Sound barrier and method of installation

By incorporating a combination of crash barriers, sound insulation mechanisms, and anti-detachment mechanisms into the sound barrier, and using locking steel ropes and locking components for binding and fixing, the problem of loosening or falling off the sound barrier under external loads is solved, achieving a stable connection and improved safety.

CN123133288APending Publication Date: 2026-11-20POLY CHANGDA ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611322154.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing sound barriers are prone to loosening or falling off at the connection points when exposed to strong winds, vibrations from heavy vehicles, or sudden collisions, posing a serious safety hazard.

Method used

The design combines crash barriers, sound insulation mechanisms, and anti-detachment mechanisms. By creating through holes at the top of the crash barriers and setting guide holes within the sound insulation mechanisms, and using anti-detachment mechanisms such as locking steel ropes and locking components for binding and fixing, a strong connection is formed, preventing the sound insulation mechanisms from shifting or separating under external loads.

Benefits of technology

This effectively prevents the sound barrier panels from loosening or falling off, ensuring the safety and stability of the sound barrier, extending its service life, and adapting to the effects of long-term wind and vehicle vibration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133288A_ABST
    Figure CN123133288A_ABST
Patent Text Reader

Abstract

The application discloses a sound barrier and a mounting method, relates to the technical field of sound barrier protection, and is characterized in that an anti-collision guardrail, a sound insulation mechanism and an anti-falling mechanism are arranged, the anti-collision guardrail is arranged on one side of a road surface to be protected, a through hole penetrating in a horizontal direction and a mounting position distributed at intervals with the through hole are formed at the top of the anti-collision guardrail, the sound insulation mechanism is arranged at the mounting position and located at the top of the anti-collision guardrail, a guide hole penetrating in a vertical direction is formed in the sound insulation mechanism, then the anti-falling mechanism is arranged in the sound insulation mechanism and penetrates the guide hole and the through hole in the vertical direction, so that the sound insulation mechanism and the anti-collision guardrail are fixed by binding, the anti-falling mechanism is used to penetrate the guide hole and the through hole to realize the binding and fixing of the sound insulation mechanism and the anti-collision guardrail, the sound insulation mechanism can be connected with the anti-collision guardrail firmly under the penetrating binding action of the anti-falling mechanism, displacement or separation of the sound insulation mechanism is prevented by the binding constraint under the action of external load, and the safety, stability and service life of the sound barrier are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of sound barrier protection technology, and in particular to a sound barrier and its installation method. Background Technology

[0002] With the continuous development of transportation infrastructure and the sustained increase in highway traffic volume, the safety and stability of sound barriers, as important facilities for reducing noise pollution along highways, are receiving increasing attention. To ensure the structural stability of sound barriers under long-term wind, vehicle vibration, and environmental conditions, and to prevent potential safety hazards caused by panel detachment, fall protection technology has gradually become a key technical aspect of sound barrier design. In recent years, with the development of materials science and connection technology, researchers have attempted to improve the fall protection performance of sound barriers through various mechanical connections and auxiliary fixing structures, thereby enhancing the overall protection level and service life.

[0003] Currently, the anti-fall technology for sound barriers mainly relies on traditional methods such as mechanical insertion, bolt fixing, or welding to ensure the secure installation of the panels. However, during installation, the traditional sound-absorbing panels are mainly fixed by insertion or bolts. In the face of strong winds, vibrations from heavy vehicles, or sudden collisions, the connection points are prone to loosening or even falling off, directly causing the sound barrier panels to fall, posing a serious safety hazard. Summary of the Invention

[0004] The main objective of this invention is to propose a sound barrier and its installation method, aiming to solve the technical problem that in the installation of existing sound barrier anti-fall technology, the traditional sound-absorbing panels are mainly fixed by plugging or bolting. When faced with strong winds, vibrations from heavy vehicles, or sudden collisions, the connection points are prone to loosening or even falling off, directly causing the sound barrier panels to fall, which poses a serious safety hazard.

[0005] To achieve the above objectives, in a first aspect, the present invention provides a sound barrier comprising: A crash barrier is installed on one side of the road surface to be protected. The top of the crash barrier has a through hole that runs horizontally through the crash barrier and installation positions that are spaced apart from the through hole. A sound insulation mechanism, installed at the installation position, located at the top of the crash barrier, and having a guide hole extending vertically through it; and... An anti-detachment mechanism is installed on the sound insulation mechanism. The anti-detachment mechanism extends vertically through the guide hole and the through hole to secure the sound insulation mechanism to the crash barrier.

[0006] The technical solution of this invention involves setting up a crash barrier, a sound insulation mechanism, and an anti-detachment mechanism. In use, the crash barrier is installed on one side of the road surface to be protected. The top of the crash barrier has a horizontally penetrating through-hole and installation positions spaced apart from the through-hole. The sound insulation mechanism is installed at the installation positions, positioned on top of the crash barrier, and has a vertically penetrating guide hole within it. Subsequently, the anti-detachment mechanism is installed on top of the sound insulation mechanism, penetrating vertically through the guide hole and the through-hole, thereby binding and fixing the sound insulation mechanism to the crash barrier. This allows the anti-detachment mechanism to be used to bind and fix the sound insulation mechanism to the crash barrier through the guide hole and the through-hole, enabling the invention to utilize the sound insulation mechanism located on top of the crash barrier under the binding action of the anti-detachment mechanism. The crash barrier forms a strong connection, and under external loads, the binding constraint prevents the sound insulation mechanism from shifting or separating. This avoids the shortcomings of traditional sound-absorbing panels in current sound barrier anti-fall technology, which mainly rely on plug-in or bolt fixing. These connections are prone to loosening or even falling off under strong winds, heavy vehicle vibrations, or sudden collisions, directly causing the sound barrier panels to fall and posing a serious safety hazard. At the same time, because the sound insulation mechanism is set on the top of the crash barrier and bound and fixed through the through hole, this invention can form an additional through constraint in addition to the fixed installation position. This ensures the overall stability under long-term wind, vehicle vibrations, and natural environmental conditions, guaranteeing the safety, stability, and service life of the sound barrier. Attached Figure Description

[0007] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0008] Figure 1 A schematic diagram of the structure of the sound barrier provided by the present invention; Figure 2 for Figure 1 The example shows a schematic diagram of the sound insulation mechanism. Figure 3 for Figure 2 A schematic diagram of the supporting components in the example; Figure 4 for Figure 1 A schematic diagram of the anti-hair loss mechanism in the example; Figure 5 for Figure 4 An enlarged structural diagram of part A in the example; Figure 6 for Figure 4An enlarged structural diagram of part B in the example; Figure 7 This is a flowchart illustrating an assembly method exemplified by the present invention.

[0009] Figure label: 100. Crash barrier; 200. Sound insulation mechanism; 300. Anti-detachment mechanism; 310. Locking steel rope; 320. Locking assembly; 321. Buckle body; 322. Locking bolt; 210. Support assembly; 220. Protective assembly; 211. Support column; 212. Base; 221. Sound barrier protective panel.

