Anti-slide pile for landslide treatment
By arranging drive components and multi-level protective structures on the outside of the anti-slide pile, fully automated dredging operations of the anti-slide pile are realized, solving the problems of high maintenance difficulty and easy equipment damage caused by dredging equipment being arranged inside the pile in the existing technology, and ensuring the long-term stable operation of the anti-slide pile.
Patent Information
- Application Number
- CN202611579202.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-20
AI Technical Summary
The existing dredging equipment for anti-slide piles used in landslide control is located inside the pile body, which makes troubleshooting difficult, maintenance costs high, and it is susceptible to underground moisture and silt, making it difficult to operate stably for a long time.
The drive components and drive source are arranged on the outside of the anti-sliding pile body. The mechanical linkage is used to realize the fully automatic sludge removal operation of the tapered pipe and the liquid storage tank. Combined with the design of multi-level protection structure and spiral blade, the sludge in the pipeline is cleaned up synchronously.
It reduces the difficulty and cost of equipment maintenance, extends service life, ensures the stable operation of the drainage system, and avoids the problems of blockage and difficulty in diagnosing faults in deeply buried structures.
Smart Images

Figure CN123133397A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building technology, and more specifically, to an anti-slide pile for landslide control. Background Technology
[0002] Landslides are one of the most frequent geological hazards in mountainous highway, railway, water conservancy, slope foundation pit, and mountain management projects. They are characterized by their suddenness, destructive power, and high difficulty in management. They not only damage engineering infrastructure and block transportation and waterways, but can also cause casualties and significant economic losses in severe cases. In existing landslide management systems, anti-slide piles, with their advantages of high overall rigidity, strong anti-slide bearing capacity, wide construction adaptability, and stable support effect, have become the core support structure for slope reinforcement, landslide confinement, and soil stabilization, and are widely used in various geotechnical slope management projects.
[0003] In geotechnical engineering scenarios such as infrastructure excavation in mountainous areas, open-pit mining, and water conservancy project construction, slopes are exposed to the elements, soil disturbance is severe, rainfall infiltration conditions are excellent, and groundwater enrichment is significantly higher than under normal working conditions. The risk of slope landslide instability is highly concentrated within the construction period. The high-risk active period for this type of slope is usually 2 to 6 years, which is a typical mid-term service slope condition. After the main project is completed, the site is backfilled and compacted, the mine is closed and reclaimed, or the slope support system is formed, the original unloading conditions disappear, the surface runoff path is reconstructed, the soil stress of the slope gradually redistributes and tends to stabilize, the overall landslide risk is greatly reduced, and the slope changes from a high-risk active state to a long-term stable state.
[0004] Existing anti-slide piles for landslide control employ a deeply buried, built-in installation structure for their internal drainage and dredging drive components and power sources. This means the entire drive system is integrated and installed inside the pile body. While this traditional method can initially achieve the dredging and drainage functions of the internal pipes and liquid storage structures, the drive structure's placement inside the pile makes it difficult for staff to visually locate faults in case of equipment failure, component wear, or pipe blockage. This significantly increases the difficulty of overall maintenance, and the disassembly and replacement of parts are cumbersome, substantially increasing the manpower and time costs of equipment operation and maintenance, severely impacting the normal operation of the anti-slide pile drainage and protection system. Therefore, this paper proposes an anti-slide pile for landslide control. Summary of the Invention
[0005] The purpose of this invention is to provide an anti-slide pile for landslide control, which solves the technical problem of the difficulty in maintaining dredging equipment placed inside the pile shaft in the prior art.
[0006] This invention provides an anti-slide pile for landslide control, including a pile body, a vertical shaft formed in the pile body, a liquid storage cylinder installed at the bottom of the vertical shaft, a plurality of converging pipes installed on the liquid storage cylinder, and a plurality of drainage holes opened in the upper region of the converging pipes. The back sliding side of the pile body is pre-embedded with a support pipe connected to the liquid storage cylinder. The support pipe passes through the soil layer and a conveyor is installed inside the support pipe. The drive assembly has its output end connected to the conveyor, and the inlet of the conveyor is connected to the storage tank. The drive assembly drives the conveyor to extend into the storage tank to drain the mud, sand and water inside the storage tank.
[0007] As a further description of the above technical solution, the axis of the tapered tube is parallel to the horizontal plane, the inner diameter of the end of the tapered tube away from the liquid storage cylinder is smaller than the inner diameter of the end closer to the liquid storage cylinder, and a drain pipe connected to the inside of the liquid storage cylinder is installed on the tapered tube, and several drain pipes are inclined to the same side inside the liquid storage cylinder.
