Method for regulating deformation of deep foundation pit supporting structure of high-rise building

By decomposing the deformation of the support structure into cantilever, bulge, and kick-out components, and combining it with hydraulic servo adaptive steel supports, the quantitative problem of deformation control of the support structure in the construction of deep foundation pits for high-rise buildings was solved, realizing precise control of deformation status and quantitative management of environmental response.

CN123133384APending Publication Date: 2026-11-20LIAOCHENG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611605817.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the construction of deep foundation pits for high-rise buildings, existing technologies lack effective quantitative control methods for the deformation of support structures, making it difficult to predict and control the deformation trend. In particular, in complex environments, the deformation forms of support structures vary, but the treatment direction is singular and lacks basis.

Method used

By decomposing the deformation of the support structure into three deformation components—cantilever, bulge, and kick—the correspondence between the deformation components and the environmental response is established. Support parameters are monitored and adjusted in real time, and hydraulic servo adaptive steel supports are used to dynamically compensate for axial force, thereby achieving deformation control.

Benefits of technology

It enables the control of support structure deformation and the quantification of environmental response, allowing for the prediction and optimization of construction parameters in advance, reducing construction disturbance, and improving construction safety and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133384A_ABST
    Figure CN123133384A_ABST
Patent Text Reader

Abstract

The application discloses a deformation regulation and control method for a high-rise building deep foundation pit supporting structure, which comprises the following steps: determining characteristic response quantities and allowable values of each environmental protection object around the foundation pit, establishing a corresponding relationship between the characteristic response quantities and deformation components of deep horizontal displacement of the retaining wall, converting the allowable values into allowable amplitudes of the deformation components, excavating earthwork in layers and blocks, decomposing the earthwork into the deformation components according to deformation mechanisms, determining a control state of deformation of the supporting structure according to a ratio of each deformation component to the allowable amplitude and a development rate with a monitoring period, determining adjustment contents of next block step excavation parameters and supporting parameters according to the control state, performing earthwork excavation, erecting fulcrums, applying pre-axial force according to the adjustment contents, measuring deep horizontal displacement of the retaining wall after construction, and returning to the step of excavating earthwork in layers and blocks, and the block-by-block cycle is continued until the excavation is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building engineering technology, specifically to a method for deformation control of deep foundation pit support structures for high-rise buildings. Background Technology

[0002] As the construction of high-rise buildings in urban core areas deepens, the excavation depth of foundation pits generally reaches more than 10 meters, with some projects exceeding 20 meters. These pits are typically adjacent to existing buildings, subway tunnels, municipal pipelines, and urban roads, leaving little room for deformation control. The unloading during deep foundation pit excavation causes a redistribution of stress in the soil inside and outside the pit. This stress is transmitted through the soil to the support system, resulting in horizontal displacement of the support structure and further causing surface settlement and differential settlement outside the pit, thus disturbing the surrounding environment.

[0003] Under the current technical system, the main technical means for controlling the deformation of support structures include the following categories.

[0004] Firstly, during the design phase, parameters such as the number of support channels, their arrangement, component stiffness, and embedment depth are determined, and the predicted envelope of horizontal displacement for each excavation step is provided. The parameters are determined once before construction, and the predictions will deviate due to soil variability and construction deviations. Furthermore, the predictions are not adjusted based on construction feedback, which is an open-loop pre-control mode.

[0005] Secondly, during the construction phase, monitoring and alarm values ​​are set for items such as deep horizontal displacement of the retaining wall, axial force of the support, and deformation of surrounding buildings and pipelines. Emergency response is initiated after the limits are exceeded. This method is event-triggered, and no control measures are generated before the alarm value is reached. The determination of control measures after the limits are exceeded depends on engineering experience.

[0006] Third, the principles of layered, segmented, and block excavation in soft soil, as well as the excavation-as-you-go support and time-limited support, suppress deformation development by reducing the block size and shortening the unsupported exposure time. These principles are mainly based on qualitative experience, and the values ​​of block size and support timing depend on engineering analogies, without establishing a quantitative connection with the measured deformation state of the support structure.

[0007] Fourth, some projects use measured data to back-calculate equivalent soil parameters and re-predict deformation in subsequent excavation steps for design verification. The update cycle for such methods is measured in days, and the inversion results are only used for re-prediction, lacking a systematic adjustment mechanism between excavation and support parameter adjustments.

[0008] Fifth, traditional steel supports are locked after a pre-applied axial force is applied by jacks during installation. After that, the axial force passively increases or decreases with the soil pressure outside the pit and the deformation of the support wall, and cannot be actively adjusted during service. The hydraulic servo adaptive steel support device that has emerged in recent years can automatically compensate according to the set axial force, but the set value is a constant value determined once in the design stage, and no calculation connection is established with the causal components of the measured deformation and the control margin state.

[0009] In the aforementioned methods, the deformation of the support structure is generally characterized by a single maximum horizontal displacement value (or a comparison of the entire inclinometer curve and its envelope) and the deformation rate. However, two inclinometer curves with the same maximum horizontal displacement value may exhibit different deformation patterns: one shows a significant displacement at the top of the wall that decreases with depth, often related to insufficient bearing capacity at the top support or an excessively long cantilever section in the first excavation; the other shows a bulging pattern near the excavation face, often related to excessively large block sizes, excessive vertical spacing between support points, or a soft layer at the bottom of the pit. The corresponding treatment directions for these two patterns are different. When characterized by a single maximum value, the same alarm level is given, but the treatment direction needs to be determined based on experience. Similarly, the remaining space of deformation from the control limit and the allowable adjustment time are not included in the quantitative control basis as the excavation progresses; the target axial force of the servo adaptive support device also lacks a basis for determination based on the deformation cause. Summary of the Invention

[0010] The present invention aims to at least partially solve the technical problems in the above-mentioned technologies.

[0011] Therefore, this invention discloses a method for deformation control of deep foundation pit support structures for high-rise buildings, applicable to the phased excavation construction of deep foundation pits using retaining walls and fulcrum support, wherein the fulcrum is an internal support or anchor bolt, and is executed cyclically block by block as the excavation progresses, including:

[0012] S1: Determine the characteristic response quantities and allowable values ​​of each environmental protection object around the foundation pit. The characteristic response quantity is the amount of physical deformation of the object under the influence of foundation pit construction.

[0013] S2: Establish the correspondence between the characteristic response quantity and the deformation component of the deep horizontal displacement of the retaining wall, and convert each allowable value into the allowable amplitude of each deformation component;

[0014] S3: Excavate the earthwork in layers and blocks, and measure the deep horizontal displacement of the retaining wall as the excavation progresses. Decompose the displacement into the deformation components according to the deformation mechanism.

[0015] S4: Determine the control state of the support structure deformation based on the ratio of each deformation component to its allowable amplitude and the rate of development with the monitoring cycle;

[0016] S5: Based on the control state, determine the adjustment content of the next segmented excavation parameters and support parameters. The adjustment direction is determined based on the dominant deformation component. The excavation and support parameters are adjusted in coordination to meet the control requirements of each environmental protection object and the safety requirements of the support structure.

