Loess region low-carbon lightweight roadbed - gradually changing stiffness composite foundation structure and construction method
By adopting a three-section gradual structure and a gradually stiffening composite foundation in the transition section between bridges and roadbeds in loess areas, the problem of differential settlement in the transition section between bridges and roadbeds has been solved, achieving low carbonization, lightweighting, and land saving. It has effectively controlled the phenomenon of bridge approach slab settlement and reduced carbon emissions and foundation settlement.
Patent Information
- Application Number
- CN202611640659.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-22
- Publication Date
- 2026-11-20
AI Technical Summary
In loess areas, differential settlement due to stiffness differences in the transition section between bridges and roadbeds is a problem, especially for high embankment roadbeds with heavy self-weight, difficult control of differential settlement of the foundation, difficulty in achieving gradual stiffness change with traditional composite foundations, high carbon emissions, and limited land-saving effects.
The roadbed adopts a three-stage gradual structure consisting of a laterally constrained lightweight foamed concrete roadbed, a laterally constrained lightweight polymer-stabilized soil roadbed, and a geopolymer-stabilized soil roadbed. Combined with a gradually stiffened composite foundation, the roadbed structure is formed by combining lightweight materials and various pile types, along with laterally constrained structures and dynamic consolidation reinforcement, resulting in a roadbed structure with gradually stiffened and low carbon dioxide content.
It effectively controlled the phenomenon of bridge approach slab settlement, reduced the roadbed weight and carbon emissions, saved land resources, and achieved a smooth transition of foundation stiffness and settlement control, which is in line with the development direction of green and low-carbon transportation infrastructure.
Smart Images

Figure CN123133335A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of traffic engineering and green low-carbon foundation reinforcement technology, specifically relating to a low-carbon lightweight roadbed-gradient stiffness composite foundation structure and construction method in loess areas. Background Technology
[0002] The bridge-roadbed transition section is a critical structural component in road engineering, directly impacting driving comfort and structural safety. In loess regions, the construction of bridge-roadbed transition sections faces even more complex technical challenges due to unique geological conditions. Loess possesses engineering characteristics such as water sensitivity, in-situ structural stability, and high porosity, making it prone to subsidence deformation when exposed to water. Furthermore, bridge-roadbed transition sections in loess regions are often high-fill projects, with bridge foundations typically placed in deeper bearing layers, resulting in less post-construction settlement; however, the roadbed has a greater fill height, leading to significant post-construction settlement under its own weight and traffic loads. This difference in stiffness between the bridge and roadbed can easily cause differential settlement during long-term operation, potentially leading to approach slab settlement and endangering traffic safety.
[0003] To address the aforementioned issues, various roadbed treatment technologies have been employed in engineering practice. Conventional roadbed filling materials have a significant self-weight, increasing additional loads and causing compression deformation of the roadbed and foundation. Furthermore, traditional roadbeds have steep slopes, requiring substantial land occupation. The extensive use of cement also leads to high carbon emissions. Lightweight roadbed filling technology offers a new solution to these problems. Materials such as foamed concrete, lightweight solidified soil, and cement-fly ash soil achieve roadbed lightweighting while simultaneously absorbing solid waste materials such as steel slag, fly ash, and gypsum, reducing carbon emissions. In addition, laterally constrained roadbed structures effectively restrain lateral deformation, reduce the overall slope ratio of the roadbed, decrease foundation width, and achieve land-saving effects. However, in existing bridge-road transition sections and high-fill roadbed treatment in loess areas, single-pile composite foundations or conventional fill roadbeds are often used, making it difficult to simultaneously achieve multiple objectives such as roadbed lightweighting, low carbon emissions, solid waste disposal, land conservation, and gradual control of foundation stiffness. Traditional composite foundation technology has limited effectiveness in controlling differential settlement in bridge-road transition sections, making it difficult to meet the comprehensive requirements of modern road engineering for durability, comfort, and environmental protection.
[0004] Based on this, the present invention proposes a low-carbon lightweight roadbed-gradient stiffness composite foundation structure and construction method in loess areas to solve the problems existing in the prior art. Summary of the Invention
[0005] To address the aforementioned technical problems, this invention provides a low-carbon, lightweight roadbed-gradient stiffness composite foundation structure and construction method for loess areas. This structure solves the problems of high embankment roadbed self-weight, difficulty in controlling differential settlement of the foundation, difficulty in achieving gradual stiffness variation in traditional composite foundations, high carbon emissions, and limited land-saving effects in existing bridge-road transition sections in loess areas.
[0006] To achieve the above objectives, the present invention provides the following technical solution: The present invention provides a first solution: a low-carbon lightweight roadbed-gradient stiffness composite foundation structure in loess areas, located between the loess foundation and the road surface, including a laterally constrained lightweight foamed concrete roadbed, a laterally constrained lightweight polymer-stabilized soil roadbed, a polymer-stabilized soil roadbed and a gradually stiffness composite foundation; The laterally restrained lightweight foamed concrete subgrade is located at one end near the bridge abutment and overlaps with the bridge abutment. The laterally constrained lightweight polymer-solidified soil subgrade is located at the end of the laterally constrained lightweight foamed concrete subgrade away from the bridge abutment, and overlaps with the laterally constrained lightweight foamed concrete subgrade in a staggered manner. The geopolymer-stabilized soil subgrade is located at the end of the laterally constrained lightweight polymer-stabilized soil subgrade away from the laterally constrained lightweight foamed concrete subgrade, and is offset from and overlaps with the laterally constrained lightweight polymer-stabilized soil subgrade. The gradually stiffened composite foundation is located below the laterally constrained lightweight foamed concrete subgrade, the laterally constrained lightweight polymer-stabilized soil subgrade, and the polymer-stabilized soil subgrade, and extends into the loess foundation.
[0007] In a preferred embodiment, the laterally constrained lightweight foamed concrete subgrade includes a lightweight foamed concrete subgrade, a first lightweight solidified soil cushion layer, and a first laterally constrained structure. The lightweight foamed concrete subgrade is located directly beneath the road surface; The first lightweight solidified soil cushion layer is located between the lightweight foamed concrete subgrade and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. The first lateral restraint structure includes a lightweight concrete anchor plate restraint wall, a lightweight concrete anchor end, an epoxy-coated basalt fiber anchor rod, and a basalt fiber bolt. The lightweight concrete anchor plate restraint wall is located on both sides of the lightweight foamed concrete subgrade and is layered along the height direction of the lightweight foamed concrete subgrade. One end of the epoxy-coated basalt fiber anchor rod is anchored in the lightweight foamed concrete subgrade through the lightweight concrete anchor end, and the other end is connected to the lightweight concrete anchor plate restraint wall through the basalt fiber bolt.
[0008] In a preferred embodiment, the thickness of the first lightweight solidified soil cushion layer is 0.3-1.2m; the lightweight foamed concrete subgrade is formed by pouring lightweight foamed concrete, which includes cement, fly ash, steel slag powder, gypsum, foaming agent and water, with a dry density of 600-1000kg / m³. 3 The compressive strength is 3.0-5.0 MPa; the length of the epoxy-coated basalt fiber anchor is 3-8 m; the first lateral restraint structure reduces the overall slope ratio of the roadbed slope to 1:0.1-1:0.5.
[0009] In a preferred embodiment, the laterally constrained lightweight polymer-stabilized soil subgrade includes a lightweight polymer-stabilized soil subgrade, a second lightweight stabilized soil cushion layer, and a second laterally constrained structure. The lightweight polymer-stabilized soil subgrade is located directly below the road surface; The second lightweight solidified soil cushion layer is located between the lightweight polymer solidified soil subgrade and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. The second lateral restraint structure includes a lightweight concrete reinforced slab restraint wall, basalt fiber reinforced strips, and a lightweight concrete greening base trench. The lightweight concrete reinforced slab restraint wall is located on both sides of the lightweight polymer-stabilized soil subgrade, and is installed in layers along the height direction with a layer spacing of 0.3-1.2m. The basalt fiber reinforced strips are laid in layers along the height direction within the lightweight polymer-stabilized soil subgrade with a layer spacing of 0.3-1.2m, and the other end of the basalt fiber reinforced strips is connected to the lightweight concrete reinforced slab restraint wall to form an overall coordinated force-bearing system. The lightweight concrete greening base trench is located on the upper part of the outer side of the lightweight concrete reinforced slab restraint wall, and lateral sliding is restricted by limiting tenons.