[0008] As a further description of the above technical solution, a support net is installed on the outside of the tapering pipe, and geotextile is wrapped around the outside of the support net. The geotextile covers the drainage hole, and a layer of crushed stone is laid on the outside of the geotextile and the sliding side of the pile.
[0009] As a further description of the above technical solution, the conveyor includes a conveying cylinder and a spiral blade. The conveying cylinder slides inside the support tube. Second bearings are installed at both ends of the spiral blade. The bushing of one second bearing is slidably connected to the liquid storage cylinder, and the other second bearing is rotatably installed on the drive assembly. The spiral blade is connected to the drive source.
[0010] As a further description of the above technical solution, the outer diameter of the spiral blade is smaller than the inner diameter of the conveying cylinder, and the spiral blade extends into the liquid storage cylinder; a baffle is installed on the back side of the conveying cylinder, and there is a gap between the bottom of the baffle and the bottom of the liquid storage cylinder.
[0011] As a further description of the above technical solution, the drive assembly includes a first telescopic cylinder installed in the drive box, a fixed frame fixedly installed on the conveying cylinder and connected to the output end of the first telescopic cylinder, the fixed frame being slidably connected to the drive box, a second telescopic cylinder installed on the fixed frame, the output end of the second telescopic cylinder being connected to a sliding box, the sliding box being slidably connected to the drive box, and a drive source installed in the sliding box.
[0012] As a further description of the above technical solution, an adjusting plate is rotatably installed inside the liquid storage cylinder, and a second adjusting hole is provided on the adjusting plate; A support frame is installed on the conveying cylinder, and a top rod is installed on the support frame. The top rod slides within the second adjustment hole.
[0013] As a further description of the above technical solution, a support shaft is installed inside the tapered tube, and several scrapers are installed on the support shaft. The height of the scrapers gradually increases as the inner diameter of the tapered tube increases. An adjustment groove is provided on the support shaft, and an adjustment rod is rotatably installed on the support shaft. The adjustment rod slides along the axial direction of the support shaft inside the liquid storage cylinder. The adjustment plate is inclined and has several first adjustment holes, and the adjustment rod slides in the first adjustment holes.
[0014] As a further description of the above technical solution, two adjacent scrapers are staggered in the axial direction, and two adjacent scrapers have a set deflection angle in the circumferential direction. Both ends of the support shaft are equipped with first bearings, and the first bearings slide axially in the converging tube through the support ring.
[0015] As a further description of the above technical solution, a connecting frame is rotatably mounted on the connecting shaft of the spiral blade. The connecting frame is slidably connected to the liquid storage cylinder. A first lever is mounted on the connecting frame, and two sets of second levers are slidably mounted on the connecting frame. The first lever and the second lever slide in corresponding adjustment grooves.
[0016] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0017] 1. This invention arranges the entire drive assembly and drive source on the outside of the anti-slide pile body. Through telescopic drive and mechanical linkage, it achieves fully automated dredging of the internal converging pipe and liquid storage cylinder within the pile body. This design differs from traditional deeply buried, internally installed drive structures, completely avoiding the problems of moisture corrosion, silt buildup and jamming, and difficulty in troubleshooting associated with deeply buried drive components. The external drive structure is completely isolated from the slope soil and water accumulation environment, ensuring stable operation and minimizing the impact of external factors such as underground moisture, silt, and soil compression, effectively extending the service life of the drive equipment. Simultaneously, the external deployment allows for intuitive equipment inspection, rapid fault diagnosis, and convenient component replacement, significantly reducing the maintenance and dredging costs of the internal drainage structure of the anti-slide pile. It effectively avoids the drawbacks of long-term deeply buried structures, such as easy clogging and difficult maintenance, ensuring the long-term stable drainage and protection function of the anti-slide pile.
[0018] 2. This invention features a multi-level protective structure on the slope side of the anti-slide pile, consisting of a soil layer, a gravel layer, geotextile, and a support net. The geotextile fully covers the tapered drainage holes, precisely preventing fine soil particles from seeping into the drainage pipes, allowing only normal water infiltration and discharge, thus reducing sediment entry into the drainage system at the source. The outer gravel layer effectively stabilizes the slope structure, buffers the compressive force of the soil layer, prevents the drainage holes and geotextile from being blocked by soil pressure, and simultaneously guides slope seepage, ensuring smooth flow of water into the tapered pipes. This comprehensive protection of the internal drainage and dredging structure extends the service life of the entire anti-slide pile drainage system.
