Hollow steel pipe pile-cap structure in high risk area of offshore earthquake and construction method thereof
By combining precast hollow steel pipe piles with precast pile cap structures, along with internal and external reinforcing ribs and irregular notch designs, a pressure bar-constraint collaborative working mechanism is formed. This solves the problems of insufficient connection stiffness and poor durability of traditional pile foundations in near-shore environments, and achieves efficient and corrosion-resistant pile foundation construction.
Patent Information
- Application Number
- CN202611644078.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-23
- Publication Date
- 2026-11-20
AI Technical Summary
Traditional cast-in-place pile foundations are prone to corrosion in the high-temperature, high-salt, and highly corrosive environment of nearshore areas. They also suffer from insufficient connection stiffness, poor node durability, and low construction efficiency. Furthermore, traditional prefabricated pile foundations have problems such as insufficient connection stiffness, limited anchoring performance, and large residual deformation after earthquakes at the connection between the pile and the pile cap.
The system employs precast hollow steel pipe piles and precast pile caps, combined with internal and external reinforcing ribs and irregular notches, to form a pressure bar-constraint collaborative working mechanism. High-strength, corrosion-resistant connections are achieved through internal and external connectors, and high-performance grouting material is used for sealing and anchoring. The construction process involves factory prefabrication and on-site assembly.
It improves the connection performance and durability of the pile and pile cap joint, reduces the pile cross-section, reduces the structural self-weight, improves construction efficiency, adapts to the high temperature, high salt and high corrosion environment of the nearshore area, and reduces material usage and construction risks.
Smart Images

Figure CN123133347A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of civil engineering technology, and in particular to a construction method for a hollow steel pipe pile-pile cap structure in a high-risk seismic zone near the coast. Background Technology
[0002] With the rapid construction of near-shore transportation infrastructure, offshore wind power platforms, port terminals, and cross-sea projects, pile foundations, as crucial load-bearing components of the substructure, face higher demands on load-bearing capacity, construction efficiency, and service durability. Traditional cast-in-place pile foundations and cast-in-place pile cap connections typically require on-site reinforcement binding, formwork erection, concrete pouring, and long-term curing. This results in long construction cycles, a large amount of on-site wet work, and, under high temperature, high salt, high humidity, and highly corrosive environments, ordinary steel bars are prone to corrosion, leading to degradation of the load-bearing capacity of the connection zone and increased maintenance costs. Furthermore, traditional pile cap connections often rely on large insertion depths or complex anchoring structures to ensure integrity, which not only increases material usage and construction difficulty but also limits the level of industrialized structural construction.
[0003] However, while existing prefabricated pile foundations have improved upon the low construction efficiency of traditional cast-in-place methods, certain shortcomings remain at the pile-cap connection. If the pile and cap are connected solely by ordinary splicing, grouting, or conventional steel reinforcement anchoring, problems such as insufficient connection stiffness, limited anchoring performance, significant post-earthquake residual deformation, and insufficient joint durability can easily arise. Especially in the high-temperature, high-salt, and highly corrosive environment of nearshore areas, ordinary steel reinforcement and connectors are prone to corrosion and expansion after long-term chloride erosion, further weakening the load-bearing capacity and service life of the pile-cap joint. Furthermore, existing splice-and-socket connections typically require a deep splice length to ensure stability, increasing not only the size of the pile-cap socket and the amount of grouting required, but also hindering the reduction of pile cross-section and structural weight. Therefore, how to improve the connection performance, self-centering capability, durability, and anchoring efficiency of the pile-cap joint while maintaining the advantages of rapid prefabricated construction has become a crucial issue that urgently needs to be addressed for the further promotion and application of prefabricated pile foundations. Summary of the Invention
[0004] Therefore, the present invention provides a hollow steel pipe pile-pile cap structure and its construction method for high-risk seismic zones in coastal areas, in order to overcome some or all of the problems in the prior art.
