Deep and shallow pit group pile anchor rod cooperative support and intelligent dewatering linkage construction device and process
By using flexible annular hydraulic bladders and intelligent dewatering systems in large-scale deep foundation pit projects, the anchoring force can be dynamically adjusted, solving the problems of stress concentration and inability to adjust anchoring force in traditional anchor support systems, thus improving the stability and adaptability of the foundation pit.
Patent Information
- Application Number
- CN202611399669.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-10
- Publication Date
- 2026-11-20
AI Technical Summary
Traditional anchor bolt support systems suffer from stress concentration and the inability to dynamically adjust anchoring force in large-scale deep foundation pit projects, leading to instability of the pit walls, especially during dewatering, when the soil structure is prone to instability.
Flexible annular hydraulic bladders are used to replace rigid pads. Combined with an intelligent dewatering system, the anchoring force and groundwater inflow are dynamically matched through real-time adjustment of hydraulic oil volume, forming adaptive support, eliminating stress concentration and adapting to soil deformation.
It achieves dynamic matching between anchoring force and soil moisture content and groundwater inflow, improves the long-term stability of foundation pit support, avoids pit wall cracking and instability, and enhances support adaptability.
Smart Images

Figure CN123133379A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of foundation pit support technology, specifically to a construction device and process for coordinated support of deep and shallow pit groups with piles and anchors and intelligent dewatering. Background Technology
[0002] In large-scale deep foundation pit projects, anchor bolt support systems are typically used to ensure the stability of the pit wall soil. Traditional anchor bolt support mainly relies on rigid anchor bolts penetrating the sidewalls of the foundation pit, connecting with the deep soil, and transferring prestress to the soil through rigid pads (such as steel plates or concrete blocks) on the inside to resist soil pressure; Meanwhile, in order to prevent groundwater seepage from causing the bottom of the pit to heave or the slope to become unstable, dewatering operations are usually required during construction, which involves extracting groundwater to reduce the soil moisture content and improve the shear strength of the soil.
[0003] However, traditional anchor bolts often use rigid metal plates or concrete piers at their ends. Since the soil on the sidewalls of the foundation pit is often uneven or slightly deformed, the rigid contact surface cannot completely conform to the actual soil contour. This causes the load to concentrate on a few contact points, resulting in severe stress concentration. This can easily cause cracking and spalling of the concrete lining layer. Furthermore, during dewatering, as groundwater is extracted, the effective stress of the soil gradually increases. Theoretically, the shear strength of the soil will increase, but this is accompanied by the dissipation of pore water pressure. The soil structure may be temporarily unstable, and the original anchoring reinforcement strength cannot be dynamically adjusted with changes in pore water pressure. This can easily lead to problems of excessive or insufficient anchoring force, causing slope instability.
[0004] To address the aforementioned issues, this invention proposes a collaborative support device and process for deep and shallow pit piles and anchors, along with intelligent dewatering linkage. By replacing traditional rigid supports with flexible supports, the problem of stress concentration is eliminated. Furthermore, it can provide differentiated anchoring points based on the depth of different sub-pits. In addition, it can automatically adjust the anchoring force according to the dynamic changes in groundwater inflow during dewatering. Summary of the Invention
[0005] The technical solution of this invention addresses the problem of overly simplistic solutions in existing technologies by providing a solution that differs significantly from existing technologies. Specifically, the purpose of this invention is to provide a collaborative support device and process for deep and shallow pit pile anchors and intelligent dewatering linkage construction, in order to solve the problems of stress concentration at support anchor points and the inability to adjust anchoring strength in real time according to dewatering operations, as mentioned in the background technology.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a construction device for coordinated support of deep and shallow pit piles and anchors and intelligent dewatering linkage, comprising a large foundation pit, wherein the inner cavity of the large foundation pit is embedded with several sub-pits of varying depths, and several sets of independent anchor positioning components are installed at intervals on the side wall of the large foundation pit, and the several sets of anchor positioning components correspond one-to-one with the several sub-pits. The anchor positioning assembly includes several anchor rods arranged in a matrix. The front end of each anchor rod passes through the side wall of the large foundation pit and penetrates into the soil layer. The end of each anchor rod is fitted with an annular hydraulic bladder filled with hydraulic oil. Its outer circumference is adaptively and seamlessly fitted with the side wall of the large foundation pit to provide differentiated anchoring reinforcement force for sub-pits of different depths, thereby offsetting the lateral earth pressure generated during the excavation of sub-pits of different depths. The large foundation pit has a confluence pool and several water storage pools in the middle of its inner cavity. Each of the water storage pools corresponds to a number of sub-pits. Each water storage pool is used to collect rainwater from adjacent sub-pits and adjusts the hydraulic oil volume of the corresponding annular hydraulic bladder in real time based on the water inflow to adjust the anchoring reinforcement force and achieve dynamic matching between the anchoring strength and the water inflow of the sub-pit soil.
[0007] Preferably, each set of anchor positioning components is also provided with an independent hydraulic oil supply line on one side. Several branch pipes for connecting the annular hydraulic bladder are inserted into the side wall of the hydraulic oil supply line. An extension pipe is inserted into the end of the hydraulic oil supply line. Several pressure regulators are inserted into the side wall of the extension pipe.