[0017] S6: Perform earthwork excavation, erect support points and / or apply pre-loaded axial force according to the adjustment content, measure the deep horizontal displacement of the retaining wall after construction and return to step S3, and repeat the process block by block until the excavation is completed.

[0018] In addition, the deformation control method for deep foundation pit support structure of high-rise buildings disclosed in this invention may also have the following additional technical features:

[0019] Furthermore, the deformation components include cantilever deformation components, bulging deformation components, and skirting deformation components: the cantilever deformation component represents the deformation pattern of significant displacement at the top of the wall, which decreases with depth, and is related to insufficient bearing capacity of the top support or excessive length of the cantilever section in the first excavation; the bulging deformation component represents the mid-span bulging deformation pattern near the excavation face, and is related to the block size, vertical spacing of the support points, or the stratum conditions at the bottom of the pit; the skirting deformation component represents the skirting deformation pattern of significant displacement at the bottom of the wall, and is related to the embedment depth, passive zone resistance, or head difference between inside and outside the pit.

[0020] Furthermore, the adjustment content is determined according to the dominant deformation component: when the cantilever deformation component is dominant, priority is given to advancing the timing of the first layer support erection, increasing the pre-applied axial force, and controlling the first layer excavation depth; when the bulging deformation component is dominant, priority is given to reducing the block length and layer thickness, supporting as excavation progresses, adding support points, or thickening the cushion layer; when the kicker deformation component is dominant, priority is given to reinforcing the pit bottom, reinforcing the embedded section, recharge outside the pit, or controlling the dewatering rate.

[0021] Furthermore, the calculation includes: determining the environmental protection objects adversely affected by each deformation component based on the sensitivity of the characteristic response of each environmental protection object to the increase of each deformation component; for each deformation component, under the condition of keeping the other deformation components at the current level, determining the environmental allowable amplitude of the deformation component with the limit that each affected environmental protection object does not exceed its allowable value; and determining the body allowable amplitude of the deformation component with the limit of the horizontal displacement control requirements of the support structure body; the allowable amplitude is taken as the smaller of the two values ​​and is updated as the excavation progresses.

[0022] Furthermore, the control state is determined as follows: the occupancy degree of each deformation component is characterized by the ratio of each deformation component to its allowable amplitude, and the maximum occupancy degree among each deformation component is taken; the remaining time for each deformation component to reach the allowable amplitude at the current rate is estimated based on the development rate of each deformation component after smoothing; the control state of the support structure deformation is determined based on the maximum occupancy degree and the remaining time.

[0023] Furthermore, the control status is divided into four levels: normal, attention, regulation, and emergency, and handled in stages: In the normal state, the maximum occupancy is no greater than the first limit value and the remaining time is no less than the planned construction period of the next block, and excavation continues according to the baseline plan; In the attention state, the maximum occupancy is greater than the first limit value but not greater than the second limit value, or the maximum occupancy is not greater than the first limit value but the remaining time is less than the planned construction period of the next block, and the next block is constructed using a low-disturbance method that reduces the block length and / or layer thickness, and the monitoring frequency is increased; In the regulation state, the maximum occupancy... If the deformation exceeds the second limit value and none of the deformation components exceed their allowable amplitude, or if the remaining time under the monitoring state is no greater than the response time of the control measures, the deepening excavation shall be suspended; in the emergency state, if any deformation component exceeds its allowable amplitude, or any environmental protection object measurement response exceeds its permissible value, or the preset abnormality criterion is triggered, the excavation shall be stopped immediately and emergency support measures shall be implemented; among them, the conditions for resuming excavation under the control state are: for no less than two consecutive monitoring cycles, the development rate of each deformation component is no greater than the benchmark rate determined by the ratio of the remaining allowable amplitude to the planned construction period of the next block.

[0024] Furthermore, it also includes the measurement and calculation of stress transfer characteristics: measuring the axial force at each support point; taking the ratio of the measured axial force increment at each support point in each segment of excavation to the design-calculated axial force increment as the support point force transmission ratio, and taking the ratio of the increment of each deformation component in the segment to the increment of the excavation depth in the segment as the unloading response ratio; when the support point force transmission ratio deviates from the preset range, or when the unloading response ratio continues to decrease without decaying with excavation, the corresponding direction is included in the determination of the dominant deformation component and the determination of the adjustment content.

[0025] Furthermore, the determination of the adjustment content includes: estimating the changes in each deformation component after the implementation of alternative adjustment combinations of step-by-step excavation parameters and support parameters organized according to graded values; verifying that after the implementation of the adjustment combination, each deformation component does not exceed its allowable amplitude, the characteristic response of each environmental protection object does not exceed its allowable value, and verifying the bearing capacity and stability of the support system according to the current foundation pit support design method, and meeting the construction sequence requirements including layered excavation, support before excavation, and strict prohibition of over-excavation; among the adjustment combinations that have passed the verification, the adjustment combination to be adopted is determined according to the principle of minimizing the comprehensive cost of construction period, cost and construction disturbance.

[0026] Furthermore, it also includes: after the segmented excavation is completed and stabilized for a monitoring cycle, comparing the estimated value and the measured value of each deformation component; when the two deviate, the parameters on which the effect prediction of subsequent adjustment combinations is based are corrected accordingly, so that the determination of subsequent adjustment content gradually comes closer to the actual situation of this project.

[0027] Furthermore, at least some of the fulcrums employ hydraulic servo adaptive steel supports, which automatically compensate for the target axial force during service. When the development rate of any deformation component exceeds the reference rate determined by the ratio of the remaining allowable amplitude to the planned duration of the next segment, the fulcrum requiring target axial force adjustment is determined based on the dominant deformation component. The target axial force of this fulcrum is increased by a compensation amount based on its measured axial force. The compensation amount is directly proportional to the amount by which the development rate of the dominant deformation component exceeds the reference rate and inversely proportional to the rate suppression rate of this fulcrum. The rate suppression rate is the amount by which the development rate of the dominant deformation component decreases for each unit increase in the axial force of this fulcrum. The target axial force does not exceed the upper limit determined by the bearing capacity of the fulcrum component and the rated pressure of the servo system, and is not lower than the lower limit for maintaining effective bearing contact. The compensation amount is applied in stages, and after each stage of compensation, a monitoring cycle is maintained for at least one stage, and the development rate of the dominant deformation component is verified before applying the next stage.

[0028] The method for deformation control of deep foundation pit support structures for high-rise buildings disclosed in this invention has at least the following beneficial effects:

[0029] (1) This invention decomposes conventional inclinometer data into deformation components using three mechanisms: cantilever, bulge, and kick. The stress transmission state is characterized by the force transmission ratio at the fulcrum and the unloading response ratio, thus transforming the monitoring data into deformation information with discernible causes. The control direction is determined by the dominant deformation component according to a defined directional correspondence: when the cantilever component is dominant, priority is given to strengthening the first-layer fulcrum and pre-applying axial force; when the bulge component is dominant, priority is given to reducing the number of blocks and densifying the fulcrum; and when the kick component is dominant, priority is given to reinforcing the pit bottom and controlling the head difference. Thus, the control direction is linked to the deformation cause, no longer relying on empirical judgments based on a single maximum displacement value.

