A tunnel construction apparatus and method
By designing a linkage-driven tunnel construction device, the mechanical roughening of the cement concrete surface, liquid wetting, and dust cleaning are carried out simultaneously, solving the problems of dust and bonding quality in tunnel construction and improving construction efficiency and bonding strength.
Patent Information
- Application Number
- CN202611610206.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-20
AI Technical Summary
In current tunnel construction, it is difficult to simultaneously carry out surface roughening treatment of cement concrete and spraying liquid to wet and reduce dust, resulting in serious dust pollution and affecting the bonding quality between the asphalt layer and the cement base layer.
Design a tunnel construction device, including a roughening component, a spraying module and a negative pressure dust collection module. Through a linkage drive unit, the spraying and negative pressure dust collection actions are synchronized with the roughening operation, so as to simultaneously achieve mechanical roughening of the cement surface, spraying wetting and dust cleaning.
It effectively reduces dust, improves the bonding quality between the asphalt layer and the cement base layer, increases construction efficiency and quality, and ensures that the moisture of the bonding material is not absorbed by the cement base layer.
Smart Images

Figure CN123133252A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel construction technology, and specifically to a tunnel construction device and method. Background Technology
[0002] In tunnel construction, after the cement concrete pavement is completed, an asphalt layer is usually laid on its surface to form the driving surface. The quality of the interlayer bond between the asphalt layer and the cement concrete base layer directly affects the pavement's integrity and service life. However, the surface of cement concrete is often relatively smooth. If asphalt is laid directly, an isolation layer can easily form at the interface, leading to insufficient adhesion between the asphalt layer and the cement base layer, and consequently, problems such as delamination, peeling, and shoving. Therefore, before laying asphalt, the cement surface usually needs to be roughened to increase surface roughness and specific surface area, thereby improving mechanical interlocking and bonding effects. In existing technologies, cement surface roughening is mostly carried out by manual milling or shot blasting, which lacks dust control and leads to serious dust problems. Although dust collection devices are used for auxiliary treatment, dust collection is usually done by independent equipment, which is difficult to coordinate with the roughening operation in a synchronized manner. In addition, the cement floor will absorb moisture from the bonding material when laying asphalt in a dry state, resulting in the bonding material losing water too quickly, insufficient curing or demulsification, which affects the bonding strength between the asphalt layer and the cement base layer. It is also necessary to pre-wet the cement surface to prevent it from absorbing moisture from the subsequent bonding material and to ensure the interlayer bonding effect. However, existing devices cannot simultaneously achieve multiple effects such as increasing the roughness of the cement surface, spraying liquid and dust collection during the roughening process.
[0003] Therefore, the inventors have proposed a tunnel construction device and method to solve the aforementioned technical problems. Summary of the Invention
[0004] On the one hand, the purpose of this invention is to provide a tunnel construction device to solve the technical problem that it is difficult to simultaneously increase the surface roughness of cement, spray liquid to wet and reduce dust and vacuum cleaning in the roughening treatment of existing tunnel cement pavement before asphalt paving, resulting in dust flying, uncoordinated process and affecting the bonding quality between the asphalt layer and the cement base layer; on the other hand, a method is proposed.
[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A tunnel construction device includes a mobile frame and at least one roughening component, the roughening component being installed at the front end of the mobile frame, the roughening component including a mounting frame, a roughening execution head, a spraying module, and a negative pressure dust collection module; The roughening execution head is slidably mounted on the lower end of the mounting frame in a vertical direction. The bottom of the roughening execution head is provided with multiple teeth for mechanically roughening the surface of the cement concrete base layer. The spray module includes a spray chamber formed inside the roughening execution head, and a first actuator communicating with the spray chamber. The first actuator is configured to supply liquid into the spray chamber and spray the liquid into the roughening operation area. The negative pressure dust collection module includes a dust collection ring disposed on the outer periphery of the roughening execution head, and a second actuator communicating with the dust collection ring. The second actuator is configured to form a negative pressure in the dust collection ring to draw dust generated during the roughening operation into the dust collection ring. A linkage drive unit is connected to the first actuator and the second actuator and is configured to drive the first actuator and the second actuator to operate simultaneously, so that the spraying action of the spray module and the negative pressure dust collection action of the negative pressure dust collection module are synchronized when the roughening execution head performs roughening operations.
[0006] Furthermore, the linkage drive unit includes a linkage drive housing, a motor, and an eccentric linkage mechanism. The linkage drive housing is fixedly mounted on the mounting bracket, the motor is fixedly mounted on the linkage drive housing, a drive gear is rotatably mounted on the linkage drive housing, and the output shaft of the motor is coaxially and fixedly connected to the drive gear. The eccentric linkage mechanism includes a geared disc rotatably mounted on the linkage drive housing, the geared disc meshing with the drive gear, a connecting rod eccentrically hinged to the geared disc, a push rod slidably connected to the linkage drive housing, the top end of the push rod being hinged to the connecting rod, the bottom end of the push rod being fixedly connected to the roughening actuator head, and a push plate being fixedly connected to the push rod.
[0007] Furthermore, the first actuator includes a first actuator cylinder, a first piston ring, and a first actuator rod. The first actuator cylinder is fixedly mounted on the mounting bracket, and a first actuator cavity is formed inside the first actuator cylinder. The first piston ring is slidably and sealingly connected inside the first actuator cavity. The first actuator rod is fixedly mounted on the top of the first piston ring, and the top of the first actuator rod is fixedly connected to the push plate. The first actuator cylinder is provided with an inlet pipe and an outlet pipe that are connected to the first actuator cavity. A first check valve is provided at the inlet pipe and a second check valve is provided at the outlet pipe.
