An assembled ultra-high performance concrete (UHPC) shield type ship lock structure and a construction method thereof
By combining a precast UHPC shield with cast-in-place concrete into a composite structure, the precast UHPC shield can withstand ship impact loads and form an integrated force transmission system. This solves the problems of impact resistance and interface peeling of the lock sidewall, reduces project costs, and shortens construction time.
Patent Information
- Application Number
- CN202611227550.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-13
- Publication Date
- 2026-11-20
AI Technical Summary
Traditional lock sidewalls are prone to concrete spalling and cracking under ship impact. Existing reinforcement measures are costly and have limited effectiveness. Using UHPC across the entire cross section is expensive, while localized pouring is complex and prone to interface debonding.
The structure adopts a composite structure that combines a prefabricated UHPC shield with a cast-in-place main concrete structure. The prefabricated UHPC shield bears the impact load of the ship and forms an overall force transmission system through connecting components. UHPC materials are used in some areas and combined with the cast-in-place concrete.
It improved the impact toughness of the lock sidewall, ensured the long-term integrity of the structure, reduced the project cost and shortened the construction period, and solved the problem of interface delamination between UHPC and ordinary concrete.
Smart Images

Figure CN123133328A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of waterway engineering and lock structure design technology, and in particular to a prefabricated ultra-high performance concrete (UHPC) shield lock structure and its construction method. Background Technology
[0002] Ship locks are crucial hydraulic structures ensuring the safe passage of vessels. In busy waterways, lock walls, especially the sidewalls, are subjected to frequent impacts, friction, and water erosion from ships entering and exiting the locks year after year. Traditional cast-in-place ordinary concrete or high-performance concrete sidewalls, while meeting conventional load-bearing and water-blocking requirements, are significantly inadequate in resisting repetitive impact loads from ships. This leads to problems such as concrete spalling, cracking, and exposed reinforcement, which not only affect the appearance of the lock but also severely impact the structural durability and service life of the lock.
[0003] To improve the impact resistance of gate walls, existing technologies often employ methods such as adding reinforcement bars across the entire cross-section or increasing the concrete thickness. This not only leads to a significant increase in project costs but also results in unsatisfactory effects due to the limited improvement in concrete strength. While ultra-high performance concrete (UHPC) possesses ultra-high strength, high density, and excellent impact toughness, its use across the entire cross-section is extremely expensive, resulting in poor project economics. Furthermore, if UHPC is only poured in localized areas, the construction process is complex, and the interface between UHPC and cast-in-place ordinary concrete is highly susceptible to debonding and peeling damage under repeated impacts.
[0004] Therefore, there is an urgent need for a prefabricated ultra-high performance concrete (UHPC) shield lock structure and construction method that can fully utilize the high impact resistance of UHPC, reduce costs, and effectively solve the problem of interface connection durability. Summary of the Invention
[0005] The purpose of this invention is to provide a prefabricated ultra-high performance concrete (UHPC) shield lock structure and construction method to solve the problems existing in the prior art.
[0006] To achieve the above objectives, the present invention provides the following solution: a prefabricated ultra-high performance concrete (UHPC) shield-type lock structure, comprising a prefabricated UHPC shield, cast-in-place main concrete, and connecting components; the prefabricated UHPC shield is arranged within the impact range of the lock sidewall, and is used to withstand ship impact loads; the cast-in-place main concrete covers and is fixed to the inner and outer sides of the prefabricated UHPC shield, forming a load-bearing and water-retaining framework for the lock sidewall; the connecting components are used to form an integral force transmission system between the prefabricated UHPC shield and the cast-in-place main concrete.
[0007] Preferably, the prefabricated UHPC shield protrudes in an arc shape toward the gate chamber.
[0008] Preferably, the prefabricated UHPC shield has multiple toothed grooves on the side facing away from the gate chamber.
[0009] Preferably, the connecting component includes a horizontal connecting part and a vertical connecting part pre-embedded in the prefabricated UHPC shield.
[0010] Preferably, the horizontal connection includes a plurality of inner reinforcing bars, which extend out of the precast UHPC shield on the side away from the gate chamber and are located within the area of the cast-in-place main concrete.
