A quick rescue supporting structure for slope collapse and an implementation method thereof

By combining steel pipe piles, retaining walls, and anchor structures, a composite force-bearing system is formed, which solves the problems of weak bearing capacity and long construction time in slope collapse emergency repairs, achieves rapid and safe support, and is carried out in conjunction with the construction of permanent retaining walls, thus reducing costs.

CN123133389APending Publication Date: 2026-11-20POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611275394.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing temporary support methods for slope collapse emergency response have problems such as weak bearing capacity, long construction time, and lack of coordination with permanent retaining wall construction, resulting in poor emergency response timeliness and inability to guarantee the safety of permanent structure construction.

Method used

The design employs a combination of steel pipe piles, retaining plates, anchored structures, and permanent retaining walls to form a composite force-bearing system with bottom embedment and top ties. Combined with the backfill layer after the piles and the continuous transverse connecting beams, a continuous retaining protection surface is quickly constructed and carried out in coordination with the construction of the permanent retaining wall.

Benefits of technology

It enables rapid formation of stable support, improves bearing capacity, avoids lateral deformation of the pile top, ensures the safety of permanent structure construction, reduces material waste, and lowers emergency response costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133389A_ABST
    Figure CN123133389A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of slope engineering and geological disaster rescue, in particular to a kind of slope collapse rapid rescue support structure and its implementation method.The purpose is to provide a kind of slope collapse rescue support structure which is rapid in construction, reasonable in stress and can be reinforced by pulling together at the top, can form stable support system rapidly using existing equipment after collapse occurs, provide safe operation space for removing collapse body, avoid the expansion of collapse disaster.The technical scheme is a kind of slope collapse rapid rescue support structure, characterized by: including baffle arranged in collapse area, a plurality of steel pipe piles arranged in collapse area for fixing baffle, at least one pull anchor structure arranged in rear non-collapsed area, permanent retaining wall arranged in front side of baffle;The implementation method of a kind of slope collapse rapid rescue support structure is characterized by: based on the above-mentioned one kind of slope collapse rapid rescue support structure, its implementation method includes: pile foundation anchoring;Assemble baffle;Construct permanent support;Level site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of slope engineering and geological disaster emergency rescue technology, specifically a rapid emergency support structure for slope collapse and its implementation method. Background Technology

[0002] Localized slope collapses are a common geological hazard during the construction of hydropower, highway, and foundation pit projects. When a slope collapse occurs, temporary support must be implemented immediately for the unstable sections of the slope. This serves two purposes: firstly, to curb the continued expansion of the collapse and avoid the risk of secondary landslides; and secondly, to provide a safe working surface for subsequent removal of the collapsed material and construction of permanent retaining walls.

[0003] Currently, temporary support methods for slope collapse emergency response mainly include slope toe counter-pressure and shotcrete sealing of steel pipe pile support surfaces. However, these methods have significant shortcomings in actual emergency response applications. First, when steel pipe piles are used for support alone, the pile body only relies on the bottom stratum to form a cantilever force system, the overall bearing capacity is weak, and the pile top is prone to large lateral displacement under the action of slope soil pressure, resulting in insufficient support stability. Second, after the steel pipe piles are erected, the process of sealing the soil between the piles is complicated and time-consuming, making it impossible to quickly form a continuous and complete retaining protection surface, resulting in poor emergency response timeliness. Third, the existing temporary support measures are not designed in an integrated manner with the construction of permanent retaining walls. The temporary support system lacks reliable tie-down constraints and often shows significant deformation before the permanent retaining wall is poured and formed, making it difficult to ensure the safety of the entire construction process of the permanent structure.

[0004] Therefore, it is of great significance to develop a rapid emergency support structure for slope collapse and its implementation method to solve the above problems. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings in the above-mentioned background technology and provide a slope collapse emergency support structure that is quick to construct, has reasonable stress distribution, and can be reinforced by top bracing. It can quickly form a stable support system using existing equipment after a collapse occurs, providing a safe working space for clearing the collapsed body and preventing the expansion of the collapse disaster.

[0006] The technical solution of this invention is: A rapid emergency support structure for slope collapse is characterized by comprising: a baffle plate in the collapse area, several steel pipe piles in the collapse area for fixing the baffle plate, at least one anchor structure in the uncollapsed area behind it, and a permanent retaining wall in front of the baffle plate. The anchoring structure includes anchoring steel pipe piles located in the uncollapsed area behind the structure and steel ropes connecting the anchoring steel pipe piles and the steel pipe piles at both ends.

[0007] A backfill layer with piles is provided between the rear side of the baffle and the collapsed debris.