[0008] Furthermore, the bottom of the roughening execution head is provided with a plurality of spray holes, each of the spray holes being connected to the spray chamber, and the liquid outlet pipe being connected to the spray chamber.
[0009] Furthermore, the second actuator includes a second actuator cylinder, a second piston ring, and a second actuator rod. The second actuator cylinder is fixedly mounted on the mounting bracket, and a second actuator cavity is formed inside the second actuator cylinder. The second piston ring is slidably and sealingly connected inside the second actuator cavity. The second actuator rod is fixedly mounted on the top of the second piston ring, and the top of the second actuator rod is fixedly connected to the push plate. The second actuator is provided with an air inlet pipe and an air outlet pipe that are connected to the second actuator chamber. A third one-way valve is provided at the air inlet pipe and a fourth one-way valve is provided at the air outlet pipe.
[0010] Furthermore, a dust collection chamber is formed inside the dust collection ring, and a plurality of dust collection holes are provided on the outer periphery of the dust collection ring. Each dust collection hole is connected to the dust collection chamber, and the dust collection chamber is connected to the air inlet pipe. A filter screen is provided at the air inlet pipe.
[0011] Furthermore, the mobile rack includes a mobile chassis and a housing, with the housing fixedly mounted on the mobile chassis; The bottom of the mobile chassis is provided with a discharge chute, and a discharge pipe is provided between the discharge chute and the chassis; The mobile chassis has a sliding groove, and a sliding column is slidably connected in the sliding groove. A flat plate is fixedly connected to the bottom of the sliding column. Along the traveling direction of the mobile frame, the discharge chute is located in front of the flat plate. A crossbar is fixedly connected to the push rod. The crossbar is set perpendicular to the axis of the push rod and is fixedly connected to the sliding column.
[0012] Furthermore, a vibrator is provided on the platen, the vibrator is fixedly installed on the upper surface of the platen, and is configured to generate vibration when the platen is used to level asphalt.
[0013] Furthermore, at least one guide rod is fixedly provided on the roughening execution head. The guide rod is slidably connected to the mounting bracket and extends in a vertical direction. The mounting bracket is provided with a guide hole that slidably engages with the guide rod.
[0014] On the other hand, this application also proposes a tunnel construction method, including the use of the tunnel construction device as described above, and further including the following steps: S1. Move the tunnel construction device to the construction area of the cement concrete base in the tunnel, align the roughening component at the front end of the mobile frame with the surface of the cement concrete base, and connect the first actuator to the liquid supply source. S2. Start the linkage drive unit. The linkage drive unit simultaneously drives the first actuator and the second actuator to move, and drives the roughening execution head to slide back and forth in the vertical direction, so that the roughening execution head mechanically roughens the surface of the cement concrete base. S3. While the roughening actuator is performing roughening operations, the first actuator supplies liquid into the spray chamber. The liquid is sprayed into the roughening operation area through the spray chamber to wet the surface of the cement concrete base and suppress the dust generated during roughening. The second actuator creates a negative pressure in the dust collection ring to draw the dust generated during roughening into the dust collection ring, so that the liquid spraying action and the negative pressure dust collection action are synchronized with the roughening operation of the roughening actuator. S4. As the mobile frame moves along the tunnel construction face, the asphalt in the machine box is transported to the discharge chute through the discharge pipe, and then discharged from the discharge chute to the roughened cement concrete base surface. The leveling plate then levels the discharged asphalt.
[0015] The beneficial effects of this invention are: This invention uses a linkage drive unit to simultaneously drive the first and second actuators, enabling the spraying and negative pressure dust collection actions to be performed synchronously during the roughening operation of the roughening actuator head. This achieves simultaneous roughening, dust suppression, and dust collection, effectively solving the problem of simultaneously increasing surface roughness, spraying wets and suppresses dust, and vacuuming and cleaning before paving asphalt in existing tunnel cement pavements. It reduces dust emissions, prevents the cement base layer from absorbing moisture from the bonding material, and improves the bonding quality between the asphalt layer and the cement base layer. Furthermore, the spraying, dust collection, and roughening processes share the same power source, resulting in coordinated procedures, a compact structure, and improved construction efficiency and quality.
[0016] Other advantages, objectives, and features of this application will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination or study, or may be learned from practice of this application. The objectives and other advantages of this application may be realized and obtained through the detailed embodiments described below. Attached Figure Description
[0017] Figure 1 This is a bottom view of the tunnel construction device of the present invention. Figure 2 This is a schematic diagram of the overall structure of the tunnel construction device of the present invention; Figure 3 This is a cross-sectional structural schematic diagram of the tunnel construction device of the present invention; Figure 4 This is a schematic diagram of the roughening component in the tunnel construction device of the present invention when it is installed on the mounting frame; Figure 5 This is a schematic diagram of the linkage drive unit structure of the tunnel construction device of the present invention; Figure 6 In the tunnel construction device of the present invention Figure 5 A schematic diagram of the split structure; Figure 7 In the tunnel construction device of the present invention Figure 5 A schematic diagram of the cross-sectional structure; Figure 8 This is a cross-sectional schematic diagram of the spray module in the tunnel construction device of the present invention; Figure 9 In the tunnel construction device of the present invention Figure 7 A magnified structural diagram of part A.