[0005] To achieve the above objectives, on the one hand, the present invention provides a hollow steel pipe pile-pile cap structure for high-risk seismic zones in the nearshore area, including a precast pile cap, a connecting component, and a precast hollow steel pipe pile, wherein the precast hollow steel pipe pile includes an inner wall component, an outer wall component, and a central concrete. The inner wall assembly is provided with several inner reinforcing ribs outward along the circumference, and the outer wall assembly is provided with several outer reinforcing ribs inward along the circumference. The inner and outer reinforcing ribs are arranged alternately in an interlocking manner. Among them, the inner reinforcing ribs are provided with several inner pressure bar notches at equal intervals, and the outer reinforcing ribs are provided with several outer pressure bar notches at equal intervals; The inner compression rod notch and the outer compression rod notch have the same shape; The internal pressure rod notch includes a first notch, a second notch, and a connecting section; The second notch is curved, and its shape satisfies the formula: ; Among them, the x1-y1 coordinate system is established with the intersection of the second gap and the connecting section as the origin; A is the maximum amplitude of the curve; c represents the horizontal width of the steel rib.
[0006] Furthermore, the first notch is V-shaped, comprising an outer V-shaped segment and an inner V-shaped segment; The shape of the outer V-shaped segment satisfies the formula: ; The shape of the inner V-shaped segment satisfies the formula: ; Among them, the xy coordinate system is constructed with the V-shaped inflection point of the first gap as the origin; Where α is the angle between the outer V-shaped segment and the negative half-axis of the x-axis; β is the angle between the inner V-shaped segment and the positive x-axis. 'a' is the negative value of the projection of the outer V-shaped segment onto the negative x-axis. b is the size of the projection of the inner V-shaped segment onto the positive x-axis.
[0007] Furthermore, the length of the connecting segment is L, where 2C ≤ L ≤ 3C.
[0008] Furthermore, the aforementioned The angle is 30°–60°. The range is 30°–60°.
[0009] Furthermore, the connection component includes an inner connector and an outer connector; The internal connector consists of several internal elongated bars fixedly installed on the outer wall, with connecting threads at the top of the internal elongated bars. The external connector includes a fixing plate and connecting bolts. The fixing plate is fixedly installed on the outer side of the precast hollow steel pipe pile near the top. The fixing plate is provided with several through holes. The connecting bolts pass through the through holes to fix the precast pile cap to the top of the precast hollow steel pipe pile.
[0010] Furthermore, the precast pile cap is provided with a plurality of first connecting holes and a plurality of second connecting holes, the first connecting holes being used to allow the elongated reinforcing bars inside the pile to pass through, and the second connecting holes being used to allow connecting bolts to pass through.
[0011] Furthermore, a socket is provided at the connection between the precast pile cap and the precast hollow steel pipe pile, and a grouting hole is provided at the center of the precast pile cap, which communicates with the socket.
[0012] Furthermore, the precast pile cap is provided with several layers of planar steel mesh, and the planar steel meshes are connected by hoops.
[0013] On the other hand, the present invention provides a construction method for hollow steel pipe pile-pile cap structures in high-risk nearshore earthquake zones, comprising: Step S1: Use stirrups to tie the planar steel mesh, reserve the bearing slot, first connection hole, second connection hole and grouting hole, support the formwork, and pour concrete to complete the preparation of the precast pile cap; Step S2: Complete the cutting of the inner pressure rod notch on the inner reinforcing rib, complete the cutting of the outer pressure rod notch on the outer reinforcing rib, weld the inner reinforcing rib to the outer wall of the inner steel pipe, weld the outer reinforcing rib to the inner wall of the outer steel pipe, and pour concrete between the inner and outer steel pipes during the concentric assembly of the inner and outer steel pipes. Step S3: After fixing the precast hollow steel pipe piles at the construction site, place a steel plate on the top of the precast hollow steel pipe piles, and then screw the precast pile caps onto the top of the precast hollow steel pipe piles. Step S4: Use grout to fill the bearing slot through the grouting hole to complete the connection between the precast pile cap and the precast hollow steel pipe pile.