[0010] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0011] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0012] It should be noted that if the embodiments of the present invention involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a specific posture. If the specific posture changes, the directional indicators will also change accordingly.

[0013] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the use of "and / or" or "and / or" throughout the text includes three parallel solutions. For example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0014] This invention proposes a sound barrier and its installation method.

[0015] Please see Figures 1 to 7For ease of understanding, this sound barrier includes a crash barrier 100, a sound insulation mechanism 200, and an anti-detachment mechanism 300. The crash barrier 100 is installed on one side of the road surface to be protected. The top of the crash barrier 100 has a horizontal through hole and installation positions spaced apart from the through hole. The sound insulation mechanism 200 is installed at the installation positions and is located on top of the crash barrier 100. The sound insulation mechanism 200 has a vertically penetrating guide hole. The anti-detachment mechanism 300 is installed on the sound insulation mechanism 200 and penetrates the guide hole and the through hole vertically to bind and fix the sound insulation mechanism 200 to the crash barrier 100.

[0016] Specifically, in order to facilitate understanding and implementation of the present invention by those skilled in the art, the sound barrier exemplified in this embodiment is typically used for road protection in areas where people congregate. The function of the sound barrier is to prevent noise pollution caused by vehicles traveling on the road to areas where people are focused.

[0017] For ease of understanding, the crash barrier 100 in this embodiment is necessarily installed on one side of the road along the road's extension direction (i.e., the driving direction). When installing the crash barrier 100, it should be arranged sequentially along the road's extension direction, and preferably, it should be made of reinforced concrete. It should be clearly stated that, in specific implementation, the crash barrier 100 has a preset length, and the installation position is formed at the position corresponding to the center of length of each crash barrier 100. The installation position should be provided with a fixing channel for fixing a sound insulation mechanism 200, such as a screw, to the crash barrier 100. Through holes are spaced apart and symmetrically distributed above both sides of the installation position, and both the through holes and the fixing channel at the installation position penetrate along the thickness direction of the crash barrier 100.

[0018] It can be further clarified that the specific value of the preset length is determined according to the installation environment and installation length of the area where the sound barrier is located. However, under normal circumstances, the length of the crash barrier 100 is set to any length within the range of 0.5m-3m. In the embodiment of the present invention, the length of the crash barrier 100 is set to 0.6m.

[0019] Meanwhile, the sound insulation mechanism 200 is the core module for noise protection in this embodiment. When the sound insulation mechanism 200 is installed on top of the crash barrier 100 and fixed in place at the installation position on top of the crash barrier 100, the sound insulation mechanism 200 can isolate the noise generated by vehicles traveling on the road. It can be clearly stated that the sound insulation mechanism 200 in this embodiment is preferably a module formed by combining two steel columns and multiple sound barrier panels 221. In use, the bottom of the two steel columns is fixedly connected to one of the installation positions, and the two steel columns are spaced apart along the road extension direction to form an installation space between the two steel columns for installing the sound barrier panels 221. As for the sound barrier panels 221, their height is typically set to 0.3m-0.6m. The number of sound barrier panels 221 is determined based on the installation height of the area where the sound barrier is located. The length of the sound barrier panels 221 is also determined based on the installation environment and length of the area where the sound barrier is located. Both ends of each sound barrier panel 221 should be fixedly connected to the corresponding steel columns. Generally, the number of sound barrier panels 221 is an integer multiple of the length of the crash barrier 100. For example, if the length of the crash barrier 100 is 0.6m, the length of the sound barrier crash barrier 100 is 1.2m, 1.8m, or 2.4m. Each sound barrier panel 221 is provided with guide holes that correspond one-to-one with the positions of the through holes.

[0020] It is particularly important to emphasize that the one-to-one correspondence setting in this embodiment means that, taking the sound barrier anti-collision guardrail 100 as having a length of 1.8m and being located at the starting installation position of the sound barrier, one of the two steel columns is installed at the installation position on the first anti-collision guardrail 100, and the other steel column is installed at the installation position on the fourth anti-collision guardrail 100. There are two anti-collision guardrails 100 and six through holes spaced between the two columns. Therefore, the number of guide holes formed on each sound barrier protective plate 221 is also 6, and they correspond one-to-one with the positions of the through holes.

[0021] Furthermore, the purpose of the anti-detachment mechanism 300 exemplified in this embodiment is to prevent the sound insulation mechanism 200 from loosening or falling directly off the crash barrier 100 when subjected to at least one of the following external forces: collision, shock, or impact. The anti-detachment mechanism 300 has the same number of guide holes as the sound barrier protective plate 221 exemplified in this embodiment and fixes the sound barrier protective plate 221 to the crash barrier 100 corresponding to the guide holes. It can be clearly stated that the anti-detachment mechanism 300 exemplified in this embodiment is preferably a module made of locking steel rope 310, buckle 321, and locking bolt 322. In use, one end of the locking steel rope 310 passes vertically downward through all the sound barrier protective plates 221 and the corresponding through holes of the guide holes from the guide hole on the topmost sound barrier protective plate 221, then exits and extends upward from the outer surface of the sound barrier protective plate 221 to intersect with the other end and pass through the buckle 321, and is then locked and fixed using the locking bolt 322. Of course, for the sake of aesthetics and ease of use of the entire sound barrier, in the specific implementation, the guide holes in the example are set in two rows, and the two rows of guide holes are set one-to-one. When installing the anti-detachment mechanism 300, one of the guide holes on the topmost sound barrier protective plate 221 of one end of the locking steel rope 310 passes through all the sound barrier protective plates 221 and the corresponding through holes in sequence from vertical downwards, and then passes through the other guide hole upwards to the topmost sound barrier protective plate 221. It then extends upwards from the outer surface of the sound barrier protective plate 221 to intersect with the other end and pass through the buckle 321, and is then locked and fixed with locking bolts 322.

[0022] In this embodiment, by setting up a crash barrier 100, a sound insulation mechanism 200, and an anti-detachment mechanism 300, in use, the crash barrier 100 is installed on one side of the road surface to be protected. The top of the crash barrier 100 forms a through hole extending horizontally and installation positions spaced apart from the through hole. The sound insulation mechanism 200 is installed at the installation positions, positioned on top of the crash barrier 100, and a guide hole extending vertically is formed inside the sound insulation mechanism 200. Subsequently, the anti-detachment mechanism 300 is installed on the sound insulation mechanism 200, extending vertically through the guide hole and the through hole, thereby binding and fixing the sound insulation mechanism 200 to the crash barrier 100. This allows the anti-detachment mechanism 300 to be used to bind and fix the sound insulation mechanism 200 to the crash barrier 100 through the guide hole and the through hole in use. This also allows the invention to utilize the sound insulation mechanism 200 located on top of the crash barrier 100 in use. Under the through binding action of the anti-detachment mechanism 300, the sound insulation mechanism 200 is firmly connected to the crash barrier 100. Under external loads, the binding constraint prevents the sound insulation mechanism 200 from shifting or separating. This avoids the defects of traditional sound-absorbing panels in current sound barrier anti-fall technology, which mainly rely on plug-in or bolt fixing. When faced with strong winds, vibrations from heavy vehicles, or sudden collisions, the connection points are prone to loosening or even falling off, directly causing the sound barrier panels to fall and posing a serious safety hazard. At the same time, since the sound insulation mechanism 200 is set on the top of the crash barrier 100 and bound and fixed by the through-hole anti-detachment mechanism 300, the present invention can form an additional through constraint in addition to the fixed installation position. Thus, it can maintain overall stability under long-term wind, vehicle vibration, and natural environmental conditions, ensuring the safety, stability, and service life of the sound barrier.