[0018] The components include: a mobile frame 1, a mobile chassis 11, a discharge chute 13, a discharge pipe 14, a chute 15, a sliding column 16, a flat plate 17, a crossbar 18, a housing 12, a roughening component 2, a mounting bracket 3, a roughening actuator 4, teeth 411, a spray hole 41, a spray module 5, a spray chamber 51, a negative pressure dust collection module 6, a dust collection ring 61, a dust collection chamber 611, a dust collection hole 612, a linkage drive unit 7, a linkage drive housing 71, and a motor. 72. Eccentric linkage mechanism; 73. Gear plate; 731. Connecting rod; 732. Push rod; 733. Push plate; 734. Drive gear; 74. First actuator; 8. First actuator cylinder; 81. First piston ring; 82. First actuator rod; 83. First actuator chamber; 84. Liquid inlet pipe; 85. Liquid outlet pipe; 86. Second actuator; 9. Second actuator cylinder; 91. Second piston ring; 92. Second actuator rod; 93. Second actuator chamber; 94. Air inlet pipe; 95. Air outlet pipe. Detailed Implementation
[0019] The embodiments of the present invention will be described below with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention and not for limiting the scope of protection of the present invention.
[0020] It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. Therefore, the illustrations only show the components related to the present invention and are not drawn according to the actual number, shape and size of the components in the actual implementation. In the actual implementation, the shape, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.
[0021] This embodiment proposes a tunnel construction device, such as... Figures 1 to 9As shown, the device includes a mobile frame 1 and at least one roughening component. The roughening component is mounted on the front end of the mobile frame 1 and includes a mounting frame 3, a roughening actuator 4, a spray module 5, and a negative pressure dust collection module 6. The roughening actuator 4 is slidably mounted vertically on the lower end of the mounting frame 3. The bottom of the roughening actuator 4 is provided with multiple teeth 411 for mechanically roughening the surface of the cement concrete base layer. The spray module 5 includes a spray chamber 51 formed inside the roughening actuator 4 and a first actuator 8 communicating with the spray chamber 51. The first actuator 8 is configured to supply liquid into the spray chamber 51 and... The liquid is sprayed into the roughening operation area; the negative pressure dust collection module 6 includes a dust collection ring 61 disposed on the outer periphery of the roughening execution head 4, and a second actuator 9 connected to the dust collection ring 61. The second actuator 9 is configured to form a negative pressure in the dust collection ring 61 to draw the dust generated during the roughening operation into the dust collection ring 61; the linkage drive unit 7 is connected to the first actuator 8 and the second actuator 9, and is configured to drive the first actuator 8 and the second actuator 9 to operate simultaneously, so that the spraying action of the spray module 5 and the negative pressure dust collection action of the negative pressure dust collection module 6 are performed synchronously when the roughening execution head 4 performs the roughening operation.
[0022] When the tunnel construction equipment is in operation, the mobile frame 1 moves along the tunnel construction face, and the roughening component installed at the front end of the mobile frame 1 moves accordingly. The roughening execution head 4 is slidably installed at the lower end of the mounting frame 3 in the vertical direction. When it slides back and forth in the vertical direction, the multiple teeth 411 set at the bottom impact and scrape the surface of the cement concrete base, thereby achieving mechanical roughening and increasing the roughness and specific surface area of the cement concrete base surface. At the same time, the first actuator 8 in the spray module 5, which is connected to the spray chamber 51, is activated to supply liquid to the spray chamber 51 formed inside the roughening execution head 4. The liquid is sprayed through the spray chamber 51 to the roughening operation area, wetting the surface of the cement concrete base and removing the dust generated during roughening. Dust suppression is achieved through the operation of the second actuator 9 in the negative pressure dust collection module 6, which is connected to the dust collection ring 61. This creates a negative pressure within the dust collection ring 61 located on the outer periphery of the roughening execution head 4, causing some of the dust generated during the roughening operation to be drawn into the dust collection ring 61, thereby collecting the dust and reducing dust pollution. Since the linkage drive unit 7 is connected to the first actuator 8 and the second actuator 9 and drives the first actuator 8 and the second actuator 9 to operate simultaneously, the spraying action of the spray module 5 and the negative pressure dust collection action of the negative pressure dust collection module 6 are performed synchronously when the roughening execution head 4 is performing roughening operations. This coordinates the three actions of roughening, spraying to wet and suppress dust, and negative pressure dust collection, reducing dust flying and ensuring the bonding quality between the subsequent asphalt layer and the cement base layer.
[0023] Before the asphalt layer is laid on the cement concrete pavement of the tunnel, the roughening actuator 4 generates a large amount of dust when it impacts and scrapes the surface of the cement concrete base layer through the bottom teeth 411. If not dealt with in time, the dust will fly and spread in the relatively enclosed space of the tunnel, polluting the construction environment and endangering the health of construction workers. The present invention uses the linkage drive unit 7 to simultaneously drive the first actuator 8 and the second actuator 9 to perform the actions, so that the liquid spraying action and the negative pressure dust collection action are carried out simultaneously during the roughening operation. At the same time that the teeth 411 scrape and generate dust, on the one hand, the spray module 5 sprays liquid into the roughening operation area to wet and suppress the flying dust in time, and on the other hand, the negative pressure dust collection module 6 forms a negative pressure in the dust collection ring 61 to immediately suck the dust into the dust collection ring. The system collects dust within ring 61, enabling coordinated operations of "simultaneous roughening, dust suppression, and dust collection," reducing dust diffusion and secondary deposition. Simultaneously, the spraying action wets the surface of the cement concrete base layer, preventing the dry cement base layer from absorbing moisture from the binder material during subsequent asphalt paving. This avoids excessive water loss, insufficient curing, or incomplete demulsification of the binder material, thus ensuring the interlayer bond strength between the asphalt layer and the cement base layer. Furthermore, since spraying, dust collection, and roughening are driven and synchronized by the same linkage drive unit 7, the three processes do not require independent drive equipment and control systems. The processes are coordinated and timed, avoiding the problem in existing technologies where dust collection is performed by independent equipment and is difficult to synchronize with the roughening operation. This improves the efficiency and quality of base layer treatment before asphalt paving in tunnels.