[0008] Preferably, a pad is fitted onto the end of the anchor rod near the annular hydraulic bladder, the inner side of the pad abuts against the outer wall of the annular hydraulic bladder, a fastening nut is fitted onto the outer side of the pad, the fastening nut is threaded to the end of the anchor rod, the inner cavity of the anchor rod is a hollow cavity, and an anchor head is fixedly connected to the front end of the anchor rod, the anchor head having a leakage groove.
[0009] Preferably, the water storage tank has an overflow port on its side wall, and several water storage tanks are connected to the confluence tank through the overflow ports on their side walls. The side of the confluence tank is connected to the suction end of a drainage pump through a drainage pipe, and the discharge end of the drainage pump is connected to a main outlet pipe.
[0010] Preferably, the inner cavity of the water storage tank is equipped with a floating plate, and one side of the water storage tank is connected to the discharge end of a water pump through an inlet pipe. The suction end of the water pump is fixedly connected to a downpipe, and several pre-buried pipes that penetrate deep into the soil layer are inserted into the side wall of the downpipe.
[0011] Preferably, the pressure regulator includes a sealing pipe fixedly connected to the corresponding water storage tank, the inner cavity of the sealing pipe being divided into an upper cavity and a lower cavity by a piston plate, the upper cavity being connected to an extension pipe.
[0012] Preferably, a connecting rod is fixedly connected to the lower surface of the piston plate, and the lower end of the connecting rod extends through to the outside of the sealing pipe and is fixedly connected to the float plate of the corresponding water storage tank cavity.
[0013] Preferably, the inner cavity of the confluence pool is also equipped with a circulation pump and several drainage pipes. The drainage pipes are connected to several water storage tanks in a one-to-one correspondence. The circulation pump is located between two adjacent drainage pipes. Through the circulation pump and the drainage pipes, the liquid can be gradient-diverted to divert the water collected in the deeper sub-pits to the water storage tanks corresponding to the shallower sub-pits, thereby maintaining the dynamic balance of the hydraulic oil volume in the overall annular hydraulic bladder.
[0014] This invention also discloses a construction process for coordinated support of deep and shallow pit groups with piles and anchors and intelligent dewatering, employing the aforementioned coordinated support of deep and shallow pit groups with piles and anchors and intelligent dewatering, comprising the following steps: S1. Based on the location and depth of each sub-pit, use a drilling rig to drill anchor holes to the specified depth according to the marked positions. After cleaning the residual soil in the holes, place the anchor rod body into the drilled anchor hole as a whole. After ensuring that the anchor head is in place, inject cement grout of the designed grade into the anchor hole through the grouting port at the end of the anchor rod body. After the grout fills the gap of the anchor hole and completes the initial setting, the anchor head is consolidated with the deep soil to form a stable deep anchor foundation. S2. Install the annular hydraulic bladder on the body of each anchor rod in the corresponding order, then install the pad, tighten the fastening nut to complete the pre-tightening, so that the annular hydraulic bladder initially deforms and fits against the pit wall. Adjust the initial oil pressure according to the design depth of the corresponding sub-pit to complete the installation of the anchor rod positioning component. Follow this process to complete the installation of all anchor rods in the corresponding sub-pit area. S3. Dewatering pipes and multi-layer pre-buried pipes are laid in the construction areas of each sub-pit. Independent water storage tanks are excavated at the corresponding locations of each sub-pit to achieve stratified collection of deep and shallow groundwater. A confluence tank is constructed in the middle of the foundation pit. The overflow outlets on the side walls of each water storage tank are connected to the confluence tank. Float plates, connecting rods, and pressure regulator assemblies are installed inside the water storage tank. The upper cavity of the sealed pipe is connected to each annular hydraulic bladder through extension pipes, hydraulic oil supply lines, and branch pipes. A circulation pump and multi-stage diversion pipes are installed inside the confluence tank to establish a gradient water diversion channel between deep, medium, and shallow pits.
[0015] S4. Start the corresponding water pumps for each sub-pit, and continuously extract groundwater from the soil layer through the pre-buried pipes and dewatering pipes. The water inflow is collected in real time into the corresponding water storage tank. As the water inflow changes, the water level in the water storage tank rises and falls dynamically. When the water level rises, the float plate drives the piston plate to move upward, compressing the hydraulic oil in the upper cavity of the sealing pipe, automatically replenishing oil and pressurizing the annular hydraulic bladder, increasing the anchoring force of the pit wall support, and matching the high water and soil pressure working conditions. When the water level drops, the float plate sinks, the piston plate expands the upper cavity space, the hydraulic oil in the bladder flows back to release pressure, and the anchoring force is adaptively reduced, matching the low water and soil pressure working conditions, realizing the real-time dynamic matching of the anchoring force of a single pit with the soil moisture content and the groundwater inflow.
[0016] S5. When the water inflow of the deep pit sub-pit is too large and the water level of the storage tank exceeds the overflow threshold, the excess water flows into the confluence pool through the overflow outlet. At the same time, the circulation pump is started, and the excess water in the deep pit is gradually diverted to the other sub-pits through multi-stage diversion pipes. The support pressure of the other sub-pits is automatically reinforced. The diversion process is based on the depth of the sub-pit, and priority is given to transporting the water to the slightly shallower sub-pits step by step.