[0011] Preferably, the vertical connection includes a plurality of first grouting sleeves fixedly connected and communicating with the top of the prefabricated UHPC shield, and a plurality of second grouting sleeves fixedly connected and communicating with the bottom of the prefabricated UHPC shield.
[0012] Preferably, the first grouting sleeve is provided with an upper reinforcing bar.
[0013] Preferably, the second grouting sleeve is provided with a lower reinforcing bar.
[0014] Preferably, the upper and lower reinforcing bars are pre-installed within the main structure of the expected lower part of the lock sidewall foundation.
[0015] A construction method for a prefabricated ultra-high performance concrete (UHPC) shield-type ship lock structure includes the following steps: S1. Main structure steel reinforcement binding and positioning of the prefabricated UHPC shield; S2. The prefabricated UHPC shield is prefabricated in a factory; S3. Hoisting and semi-embedded installation; S4. Grouting connection; S5. Connection and formwork support; S6. Cast-in-place ordinary concrete; S7. Demolding and maintenance.
[0016] The present invention discloses the following technical effects: (1) The present invention adopts a composite structure of prefabricated UHPC shield and cast-in-place main concrete. The prefabricated UHPC shield is used to preferentially bear and dissipate the impact load of the ship, effectively avoiding the direct impact damage to the cast-in-place main concrete part of the sluice gate structure, and greatly improving the overall impact toughness of the lock sidewall.
[0017] (2) The present invention forms an integral force transmission system by connecting the prefabricated UHPC shield and the cast-in-place main concrete through the connecting components, which solves the technical problem that the interface between UHPC and ordinary concrete is prone to peeling and falling off under repeated impact loads, and ensures the integrity of the structure during long-term service.
[0018] (3) This invention uses UHPC material only in specific parts and areas of the sluice gate sidewall that are impacted, rather than using it across the entire cross section. While maintaining the advantages of UHPC such as high strength, high impermeability, and high freeze-thaw resistance, it significantly reduces the amount of UHPC used and significantly lowers the project cost.
[0019] (4) The present invention uses a factory prefabrication method to produce UHPC shields, which can strictly control the product quality of shields; at the same time, the prefabrication and hoisting of UHPC shields can be carried out in parallel with other cast-in-place construction stages, effectively shortening the overall construction period of the lock project. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0021] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a flowchart of the construction method of the present invention; Among them, 1. prefabricated UHPC shield; 2. toothed groove; 3. inner reinforcement; 4. upper reinforcement; 5. first grouting sleeve; 6. lower reinforcement; 7. second grouting sleeve. Detailed Implementation
[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0023] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0024] Reference Figures 1 to 2This invention provides a prefabricated ultra-high performance concrete (UHPC) shield-type lock structure, including a prefabricated UHPC shield 1, cast-in-place main concrete, and connecting components; the prefabricated UHPC shield 1 is arranged within the impact range of the lock sidewall and is used to withstand ship impact loads; the cast-in-place main concrete covers and is fixed to the inner and outer sides of the prefabricated UHPC shield 1, forming the load-bearing and water-retaining skeleton of the lock sidewall; the connecting components are used to form an integral force transmission system between the prefabricated UHPC shield 1 and the cast-in-place main concrete.
[0025] (1) The present invention adopts a composite structure of prefabricated UHPC shield 1 and cast-in-place main concrete. The prefabricated UHPC shield 1 is used to preferentially bear and dissipate the impact load of the ship, effectively avoiding the direct impact damage to the cast-in-place main concrete part of the sluice gate main structure, and greatly improving the overall impact toughness of the lock sidewall.
[0026] (2) The present invention forms an integral force transmission system by connecting the prefabricated UHPC shield 1 and the cast-in-place main concrete through the connecting components, which solves the technical problem that the interface between UHPC and ordinary concrete is prone to peeling and falling off under repeated impact loads, and ensures the integrity of the structure during long-term service.
[0027] (3) This invention uses UHPC material only in specific parts and areas of the sluice gate sidewall that are impacted, rather than using it across the entire cross section. While maintaining the advantages of UHPC such as high strength, high impermeability, and high freeze-thaw resistance, it significantly reduces the amount of UHPC used and significantly lowers the project cost.
[0028] (4) The present invention uses a factory prefabrication method to produce UHPC shields, which can strictly control the product quality of shields; at the same time, the prefabrication and hoisting of UHPC shields can be carried out in parallel with other cast-in-place construction stages, effectively shortening the overall construction period of the lock project.