[0030] (2) This invention converts the permissible values ​​of each environmental object into the permissible amplitude of each deformation component using a sensitivity coefficient. It quantifies the remaining deformation space and the time to reach the control limit using two margin indicators: occupancy level and remaining time. Based on this, it classifies the control state into four levels for graded handling. Thus, the remaining margin and control time window can be quantified while the deformation is still within the permissible range. The control time point is shifted from after the alarm value is reached to during the margin consumption process, making early control possible.

[0031] (3) Excavation parameters and support parameters are unified as alternative measures with tiered values. After the effect of the combination of measures on the incremental component of the next block is estimated and the component margin, environmental control, and standard verification are checked, the excavation and support parameters are determined in coordination within the same framework. For the support point using hydraulic servo adaptive steel support, the target axial force is dynamically adjusted by the calculation of the rate excess and rate inhibition rate of the dominant deformation component, so that the support axial force can be adjusted in real time according to the deformation state. The compensation direction and compensation amount of the servo support point are determined by the deformation cause, and the physical execution of the control measures is synchronized with the deformation development.

[0032] Additional features and advantages of this invention will be set forth in the description which follows, or may be learned by practicing the invention. Attached Figure Description

[0033] The technical solution and beneficial effects of the present invention will become apparent and readily understood from the following description in conjunction with the accompanying drawings, wherein:

[0034] Figure 1 This is a flowchart illustrating the deformation control method for deep foundation pit support structures of high-rise buildings according to the present invention.

[0035] Figure 2 This is a schematic diagram illustrating the servo fulcrum target axial force tuning and compensation execution of the deformation control method for deep foundation pit support structure of high-rise buildings according to the present invention. Detailed Implementation

[0036] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0037] The method for deformation control of deep foundation pit support structure for high-rise buildings disclosed in this invention will now be described with reference to the accompanying drawings.

[0038] like Figure 1 and Figure 2 As shown, a method for deformation control of deep foundation pit support structures for high-rise buildings is applied to the phased excavation construction of deep foundation pits using retaining walls and fulcrum support, where the fulcrum is internal bracing or anchor bolts. The method is executed cyclically block by block as the excavation progresses, including:

[0039] S1: Determine the characteristic response quantities and allowable values ​​of each environmental protection object around the foundation pit. The characteristic response quantity is the amount of physical deformation of the object under the influence of foundation pit construction.

[0040] S2: Establish the correspondence between the characteristic response quantity and the deformation component of the deep horizontal displacement of the retaining wall, and convert each allowable value into the allowable amplitude of each deformation component;

[0041] S3: Excavate the earthwork in layers and blocks, measure the deep horizontal displacement of the retaining wall as the excavation progresses, and decompose it into various deformation components according to the deformation mechanism.

[0042] S4: Determine the control state of the support structure deformation based on the ratio of each deformation component to its allowable amplitude and the rate of development with the monitoring cycle;

[0043] S5: Based on the control status, determine the adjustment content of the next segmented excavation parameters and support parameters. The adjustment direction is determined based on the dominant deformation component. The excavation and support parameters are adjusted in a coordinated manner to meet the control requirements of each environmental protection object and the safety requirements of the support structure.

[0044] S6: Perform earthwork excavation, erect support points and / or apply pre-loaded axial force according to the adjustment content, measure the deep horizontal displacement of the retaining wall after construction and return to step S3, repeating the process block by block until the excavation is completed.

[0045] The deformation components include cantilever deformation, bulging deformation, and kick-out deformation: the cantilever deformation component represents the deformation pattern of significant displacement at the top of the wall, which decreases with depth, and is related to insufficient bearing capacity of the top support or excessive length of the cantilever section in the first excavation; the bulging deformation component represents the bulging deformation pattern of the mid-span near the excavation face, and is related to the block size, vertical spacing of the support points, or the stratum conditions at the bottom of the pit; the kick-out deformation component represents the kick-out deformation pattern of significant displacement at the bottom of the wall, and is related to the embedment depth, passive zone resistance, or head difference between inside and outside the pit.

[0046] The adjustment direction is determined according to the dominant deformation component: when the cantilever deformation component is dominant, priority should be given to advancing the timing of the first layer support erection, increasing the pre-applied axial force, and controlling the first layer excavation depth; when the bulging deformation component is dominant, priority should be given to reducing the block length and layer thickness, supporting as excavation progresses, adding support points, or thickening the cushion layer; when the kicker deformation component is dominant, priority should be given to reinforcing the pit bottom, reinforcing the embedded section, recharge outside the pit, or controlling the dewatering rate.

[0047] The conversion includes: determining the environmental protection objects adversely affected by each deformation component based on the sensitivity of the characteristic response of each environmental protection object to the increase of each deformation component; for each deformation component, under the condition of keeping the other deformation components at the current level, determining the environmental allowable amplitude of the deformation component with the limit that each affected environmental protection object does not exceed its allowable value; and determining the body allowable amplitude of the deformation component with the limit of the horizontal displacement control requirements of the support structure body; the allowable amplitude is taken as the smaller of the two values ​​and is updated as the excavation progresses.

[0048] The control state is determined as follows: the occupancy degree of each deformation component is characterized by the ratio of each deformation component to its allowable amplitude, and the maximum occupancy degree among all deformation components is taken; the remaining time for each deformation component to reach the allowable amplitude at the current rate is estimated based on the development rate of each deformation component after smoothing; the control state of the support structure deformation is determined based on the maximum occupancy degree and the remaining time.

[0049] The control status is divided into four levels: normal, attention, regulation, and emergency, with tiered handling: In the normal state, the maximum occupancy does not exceed the first threshold and the remaining time is not less than the planned duration of the next block; excavation continues according to the baseline plan. In the attention state, the maximum occupancy exceeds the first threshold but does not exceed the second threshold, or the maximum occupancy does not exceed the first threshold but the remaining time is less than the planned duration of the next block; the next block is constructed using a low-disturbance method with reduced block length and / or layer thickness, and monitoring frequency is increased. In the regulation state, the maximum occupancy exceeds the second threshold. If the limit value is reached and none of the deformation components exceed their allowable amplitude, or if the remaining time under the monitoring state is not greater than the response time of the control measures, the deepening excavation shall be suspended; in the emergency state, if any deformation component exceeds its allowable amplitude, or if the measurement response of any environmental protection object exceeds its permissible value, or if the preset abnormality criterion is triggered, the excavation shall be stopped immediately and emergency support measures shall be implemented; among them, the conditions for resuming excavation under the control state are: for no less than two consecutive monitoring cycles, the development rate of each deformation component is not greater than the benchmark rate determined by the ratio of the remaining allowable amplitude to the planned construction period of the next block.