[0014] Compared with existing technologies, the beneficial effects of this invention are as follows: By combining precast hollow steel pipe piles with precast pile caps and incorporating high-performance grouting materials, this invention achieves lightweight prefabricated pile foundations and novel node structures, solving problems such as long construction cycles, cumbersome on-site rebar tying, complex formwork erection, and large amounts of wet work in traditional cast-in-place pile foundations. Through rebar tensioning connections and the insertion design of the fixed plate on the pile, this invention significantly improves the connection performance between the pile and the pile cap, enhances the self-resetting ability of the node, and simultaneously reduces the pile cross-section and structural self-weight, thereby improving construction efficiency and overall structural performance.
[0015] Furthermore, this invention incorporates staggered reinforcing ribs within the hollow steel pipe pile, applying the structural mechanics theory of column stability to the hollow steel pipe pile structure. The curve at the top of the reinforcing ribs simulates the half-wave buckling mode of a column under compression. This curved structure generates a lateral restraint reaction force on the concrete, counteracting the lateral expansion of the concrete under compression, thus forming a "column-restraint" collaborative working mechanism. Through the tight integration of the reinforcing ribs between the inner and outer steel pipes and the concrete, a unified spatial restraint system is formed, significantly improving the stiffness of the steel pipe pile wall and effectively preventing local elastic buckling inward or outward under axial compression.
[0016] Furthermore, compared with traditional prefabricated pile foundations, this invention not only retains the universal advantages of prefabricated structures, such as rapid construction, factory prefabrication, and convenient on-site assembly, but also optimizes node connections, insertion depth, and anchorage performance. The pile cap node achieves prestressed connection through the tensioning of internal connectors and the design of fixing plates, ensuring uniform stress and high durability at the node. Simultaneously, it reduces insertion depth, minimizing formwork and grouting volume, thereby bringing additional benefits such as construction convenience, material savings, and reduced construction risks. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the overall structure of the hollow steel pipe pile-pile cap structure in a high-risk seismic zone near the coast, according to an embodiment of the present invention. Figure 2 This is an embodiment of the present invention. Figure 1 A schematic diagram of the AA cross-section; Figure 3 This is an embodiment of the present invention. Figure 1 BB cross-sectional diagram; Figure 4 The specific shape of the notch in the inner pressure bar according to an embodiment of the present invention; Figure 5 This is a schematic diagram of the concrete compression bar effect according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the prefabricated pile cap structure according to an embodiment of the invention; Figure 7 This is a schematic diagram of the three-dimensional structure of a prefabricated hollow steel pipe pile according to an embodiment of the invention; The components include: 1. Precast pile cap; 3. Precast hollow steel pipe pile; 31. Inner reinforcing rib; 32. Outer reinforcing rib; 33. Central concrete; 311. Inner pressure bar notch; 321. Outer pressure bar notch; 21. Pile internal elongation bar; 22. Fixing plate; 23. Connecting bolt; 11. First connecting hole; 12. Second connecting hole; 24. Socket; 13. Grouting hole; 25. Planar steel mesh; 26. Stirrup. Detailed Implementation
[0018] To make the objectives and advantages of the present invention clearer, the present invention will be further described below with reference to embodiments; it should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.
[0019] Preferred embodiments of the present invention will now be described with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are merely illustrative of the technical principles of the present invention and are not intended to limit the scope of protection of the present invention.
[0020] It should be noted that in the description of this invention, the terms "upper", "lower", "left", "right", "inner", "outer", etc., which indicate directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings. This is only for the convenience of description and is not intended to indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation of this invention.
[0021] Furthermore, it should be noted that, in the description of this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0022] This invention provides a hollow steel pipe pile-pile cap structure and construction method for high-risk nearshore earthquake zones, which is suitable for nearshore high temperature, high salinity, high corrosion and frequent earthquake conditions. It solves the technical pain points of traditional cast-in-place pile foundations, such as low construction efficiency, insufficient stiffness of prefabricated pile cap joints, large residual deformation after earthquakes, poor durability and low anchoring efficiency. It has the core advantages of rapid prefabricated construction, self-resetting joints, buckling resistance and corrosion resistance.