[0029] Further optimization of the design resulted in the prefabricated UHPC shield 1 protruding towards the lock chamber in an arc shape. Located at the specific elevation range where the lock sidewall faces the greatest impact risk, the prefabricated UHPC shield 1, protruding towards the lock chamber in an arc shape, serves as the first line of defense against ship impact loads. It utilizes the high density, high impermeability, and high freeze-thaw resistance of UHPC to preferentially absorb impact energy.
[0030] The design was further optimized by creating multiple toothed grooves 2 on the side of the prefabricated UHPC shield 1 that is away from the gate chamber.
[0031] By setting multiple grooves 2 at the interface between the precast UHPC shield 1 and the cast-in-place ordinary concrete, the multiple grooves 2 adopt the form of concave and convex grooves to enhance the shear resistance of the interface between the precast UHPC shield 1 and the ordinary concrete, and prevent interface peeling failure under repeated impact loads.
[0032] The design was further optimized, and the connecting components include horizontal and vertical connecting parts pre-embedded in the prefabricated UHPC shield 1.
[0033] The horizontal connection is embedded inside the precast UHPC shield and extends into the cast-in-place concrete area during construction to anchor the precast UHPC shield 1 to the post-cast main concrete in both planar and shear configuration.
[0034] The vertical connection is reserved in the cast-in-place main structure to make a vertical rigid connection between the upper and lower main structures and the precast UHPC shield 1, so as to ensure that the precast UHPC shield 1 will not fall or slip when it is impacted.
[0035] The scheme was further optimized, and the horizontal connection part includes multiple inner steel bars 3. The multiple inner steel bars 3 extend out of the precast UHPC shield 1 on the side away from the gate chamber and are located in the area of the cast-in-place main concrete.
[0036] The scheme is further optimized. The vertical connection part includes a plurality of first grouting sleeves 5 that are fixedly connected and communicate with the top of the prefabricated UHPC shield 1, and a plurality of second grouting sleeves 7 that are fixedly connected and communicate with the bottom of the prefabricated UHPC shield 1.
[0037] The scheme was further optimized by installing an upper reinforcing bar 4 inside the first grouting sleeve 5.
[0038] The design was further optimized by installing a lower reinforcing bar 6 inside the second grouting sleeve 7.
[0039] The design was further optimized so that the upper steel bar 4 and the lower steel bar 6 are pre-installed in the main structure of the expected lower part of the lock sidewall foundation.
[0040] The cast-in-place main concrete uses ordinary concrete or high-performance concrete. The cast-in-place main concrete is located inside and outside the precast UHPC shield 1, serving as the main load-bearing and water-retaining skeleton of the lock sidewall. The precast UHPC shield 1 is wrapped and solidified by semi-embedding and steel bar connection.
[0041] A construction method for a prefabricated ultra-high performance concrete (UHPC) shield-type ship lock structure includes the following steps: S1. Main structure reinforcement binding and prefabricated UHPC shield 1 positioning; During the construction of the lock side wall foundation and lower main structure, the structural reinforcement is bound according to the design drawings. The upper reinforcement 4 and lower reinforcement 6 are reserved at the specific position where the prefabricated UHPC shield 1 needs to be installed, and the temporary positioning frame of the shield is installed according to the design positioning.
[0042] S2. The prefabricated UHPC shield 1 is prefabricated in the factory; the interior of the prefabricated UHPC shield 1 is pre-embedded with inner steel bars 3, a first grouting sleeve 5, and a second grouting sleeve 7, and the thickness, curvature, and semi-embedded size of the prefabricated UHPC shield 1 are precisely controlled, and it is fully cured to reach the design strength.
[0043] S3. Lifting and semi-embedded installation: The prefabricated UHPC shield 1 is transported to the construction site, and the prefabricated UHPC shield 1 is precisely lifted to the reserved position using lifting equipment, so that it is semi-embedded and fits into the side wall design area.
[0044] S4. Grouting connection: Align the first grouting sleeve 5 and the second grouting sleeve 7 pre-embedded in the precast UHPC shield 1 with the upper side steel bar 4 and the lower side steel bar 6 reserved in the main structure. By pressurizing and injecting high-strength grout, the precast UHPC shield 1 and the cast-in-place main structure form an integral vertical force transmission and anchoring system.