[0017] Compared with the prior art, the beneficial effects of the present invention are: This invention addresses the complex multi-pit construction condition where a large foundation pit contains multiple sub-pits of varying depths. It employs a gradient-differentiated arrangement of anchor bolt matrices and initial support pressures based on shallow, medium, and deep pits, matching the progressively increasing lateral earth pressures of the sub-pits at different depths. A deep, rigid anchoring foundation is formed by grouting the front end of the anchor bolts. The end uses a ring-shaped hydraulic bladder instead of a traditional rigid pad to contact the pit wall. Utilizing the bladder's flexible expansion characteristics, it adapts to the uneven deformation of the pit wall soil, eliminating problems such as stress concentration in rigid support, localized spalling of the pit wall, and eccentric load on the support. It balances the deep anchoring stiffness with the adaptive performance of the pit wall, significantly improving the support's adaptability.
[0018] This invention utilizes a water pump, pre-embedded pipes, and a reservoir to collect groundwater in the area. It employs water level fluctuations to drive the mechanical linkage of a floating plate, connecting rod, and piston plate, controlling the increase and decrease of hydraulic oil pressure. When groundwater inflow is high, soil moisture is high, and soil and water pressure increases, the pressure of the annular hydraulic bladder support is automatically increased. When the water level drops and soil and water pressure decreases, the bladder pressure adaptively unloads and decreases, preventing excessive anchoring force that could lead to soil cracking and maintaining the bond strength between the anchor rod and the soil layer. The overall anchoring force adapts to the changes in dewatering conditions throughout the entire foundation pit process, solving the problem that traditional rigid fixed supports cannot adapt to dynamic changes in soil and water pressure, and improving the long-term stability of foundation pit support.
[0019] This invention establishes a hydraulic buffer pool between deep and shallow pits by using gradient diversion pipes and circulation pumps. Each sub-pit first completes adaptive pressure regulation based on its own water level. Only when the water level in the deep pit exceeds the overflow threshold is the cross-pit water diversion and linkage reinforcement triggered step by step. Excess water is guided to the next level, so that the anchoring force adjustment process of all sub-pits presents the characteristics of "tiered and gradual advancement", avoiding the step change of anchoring force and protecting the integrity of the foundation pit concrete lining structure. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the overall structure of the present invention.
[0021] Figure 2 This is a schematic cross-sectional view of the large foundation pit section of the present invention.
[0022] Figure 3 For the present invention Figure 2 Enlarged structural diagram at point A in the middle.
[0023] Figure 4 This is a schematic diagram of the anchor bolt positioning component of the present invention.
[0024] Figure 5 This is a schematic diagram of the anchor rod structure of the present invention.
[0025] Figure 6 This is a cross-sectional view of the sealing tube structure of the present invention.
[0026] Figure 7 This is a schematic cross-sectional view of the confluence pool structure of the present invention.
[0027] Figure 8 For the present invention Figure 7 Enlarged structural diagram at point A in the middle.
[0028] In the diagram: 1. Large foundation pit; 2. Combination pool; 3. Anchor rod; 301. Annular hydraulic bladder; 302. Pad; 303. Fastening nut; 4. Main outlet pipe; 5. Water storage tank; 6. Hydraulic oil supply pipeline; 7. Branch pipeline; 8. Extension pipeline; 9. Float; 10. Water pump; 11. Dewatering pipe; 12. Embedded pipe; 13. Sealing pipe; 14. Piston plate; 15. Connecting rod; 16. Overflow port; 17. Drainage pump; 18. Circulation pump. Detailed Implementation
[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0030] Please see Figures 1 to 8 The present invention provides a technical solution: a construction device for coordinated support of deep and shallow pit groups with pile anchors and intelligent dewatering, including a large foundation pit 1, the inner cavity of the large foundation pit 1 is embedded with several sub-pits of different depths, and several sets of independent anchor positioning components are installed at intervals on the side wall of the large foundation pit 1, and the several sets of anchor positioning components correspond one-to-one with the several sub-pits. The anchor positioning assembly includes several anchor rods 3 arranged in a matrix. The front end of the anchor rod 3 passes through the side wall of the large foundation pit 1 and penetrates into the soil layer. The end of the anchor rod 3 is fitted with an annular hydraulic bladder 301, which is filled with hydraulic oil. Its outer circumference is adaptively and seamlessly fitted with the side wall of the large foundation pit 1 to provide differentiated anchoring reinforcement force for sub-pits of different depths and to counteract the lateral earth pressure generated during the excavation of sub-pits of different depths. The inner cavity of the large foundation pit 1 is provided with a confluence pool 2 and several water storage pools 5. The several water storage pools 5 correspond one-to-one with several sub-pits. Each water storage pool 5 is used to collect the precipitation of the adjacent sub-pits and adjusts the hydraulic oil volume of the corresponding annular hydraulic bladder 301 in real time based on the water inflow to adjust the anchoring reinforcement force and achieve dynamic matching between the anchoring strength and the water inflow of the sub-pit soil.