[0023] like Figure 1 , Figure 2 , Figure 7 As shown, the invention provides a hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones. The main structure comprises three parts: a precast pile cap 1, connecting components, and a precast hollow steel pipe pile 3. The precast hollow steel pipe pile 3 is the core load-bearing component, consisting of an inner wall component, an outer wall component, and a central concrete 33 filling the space between them. The overall structure is a double-layer steel pipe sandwiched concrete composite structure, balancing lightweight and high rigidity characteristics, suitable for nearshore pile foundation bearing and seismic resistance requirements. The precast pile cap 1 is a factory-integrated precast component, assembled and fixedly connected to the top of the precast hollow steel pipe pile 3 via connecting components, achieving sealing and anchoring with grouting material. The entire process involves minimal on-site wet work, making construction convenient.
[0024] The inner wall assembly is uniformly welded outwards along the circumference to form several inner reinforcing ribs 31, while the outer wall assembly is uniformly welded inwards along the circumference to form several outer reinforcing ribs 32. The number of inner and outer reinforcing ribs 31 and 32 may be the same or different, but their positions are staggered, arranged in an interlocking pattern without direct contact. This interlocking staggered structure can form an all-round spatial constraint system between the double-layer steel pipe and the central concrete 33, significantly improving the overall buckling resistance of the steel pipe pile and avoiding local deformation and cracking of the pile body under near-shore seismic loads.
[0025] like Figure 4 As shown, several internal compression rod notches 311 are cut at equal intervals on all internal reinforcing ribs 31, and several external compression rod notches 321 are cut at equal intervals on all external reinforcing ribs 32. The internal compression rod notches 311 and external compression rod notches 321 are identical in shape and size and are symmetrically arranged. The notch structure can change the compressive stress form of the central concrete 33, forming a compression rod constraint and cooperative working mechanism, which can counteract the lateral expansion force generated by the axial compression of the concrete, thereby improving the pile's bearing stability and seismic self-resetting ability from a structural perspective.
[0026] Specifically, the inner compression member notch 311 and the outer compression member notch 321 have the same structure, both being integrally formed from three sections: a first notch, a second notch, and a connecting section. The second notch has a curved structure with 4-5 segments, accurately simulating the half-wave buckling mode of the compression member under compression, and its contour curve strictly follows the formula: In this embodiment, an x1-y1 plane coordinate system is established with the intersection of the second notch and the connecting section as the origin. A is the maximum amplitude of the curve, which is 8mm to 12mm. c is the horizontal width of the steel rib, which is uniformly taken as 50mm. This parameter is suitable for the conventional load conditions of near-shore pile foundations and can maximize the curve constraint effect.
[0027] The first opening has a V-shaped structure, represented by points 1-3, and is divided into an outer V-shaped segment (points 1-2) and an inner V-shaped segment (points 2-3). An xy-plane coordinate system is constructed with the V-shaped inflection point as the origin. The formula for the outer V-shaped segment is as follows: α is the angle between the outer V-shaped segment and the negative x-axis, preferably 45°; a is the negative projection of the outer V-shaped segment onto the negative x-axis, with a value of -15mm. The formula for the inner V-shaped segment contour is: β is the angle between the inner V-shaped segment and the positive x-axis, preferably 45°; b is the projected length of the inner V-shaped segment along the positive x-axis, 15mm. Both α and β are controlled within the optimal range of 30° to 60° to ensure uniform stress distribution at the notch and avoid stress concentration leading to rib cracking and concrete damage.
[0028] The connecting section is a straight transition section, and its length L is strictly controlled within the range of 2C≤L≤3C. In this preferred embodiment, C is 50mm and the length L of the connecting section is 120mm. This balances the integrity of the notch structure with the continuity of stress transmission, avoids stress abrupt changes at the junction of the curved section and the V-shaped section, and ensures the stable operation of the pressure bar constraint system.