[0010] In a preferred embodiment, the lightweight polymer-stabilized soil subgrade is formed by compacting lightweight polymer-stabilized soil, which is made of loess, fly ash, steel slag powder, gypsum, alkali activator and admixtures, with the total amount of polymer material being 10-20% of the weight of the stabilized soil; the second lateral restraint structure reduces the overall slope ratio of the subgrade slope to 1:0.5-1:1; The total amount of geopolymer material is the ratio of the total mass of the geopolymer materials (fly ash, steel slag powder, gypsum, and alkali activator) to the weight of the solidified soil.
[0011] In a preferred embodiment, the geopolymer-stabilized soil subgrade includes a geopolymer-stabilized soil subgrade body, a cement fly ash soil cushion layer, and a basalt fiber geogrid. The main body of the geopolymer-stabilized soil subgrade is located directly below the road surface; The cement fly ash soil cushion layer is located between the main body of the geopolymer-stabilized soil subgrade and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. Basalt fiber geogrids are laid in layers within the main body of the geopolymer-stabilized soil subgrade, with a layer spacing of 0.3-0.6m; and a dynamically consolidated foundation is set below the cement fly ash soil cushion layer.
[0012] In a preferred embodiment, the cement fly ash soil cushion layer is formed by pouring cement fly ash soil, which is made of loess, cement, fly ash and gypsum. The cement content is 4-8% of the weight of loess, the fly ash content is 10-20% of the weight of loess, and the gypsum content is 2-5% of the weight of loess. The angle α between the boundary line of the lightweight foamed concrete subgrade and the lightweight polymer-stabilized soil subgrade and the horizontal line is greater than the angle β between the boundary line of the lightweight polymer-stabilized soil subgrade and the main body of the polymer-stabilized soil subgrade and the horizontal line.
[0013] In a preferred embodiment, the gradually varying stiffness composite foundation sequentially comprises a rigid-semi-rigid pile composite foundation, a semi-rigid-variable stiffness pile composite foundation, and a flexible pile composite foundation along the direction away from the abutment. The rigid-semi-rigid pile composite foundation is located below the laterally confined lightweight foamed concrete subgrade and is connected to the first lightweight solidified soil cushion layer. The semi-rigid-variable stiffness pile composite foundation is located below the laterally constrained lightweight polymer solidified soil subgrade and is connected to the second lightweight solidified soil cushion layer. The flexible pile composite foundation is located below the geopolymer-stabilized soil subgrade and is connected to the cement fly ash soil cushion layer.
[0014] In a preferred embodiment, the rigid-semi-rigid pile composite foundation includes a number of foamed concrete piles and first fluidized solidified soil piles, and each reinforcement unit of the rigid-semi-rigid pile composite foundation consists of 1 foamed concrete pile and 4 first fluidized solidified soil piles. The first fluidized solidified soil piles are arranged in a rectangular shape, and the foamed concrete pile is located at the centroid of the 4 first fluidized solidified soil piles. The semi-rigid-variable stiffness pile composite foundation includes several second-flow solidified soil piles and solidified soil-cement fly ash soil composite piles. Each reinforcement unit of the semi-rigid-variable stiffness pile composite foundation consists of 1 second-flow solidified soil pile and 4 solidified soil-cement fly ash soil composite piles. The solidified soil-cement fly ash soil composite piles are arranged in a rectangular shape, and the second-flow solidified soil pile is located at the centroid of the 4 solidified soil-cement fly ash soil composite piles. The flexible pile composite foundation is formed by several cement fly ash soil piles and a dynamically consolidated foundation. Among them, foamed concrete piles and second fluidized solidified soil piles are long piles, first fluidized solidified soil piles and solidified soil-cement fly ash soil composite piles are short piles, and cement fly ash soil piles are flexible piles; and in rigid-semi-rigid pile composite foundations and semi-rigid-variable stiffness pile composite foundations, the length ratio of long piles to short piles is 1.2-2; in flexible pile composite foundations, the depth ratio of flexible piles to dynamically consolidated foundations is 1.2-2.
[0015] This invention provides a second solution: a construction method for a low-carbon lightweight roadbed-gradient stiffness composite foundation structure in loess areas, comprising the following steps: S1. Site leveling: Level the site within the roadbed reinforcement area and remove surface debris; S2. Layout and Point Layout: Set up control measurement points within the reinforced area and mark the pile positions of foam concrete piles, first fluidized solidified soil piles, second fluidized solidified soil piles, solidified soil-cement fly ash soil composite piles and cement fly ash soil piles to ensure that the pile position deviations meet the specifications. S3. Design parameters of the composite subgrade structure: Based on the burial depth of the bridge-road transition section, the geological engineering characteristics and deformation control requirements, calculate and determine the pile length, pile diameter, pile spacing, layout, number of lateral constraint structure layers and subgrade layer thickness for each pile type; S4. Construction of rigid-semi-rigid pile composite foundation: Foamed concrete piles and first-flow solidified soil piles are constructed near the abutment. Foamed concrete piles are formed by bored casting or rotary drilling. During the casting process, the flowability of the foamed concrete is controlled to ensure that the pile body is uniform and dense. The first-flow solidified soil piles are formed by driven pipe. The flowability of the solidified soil meets the pumping requirements and is controlled within the range of 150-200mm. S5. Construction of semi-rigid-variable stiffness pile composite foundation: Second-flow solidified soil piles and solidified soil-cement fly ash soil composite piles are constructed in the intermediate transition section; the second-flow solidified soil piles are formed by bored grouting or rotary drilling, and the flowability of the solidified soil meets the pumping requirements; the solidified soil-cement fly ash soil composite piles are formed by driving pipes and then compacted in layers, with the lower half of the pile being solidified soil and the upper half being cement fly ash soil, forming a variable stiffness pile body; S6. Construction of Flexible Pile Composite Foundation: Dynamic consolidation and reinforcement of the underlying loess foundation is carried out on the far side of the platform to form a dynamically consolidated foundation, and then cement fly ash soil piles are constructed; the cement fly ash soil piles are constructed using driven pipe piles, and the pile body compaction degree is not less than 95%; S7. Foundation quality inspection: Conduct composite foundation load tests and pile integrity tests on each pile. The characteristic value of the composite foundation bearing capacity should meet the design requirements, and the pile integrity test should meet the Class I pile standard. S8. Subbase Filling: Construct a first lightweight solidified soil subbase, a second lightweight solidified soil subbase, and a cement fly ash soil subbase, with a subbase compaction degree of not less than 93%; S9. Installation of the first-layer lateral restraint structure: Install lightweight concrete anchor plate restraint walls on both sides of the lateral restraint lightweight foamed concrete subgrade, construct lightweight concrete anchor ends, and install epoxy-coated basalt fiber anchor rods and basalt fiber bolts; install lightweight concrete reinforced plate restraint walls and basalt fiber reinforcement strips on both sides of the lateral restraint lightweight polymer-solidified soil subgrade; and conduct quality inspection of the lateral restraint structure. S10. First-layer subgrade pouring or filling construction: Pour lightweight foamed concrete at the laterally constrained lightweight foamed concrete subgrade, controlling the layer thickness to be 0.3-0.6m during pouring; pour lightweight polymer-stabilized soil at the laterally constrained lightweight polymer-stabilized soil subgrade, with a layer pouring thickness of 0.3-0.6m; fill polymer-stabilized soil or cement fly ash soil at the polymer-stabilized soil subgrade, with a layer filling thickness of 0.3-0.6m, and lay basalt fiber geogrid in layers with a layer spacing of 0.3-0.6m; S11. Installation of the second layer of lateral restraint structure and pouring or filling of the second layer of roadbed: The construction and quality inspection of the lateral restraint structure and roadbed are carried out alternately layer by layer until the design roadbed elevation is reached; S12. Level the subgrade surface and conduct subgrade surface quality inspection: Install drainage pipes to ensure smooth drainage; construct the road base, crash barriers, concrete shoulders, and road surface layer; S13. Settlement monitoring after construction: Settlement monitoring points are set up in the bridge-road transition section to monitor the settlement of the abutment, rigid-semi-rigid pile composite foundation section, semi-rigid-variable stiffness pile composite foundation section, variable stiffness-flexible pile composite foundation section and flexible pile composite foundation section until the settlement control requirements are met. S14. After the settlement observation is completed after construction, tighten the basalt fiber bolts and apply prestress by tightening the epoxy-coated basalt fiber anchor rods. The prestress value is calculated and determined according to the following formula: ; in, P This represents the prestress value of the anchor bolt. γ For the density of roadbed materials, H This is the height of the roadbed. A For the roadbed area served by a single anchor bolt, k is the prestress coefficient.