[0024] In a preferred embodiment, the linkage drive unit 7 includes a linkage drive housing 71, a motor 72, and an eccentric linkage mechanism 73. The linkage drive housing 71 is fixedly mounted on the mounting bracket 3, the motor 72 is fixedly mounted on the linkage drive housing 71, and a drive gear 74 is rotatably mounted on the linkage drive housing 71. The output shaft of the motor 72 is coaxially and fixedly connected to the drive gear 74. The eccentric linkage mechanism 73 includes a gear disk 731 rotatably mounted on the linkage drive housing 71. The gear disk 731 meshes with the drive gear 74. A connecting rod 732 is eccentrically hinged on the gear disk 731. A push rod 733 is slidably connected to the linkage drive housing 71. The top end of the push rod 733 is hinged to the connecting rod 732, and the bottom end of the push rod 733 is fixedly connected to the roughening execution head 4. A push plate 734 is fixedly connected to the push rod 733.
[0025] When the linkage drive unit 7 is working, the linkage drive housing 71, which is fixedly mounted on the mounting bracket 3, provides support for each component. After the motor 72, which is fixedly mounted on the linkage drive housing 71, starts, the output shaft of the motor 72 drives the drive gear 74, which is coaxially fixedly connected to it and rotatably mounted on the linkage drive housing 71, to rotate. The drive gear 74 meshes with the gear disk 731, which is rotatably mounted on the linkage drive housing 71, thereby driving the gear disk 731 to rotate. Since the gear disk 731 is eccentrically hinged with a connecting rod 732, and the connecting rod 732 is hinged to the top of the push rod 733, which is slidably connected to the linkage drive housing 71, the gear disk 731 rotates through the eccentrically hinged... The connecting rod 732 converts the rotational motion into the reciprocating sliding of the push rod 733 along the direction of the linkage drive housing 71. The bottom of the push rod 733 is fixedly connected to the roughening execution head 4. Therefore, when the push rod 733 slides back and forth, it drives the roughening execution head 4 to reciprocate synchronously, thereby achieving mechanical roughening of the cement concrete base surface. At the same time, a push plate 734 is fixedly connected to the push rod 733. The push plate 734 reciprocates with the push rod 733, thereby providing driving force for the first actuator 8 and the second actuator 9 that cooperate with the push plate 734. This allows the spraying action of the spray module 5 and the negative pressure dust collection action of the negative pressure dust collection module 6 to be carried out synchronously with the roughening operation of the roughening execution head 4.
[0026] In a preferred embodiment, at least one guide rod 412 is fixedly mounted on the roughening execution head 4. The guide rod 412 is slidably connected to the mounting frame 3 and extends vertically. The mounting frame 3 is provided with a guide hole that slidably engages with the guide rod 412. When the guide rod 412 is working, it extends vertically and passes through the guide hole on the mounting frame 3, thus providing guidance for the guide rod 412 when the roughening execution head 4 slides back and forth vertically. Because the guide rod 412 slidably engages with the guide hole, when the roughening execution head 4 moves up and down under the drive of the push rod 733, its movement direction is restricted to a straight line along the vertical direction. This prevents the roughening execution head 4 from deflecting, tilting, or rotating circumferentially when subjected to the reaction force of the cement concrete base surface. This ensures that the multiple teeth 411 at the bottom of the roughening execution head 4 always maintain a stable posture to mechanically roughen the cement concrete base surface, improving the uniformity and reliability of the roughening treatment.
[0027] In a preferred embodiment, the first actuating element 8 includes a first actuating cylinder 81, a first piston ring 82, and a first actuating rod 83. The first actuating cylinder 81 is fixedly mounted on the mounting bracket 3, and a first actuating cavity 84 is formed inside the first actuating cylinder 81. The first piston ring 82 is slidably connected to the first actuating cavity 84, and the first actuating rod 83 is fixedly mounted on the top of the first piston ring 82. The top of the first actuating rod 83 is fixedly connected to the push plate 734. The first actuating cylinder 81 is provided with an inlet pipe 85 and an outlet pipe 86 that communicate with the first actuating cavity 84. A first one-way valve is provided at the inlet pipe 85, and a second one-way valve is provided at the outlet pipe 86. Further, the bottom of the roughening actuator 4 is provided with a plurality of spray holes 41, each of which communicates with the spray cavity 51, and the outlet pipe 86 communicates with the spray cavity 51.