[0050] It also includes the measurement and calculation of stress transfer characteristics: measuring the axial force at each support point; taking the ratio of the measured axial force increment at each support point in each segment of excavation to the design-calculated axial force increment as the support point force transmission ratio, and taking the ratio of the increment of each deformation component in the segment to the increment of the excavation depth in the segment as the unloading response ratio; when the support point force transmission ratio deviates from the preset range, or when the unloading response ratio does not decrease continuously with excavation, the corresponding direction is included in the determination and adjustment of the dominant deformation component.

[0051] The determination of the adjustment content includes: estimating the changes in each deformation component after the implementation of alternative adjustment combinations for the step-by-step excavation parameters and support parameters organized according to the graded values; verifying that after the implementation of the adjustment combination, each deformation component does not exceed its allowable amplitude, and the characteristic response of each environmental protection object does not exceed its allowable value, and verifying the bearing capacity and stability of the support system according to the current foundation pit support design method, and meeting the construction sequence requirements including layered excavation, support before excavation, and strict prohibition of over-excavation; among the adjustment combinations that have passed the verification, the adjustment combination to be adopted is determined according to the principle of minimizing the comprehensive cost of construction period, cost and construction disturbance.

[0052] It also includes: after the segmented excavation is completed and stabilized for a monitoring cycle, comparing the estimated value and the measured value of each deformation component; when the two deviate, the parameters on which the effect prediction of subsequent adjustment combinations is based are corrected accordingly, so that the determination of subsequent adjustment content gradually gets closer to the actual situation of this project.

[0053] At least some support points adopt hydraulic servo adaptive steel supports, which automatically compensate for the target axial force during service. When the development rate of any deformation component exceeds the reference rate determined by the ratio of the remaining allowable amplitude to the planned duration of the next segment, the support point whose target axial force needs to be adjusted is determined according to the dominant deformation component. The target axial force of the support point is increased by the compensation amount based on its measured axial force. The compensation amount is proportional to the amount by which the development rate of the dominant deformation component exceeds the reference rate and inversely proportional to the rate suppression rate of the support point. The rate suppression rate is the amount by which the development rate of the dominant deformation component decreases for each unit increase in the axial force of the support point. The target axial force does not exceed the upper limit determined by the bearing capacity of the support component and the rated pressure of the servo system, and is not lower than the lower limit for maintaining effective bearing contact. The compensation amount is applied in stages, and after each level of compensation, a monitoring cycle is maintained for no less than one stage. The development rate of the dominant deformation component is checked before the next stage is applied.

[0054] Example

[0055] This embodiment illustrates the application of the deformation control method for deep foundation pit support structures of high-rise buildings in a deep foundation pit project of a high-rise building in a core urban area. All parameter values ​​in this embodiment are illustrative and used to explain the implementation of the method, and do not constitute a limitation on the scope of protection of this invention; in actual engineering, each parameter is calibrated according to the survey documents, support design, and environmental object level.

[0056] In this embodiment, the foundation pit is located in the core urban area, with an excavation depth of 12m and three basement levels. Surrounding environment: To the east, approximately 8m from the pit edge, is a six-story masonry office building with strip foundations and a shallow foundation depth of approximately 1.5m, sensitive to settlement and local tilting; to the south, approximately 6m from the pit edge, is a socket-jointed cast iron water supply pipeline, buried at a depth of approximately 2.5m, sensitive to the curvature of the settlement trough (differential settlement); the remaining sidewalls are adjacent to urban roads. The foundation pit support safety level is Level 1.

[0057] The support system consists of an 800mm thick diaphragm wall with a length of 24m (embedding depth of 12m). Three vertical supports are installed: the first is reinforced concrete (center elevation -2.5m), and the second and third are steel supports (center elevations -6.5m and -10.5m respectively). On the east side adjacent to the masonry structure, the second and third steel supports are hydraulic servo adaptive steel supports (consisting of servo hydraulic cylinders, hydraulic pump stations, axial force sensors, and control units; after installation, they can automatically compensate for the target axial force during service and have a power-off pressure-maintaining function). The remaining supports are conventional prestressed steel supports.

[0058] The earthwork excavation is divided into five layers from top to bottom, with each layer further divided into blocks of 15-25m in length for excavation and support. This method uses the block as the basic work unit and organizes the deformation control of the support structure into a construction process chain that is executed cyclically with each block of excavation: measurement, decomposition, calculation, process handling, support implementation, and closure correction; the control is organized and implemented at two levels: process level and equipment level (the overall structure is described in the invention description and will not be repeated here).

[0059] All protected objects within the impact range of the foundation pit were investigated one by one: For the masonry buildings on the east side, settlement, tilting, and local tilting were used as characteristic response quantities, with allowable values ​​determined according to the allowable deformation values ​​for masonry load-bearing foundations in the Building Foundation Design Code (where the allowable value for local tilting of masonry load-bearing foundations is 0.002 according to the current code), and appropriately tightened based on the requirements of the property owner; for the cast iron pipelines with socket joints on the south side, the curvature of the settlement groove (or differential settlement of pipe sections) was used as a characteristic response quantity, with allowable values ​​determined according to the pipeline material, joint type, and the property owner's requirements; for urban roads, pavement settlement was used as a characteristic response quantity. The baseline deformation of each object before construction was deducted from its allowable value, and the remaining portion was used as a control margin for this method. Monitoring items, measuring point layout, and monitoring frequency were implemented according to the Technical Standards for Monitoring Foundation Pit Engineering and the project monitoring plan, and the measurement accuracy was implemented according to the corresponding level of the Building Deformation Measurement Code.

[0060] Based on the support design calculations (elastic support method and numerical calculation), the predicted envelopes of horizontal displacement of the retaining wall and the predicted envelopes of axial force at the supports are established for each excavation step. The horizontal displacement control envelope of the support structure itself is also established. Based on the support safety level and regional experience, this example uses 35mm (approximately 0.3% of the excavation depth), and the value is taken uniformly along the entire depth.

[0061] The deep horizontal displacement curve of the retaining wall is decomposed using a set of shape functions. Let the depth calculated from the top of the wall be... The total length of the enclosure wall is (This embodiment) The normalization depth is: .

[0062] Three predefined mechanism-type functions:

[0063] Their physical meanings are as follows: The cantilever component shape function is 1 at the top of the wall and 0 at the bottom of the wall, which represents the shape of significant displacement at the top of the wall that decreases with depth. It is related to insufficient bearing capacity at the top support and excessive length of the cantilever section in the first excavation. For the bulging component shape function, both ends are 0, in The value is 1 (in this embodiment, it is about 16m deep near the excavation face), which represents the mid-span bulging shape near the excavation face and is related to excessively large block size, excessively large vertical spacing of support points, and soft layer at the bottom of the pit. The skirting component is a shape function, with 0 at the top and 1 at the bottom, representing a skirting shape with significant displacement at the bottom of the wall. This is related to insufficient embedment depth, weak passive zone resistance, and excessive head difference between the inside and outside of the pit. The three shape functions are linearly independent and all normalize to a peak value of 1. The inclined displacement is positively expressed as the direction towards the excavation side of the pit. The superposition expression of the displacement curves is:

[0064]

[0065] in, It represents the deformation component coefficient (i.e., the amplitude of the three deformation components: cantilever, bulge, and kick). Negative values ​​do not occupy environmental margin.