[0016] Compared with existing technologies, this invention provides a low-carbon lightweight roadbed-gradient stiffness composite foundation structure and construction method for loess areas, which has the following beneficial effects: This invention achieves a smooth transition of foundation stiffness from the abutment to the far abutment in the bridge-road transition section by setting up a three-section gradual transition structure consisting of a laterally constrained lightweight foamed concrete subgrade, a laterally constrained lightweight polymer-stabilized soil subgrade, and a geopolymer-stabilized soil subgrade, combined with a gradually stiffening composite foundation. This effectively controls differential settlement and eliminates the phenomenon of vehicle slab settlement at bridge approach. At the same time, the application of lightweight foamed concrete and lightweight polymer-stabilized soil significantly reduces the self-weight of the subgrade and reduces the additional stress on the foundation. The application of the lateral constrained structure greatly reduces the overall slope ratio of the subgrade slope and reduces the foundation width, thus saving land resources.
[0017] This invention achieves the resource utilization of solid waste and reduces carbon emissions by adding solid waste materials such as fly ash, steel slag powder, and gypsum to the roadbed material, with the total amount of solid waste not less than 30%, which is in line with the development direction of green and low-carbon transportation infrastructure. The application of geopolymer solidified soil and cement fly ash soil replaces traditional cement materials, further reducing carbon emissions.
[0018] This invention employs a combination of various pile types, including foamed concrete piles, fluidized solidified soil piles, solidified soil-cement fly ash soil composite piles, and cement fly ash soil piles, in conjunction with dynamic consolidation reinforcement, to form a gradually stiffening composite foundation. The gradual stiffness variation effect of the combination of long and short piles and the deep combination of flexible piles and dynamic consolidation achieve a multi-level smooth transition of foundation stiffness, thus improving the settlement control effect of bridge-road transition sections.
[0019] This invention effectively constrains the lateral deformation of lightweight roadbed materials by setting up lateral constraint structures such as lightweight concrete anchor plate constraint walls, epoxy-coated basalt fiber anchor rods, and basalt fiber reinforcement strips, thereby improving the integrity and stability of the roadbed. The application of basalt fiber materials has excellent corrosion resistance, ensuring the durability of the structure in complex loess environments.
[0020] This invention combines ecological restoration with road engineering by setting up greening trenches and greening shrubs, which is in line with the concept of green highway construction; the setting of drainage ditches and drainage pipes ensures smooth drainage and prevents loess subsidence from affecting the stability of the roadbed.
[0021] It solves the problems of high embankment roadbed self-weight, difficulty in controlling differential settlement of foundation, difficulty in achieving gradual stiffness change of traditional composite foundation, high carbon emissions and limited land saving effect in the existing bridge-road transition section in loess area. Attached Figure Description
[0022] Figure 1 The facade of the low-carbon lightweight roadbed-gradient stiffness composite foundation structure of this invention Figure 1 .
[0023] Figure 2 The facade of the low-carbon lightweight roadbed-gradient stiffness composite foundation structure of this invention Figure 2 .
[0024] Figure 3 For the present invention Figure 2 Cross-sectional view of section AA of the medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0025] Figure 4 For the present invention Figure 2 Cross-sectional view of section BB of the medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0026] Figure 5 For the present invention Figure 2 Cross-sectional view of CC section of medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0027] Figure 6 For the present invention Figure 3 Large detail drawing of node A of the medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0028] Figure 7 For the present invention Figure 4 Large-scale drawing of node B of medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0029] Figure 8 For the present invention Figure 5 Large-scale drawing of node C of medium-low carbon lightweight roadbed-gradient stiffness composite foundation structure.
[0030] in: 1. Laterally restrained lightweight foamed concrete subgrade; 1-1. Lightweight concrete anchor plate restraint wall; 1-2. Lightweight concrete anchor end; 1-3. Epoxy-coated basalt fiber anchor; 1-4. Basalt fiber bolt; 1-5. Lightweight foamed concrete subgrade; 1-6. First lightweight solidified soil cushion layer; 1-7. First fluidized solidified soil pile; 1-8. Foamed concrete pile; 2. Laterally constrained lightweight polymer-stabilized soil subgrade; 2-1. Green shrubs; 2-2. Lightweight concrete greening trench; 2-3. Lightweight concrete reinforced slab confinement wall; 2-4. Basalt fiber reinforced strip; 2-5. Lightweight polymer-stabilized soil subgrade; 2-6. Second lightweight stabilized soil cushion layer; 2-7. Stabilized soil-cement fly ash soil composite pile; 2-8. Second fluidized stabilized soil pile; 3. Geopolymer-stabilized soil subgrade; 3-1. Basalt fiber geogrid; 3-2. Geopolymer-stabilized soil subgrade main body; 3-3. Cement fly ash soil cushion layer; 3-4. Cement fly ash soil piles; 3-5. Dynamically consolidated foundation; 4. Abutment; 4-1. Beam body; 4-2. Abutment top; 4-3. Abutment cap; 4-4. Abutment body; 4-5. Pile cap; 4-6. Pile foundation; 5. Road surface; 5-1. Road surface layer; 5-2. Road base layer; 5-3. Crash barrier; 5-4. Drainage pipe; 6. Original ground line; 7. Loess foundation; 7-1. Drainage ditch; α, the angle between the boundary line of the lightweight foamed concrete subgrade and the lightweight polymer-stabilized soil subgrade at their contact point and the horizontal line; β, the angle between the boundary line of the lightweight polymer-stabilized soil subgrade and the main body of the geopolymer-stabilized soil subgrade at their contact point and the horizontal line. Detailed Implementation
[0031] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions in the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without inventive effort are within the scope of protection of this invention. Unless otherwise defined, the technical or scientific terms used herein should have the ordinary meaning understood by those skilled in the art. The terms "comprising" and similar expressions used herein mean that the element or object preceding the word covers the element or object listed following the word and its equivalents, but do not exclude other elements or objects.
[0032] As per the instruction manual Figure 1 To be continued Figure 8 As shown, to address the problems existing in the prior art, on the one hand, embodiments of the present invention provide a low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas. This structure is located between the loess foundation 7 and the pavement 5, with its entirety situated on the upper side of the loess foundation 7 and the lower side of the pavement 5. It includes a laterally constrained lightweight foamed concrete roadbed 1, a laterally constrained lightweight polymer-stabilized soil roadbed 2, a polymer-stabilized soil roadbed 3, and a gradually stiffening composite foundation. Wherein: The laterally constrained lightweight foamed concrete subgrade 1 is located at one end adjacent to the bridge abutment 4 and overlaps with the bridge abutment 4, in order to reduce the self-weight of the subgrade and constrain lateral deformation.
[0033] The laterally constrained lightweight polymer-solidified soil subgrade 2 is located at the end of the laterally constrained lightweight foamed concrete subgrade 1 away from the bridge abutment 4, and is staggered and overlapped with the laterally constrained lightweight foamed concrete subgrade 1, in order to improve the integrity of the subgrade and achieve low-carbon filling.
[0034] The geopolymer-stabilized soil subgrade 3 is located at the end of the laterally constrained lightweight polymer-stabilized soil subgrade 2 away from the laterally constrained lightweight foamed concrete subgrade 1, and is staggered and overlapped with the laterally constrained lightweight polymer-stabilized soil subgrade 2, in order to achieve the lightweighting of the subgrade and the smooth transition of the foundation stiffness at the end away from the bridge abutment 4.
