provided on the first branch pipe along the flow direction of the heat transfer oil; a second shut-off valve and a second flow regulating valve are sequentially provided on the second branch pipe along the flow direction of the heat transfer oil; and a third shut-off valve and a third flow regulating valve are sequentially provided on the third branch pipe along the flow direction of the heat transfer oil. The control module is electrically connected to the first shut-off valve, the first flow regulating valve, the second shut-off valve, the second flow regulating valve, the third shut-off valve, and the third flow regulating valve.

[0008] Preferably, the outlet pipe is connected to a seventh branch pipe, an eighth branch pipe, a ninth branch pipe, and a tenth branch pipe. The seventh branch pipe is connected to the cooling water inlet of the pre-deoxygenation gas cooler, the eighth branch pipe is connected to the cooling water inlet of the post-deoxygenation gas cooler, the ninth branch pipe is connected to the cooling water inlet of the post-dehydration gas cooler, and the tenth branch pipe is connected to the cooling water inlet of the outlet gas cooler. The return pipe is connected to an eleventh branch pipe, a twelfth branch pipe, a thirteenth branch pipe, and a fourteenth branch pipe. The eleventh branch pipe is connected to the cooling water outlet of the pre-deoxygenation gas cooler, the twelfth branch pipe is connected to the cooling water outlet of the post-deoxygenation gas cooler, the thirteenth branch pipe is connected to the cooling water outlet of the post-dehydration gas cooler, and the fourteenth branch pipe is connected to the cooling water outlet of the outlet gas cooler.

[0009] More preferably, the seventh branch pipe is provided with a seventh shut-off valve and a seventh flow regulating valve in sequence along the cooling water flow direction; the eighth branch pipe is provided with an eighth shut-off valve and an eighth flow regulating valve in sequence along the cooling water flow direction; the ninth branch pipe is provided with a ninth shut-off valve and a ninth flow regulating valve in sequence along the cooling water flow direction; and the tenth branch pipe is provided with a tenth shut-off valve and a tenth flow regulating valve in sequence along the cooling water flow direction. The control module is electrically connected to the seventh shut-off valve, the seventh flow regulating valve, the eighth shut-off valve, the eighth flow regulating valve, the ninth shut-off valve, the ninth flow regulating valve, the tenth shut-off valve, and the tenth flow regulating valve.

[0010] Preferably, a first heat-conducting pipe is provided on the connecting pipe between the pyrolysis furnace and the outlet gas cooler, and the other end of the first heat-conducting pipe extends to the rear end of the preheater. A second heat-conducting pipe is provided at the front end of the outlet gas cooler, and the other end of the second heat-conducting pipe extends to the front end of the preheater. The two ends of the first heat-conducting pipe and the second heat-conducting pipe are closed and filled with refrigerant.

[0011] Preferably, the water electrolysis hydrogen production line further includes an electrolyte heat exchanger, which is provided with an electrolyte inlet and an electrolyte outlet. The electrolyte inlet is connected to the liquid outlet of the gas-liquid separator, and the electrolyte outlet is connected to the electrolysis cell.

[0012] More preferably, a fifteenth branch pipe is connected to the outlet pipe, the fifteenth branch pipe being connected to the cooling water inlet of the electrolyte heat exchanger, and a sixteenth branch pipe is connected to the return pipe, the sixteenth branch pipe being connected to the cooling water outlet of the electrolyte heat exchanger.

[0013] More preferably, the fifteenth branch pipe is provided with a fifteenth shut-off valve and a fifteenth flow regulating valve in sequence along the cooling water flow direction, and the control module is electrically connected to the fifteenth shut-off valve and the fifteenth flow regulating valve.

[0014] Preferably, the thermal oil heater is a gas-fired thermal oil heater, and the gas inlet of the thermal oil heater is connected to the tail gas pipeline of the pressure swing adsorption tower.