[0008] The top of the steel pipe pile is provided with a continuous transverse connecting beam, which connects all the steel pipe piles into one unit; the steel rope connects all the steel pipe piles through the continuous transverse connecting beam.

[0009] The area behind which there was no collapse was filled with concrete, and the lower end of the anchor steel pipe pile was anchored in the concrete.

[0010] Pine piles were driven into the soil layer below the permanent retaining wall to reinforce the foundation.

[0011] The steel pipe piles are arranged at intervals along the left and right directions in the middle of the collapsed area.

[0012] The baffle is attached to the rear side of the steel pipe pile and is tied to the steel pipe pile.

[0013] A method for implementing a rapid emergency support structure for slope collapse, characterized in that: based on the aforementioned rapid emergency support structure for slope collapse, the implementation method includes: Step 1, Pile Foundation Anchoring: After the collapse occurs, drive several steel pipe piles into the left and right directions in the middle of the collapse area at the designed intervals; erect a continuous transverse connecting beam on the top of each steel pipe pile to connect the steel pipe piles into a whole. Step 2: Assemble the baffle: Install and fix the baffle on the side of the adjacent steel pipe pile facing away from the direction of movement of the collapsed material. The baffle and the steel pipe pile can be fixed with iron wire. Connect the two ends of the steel rope to the top of the steel pipe pile and the anchor steel pipe pile respectively. Apply pre-tension to the steel rope and maintain it with a tensioner. Backfill the gap between the back side of the baffle and the collapsed area with filler and compact it to form a backfill layer after the pile. Step 3: Construct permanent support: Clear the excavation and remove the collapsed debris in front of the retaining wall, and excavate to the stable soil layer; construct a permanent retaining wall, drive pine piles into the stable foundation surface (11) below the permanent retaining wall for reinforcement, and build the permanent wall in layers with reinforced gabions and fill them with stone chips to form a trapezoidal reinforced gabion retaining wall; pour a concrete bonding layer between adjacent reinforced gabions to form a permeable gravity retaining wall, and cyclically construct until the retaining wall is at the design elevation; Step 4: Site leveling: Final demolition and restoration. After the permanent retaining wall reaches the design strength, remove the anchor structure, cut off the exposed section of the steel pipe pile, and pour the site restoration structure to level the site.

[0014] In step one, concrete slab is first poured in the uncollapsed area behind the steel pipe pile; then the lower end of the anchor steel pipe pile is anchored in the concrete slab to improve the anchoring effect.

[0015] The beneficial effects of this invention are: 1. The present invention provides an anchor structure at the top of the steel pipe pile, which makes the steel pipe pile form a composite force system with bottom embedment and top connection, changing the traditional force form of pure cantilever steel pipe pile, greatly improving the overall support bearing capacity, effectively suppressing the lateral deformation of the pile top, and avoiding slope instability.

[0016] 2. The complete temporary support system of the present invention is composed of steel pipe piles, retaining plates, and backfill layers after piles. The component assembly process is simple and the on-site operation is convenient. It can quickly form a continuous retaining protection surface after a collapse occurs, meeting the working conditions requirements for rapid handling of geological disasters.

[0017] 3. The temporary support system of the present invention independently forms a safety protection barrier, under which the clearing of landslide debris and construction of permanent retaining walls can be carried out. The construction processes of temporary support and permanent retaining walls do not interfere with each other, solving the problems of premature deformation of traditional support and inability to guarantee the safety of permanent structure construction.

[0018] 4. The steel pipe piles, baffles, and steel ropes used in this invention are all conventional and commonly used building materials in civil engineering. There is no need to customize special components. The difficulty of material procurement and on-site processing is low, and it is suitable for various construction site emergency rescue and on-site material needs.

[0019] 5. After the permanent retaining wall of the present invention is completed, the top anchoring structure and steel pipe piles can be dismantled, recycled and reused, reducing the investment in one-time consumables and lowering the overall cost of emergency response to slope collapse. Attached Figure Description

[0020] Figure 1 This is one of the schematic diagrams illustrating the working principle of the present invention (pile foundation anchorage).

[0021] Figure 2 This is the second schematic diagram of the working principle of the present invention (assembling the baffle and constructing permanent support).

[0022] Figure 3 This is the third schematic diagram of the working principle of the present invention (leveling the site).

[0023] Figure label: 1. Slope line of the non-collapsed area; 2. Original slope line of the collapsed area; 3. Collapsed debris; 4. Bottom sliding surface of the collapsed area; 5. Ground concrete; 6. Steel pipe piles; 7. Anchored steel pipe piles; 8. Steel ropes; 9. Baffles; 10. Backfill layer after piles; 11. Stabilized foundation surface; 12. Pine piles; 13. Permanent retaining wall; 14. Site restoration structure. Detailed Implementation

[0024] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments.