[0031] In this embodiment, as Figures 1 to 5 As shown, each set of anchor positioning components is also provided with an independent hydraulic oil supply line 6 on one side. Several branch pipes 7 for connecting the annular hydraulic bladder 301 are inserted into the side wall of the hydraulic oil supply line 6. An extension pipe 8 is inserted into the end of the hydraulic oil supply line 6. Several pressure regulators are inserted into the side wall of the extension pipe 8. A pad 302 is fitted at the end of the anchor rod 3 near the annular hydraulic bladder 301. The inner side of the pad 302 abuts against the outer wall of the annular hydraulic bladder 301. A fastening nut 303 is attached to the outer side of the pad 302. The fastening nut 303 is threaded to the end of the anchor rod 3. The inner cavity of the anchor rod 3 is a hollow cavity. An anchor head is fixedly connected to the front end of the anchor rod 3. The anchor head has a leakage groove. It should be noted that during construction, the drilling rig first drills a hole on the side wall of the large foundation pit 1, and then the front end of the anchor rod 3 is inserted into the deep soil. After reaching a certain depth, cement grout is injected through the end of the anchor rod 3. The cement grout gradually overflows through the anchor head seepage groove and fills the gap, so that the front end of the anchor rod 3 is solidified with the deep soil to form a stable deep anchor foundation. This cement pouring and positioning operation is existing technology.
[0032] In this embodiment, the sub-pits are mainly divided into three sub-pits, namely the first sub-pit, the second sub-pit, and the third sub-pit. The depths of the three sub-pits are different. The first sub-pit is a shallow pit, the second sub-pit is a medium pit, and the third sub-pit is a deep pit. Each sub-pit is equipped with a set of independent anchor bolt positioning components on one side. The deeper the sub-pit, the more anchor bolts 3 are installed, and the larger the control range, thereby providing a stronger initial anchoring reinforcement force to match the greater lateral earth pressure of the deeper sub-pits.
[0033] After the cement is poured, the annular bladder is sequentially fitted onto the end of the corresponding anchor rod 3, and then the pad 302 and fastening nut 303 are fitted on. By rotating the fastening nut 303, the pad 302 is squeezed, so that the pad 302 applies pre-tightening pressure to the annular hydraulic bladder 301, causing the annular hydraulic bladder 301 to begin to deform, the oil pressure increases, and its inner side is attached to the side wall of the large foundation pit 1, thus completing the initial anchoring force setting. The initial oil pressure value is also adaptively increased and adjusted as the depth of the sub-pit increases.
[0034] In this embodiment, each annular hydraulic bladder 301 is pre-filled with hydraulic oil. A sealing cap is threaded to the front end of the hydraulic oil supply line 6. During actual operation, the sealing cap can be opened to connect to an external oil supply mechanism. The oil enters the branch pipe 7 through the hydraulic oil supply line 6 and then enters the corresponding annular hydraulic bladder 301 through the branch pipe 7. The amount of hydraulic oil in the annular hydraulic bladder 301 can be adjusted according to the actual shape of the sidewall of the large foundation pit 1, thereby further adjusting the initial anchoring force. This ensures that the anchor rod 3 and the sidewall of the large foundation pit 1 always maintain a stable fit, and the initial pressure is not too high. This avoids the problem of stress concentration on the sidewall caused by gaps and also prevents the concrete of the sidewall of the large foundation pit 1 from cracking due to pressure caused by excessive initial anchoring force, thus balancing the stress stability of the initial support.
[0035] The anchor rods 3 of each anchor rod positioning assembly are distributed in a matrix in the side wall area of the corresponding large foundation pit 1. The annular hydraulic bladders 301 of each anchor rod 3 can cooperate with each other to form a uniform and overall support for the side wall of the large foundation pit 1. Relying on the flexible fit between the annular hydraulic bladders 301 and the pit wall, instead of the traditional rigid contact, it can adapt to the slight uneven deformation of the pit wall soil and avoid local stress concentration that could cause pit wall spalling and support failure due to eccentric load.
[0036] In this embodiment, an overflow port 16 is provided on the side wall of the water storage tank 5. Several water storage tanks 5 are connected to the confluence tank 2 through the overflow port 16 on their side walls. The side of the confluence tank 2 is connected to the suction end of the drainage pump 17 through a drainage pipe. The discharge end of the drainage pump 17 is connected to the main outlet pipe 4. It should be noted that a confluence pool 2 and several water storage pools 5 are set up in the middle of the inner cavity of the large foundation pit 1. The water storage pools 5 are distributed one-to-one with several sub-pits, and collect the groundwater seeping from the corresponding sub-pit areas. When the soil moisture content in the sub-pit area increases, the groundwater in the soil of the sub-pit area will concentrate near the pre-buried pipe 12. The water pump 10 is started periodically. When the water pump 10 is working, the seepage water continuously flows into the corresponding water storage pool 5, and the water level in the water storage pool 5 gradually rises. Once the height rises to the height of the overflow port 16 of each water storage pool 5, the excess water will be discharged into the confluence pool 2 through the overflow port 16, and finally pumped out to the outside of the large foundation pit 1 by the drainage pump 17 to complete the overall dewatering operation and effectively avoid local water accumulation in the large foundation pit 1 from affecting the construction progress.