[0015] Due to the application of the above technical solution, the present invention has the following advantages compared with the prior art: The dual-hydrogen-source hydrogen production line provided by this invention includes a water electrolysis hydrogen production line and a methanol hydrogen production line, as well as a thermal management system composed of a heat transfer oil heater, a chiller unit, and a control module. By connecting an oil outlet pipe and a return pipe to the heat transfer oil heater, heat transfer oil is supplied to the temperature-switching adsorption deoxygenation tower and temperature-switching adsorption dehydration tower of the water electrolysis hydrogen production line, and the cracking furnace of the methanol hydrogen production line via the oil outlet pipe. The heat transfer oil is then recovered via the return pipe, enabling centralized heating with stable heating temperature, fast heating speed, and good safety. By connecting an outlet water pipe and a return water pipe to the chiller unit, cooling water is supplied to the pre-deoxygenation gas cooler, post-deoxygenation gas cooler, and post-dehydration gas cooler of the water electrolysis hydrogen production line, and the outlet gas cooler of the methanol hydrogen production line via the outlet water pipe. The cooling water is then recovered via the return water pipe, enabling centralized cooling and precise control of the temperature of each processing tower and processor. This reduces the number of cold and heat sources in the hydrogen production line, lowering its energy consumption and cost. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of a preferred embodiment of the present invention.

[0017] Figure 2 , Figure 3 , Figure 4 yes Figure 1 A magnified view of a portion of the image.

[0018] The components are: 1. User terminal; 11. Electrolyte; 12. Gas-liquid separator; 13. Gas cooler before deoxygenation; 14. Temperature-switching adsorption deoxygenation tower; 15. Gas cooler after deoxygenation; 16. Temperature-switching adsorption dehydration tower; 17. Gas cooler after dehydration; 18. Electrolyte heat exchanger; 181. First reflux pipe; 182. Second reflux pipe; 21. Raw material tank; 22. Preheater; 23. Gasification furnace; 24. Cracking furnace; 25. Outlet gas cooler. 26. Pressure Swing Adsorption Tower; 261. Tail Gas Pipeline; 31. Thermal Oil Heater; 32. Chiller Unit; 33. Control Module; 41. Oil Outlet Pipe; 411. First Branch Pipe; 411a. First Shut-off Valve; 411b. First Flow Control Valve; 412. Second Branch Pipe; 412a. Second Shut-off Valve; 412b. Second Flow Control Valve; 413. Third Branch Pipe; 413a. Third Shut-off Valve; 413b. Third Flow Control Valve; 42. Return oil pipe; 421. Fourth branch pipe; 422. Fifth branch pipe; 423. Sixth branch pipe; 43. Heat transfer oil pipe; 51. Water outlet pipe; 511. Seventh branch pipe; 511a. Seventh shut-off valve; 511b. Seventh flow regulating valve; 512. Eighth branch pipe; 512a. Eighth shut-off valve; 512b. Eighth flow regulating valve; 513. Ninth branch pipe; 513a. Ninth shut-off valve; 513b. Ninth flow regulating valve Valve; 514. Tenth branch pipe; 514a. Tenth shut-off valve; 514b. Tenth flow regulating valve; 515. Fifteenth branch pipe; 515a. Fifteenth shut-off valve; 515b. Fifteenth flow regulating valve; 52. Return water pipe; 521. Eleventh branch pipe; 522. Twelfth branch pipe; 523. Thirteenth branch pipe; 524. Fourteenth branch pipe; 525. Sixteenth branch pipe; 61. First heat conduction pipe; 62. Second heat conduction pipe. Detailed Implementation

