Foundation pit slope anti-sliding protection structure for building construction and method thereof

By combining positioning plates, slope protection plates, and transmission gear systems, the continuous and orderly laying and soil fixing of the foundation pit slope protection structure is achieved, solving the problem of cumbersome operation in the existing technology and improving the installation convenience and stability of the protection structure.

CN123133385APending Publication Date: 2026-11-20JIANGXI JINXUN NONFERROUS ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611635062.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

When existing foundation pit slope protection structures are installed on a large scale, they require repeated handling, alignment, and connection, making the operation cumbersome and making it difficult to achieve the orderly deployment of multiple sets of protection panels, thus increasing the amount of slope installation work.

Method used

The system employs components such as positioning plates, slope protection plates, rod-shaped sliding parts, elastic telescopic rods, and locking blocks. Through a transmission gear system, the slope protection plates are laid continuously and orderly. Arc-shaped cutting plates are used to cut into the soil layer for fixation, reducing interference from handling and adjusting the posture of each piece.

Benefits of technology

It enables the continuous and orderly laying of multiple sets of slope protection panels, reducing the need for handling, alignment, and individual unlocking of each panel, and improving the ease of laying slope protection structures and the effect of fixing them in the soil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133385A_ABST
    Figure CN123133385A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of foundation pit engineering protection, and discloses a foundation pit slope anti-sliding protection structure and method for building construction, which comprises a positioning plate, the surface of the positioning plate is provided with an anchoring device for inserting into the soil body on the slope top. The device is provided with a slope protection plate, an L-shaped groove, a rod-shaped sliding piece, an elastic expansion rod and a clamping block. After the initial locking of the bottommost slope protection plate is released, the relative movement generated when the rod-shaped sliding piece moves along the L-shaped groove drives the clamping block to release the upper slope protection plate through the driving gear, the transmission gear and the driven gear, the stacked slope protection plates are unfolded step by step from the bottom, the elastic displacement of the rod-shaped sliding piece is provided through the cooperation of the clamping block and the torsional spring, the continuous and orderly laying of the multiple slope protection plates is realized, the operations of block-by-block carrying, alignment and step-by-step independent unlocking are reduced, and the laying convenience of the slope protection structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of foundation pit engineering protection technology, and in particular to a slope protection structure and method for preventing slippage in foundation pits during building construction. Background Technology

[0002] The foundation pit slope protection structure is a protective facility set on the slope of the foundation pit during construction. It is mainly used to cover and restrain the surface soil of the slope, reduce the impact of soil loosening and local sliding on construction. It usually consists of a protective plate, anchoring components and connecting components. The protective plate covers the slope, the anchoring components fix the protective plate to the soil, and the connecting components expand the protection range.

[0003] However, judging from its installation method, when the protection range is large, it is necessary to repeatedly move, align, anchor and connect the protective panels. Each protective panel is placed separately, and there are many operation steps in the continuous laying process. It is difficult to achieve the orderly deployment of multiple sets of protective panels through centralized arrangement, which increases the amount of installation work on the slope. Summary of the Invention

[0004] To address the shortcomings mentioned above, this invention proposes a slope protection structure and method for preventing slippage in foundation pits during building construction.

[0005] To achieve the above objectives, this application adopts the following technical solution: a slope protection structure for preventing slippage in foundation pits during building construction, comprising a positioning plate, wherein an anchoring device for inserting into the soil at the top of the slope is installed on the surface of the positioning plate, and multiple sets of slope protection plates that can be stacked and retracted are hinged to one side of the positioning plate, wherein an L-groove is provided on the side wall of the slope protection plate, and a rod-shaped sliding member is slidably inserted inside the L-groove, wherein the rod-shaped sliding member is connected to the end of the adjacent slope protection plate;

[0006] The outer wall of the rod-shaped sliding member is rotatably connected to an elastic telescopic rod, and the end of the elastic telescopic rod away from the rod-shaped sliding member is fixedly connected to a driving gear, which is rotatably installed inside the slope protection plate.

[0007] A transmission gear is rotatably mounted inside the slope protection plate and on one side of the driving gear. The transmission gear meshes with the driving gear. A secondary driven gear, meshing with the transmission gear, is rotatably mounted on one side of the transmission gear and inside the same slope protection plate. A locking block for restricting the movement of the upper-level slope protection plate is rotatably connected to the surface of the secondary driven gear. A torsion spring is installed at the rotatable connection between the locking block and the secondary driven gear. The locking block rotates with the secondary driven gear.