[0035] The gradually stiffening composite foundation is located below the laterally constrained lightweight foamed concrete subgrade 1, the laterally constrained lightweight polymer-stabilized soil subgrade 2, and the polymer-stabilized soil subgrade 3, and extends into the loess foundation 7, so that the foundation stiffness of the bridge-road transition section gradually decreases from the bridge abutment to the far abutment.
[0036] This embodiment, by setting up the aforementioned three-segment gradual transition structure, achieves a smooth transition in the foundation stiffness of the bridge-road transition section, effectively controlling differential settlement and eliminating the phenomenon of vehicle slab settlement at bridge approach. Simultaneously, the application of lightweight foamed concrete and lightweight polymer-stabilized soil significantly reduces the roadbed's self-weight and decreases additional stress on the foundation.
[0037] In one embodiment, such as Figure 2 and Figure 3 As shown, the laterally constrained lightweight foamed concrete subgrade 1 includes a lightweight foamed concrete subgrade 1-5, a first lightweight solidified soil cushion layer 1-6, and a first laterally constrained structure.
[0038] The lightweight foamed concrete subgrade 1-5 is located directly below the road surface 5 and is used to form the main body of the subgrade of the laterally constrained lightweight foamed concrete subgrade 1.
[0039] The first lightweight solidified soil cushion layer 1-6 is located between the lightweight foamed concrete subgrade 1-5 and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation.
[0040] The first lateral restraint structure includes a lightweight concrete anchor plate restraint wall 1-1, a lightweight concrete anchor end 1-2, an epoxy-coated basalt fiber anchor rod 1-3, and a basalt fiber bolt 1-4. The lightweight concrete anchor plate restraint wall 1-1 is located on both sides of the lightweight foamed concrete subgrade 1-5, and is arranged in layers along the height direction of the lightweight foamed concrete subgrade 1-5, with a layer spacing of 0.3-1.2m. The specific layer spacing is determined according to the comprehensive slope design of the lightweight foamed concrete subgrade. One end of the epoxy-coated basalt fiber anchor rod 1-3 is anchored inside the lightweight foamed concrete subgrade 1-5 through the lightweight concrete anchor end 1-2, and the other free end is connected and fixed to the lightweight concrete anchor plate restraint wall 1-1 through the basalt fiber bolt 1-4.
[0041] In this embodiment, the first lateral constraint structure can constrain the lateral deformation of the lightweight foamed concrete subgrade 1-5, reduce the overall slope ratio of the subgrade slope, and reduce the foundation width and land use.
[0042] Specifically, the thickness of the first lightweight solidified soil cushion layer 1-6 is 0.3-1.2m.
[0043] Specifically, the lightweight foamed concrete subgrade 1-5 is formed by pouring lightweight foamed concrete, which includes raw materials such as cement, fly ash, steel slag powder, gypsum, foaming agent, and water, with a dry density of 600-1000 kg / m³. 3 With a compressive strength of 3.0-5.0 MPa, it can reduce the self-weight of the roadbed, reduce the additional stress on the foundation, and absorb solid wastes such as fly ash, steel slag, and gypsum, thus achieving the goals of lightweight and low-carbon roadbed.
[0044] In practical engineering, the epoxy-coated basalt fiber anchor bolts 1-3 are 3-8m long, with the specific length determined by the fracture surface of the lightweight foamed concrete subgrade stability analysis. The first lateral restraint structure reduces the overall slope ratio of the subgrade to 1:0.1-1:0.5, with the overall slope determined based on the fracture angle of the lightweight foamed concrete. Compared to the traditional subgrade slope ratio of 1:1.5 to 1:2.0, this embodiment significantly reduces the foundation width, saving land resources.
[0045] In one embodiment, such as Figure 2 and Figure 4 As shown, the laterally constrained lightweight polymer-stabilized soil subgrade 2 includes a lightweight polymer-stabilized soil subgrade 2-5, a second lightweight stabilized soil cushion layer 2-6, and a second laterally constrained structure.
[0046] The lightweight polymer-stabilized soil subgrade 2-5 is located directly below the road surface 5 and is used to form the main body of the subgrade that laterally constrains the lightweight polymer-stabilized soil subgrade 2.
[0047] The second lightweight solidified soil cushion layer 2-6 is located between the lightweight polymer solidified soil subgrade 2-5 and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation.
[0048] The second lateral restraint structure includes a lightweight concrete reinforced slab restraint wall 2-3, a basalt fiber reinforced strip 2-4, a lightweight concrete greening trench 2-2, and greening shrubs 2-1. The lightweight concrete reinforced slab confinement wall 2-3 is installed on both sides of the lightweight polymer-stabilized soil subgrade 2-5, layered along the height direction with a layer spacing of 0.3-1.2m. The layer height is designed according to the comprehensive slope of the lightweight polymer-stabilized soil subgrade. The basalt fiber reinforced strip 2-4 is laid in layers along the height direction within the lightweight polymer-stabilized soil subgrade 2-5 with a layer spacing of 0.3-1.2m. The other end of the basalt fiber reinforced strip 2-4 is connected and fixed to the lightweight concrete reinforced slab confinement wall 2-3, forming an integrated and coordinated force-bearing system to improve the overall integrity and lateral stability of the subgrade. The lightweight concrete greening trench 2-2 is set on the upper part of the outer side of the lightweight concrete reinforced slab confinement wall 2-3, and lateral sliding is restricted by the limiting tenon. The greening shrubs 2-1 are planted in the lightweight concrete greening trench 2-2, which is conducive to ecological restoration.
[0049] In this embodiment, by adopting the above-mentioned technical solution, the basalt fiber reinforced strip is connected to the restraint wall, which improves the overall integrity and lateral stability of the roadbed; the greening trench and greening shrubs are conducive to ecological restoration and achieve the goal of green highway construction; the lightweight polymer solidified soil is made of loess, fly ash, steel slag powder, gypsum, alkali activator and admixtures, and the total amount of geopolymer material is 10-20% of the weight of the solidified soil, which can absorb solid wastes such as fly ash, steel slag and gypsum, and reduce carbon emissions.
[0050] In actual engineering, the second lateral constraint structure reduces the overall slope ratio of the roadbed slope to 1:0.5-1:1, which is significantly lower than the traditional overall slope ratio of the roadbed slope, thus achieving land saving effect.
[0051] In one embodiment, such as Figure 2 and Figure 5 As shown, the geopolymer-stabilized soil subgrade 3 includes a geopolymer-stabilized soil subgrade body 3-2, a cement fly ash soil cushion layer 3-3, and a basalt fiber geogrid 3-1.
[0052] The geopolymer-stabilized soil subgrade body 3-2 is located directly below the road surface 5 and is used to form the subgrade body of the geopolymer-stabilized soil subgrade 3.
[0053] The cement fly ash soil cushion layer 3-3 is located between the geopolymer solidified soil subgrade main body 3-2 and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation.
[0054] The basalt fiber geogrid 3-1 is laid in layers within the geopolymer-stabilized soil subgrade body 3-2, with a layer spacing of 0.3-0.6m. The basalt fiber geogrid 3-1 is woven from high-strength basalt fibers, possessing excellent tensile strength and corrosion resistance, thus improving the tensile and shear strength of the subgrade. A dynamically consolidated foundation 3-5 is installed beneath the cement-fly ash soil cushion layer 3-3. This dynamically consolidated foundation 3-5 is formed by reinforcing the loess foundation using dynamic compaction or heavy hammer tamping methods.
[0055] In this embodiment, by adopting the above-mentioned technical solution, cement fly ash soil piles and dynamic consolidation reinforced foundation form a flexible pile composite foundation, achieving a smooth transition in foundation stiffness at the end away from abutment 4; cement fly ash soil is made of loess, cement, fly ash and gypsum, with cement content of 4-8% of the weight of loess, fly ash content of 10-20% of the weight of loess, and gypsum content of 2-5% of the weight of loess, which can absorb solid wastes such as fly ash and gypsum, realizing resource utilization.