[0045] S5. Connecting and formwork support; tie the main horizontal steel bars on the inner side of the precast UHPC shield 1, and tie or weld the horizontal connecting steel bars to the main steel bars. Then, set up formwork on the inner and outer sides of the precast UHPC shield 1 to reserve space for pouring.
[0046] S6. Cast-in-place ordinary concrete; ordinary high-performance concrete is poured in one go into the formwork and the back cavity of the precast UHPC shield 1, and the concrete is vibrated to fully fill the semi-embedded groove and interface on the back of the precast UHPC shield 1.
[0047] S7. Formwork Removal and Curing. After the ordinary concrete to be poured reaches the design strength, the formwork is removed, and the interface between the precast UHPC shield 1 and the cast-in-place concrete is repaired and cured as required to complete the overall structural construction.
[0048] This invention addresses the current situation of weak impact resistance of lock sidewalls, high cost of traditional reinforcement measures, and easy damage to the interface between UHPC and ordinary concrete. The structure of this invention abandons the traditional single homogeneous material system and innovatively adopts the design concept of "identifying vulnerable parts, local reinforcement, and assembly molding". It combines high impact-resistant UHPC prefabricated components with cast-in-place main concrete through semi-embedded assembly, comprehensively solving the problems of impact resistance, long-term durability, construction efficiency, and cost control of lock sidewalls.
[0049] In the description of this invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this invention, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention.
[0050] The embodiments described above are merely preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Various modifications and improvements made by those skilled in the art to the technical solutions of the present invention without departing from the spirit of the present invention should fall within the protection scope defined by the claims of the present invention.
Claims
1. A prefabricated ultra-high performance concrete (UHPC) shield-type ship lock structure, characterized in that: Includes prefabricated UHPC shield (1), cast-in-place main concrete and connecting components; The prefabricated UHPC shield (1) is arranged within the impact range of the lock sidewall, and the prefabricated UHPC shield (1) is used to withstand the impact load of the ship. The cast-in-place main concrete covers and is fixed to the inner and outer sides of the precast UHPC shield (1), forming the load-bearing and water-retaining skeleton of the lock side wall; The connecting component is used to form an integral force transmission system between the prefabricated UHPC shield (1) and the cast-in-place main concrete.
2. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 1, characterized in that: The prefabricated UHPC shield (1) protrudes in an arc shape toward the gate chamber.
3. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 2, characterized in that: The prefabricated UHPC shield (1) has multiple toothed grooves (2) on the side away from the gate chamber.
4. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 2, characterized in that: The connecting components include a horizontal connecting part and a vertical connecting part pre-embedded in the prefabricated UHPC shield (1).
5. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 4, characterized in that: The horizontal connection includes multiple inner steel bars (3), which extend from the side of the precast UHPC shield (1) away from the gate chamber and are located within the area of the cast-in-place main concrete.
6. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 4, characterized in that: The vertical connection includes a plurality of first grouting sleeves (5) that are fixedly connected to and communicate with the top of the prefabricated UHPC shield (1) and a plurality of second grouting sleeves (7) that are fixedly connected to and communicate with the bottom of the prefabricated UHPC shield (1).
7. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 6, characterized in that: The first grouting sleeve (5) is provided with an upper side steel bar (4).
8. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 7, characterized in that: The second grouting sleeve (7) is provided with a lower side steel bar (6).
9. The prefabricated ultra-high performance concrete (UHPC) shield lock structure according to claim 8, characterized in that: The upper side steel bar (4) and the lower side steel bar (6) are pre-installed in the main structure of the expected lower part of the lock sidewall foundation.
10. A construction method for a prefabricated ultra-high performance concrete (UHPC) shield lock structure, based on the prefabricated ultra-high performance concrete (UHPC) shield lock structure according to any one of claims 1-9, characterized in that: Includes the following steps: S1. The main structure steel reinforcement binding and the position positioning of the prefabricated UHPC shield (1); S2. The prefabricated UHPC shield (1) is prefabricated in a factory; S3. Hoisting and semi-embedded installation; S4. Grouting connection; S5. Connection and formwork support; S6. Cast-in-place ordinary concrete; S7. Demolding and maintenance.