[0008] Preferably, the slope protection plate has an arc-shaped cavity inside, and an arc-shaped cutting plate for cutting into the soil layer of the foundation pit slope is slidably installed inside the arc-shaped cavity. A power push rod is fixedly installed inside the slope protection plate, and the output end of the power push rod is connected to the arc-shaped cutting plate for transmission.

[0009] Preferably, the L-groove includes a longitudinal section and a vertical end section that are interconnected. The longitudinal section extends along the unfolding direction of the slope protection board, and the vertical end section extends from the end of the longitudinal section toward the slope-adhering side of the slope protection board.

[0010] Preferably, one end of the locking block corresponds to the rod-shaped sliding member connected to the upper-level slope protection plate to be released, one end of the torsion spring is fixedly connected to the locking block, and the other end of the torsion spring is fixedly connected to the secondary driven gear.

[0011] Preferably, an electrically controlled drive device for releasing the corresponding locking block is provided inside the bottommost set of slope protection plates, and the output end of the electrically controlled drive device is connected to the locking block in a transmission connection.

[0012] Preferably, the output end of the power push rod is connected to a rack, the rack is slidably installed inside the slope protection plate, the surface of the arc-shaped cutting plate is provided with teeth that mesh with the rack, the interior of the arc-shaped cavity has an arc-shaped guide space adapted to the arc-shaped cutting plate, the end of the arc-shaped cavity facing the slope side of the slope protection plate is provided with an opening for the arc-shaped cutting plate to extend out, and the end of the arc-shaped cutting plate facing the opening is provided as a sharp end for cutting into the soil layer.

[0013] Preferably, each set of slope protection plates is provided with a set of arc-shaped cutting plates, and the arc-shaped cutting plates on each set of slope protection plates have the same cutting direction relative to the corresponding slope protection plate. The surface of the arc-shaped cutting plates is fixedly connected with stiffening plates for reinforcing the arc-shaped cutting plates.

[0014] Preferably, the slope protection plate is fixedly provided with a first insert and a second insert on opposite sides in the lateral direction. The shapes of the first insert and the second insert are adapted to each other. The slope protection plates that are laterally adjacent are connected to each other and limited by the interlocking of the first insert and the second insert.

[0015] A method for preventing and protecting the slope of a foundation pit during construction from slippage includes the following steps:

[0016] S1. First, place the positioning plate on the top of the foundation pit slope, and fix the positioning plate to the top of the slope soil through the anchoring device, so that multiple sets of slope protection plates are kept in a stacked and closed state, and the arc-shaped cutting plate is stored in the arc-shaped cavity.

[0017] S2. Then, the electronically controlled drive device drives the corresponding locking block of the bottom slope protection plate to flip and move, releasing the locking of the bottom slope protection plate. When the corresponding rod-shaped sliding piece passes, the drive is released, so that the locking block is reset relative to the secondary driven gear under the action of the torsion spring.

[0018] The unlocked slope protection plate moves downward along the slope of the pit, and the rod-shaped sliding piece slides along the long section of the L groove of the adjacent slope protection plate and moves into the vertical section at the end. The swing of the elastic telescopic rod drives the driving gear to rotate, and the driving gear drives the secondary driven gear to rotate through the transmission gear, so that the locking block releases the limit on the upper slope protection plate.

[0019] S3. Move the upper-level slope protection plate that has been released from the limit down along the slope of the foundation pit, and move the slope protection plate that has been unfolded below with it. Release the remaining slope protection plates to be unfolded in the same way to complete the longitudinal unfolding of multiple sets of slope protection plates.

[0020] S4. Connect the adjacent slope protection panels laterally. After the slope protection panels are unfolded and spliced ​​and attached to the slope of the foundation pit, start the power push rod to drive the arc-shaped cutting plate to extend along the arc-shaped cavity and cut into the soil layer. After the arc-shaped cutting plate reaches the predetermined extension position, maintain the position of the power push rod so that the arc-shaped cutting plate remains in the soil.