[0019] like Figures 1 to 4As shown, the dual-hydrogen-source hydrogen production line provided by the present invention includes: a water electrolysis hydrogen production line, a methanol hydrogen production line, and a thermal management system; wherein, the water electrolysis hydrogen production line has an electrolyzer 11, a gas-liquid separator 12, a pre-deoxygenation gas cooler 13, a temperature-switching adsorption deoxygenation tower 14, a post-deoxygenation gas cooler 15, a temperature-switching adsorption dehydration tower 16, and a post-dehydration gas cooler 17 connected in sequence, and the post-dehydration gas cooler 17 is connected to the user end 1; the methanol hydrogen production line has a raw material tank 21, a preheater 22, a vaporizer 23, a cracking furnace 24, an outlet gas cooler 25, and a pressure swing adsorption tower 26 connected in sequence, and the hydrogen outlet of the pressure swing adsorption tower 26 is connected to the user end 1; the thermal management system consists of a thermal oil heater 31, a chiller unit 32, and a control module 33, specifically, the thermal oil heater 31 is connected to an oil outlet pipe 41 and an oil return pipe 42, and the oil outlet pipe 41 is used to supply the hydrogen to the temperature-switching adsorption tower 26. The deoxygenation tower 14, the temperature-switching adsorption dehydration tower 16, and the pyrolysis furnace 24 are supplied with heated heat transfer oil. The return oil pipe 42 is used to recover the heat transfer oil after it has released heat in the temperature-switching adsorption deoxygenation tower 14, the temperature-switching adsorption dehydration tower 16, and the vaporization furnace 23. The heat transfer oil outlet of the pyrolysis furnace 24 and the heat transfer oil inlet of the vaporization furnace 23 are connected through the heat transfer oil pipe 43. The chiller unit 32 is connected with an outlet water pipe 51 and a return water pipe 52. The outlet water pipe 51 is used to supply cooled water to the pre-deoxygenation gas cooler 13, the post-deoxygenation gas cooler 15, the post-dehydration gas cooler 17, and the outlet gas cooler 25. The return water pipe 52 is used to recover the cooled water after it has absorbed heat in the pre-deoxygenation gas cooler 13, the post-deoxygenation gas cooler 15, the post-dehydration gas cooler 17, and the outlet gas cooler 25. The control module 33 is electrically connected to the controller of the heat transfer oil heater 31 and the chiller unit 32 to realize thermal management.

[0020] The advantages of this setup are twofold: firstly, it enables centralized heating of each processing tower and processor via the oil outlet and return pipes, avoiding the uneven temperature distribution and slow initial heating of temperature-switching adsorption electric heating, resulting in stable heating temperature and rapid heating speed; secondly, it enables centralized cooling of each processing tower and processor via the water outlet and return pipes, resulting in stable cooling temperature and rapid cooling speed. It also allows for precise temperature control of each processing tower and processor using existing temperature sensors on the water electrolysis hydrogen production line and methanol hydrogen production line, significantly reducing the number of cold and heat sources in the hydrogen production line and lowering its energy consumption and cost.

[0021] In this embodiment, the oil outlet pipe 41 is connected to a first branch pipe 411, a second branch pipe 412, and a third branch pipe 413. The first branch pipe 411 is connected to the heat transfer oil inlet of the temperature-switching adsorption deoxygenation tower 14, the second branch pipe 412 is connected to the heat transfer oil inlet of the temperature-switching adsorption dehydration tower 16, and the third branch pipe 413 is connected to the heat transfer oil inlet of the cracking furnace 24. The oil return pipe 42 is connected to a fourth branch pipe 421, a fifth branch pipe 422, and a sixth branch pipe 423. The fourth branch pipe 421 is connected to the heat transfer oil outlet of the temperature-switching adsorption deoxygenation tower 14, the fifth branch pipe 422 is connected to the heat transfer oil outlet of the temperature-switching adsorption dehydration tower 16, and the sixth branch pipe 423 is connected to the heat transfer oil outlet of the vaporization furnace 23.

[0022] Furthermore, a first shut-off valve 411a and a first flow regulating valve 411b are sequentially provided on the first branch pipe 411 along the flow direction of the heat transfer oil; a second shut-off valve 412a and a second flow regulating valve 412b are sequentially provided on the second branch pipe 412 along the flow direction of the heat transfer oil; and a third shut-off valve 413a and a third flow regulating valve 413b are sequentially provided on the third branch pipe 413 along the flow direction of the heat transfer oil. The first shut-off valve 411a, the first flow regulating valve 411b, the second shut-off valve 412a, the second flow regulating valve 412b, the third shut-off valve 413a, and the third flow regulating valve 413b are all electrically controlled valves. At the same time, the control module 33 is electrically connected to the first shut-off valve 411a, the first flow regulating valve 411b, the second shut-off valve 412a, the second flow regulating valve 412b, the third shut-off valve 413a, and the third flow regulating valve 413b to realize remote real-time control.