[0028] When the first actuator 8 is working, the first actuator cylinder 81, fixedly mounted on the mounting bracket 3, provides a space for the first actuator cavity 84. The first piston ring 82 is slidably connected within the first actuator cavity 84. The first actuator rod 83 is fixedly mounted on the top of the first piston ring 82, and its top is fixedly connected to the push plate 734. When the push plate 734 moves upward with the push rod 733, the push plate 734 drives the first actuator rod 83 to move upward. The first actuator rod 83 drives the first piston ring 82 to slide upward within the first actuator cavity 84, creating a negative pressure within the first actuator cavity 84. At this time, the first one-way valve located at the inlet pipe 85 opens, and the second one-way valve located at the outlet pipe 86 closes. In this embodiment, the liquid is preferably a diluted asphalt binder. The inlet pipe 85 is connected to an external diluted asphalt binder, and the diluted asphalt binder is drawn into the first actuator cavity 84 through the inlet pipe 85. When the push plate 834 moves upward with the push rod 733, the first actuator rod 83 moves upward. The first actuator rod 83 drives the first piston ring 82 to slide upward within the first actuator cavity 84, creating a negative pressure within the first actuator cavity 84. At this time, the first one-way valve located at the inlet pipe 85 opens, and the second one-way valve located at the outlet pipe 86 closes. The liquid in this embodiment is preferably a diluted asphalt binder. The inlet pipe 85 is connected to an external diluted asphalt binder, and the diluted asphalt binder is drawn into the first actuator cavity 84 through the inlet pipe 85. When the push plate 734 moves downward with the push rod 733, the push plate 734 drives the first actuating rod 83 to move downward. The first actuating rod 83 drives the first piston ring 82 to slide downward in the first actuating chamber 84, which increases the pressure in the first actuating chamber 84. At this time, the first one-way valve closes and the second one-way valve opens, and the liquid in the first actuating chamber 84 is discharged through the liquid outlet pipe 86. Since the liquid outlet pipe 86 is connected to the spray chamber 51 formed inside the roughening execution head 4, and the bottom of the roughening execution head 4 is provided with several spray holes 41 connected to the spray chamber 51, the liquid discharged through the liquid outlet pipe 86 enters the spray chamber 51 and is sprayed from each spray hole 41 to the roughening operation area to wet the surface of the cement concrete base and reduce the dust generated during the roughening operation. The spraying action continues with the up-and-down reciprocating motion of the push plate 734 and is synchronized with the roughening operation of the roughening execution head 4.
[0029] In a preferred embodiment, the second actuating member 9 includes a second actuating cylinder 91, a second piston ring 92, and a second actuating rod 93. The second actuating cylinder 91 is fixedly mounted on the mounting bracket 3, and a second actuating cavity 94 is formed inside the second actuating cylinder 91. The second piston ring 92 is slidably connected to the second actuating cavity 94, and the second actuating rod 93 is fixedly mounted on the top of the second piston ring 92. The top of the second actuating rod 93 is fixedly connected to the push plate 734. An inlet pipe 95 and an outlet pipe 96 communicating with the second actuating cavity 94 are provided on the second actuating cylinder 91. A third one-way valve is provided at the inlet pipe 95, and a fourth one-way valve is provided at the outlet pipe 96. A dust collecting chamber 611 is formed inside the dust collecting ring 61, and a plurality of dust collecting holes 612 are provided on the outer periphery of the dust collecting ring 61. Each dust collecting hole 612 communicates with the dust collecting chamber 611, and the dust collecting chamber 611 communicates with the inlet pipe 95. A filter screen is provided at the inlet pipe 95.
[0030] When the second actuator 9 is working, the second actuator cylinder 91, fixedly mounted on the mounting bracket 3, provides a space for the second actuator cavity 94. The second piston ring 92 is slidably connected within the second actuator cavity 94. The second actuator rod 93 is fixedly mounted on the top of the second piston ring 92, and its top is fixedly connected to the push plate 734. When the push plate 734 moves upward with the push rod 733, the push plate 734 drives the second actuator rod 93 to move upward. The second actuator rod 93 drives the second piston ring 92 to slide upward within the second actuator cavity 94, creating a negative pressure within the second actuator cavity 94. At this time, the third one-way valve located at the air inlet pipe 95 opens, and the fourth one-way valve located at the air outlet pipe 96 closes, allowing gas to be drawn into the second actuator cavity 94 through the air inlet pipe 95. When the push plate 734 moves downward with the push rod 733, the push plate 734 drives the second actuator rod 93 to move downward. The second actuator rod 93 drives the second piston ring 92 to move upward. The gas slides downwards within the second actuation chamber 94, increasing the pressure within it. At this time, the third one-way valve closes and the fourth one-way valve opens, allowing the gas in the second actuation chamber 94 to be discharged through the outlet pipe 96. Since a dust collection chamber 611 is formed within the dust collection ring 61, and several dust collection holes 612 communicating with the dust collection chamber 611 are provided on the outer periphery of the dust collection ring 61, and the dust collection chamber 611 is connected to the inlet pipe 95, when a negative pressure is generated within the second actuation chamber 94, a negative pressure is simultaneously generated within the dust collection chamber 611. External dust-laden gas is drawn into the dust collection chamber 611 through each dust collection hole 612. The dust is intercepted and retained in the dust collection chamber 611 by the filter screen located at the inlet pipe 95, while the gas enters the second actuation chamber 94 through the inlet pipe 95 and is discharged from the outlet pipe 96, thereby achieving negative pressure dust collection. This dust collection action continues with the up-and-down reciprocating motion of the push plate 734, maintaining synchronization with the roughening operation of the roughening execution head 4.