[0056] In one embodiment, such as Figure 1 and Figure 2 As shown, to ensure the overlap effect between the laterally constrained lightweight foamed concrete subgrade 1 and the laterally constrained lightweight polymer-stabilized soil subgrade 2, and between the laterally constrained lightweight polymer-stabilized soil subgrade 2 and the geopolymer-stabilized soil subgrade 3, the angle α between the boundary line of the contact point between the lightweight foamed concrete subgrade 1-5 and the lightweight polymer-stabilized soil subgrade 2-5 and the horizontal line is greater than the angle β between the boundary line of the contact point between the lightweight polymer-stabilized soil subgrade 2-5 and the geopolymer-stabilized soil subgrade body 3-2 and the horizontal line.
[0057] In this embodiment, by adopting the above technical solution, the setting of this angle relationship ensures a smooth transition between each section of the roadbed and avoids the formation of abrupt interfaces.
[0058] In one embodiment, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the gradually stiffening composite foundation extends into the loess foundation 7 below, and in sequence along the direction away from the abutment 4, it includes a rigid-semi-rigid pile composite foundation, a semi-rigid-variable stiffness pile composite foundation, and a flexible pile composite foundation.
[0059] The rigid-semi-rigid pile composite foundation is located below the laterally constrained lightweight foamed concrete subgrade 1 and is connected to the first lightweight solidified soil cushion layer 1-6.
[0060] The semi-rigid-variable stiffness pile composite foundation is located below the laterally constrained lightweight polymer solidified soil subgrade 2 and is connected to the second lightweight solidified soil cushion layer 2-6.
[0061] The flexible pile composite foundation is located below the geopolymer solidified soil subgrade 3 and is connected to the cement fly ash soil cushion layer 3-3.
[0062] Specifically, the rigid-semi-rigid pile composite foundation includes several foamed concrete piles 1-8 and first fluidized solidified soil piles 1-7. Each reinforcement unit of the rigid-semi-rigid pile composite foundation consists of one foamed concrete pile 1-8 and four first fluidized solidified soil piles 1-7. The first fluidized solidified soil piles 1-7 are arranged in a rectangular shape, and the foamed concrete piles 1-8 are located at the centroid of the four first fluidized solidified soil piles 1-7, forming a central pile arrangement, which improves the overall bearing capacity of the composite foundation.
[0063] Specifically, the semi-rigid-variable stiffness pile composite foundation includes several second-flow solidified soil piles 2-8 and solidified soil-cement fly ash soil composite piles 2-7. Each reinforcement unit of the semi-rigid-variable stiffness pile composite foundation consists of one second-flow solidified soil pile 2-8 and four solidified soil-cement fly ash soil composite piles 2-7. The solidified soil-cement fly ash soil composite piles 2-7 are arranged in a rectangular shape, and the second-flow solidified soil piles 2-8 are located at the centroid of the four solidified soil-cement fly ash soil composite piles 2-7.
[0064] Specifically, the flexible pile composite foundation is formed by several cement fly ash soil piles 3-4 and a dynamic consolidation reinforced foundation 3-5. Through the coordinated work of the cement fly ash soil piles 3-4 and the dynamic consolidation reinforced foundation 3-5, a smooth stiffness transition is formed.
[0065] In actual engineering projects, the parameters of the above-mentioned pile types are shown in Table 1: Table 1: Pile Type Parameter Table
[0066] Specifically, in the aforementioned gradually varying stiffness composite foundation, foamed concrete piles 1-8 and second fluidized solidified soil piles 2-8 are long piles, while first fluidized solidified soil piles 1-7 and solidified soil-cement fly ash soil composite piles 2-7 are short piles, and cement fly ash soil piles 3-4 are flexible piles. Furthermore, in rigid-semi-rigid pile composite foundations and semi-rigid-variable stiffness pile composite foundations, the length ratio of long piles to short piles is 1.2-2. Long piles represent piles with higher stiffness, while short piles represent piles with lower stiffness, achieving a gradual change in stiffness through the combination of long and short piles. Specifically, the length ratio of long to short piles in foamed concrete piles 1-8 and first fluidized solidified soil piles 1-7 is 1.2-2, with foamed concrete piles 1-8 providing greater stiffness as long piles and first fluidized solidified soil piles 1-7 providing less stiffness as short piles; similarly, the length ratio of long to short piles in second fluidized solidified soil piles 2-8 and solidified soil-cement fly ash soil composite piles 2-7 is also 1.2-2. In the flexible pile composite foundation, the depth ratio of the flexible pile to the dynamic consolidation foundation 3-5 is 1.2-2, and the depth of the flexible pile is greater than that of the dynamic consolidation foundation to ensure a smooth transition in stiffness.
[0067] This embodiment achieves a smooth transition of foundation stiffness from the abutment to the far abutment by adopting the above-mentioned multi-level stiffness gradient structure, which significantly improves the settlement control effect of the bridge-road transition section.
[0068] In one embodiment, such as Figure 1 As shown, the abutment 4 is a bridge end structure, including abutment cap 4-3, abutment body 4-4 and abutment 4-5.
[0069] The cap 4-3 is located on the upper side of the abutment body 4-4, and a beam 4-1 and abutment top 4-2 are connected to each other on the upper side of the cap 4-3. The beam 4-1 is located on one side of the bridge body, and the abutment top 4-2 is located on one side of the road surface 5 and is connected to the road surface 5.
[0070] The platform body 4-4 is located between the cap 4-3 and the foundation 4-5, and is in contact with the lightweight foamed concrete subgrade 1-5.
[0071] The foundation 4-5 is located below the body 4-4, and several piles 4-6 are arranged below the foundation 4-5.
[0072] In this embodiment, the abutment 4 serves as the connection structure between the bridge and the roadbed. Its abutment body 4-4 is in direct contact with the lightweight foamed concrete roadbed 1-5. The load is transferred to the deep bearing layer through the rigid-semi-rigid pile composite foundation, which effectively controls the differential settlement between the abutment and the roadbed.
[0073] In one embodiment, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the road surface 5 includes a road base layer 5-2 and a road surface layer 5-1. The road base layer 5-2 is located below the road surface layer 5-1 and is in contact with the lightweight foamed concrete subgrade 1-5, the lightweight polymer-stabilized soil subgrade 2-5, and the polymer-stabilized soil subgrade body 3-2.
[0074] Specifically, crash barriers 5-3 and drainage pipes 5-4 are installed on both sides of the road surface 5. The crash barriers 5-3 extend into the road base layer 5-2 and are fixed therein. The inlets of the drainage pipes 5-4 extend to both sides of the road surface 5 for drainage, preventing rainwater from seeping into the roadbed and causing loess subsidence.
[0075] In one embodiment, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, a drainage ditch 7-1 is also provided on the upper surface of the loess foundation 7. The drainage ditch 7-1 is located on both sides of the laterally constrained lightweight foamed concrete subgrade 1, the laterally constrained lightweight polymer-stabilized soil subgrade 2, and the polymer-stabilized soil subgrade 3. The drainage ditch 7-1, together with the drainage pipe 5-4, constitutes a complete drainage system to ensure smooth drainage and prevent the impact of loess subsidence on the stability of the subgrade.