[0023] In this embodiment, the outlet pipe 51 is connected to a seventh branch pipe 511, an eighth branch pipe 512, a ninth branch pipe 513, and a tenth branch pipe 514. The seventh branch pipe 511 is connected to the cooling water inlet of the pre-deoxygenation gas cooler 13, the eighth branch pipe 512 is connected to the cooling water inlet of the post-deoxygenation gas cooler 15, the ninth branch pipe 513 is connected to the cooling water inlet of the post-dehydration gas cooler 17, and the tenth branch pipe 514 is connected to the cooling water inlet of the outlet gas cooler 25. The return water pipe 52 is connected to the eleventh branch pipe 521, the twelfth branch pipe 522, the thirteenth branch pipe 523, and the fourteenth branch pipe 524. The eleventh branch pipe 521 is connected to the cooling water outlet of the pre-deoxygenation gas cooler 13, the twelfth branch pipe 522 is connected to the cooling water outlet of the post-deoxygenation gas cooler 15, the thirteenth branch pipe 523 is connected to the cooling water outlet of the post-dehydration gas cooler 17, and the fourteenth branch pipe 524 is connected to the cooling water outlet of the outlet gas cooler 25.

[0024] Furthermore, the seventh branch pipe 511 is sequentially equipped with a seventh shut-off valve 511a and a seventh flow regulating valve 511b along the cooling water flow direction; the eighth branch pipe 512 is sequentially equipped with an eighth shut-off valve 512a and an eighth flow regulating valve 512b along the cooling water flow direction; the ninth branch pipe 513 is sequentially equipped with a ninth shut-off valve 513a and a ninth flow regulating valve 513b along the cooling water flow direction; and the tenth branch pipe 514 is sequentially equipped with a tenth shut-off valve 514a and a tenth flow regulating valve 514b along the cooling water flow direction. The seventh shut-off valve 511a and the seventh flow regulating valve 511b are also sequentially equipped with... 11b, the eighth shut-off valve 512a, the eighth flow regulating valve 512b, the ninth shut-off valve 513a, the ninth flow regulating valve 513b, the tenth shut-off valve 514a, and the tenth flow regulating valve 514b are all electrically controlled valves. At the same time, the control module 33 is electrically connected to the seventh shut-off valve 511a, the seventh flow regulating valve 511b, the eighth shut-off valve 512a, the eighth flow regulating valve 512b, the ninth shut-off valve 513a, the ninth flow regulating valve 513b, the tenth shut-off valve 514a, and the tenth flow regulating valve 514b to realize remote real-time control.

[0025] In this embodiment, the thermal oil heater 31 is a gas-fired thermal oil heater. The gas inlet of the thermal oil heater 31 is connected to the tail gas pipe 261 of the pressure swing adsorption tower 26. This configuration allows for the reuse of tail gas, further reducing the energy consumption of the hydrogen production line and thus reducing costs.

[0026] In this embodiment, the water electrolysis hydrogen production line also includes an electrolyte heat exchanger 18, which has an electrolyte inlet and an electrolyte outlet. The electrolyte inlet is connected to the liquid outlet of the gas-liquid separator 12 through a first return pipe 181, and the electrolyte outlet is connected to the electrolytic cell through a second return pipe 182. Furthermore, a fifteenth branch pipe 515 is connected to the water outlet pipe 51, which is connected to the cooling water inlet of the electrolyte heat exchanger 18. A sixteenth branch pipe 525 is connected to the water return pipe 52, which is connected to the cooling water outlet of the electrolyte heat exchanger 18.

[0027] Furthermore, the fifteenth branch pipe 515 is provided with a fifteenth shut-off valve 515a and a fifteenth flow regulating valve 515b in sequence along the cooling water flow direction. Both the fifteenth shut-off valve 515a and the fifteenth flow regulating valve 515b are electrically controlled valves. At the same time, the control module 33 is electrically connected to the fifteenth shut-off valve 515a and the fifteenth flow regulating valve 515b to realize remote real-time control.