[0029] like Figure 5As shown, when the pile is subjected to axial compression, the notch structure can make the central concrete 33 form a regular compression bar. Through the dual constraints of the curved segment and the V-shaped segment, a continuous lateral constraint reaction force is generated on the concrete to offset the lateral expansion deformation. At the same time, it restricts the local elastic buckling of the inner and outer steel pipes, which greatly improves the axial bearing capacity and seismic residual deformation control capability of the hollow steel pipe pile.
[0030] Specifically, the connection components include inner and outer connectors. The dual connection structures work together to achieve a high-strength and high-durability anchoring connection between the pile cap and the steel pipe pile, replacing the traditional single grouting and plug connection method, and solving the problems of insufficient node stiffness, anchoring failure, and corrosion degradation.
[0031] The internal connecting parts are multiple pile extension bars 21 that are evenly fixed to the outer wall of the precast hollow steel pipe pile 3. The pile extension bars 21 are made of high-strength corrosion-resistant threaded steel bars with precast connecting threads at the top. They do not require on-site threading and can be directly screwed to the precast pile cap 1 to achieve prestressed tensioning connection and ensure uniform stress at the node.
[0032] The external connector includes a fixing plate 22 and connecting bolts 23. The fixing plate 22 is a ring-shaped steel plate, welded and fixed to the outer wall of the precast hollow steel pipe pile 3 near the top. Several circular through holes are evenly opened on the plate surface, and the positions of the through holes correspond one-to-one with the second connecting holes 12 of the precast pile cap 1. The connecting bolts 23 are high-strength anti-corrosion bolts, which pass through the through holes and lock and fix to the precast pile cap 1, forming an outer rigid connection constraint, further improving the overall stiffness of the node and its resistance to overturning and shearing.
[0033] Specifically, such as Figure 6 As shown, the precast pile cap 1 is a precast reinforced concrete integrated structure in the factory, with multiple layers of planar steel mesh 25 inside. The planar steel mesh 25 is tied and fixed between each layer of planar steel mesh 25 by vertical stirrups 26 to form an overall steel cage skeleton, which greatly improves the strength and crack resistance of the pile cap itself and is suitable for complex near-shore load environment.
[0034] Several first connecting holes 11 and second connecting holes 12 are opened on the precast pile cap 1 plate. The first connecting holes 11 correspond one-to-one with the inner extension bar 21 of the pile, so that the inner extension bar 21 can be screwed through. The second connecting holes 12 are aligned with the through holes of the fixing plate 22, so that the connecting bolts 23 can be inserted and locked, so as to achieve double precision assembly inside and outside.
[0035] A circular socket 24 is pre-reserved at the center of the bottom of the precast pile cap 1. The size of the socket 24 matches the top of the precast hollow steel pipe pile 3. It adopts a shallow socket design, which can significantly reduce the socket depth compared with the traditional structure, thereby reducing the amount of grouting and construction difficulty. At the same time, a grouting hole 13 is opened at the center of the top of the precast pile cap 1. The grouting hole 13 is vertically connected to the bottom socket 24, which can realize pressure grouting in the later stage, fill the gap of the socket 24, seal the anchoring node, isolate seawater and salt spray corrosion, and improve the durability of the node.
[0036] On the other hand, the present invention provides a construction method for hollow steel pipe pile-pile cap structures in high-risk nearshore earthquake zones, the specific steps of which are as follows: Step S1: Precast pile caps are prefabricated in the factory. First, the reinforcing bars are cut according to the design dimensions, and multiple layers of planar reinforcing mesh and vertical stirrups are tied to form an overall reinforcing cage. Then, the positions of the reserved socket, the first connecting hole, the second connecting hole, and the central grouting hole are precisely located, and the formwork is supported to ensure that the position of each hole is accurate and the size is compliant. Finally, high-performance corrosion-resistant concrete is poured and cured at room temperature to the design strength to complete the precast pile cap preparation. The entire process is carried out in a standardized factory construction, and the quality is controllable.