[0021] The technical effects and advantages of this invention are as follows:

[0022] In this invention, the device, through slope protection plates, L-grooves, rod-shaped sliding members, elastic telescopic rods, and locking blocks, utilizes the relative motion generated when the bottom slope protection plate is released from its initial lock. This motion, generated by the rod-shaped sliding member moving along the L-groove, drives the locking blocks to release the upper-level slope protection plate via the driving gear, transmission gear, and secondary driven gear. This allows the stacked slope protection plates to unfold gradually from the bottom. The locking blocks, in conjunction with torsion springs, provide elastic clearance for the passing rod-shaped sliding members, enabling the continuous and orderly laying of multiple sets of slope protection plates. This reduces the need for individual handling, alignment, and unlocking of each plate, improving the ease of laying slope protection structures.

[0023] In this invention, the device uses a power push rod, rack, arc-shaped cavity, arc-shaped cutting plate, and reinforcing plate to house the arc-shaped cutting plate within the arc-shaped cavity during the unfolding and splicing of the slope protection panel. After the slope protection panel is attached to the slope surface of the foundation pit, the power push rod pushes the rack, causing the arc-shaped cutting plate to cut into the soil layer in the same direction along the curved path guided by the arc-shaped cavity. The reinforcing plate strengthens the arc-shaped cutting plate, realizing the sequential execution of the laying process and the soil fixing process. This reduces the interference of the soil-inserting components on the movement and posture adjustment of the panel. The contact resistance between the arc-shaped cutting plate and the surrounding soil enhances the soil-inserting constraint of the slope protection panel, improving the coverage and limiting effect on the surface soil of the slope. Attached Figure Description

[0024] The disclosure of this invention is illustrated with reference to the accompanying drawings. It should be understood that the drawings are for illustrative purposes only and are not intended to limit the scope of protection of this invention. In the drawings, the same reference numerals are used to refer to the same parts:

[0025] Figure 1This is a schematic diagram of the device of the present invention in use at the site;

[0026] Figure 2 This is a schematic diagram of the device in its unfolded state according to the present invention;

[0027] Figure 3 This is a schematic diagram of the external structure of the device of the present invention;

[0028] Figure 4 This is a schematic diagram of the slope protection board and arc-shaped cutting plate structure of the present invention;

[0029] Figure 5 This is a schematic diagram of the slide bar structure of the present invention;

[0030] Figure 6 For the present invention Figure 5 Enlarged schematic diagram of the structure at point A in the middle;

[0031] Figure 7 This is a cross-sectional view of the device of the present invention in its unfolded state.

[0032] Legend: 1. Excavation pit slope; 2. Positioning plate; 201. Anchoring device; 21. Slope protection plate; 211. L-groove; 22. Rod-shaped sliding component; 23. Elastic telescopic rod; 24. Main drive gear; 25. Transmission gear; 26. Secondary driven gear; 27. Locking block; 3. Arc-shaped cavity; 31. Arc-shaped cutting plate; 32. Rib plate; 33. Rack; 34. Power push rod; 4. First insert; 41. Second insert. Detailed Implementation

[0033] It is readily understood that, based on the technical solution of this invention, those skilled in the art can propose various interchangeable structural methods and implementations without altering the essential spirit of the invention. Therefore, the following detailed embodiments and accompanying drawings are merely illustrative examples of the technical solution of this invention and should not be considered as the entirety of the invention or as limitations or restrictions on the technical solution of this invention.

[0034] Reference Figure 1-7 As shown, the present invention provides a technical solution: a slope protection structure for preventing slippage in a foundation pit during construction, including a positioning plate 2, an anchoring device 201 for inserting into the soil at the top of the slope is installed on the surface of the positioning plate 2, and a plurality of slope protection plates 21 that can be stacked and folded are hinged to one side of the positioning plate 2. The side wall of the slope protection plate 21 is provided with an L-groove 211, and a rod-shaped sliding member 22 is slidably inserted inside the L-groove 211. The rod-shaped sliding member 22 is connected to the end of the adjacent slope protection plate 21.

[0035] The outer wall of the rod-shaped sliding member 22 is rotatably connected to an elastic telescopic rod 23. The end of the elastic telescopic rod 23 away from the rod-shaped sliding member 22 is fixedly connected to a driving force gear 24. The driving force gear 24 is rotatably installed inside the slope protection plate 21.

[0036] A transmission gear 25 is rotatably mounted inside the slope protection plate 21 and on one side of the driving gear 24. The transmission gear 25 meshes with the driving gear 24. A secondary driven gear 26, which meshes with the transmission gear 25, is rotatably mounted on one side of the transmission gear 25 and inside the same slope protection plate 21. A locking block 27 for restricting the movement of the upper slope protection plate 21 is rotatably connected to the surface of the secondary driven gear 26. A torsion spring is installed at the rotatable connection between the locking block 27 and the secondary driven gear 26. The locking block 27 rotates with the secondary driven gear 26.