[0023] In one embodiment, the anti-detachment mechanism 300 includes a locking steel rope 310 and a locking assembly 320. The locking steel rope 310 passes vertically through a guide hole and a through hole. The locking assembly 320 is fixed to the locking steel rope 310 so as to bind and fix the sound insulation mechanism 200 and the crash barrier 100 through the locking steel rope 310.

[0024] Specifically, the locking steel rope 310 is a flexible cable made of multiple strands of steel wire, with a diameter ranging from 5mm to 16mm. The locking steel rope 310 possesses high tensile strength and a certain degree of flexibility. During installation, the locking steel rope 310 is inserted downwards from the top of the sound insulation mechanism 200 along the guide hole. The axis of the locking steel rope 310 coincides with the axis of the guide hole. The locking steel rope 310 extends vertically within the guide hole and passes through the lower opening of the guide hole. After passing through the guide hole, the locking steel rope 310 continues downwards into the through hole at the top of the crash barrier 100. The locking steel rope 310 extends downwards along the channel of the through hole and extends out from the lower end of the through hole, thus realizing the vertical insertion process of the locking steel rope 310 through the guide hole and the through hole. During the process of passing through the guide hole and the through hole, the locking steel rope 310's flexibility allows it to adapt to slight deviations that may occur during the processing or installation of the guide hole and the through hole. The locking steel rope 310 can compensate for the axial offset between the guide hole and the through hole through its own bending deformation, avoiding installation difficulties or connection failures caused by hole position deviations.

[0025] The locking assembly 320 is fixed to the locking steel rope 310. The function of the locking assembly 320 is to bind and fix the sound insulation mechanism 200 and the crash barrier 100 through the fixed connection with the locking steel rope 310. In this application, the sound barrier uses the locking steel rope 310 as the main load-bearing component of the anti-detachment mechanism 300. The locking steel rope 310 forms a longitudinally penetrating tie path through the guide hole and through hole. The locking steel rope 310 withstands the pull-out load generated by the sound insulation mechanism 200 under external force through its high tensile strength. Compared with the rigid fixing rod, the flexible characteristics of the locking steel rope 310 allow it to be uniformly stressed axially when under tension, avoiding connection failure caused by local stress concentration. The flexible nature of the locking steel rope 310 also enables it to adapt to minor deformations or displacements that may occur between the sound insulation mechanism 200 and the crash barrier 100 during long-term use. The locking steel rope 310 absorbs these deformations or displacements through its own elastic deformation, maintaining the continuous effectiveness of the connection between the sound insulation mechanism 200 and the crash barrier 100, and avoiding stress accumulation or connection failure caused by rigid connection.

[0026] In one embodiment, the locking assembly 320 includes a buckle body 321 and a locking bolt 322. The buckle body 321 surrounds the outer periphery of the locking steel rope 310. A threaded locking hole is formed on the buckle body 321. The locking bolt 322 is threadedly fixed to the threaded locking hole to lock the buckle body 321 and the locking steel rope 310 and to bind and fix the sound insulation mechanism 200 to the crash barrier 100.

[0027] Specifically, the buckle body 321 has a ring-shaped structure. A central through-hole is formed in the center of the buckle body 321 for the locking steel rope 310 to pass through. The diameter of the central through-hole is slightly larger than the diameter of the locking steel rope 310. After the locking steel rope 310 passes through the central through-hole, the buckle body 321 surrounds the outer periphery of the locking steel rope 310. In one specific embodiment, the buckle body 321 has an open ring-shaped structure. The annular wall of the buckle body 321 forms an opening in the circumferential direction, allowing the buckle body 321 to be fitted laterally onto the outer periphery of the locking steel rope 310, facilitating the installation operation of the buckle body 321 after the locking steel rope 310 is passed through. A first connecting ear and a second connecting ear are formed on both sides of the opening of the buckle body 321, respectively. The first connecting ear and the second connecting ear are arranged opposite each other and connected by a connecting bolt. Tightening the connecting bolt brings the first connecting ear and the second connecting ear closer together, thereby closing the opening of the buckle body 321 and completely surrounding the outer periphery of the locking steel rope 310.

[0028] A threaded locking hole is formed on the buckle body 321, extending from the outer periphery of the buckle body 321 towards the central through hole. The axis of the threaded locking hole is perpendicular to the axis of the locking steel rope 310 or inclined at a predetermined angle. The inner wall of the threaded locking hole is threaded, and the diameter of the threaded locking hole is configured according to the specifications of the locking bolt 322. In one specific embodiment, multiple threaded locking holes are evenly distributed circumferentially on the buckle body 321, spaced at 120-degree intervals. The arrangement of multiple threaded locking holes allows the buckle body 321 to apply locking force to the locking steel rope 310 from multiple directions, improving the locking stability between the buckle body 321 and the locking steel rope 310.

[0029] The locking bolt 322 is threaded into the threaded locking hole. The locking bolt 322 includes a bolt head and a threaded shank. The bolt head has a hexagonal or internal hexagonal structure, facilitating tightening with a wrench or internal hex wrench. The outer surface of the threaded shank has an external thread that matches the threaded locking hole, and the end of the threaded shank is conical or flat. During installation, the locking bolt 322 is inserted into the threaded locking hole from the outer circumference of the locking body 321. The external thread of the threaded shank engages with the internal thread of the threaded locking hole. By rotating the bolt head, the locking bolt 322 is screwed forward along the threaded locking hole towards the central through hole. As the locking bolt 322 screws forward, the end of the threaded shank gradually approaches and eventually abuts against the outer surface of the locking steel rope 310, applying a radial clamping force to the outer surface of the locking steel rope 310. Continue to tighten the locking bolt 322, and the radial clamping force gradually increases. Under the action of the radial clamping force, the locking steel rope 310 is radially compressed, and a tight clamping contact is formed between the buckle body 321 and the locking steel rope 310. The friction between the buckle body 321 and the locking steel rope 310 increases with the increase of the radial clamping force. When the friction reaches the predetermined value, the buckle body 321 and the locking steel rope 310 are reliably locked.