[0037] Step S2: Prefabrication of hollow steel pipe piles in the factory. Precisely cut the notches for the inner and outer reinforcing ribs according to the design parameters, ensuring that the notch curves, angles, and dimensions meet the design formula requirements. The processed inner reinforcing ribs are uniformly welded and fixed to the outer wall of the inner steel pipe, and the outer reinforcing ribs are uniformly welded and fixed to the inner wall of the outer steel pipe, ensuring that the inner and outer ribs are interlocked and staggered. The inner and outer steel pipes are concentrically aligned and assembled, ensuring that the coaxiality error of the double-layer steel pipes is ≤3mm. Then, high-strength, corrosion-resistant concrete is poured into the cavity between the inner and outer steel pipes, compacted by vibration, and cured according to standard procedures, forming a prefabricated hollow steel pipe pile with a spatial constraint system.
[0038] Step S3: On-site assembly and positioning. At the near-shore construction site, the precast hollow steel pipe piles are driven, fixed, and leveled to ensure the verticality of the piles meets construction specifications. A layer of anti-corrosion steel sheet is laid flat on the top of the precast hollow steel pipe pile to buffer, level, and isolate corrosion, preventing stress concentration caused by hard contact between the pile cap and the steel pipe pile. It also isolates the grouting material, preventing leakage into the precast hollow steel pipe pile. The precast pile cap is then hoisted and aligned, ensuring precise alignment of the elongated reinforcing bars through the first connecting hole, the fixing plate through hole, and the second connecting hole. Initial fixing is achieved through threaded connections, completing the initial positioning and assembly of the pile cap.
[0039] Step S4, Pressure Grouting Anchoring. Using a special corrosion-resistant high-performance grout for nearshore applications, pressure grouting is performed through the grouting hole at the top of the precast pile cap. Grouting continues until the grout completely fills all gaps in the bearing slot, leaving no air bubbles or voids, and the grouting hole is sealed. After the grout has cured to the design strength, all connecting bolts are tightened to complete the high-strength anchoring connection between the pile cap and the hollow steel pipe pile, thus completing the overall construction.
[0040] In summary, this invention constructs a "compression member-constraint" collaborative working system within the hollow steel pipe pile through interlocking reinforcing ribs and an irregularly shaped notch structure. The notch curve simulates the buckling mode of the compression member, providing stable lateral constraint on the central concrete, effectively suppressing lateral deformation of the concrete and local buckling of the steel pipe, significantly improving the pile's axial bearing capacity and seismic performance. Simultaneously, the internal and external double-assembled connection structure replaces the traditional complex structure of deep-bearing and multiple anchorages, significantly improving the connection stiffness, stress uniformity, and post-earthquake self-resetting ability of the pile cap joint while reducing the pile cross-section, structural self-weight, and material usage.
[0041] The entire process utilizes a factory prefabrication and on-site assembly construction mode, completely solving the problems of large-scale on-site wet work, long construction period, and high maintenance difficulty associated with traditional cast-in-place pile foundations. It is suitable for the harsh environment of nearshore high temperature, high salinity, and high corrosion, effectively avoiding the corrosion and failure of reinforcing bars and connectors, reducing later-stage structural maintenance costs, and significantly improving the construction efficiency and long-term service durability of pile foundation projects in high-risk nearshore earthquake zones. The accompanying construction method of this invention adopts a fully prefabricated, rapid on-site assembly process, significantly reducing on-site wet work, shortening the construction period, and adapting to the restricted working conditions of nearshore offshore construction. The technical solution of the present invention has been described above with reference to the preferred embodiments shown in the accompanying drawings. However, it will be readily understood by those skilled in the art that the scope of protection of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will all fall within the scope of protection of the present invention.