[0037] Reference Figure 1-7 As shown in this embodiment: the slope protection plate 21 has an arc-shaped cavity 3 inside, and an arc-shaped cutting plate 31 for cutting into the soil layer of the slope 1 of the foundation pit is slidably installed inside the arc-shaped cavity 3. A power push rod 34 is fixedly installed inside the slope protection plate 21, and the output end of the power push rod 34 is connected to the arc-shaped cutting plate 31 in a transmission connection. The L-groove 211 includes a longitudinal section and a vertical end section that are interconnected. The longitudinal section extends along the unfolding direction of the slope protection plate 21, and the vertical end section extends from the end of the longitudinal section toward the slope-adhering side of the slope protection plate 21. One end of the locking block 27 corresponds to the rod-shaped sliding member 22 connected to the upper-level slope protection plate 21 to be released. One end of the torsion spring is fixedly connected to the locking block 27, and the other end of the torsion spring is fixedly connected to the secondary driven gear 26. Inside the lowermost set of slope protection plates 21, there is an electric control drive device for releasing the corresponding locking block 27. The output end of the electric control drive device is connected to the locking block 27 in a transmission connection.

[0038] Reference Figure 3-7 As shown in this embodiment: the output end of the power push rod 34 is connected to a rack 33, the rack 33 is slidably installed inside the slope protection plate 21, the surface of the arc-shaped cutting plate 31 is provided with teeth that mesh with the rack 33, the interior of the arc-shaped cavity 3 has an arc-shaped guide space that matches the arc-shaped cutting plate 31, the end of the arc-shaped cavity 3 facing the slope side of the slope protection plate 21 is provided with an opening for the arc-shaped cutting plate 31 to extend out, and the end of the arc-shaped cutting plate 31 facing the opening is provided with a sharp end for cutting into the soil layer.

[0039] Reference Figure 3-7 As shown in this embodiment: each set of slope protection plates 21 is provided with a set of arc-shaped cutting plates 31. The arc-shaped cutting plates 31 on each set of slope protection plates 21 have the same cutting direction relative to the corresponding slope protection plate 21. The surface of the arc-shaped cutting plates 31 is fixedly connected with ribs 32 for reinforcing the arc-shaped cutting plates 31. The slope protection plates 21 are respectively fixedly provided with a first insert 4 and a second insert 41 on opposite sides in the lateral direction. The shapes of the first insert 4 and the second insert 41 are adapted to each other. The slope protection plates 21 that are adjacent in the lateral direction are connected to each other and limited by the fitting of the first insert 4 and the second insert 41.

[0040] A method for preventing and protecting the slope of a foundation pit during construction from slippage includes the following steps:

[0041] S1. First, place the positioning plate 2 on the top of the foundation pit slope 1, and fix the positioning plate 2 to the soil at the top of the slope through the anchoring device 201, so that multiple sets of slope protection plates 21 are kept in a stacked and compacted state, and the arc-shaped cutting plate 31 is stored in the arc-shaped cavity 3.

[0042] S2. Then, the electronically controlled drive device drives the corresponding locking block 27 of the bottom slope protection plate 21 to flip and move, releasing the locking of the bottom slope protection plate 21. When the corresponding rod-shaped sliding member 22 passes, the drive is released, so that the locking block 27 is reset relative to the secondary driven gear 26 under the action of the torsion spring.

[0043] The unlocked slope protection plate 21 moves downward along the slope surface 1 of the foundation pit, and the rod-shaped sliding member 22 slides along the longitudinal section of the L groove 211 of the adjacent slope protection plate 21 and moves into the vertical section at the end. The swing of the elastic telescopic rod 23 drives the driving gear 24 to rotate. The driving gear 24 drives the secondary driven gear 26 to rotate through the transmission gear 25, so that the locking block 27 releases the restriction on the upper slope protection plate 21.

[0044] S3. Move the upper-level slope protection plate 21 that has been released from the limit downward along the slope surface 1 of the foundation pit, and move the slope protection plate 21 that has been unfolded below together. Release the remaining slope protection plates 21 to be unfolded step by step in the same process to complete the longitudinal unfolding of multiple sets of slope protection plates 21.