[0066] The shape function set is statistically calibrated according to the typical forms of this project: During the design phase, normalized displacement forms for each working condition are extracted and classified statistically analyzed using parametric numerical calculations (combinations of soil profile variability, support parameters, and excavation sequence). The exponential parameters of the shape functions are calibrated using typical forms. The peak depth of the bulging shape function is allowed to be adjusted within the range of 0.5 to 0.8 times the wall length. If the classification statistics and subsequent field measurements show that the residuals of the three shape functions exceed the limits, a fourth local morphological shape function is added.

[0067] Define two stress transfer characteristic quantities.

[0068] One is the fulcrum force transmission ratio: the first Excavation step, first Measured axial force increment at the fulcrum axial force increments calculated in the design The ratio:

[0069]

[0070] The second is the unloading response ratio: Excavation step deformation component Increment Compared with the incremental excavation depth in this step The ratio:

[0071]

[0072] Reflecting whether unloading is effectively converted into support bearing: Systemic low indicates that soil pressure has not been transmitted to the support as expected and the tendency of deformation is increasing, and support-type measures should be given priority; Systemic high indicates that the support stress exceeds expectations, and the safety of the component should be checked and the single-step unloading intensity should be reduced. The deformation response per unit excavation depth should gradually decrease as the support system improves. If it does not decrease or increases for two consecutive steps, it indicates that stress transmission is obstructed or the proportion of aging deformation is increasing. The normal range of the force transmission ratio is determined based on the uncertainty of the support design calculation. In this example, it is taken as 0.75 to 1.25.

[0073] For each protected object The characteristic response quantity is established based on numerical calculations during the design phase. The linear relationship between the deformation component coefficients (locally linearized within the horizontal neighborhood of the current excavation depth, and updated every 1-2 steps as excavation progresses):

[0074]

[0075] in, For object For components The sensitivity coefficients are determined by numerical calculation—a unit increment is applied to each component coefficient and the object's response increment is calculated. Taking this embodiment as an example: the masonry building on the east side responds positively to both the cantilever component and the bulging component (the displacement at the top of the wall and the deformation in the middle of the pit wall both drive the development of the settlement trough on its side), so the sensitivity coefficients of both components are positive; the pipeline on the south side is mainly affected by the curvature of the settlement trough in the middle of the pit wall and is sensitive to the bulging component.

[0076] The allowable value of the object is converted into the allowable amplitude of each component. The received component is recorded. The set of environmental objects with adverse effects is as follows: , quantity The environmental conversion allowable amplitude is:

[0077]

[0078] That is, keep the remaining components at the current level, components When growing individually, each object does not exceed the maximum allowed limit; if If empty, the component is not constrained by the environment, but only by the support body.

[0079] The support structure body is controlled by the horizontal displacement envelope Constraints. Take components. Depth of the peak of the shape function ( Take the top of the wall, Pick , (Based on the wall base), the allowable amplitude calculated based on the main body is:

[0080]

[0081] The component allows the amplitude to take the smaller of the two values:

[0082]

[0083] Equation (10) is a necessary condition for the verification of measures; deformation acceptance is based on the fitted curve and The full depth comparison of the envelope is used as the standard. If the calculated value of equation (9) or equation (10) is not positive, it means that the remaining components have exhausted the object's margin or the body's envelope, and the emergency state is directly entered.

[0084] The adjustable parameters for excavation and support are organized into three categories of alternative measures, with each measure's parameters assigned values ​​according to different tiers (example values ​​for each tier are determined based on the specific design):

[0085] Category A (Excavation): Segment length grading (example: 30, 25, 20, 15, 10m), layer thickness grading (determined according to the matching of soil layer and vertical arrangement of support points, example: four grades within 2.0~4.0m), segmentation sequence (excavation on the side, skip excavation), and further subdivision of segment plane;

[0086] Category B (Support): The timing of the support erection is advanced, the pre-applied axial force is graded (the value meets the current standard limit and has been verified by the component bearing capacity, for example, 0.5 to 0.8 times the design axial force), an additional support is added, and the waler stiffness is enhanced;

[0087] Category C (Auxiliary, Alternative): Pit bottom reinforcement (range or intensity), embedded section reinforcement, external recharge regulation and internal precipitation rate control.

[0088] Any combination of measures must meet the mandatory requirements of the construction sequence: layered excavation, support before excavation, strict prohibition of over-excavation, and the unsupported exposure time must not exceed the limit determined by the soil creep characteristics and the specific design. (This embodiment uses 24 hours based on experience in soft soil areas and verifies the results according to soil creep characteristics). This requirement is implemented in the measure set itself during the measure grading stage.

[0089] Arrangement of servo adaptive steel supports: Hydraulic servo adaptive steel supports are used for the side walls adjacent to the environmental protection objects and at the control support points, while conventional prestressed steel supports or anchor bolts are used for the remaining support points; the servo support points are also subjected to initial pre-loaded axial force as designed during erection. In this embodiment, the second and third support points on the east side wall are servo support points.

[0090] Effectiveness coefficient calibration: for each individual measure The effect coefficients on each deformation component are determined by support design calculations (elastic support method, supplemented by numerical calculations when necessary). Keeping all other conditions unchanged, this measure is calculated separately, and the change in the increment of the next component is taken (the effect of reducing the increment is taken as a negative value). The effect coefficients of all individual measures are compiled into an effect coefficient table.

[0091] Component rate suppression rate calibration: for each servo pivot point Similarly, the rate suppression rate of each component is calibrated by the support design calculation. Used for target axial force tuning calculation.

[0092] Earthwork excavation shall be carried out according to the benchmark plan or adjusted parameters: excavation shall be carried out in layers and blocks, with support provided as excavation progresses, and support provided before excavation, and over-excavation is strictly prohibited; the blocks shall be organized in plan sequence according to the principle of "layered excavation, island-style or strip-style soil retention"; a thickness of 0.3m shall be reserved above the pit bottom for manual cleaning, and mechanical excavation shall not disturb the original soil layer at the bottom of the pit; after each block is excavated to the design elevation, a cushion layer shall be poured within a limited time and the working face shall be sealed, and the unsupported exposure time shall not exceed [a certain value]. .

[0093] All measurement items are routine monitoring items required by the standard and project monitoring plan, and no new monitoring sensors are needed. The corresponding relationship of their uses is shown in Table 1.