[0037] In this embodiment, the layout of the main outlet pipe 4 is not fully shown. Depending on the actual situation inside the large foundation pit 1, the outlet end of the main outlet pipe 4 can be guided to the ground or other places where it is needed. This drainage operation is an existing technology.
[0038] In addition, an extension pipe 8 is inserted at the end of the hydraulic oil supply line 6. Several pressure regulators are inserted on the side wall of the extension pipe 8. During the initial oil supply stage, excess hydraulic oil enters the extension pipe 8 and the pressure regulators through the branch pipe 7 to prepare for subsequent adjustment operations.
[0039] In this embodiment, as Figure 2 , Figure 3 and Figure 6 As shown, a float plate 9 floats in the inner cavity of the water storage tank 5. The discharge end of the water pump 10 is connected to one side of the water storage tank 5 through the water inlet pipe. The suction end of the water pump 10 is fixedly connected to the downcomer pipe 11. Several pre-buried pipes 12 that penetrate deep into the soil layer are inserted into the side wall of the downcomer pipe 11. The pressure regulator includes a sealing pipe 13 fixedly connected to the corresponding water storage tank 5. The inner cavity of the sealing pipe 13 is divided into an upper cavity and a lower cavity by a piston plate 14. The upper cavity is connected to the extension pipe 8. A connecting rod 15 is fixedly connected to the lower surface of the piston plate 14. The lower end of the connecting rod 15 extends through to the outside of the sealing pipe 13 and is fixedly connected to the float plate 9 in the corresponding water storage tank 5. It should be noted that each water storage tank 5 is equipped with a float plate 9, which can rise and fall synchronously with the water level in the water storage tank 5. The pressure regulator is mainly composed of a sealing tube 13, a piston plate 14 and a connecting rod 15. The sealing tube 13 is fixed to one side of the water storage tank 5 by a mounting plate. In this embodiment, the bottom of the mounting plate is provided with a serrated tip, which can be directly embedded into the soil layer and fixed by cement pouring, thereby fixing the height of the sealing tube 13. The piston plate 14 divides the sealing pipe 13 into two independent chambers, upper and lower. The upper chamber is connected to the extension pipe 8, and both the upper chamber and the extension pipe 8 are filled with hydraulic oil. The lower chamber is connected to the outside atmosphere. When the float 9 rises with the water level in the reservoir 5, the overflow port 16 can no longer meet the drainage needs. The buoyancy of the rising float 9 is transmitted to the connecting rod 15, which drives the piston plate 14 to move upward within the sealing pipe 13, thereby compressing the internal space of the upper chamber. This causes the hydraulic oil inside the upper chamber to flow in the opposite direction along the extension pipe 8, and then flows through the hydraulic oil supply line 6 and the branch line line 7 to replenish all the annular hydraulic bladders 301 in the corresponding area, thus achieving the following functions: As the amount of hydraulic oil in the annular hydraulic bladder 301 increases, the oil pressure inside the bladder rises synchronously, forcing the annular hydraulic bladder 301 to expand radially. This increases the contact pressure between the annular hydraulic bladder 301 and the side wall of the large foundation pit 1, which directly increases the anchoring and reinforcement force of the entire anchor positioning assembly on the pit wall in this area. This counteracts the increased lateral earth pressure under high soil moisture content conditions and prevents the pit wall from becoming unstable and deformed due to increased water and soil pressure.
[0040] It should be noted that the rising process of the float 9 needs to be countered by the hydraulic oil pressure of the original hydraulic oil. Therefore, the float 9 can be made of closed hollow plate, which can not only stabilize as the water level rises, but also provide upward lifting force. In addition, the overall mass and density of the float 9 in the three water storage tanks 5 can be set according to the depth of the sub-pit on one side. For example, the initial oil pressure value of the first sub-pit is set to be relatively small, so the oil pressure value that the float 9 resists when rising is relatively small. However, the initial oil pressure value of the third sub-pit is set to be larger. Therefore, when selecting the corresponding float 9, a material with a relatively suitable density should be selected, and the area of the float 9 should also be designed accordingly to ensure that the float 9 has sufficient buoyancy to lift the connecting rod 15, regardless of which sub-pit the water in the reservoir 5 rises.
[0041] Subsequently, when the soil moisture content in the sub-pit area decreases, the pump 10, operating periodically, can no longer pump out enough water. The water level in the reservoir 5 gradually decreases, and the float 9 moves down with the water level. Due to gravity, the float 9 sinks synchronously, pulling the connecting rod 15 and causing the piston plate 14 to move downwards within the sealing pipe 13, expanding the internal space of the upper cavity. The hydraulic oil in the annular hydraulic bladder 301 flows back into the upper cavity, causing the oil pressure inside the annular hydraulic bladder 301 to decrease, and the anchoring reinforcement force decreases accordingly. The more groundwater there is, the higher the soil saturation and the greater the lateral hydrostatic pressure. At this time, the system automatically increases the pressure of the bladder to resist this. After the water is pumped out, the pressure automatically drops, and the anchoring force always maintains a dynamic balance with the total water and soil pressure under the current working conditions, reducing the risk of pit instability caused by sudden changes in water and soil pressure. The overall system achieves the following functions: During the precipitation phase: the water level rises → the float 9 rises → the upper cavity of the sealing pipe 13 is compressed → hydraulic oil is squeezed and injected into the annular bladder, increasing the anchoring force.