[0045] S4. Connect the adjacent slope protection panels 21 laterally. After the slope protection panels 21 are unfolded and spliced ​​and attached to the slope surface 1 of the foundation pit, start the power push rod 34 to drive the arc-shaped cutting plate 31 to extend along the arc-shaped cavity 3 and cut into the soil layer. After the arc-shaped cutting plate 31 reaches the predetermined extension position, maintain the position of the power push rod 34 so that the arc-shaped cutting plate 31 is kept in the soil.

[0046] The specific operation method of the present invention is as follows: First, the positioning plate 2 is placed at the installation position at the top of the foundation pit slope 1. The positioning plate 2 is fixed by inserting the anchoring device 201 into the soil at the top of the slope, so that the positioning plate 2 supports the slope protection plate 21 connected to it. Multiple sets of slope protection plates 21 are kept in a stacked and folded state before laying. Adjacent slope protection plates 21 are kept connected by the cooperation of the rod-shaped sliding member 22 and the L groove 211. Each locking block 27 is in the corresponding initial locking position, which limits the slope protection plate 21 that has not yet been unfolded. At the same time, the power push rod 34 is kept in the initial position, and the arc-shaped cutting plate 31 is stored in the corresponding arc-shaped cavity 3 to prevent the arc-shaped cutting plate 31 from extending out and cutting into the soil in advance during the unfolding of the slope protection plate 21.

[0047] Secondly, the locking block 27 corresponding to the bottom slope protection plate 21 is driven by the electric control drive device to flip in the yielding direction, so that the locking block 27 exits the bearing position of the bottom rod-shaped sliding member 22, releases the initial locking of the slope protection plate 21 closest to the foundation pit slope 1, and controls the slope protection plate 21 to move downward along the foundation pit slope 1. Before the corresponding rod-shaped sliding member 22 completely crosses the interference range of the locking block 27, the electric control drive device maintains the yielding state of the locking block 27. After the rod-shaped sliding member 22 passes, the electric control drive device is released from driving the locking block 27, so that the locking block 27 can be reset relative to the secondary driven gear 26 under the action of the torsion spring, thereby completing the first release before the multiple sets of slope protection plates 21 are deployed step by step.

[0048] Secondly, as the slope protection plate 21 moves downward along the slope surface 1 of the foundation pit, the rod-shaped sliding member 22 slides relative to the longitudinal section of the L-groove 211 corresponding to the adjacent slope protection plate 21. The L-groove 211 restricts the movement direction of the rod-shaped sliding member 22, allowing the slope protection plate 21 to gradually slide out of the stacking area. The elastic telescopic rod 23 extends and retracts with the change of distance between the rod-shaped sliding member 22 and the driving gear 24, and swings with the change of the relative position of the two ends. The swing of the elastic telescopic rod 23 drives the driving gear 24 to rotate. The driving gear 24 transmits the rotation to the secondary driven gear 26 through meshing with the transmission gear 25, causing the locking block 27 to change position with the secondary driven gear 26. At the stage when the current slope protection plate 21 has not yet been unfolded into place, the corresponding locking block 27 should continue to support the upper-level rod-shaped sliding member 22 to prevent the upper-level slope protection plate 21 from sliding out prematurely.

[0049] Next, when the rod-shaped slider 22 moves to the turning position of the L-groove 211, the rod-shaped slider 22 enters the end vertical section from the longitudinal section of the L-groove 211 and moves down along the end vertical section, so that the corresponding slope protection plate 21 falls towards the foundation pit slope 1 and adjusts the laying posture, reducing the stacking height difference between adjacent slope protection plates 21, so that the slid-out slope protection plate 21 gradually adheres to the foundation pit slope 1. After the rod-shaped slider 22 moves down to the position, the end of the rod-shaped slider 22 is locked to prevent it from detaching, restricting the rod-shaped slider 22 from exiting in the opposite direction along the end vertical section of the L-groove 211, so that the adjacent slope protection plates 21 remain connected after unfolding.