[0031] In a preferred embodiment, the mobile frame 1 includes a mobile chassis 11 and a housing 12, with the housing 12 fixedly mounted on the mobile chassis 11. A discharge trough 13 is provided at the bottom of the mobile chassis 11, and a discharge pipe 14 is provided between the discharge trough 13 and the housing 12. A sliding groove 15 is provided on the mobile chassis 11, and a sliding column 16 is slidably connected in the sliding groove 15. A flat plate 17 is fixedly connected to the bottom of the sliding column 16. Along the traveling direction of the mobile frame 1, the discharge trough 13 is located in front of the flat plate 17. A push rod 733 is fixedly connected to a crossbar 18, which is perpendicular to the axis of the push rod 733. The crossbar 18 is fixedly connected to the sliding column 16. When the mobile frame 1 is in operation, the housing 12, which is fixedly installed on the mobile chassis 11, is used to store paving materials such as asphalt. The material in the housing 12 is transported to the discharge trough 13 through the discharge pipe 14 located between the housing 12 and the discharge trough 13 at the bottom of the mobile chassis 11, and discharged from the discharge trough 13 to the cement concrete base surface. Since the mobile chassis 11 has a sliding groove 15, and a sliding column 16 is slidably connected in the sliding groove 15, and a flat plate 17 is fixedly connected to the bottom of the sliding column 16, and the discharge trough 13 is located in front of the flat plate 17 along the traveling direction of the mobile frame 1, when the mobile frame 1 moves, the discharge trough 13 first lays the material on the front base surface, and the flat plate 17 then levels the laid material. At the same time, since the push rod 733 is fixedly connected to the crossbar 18, and the crossbar 18 is perpendicular to the ground surface, the material is laid on the ground surface. The axis of the push rod 733 is set and fixedly connected to the sliding column 16. The push rod 733 slides back and forth in the vertical direction under the drive of the eccentric linkage mechanism 73. Therefore, the vertical reciprocating motion of the push rod 733 is transmitted to the sliding column 16 through the crossbar 18, so that the sliding column 16 slides back and forth in the vertical direction in the groove 15, thereby driving the platen 17 to generate up and down reciprocating vibration leveling action while leveling the material. Thus, the leveling action of the platen 17 shares the same power source and operates synchronously with the roughening actuator 4, the first actuator 8 and the second actuator 9 driven by the push rod 733. This allows roughening, spraying wet dust reduction, negative pressure dust collection and vibration leveling after asphalt discharge to be carried out in coordination during the movement of the moving frame 1, without the need for separate independent drive equipment, thus realizing the time synchronization and structural linkage of multiple processes.
[0032] In a preferred embodiment, a vibrator is provided on the leveling plate 17. The vibrator is fixedly installed on the upper surface of the leveling plate 17 and configured to generate vibration when the leveling plate 17 is used to level the asphalt. The vibrator fixedly installed on the upper surface of the leveling plate 17 generates vibration when the leveling plate 17 is used to level the asphalt and transmits the vibration force to the leveling plate 17. This causes the leveling plate 17 to reciprocate up and down with the sliding column 16 while superimposing the vibration effect, thereby vibrating and leveling the asphalt discharged from the discharge chute 13, improving the density and smoothness of the asphalt layer. The vibrator is preferably a plate vibrator, such as a ZW-5 type plate vibrator. Since the vibrator is directly installed on the upper surface of the leveling plate 17, the vibration it generates can directly act on the leveling plate 17 and be synchronized with the movement of the leveling plate 17. It also coordinates with the actions of the roughening actuator 4, the first actuator 8 and the second actuator 9 driven by the push rod 733, so that roughening, spraying wet dust suppression, negative pressure dust collection and asphalt vibration leveling are carried out simultaneously during the movement of the moving frame 1.
[0033] On the other hand, this embodiment proposes a tunnel construction method using the aforementioned tunnel construction device, comprising the following steps: S1. Construction preparation and equipment positioning: Move the tunnel construction equipment to the cement concrete base construction area inside the tunnel where the asphalt layer needs to be laid, and align the roughening component at the front end of the mobile frame 1 with the cement concrete base surface to be treated; check the connection status of the motor 72 of the linkage drive unit 7, the liquid inlet pipe 85 and liquid outlet pipe 86 of the first actuator 8, the air inlet pipe 95 and air outlet pipe 96 of the second actuator 9, and the filter screen inside the dust collection ring 61, and confirm that each one-way valve is opening and closing normally; load the asphalt mixture to be laid into the machine box 12, and connect the liquid inlet pipe 85 to the external asphalt binder dilution liquid supply source, so that the mobile frame 1 is positioned along the tunnel construction face travel direction.
[0034] S2. Roughening and dust suppression by spraying are carried out simultaneously; the motor 72 of the linkage drive unit 7 is started, the output shaft of the motor 72 drives the drive gear 74 to rotate, the drive gear 74 drives the gear disk 731 to rotate, and the gear disk 731 drives the push rod 733 to slide back and forth along the linkage drive housing 71 through the eccentrically hinged connecting rod 732; the bottom of the push rod 733 drives the roughening execution head 4 to slide back and forth in the vertical direction, and the multiple teeth 411 at the bottom of the roughening execution head 4 impact and scrape the surface of the cement concrete base layer to achieve mechanical roughening; at the same time, the push rod The push plate 734 on 733 reciprocates together with the push rod 733, driving the first actuating rod 83 of the first actuating member 8 to reciprocate, causing the first piston ring 82 to slide back and forth in the first actuating chamber 84. With the cooperation of the first one-way valve and the second one-way valve, the asphalt binder diluted liquid is drawn into the first actuating chamber 84 through the liquid inlet pipe 85 and discharged into the spray chamber 51 through the liquid outlet pipe 86. Then, it is sprayed into the roughening operation area through the spray holes 41 at the bottom of the roughening execution head 4 to wet the surface of the cement concrete base and suppress the dust generated by roughening.