[0028] In this embodiment, a first heat-conducting pipe 61 is wound around the connecting pipe between the pyrolysis furnace 24 and the outlet gas cooler 25. The other end of the first heat-conducting pipe 61 extends into the rear end of the preheater 22. A second heat-conducting pipe 62 is inserted into the front end of the outlet gas cooler 25. The other end of the second heat-conducting pipe 62 extends into the front end of the preheater 22. The two ends of the first heat-conducting pipe 61 and the second heat-conducting pipe 62 are sealed and filled with refrigerant, so as to make full use of the heat in the gas delivered by the pyrolysis furnace 24.

[0029] In this embodiment, temperature sensors are provided on the connecting pipes of the pre-deoxygenation gas cooler 13 and the temperature swing adsorption deoxygenation tower 14, the connecting pipes of the post-deoxygenation gas cooler 15 and the temperature swing adsorption dehydration tower 16, the connecting pipes of the gas cooler 17 and the user terminal 1, the connecting pipes of the outlet gas cooler 25 and the pressure swing adsorption tower 26, and the second reflux pipe 182. Temperature sensors are also provided at the rear ends of the temperature swing adsorption deoxygenation tower 14, the temperature swing adsorption dehydration tower 16, and the pyrolysis furnace 24. Of course, temperature sensors and pressure sensors are also provided on other components such as the thermal oil heater 31 and the chiller unit 32, which can be added according to actual needs.

[0030] The above embodiments are only for illustrating the technical concept and features of the present invention, and are intended to enable those skilled in the art to understand the content of the present invention and implement it accordingly. They should not be used to limit the scope of protection of the present invention. All equivalent changes or modifications made in accordance with the spirit and essence of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A dual-hydrogen-source hydrogen production line, comprising: A water electrolysis hydrogen production line equipped with an electrolyzer, gas-liquid separator, pre-deoxygenation gas cooler, temperature-switching adsorption deoxygenation tower, post-deoxygenation gas cooler, temperature-switching adsorption dehydration tower, and post-dehydration gas cooler; A methanol-to-hydrogen production line equipped with a raw material tank, preheater, vaporizer, cracking furnace, outlet gas cooler, and pressure swing adsorption tower; Its features are: It also includes a thermal management system consisting of a thermal oil heater, a chiller unit, and a control module; The heat transfer oil heater is connected to an oil outlet pipe and an oil return pipe. The oil outlet pipe is used to supply heat transfer oil to the temperature-switching adsorption deoxygenation tower, the temperature-switching adsorption dehydration tower, and the pyrolysis furnace. The oil return pipe is used to recover the heat transfer oil from the temperature-switching adsorption deoxygenation tower, the temperature-switching adsorption dehydration tower, and the vaporization furnace. The heat transfer oil outlet of the pyrolysis furnace and the heat transfer oil inlet of the vaporization furnace are connected through a heat transfer oil pipe. The chiller unit is connected to an outlet pipe and a return pipe. The outlet pipe is used to supply cooling water to the pre-deoxygenation gas cooler, the post-deoxygenation gas cooler, the post-dehydration gas cooler, and the outlet gas cooler. The return pipe is used to recover the cooling water from the pre-deoxygenation gas cooler, the post-deoxygenation gas cooler, the post-dehydration gas cooler, and the outlet gas cooler. The control module is electrically connected to the controllers of the thermal oil heater and the chiller unit to achieve thermal management.

2. The dual-hydrogen-source hydrogen production line according to claim 1, characterized in that: The oil outlet pipe is connected to a first branch pipe, a second branch pipe, and a third branch pipe. The first branch pipe is connected to the heat transfer oil inlet of the temperature-switching adsorption deoxygenation tower, the second branch pipe is connected to the heat transfer oil inlet of the temperature-switching adsorption dehydration tower, and the third branch pipe is connected to the heat transfer oil inlet of the pyrolysis furnace. The oil return pipe is connected to a fourth branch pipe, a fifth branch pipe, and a sixth branch pipe. The fourth branch pipe is connected to the heat transfer oil outlet of the temperature-switching adsorption deoxygenation tower, the fifth branch pipe is connected to the heat transfer oil outlet of the temperature-switching adsorption dehydration tower, and the sixth branch pipe is connected to the heat transfer oil outlet of the vaporization furnace.