[0030] After the buckle 321 is locked to the locking steel rope 310 by the locking bolt 322, the buckle 321 forms a fixed point on the locking steel rope 310. The position of the buckle 321 is adjusted according to the installation requirements of the sound insulation mechanism 200 and the crash barrier 100. In one specific embodiment, the buckle 321 is set at the upper end of the locking steel rope 310 at the top of the sound insulation mechanism 200, and the bottom surface of the buckle 321 abuts against the top surface of the sound insulation mechanism 200. The buckle 321 achieves downward limiting of the sound insulation mechanism 200 through its locking connection with the locking steel rope 310 and the abutment of its bottom surface against the top surface of the sound insulation mechanism 200. In another specific embodiment, the buckle 321 is located at the lower end of the locking steel rope 310 at the bottom of the crash barrier 100. The top surface of the buckle 321 abuts against the bottom surface of the crash barrier 100. The buckle 321 achieves the upper limit of the sound insulation mechanism 200 through its locking connection with the locking steel rope 310 and the abutment between its top surface and the bottom surface of the crash barrier 100. In another specific embodiment, the upper end and lower end of the locking steel rope 310 are respectively provided with an upper buckle 321 and a lower buckle 321. The bottom surface of the upper buckle 321 abuts against the top surface of the sound insulation mechanism 200, and the top surface of the lower buckle 321 abuts against the bottom surface of the crash barrier 100. The upper buckle 321 and the lower buckle 321 are locked to the locking steel rope 310 by their respective locking bolts 322. The upper buckle 321 and the lower buckle 321 form two fixing points on the locking steel rope 310, thereby realizing the binding and fixing of the sound insulation mechanism 200 and the crash barrier 100.

[0031] This application's sound barrier employs a structure where a buckle 321 surrounds the locking steel rope 310, and the buckle 321 is locked to the locking steel rope 310 by a locking bolt 322. The locking bolt 322 applies radial clamping force to the locking steel rope 310 through a threaded locking hole. The friction between the buckle 321 and the locking steel rope 310 achieves the fixation of the buckle 321 on the locking steel rope 310. Compared to connecting the fastener to the locking steel rope 310 by welding or die casting, the threaded locking method using the locking bolt 322 in this application has the advantages of convenient installation, adjustability, and detachability. During installation, the buckle 321 can slide along the axial direction of the locking steel rope 310 to the desired position, and the buckle 321 can be fixed in that position by tightening the locking bolt 322, without the need for special tools or complicated operations, resulting in high installation efficiency. The position of the buckle 321 on the locking steel rope 310 can be adjusted according to the actual installation dimensions of the sound insulation mechanism 200 and the crash barrier 100. By loosening the locking bolt 322, the buckle 321 slides on the locking steel rope 310 and is repositioned. Tightening the locking bolt 322 again completes the position adjustment, thus adapting to the installation requirements of crash barriers 100 of different specifications or sound insulation mechanisms 200 of different heights, improving the applicability and versatility of the sound barrier. When maintenance or replacement of the sound insulation mechanism 200 is required, the buckle 321 can be separated from the locking steel rope 310 by loosening the locking bolt 322, facilitating the disassembly and replacement of the sound insulation mechanism 200 and providing high maintenance convenience.

[0032] In one embodiment, the locking steel rope 310 is made of φ5 steel wire rope.

[0033] Specifically, the locking steel rope 310 uses 5mm diameter steel wire rope as raw material. The steel wire rope is made of multiple strands of high-strength steel wire twisted together according to a predetermined stranding process. In one specific embodiment, the φ5 steel wire rope adopts a 7×7 structure, that is, the steel wire rope includes 7 sub-ropes, each sub-rope is made of 7 steel wires twisted together, and the 7 sub-ropes are spirally wound along the central axis to form a complete steel wire rope structure. The steel wire is made of high carbon steel or alloy steel. The steel wire undergoes drawing, heat treatment and surface galvanizing treatment. The tensile strength of the steel wire reaches 1570MPa to 1770MPa, and the thickness of the surface galvanized layer is 8μm to 12μm. The galvanized layer provides corrosion protection for the steel wire and extends the service life of the steel wire rope. The nominal tensile strength of the φ5 steel wire rope is 1200N to 1500N, the breaking tensile force is 1800N to 2200N, and the flexibility of the steel wire rope makes its minimum bending radius 25mm to 30mm.

[0034] The φ5 steel wire rope has a diameter of 5mm, which allows the locking steel rope 310 to have appropriate flexibility while meeting the load-bearing strength requirements. The locking steel rope 310 passes vertically through guide holes and through holes. The diameters of the guide holes and through holes are configured according to the diameter of the locking steel rope 310. The diameter of the guide holes is 6mm to 8mm, and the diameter of the through holes is 6mm to 8mm. The diameters of the guide holes and through holes are slightly larger than the diameter of the locking steel rope 310, allowing the locking steel rope 310 to pass smoothly through the guide holes and through holes. At the same time, the guide holes and through holes provide appropriate guiding constraints for the locking steel rope 310, preventing excessive deviation or bending of the locking steel rope 310 during installation.

[0035] The tensile strength of the φ5 steel wire rope is 1200N to 1500N, which is sufficient to meet the load-bearing requirements of the sound barrier under normal use conditions.

[0036] In this embodiment, the sound barrier uses a φ5 steel wire rope to make a locking steel rope 310. The tensile strength of the φ5 steel wire rope is 1200N to 1500N, and the breaking strength is 1800N to 2200N. This strength is sufficient to meet the load-bearing requirements of the sound barrier under normal use conditions, including the weight of the sound insulation mechanism 200, wind pressure load, and vibration load, ensuring the reliability of the fixation between the sound insulation mechanism 200 and the crash barrier 100. The flexibility of the φ5 steel wire rope allows its minimum bending radius to be 25mm to 30mm. This flexibility allows the locking steel rope 310 to adapt to the positional deviations of the guide holes and through holes, facilitating the installation of the locking steel rope 310. Furthermore, its elastic deformation absorbs vibration energy, improving the stability of the connection in long-term vibration environments. The diameter of the φ5 steel wire rope is 5mm. This diameter specification makes the dimensions of the buckle body 321 and the locking bolt 322 moderate, facilitating installation and operation, and reducing the weight of the locking assembly 320. The sound barrier of this application uses a locking steel rope 310 made of φ5 steel wire rope, which effectively improves the anti-fall performance and connection reliability of the sound barrier under complex working conditions such as strong wind, vibration and impact, and solves the safety hazard of the existing sound barrier connection parts being easy to loosen or fall off, causing the panels to fall.

[0037] In one embodiment, there are multiple crash barriers 100, all of which are arranged along the extension direction of the road surface to be protected. The number of guide holes and through holes are the same and they are connected in a one-to-one correspondence. The number of anti-detachment mechanisms 300 is the same as the number of guide holes and they are arranged in a one-to-one correspondence.