[0019] 3. During the conveyor's advancement, the converging tube cleaning mechanism can be triggered simultaneously. The spiral blades precisely extend into the sludge accumulation area of the storage cylinder, actively transporting the sludge and water to the outside of the pile body, achieving simultaneous and thorough cleaning of the sludge in the pipeline and cylinder without the need for step-by-step manual intervention, making the dredging process continuous and efficient. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the overall structure of the anti-slide pile disclosed in a preferred embodiment of the present invention;
[0021] Figure 2 The anti-slide pile disclosed in a preferred embodiment of the present invention Figure 1 Enlarged view of point A in the middle;
[0022] Figure 3 This is a schematic diagram of the drainage pipe distribution of the anti-slide pile according to a preferred embodiment of the present invention;
[0023] Figure 4 This is a schematic diagram of the distribution of adjustment holes in an anti-slide pile according to a preferred embodiment of the present invention;
[0024] Figure 5 This is a schematic diagram of the tapered tube distribution of an anti-slide pile according to a preferred embodiment of the present invention;
[0025] Figure 6 This is a schematic diagram of the tapered tube structure of an anti-slide pile disclosed in a preferred embodiment of the present invention;
[0026] Figure 7 The anti-slide pile disclosed in a preferred embodiment of the present invention Figure 6 Enlarged view at point B in the middle;
[0027] Figure 8 This is a schematic diagram of the scraper connection structure of the anti-slide pile disclosed in a preferred embodiment of the present invention;
[0028] Figure 9 This is a schematic diagram of the scraper distribution of an anti-slide pile according to a preferred embodiment of the present invention;
[0029] Figure 10 The anti-slide pile disclosed in a preferred embodiment of the present invention Figure 1 Enlarged view at point C;
[0030] Figure 11 This is a schematic diagram of the anti-slide pile casting process according to a preferred embodiment of the present invention;
[0031] Figure 12 The anti-slide pile disclosed in a preferred embodiment of the present invention Figure 1 Enlarged view of point D in the middle.
[0032] The following are the labeling symbols in the diagram: 1. Pile body; 11. Enlarged head; 12. Reinforcing cage; 13. Shaft; 2. Liquid storage tank; 21. Adjusting plate; 22. Second adjusting hole; 23. Guide column; 24. Guide rod; 25. First adjusting hole; 3. Converging pipe; 31. Drain hole; 32. Drain pipe; 33. Support shaft; 34. Scraper; 35. First bearing; 36. Support ring; 37. Adjusting groove; 38. Adjusting rod; 4. Crushed stone layer; 41. Soil layer; 5. Support pipe; 6. Conveying cylinder; 61. Spiral blade; 62. Second bearing; 64. Baffle; 65. Guide plate; 66. Support frame; 67. Top rod; 68. Drive source; 69. Connecting frame; 610. First lever; 611. Second lever; 7. Drive assembly; 71. First telescopic cylinder; 72. Fixing frame; 73. Second telescopic cylinder; 74. Sliding box. Detailed Implementation
[0033] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0034] Reference Figures 1 to 12 This embodiment discloses an anti-slide pile for landslide control, including a pile body 1, which is cast in shape. The bottom of the pile body 1 is integrally cast with an enlarged head 11. A steel cage 12 is provided inside the pile body 1. The pile body 1 is formed with a vertical shaft 13. A liquid storage cylinder 2 is fixedly installed at the bottom of the vertical shaft 13. The liquid storage cylinder 2 is fixedly connected to the steel cage 12 through a steel reinforcement frame. The steel reinforcement frame is pre-embedded in the pile body 1.
[0035] Reference Figures 2 to 4 The bottom of the storage cylinder 2 is lower in the middle and higher on both sides, allowing sediment to accumulate towards the center. An adjusting plate 21 is rotatably installed inside the storage cylinder 2. The adjusting plate 21 has several first adjusting holes 25, each at an angle to the diameter of the adjusting plate 21. In this embodiment, three sets are provided. The adjusting plate 21 also has second adjusting holes 22. Guide columns 23 and guide rods 24 are fixedly installed inside the storage cylinder 2. Several tapered tubes 3 are fixedly installed on the storage cylinder 2; in this embodiment, three sets of tapered tubes 3 are provided.