[0050] At the same time, when the rod-shaped sliding member 22 enters the vertical section at the end of the L-groove 211, it drives the elastic telescopic rod 23 to further adjust its length and swing angle. The elastic telescopic rod 23 drives the active power gear 24 to rotate. The active power gear 24 drives the secondary driven gear 26 to rotate through the transmission gear 25. After the current slope protection plate 21 has completed its unfolding and end anti-detachment locking, the secondary driven gear 26 brings the corresponding locking block 27 to the position of releasing the bearing, releasing the upper-level rod-shaped sliding member 22, and releasing the movement restriction of the upper-level slope protection plate 21 relative to the higher-level slope protection plate 21. Thus, the relative movement generated when the current slope protection plate 21 is unfolded triggers the release of the upper-level slope protection plate 21.

[0051] Furthermore, the locking block 27 is rotatably mounted on the secondary driven gear 26. A torsion spring is provided at the rotatable connection between the locking block 27 and the secondary driven gear 26. One end of the torsion spring is fixedly connected to the locking block 27, and the other end is fixedly connected to the secondary driven gear 26. When the locking block 27 is in the blocking posture, the folded edge at the root of the locking block 27 abuts against the corresponding part of the secondary driven gear 26, which restricts the locking block 27 from continuing to rotate to the side of releasing the blocking, so that the locking block 27 can maintain the blocking posture when subjected to the locking direction force. When the locking block 27 is pushed in the allowable direction, it can overcome the elastic effect of the torsion spring and rotate relative to the secondary driven gear 26 in the yielding direction, providing passage space for the rod-shaped sliding member 22.

[0052] Immediately afterwards, the released rod-shaped slider 22 continues to move along the L-groove 211. When the rod-shaped slider 22 contacts the yielding side of the block 27, the block 27 is flipped by the rod-shaped slider 22, causing the torsion spring to deform elastically. After the rod-shaped slider 22 has completely passed and disengaged from the block 27, the torsion spring releases its elastic force, causing the block 27 to return to the predetermined angle relative to the secondary driven gear 26. The swing generated by the block 27 as it moves with the secondary driven gear 26 should be avoided by the contact and cooperation between the yielding side and the rod-shaped slider 22, so that the block 27 can be flipped under pressure, reducing the situation where the released rod-shaped slider 22 is rigidly blocked again during the passage. The flipping and yielding of the block 27 is used to adapt to the passage process. Before the current slope protection plate 21 is in place, the bearing side of the block 27 still needs to maintain the restriction on the previous rod-shaped slider 22.

[0053] Subsequently, the unlocked upper-level slope protection plate 21 moves downward along the slope surface 1 of the foundation pit, and drives the lower slope protection plate 21 that has been unfolded and remains connected to move together, so that the upper-level slope protection plate 21 gradually slides out of the stacking area. When the corresponding rod-shaped sliding member 22 enters the vertical section at the end of the L groove 211, the attitude adjustment and end anti-detachment locking of the slope protection plate 21 are completed again. Through the transmission of the elastic telescopic rod 23, the driving gear 24, the transmission gear 25, the secondary driven gear 26 and the locking block 27, the upper-level slope protection plate 21 is released. Following the same process, multiple sets of slope protection plates 21 are unfolded step by step from the bottom of the stack. For adjacent slope protection plates 21 that have been unfolded and whose relative positions remain unchanged, the corresponding elastic telescopic rod 23 and the driving gear 24 maintain their relative positions and do not rotate individually due to the overall movement of the slope protection plate 21 down the slope.

[0054] Next, based on the lateral coverage of the foundation pit slope 1, the adjacent slope protection plates 21 are connected by the fitting of the first insert 4 and the second insert 41, so that the adjacent slope protection plates 21 are mutually limited. The coverage is expanded by longitudinally unfolding and laterally splicing multiple sets of slope protection plates 21. After the slope protection plates 21 are unfolded, spliced ​​and attached to the foundation pit slope 1, the positioning plate 2 is held in the installation position at the top of the slope by the anchoring device 201. The adjacent slope protection plates 21 are connected by the rod-shaped sliding member 22, the L-groove 211 and the first insert 4 and the second insert 41, providing support for the subsequent arc-shaped cutting plate 31 to cut into the soil layer.

[0055] Subsequently, the power push rod 34 is activated, which drives the rack 33 to move. The rack 33, through meshing with the teeth of the arc-shaped cutting plate 31, transmits the pushing action of the power push rod 34 to the arc-shaped cutting plate 31, causing the arc-shaped cutting plate 31 to move outward along the arc-shaped cavity 3. The arc-shaped cavity 3 guides the movement trajectory of the arc-shaped cutting plate 31, causing the arc-shaped cutting plate 31 to extend from the slope protection plate 21 toward the slope surface 1 of the foundation pit along the curved path, and gradually cut into the soil layer through the sharp end of the arc-shaped cutting plate 31. As the power push rod 34 continues to push the rack 33, the part of the arc-shaped cutting plate 31 that enters the soil gradually increases, so that the arc-shaped cutting plate 31 forms contact with the surrounding soil.