[0038] Specifically, the road surface to be protected is a highway or urban expressway, extending in a specific direction, which is the longitudinal direction of the road surface. Multiple crash barriers 100 are arranged sequentially along the extension direction of the road surface to be protected, with adjacent crash barriers 100 fixedly connected by connectors, forming a continuous protective structure. Each crash barrier 100 has a horizontal through-hole at its top, the number of which is configured according to the length of the crash barrier 100 and the fixing requirements of the sound insulation mechanism 200. Guide holes and through-holes are connected in a one-to-one correspondence, meaning the axis of each guide hole is vertically aligned with the axis of its corresponding through-hole, forming a continuous through-channel. During installation, the sound insulation mechanism 200 is placed on top of the crash barrier 100, with its bottom contacting the top of the crash barrier 100. The sound insulation mechanism 200 is adjusted along the length of the crash barrier 100 so that each guide hole within the sound insulation mechanism 200 is vertically aligned with each through hole on the crash barrier 100, forming a vertically connected through channel. In one specific embodiment, the bottom of the sound insulation mechanism 200 is provided with a positioning protrusion, and the top of the crash barrier 100 is provided with a positioning groove that mates with the positioning protrusion. The positioning protrusion inserts into the positioning groove to achieve relative positioning of the sound insulation mechanism 200 and the crash barrier 100, ensuring accurate alignment of the guide holes and through holes.

[0039] In this embodiment, multiple crash barriers 100 are arranged along the extension direction of the road surface to be protected, forming a continuous protective structure. This continuous protective structure extends longitudinally along the road surface to be protected, providing continuous support and a fixed foundation for the sound insulation mechanism 200. The arrangement of multiple crash barriers 100 enables the sound barrier to achieve noise blocking along the entire length of the road surface to be protected, meeting the need for large-scale noise reduction along highways or urban expressways.

[0040] The number of guide holes and through holes is consistent and they are connected one-to-one. Each guide hole and its corresponding through hole are vertically aligned to form a continuous through channel, which provides an accurate path for the vertical installation of the anti-detachment mechanism 300. The one-to-one connection between the guide holes and through holes ensures that the anti-detachment mechanism 300 can smoothly pass through the guide holes and through holes vertically, avoiding installation difficulties or connection failures caused by misalignment of the holes. When the sound insulation mechanism 200 is installed on the top of the crash barrier 100, the position of the sound insulation mechanism 200 is adjusted so that each guide hole is aligned with each through hole. Multiple guide holes and multiple through holes form multiple vertical through channels, which are distributed along the length of the sound insulation mechanism 200, providing a distributed installation path for the installation of multiple anti-detachment mechanisms 300 and improving the connection stability between the sound insulation mechanism 200 and the crash barrier 100.

[0041] In one embodiment, the sound insulation mechanism 200 includes a support component 210 and a protective component 220. The support component 210 is installed on the top of the crash barrier 100. An installation space is formed in the support component 210 along the extension direction of the road surface to be protected. The protective component 220 is installed in the installation space and has a guide hole that extends vertically through it.

[0042] In this embodiment, the sound insulation mechanism 200 is divided into a support component 210 and a protective component 220. The support component 210 provides structural support, and the protective component 220 provides sound insulation. This functional separation allows each component to be optimized for its functional requirements. The support component 210 has an open installation space extending along the direction of the road surface to be protected, which accommodates the protective component 220. The installation space's orientation along the road surface allows the protective component 220 to be inserted into the installation space. Installation of the protective component 220 is simple, achieved by sliding it horizontally. The open structure of the installation space also allows the protective component 220 to be replaced as needed. When the protective component 220 needs replacement due to damage or aging, the damaged component can be removed from the installation space by removing the fixing slots or pressure strips. A new protective component 220 is then inserted into the installation space and secured by the fixing slots or pressure strips. This convenient replacement operation and high maintenance efficiency make maintenance efficient.

[0043] The protective component 220 is installed within the installation space and is enclosed and supported by the frame structure of the supporting component 210. The four edges of the protective component 220 contact the upper beam, lower beam, and vertical column, respectively. The frame structure of the supporting component 210 provides peripheral constraint to the protective component 220. Under strong winds, the protective component 220 is subjected to horizontal wind pressure loads. These wind pressure loads act on the protective component 220 and attempt to cause it to bend and deform. The four edges of the protective component 220 contact the frame structure of the supporting component 210, and the frame structure of the supporting component 210 applies a supporting reaction force to the four edges of the protective component 220. This supporting reaction force resists the bending effect caused by the wind pressure load. Under the peripheral constraint of the supporting component 210, the protective component 220 remains flat, preventing excessive bending deformation that could lead to cracking or detachment. Multiple vertical columns are distributed along the length of the protective component 220, and the multiple vertical columns provide multi-point support to the sides of the protective component 220. The multi-point support structure distributes the wind pressure load on the protective component 220 to the multiple vertical columns. The load borne by each vertical column is the total wind pressure load divided by the number of vertical columns, thereby reducing the load on a single vertical column and improving the load-bearing reliability of the support component 210.

[0044] A guide hole is formed on the protective component 220, extending vertically through the thickness of the protective component 220, providing a channel for the locking steel rope 310 to pass through. The guide hole allows the anti-detachment mechanism 300 to be directly connected to the protective component 220. The anti-detachment mechanism 300 achieves fixed constraint on the protective component 220 through the locking steel rope 310 passing through the guide hole and the through hole. The constraint force applied by the anti-detachment mechanism 300 to the protective component 220 acts directly on the protective component 220, avoiding the complexity of the force transmission path caused by the indirect transmission of the constraint force through the support component 210. When the protective component 220 is subjected to an upward pulling external force, this force is transmitted through the protective component 220 to the locking steel rope 310 at the guide hole. The locking steel rope 310 withstands the force through its tensile strength and transmits the force to the crash barrier 100. The force transmission path is short and direct, with high force transmission efficiency, avoiding force loss or connection failure caused by an excessively long force transmission path.

[0045] In one embodiment, the support assembly 210 includes two support columns 211 and a base 212. The two support columns 211 are spaced apart along the extension direction of the road surface to be protected, and the bottom of each support column 211 is connected to the crash barrier 100. An installation space is formed between the two support columns 211. A vertically arranged installation groove is formed on the side of the support column 211 facing the installation space. A base 212 is installed at the bottom of each support column 211, and the base 212 is fixed to the crash barrier 100.

[0046] Specifically, two support columns 211 are spaced apart along the longitudinal direction of the road surface to be protected, with a longitudinal spacing of 100mm to 200mm. The support columns 211 are vertical structures, extending vertically perpendicular to the road surface to be protected, and have a height of 2m to 3m. The cross-sectional shape of the support columns 211 is rectangular or C-shaped. The rectangular cross-section has a width of 80mm to 120mm and a thickness of 60mm to 100mm. The C-shaped cross-section includes a back plate and two side plates. The back plate extends vertically, and the two side plates extend from both sides of the back plate in the same direction, perpendicular to or at an obtuse angle to the back plate. The back plate has a width of 80mm to 120mm, the side plates have a width of 30mm to 50mm, and the back plate and side plates have a thickness of 3mm to 6mm.