[0094] Table 1

[0095] Monitoring Projects Use in this method Deep horizontal displacement of retaining wall (piles) (inclinometer) Decomposition of deformation components (Equations (5)(12)~(14)) fulcrum axial force Force transmission ratio calculation (Equation (6)), component safety check, servo fulcrum target axial force setting Groundwater level outside the pit Basis for head difference verification, Class C recharge and precipitation measures Surface subsidence outside the pit Environmental response verification and sensitivity coefficient calibration Settlement and tilting of neighboring buildings Object response test and tolerance verification underground pipeline displacement Object response test and tolerance verification

[0096] The monitoring frequency shall be implemented in accordance with the requirements of the corresponding excavation conditions in the standard specifications, with increased monitoring frequency during the active unloading period of excavation; the accuracy of settlement and displacement measurement shall be implemented in accordance with the corresponding level of the standard specifications. In this embodiment, after the excavation depth exceeds 5m, the monitoring frequency of inclination and axial force at the support point shall not be less than once a day, and the monitoring frequency shall be increased to twice a day when the excavation depth exceeds 10m and during the active unloading period of each section.

[0097] Preferably, during the active excavation unloading period and the period of monitoring the above control states, automated measurement (fixed inclinometer, online measurement of axial force at the support point) is used for inclinometer and support point axial force, shortening the update cycle of component decomposition and residual calculation from days to hours; the procedures for determining measurement items, accuracy, and alarm values ​​still follow the current standards. Automated measurement is the preferred method and does not change the composition of measurement items in this method.

[0098] Discrete sequence of inclinometer measurements for each monitoring cycle and each sidewall ( The number of measuring points is [number], and the vertical spacing between the measuring points is usually 0.5m. (Naturally satisfied), based on equations (2) to (5) fitted according to the least squares principle. Let... for Shape function matrix, ; for The measured displacement vector is given. The fitting solution for the component coefficients is: The fitting residual is: The root mean square of the residuals is: .

[0099] Residual verification rules: If the result exceeds the product of the inclinometer's measurement accuracy and the set ratio (in this example, 1.5 times the measurement accuracy), or if the residual shows a single-peak local bulge along the depth, it indicates a local anomaly or measurement anomaly. First, review the data and support status. Only after the review confirms that there are no errors can the decomposition results be used for subsequent calculations.

[0100] Stress transfer characteristics extraction. The force transfer ratio at each support point is calculated according to equation (6). Calculate the unloading response ratio of each component according to formula (7). Simultaneously extract the measured response quantities of each environmental object in the current period. . When the value deviates from the set range (example in this embodiment: two consecutive monitoring cycles below 0.75 or above 1.25), the corresponding direction will be included in the direction determination.

[0101] Amplitude values ​​are allowed to be updated in a rolling fashion. With each excavation step, the current component coefficients are updated. Update the allowable amplitude of each component in a rolling manner according to formulas (9) to (11). And update the sensitivity coefficient synchronously as agreed. (Every 1-2 steps).

[0102] Margin calculation. The degree of occupancy of each deformation component, i.e., the ratio of the component coefficient to its allowable amplitude. and its worst-case scenario:

[0103]

[0104] The development rate of each deformation component, i.e., the rate of development of the component coefficients after moving average processing. :

[0105]

[0106] Assuming the current rate does not decay conservatively, the remaining time for each component to reach its allowable amplitude, i.e., the time to the limit, is as follows:

[0107]

[0108] When there is no component with a rate greater than zero, the time margin is not constrained by the rate.

[0109] Rate ratio. Excavation period rate ratio:

[0110]

[0111] in, This represents the current rate of development of the excavation depth. The component development rate characterizes the rate of change of a unit unloading rate. Its continuous increase suggests that unloading is more converted into deformation rather than fulcrum bearing, serving as an auxiliary input for determining the direction of the measure.

[0112] Stop excavation period ( =0) Change to rate baseline verification: Use the component attenuation envelope obtained from regression of previous excavation stop periods of this project as the baseline (if there is no previous excavation stop data, determine the initial baseline according to soil creep test and regional experience), and measure... If the deformation exceeds the upper limit of the baseline, it is identified as an abnormal deformation due to time, and is included in the control status calculation and triggers a review of the data and support status.

[0113] Based on occupancy rate With boundary time The control status is jointly divided into four levels. The level boundary values ​​are determined according to the engineering safety level and the environmental object level. In this embodiment, the example value is... .

[0114] The planned construction period for the next block is determined according to the construction organization; in this example, each block is taken as 6 days. The response time for control measures is the time from when the measures are determined until they can be implemented, as determined by the construction organization.

[0115] Normal state: and Continue excavation according to the baseline plan;

[0116] Attention status: ,or and The next segment adopts a low-disturbance grading (e.g., the segment length is reduced by one grade), and the monitoring frequency is increased; the sidewall servo fulcrum enters the target axial force tuning execution state;

[0117] Regulation status: or under watch status Suspend further excavation (final stages of the excavated workface, foundation pouring and remaining support erection will proceed as usual), and implement coordinated adjustments and support measures;

[0118] State of emergency: If the measured response of any object exceeds the allowable value, or the converted value of equations (9) and (10) is not positive, or the abnormality criterion between the residual and the rate baseline during the excavation stoppage period is triggered, excavation shall be stopped immediately, and emergency support measures such as backfilling and counter-pressure, unloading at the top of the slope, and temporary support shall be implemented, and control and verification shall be carried out simultaneously.

[0119] Conditions for resuming excavation (after adjustment): First, for at least two consecutive monitoring cycles, the development rate of each deformation component is not greater than the compatibility reference rate of the remaining quantities. (See Equation (19)) — By definition of the baseline rate, this condition is equivalent to the remaining time not being less than the planned duration of the next block; secondly, the stress transmission characteristics that triggered the anomaly (the force transmission ratio of the fulcrum deviates from the range, and the unloading response ratio does not decay continuously) have recovered to the normal range, or it has been verified that its cause can be eliminated by the control measures that have been implemented. Excavation will resume only after both conditions are met.

[0120] It should be noted that: cumulative value of deformation components As excavation monotonically increases, the allowable amplitude As excavation tightens monotonically, the overall occupancy level does not decrease with control measures. The physical irreversibility of deformation determines that the recovery criterion cannot be based on the decrease in occupancy level, but rather on the suppression of the aforementioned rate and the recovery of stress transmission characteristics.

[0121] The margin compatibility reference rate is calculated using the following formula:

[0122]

[0123] in, This refers to the planned duration of the next block. It means that if the rate of development of a component does not exceed the upper limit of the remaining allowable amplitude obtained by averaging the planned duration of the next block, the allowable amplitude will not be reached within the planned duration of the next block.

[0124] Control state calculation is performed simultaneously with fitting curve and The full depth comparison of the envelope serves as a criterion for deformation acceptance.

[0125] Determining the dominant components and the direction of measures. (By...) Determine the dominant deformation component ;in accordance with The calculation results determine the stress transfer state, and then identify alternative individual measures. The correspondence between the dominant deformation component and the direction of the control measures is shown in Table 2.