[0076] On the other hand, embodiments of the present invention provide a construction method for a low-carbon lightweight roadbed-gradient stiffness composite foundation structure in loess areas, specifically including the following steps: S1. Site leveling: Level the site within the roadbed reinforcement area, remove surface debris, and ensure that the construction site is firm and flat; S2. Layout and point setting: Set up control measurement points within the reinforced area and mark the pile positions of foam concrete piles 1-8, first fluidized solidified soil piles 1-7, second fluidized solidified soil piles 2-8, solidified soil-cement fly ash soil composite piles 2-7 and cement fly ash soil piles 3-4 to ensure that the pile position deviations meet the specifications. S3. Design parameters of the composite foundation structure of the roadbed: Based on the burial depth of the bridge-road transition section, the engineering characteristics of the strata and the deformation control requirements, calculate and determine the pile length, pile diameter, pile spacing, layout of each pile type, as well as the number of layers of lateral restraint structures (including the first lateral restraint structure and the second lateral restraint structure) and the thickness of each roadbed layer; the collapsibility characteristics of loess and the bearing capacity requirements of the foundation should be considered during the calculation process; S4. Construction of Rigid-Semi-rigid Pile Composite Foundation: Foamed concrete piles 1-8 and first-flow solidified soil piles 1-7 are constructed near the abutment. Foamed concrete piles 1-8 are formed by bored casting or rotary drilling. During the casting process, the flowability of the foamed concrete is controlled to ensure that the pile body is uniform and dense. First-flow solidified soil piles 1-7 are formed by driven pipe. The flowability of the solidified soil meets the pumping requirements and is controlled within the range of 150-200mm. S5. Construction of semi-rigid-variable stiffness pile composite foundation: In the intermediate transition section, construct second-flow solidified soil piles 2-8 and solidified soil-cement fly ash soil composite piles 2-7; the second-flow solidified soil piles 2-8 are formed by bored grouting or rotary drilling, and the fluidity of the solidified soil meets the pumping requirements; the solidified soil-cement fly ash soil composite piles 2-7 are formed by driving pipe method and then compacted in layers, with the lower half of the pile being solidified soil and the upper half being cement fly ash soil, forming a variable stiffness pile body; S6. Construction of flexible pile composite foundation: Dynamic consolidation and reinforcement of the lower loess foundation is carried out on the far side to form a dynamic consolidation and reinforcement foundation 3-5, and then cement fly ash soil piles 3-4 are constructed; cement fly ash soil piles 3-4 are constructed by driven pipe piles, and the compaction degree of the pile body is not less than 95% to ensure that the quality of the pile body meets the design requirements. S7. Foundation quality inspection: Conduct composite foundation load tests and pile integrity tests on each pile. The characteristic value of the composite foundation bearing capacity should meet the design requirements, and the pile integrity test should meet the Class I pile standard. S8. Subbase filling: Fill the first lightweight solidified soil subbase 1-6, the second lightweight solidified soil subbase 2-6 and the cement fly ash soil subbase 3-3. The compaction degree of the subbase shall not be less than 93%, and the subbase quality shall be inspected. S9. Installation of the first-floor lateral restraint structure: Install lightweight concrete anchor plate restraint walls 1-1 on both sides of the laterally restrained lightweight foamed concrete subgrade 1, construct lightweight concrete anchor ends 1-2, and install epoxy-coated basalt fiber anchor rods 1-3 and basalt fiber bolts 1-4; install lightweight concrete reinforced plate restraint walls 2-3 and basalt fiber reinforced strips 2-4 on both sides of the laterally restrained lightweight polymer-solidified soil subgrade 2; and conduct quality inspection of the lateral restraint structure to ensure that the anchor rod anchoring force and bolt tightening force meet the design requirements; S10. First-layer subgrade pouring or filling construction: Pour lightweight foamed concrete at the laterally constrained lightweight foamed concrete subgrade 1, controlling the layer thickness to be 0.3-0.6m during pouring; pour lightweight polymer-stabilized soil at the laterally constrained lightweight polymer-stabilized soil subgrade 2, with a layer thickness of 0.3-0.6m; fill polymer-stabilized soil or cement fly ash soil at the polymer-stabilized soil subgrade 3, with a layer thickness of 0.3-0.6m, and lay basalt fiber geogrid 3-1 in layers with a layer spacing of 0.3-0.6m; conduct quality inspection of the first-layer subgrade; S11. Installation of the second layer of lateral restraint structure and pouring or filling of the second layer of roadbed: The construction and quality inspection of the lateral restraint structure and roadbed should be carried out alternately layer by layer until the design roadbed elevation is reached; after the completion of each layer, compaction test and quality acceptance should be carried out. S12. Level the subgrade surface and conduct subgrade surface quality inspection: Install drainage pipes to ensure smooth drainage; construct the road base, crash barriers, concrete shoulders, and road surface layer; S13. Post-construction settlement monitoring: Settlement monitoring points shall be set up in the bridge-road transition section to monitor the settlement of the abutment, rigid-semi-rigid pile composite foundation section, semi-rigid-variable stiffness pile composite foundation section, variable stiffness-flexible pile composite foundation section, and flexible pile composite foundation section until the settlement control requirements are met; settlement monitoring shall be carried out using a precision level, and the monitoring accuracy shall meet the requirements of second-order leveling; S14. After the settlement monitoring is completed, tighten the basalt fiber bolts and apply prestress by tightening the epoxy-coated basalt fiber anchors. The magnitude of the prestress is designed according to the roadbed height, and the prestress value is calculated and determined according to the following formula: ; in, P This represents the prestress value of the anchor bolt (kN). γ Unit weight of roadbed material (kN / m) 3 ), H The elevation of the roadbed is in meters (m). A The service area of a single anchor bolt for the subgrade (m²) 2 ), k This is the prestressing coefficient, with a value ranging from 0.3 to 0.5.
[0077] In one embodiment, in step S9, the lightweight concrete anchor plate constraint wall 1-1 and the lightweight concrete reinforced plate constraint wall 2-3 are arranged in layers along the height direction with a layer spacing of 0.3-1.2m; the epoxy-coated basalt fiber anchor rod 1-3 has a length of 3.0-8.0m; the basalt fiber reinforcement strip 2-4 has a layer spacing of 0.3-1.2m; a lightweight concrete greening trench 2-2 is set on the outside of the lightweight concrete reinforced plate constraint wall 2-3 and greening shrubs 2-1 are planted. The greening shrubs are local suitable varieties to ensure survival rate and landscape effect.
[0078] In one embodiment, in step S10, one or more solid waste materials selected from steel slag, fly ash, and gypsum are added to lightweight foamed concrete, lightweight polymer-stabilized soil, and cement fly ash soil, with the total amount of solid waste materials not less than 30%, to achieve resource utilization of solid waste; the lightweight foamed concrete is poured in layers with a thickness of 0.3-0.6m, and the curing time after pouring is not less than 7 days; the lightweight polymer-stabilized soil is poured in layers with a thickness of 0.3-0.6m, and the curing time after pouring is not less than 7 days; the main body 3-2 of the polymer-stabilized soil subgrade is filled in layers with a thickness of 0.3-0.6m, and the basalt fiber geogrid 3-1 has a layer spacing of 0.3-0.6m, and is fixed by binding or welding during laying.
[0079] After construction, composite foundation load tests, roadbed quality inspections, and post-construction settlement observations will be conducted. For high-speed railways, the post-construction settlement of the bridge-road transition section will be controlled within 15mm. For rail-track high-speed railways with a speed of 300km / h or more, the post-construction settlement will be controlled within 50mm. For highways, the post-construction settlement will be controlled within 100mm. The bridge approach slab evaluation index will meet the design requirements, and the bridge approach slab gradient difference will not exceed 0.4%.
[0080] To quantitatively verify the superior performance of the technical solution described in this invention, a detailed data demonstration is provided below through a set of specific embodiments and comparative examples.
[0081] Example 1: In this example, the structural scheme and construction method described in this invention are adopted. The dry density of the lightweight foamed concrete in the laterally constrained lightweight foamed concrete subgrade 1 is set to 800 kg / m³. 3 The compressive strength is set at 4.0 MPa, and the total content of solid waste material is 35%. The lateral restraint structure reduces the comprehensive slope ratio of the roadbed slope to 1:0.3. The gradually stiffened composite foundation adopts a combination of foamed concrete piles 1-8 and first-flow solidified soil piles 1-7, and the length ratio of long and short piles is set at 1.5.
[0082] Example 2: This example is basically the same as Example 1, except that the total amount of polymer material in the laterally constrained lightweight polymer solidified soil subgrade 2 is set to 15%, and the lateral constraint structure reduces the comprehensive slope ratio of the subgrade slope to 1:0.7; the length ratio of the second fluid solidified soil pile 2-8 to the solidified soil-cement fly ash soil composite pile 2-7 in the semi-rigid-variable stiffness pile composite foundation is set to 1.8.
[0083] Comparative Example 1: A traditional earth-filled roadbed and a single-pile composite foundation were adopted. The overall slope ratio of the slope was 1:1.5. The roadbed material was ordinary soil, and the composite foundation adopted a single cement-soil mixing pile.
[0084] The experimental conditions were strictly implemented in accordance with JTG D30-2015 "Specifications for Design of Highway Subgrade" and JTG E60-2008 "Specifications for Field Testing of Highway Subgrade and Pavement". The experimental test data comparison results are shown in Table 2.