[0047] The support column 211 is made of either aluminum alloy profiles or galvanized steel profiles. The aluminum alloy profiles have a density of 2700 kg / m³ and a tensile strength of 200 MPa to 300 MPa, and are characterized by their light weight, corrosion resistance, and ease of processing. The galvanized steel profiles have a density of 7850 kg / m³ and a tensile strength of 400 MPa to 600 MPa. The galvanized layer thickness is 60 μm to 80 μm, providing corrosion protection for the steel profiles. Galvanized steel profiles possess high strength and high durability. The support column 211 is formed by extrusion molding or rolling molding. Extrusion molding is used for aluminum alloy profiles, while rolling molding is used for galvanized steel profiles.

[0048] Two support columns 211 are spaced apart along the extension direction of the road surface to be protected. The two support columns 211 are parallel to each other in the longitudinal direction, and the bottoms of both support columns 211 are connected to the crash barrier 100. In one specific embodiment, the top surface of the crash barrier 100 is a horizontal plane. The bottoms of the two support columns 211 are placed at different positions on the top surface of the crash barrier 100. The longitudinal distance between the two support columns 211 is 100mm to 200mm. The two support columns 211 are fixedly connected to the crash barrier 100 via bases 212. An installation space is formed between the two support columns 211. The installation space extends vertically, and its height is the same as the height of the support columns 211, ranging from 2m to 3m. The longitudinal width of the installation space is equal to the longitudinal distance between the two support columns 211, ranging from 100mm to 200mm. The installation space is used to accommodate the protective component 220. The protective component 220 is inserted into the installation space between the two support columns 211. The thickness of the protective component 220 is less than the width of the installation space, so that the protective component 220 can be smoothly inserted into the installation space.

[0049] A vertically oriented mounting groove is formed on the side of the support column 211 facing the installation space. The mounting groove is a trough-shaped structure that extends along the height of the support column 211, with a length consistent with the height of the support column 211, ranging from 2m to 3m. When the support column 211 has a C-shaped cross-section, the mounting groove is formed between two side plates. The inner surfaces of the two side plates are positioned opposite each other, and the inner surfaces of the two side plates and the back plate together form the mounting groove. The opening of the mounting groove faces the installation space. The groove depth is equal to the width of the side plate, ranging from 30mm to 50mm. The groove width is the distance between the two side plates, ranging from 80mm to 120mm. When the support column 211 has a rectangular cross section, the mounting groove is formed by machining the side of the support column 211 facing the mounting space. The mounting groove extends along the height direction of the support column 211 and is formed by milling or planing. The groove depth is 20mm to 40mm and the groove width is 60mm to 100mm.

[0050] The mounting slots are used to accommodate the sides of the protective component 220. When the protective component 220 is inserted into the mounting space between the two support columns 211, the two sides of the protective component 220 are respectively inserted into the mounting slots on the two support columns 211. In one specific embodiment, the protective component 220 is a transparent polycarbonate sheet with a thickness of 8mm to 12mm. The two sides of the transparent polycarbonate sheet are respectively inserted into the mounting slots of the two support columns 211. The width of the mounting slot is slightly larger than the thickness of the transparent polycarbonate sheet, allowing the sides of the transparent polycarbonate sheet to be smoothly inserted into the mounting slot. The sidewall of the mounting slot guides and constrains the sides of the transparent polycarbonate sheet, preventing the transparent polycarbonate sheet from shifting or tilting during insertion. After the sides of the transparent polycarbonate sheet are inserted into the mounting slots, the sidewall of the mounting slot contacts the sides of the transparent polycarbonate sheet, and the mounting slot provides support for the sides of the transparent polycarbonate sheet. The transparent polycarbonate sheet is connected to the support columns 211 through the mounting slots.

[0051] Each support column 211 has a base 212 installed at its bottom, meaning each support column 211 has one base 212 installed at its bottom, and two support columns 211 are equipped with two bases 212. The base 212 is a plate-like or block-like structure, with a rectangular or square planar shape. The rectangular base 212 has a length of 150mm to 250mm and a width of 100mm to 150mm. The square base 212 has a side length of 150mm to 200mm. The base 212 has a thickness of 20mm to 40mm and is made of aluminum alloy or steel, formed by casting or machining.

[0052] The top surface of the base 212 has a mounting portion for a support column 211, which can be either a raised or recessed structure. When the mounting portion is a raised structure, the cross-sectional shape of the raised structure matches the bottom cross-sectional shape of the support column 211. The height of the raised structure is 10mm to 30mm, and the bottom of the support column 211 is fitted onto the outer periphery of the raised structure. The bottom of the support column 211 is fixed to the raised structure by welding or bolts. When the mounting portion is a recessed structure, the cross-sectional shape of the recessed structure matches the bottom cross-sectional shape of the support column 211. The depth of the recessed structure is 10mm to 30mm, and the bottom of the support column 211 is inserted into the recessed structure. The bottom of the support column 211 is fixed to the recessed structure by welding or bolts.

[0053] The base 212 has a flat bottom surface that abuts against the top surface of the crash barrier 100. The base 212 is fixed to the crash barrier 100 by connecting bolts. The bottom surface of the base 212 has mounting holes that penetrate the thickness of the base 212. There are two to four mounting holes distributed along the perimeter of the base 212. The top surface of the crash barrier 100 has threaded holes corresponding to the mounting holes. The inner wall of the threaded holes has internal threads, and the depth of the threaded holes is 30mm to 50mm. Connecting bolts pass through the mounting holes of the base 212 and are screwed into the threaded holes of the crash barrier 100. The connecting bolts are either hexagonal headstocks or socket head cap screws, with specifications ranging from M10 to M16, and a length of 60mm to 100mm. By rotating the connecting bolt, the connecting bolt is screwed downward along the threaded hole. The bolt head of the connecting bolt applies a downward clamping force to the top surface of the base 212. This clamping force causes the bottom surface of the base 212 to come into close contact with the top surface of the crash barrier 100. The base 212 is rigidly fixedly connected to the crash barrier 100 by the connecting bolt.

[0054] In this embodiment, by employing a structure in which two support columns 211 are spaced apart along the extension direction of the road surface to be protected, an installation space is formed between the two support columns 211. This installation space is used to accommodate the protective component 220. This structure simplifies the structure of the support component 210, which consists of only two support columns 211 and two bases 212. The number of components is reduced, and the total weight of the support component 210 is decreased. Compared to a frame structure composed of multiple columns and beams, the structure with two support columns 211 has fewer member connection nodes. Member connection nodes are the weak points of the structure. The reduction of connection nodes increases the overall rigidity of the support component 210, avoiding deformation or failure of the support component 210 due to loose connection nodes.

[0055] In one embodiment, the protective component 220 includes multiple sound barrier panels 221, which are installed vertically in the mounting groove. Each sound barrier panel 221 has a hole that runs vertically through it, and all the holes are concentrically arranged to form a guide hole.