[0025] like Figure 1 As shown, the left and right directions in the figure are defined as the back-forward direction, and the direction perpendicular to the plane of the figure is defined as the left and right direction.

[0026] as Figures 1-3 shown, a rapid emergency support structure for slope collapse includes a baffle 9, steel pipe piles 6, an anchor pulling structure, and a permanent retaining wall 13. The baffle, steel pipe piles and anchor pulling structure are temporary support parts of this complete set of support structures, which can independently form a safety protection barrier. The pouring construction of the permanent retaining wall matching this complete set of support structure is completed in the space protected by them, so as to realize the collaborative protection combining permanent and temporary support.

[0027] as Figure 1 shown, the collapse deposits 3 in the collapse area move downward along the slope, the original slope line 2 of the collapse area is higher than the height of the collapse deposits, and the original slope line 1 of the non-collapsed area is lower than the height of the collapse deposits. The temporary support system shall be arranged in the area of the bottom sliding surface 4 of the collapse area to prevent new collapse deposits from sliding downwards.

[0028] A plurality of steel pipe piles are arranged at intervals in the left-right direction along the middle of the collapse area (i.e. Figure 1 within the range of the original slope line 2 of the collapse area in the figure), the bottom of each steel pipe pile is embedded into the stable stratum below the collapse sliding surface, and the top of the pile is 20cm to 50cm higher than the ground surface; baffles are arranged between adjacent steel pipe piles, the baffles are made of wood boards or bamboo rows, and are tied and fixed on the rear side of the steel pipe piles (the side facing away from the moving direction of the collapse deposits) with iron wires. A plurality of baffles are continuously spliced to form a complete closed soil retaining surface for blocking the collapsed soil from slipping outwards.

[0029] There is a gap between the rear side of the baffle and the collapse deposits, and the gap is backfilled with gravel, cobblestones or plain soil and slightly compacted to form a pile-back backfill layer 10. The backfill layer is attached to the baffle and the steel pipe piles as a whole, which further restricts the deformation and expansion of the collapse mass.

[0030] A full-length transverse connecting beam is erected on the tops of all the steel pipe piles. The full-length transverse connecting beam is made of channel steel or on-site welded steel bars, which rigidly connects the tops of all the steel pipe piles into a whole, bears the anchor pulling tension uniformly, and reduces the number of arranged steel pipe piles.

[0031] A plurality of anchor pulling steel pipe piles 7 are anchored in the non-collapsed and soil-stable area behind the pile-back backfill layer 10; the anchor pulling structure includes the anchor pulling steel pipe piles 7 and steel ropes 8. One end of the steel rope is bound and fixed on the transverse connecting beam at the top of the steel pipe pile, and the other end is anchored to the anchor pulling steel pipe pile. After the steel rope is tensioned, a pre-tension is applied, so that the steel pipe piles form a composite stress system with embedded bottom and tied top; the steel rope is tightened by a tensioning jack, and the pre-tension is locked with a matched cable tightener. During construction, the inward deformation of the top of the steel pipe pile is controlled to be 5cm.

[0032] In order to improve the anchor pulling effect, the floor concrete 5 can be poured in the non-collapsed and soil-stable area behind the pile-back backfill layer 10 first, and then the anchor pulling steel pipe piles 7 are anchored inside the floor concrete; in this way, the strength of the concrete can be used to further improve the anchor pulling effect.

[0033] The working face is between the steel pipe piles and the slope line 1 of the non-collapsed area. After the working face is excavated to the stable foundation surface 11, a permanent retaining wall is constructed. Multiple pine piles 12 are vertically driven into the soil layer at the base of the permanent retaining wall. The pine piles can compact the soft soil at the base, drain groundwater, improve the bearing capacity of the foundation, and prevent the permanent retaining wall from sliding and settling. The permanent retaining wall is a trapezoidal reinforced gabion gravity retaining wall. Reinforced gabions are erected in layers and filled with stone chips. One to two layers of stone chips are laid between two adjacent layers of reinforced gabions, and then a fluid concrete bonding layer is poured to make the wall permeable.