[0035] S3. Simultaneous operation of negative pressure dust collection and roughening; During the reciprocating motion of the push plate 734 with the push rod 733, the push plate 734 simultaneously drives the second actuator 9's second actuator rod 93 to reciprocate, causing the second piston ring 92 to slide back and forth in the second actuator chamber 94. With the cooperation of the third and fourth one-way valves, a negative pressure is generated in the second actuator chamber 94 and connected to the dust collection chamber 611 through the air inlet pipe 95. A negative pressure is simultaneously formed in the dust collection chamber 611; External dust-laden gas passes through the various collection rings around the outer periphery of the dust collection ring 61. Dust is drawn into the dust collection chamber 611 through the dust hole 612. The dust is intercepted and retained in the dust collection chamber 611 by the filter screen at the air inlet pipe 95. The gas enters the second actuation chamber 94 through the air inlet pipe 95 and is discharged from the air outlet pipe 96, thereby achieving negative pressure dust collection. Since the first actuator 8 and the second actuator 9 are both driven by the same push plate 734, the liquid spraying dust suppression action and the negative pressure dust collection action are carried out simultaneously when the roughening execution head 4 performs roughening operations, realizing the coordinated operation of "simultaneous roughening, liquid spraying dust suppression, and negative pressure dust collection".
[0036] S4. Asphalt Discharge and Vibration Leveling: As the mobile frame 1 continues to move along the tunnel construction face, the asphalt mixture in the machine box 12 is conveyed through the discharge pipe 14 to the discharge chute 13 at the bottom of the mobile chassis 11, and discharged from the discharge chute 13 to the roughened cement concrete base surface; since the discharge chute 13 is located in front of the leveling plate 17 along the moving direction of the mobile frame 1, the leveling plate 17 then levels the laid asphalt mixture; at the same time, the vertical reciprocating motion of the push rod 733 is transmitted to the sliding column 16 through the crossbar 18, causing the sliding column 16 to slide back and forth in the vertical direction in the sliding groove 15, driving the leveling plate 16 to level the asphalt mixture. While leveling the asphalt, the plate 17 generates a reciprocating vibration leveling action; the vibrator on the upper surface of the plate 17 generates vibration synchronously and transmits the vibration force to the plate 17, so that the plate 17, while moving up and down with the sliding column 16, superimposes the vibration effect, and vibrates and levels the asphalt discharged from the discharge chute 13, thereby improving the density and smoothness of the asphalt layer; thus, roughening, spraying to wet and suppress dust, negative pressure dust collection, and vibration leveling after asphalt discharge all share the same power source and are carried out in coordination during the movement of the moving frame 1, completing the roughening treatment of the tunnel cement concrete base and the laying of the asphalt layer.
[0037] The above embodiments are merely preferred embodiments provided to fully illustrate the present invention, and the scope of protection of the present invention is not limited thereto. Equivalent substitutions or modifications made by those skilled in the art based on the present invention are all within the scope of protection of the present invention.
Claims
1. A tunnel construction device, characterized in that, include: A mobile frame (1) and at least one roughening component (2), the roughening component (2) being mounted on the front end of the mobile frame (1), the roughening component (2) including a mounting bracket (3), a roughening execution head (4), a spray module (5) and a negative pressure dust collection module (6). The roughening execution head (4) is slidably installed at the lower end of the mounting frame (3) in the vertical direction. The bottom of the roughening execution head (4) is provided with a plurality of teeth (411) for mechanical roughening of the cement concrete base surface. The spray module (5) includes a spray chamber (51) formed inside the roughening execution head (4), and a first actuator (8) communicating with the spray chamber (51). The first actuator (8) is configured to supply liquid into the spray chamber (51) and spray the liquid into the roughening operation area. The negative pressure dust collection module (6) includes a dust collection ring (61) disposed on the outer periphery of the roughening execution head (4), and a second actuator (9) communicating with the dust collection ring (61). The second actuator (9) is configured to form a negative pressure in the dust collection ring (61) to draw dust generated by the roughening operation into the dust collection ring (61). Linkage drive unit (7), which is connected to the first actuator (8) and the second actuator (9) and is configured to drive the first actuator (8) and the second actuator (9) to operate simultaneously, so that the spraying action of the spray module (5) and the negative pressure dust collection action of the negative pressure dust collection module (6) are performed synchronously when the roughening execution head (4) performs roughening operation.
2. The tunnel construction device according to claim 1, characterized in that: The linkage drive unit (7) includes a linkage drive housing (71), a motor (72) and an eccentric linkage mechanism (73). The linkage drive housing (71) is fixedly mounted on the mounting bracket (3). The motor (72) is fixedly mounted on the linkage drive housing (71). A drive gear (74) is rotatably mounted on the linkage drive housing (71). The output shaft of the motor (72) is coaxially and fixedly connected to the drive gear (74). The eccentric linkage mechanism (73) includes a gear disk (731) rotatably mounted on the linkage drive housing (71), the gear disk (731) meshing with the drive gear (74), a connecting rod (732) eccentrically hinged on the gear disk (731), a push rod (733) slidably connected on the linkage drive housing (71), the top end of the push rod (733) hinged to the connecting rod (732), the bottom end of the push rod (733) fixedly connected to the roughening actuator head (4), and a push plate (734) fixedly connected on the push rod (733).