[0056] Specifically, the protective component 220 consists of multiple sound barrier panels 221. Each sound barrier panel 221 has a plate-like structure. The length of each panel extends along the longitudinal direction of the road surface to be protected, and the length of the panel is the same as the length of the installation space. The width of each panel extends vertically, and its width is between 400mm and 800mm. The thickness of each panel is between 8mm and 150mm, and is less than the width of the installation space in the longitudinal direction. Each panel 221 can be inserted into the installation space between two support columns 211.

[0057] The sound barrier panel 221 is made of transparent polycarbonate sheet, color steel sandwich panel, or concrete sound insulation panel. The transparent polycarbonate sheet has a thickness of 8mm to 12mm, a light transmittance of 80% to 90%, a sound insulation of 25dB to 30dB, and a density of 1200kg / m³. The color steel sandwich panel consists of two layers of steel plates and a sound insulation core material sandwiched between them. The steel plates have a thickness of 0.5mm to 1mm, and the sound insulation core material is rock wool or polyurethane foam with a thickness of 50mm to 100mm. The total thickness of the color steel sandwich panel is 51mm to 102mm, with a sound insulation of 30dB to 35dB and a density of 150kg / m³ to 200kg / m³. The thickness of the concrete sound insulation board is 100mm to 150mm. The concrete sound insulation board is reinforced with steel bars. The sound insulation of the concrete sound insulation board is 35dB to 40dB. The density of the concrete sound insulation board is 2400kg / m³.

[0058] Multiple sound barrier panels 221 are installed vertically and sequentially in the mounting groove, meaning the multiple sound barrier panels 221 are arranged vertically in sequence, with each sound barrier panel 221 extending vertically in height. In one specific embodiment, the protective assembly 220 includes three sound barrier panels 221, which are arranged vertically from bottom to top as a first sound barrier panel 221, a second sound barrier panel 221, and a third sound barrier panel 221. The bottom edge of the first sound barrier panel 221 is located at the bottommost position, the top edge of the first sound barrier panel 221 is adjacent to the bottom edge of the second sound barrier panel 221, the top edge of the second sound barrier panel 221 is adjacent to the bottom edge of the third sound barrier panel 221, and the top edge of the third sound barrier panel 221 is located at the topmost position. The total height of the three sound barrier panels 221 is the same as the height of the protective component 220. The total height of the three sound barrier panels 221 is 2m to 3m, and the height of a single sound barrier panel 221 is 667mm to 1000mm.

[0059] In one embodiment, the crash barrier 100 is made of reinforced concrete.

[0060] Specifically, the crash barrier 100 is a reinforced concrete structure, comprising a concrete body and a steel reinforcement frame embedded within the concrete body. The concrete body is made of ordinary concrete or high-strength concrete. Ordinary concrete has a strength grade of C30 to C40, a compressive strength standard value of 30 MPa to 40 MPa, and an elastic modulus of 30 GPa to 32.5 GPa. High-strength concrete has a strength grade of C50 to C60, a compressive strength standard value of 50 MPa to 60 MPa, and an elastic modulus of 34.5 GPa to 36 GPa. The concrete density is 2400 kg / m³ to 2500 kg / m³, and it possesses characteristics of high compressive strength, good durability, and moderate cost.

[0061] A reinforcing steel cage, including longitudinal bars and stirrups, is embedded within the concrete body. The longitudinal bars extend along the length of the concrete body, have a diameter of 12mm to 20mm, and number between 4 and 8. The longitudinal bars are distributed along the perimeter of the concrete body's cross-section. In one specific embodiment, the concrete body has a rectangular cross-section, with one longitudinal bar embedded at each of the four corners and one longitudinal bar embedded at the center of each long side, for a total of 6 longitudinal bars embedded within the concrete body. These 6 longitudinal bars are evenly distributed along the perimeter of the rectangular cross-section. The protective layer thickness for the longitudinal bars is 30mm to 50mm, and the thickness is the distance from the outer surface of the longitudinal bars to the outer surface of the concrete body. The protective layer provides corrosion protection for the longitudinal bars and effective bonding with the concrete.

[0062] Stirrups are arranged at intervals along the length of the concrete core, perpendicular to the longitudinal reinforcement. The stirrups are rectangular or circular in shape; the side length of rectangular stirrups matches the cross-sectional dimensions of the concrete core, while the diameter of circular stirrups matches the cross-sectional dimensions of the concrete core. The diameter of the stirrups is 8mm to 12mm, and they are arranged at intervals of 100mm to 200mm along the length of the concrete core. The stirrups are connected to the longitudinal reinforcement by binding wire or spot welding. The stirrups confine and restrain the longitudinal reinforcement, connecting multiple longitudinal reinforcement bars into a unified reinforcing cage with good overall stiffness and stability.

[0063] The longitudinal reinforcement and stirrups are made of hot-rolled ribbed steel bars, with grades HRB400 or HRB500. The standard yield strength of HRB400 steel bars is 400 MPa, and the standard ultimate strength is 540 MPa. The standard yield strength of HRB500 steel bars is 500 MPa, and the standard ultimate strength is 630 MPa. The surface of the hot-rolled ribbed steel bars has transverse and longitudinal ribs, which increase the bond strength between the steel bars and concrete, improving their synergistic performance.

[0064] The fabrication process of the 100mm crash barrier includes steps such as steel reinforcement cage processing, formwork installation, concrete pouring, and curing. First, the steel reinforcement cage is processed. Longitudinal steel bars are cut to the designed length, and stirrups are bent into the designed shape and size. The stirrups and longitudinal steel bars are then tied together with binding wire to form the steel reinforcement cage. The size and shape of the steel reinforcement cage meet the design requirements. Next, the formwork is installed. The formwork can be wooden or steel. The formwork is assembled according to the designed shape and size of the concrete body. The inner surface of the formwork forms the molding surface for concrete pouring. The formwork is fixed by support rods and tie rods to ensure the stability and dimensional accuracy of the formwork during the concrete pouring process.

[0065] The reinforcing steel cage is placed inside the formwork, maintaining a distance between it and the bottom of the formwork using spacers. The thickness of the spacers is equal to the thickness of the protective layer, ranging from 30mm to 50mm. These spacers can be made of concrete or plastic. The spacers ensure the positional stability of the reinforcing steel cage during concrete pouring and guarantee that the protective layer thickness meets design requirements. After the reinforcing steel cage is placed, concrete is poured. The concrete is transported to the inside of the formwork via a concrete pump truck or concrete delivery pipe. The concrete is poured layer by layer from bottom to top inside the formwork. During the pouring process, a vibrator is used for compaction. The vibrator is inserted into the concrete and vibrates at a high frequency of 10,000 to 15,000 times per minute. This vibration removes air bubbles from the concrete and compacts the concrete, filling the space inside the formwork. This vibration operation ensures the density and uniformity of the concrete.

[0066] After the concrete is poured, the surface is smoothed using a trowel or vibratory trowel to create a flat, level surface on the top of the concrete. This level surface serves as the installation reference surface for the sound insulation mechanism 200. After pouring, the concrete is cured. During curing, the surface is covered with plastic film or burlap sacks and regularly watered to keep it moist. The curing temperature is maintained between 5°C and 35°C, and the curing time is 7 to 14 days. The curing process allows the concrete to fully hydrate and harden, gradually increasing its strength. After curing, the compressive strength reaches 70% to 80% of the design strength. After 28 days of continued hardening, the compressive strength reaches 100% of the design strength.