[0042] During the water level drop phase: the float 9 sinks → the piston expands the upper cavity → the hydraulic oil in the bladder flows back to the sealing pipe 13, and the anchoring force decreases.
[0043] By linking the anchoring force with the groundwater level, the mechanical structure is adjusted entirely by the buoyancy of the water level. When the groundwater inflow is large, the soil moisture is high, and the soil and water pressure increases, the support pressure of the annular hydraulic bladder 301 is automatically increased. When the water level drops and the soil and water pressure decreases, the pressure of the bladder is adaptively unloaded and reduced. No external power supply or manual control system is required throughout the process. The adaptive adjustment can be completed by relying on the linkage of hydraulic machinery, realizing the automatic adaptation of the support strength with the soil and water pressure. This makes the anchoring force proportional to the soil moisture. When the overall soil moisture content increases, the total soil and water pressure increases, and the support strength increases automatically. Conversely, when the soil moisture content decreases, the support strength is appropriately reduced to avoid excessive anchoring force, which could cause the soil layer to crack. This maintains the bonding strength between the anchor rod 3 and the soil layer, solving the problem that traditional rigid fixed support cannot adapt to the dynamic changes in soil and water pressure, and improving the long-term stability of the foundation pit support.
[0044] In this embodiment, as Figure 7 and Figure 8 As shown, the inner cavity of the confluence pool 2 is also equipped with a circulation pump 18 and several drainage pipes. The drainage pipes are connected to several water storage tanks 5 one by one. The circulation pump 18 is located between two adjacent drainage pipes. The circulation pump 18 and the drainage pipes can realize the gradient diversion of liquid, so as to divert the water collected in the deeper sub-pit to the water storage tank 5 corresponding to the shallower sub-pit, and maintain the dynamic balance of hydraulic oil in the overall annular hydraulic bladder 301. It should be noted that, due to the different depths of the multiple sub-pits, the groundwater seepage rate varies at different soil depths. Deeper sub-pits tend to collect more infiltrated groundwater, and the corresponding water inflow rate of reservoir 5 will be faster.
[0045] In this embodiment, a total of three drainage tubes are provided, namely the first drainage tube, the second drainage tube and the third drainage tube, which correspond to the first sub-pit, the second sub-pit and the third sub-pit respectively; The first drainage pipe has a higher front end that connects to the higher area of the third sub-pit, and its end connects to the suction end of the circulation pump 18. The second drainage pipe is positioned at a lower level, with its front end connected to the drainage end of the circulation pump 18 and its end connected to the lower area of the second sub-pit. The third drainage pipe has its front end connected to the second sub-pit and is positioned at a higher level, with its end connected to the first sub-pit. This achieves the series connection of the three sub-pits. With the active drainage operation of the circulation pump 18, excess water in the deeper third sub-pit reservoir 5 can be transported in stages to the shallower second sub-pit and the corresponding reservoir 5 of the first sub-pit.
[0046] When the overall water inflow in the third sub-pit increases, the circulating pump 18 is used to gradually divert the excess groundwater collected in the corresponding reservoir 5 of the third sub-pit to the reservoir 5 of the shallower second and first sub-pits. This prevents the water level in the corresponding reservoir 5 from rising too quickly due to a sudden increase in the water inflow of a single sub-pit, which would cause the anchoring force in the annular hydraulic bladder 301 to increase too much in a short period of time and cause local overload on the side wall of the large foundation pit 1.
[0047] Furthermore, the entire diversion process is gradient-triggered. Excess water is immediately collected in the third sub-pit reservoir 5, and the rise in water level first triggers the corresponding anchoring force adjustment in the third sub-pit. Only when the water level exceeds the set height of the overflow outlet 16 will the circulation pump 18 be activated to divert the flow. This avoids excessive interference with the adaptive adjustment process of the anchoring force in other sub-pits at different depths, maintaining a stable balance of the overall support force of the deep and shallow pit group. Only when the inflow of water from the third sub-pit exceeds the bearing capacity of the overflow outlet 16 will gradient diversion be triggered, first diverting the flow to the second sub-pit and triggering the pressurization operation in the second sub-pit. When the water level in the second sub-pit reservoir 5 also exceeds the bearing capacity of the overflow outlet 16, the flow is further diverted to the first sub-pit. This makes the anchoring force adjustment process of all sub-pits present a "tiered, gradual" characteristic, avoiding a step-like sudden change in anchoring force and protecting the integrity of the foundation pit concrete lining structure.
[0048] In this embodiment, only the water diversion effect between the three sub-pits is shown. In other embodiments, the number of drainage pipes can be increased synchronously according to the number of foundation pits, and the overall drainage direction can also be flexibly adjusted according to the depth of each sub-pit to adapt to the water inrush characteristics of sub-pits of different depths, and always maintain the dynamic stability of the overall support structure under stress.