3. The tunnel construction device according to claim 2, characterized in that: The first actuator (8) includes a first actuator cylinder (81), a first piston ring (82) and a first actuator rod (83). The first actuator cylinder (81) is fixedly mounted on the mounting bracket (3). A first actuator cavity (84) is formed inside the first actuator cylinder (81). The first piston ring (82) is slidably connected in the first actuator cavity (84). The first actuator rod (83) is fixedly mounted on the top of the first piston ring (82). The top of the first actuator rod (83) is fixedly connected to the push plate (734). The first actuator (81) is provided with an inlet pipe (85) and an outlet pipe (86) that are connected to the first actuator cavity (84). A first check valve is provided at the inlet pipe (85) and a second check valve is provided at the outlet pipe (86).
4. The tunnel construction device according to claim 3, characterized in that: The bottom of the roughening execution head (4) is provided with a plurality of spray holes (41), each of the spray holes (41) is connected to the spray chamber (51), and the liquid outlet pipe (86) is connected to the spray chamber (51).
5. The tunnel construction device according to claim 4, characterized in that: The second actuator (9) includes a second actuator cylinder (91), a second piston ring (92), and a second actuator rod (93). The second actuator cylinder (91) is fixedly mounted on the mounting bracket (3). A second actuator cavity (94) is formed inside the second actuator cylinder (91). The second piston ring (92) is slidably connected in the second actuator cavity (94). The second actuator rod (93) is fixedly mounted on the top of the second piston ring (92). The top of the second actuator rod (93) is fixedly connected to the push plate (734). The second actuator (91) is provided with an air inlet pipe (95) and an air outlet pipe (96) that are connected to the second actuator chamber (94). A third one-way valve is provided at the air inlet pipe (95), and a fourth one-way valve is provided at the air outlet pipe (96).
6. The tunnel construction device according to claim 5, characterized in that: A dust collection chamber (611) is formed inside the dust collection ring (61). A plurality of dust collection holes (612) are provided on the outer periphery of the dust collection ring (61). Each dust collection hole (612) is connected to the dust collection chamber (611). The dust collection chamber (611) is connected to the air inlet pipe (95). A filter screen is provided at the air inlet pipe (95).
7. The tunnel construction device according to claim 6, characterized in that: The mobile rack (1) includes a mobile chassis (11) and a housing (12), the housing (12) being fixedly mounted on the mobile chassis (11); The bottom of the mobile chassis (11) is provided with a discharge trough (13), and a discharge pipe (14) is provided between the discharge trough (13) and the chassis (12). The mobile chassis (11) is provided with a sliding groove (15), and a sliding column (16) is slidably connected in the sliding groove (15). A flat plate (17) is fixedly connected to the bottom of the sliding column (16). Along the traveling direction of the mobile frame (1), the discharge chute (13) is located in front of the flat plate (17). A crossbar (18) is fixedly connected to the push rod (733). The crossbar (18) is set perpendicular to the axis of the push rod (733). The crossbar (18) is fixedly connected to the sliding column (16).
8. The tunnel construction device according to claim 7, characterized in that: A vibrator is provided on the platen (17), the vibrator is fixedly installed on the upper surface of the platen (17), and is configured to generate vibration when the asphalt is leveled on the platen (17).
9. The tunnel construction device according to claim 8, characterized in that: At least one guide rod (412) is fixedly provided on the roughening execution head (4). The guide rod (412) is slidably connected to the mounting frame (3). The guide rod (412) extends in the vertical direction. The mounting frame (3) is provided with a guide hole that slidably engages with the guide rod (412).
10. A tunnel construction method, characterized in that, Including the tunnel construction apparatus as described in any one of claims 1 to 9, the method further includes the following steps: S1. Move the tunnel construction device to the construction area of the cement concrete base in the tunnel, so that the roughening component (2) at the front end of the mobile frame (1) is aligned with the surface of the cement concrete base, and connect the first actuator (8) to the liquid supply source. S2. Start the linkage drive unit (7). The linkage drive unit (7) simultaneously drives the first actuator (8) and the second actuator (9) to move, and drives the roughening execution head (4) to slide back and forth in the vertical direction, so that the roughening execution head (4) mechanically roughens the surface of the cement concrete base. S3. While the roughening execution head (4) is performing roughening operations, the first actuator (8) supplies liquid into the spray chamber (51). The liquid is sprayed into the roughening operation area through the spray chamber (51) to wet the surface of the cement concrete base and reduce the dust generated during roughening. The second actuator (9) creates a negative pressure in the dust collection ring (61) to draw the dust generated during roughening operations into the dust collection ring (61), so that the liquid spraying action and the negative pressure dust collection action are synchronized with the roughening operation of the roughening execution head (4). S4. As the mobile frame (1) moves along the tunnel construction face, the asphalt in the machine box (12) is transported to the discharge trough (13) through the discharge pipe (14) and discharged from the discharge trough (13) to the surface of the cement concrete base that has been roughened. The leveling plate (17) then levels the discharged asphalt.