[0036] Reference Figures 5 to 10The axis of the converging tube 3 is set parallel to the horizontal plane. The inner diameter of the end of the converging tube 3 away from the liquid storage cylinder 2 is smaller than the inner diameter of the end closer to the liquid storage cylinder 2. Several drainage holes 31 are opened in the upper area of the converging tube 3. A drainage pipe 32 connected to the inside of the liquid storage cylinder 2 is installed on the converging tube 3. The three sets of drainage pipes 32 are inclined to the same side inside the liquid storage cylinder 2. Therefore, the water discharged by the drainage pipe 32 can rotate inside the liquid storage cylinder 2, thereby agitating the mud and sand in the water, assisting in the discharge of mud and sand, and preventing mud and sand from accumulating at the bottom of the liquid storage cylinder 2.
[0037] A support shaft 33 is installed inside the converging tube 3. Several scrapers 34 are fixedly mounted on the support shaft 33. As the inner diameter of the converging tube 3 increases, the height of the scrapers 34 gradually increases. Adjacent scrapers 34 are staggered in the axial direction, i.e., they have a certain overlap stroke, ensuring that there are no dead corners when the scrapers 34 clean the inner wall of the converging tube 3. Adjacent scrapers 34 have a set deflection angle in the circumferential direction to avoid an excessive number of scrapers 34 in the same row, which would affect the drainage of accumulated water. First bearings 35 are installed at both ends of the support shaft 33. The first bearings 35 must have high wear resistance. The bushings of the first bearings 35 are fixed on the support ring 36, which slides axially inside the converging tube 3. During drainage operations, the scraper 34 does not contact the inner wall of the converging pipe 3, thus maintaining a certain unobstructed area at the bottom of the converging pipe 3 to ensure a stable outflow of silt. When cleaning is required, the support shaft 33 is pushed towards the smaller inner diameter end of the converging pipe 3, causing the scraper 34 to come into contact with the inner wall of the converging pipe 3. Rotating the support shaft 33 cleans the inner wall of the converging pipe 3. It should be noted that a flow monitoring instrument can be installed at the outlet of the drain pipe 32 of the converging pipe 3 to detect the drainage volume. When the drainage volume reaches a set value, the scraper 34 can be controlled to perform cleaning operations, allowing the scraped silt to be discharged with the accumulated water. Alternatively, an external water inlet pipe can be connected to the converging pipe 3 for auxiliary cleaning by actively supplying water from the outside.
[0038] Reference Figure 4 and Figure 7 An adjustment groove 37 is provided on the support shaft 33. The adjustment groove 37 has a certain deflection angle in the circumferential direction. An adjustment rod 38 is rotatably installed on the support shaft 33. The adjustment rod 38 is slidably connected to the guide rod 24. The guide rod 24 is parallel to the axis of the corresponding support shaft 33. The adjustment rod 38 slides in the first adjustment hole 25.
[0039] Reference Figure 11A support net is installed on the outside of the tapered pipe 3, and geotextile is wrapped around the outside of the support net. The geotextile must cover the drainage hole 31 and its surface must be wrinkle-free. Crushed stone layer 4 is laid on the outside of the geotextile and on the sliding side of the pile body 1. Soil layer 41 is laid on the outside of the crushed stone layer 4. After the pile hole is formed, the steel cage 12 is laid and the liquid storage cylinder 2 is fixed. The tapered pipe 3 is placed and fixed by laterally drilling the hole. Then, the crushed stone layer 4 around the tapered pipe 3 is backfilled. The support pipe 5 on the back sliding side of the pile body 1 is installed. When there is a soil layer 41 on the back sliding side, the support pipe 5 must penetrate the soil layer 41. The support pipe 5 is connected to the inside of the liquid storage cylinder 2. Then, the pile body 1 is poured and the crushed stone layer 4 on the sliding side of the pile body 1 is backfilled.
[0040] Reference Figure 1 , Figure 2 , Figure 4 and Figure 12 A conveyor is installed inside the support pipe 5. The conveyor includes a conveying cylinder 6 and a spiral blade 61. The conveying cylinder 6 slides inside the support pipe 5. Second bearings 62 are installed at both ends of the connecting shaft of the spiral blade 61. An adjusting ring is fixedly installed on the bushing of one of the second bearings 62. The second bearing 62 slides inside the liquid storage cylinder 2 through the adjusting ring. The other second bearing 62 is rotatably installed on the drive assembly 7. The outer diameter of the spiral blade 61 is smaller than the inner diameter of the conveying cylinder 6, so that the mud and sand are automatically guided out from the bottom of the inner side of the conveying cylinder 6. The spiral blade 61 extends into the liquid storage cylinder 2 and is located in the lower middle area of the liquid storage cylinder 2.