3. The dual-hydrogen-source hydrogen production line according to claim 2, characterized in that: A first shut-off valve and a first flow regulating valve are sequentially provided on the first branch pipe along the flow direction of the heat transfer oil; a second shut-off valve and a second flow regulating valve are sequentially provided on the second branch pipe along the flow direction of the heat transfer oil; a third shut-off valve and a third flow regulating valve are sequentially provided on the third branch pipe along the flow direction of the heat transfer oil; and the control module is electrically connected to the first shut-off valve, the first flow regulating valve, the second shut-off valve, the second flow regulating valve, the third shut-off valve, and the third flow regulating valve.

4. The dual-hydrogen-source hydrogen production line according to claim 1, characterized in that: The outlet pipe is connected to a seventh branch pipe, an eighth branch pipe, a ninth branch pipe, and a tenth branch pipe. The seventh branch pipe is connected to the cooling water inlet of the pre-deoxygenation gas cooler, the eighth branch pipe is connected to the cooling water inlet of the post-deoxygenation gas cooler, the ninth branch pipe is connected to the cooling water inlet of the post-dehydration gas cooler, and the tenth branch pipe is connected to the cooling water inlet of the outlet gas cooler. The return pipe is connected to an eleventh branch pipe, a twelfth branch pipe, a thirteenth branch pipe, and a fourteenth branch pipe. The eleventh branch pipe is connected to the cooling water outlet of the pre-deoxygenation gas cooler, the twelfth branch pipe is connected to the cooling water outlet of the post-deoxygenation gas cooler, the thirteenth branch pipe is connected to the cooling water outlet of the post-dehydration gas cooler, and the fourteenth branch pipe is connected to the cooling water outlet of the outlet gas cooler.

5. The dual-hydrogen-source hydrogen production line according to claim 4, characterized in that: The seventh branch pipe is provided with a seventh shut-off valve and a seventh flow regulating valve in sequence along the cooling water flow direction; the eighth branch pipe is provided with an eighth shut-off valve and an eighth flow regulating valve in sequence along the cooling water flow direction; the ninth branch pipe is provided with a ninth shut-off valve and a ninth flow regulating valve in sequence along the cooling water flow direction; and the tenth branch pipe is provided with a tenth shut-off valve and a tenth flow regulating valve in sequence along the cooling water flow direction. The control module is electrically connected to the seventh shut-off valve, the seventh flow regulating valve, the eighth shut-off valve, the eighth flow regulating valve, the ninth shut-off valve, the ninth flow regulating valve, the tenth shut-off valve, and the tenth flow regulating valve.

6. The dual-hydrogen-source hydrogen production line according to claim 1, characterized in that: A first heat-conducting pipe is provided on the connecting pipe between the pyrolysis furnace and the outlet gas cooler. The other end of the first heat-conducting pipe extends to the rear end of the preheater. A second heat-conducting pipe is provided at the front end of the outlet gas cooler. The other end of the second heat-conducting pipe extends to the front end of the preheater. Both ends of the first heat-conducting pipe and the second heat-conducting pipe are closed and filled with refrigerant.

7. The dual-hydrogen-source hydrogen production line according to claim 1, characterized in that: The water electrolysis hydrogen production line also includes an electrolyte heat exchanger, which has an electrolyte inlet and an electrolyte outlet. The electrolyte inlet is connected to the liquid outlet of the gas-liquid separator, and the electrolyte outlet is connected to the electrolysis cell.

8. The dual-hydrogen-source hydrogen production line according to claim 7, characterized in that: The outlet pipe is connected to a fifteenth branch pipe, which is connected to the cooling water inlet of the electrolyte heat exchanger. The return pipe is connected to a sixteenth branch pipe, which is connected to the cooling water outlet of the electrolyte heat exchanger.

9. The dual-hydrogen-source hydrogen production line according to claim 8, characterized in that: The fifteenth branch pipe is provided with a fifteenth shut-off valve and a fifteenth flow regulating valve in sequence along the cooling water flow direction. The control module is electrically connected to the fifteenth shut-off valve and the fifteenth flow regulating valve.

10. The dual-hydrogen-source hydrogen production line according to claim 1, characterized in that: The thermal oil heater is a gas-fired thermal oil heater, and the gas inlet of the thermal oil heater is connected to the tail gas pipeline of the pressure swing adsorption tower.