[0126] Table 2

[0127] dominant component Typical causes Priority measures category Representative individual measures cantilever component Insufficient load-bearing capacity at the top support and excessive length of the cantilever section on the first floor. Category B is the primary category, with Category A as a secondary category. Pre-establish the first-level support points, increase the pre-applied axial force (or set the target axial force of the first-level servo support points), and control the excavation depth of the first level. bulging quantity Excessive block size, excessive vertical spacing between support points, soft layer at the bottom of the pit, and excessively long exposure time. Both Category A and Category B are given equal importance. Reduce block length and layer thickness, support as you excavate, add support points, and thicken the cushion layer; adjust the target axial force of the servo support points adjacent to the excavation face. kicking weight Insufficient embedment depth, weak passive zone resistance, and excessive head difference between the inside and outside of the pit. Category C is the primary category, with Category A as a secondary category. Pit bottom reinforcement, embedded section reinforcement, external recharge, and control of precipitation rate; the target axial force adjustment of the lowest servo support point is used as an auxiliary measure.

[0128] Predicting the effects of the combination of measures. For each alternative combination of measures... (by specific individual measures) Composition (including the "maintaining the baseline scheme" combination), the estimated value of the next block excavation completion after its implementation is:

[0129]

[0130] in, The incremental component caused by excavation of the next block according to the baseline scheme (unadjusted) is given by the support design calculation; This is the effect coefficient of a single measure on the incremental component of the next sub-block. This is the effect correction factor (initial value is 1), used to correct the deviation between the calculated effect and the actual effect on site.

[0131] Verification of the combination of measures. Each combination of measures is verified sequentially:

[0132] (1) Checking the component margin: For all components Established;

[0133] (2) Environmental control verification: For all objects Established;

[0134] (3) Standard verification and validation: Perform verification of the bearing capacity of the support components, the overall stability and resistance to uplift and seepage of the support system after the implementation of the combined measures in accordance with the standard specifications; when using servo supports, the axial force is verified by taking the upper limit of the target axial force. ;

[0135] Determining the control plan. From the combinations of measures that have passed all verifications, the plan is determined based on the principle of minimizing the overall cost index:

[0136]

[0137] in, For the increase in construction period, For increased construction costs, The disturbance equivalent (calculated from prestressed disturbance, reinforcement construction disturbance, etc.), weight Targeted according to project objectives. (Take / Operate) The minimum combination of measures constitutes the control plan, which is translated into adjustments to construction parameters: the block length, layer thickness, excavation sequence and further subdivision plan for the next segment, the elevation and timing of fulcrum erection, the pre-applied axial force value, and (if included) reinforcement and backfilling parameters. The control plan is confirmed by the project manager before being communicated to the construction team for implementation.

[0138] After the conventional steel supports are erected, a pre-loaded axial force is applied using jacks and then locked (in this embodiment, the pre-loaded axial force is divided into 0.5 to 0.8 times the design axial force, all of which have been verified by the component's bearing capacity); the anchor bolt tensioning and locking are performed according to the specific design. The support erection follows the principle of supporting before excavation and supporting as excavation progresses.

[0139] When the sidewall is under attention, regulation, or emergency, or when the development rate of any component of the sidewall exceeds the compatibility reference rate of the remaining components. At that time, the target axial force is adjusted for the servo support point on the side wall (the adjustment point is determined according to the cause and location of the dominant components in Table 2: the first-level support point is adjusted when the cantilever component is dominant, the support point adjacent to the excavation face is adjusted when the bulging component is dominant, and the lowest support point is adjusted when the kicker component is dominant); under normal conditions, the servo support point is maintained according to the current target axial force. The target axial force is calculated by the following formula:

[0140]

[0141] in, This represents the current measured axial force at that fulcrum. This is the dominant deformation component of the sidewall; For the fulcrum pair components Rate inhibition rate; The coefficient is applied step by step (in this example, it is 0.6, and the example range is 0.5 to 0.8). The upper limit of axial force is determined by verifying the bearing capacity of the support components and the rated pressure of the servo system. To maintain the lower limit of the axial force for effective bearing contact at the fulcrum (in this example, it is taken as 0.2 to 0.3 times the design axial force, which is determined according to the specific design).

[0142] After a monitoring cycle is completed and stabilized for a given segment, the prediction-measurement comparison for that segment is closed. This includes the individual measures actually implemented for that segment. The effect correction factor is adjusted according to the following formula:

[0143]

[0144] in, These are the components of the block. The measured increment and the estimated value (calculated by taking the actual combination of measures implemented according to formula (20)). To adjust the weight (0.2 in this example), the adjusted weight is... The value is limited to a preset reasonable range (0.5 to 2.0 in this example). If there is no implementation history in the first step, then... Direct estimation. As a result, the deviation between the effect coefficient and the actual situation on site is corrected piecemeal as the construction progresses, and subsequent adjustment estimates gradually come closer to the actual situation of this project.

[0145] In summary, the deformation control method for deep foundation pit support structures of high-rise buildings disclosed in this invention has at least the following beneficial effects:

[0146] (1) This invention decomposes conventional inclinometer data into deformation components using three mechanisms: cantilever, bulge, and kick. The stress transmission state is characterized by the force transmission ratio at the fulcrum and the unloading response ratio, thus transforming the monitoring data into deformation information with discernible causes. The control direction is determined by the dominant deformation component according to a defined directional correspondence: when the cantilever component is dominant, priority is given to strengthening the first-layer fulcrum and pre-applying axial force; when the bulge component is dominant, priority is given to reducing the number of blocks and densifying the fulcrum; and when the kick component is dominant, priority is given to reinforcing the pit bottom and controlling the head difference. Thus, the control direction is linked to the deformation cause, no longer relying on empirical judgments based on a single maximum displacement value.

[0147] (2) This invention converts the permissible values ​​of each environmental object into the permissible amplitude of each deformation component using a sensitivity coefficient. It quantifies the remaining deformation space and the time to reach the control limit using two margin indicators: occupancy level and remaining time. Based on this, it classifies the control state into four levels for graded handling. Thus, the remaining margin and control time window can be quantified while the deformation is still within the permissible range. The control time point is shifted from after the alarm value is reached to during the margin consumption process, making early control possible.

[0148] (3) Excavation parameters and support parameters are unified as alternative measures with tiered values. After the effect of the combination of measures on the incremental component of the next block is estimated and the component margin, environmental control, and standard verification are checked, the excavation and support parameters are determined in coordination within the same framework. For the support point using hydraulic servo adaptive steel support, the target axial force is dynamically adjusted by the calculation of the rate excess and rate inhibition rate of the dominant deformation component, so that the support axial force can be adjusted in real time according to the deformation state. The compensation direction and compensation amount of the servo support point are determined by the deformation cause, and the physical execution of the control measures is synchronized with the deformation development.

[0149] The above description is merely a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention are covered within the scope of protection of the present invention.