[0042] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones, comprising a precast pile cap, connecting components, and a precast hollow steel pipe pile, characterized in that: The precast hollow steel pipe pile includes an inner wall assembly, an outer wall assembly, and a central concrete. The inner wall assembly is provided with several inner reinforcing ribs outward along the circumference, and the outer wall assembly is provided with several outer reinforcing ribs inward along the circumference. The inner and outer reinforcing ribs are arranged alternately in an interlocking manner. Among them, the inner reinforcing ribs are provided with several inner pressure bar notches at equal intervals, and the outer reinforcing ribs are provided with several outer pressure bar notches at equal intervals; The inner compression rod notch and the outer compression rod notch have the same shape; The internal pressure rod notch includes a first notch, a second notch, and a connecting section; The second notch is curved, and its shape satisfies the formula: ; Among them, the x1-y1 coordinate system is established with the intersection of the second gap and the connecting section as the origin; A is the maximum amplitude of the curve; c represents the horizontal width of the steel rib.
2. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 1, characterized in that, The first notch is V-shaped, comprising an outer V-shaped segment and an inner V-shaped segment; The shape of the outer V-shaped segment satisfies the formula: ; The shape of the inner V-shaped segment satisfies the formula: ; Among them, the xy coordinate system is constructed with the V-shaped inflection point of the first gap as the origin; Where α is the angle between the outer V-shaped segment and the negative half-axis of the x-axis; β is the angle between the inner V-shaped segment and the positive x-axis. 'a' is the negative value of the projection of the outer V-shaped segment onto the negative x-axis. b is the size of the projection of the inner V-shaped segment onto the positive x-axis.
3. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 2, characterized in that, The length of the connecting segment is L, where 2C ≤ L ≤ 3C.
4. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 3, characterized in that, The The angle is 30°–60°. The range is 30°–60°.
5. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 1, characterized in that, The connection component includes an inner connector and an outer connector; The internal connector consists of several internal elongated bars fixedly installed on the outer wall, with connecting threads at the top of the internal elongated bars. The external connector includes a fixing plate and connecting bolts. The fixing plate is fixedly installed on the outer side of the precast hollow steel pipe pile near the top. The fixing plate is provided with several through holes. The connecting bolts pass through the through holes to fix the precast pile cap to the top of the precast hollow steel pipe pile.
6. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 1, characterized in that, The precast pile cap is provided with a number of first connecting holes and a number of second connecting holes. The first connecting holes are used to allow the elongated bars inside the pile to pass through, and the second connecting holes are used to allow the connecting bolts to pass through.
7. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 6, characterized in that, A bearing slot is also provided at the connection between the precast pile cap and the precast hollow steel pipe pile. A grouting hole is provided at the center of the precast pile cap, and the grouting hole communicates with the bearing slot.
8. The hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones according to claim 7, characterized in that, The precast pile cap has several layers of planar steel mesh inside, and the planar steel meshes are connected by hoops.
9. A construction method, based on the hollow steel pipe pile-pile cap structure for high-risk nearshore earthquake zones as described in any one of claims 1-8, characterized in that, include: Step S1: Use stirrups to tie the planar steel mesh, reserve the bearing slot, first connection hole, second connection hole and grouting hole, support the formwork, and pour concrete to complete the preparation of the precast pile cap; Step S2: Complete the cutting of the inner pressure rod notch on the inner reinforcing rib, complete the cutting of the outer pressure rod notch on the outer reinforcing rib, weld the inner reinforcing rib to the outer wall of the inner steel pipe, weld the outer reinforcing rib to the inner wall of the outer steel pipe, and pour concrete between the inner and outer steel pipes during the concentric assembly of the inner and outer steel pipes. Step S3: After fixing the precast hollow steel pipe piles at the construction site, place a steel plate on the top of the precast hollow steel pipe piles, and then screw the precast pile caps onto the top of the precast hollow steel pipe piles. Step S4: Use grout to fill the bearing slot through the grouting hole to complete the connection between the precast pile cap and the precast hollow steel pipe pile.