[0067] The top surface of the crash barrier 100 has threaded holes for connection with the base 212 or the sound insulation mechanism 200. These threaded holes are formed during concrete pouring using embedded sleeves. The embedded sleeves are metal, with an outer diameter of 20mm to 30mm, an inner diameter of 10mm to 16mm, and a length of 50mm to 100mm. The inner wall of the embedded sleeve is machined with internal threads of M10 to M16. Before concrete pouring, the embedded sleeve is fixed to the reinforcing steel frame by welding or binding. The axis of the embedded sleeve is vertical, perpendicular to the top surface of the concrete body, and the top of the embedded sleeve is flush with or slightly below the top surface of the concrete body. When the concrete is poured, the concrete fills the area around the embedded sleeve. After the concrete hardens, the embedded sleeve is firmly embedded in the concrete body. The internal thread of the embedded sleeve forms a threaded hole, and the connecting bolt is screwed into the threaded hole to achieve a fixed connection with the crash barrier 100.

[0068] In this embodiment, the crash barrier 100 is constructed using reinforced concrete. The reinforced concrete structure fully utilizes the compressive strength of concrete and the tensile strength of reinforcing steel. The steel and concrete form a composite material through bonding. The compressive strength of the reinforced concrete is provided by the concrete, while its tensile and flexural strengths are provided by the steel reinforcement. The reinforced concrete structure possesses high strength, high stiffness, and high load-bearing capacity. As the basic load-bearing structure of the sound barrier, the crash barrier 100 needs to withstand the self-weight of the sound insulation mechanism 200 and the loads generated by external forces such as wind pressure loads, vehicle impact loads, and seismic loads. The high strength and high load-bearing capacity of the reinforced concrete crash barrier 100 enable it to reliably withstand these loads, ensuring the structural safety of the sound barrier.

[0069] Based on the same technical concept, in a second aspect, the present invention also proposes a method for installing a sound barrier for installing the sound barrier described in the first aspect; Includes the following steps: S100. The road surface to be protected is constructed in a pre-defined construction area; wherein, at least one side of the road surface to be protected is formed with a sound barrier installation area. S200. Install the crash barriers sequentially in the sound barrier installation area; S300. Install the sound insulation mechanism on top of all the crash barriers in sequence; S400. Use the anti-detachment mechanism to bind and fix the sound insulation mechanism and the anti-collision mechanism.

[0070] In this embodiment, the construction is carried out sequentially, following the order of road surface construction, crash barrier installation, sound insulation mechanism installation, and anti-detachment mechanism installation. The order of each construction step is clear, with each step providing the construction conditions and benchmarks for the next. This orderly construction process avoids rework or quality problems caused by chaotic steps. After the road surface construction is completed, a stable road structure is formed, providing the installation benchmark and load-bearing foundation for the crash barrier. After the crash barrier is installed, a stable load-bearing structure is formed, providing an installation platform and load-bearing support for the sound insulation mechanism. After the sound insulation mechanism is installed, a complete sound insulation and protection structure is formed, effectively blocking road traffic noise. After the anti-detachment mechanism is installed, the sound insulation mechanism is bound and fixed to the crash barrier, providing reliable fall protection for the sound insulation mechanism and preventing it from detaching or falling under external forces.

[0071] The above description is merely an exemplary embodiment of this application and does not limit the scope of this application. Any equivalent structural transformations made based on the technical concept of this application and the contents of the application specification and drawings, or direct / indirect applications in other related technical fields, are included within the protection scope of this application.

Claims

1. A sound barrier, characterized in that, include: A crash barrier is installed on one side of the road surface to be protected. The top of the crash barrier has a through hole that runs horizontally through the crash barrier and installation positions that are spaced apart from the through hole. A sound insulation mechanism, installed at the installation position, located at the top of the crash barrier, and having a guide hole extending vertically through it; and... An anti-detachment mechanism is installed on the sound insulation mechanism. The anti-detachment mechanism extends vertically through the guide hole and the through hole to secure the sound insulation mechanism to the crash barrier.

2. The sound barrier as described in claim 1, characterized in that, The anti-loosening mechanism includes: A locking steel rope, the locking steel rope passing vertically through the guide hole and the through hole; and, A locking assembly is fixed to the locking steel rope to bind and fix the sound insulation mechanism to the crash barrier via the locking steel rope.

3. The sound barrier as described in claim 2, characterized in that, The locking assembly includes: A buckle body, said buckle body surrounding the outer periphery of the locking steel rope, said buckle body having a threaded locking hole formed thereon; and... A locking bolt is used to thread and lock the buckle body to the locking steel rope and to bind and fix the sound insulation mechanism to the crash barrier.

4. The sound barrier as described in claim 3, characterized in that, The locking steel rope is made of φ5 steel wire rope.

5. The sound barrier as described in any one of claims 1 to 4, characterized in that, The crash barriers are multiple in number, and all the crash barriers are arranged along the extension direction of the road surface to be protected. The number of guide holes and through holes are the same and they are connected in a one-to-one correspondence. The number of anti-detachment mechanisms is the same as the number of guide holes and they are arranged in a one-to-one correspondence.

6. The sound barrier as described in any one of claims 1 to 4, characterized in that, The sound insulation mechanism includes: A support assembly, mounted on top of the crash barrier, wherein the support assembly has an installation space formed within it, extending along the direction of the road surface to be protected; and, A protective component is installed within the installation space, and the protective component has a guide hole that extends vertically through it.

7. The sound barrier as described in claim 6, characterized in that, The support components include: Two support columns are spaced apart along the extension direction of the road surface to be protected, and the bottom of each support column is connected to the crash barrier. An installation space is formed between the two support columns, and a vertically oriented installation groove is formed on the side of each support column facing the installation space. A base is installed at the bottom of each of the supporting columns, and the base is fixed to the crash barrier.

8. The sound barrier as described in claim 7, characterized in that, The protective component includes multiple sound barrier panels, which are vertically installed in the mounting groove. Each sound barrier panel has a vertically penetrating hole, and all the holes are concentrically arranged to form the guide hole.

9. The sound barrier as described in any one of claims 1 to 4, characterized in that, The crash barrier is made of reinforced concrete.

10. A method for installing a sound barrier, characterized in that, For use in installing a sound barrier as described in any one of claims 1 to 9; Includes the following steps: The road surface to be protected is constructed in a pre-defined construction area; wherein, at least one side of the road surface to be protected is formed with a sound barrier installation area. The crash barriers are installed sequentially in the sound barrier installation area; The sound insulation mechanism is installed sequentially on top of all the aforementioned guardrails; The sound insulation mechanism and the anti-collision mechanism are bound and fixed together using the anti-detachment mechanism.