[0049] The following describes a construction process for a combined deep and shallow pit group pile-anchor support and intelligent dewatering system, based on the aforementioned device. The process includes the following steps: S1. Based on the location and depth of each sub-pit, use a drilling rig to drill anchor holes of the specified depth according to the marked positions. After cleaning the residual soil in the holes, place the anchor rod body 3 into the drilled anchor hole as a whole. After ensuring that the anchor head is in place, inject the designed grade of cement grout into the anchor hole through the grouting port at the end of the anchor rod body 3. After the grout fills the gap of the anchor hole and completes the initial setting, the anchor head and the deep soil are consolidated to form a stable deep anchor foundation. S2. In the corresponding order, attach the annular hydraulic bladder 301 to the body of each anchor rod 3 in sequence, then install the pad 302, tighten the fastening nut 303 to complete the pre-tightening, so that the annular hydraulic bladder 301 initially deforms and fits against the pit wall, adjust the initial oil pressure according to the design depth of the corresponding sub-pit, and complete the installation of the anchor rod positioning component. Follow this process to complete the installation of all anchor rods in the corresponding sub-pit area. S3. Dewatering pipes 11 and multi-layer pre-buried pipes 12 are laid in the construction area of each sub-pit. Independent water storage tanks 5 are excavated at the corresponding positions of each sub-pit to achieve stratified collection of deep and shallow groundwater. A confluence tank 2 is constructed in the middle of the foundation pit. The overflow outlets 16 on the side walls of each water storage tank 5 are connected to the confluence tank 2. Float plates 9, connecting rods 15, and pressure regulator assemblies are installed inside the water storage tank 5. The upper cavity of the sealing pipe 13 is connected to each annular hydraulic bladder 301 through the extension pipe 8, hydraulic oil supply line 6, and branch line pipe 7. A circulation pump 18 and multi-stage diversion pipes are installed inside the confluence tank 2 to establish a gradient water diversion channel between deep pits, medium pits, and shallow pits.
[0050] S4. Start the corresponding water pump 10 for each sub-pit, and continuously extract groundwater from the soil layer through the pre-buried pipe 12 and the dewatering pipe 11. The water inflow is collected in real time into the corresponding water storage tank 5. As the water inflow in the soil layer changes, the water level in the water storage tank 5 rises and falls dynamically. When the water level rises, the float 9 drives the piston plate 14 to move upward, compressing the hydraulic oil in the upper cavity of the sealing pipe 13, and automatically replenishing oil and increasing pressure to the annular hydraulic bladder 301, increasing the anchoring force of the pit wall support, matching the high water and soil pressure working condition. When the water level drops, the float 9 sinks, the piston plate 14 moves downward, the upper cavity space expands, the hydraulic oil in the bladder flows back to release pressure, and the anchoring force is adaptively reduced, matching the low water and soil pressure working condition, realizing the real-time dynamic matching of the anchoring force of a single pit with the soil moisture content and the groundwater inflow.
[0051] S5. When the water inflow of the deep pit sub-pit is too large and the water level of the reservoir 5 exceeds the threshold of the overflow outlet 16, the excess water flows into the confluence pool 2 through the overflow outlet 16. At the same time, the circulation pump 18 is started, and the excess water in the deep pit is gradually diverted to the other sub-pits through the multi-stage diversion pipes, automatically reinforcing the support pressure of the other sub-pits. The diversion process is based on the depth of the sub-pit, and priority is given to the sub-pits with slightly shallower depths.
[0052] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A deep and shallow pit group pile anchor rod cooperative support and intelligent precipitation linkage construction device, comprising a large foundation pit, the inner cavity of the large foundation pit is embedded with a plurality of deep and shallow sub-pits, characterized in that: Several sets of independent anchor bolt positioning components are installed at intervals on the side wall of the large foundation pit, and each set of anchor bolt positioning components corresponds to one of the several sub-pits. The anchor positioning assembly includes several anchor rods arranged in a matrix. The front end of each anchor rod passes through the side wall of the large foundation pit and penetrates into the soil layer. The end of each anchor rod is fitted with an annular hydraulic bladder filled with hydraulic oil. Its outer circumference is adaptively and seamlessly fitted with the side wall of the large foundation pit to provide differentiated anchoring reinforcement force for sub-pits of different depths, thereby offsetting the lateral earth pressure generated during the excavation of sub-pits of different depths. The large foundation pit has a confluence pool and several water storage pools in the middle of its inner cavity. Each of the water storage pools corresponds to a number of sub-pits. Each water storage pool is used to collect rainwater from adjacent sub-pits and adjusts the hydraulic oil volume of the corresponding annular hydraulic bladder in real time based on the water inflow to adjust the anchoring reinforcement force and achieve dynamic matching between the anchoring strength and the water inflow of the sub-pit soil.
2. The deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to claim 1, characterized in that: Each set of anchor positioning components is also provided with an independent hydraulic oil supply line on one side. Several branch pipes for connecting the annular hydraulic bladder are inserted into the side wall of the hydraulic oil supply line. An extension pipe is inserted into the end of the hydraulic oil supply line. Several pressure regulators are inserted into the side wall of the extension pipe.
3. The deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to claim 1, characterized in that: A pad is fitted onto the end of the anchor rod near the annular hydraulic bladder. The inner side of the pad abuts against the outer wall of the annular hydraulic bladder. A fastening nut is attached to the outer side of the pad and is threaded to the end of the anchor rod. The inner cavity of the anchor rod is a hollow cavity, and an anchor head is fixedly connected to the front end of the anchor rod. The anchor head has a leakage groove.