[0056] Meanwhile, each set of slope protection plates 21 is equipped with a set of arc-shaped cutting plates 31 that enter the soil layer at the corresponding position in the same cutting direction, so that multiple sets of slope protection plates 21 form distributed soil-entry constraints along the laying range of the foundation pit slope 1. The stiffening plate 32 provides reinforced support for the arc-shaped cutting plates 31, reducing the bending deformation caused by local obstruction when the arc-shaped cutting plates 31 cut into the soil layer. The reaction force generated by the arc-shaped cutting plates 31 during the cutting process is transmitted to the slope protection plates 21 through the arc-shaped cavity 3 and its supporting parts, and is jointly borne by the connection between adjacent slope protection plates 21, as well as the positioning plate 2 and the anchoring device 201, so as to limit the displacement of the slope protection plates 21 during the cutting process.

[0057] Finally, when the arc-shaped cutting plate 31 reaches the predetermined extension position, the extension action of the power push rod 34 is stopped and the position of the power push rod 34 is maintained, so that the rack 33 and the arc-shaped cutting plate 31 are maintained in the corresponding state. Through the contact resistance between the arc-shaped cutting plate 31 and the surrounding soil, the sliding and outward tilting of the slope protection plate 21 along the foundation pit slope 1 is constrained. At the same time, the overall laying position is maintained through the connection between the positioning plate 2, the anchoring device 201 and the adjacent slope protection plate 21, so that the slope protection plate 21 covers and limits the surface soil of the foundation pit slope 1, reduces the loosening and sliding of the surface soil, and improves the stability of the slope protection plate 21 after laying.

[0058] The technical scope of this invention is not limited to the content described above. Those skilled in the art can make various modifications and variations to the above embodiments without departing from the technical concept of this invention, and all such modifications and variations should fall within the protection scope of this invention.

Claims

1. A slope protection structure for preventing slippage in foundation pits during building construction, comprising a positioning plate (2), characterized in that: The surface of the positioning plate (2) is equipped with an anchoring device (201) for inserting into the soil at the top of the slope. A plurality of slope protection plates (21) that can be stacked and folded are hinged to one side of the positioning plate (2). The side wall of the slope protection plate (21) is provided with an L-groove (211). A rod-shaped sliding member (22) is slidably inserted inside the L-groove (211). The rod-shaped sliding member (22) is connected to the end of the adjacent slope protection plate (21). The outer wall of the rod-shaped sliding member (22) is rotatably connected to an elastic telescopic rod (23), and the end of the elastic telescopic rod (23) away from the rod-shaped sliding member (22) is fixedly connected to a driving force gear (24), which is rotatably installed inside the slope protection plate (21). A transmission gear (25) is rotatably mounted inside the slope protection plate (21) and on one side of the driving gear (24). The transmission gear (25) meshes with the driving gear (24). A secondary driven gear (26) meshes with the transmission gear (25) and is rotatably mounted on one side of the transmission gear (25) and inside the same slope protection plate (21). A locking block (27) for restricting the movement of the upper slope protection plate (21) is rotatably connected to the surface of the secondary driven gear (26). A torsion spring is installed at the rotatable connection between the locking block (27) and the secondary driven gear (26). The locking block (27) rotates with the secondary driven gear (26).

2. The anti-slip protection structure for foundation pit slopes in building construction according to claim 1, characterized in that: The slope protection plate (21) has an arc-shaped cavity (3) inside. An arc-shaped cutting plate (31) for cutting into the soil layer of the foundation pit slope (1) is slidably installed inside the arc-shaped cavity (3). A power push rod (34) is fixedly installed inside the slope protection plate (21). The output end of the power push rod (34) is connected to the arc-shaped cutting plate (31) in a transmission connection.

3. The anti-slip protection structure for foundation pit slopes in building construction according to claim 1, characterized in that: The L-groove (211) includes a longitudinal section and a vertical end section that are interconnected. The longitudinal section extends along the unfolding direction of the slope protection plate (21), and the vertical end section extends from the end of the longitudinal section toward the slope-adhering side of the slope protection plate (21).