[0034] The implementation method of the present invention is as follows: Step 1, Pile Foundation Anchoring: After the collapse occurs, drive several steel pipe piles into the left and right directions in the middle of the collapsed area at the designed intervals (if necessary, first pour the ground concrete in the uncollapsed area behind the steel pipe piles, and then anchor the lower end of the anchor steel pipe piles into the ground concrete); erect a continuous transverse connecting beam on the top of each steel pipe pile to connect the steel pipe piles into a whole. Step 2: Assemble the baffle: Install and fix the baffle on the back side of the adjacent steel pipe pile (the side facing away from the direction of movement of the collapsed material). The baffle and the steel pipe pile can be fixed with iron wire. Connect the two ends of the steel rope to the top of the steel pipe pile and the anchor steel pipe pile respectively. Apply pre-tension to the steel rope and maintain it with a tensioner. Backfill the gap between the back side of the baffle and the collapsed area with filler and compact it to form a backfill layer after the pile. Step 3: Construct permanent support: Clear and excavate, remove the collapsed debris in front of the retaining wall, and excavate to the stable soil layer; construct a permanent retaining wall, drive pine piles into the stable foundation surface 11 below the permanent retaining wall for reinforcement, the permanent wall is constructed by layering reinforced gabions and filling them with stone chips to form a trapezoidal reinforced gabion retaining wall; pour a concrete bonding layer between adjacent reinforced gabions to form a permeable gravity retaining wall, and cyclically construct until the retaining wall reaches the design elevation; Step 4: Site leveling: Finishing up the demolition and restoration. After the permanent retaining wall reaches the design strength, remove the anchor structure, cut off the exposed section of the steel pipe pile, and pour the site restoration structure 14 to level the site.

Claims

1. A rapid emergency support structure for slope collapse, characterized in that: Includes a baffle (9) in the collapsed area, several steel pipe piles (6) in the collapsed area for fixing the baffle, at least one anchor structure in the non-collapsed area behind, and a permanent retaining wall (13) in front of the baffle. The anchoring structure includes anchoring steel pipe piles (7) located in the uncollapsed area behind the anchoring steel pipe piles and steel pipe piles at both ends (8).

2. The rapid emergency support structure for slope collapse according to claim 1, characterized in that: A backfill layer (10) is provided between the rear side of the baffle and the collapsed debris (3).

3. The rapid emergency support structure for slope collapse according to claim 2, characterized in that: The top of the steel pipe pile is provided with a continuous transverse connecting beam, which connects all the steel pipe piles into one unit; the steel rope connects all the steel pipe piles through the continuous transverse connecting beam.

4. The rapid emergency support structure for slope collapse according to claim 3, characterized in that: The area behind which there is no collapse is filled with concrete (5), and the lower end of the anchor steel pipe pile (7) is anchored in the concrete.

5. The rapid emergency support structure for slope collapse according to claim 4, characterized in that: Pine piles (12) were driven into the soil layer below the permanent retaining wall to reinforce the foundation.

6. The rapid emergency support structure for slope collapse according to claim 5, characterized in that: The steel pipe piles are arranged at intervals along the left and right directions in the middle of the collapsed area.

7. The rapid emergency support structure for slope collapse according to claim 6, characterized in that: The baffle (9) is attached to the rear side of the steel pipe pile and is tied to the steel pipe pile.

8. A method for implementing a rapid emergency support structure for slope collapse, characterized in that: The method of implementing the rapid emergency support structure for slope collapse based on any one of claims 1 to 5 includes: Step 1, Pile Foundation Anchoring: After the collapse occurs, drive several steel pipe piles into the left and right directions in the middle of the collapse area at the designed intervals; erect a continuous transverse connecting beam on the top of each steel pipe pile to connect the steel pipe piles into a whole. Step 2: Assemble the baffle: Install and fix the baffle on the side of the adjacent steel pipe pile facing away from the direction of movement of the collapsed material. The baffle and the steel pipe pile are fixed with iron wire. Connect the two ends of the steel rope to the top of the steel pipe pile and the anchor steel pipe pile respectively. Apply pre-tension to the steel rope and maintain it with a tensioner. Backfill the gap between the back side of the baffle and the collapsed area with filler and compact it to form a backfill layer after the pile. Step 3: Construct permanent support: Clear the excavation and remove the collapsed debris in front of the retaining wall, and excavate to the stable soil layer; construct a permanent retaining wall, drive pine piles into the stable foundation surface (11) below the permanent retaining wall for reinforcement, and build the permanent wall in layers with reinforced gabions and fill them with stone chips to form a trapezoidal reinforced gabion retaining wall; pour a concrete bonding layer between adjacent reinforced gabions to form a permeable gravity retaining wall, and cyclically construct until the retaining wall is at the design elevation; Step 4: Leveling the site: Finishing up the demolition and restoration. After the permanent retaining wall reaches the design strength, remove the anchor structure, cut off the exposed steel pipe piles, and pour the site restoration structure (14) to level the site.

9. The implementation method of a rapid emergency support structure for slope collapse according to claim 8, characterized in that: In step one, concrete slab (5) is first poured in the uncollapsed area behind the steel pipe pile; then the lower end of the anchored steel pipe pile (7) is anchored in the concrete slab to improve the anchoring effect.