4. The deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to claim 1, characterized in that: The side wall of the water storage tank is provided with an overflow port. Several water storage tanks are connected to the confluence pool through the overflow ports on their side walls. The side of the confluence pool is connected to the suction end of the drainage pump through a drainage pipe. The discharge end of the drainage pump is connected to the main outlet pipe.
5. The deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to claim 1, characterized in that: The inner cavity of the water storage tank has a floating plate. One side of the water storage tank is connected to the discharge end of a water pump through an inlet pipe. The suction end of the water pump is fixedly connected to a downwater pipe. Several pre-buried pipes that penetrate deep into the soil layer are inserted into the side wall of the downwater pipe.
6. The deep and shallow pit group pile anchor bolt collaborative support and intelligent dewatering linkage construction device according to claim 5, characterized in that: The pressure regulator includes a sealed pipe fixedly connected to a corresponding water storage tank. The inner cavity of the sealed pipe is divided into an upper cavity and a lower cavity by a piston plate. The upper cavity is connected to an extension pipe.
7. The deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to claim 6, characterized in that: A connecting rod is fixedly connected to the lower surface of the piston plate. The lower end of the connecting rod extends through to the outside of the sealing pipe and is fixedly connected to the float plate of the corresponding water storage tank cavity.
8. The deep and shallow pit group pile anchor bolt collaborative support and intelligent dewatering linkage construction device according to claim 1, characterized in that: The inner cavity of the confluence pool is also equipped with a circulation pump and several drainage pipes. The drainage pipes are connected to several water storage tanks in a one-to-one correspondence. The circulation pump is located between two adjacent drainage pipes. Through the circulation pump and the drainage pipes, the liquid can be divided in a gradient, so as to divert the water collected in the deeper sub-pits to the water storage tanks corresponding to the shallower sub-pits, and maintain the dynamic balance of the hydraulic oil in the overall annular hydraulic bladder.
9. A construction technology for coordinated support of deep and shallow pit groups with piles and anchors and intelligent dewatering, characterized in that, The method of using the deep and shallow pit group pile anchor bolt coordinated support and intelligent dewatering linkage construction device according to any one of claims 1-8 includes the following steps: S1. Based on the location and depth of each sub-pit, use a drilling rig to drill anchor holes to the specified depth according to the marked positions. After cleaning the residual soil in the holes, place the anchor rod body into the drilled anchor hole as a whole. After ensuring that the anchor head is in place, inject cement grout of the designed grade into the anchor hole through the grouting port at the end of the anchor rod body. After the grout fills the gap of the anchor hole and completes the initial setting, the anchor head is consolidated with the deep soil to form a stable deep anchor foundation. S2. Install the annular hydraulic bladder on the body of each anchor rod in the corresponding order, then install the pad, tighten the fastening nut to complete the pre-tightening, so that the annular hydraulic bladder initially deforms and fits against the pit wall. Adjust the initial oil pressure according to the design depth of the corresponding sub-pit to complete the installation of the anchor rod positioning component. Follow this process to complete the installation of all anchor rods in the corresponding sub-pit area. S3. Dewatering pipes and multi-layer pre-buried pipes are laid in the construction areas of each sub-pit. Independent water storage tanks are excavated at the corresponding locations of each sub-pit to achieve stratified collection of deep and shallow groundwater. A confluence tank is constructed in the middle of the foundation pit. The overflow outlets on the side walls of each water storage tank are connected to the confluence tank. Float plates, connecting rods, and pressure regulator assemblies are installed inside the water storage tank. The upper cavity of the sealed pipe is connected to each annular hydraulic bladder through extension pipes, hydraulic oil supply lines, and branch pipes. A circulation pump and multi-stage diversion pipes are installed inside the confluence tank to establish a gradient water diversion channel between deep, medium, and shallow pits. S4. Start the corresponding water pumps for each sub-pit, and continuously extract groundwater from the soil layer through the pre-buried pipes and dewatering pipes. The water inflow is collected in real time into the corresponding water storage tank. As the water inflow changes, the water level in the water storage tank rises and falls dynamically. When the water level rises, the float plate drives the piston plate to move upward, compressing the hydraulic oil in the upper cavity of the sealing pipe, automatically replenishing oil and pressurizing the annular hydraulic bladder, increasing the anchoring force of the pit wall support, and matching the high water and soil pressure working conditions. When the water level drops, the float plate sinks, the piston plate expands the upper cavity space, the hydraulic oil in the bladder flows back to release pressure, and the anchoring force is adaptively reduced, matching the low water and soil pressure working conditions, realizing the real-time dynamic matching of the anchoring force of a single pit with the soil moisture content and the groundwater inflow. S5. When the water inflow of the deep pit sub-pit is too large and the water level of the storage tank exceeds the overflow threshold, the excess water flows into the confluence pool through the overflow outlet. At the same time, the circulation pump is started, and the excess water in the deep pit is gradually diverted to the other sub-pits through multi-stage diversion pipes. The support pressure of the other sub-pits is automatically reinforced. The diversion process is based on the depth of the sub-pit, and priority is given to transporting the water to the slightly shallower sub-pits step by step.