4. The anti-slip protection structure for foundation pit slopes in building construction according to claim 2, characterized in that: One end of the locking block (27) corresponds to the rod-shaped sliding member (22) connected to the upper-level slope protection plate (21) to be released. One end of the torsion spring is fixedly connected to the locking block (27), and the other end of the torsion spring is fixedly connected to the secondary driven gear (26).

5. The anti-slip protection structure for foundation pit slopes in building construction according to claim 1, characterized in that: Inside the bottommost set of slope protection plates (21), there is an electrically controlled drive device for releasing the corresponding locking block (27). The output end of the electrically controlled drive device is connected to the locking block (27) in a transmission connection.

6. The anti-slip protection structure for foundation pit slopes in building construction according to claim 2, characterized in that: The output end of the power push rod (34) is connected to a rack (33), which is slidably installed inside the slope protection plate (21). The surface of the arc-shaped cutting plate (31) is provided with teeth that mesh with the rack (33). The interior of the arc-shaped cavity (3) has an arc-shaped guide space that is adapted to the arc-shaped cutting plate (31). The end of the arc-shaped cavity (3) facing the slope side of the slope protection plate (21) is provided with an opening for the arc-shaped cutting plate (31) to extend out. The end of the arc-shaped cutting plate (31) facing the opening is provided with a sharp end for cutting into the soil layer.

7. The anti-slip protection structure for foundation pit slopes in building construction according to claim 6, characterized in that: Each set of slope protection plates (21) is provided with a set of arc-shaped cutting plates (31). The arc-shaped cutting plates (31) on each set of slope protection plates (21) have the same cutting direction relative to the corresponding slope protection plate (21). The surface of the arc-shaped cutting plates (31) is fixedly connected with stiffening plates (32) for reinforcing the arc-shaped cutting plates (31).

8. The anti-slip protection structure for foundation pit slopes in building construction according to claim 1, characterized in that: The slope protection plate (21) is fixedly provided with a first insert (4) and a second insert (41) on opposite sides in the lateral direction. The first insert (4) and the second insert (41) are adapted to each other in shape. The slope protection plates (21) that are adjacent in the lateral direction are connected to each other and limited by the fitting of the first insert (4) and the second insert (41).

9. The method for preventing and protecting the slope of a foundation pit during construction as described in any one of claims 1-8, characterized in that: Includes the following steps: S1. First, place the positioning plate (2) on the top of the foundation pit slope (1), and fix the positioning plate (2) to the top of the slope soil through the anchoring device (201) so that multiple sets of slope protection plates (21) are kept in a stacked and closed state, and the arc-shaped cutting plate (31) is stored in the arc-shaped cavity (3). S2. Then, the electronically controlled drive device drives the corresponding locking block (27) of the bottom slope protection plate (21) to flip and move, releasing the locking of the bottom slope protection plate (21). When the corresponding rod-shaped sliding member (22) passes through, the drive is released, so that the locking block (27) is reset relative to the secondary driven gear (26) under the action of the torsion spring. The unlocked slope protection plate (21) moves downward along the slope surface (1) of the foundation pit. The rod-shaped sliding member (22) slides along the longitudinal section of the L groove (211) of the adjacent slope protection plate (21) and enters the end vertical section to move into place. The swing of the elastic telescopic rod (23) drives the active power gear (24) to rotate. The active power gear (24) drives the secondary driven gear (26) to rotate through the transmission gear (25), so that the locking block (27) releases the limit on the upper slope protection plate (21). S3. Move the upper-level slope protection plate (21) that has been released from the limit downward along the slope surface (1) of the foundation pit, and move the slope protection plate (21) that has been unfolded below together. Release the remaining slope protection plates (21) to be unfolded step by step in the same process to complete the longitudinal unfolding of multiple sets of slope protection plates (21). S4. Connect the adjacent slope protection boards (21) laterally. After the slope protection boards (21) are unfolded and spliced ​​and attached to the slope surface (1) of the foundation pit, start the power push rod (34) to drive the arc-shaped cutting plate (31) to extend along the arc-shaped cavity (3) and cut into the soil layer. After the arc-shaped cutting plate (31) reaches the predetermined extension position, keep the position of the power push rod (34) so ​​that the arc-shaped cutting plate (31) is kept in the soil.