Claims

1. A method for deformation control of deep foundation pit support structures for high-rise buildings, applied to the phased excavation construction of deep foundation pits using retaining walls and fulcrum support, wherein the fulcrum is an internal support or an anchor rod, characterized in that, The process is executed cyclically, block by block, as the excavation proceeds in stages, including: S1: Determine the characteristic response quantities and allowable values ​​of each environmental protection object around the foundation pit. The characteristic response quantity is the amount of physical deformation of the object under the influence of foundation pit construction. S2: Establish the correspondence between the characteristic response quantity and the deformation component of the deep horizontal displacement of the retaining wall, and convert each allowable value into the allowable amplitude of each deformation component; S3: Excavate the earthwork in layers and blocks, and measure the deep horizontal displacement of the retaining wall as the excavation progresses. Decompose the displacement into the deformation components according to the deformation mechanism. S4: Determine the control state of the support structure deformation based on the ratio of each deformation component to its allowable amplitude and the rate of development with the monitoring cycle; S5: Based on the control state, determine the adjustment content of the next segmented excavation parameters and support parameters. The adjustment direction is determined based on the dominant deformation component. The excavation and support parameters are adjusted in coordination to meet the control requirements of each environmental protection object and the safety requirements of the support structure. S6: Perform earthwork excavation, erect support points and / or apply pre-loaded axial force according to the adjustment content, measure the deep horizontal displacement of the retaining wall after construction and return to step S3, and repeat the process block by block until the excavation is completed.

2. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, The deformation components include cantilever deformation, bulging deformation, and kick-out deformation: the cantilever deformation component represents the deformation pattern of significant displacement at the top of the wall, which decreases with depth, and is related to insufficient bearing capacity of the top support or excessive length of the cantilever section in the first excavation; the bulging deformation component represents the bulging deformation pattern of the mid-span near the excavation face, and is related to the block size, vertical spacing of the support points, or the stratum conditions at the bottom of the pit; the kick-out deformation component represents the kick-out deformation pattern of significant displacement at the bottom of the wall, and is related to the embedment depth, passive zone resistance, or head difference between inside and outside the pit.

3. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 2, characterized in that, The adjustment content is determined according to the dominant deformation component: when the cantilever deformation component is dominant, priority should be given to advancing the timing of the first layer support erection, increasing the pre-applied axial force and controlling the first layer excavation depth; when the bulging deformation component is dominant, priority should be given to reducing the block length and layer thickness, supporting as excavation progresses, adding support points or thickening the cushion layer; when the kicker deformation component is dominant, priority should be given to reinforcing the pit bottom, reinforcing the embedded section, recharge outside the pit or controlling the dewatering rate.

4. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, The calculation includes: determining the environmental protection objects adversely affected by each deformation component based on the sensitivity of the characteristic response of each environmental protection object to the increase of each deformation component; for each deformation component, under the condition of keeping the other deformation components at the current level, determining the environmental allowable amplitude of the deformation component with the limit that each affected environmental protection object does not exceed its allowable value; and determining the body allowable amplitude of the deformation component with the limit of the horizontal displacement control requirements of the support structure body; the allowable amplitude is taken as the smaller of the two values ​​and is updated as the excavation progresses.

5. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, The control state is determined by: using the ratio of each deformation component to its allowable amplitude to characterize the degree of occupancy of that deformation component, and taking the maximum degree of occupancy among all deformation components; Based on the development rate of each deformation component after smoothing, estimate the remaining time for it to reach the allowable amplitude at the current rate; determine the control state of the support structure deformation based on the maximum occupancy level and the remaining time.

6. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 5, characterized in that, The control status is divided into four levels: normal, attention, regulation, and emergency, and handled in stages: In the normal state, the maximum occupancy is not greater than the first limit value and the remaining time is not less than the planned construction period of the next block, and excavation continues according to the benchmark plan; In the attention state, the maximum occupancy is greater than the first limit value but not greater than the second limit value, or the maximum occupancy is not greater than the first limit value but the remaining time is less than the planned construction period of the next block, and the next block adopts a low-disturbance construction method with reduced block length and / or layer thickness, and the monitoring frequency is increased; In the control state, if the maximum occupancy exceeds the second limit value and none of the deformation components exceed their allowable amplitude, or if the remaining time in the attention state is not greater than the response time of the control measures, the deepening excavation is suspended. In the emergency state, if any deformation component exceeds its allowable amplitude, or any environmental protection object's measurement response exceeds its permissible value, or a preset abnormality criterion is triggered, excavation is immediately stopped and emergency support measures are implemented. The conditions for resuming excavation in the control state are: for no less than two consecutive monitoring cycles, the development rate of each deformation component is not greater than the baseline rate determined by the ratio of the remaining allowable amplitude to the planned duration of the next block.

7. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, It also includes the measurement and calculation of stress transfer characteristics: measuring the axial force at each support point; The ratio of the measured axial force increment at each support point in each segment excavation to the design-calculated axial force increment is taken as the support point force transmission ratio, and the ratio of the increment of each deformation component in the segment to the increment of the excavation depth in the segment is taken as the unloading response ratio. When the force transmission ratio of the fulcrum deviates from the preset range, or when the unloading response ratio does not decrease continuously with excavation, the corresponding direction is included in the determination of the dominant deformation component and the determination of the adjustment content.

8. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 8, characterized in that, The determination of the adjustment content includes: estimating the changes in each deformation component after the implementation of alternative adjustment combinations of step-by-step excavation parameters and support parameters organized according to graded values; verifying that after the implementation of the adjustment combination, each deformation component does not exceed its allowable amplitude, the characteristic response of each environmental protection object does not exceed its allowable value, and verifying the bearing capacity and stability of the support system according to the current foundation pit support design method, and meeting the construction sequence requirements including layered excavation, support before excavation, and strict prohibition of over-excavation; among the adjustment combinations that have passed the verification, the adjustment combination to be adopted is determined according to the principle of minimizing the comprehensive cost of construction period, cost and construction disturbance.

9. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, Also includes: After the segmented excavation is completed and stabilized for one monitoring cycle, the estimated values ​​and measured values ​​of each deformation component are compared. When the two deviate, the parameters on which the effect prediction of subsequent adjustment combinations is based are corrected accordingly, so that the determination of subsequent adjustment contents gradually comes closer to the actual situation of this project.

10. The method for deformation control of deep foundation pit support structure for high-rise buildings according to claim 1, characterized in that, At least some of the fulcrums are supported by hydraulic servo adaptive steel supports, which automatically compensate for the target axial force during service. When the development rate of any deformation component is greater than the reference rate determined by the ratio of the remaining allowable amplitude to the planned duration of the next segment, the fulcrum for which the target axial force needs to be tuned is determined according to the dominant deformation component. The target axial force of the fulcrum is increased by a compensation amount based on its measured axial force. The compensation amount is proportional to the amount by which the development rate of the dominant deformation component exceeds the reference rate and inversely proportional to the rate suppression rate of the fulcrum. The rate suppression rate is the amount by which the development rate of the dominant deformation component decreases for each unit increase in the axial force of the fulcrum. The target axial force shall not exceed the upper limit determined by the bearing capacity of the support member and the rated pressure of the servo system, and shall not be lower than the lower limit for maintaining effective bearing contact. The compensation is applied in stages. After each level of compensation, a monitoring period of no less than one day is maintained, and the development rate of the dominant deformation component is checked before applying the next level.