[0085] Table 2: Test Data Table
[0086] The data comparison in Table 2 clearly shows that, in terms of land-saving effect, the comprehensive slope ratio of the roadbed slope in Example 1 is reduced to 1:0.3, the foundation width is reduced by 45% compared with Comparative Example 1, and by 30% in Example 2, which significantly saves land resources.
[0087] Regarding lightweighting of the roadbed, the unit weight of the roadbed material in Example 1 was reduced to 10.5 kN / m. 3 Compared to 18.5 kN / m in Comparative Example 1 3 The stress was reduced by 43%, and the additional stress on the foundation was reduced by 38%; the unit weight of the roadbed material in Example 2 was reduced to 14.2 kN / m. 3 This reduced the stress by 23% and the additional stress on the foundation by 22%.
[0088] In terms of low carbon and environmental protection, the total amount of solid waste materials in Examples 1 and 2 reached 35% and 30% respectively, realizing the resource utilization of solid waste and reducing carbon emissions.
[0089] Regarding settlement control, the post-construction settlements of Examples 1 and 2 were 12mm and 14mm, respectively, both meeting the 15mm settlement control requirement for high-speed railways and significantly better than the 28mm of Comparative Example 1. The bridge approach ramp gradients were 0.25% and 0.32%, respectively, both meeting the design requirement of not exceeding 0.4% and significantly better than the 0.65% of Comparative Example 1.
[0090] This invention employs a three-stage, gradually transitioning structure—comprising a laterally constrained lightweight foamed concrete subgrade, a laterally constrained lightweight polymer-stabilized soil subgrade, and a polymer-stabilized soil subgrade—along with a gradually varying stiffness composite foundation. This achieves a smooth transition of foundation stiffness from the abutment to the far abutment in the bridge-road transition section, effectively controlling differential settlement and eliminating bridge approach slab settlement. The application of lightweight foamed concrete and lightweight polymer-stabilized soil significantly reduces the subgrade's self-weight and additional foundation stress. The laterally constrained structure substantially reduces the overall slope ratio of the subgrade slopes, decreasing foundation width and conserving land resources. By incorporating solid waste materials such as fly ash, steel slag powder, and gypsum into the subgrade materials, with a total solid waste content of no less than 30%, solid waste resource utilization is achieved, reducing carbon emissions and aligning with the development direction of green and low-carbon transportation infrastructure.
[0091] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas, located between the loess foundation (7) and the pavement (5), characterized in that: It includes laterally constrained lightweight foamed concrete subgrade (1), laterally constrained lightweight polymer-stabilized soil subgrade (2), geopolymer-stabilized soil subgrade (3) and gradually stiffened composite foundation; The laterally constrained lightweight foamed concrete subgrade (1) is located at one end near the bridge abutment (4) and overlaps with the bridge abutment (4); The laterally constrained lightweight polymer solidified soil subgrade (2) is located at the end of the laterally constrained lightweight foamed concrete subgrade (1) away from the bridge abutment (4), and is offset from the laterally constrained lightweight foamed concrete subgrade (1). The geopolymer solidified soil subgrade (3) is located at the end of the laterally constrained lightweight polymer solidified soil subgrade (2) away from the laterally constrained lightweight foamed concrete subgrade (1), and is offset from the laterally constrained lightweight polymer solidified soil subgrade (2). The gradually stiffened composite foundation is located below the laterally constrained lightweight foamed concrete subgrade (1), the laterally constrained lightweight polymer-stabilized soil subgrade (2) and the polymer-stabilized soil subgrade (3), and extends into the loess foundation (7).
2. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 1, characterized in that: The laterally constrained lightweight foamed concrete subgrade (1) includes a lightweight foamed concrete subgrade (1-5), a first lightweight solidified soil cushion layer (1-6), and a first laterally constrained structure; The lightweight foamed concrete subgrade (1-5) is located directly below the pavement (5); The first lightweight solidified soil cushion layer (1-6) is located between the lightweight foamed concrete subgrade (1-5) and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. The first lateral restraint structure includes a lightweight concrete anchor plate restraint wall (1-1), a lightweight concrete anchor end (1-2), an epoxy-coated basalt fiber anchor rod (1-3), and a basalt fiber bolt (1-4). The lightweight concrete anchor plate restraint wall (1-1) is located on both sides of the lightweight foamed concrete subgrade (1-5) and is layered along the height direction of the lightweight foamed concrete subgrade (1-5). One end of the epoxy-coated basalt fiber anchor rod (1-3) is anchored in the lightweight foamed concrete subgrade (1-5) through the lightweight concrete anchor end (1-2), and the other end is connected to the lightweight concrete anchor plate restraint wall (1-1) through the basalt fiber bolt (1-4).
3. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 2, characterized in that: The thickness of the first lightweight solidified soil cushion layer (1-6) is 0.3-1.2m; the lightweight foamed concrete subgrade (1-5) is formed by pouring lightweight foamed concrete, which includes cement, fly ash, steel slag powder, gypsum, foaming agent and water, with a dry density of 600-1000kg / m³. 3 The compressive strength is 3.0-5.0MPa; the length of the epoxy-coated basalt fiber anchor (1-3) is 3-8m; the first lateral restraint structure reduces the overall slope ratio of the roadbed slope to 1:0.1-1:0.
5.
4. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 2, characterized in that: The laterally constrained lightweight polymer-stabilized soil subgrade (2) includes a lightweight polymer-stabilized soil subgrade (2-5), a second lightweight stabilized soil cushion layer (2-6), and a second laterally constrained structure; The lightweight polymer-stabilized soil subgrade (2-5) is located directly below the pavement (5); The second lightweight solidified soil cushion layer (2-6) is located between the lightweight polymer solidified soil subgrade (2-5) and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. The second lateral restraint structure includes a lightweight concrete reinforced slab restraint wall (2-3), a basalt fiber reinforced strip (2-4), and a lightweight concrete greening base trench (2-2). The lightweight concrete reinforced slab restraint wall (2-3) is located on both sides of the lightweight polymer-stabilized soil subgrade (2-5) and is layered along the height direction with a layer spacing of 0.3-1.2m. The basalt fiber reinforced strip (2-4) is laid in layers along the height direction within the lightweight polymer-stabilized soil subgrade (2-5) with a layer spacing of 0.3-1.2m, and the other end of the basalt fiber reinforced strip (2-4) is connected to the lightweight concrete reinforced slab restraint wall (2-3) to form an overall coordinated force-bearing system. The lightweight concrete greening base trench (2-2) is located on the upper part of the outer side of the lightweight concrete reinforced slab restraint wall (2-3) and is restricted from lateral sliding by a limiting tenon.
5. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 4, characterized in that: The lightweight polymer-stabilized soil subgrade (2-5) is formed by compacting lightweight polymer-stabilized soil. The lightweight polymer-stabilized soil is made of loess, fly ash, steel slag powder, gypsum, alkali activator and admixtures. The total amount of polymer material is 10-20% of the weight of the stabilized soil. The second lateral restraint structure reduces the overall slope ratio of the roadbed slope to 1:0.5-1:1; The total amount of geopolymer material is the ratio of the total mass of the geopolymer materials (fly ash, steel slag powder, gypsum, and alkali activator) to the weight of the solidified soil.
6. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 4, characterized in that: The geopolymer-stabilized soil subgrade (3) includes the main body of the geopolymer-stabilized soil subgrade (3-2), the cement fly ash soil cushion layer (3-3), and the basalt fiber geogrid (3-1). The main body of the geopolymer-stabilized soil subgrade (3-2) is located directly below the road surface (5); The cement fly ash soil cushion layer (3-3) is located between the main body of the geopolymer solidified soil subgrade (3-2) and the gradually stiffened composite foundation, and is connected to the gradually stiffened composite foundation. Basalt fiber geogrid (3-1) is laid in layers within the main body of the geopolymer-stabilized soil subgrade (3-2) with a layer spacing of 0.3-0.6m; and a dynamic consolidation reinforced foundation (3-5) is set below the cement fly ash soil cushion layer (3-3).
7. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 6, characterized in that: The cement fly ash soil cushion layer (3-3) is formed by pouring cement fly ash soil, which is made of loess, cement, fly ash and gypsum. The cement content is 4-8% of the weight of loess, the fly ash content is 10-20% of the weight of loess, and the gypsum content is 2-5% of the weight of loess. The angle α between the boundary line of the lightweight foamed concrete subgrade (1-5) and the lightweight polymer-stabilized soil subgrade (2-5) and the horizontal line is greater than the angle β between the boundary line of the lightweight polymer-stabilized soil subgrade (2-5) and the main body of the polymer-stabilized soil subgrade (3-2) and the horizontal line.
8. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in any one of claims 1 to 7, characterized in that: The gradually varying stiffness composite foundation includes, in sequence, a rigid-semi-rigid pile composite foundation, a semi-rigid-variable stiffness pile composite foundation, and a flexible pile composite foundation along the direction away from the abutment (4); The rigid-semi-rigid pile composite foundation is located below the laterally constrained lightweight foamed concrete subgrade (1) and is connected to the first lightweight solidified soil cushion layer (1-6); The semi-rigid-variable stiffness pile composite foundation is located below the laterally constrained lightweight polymer solidified soil subgrade (2) and is connected to the second lightweight solidified soil cushion layer (2-6); The flexible pile composite foundation is located below the geopolymer solidified soil subgrade (3) and is connected to the cement fly ash soil cushion layer (3-3).
9. The low-carbon lightweight roadbed-gradient stiffness composite foundation structure for loess areas as described in claim 8, characterized in that: The rigid-semi-rigid pile composite foundation includes several foamed concrete piles (1-8) and first fluidized solidified soil piles (1-7). Each reinforcement unit of the rigid-semi-rigid pile composite foundation consists of 1 foamed concrete pile (1-8) and 4 first fluidized solidified soil piles (1-7). The first fluidized solidified soil piles (1-7) are arranged in a rectangular shape, and the foamed concrete pile (1-8) is located at the centroid of the 4 first fluidized solidified soil piles (1-7). The semi-rigid-variable stiffness pile composite foundation includes several second-flow solidified soil piles (2-8) and solidified soil-cement fly ash soil composite piles (2-7). Each reinforcement unit of the semi-rigid-variable stiffness pile composite foundation consists of 1 second-flow solidified soil pile (2-8) and 4 solidified soil-cement fly ash soil composite piles (2-7). The solidified soil-cement fly ash soil composite piles (2-7) are arranged in a rectangular shape, and the second-flow solidified soil pile (2-8) is located at the centroid of the 4 solidified soil-cement fly ash soil composite piles (2-7). The flexible pile composite foundation is formed by several cement fly ash soil piles (3-4) and a dynamically consolidated foundation (3-5); Among them, foamed concrete piles (1-8) and second fluidized solidified soil piles (2-8) are long piles, first fluidized solidified soil piles (1-7) and solidified soil-cement fly ash soil composite piles (2-7) are short piles, and cement fly ash soil piles (3-4) are flexible piles; and in rigid-semi-rigid pile composite foundations and semi-rigid-variable stiffness pile composite foundations, the length ratio of long piles to short piles is 1.2-2; in flexible pile composite foundations, the depth ratio of flexible piles to dynamic consolidation reinforced foundations (3-5) is 1.2-2.
10. A construction method for a low-carbon lightweight roadbed-gradient stiffness composite foundation structure in loess areas as described in claim 9, characterized in that: Includes the following steps: S1. Site leveling: Level the site within the roadbed reinforcement area and remove surface debris; S2. Layout and layout: Set up control measurement points within the reinforced area and mark the pile positions of foam concrete piles (1-8), first fluidized solidified soil piles (1-7), second fluidized solidified soil piles (2-8), solidified soil-cement fly ash soil composite piles (2-7) and cement fly ash soil piles (3-4) to ensure that the pile position deviations meet the specifications. S3. Design parameters of the composite subgrade structure: Based on the burial depth of the bridge-road transition section, the geological engineering characteristics and deformation control requirements, calculate and determine the pile length, pile diameter, pile spacing, layout, number of lateral constraint structure layers and subgrade layer thickness for each pile type; S4. Construction of rigid-semi-rigid pile composite foundation: Foamed concrete piles (1-8) and first-flow solidified soil piles (1-7) are constructed near the abutment. The foamed concrete piles (1-8) are formed by bored casting or rotary drilling. During the casting process, the flowability of the foamed concrete is controlled to ensure that the pile body is uniform and dense. The first-flow solidified soil piles (1-7) are formed by driven pipe. The flowability of the solidified soil meets the pumping requirements and is controlled within the range of 150-200mm. S5. Construction of semi-rigid-variable stiffness pile composite foundation: In the intermediate transition section, construct the second fluidized solidified soil pile (2-8) and the solidified soil-cement fly ash soil composite pile (2-7); the second fluidized solidified soil pile (2-8) is formed by bored grouting or rotary drilling, and the fluidity of the fluidized solidified soil meets the pumping requirements; the solidified soil-cement fly ash soil composite pile (2-7) is formed by driving the pipe and then compacting in layers, with the lower half of the pile being solidified soil and the upper half being cement fly ash soil, forming a variable stiffness pile body; S6. Construction of Flexible Pile Composite Foundation: Dynamic consolidation and reinforcement of the lower loess foundation is carried out on the far side of the platform to form a dynamic consolidation and reinforcement foundation (3-5), and then cement fly ash soil piles (3-4) are constructed; the cement fly ash soil piles (3-4) are constructed by driven pipe piles, and the compaction degree of the pile body is not less than 95%; S7. Foundation quality inspection: Conduct composite foundation load tests and pile integrity tests on each pile. The characteristic value of the composite foundation bearing capacity should meet the design requirements, and the pile integrity test should meet the Class I pile standard. S8. Subbase Filling: Fill the first lightweight solidified soil subbase (1-6), the second lightweight solidified soil subbase (2-6), and the cement fly ash soil subbase (3-3), with a subbase compaction degree of not less than 93%; S9. Installation of the first-layer lateral restraint structure: Install lightweight concrete anchor plate restraint walls (1-1) on both sides of the lateral restraint lightweight foamed concrete subgrade (1), construct lightweight concrete anchor ends (1-2), and install epoxy-coated basalt fiber anchor rods (1-3) and basalt fiber bolts (1-4); install lightweight concrete reinforced plate restraint walls (2-3) and basalt fiber reinforced strips (2-4) on both sides of the lateral restraint lightweight polymer-solidified soil subgrade (2); and conduct quality inspection of the lateral restraint structure; S10. First-layer roadbed pouring or filling construction: pour lightweight foam concrete at the laterally constrained lightweight foam concrete roadbed (1), and control the layer thickness to be 0.3-0.6m during the pouring process; pour lightweight polymer solidified soil at the laterally constrained lightweight polymer solidified soil roadbed (2), and pour the layer thickness to be 0.3-0.6m; fill the polymer solidified soil or cement fly ash soil at the polymer solidified soil roadbed (3), and fill the layer thickness to be 0.3-0.6m, and lay basalt fiber geogrid (3-1) in layers with a layer spacing of 0.3-0.6m; S11. Installation of the second layer of lateral restraint structure and pouring or filling of the second layer of roadbed: The construction and quality inspection of the lateral restraint structure and roadbed are carried out alternately layer by layer until the design roadbed elevation is reached; S12. Level the subgrade surface and conduct subgrade surface quality inspection: Install drainage pipes to ensure smooth drainage; construct the road base, guardrails, concrete shoulders and road surface layer; S13. Settlement monitoring after construction: Settlement monitoring points are set up in the bridge-road transition section to monitor the settlement of the abutment, rigid-semi-rigid pile composite foundation section, semi-rigid-variable stiffness pile composite foundation section, variable stiffness-flexible pile composite foundation section and flexible pile composite foundation section until the settlement control requirements are met. S14. After the settlement observation is completed after construction, tighten the basalt fiber bolts (1-4) and tighten the epoxy-coated basalt fiber anchor rods (1-3) to apply prestress. The prestress value is calculated and determined according to the following formula: ; in, P This represents the prestress value of the anchor bolt. γ For the density of roadbed materials, H This is the height of the roadbed. A For the roadbed area served by a single anchor bolt, k is the prestress coefficient.