[0041] Reference Figure 3 and Figure 4 A baffle 64 is fixedly installed on the conveying cylinder 6, and the baffle 64 is installed on the back water side of the spiral blade 61 to block the agitated water and allow the water to quickly enter the conveying cylinder 6. There is a certain gap between the bottom of the baffle 64 and the bottom of the storage cylinder 2, so that the water flow can pass through the gap between the two, thereby impacting the sediment deposited at the bottom of the storage cylinder 2 and further improving the sediment drainage effect. Several guide plates 65 are fixedly installed on the baffle 64 for guiding the water flow. A support frame 66 is fixedly installed on the conveying cylinder 6, and a top rod 67 is fixedly installed on the support frame 66. The top rod 67 slides in the second adjustment hole 22. When the conveying cylinder 6 moves the top rod 67 via the support frame 66, the top rod 67 slides in the second adjustment hole 22, thereby driving the adjustment plate 21 to rotate. The rotating adjustment plate 21 can force the adjustment rod 38 to move circumferentially along the support shaft 33 through the first adjustment hole 25, thereby causing the scraper 34 on the support shaft 33 to move towards the small diameter end of the tapered tube 3, so that the scraper 34 fits against the inner wall of the tapered tube 3, preparing for subsequent cleaning of mud and sand.
[0042] The end of the spiral blade 61 away from the liquid storage tank 2 is connected to the drive source 68. The drive source 68 can drive the spiral blade 61 to rotate, thereby actively cleaning the mud and sand at the bottom of the liquid storage tank 2 and conveying the accumulated water and mud and sand out of the conveying tank 6.
[0043] Reference Figure 4 and Figure 7 A connecting frame 69 is rotatably mounted on the connecting shaft of the helical blade 61. The connecting frame 69 is slidably connected to the guide post 23. A first lever 610 is fixedly mounted on the connecting frame 69, and two sets of second levers 611 are slidably mounted on the connecting frame 69. The first lever 610 and the second lever 611 slide within corresponding adjustment grooves 37. When the connecting shaft of the helical blade 61 moves axially, the connecting frame 69 drives the first lever 610 and the second lever 611 to move synchronously. The second lever 611 slides on the connecting frame 69, and the lever slides within the corresponding adjustment grooves 37, forcing the support shaft 33 to rotate, thereby enabling the scraper 34 on the support shaft 33 to clean the inner wall of the tapered tube 3.
[0044] Reference Figure 12 The anti-slide pile also includes a drive assembly 7, which is installed on the outside of the pile body 1. The drive assembly 7 includes a first telescopic cylinder 71 installed in the drive box. The output end of the first telescopic cylinder 71 is fixedly connected to a fixed frame 72. The fixed frame 72 is fixedly connected to the conveying cylinder 6 and slidably connected to the drive box. A second telescopic cylinder 73 is fixedly installed on the fixed frame 72. The output end of the second telescopic cylinder 73 is fixedly connected to a sliding box 74. The sliding box 74 is slidably connected to the drive box. The drive source 68 is installed in the sliding box 74. A second bearing 62 of the spiral blade 61 is installed on the sliding box 74. When the output end of the first telescopic cylinder 71 moves, it can drive the fixed frame 72, the second telescopic cylinder 73, and the sliding box 74 to move, thereby driving the entire conveyor to slide within the support pipe 5. When the output end of the second telescopic cylinder 73 moves, it drives the spiral blade 61 to move within the conveying cylinder 6 via the sliding box 74. When the entire conveyor moves into the storage cylinder 2, it can drive the scraper 34 to contact the inner wall of the converging pipe 3 through the transmission of the support frame 66 and the top rod 67. When the spiral blade 61 moves into the storage cylinder 2, it can control the rotation of the support shaft 33 and the scraper 34 via the adjusting rod 38 to clean the inner wall of the converging pipe 3. Therefore, this embodiment can clean the converging pipe 3 and the storage cylinder 2 inside the anti-slip pile by setting a driving component on the outside of the anti-slip pile, significantly reducing the maintenance difficulty inside the anti-slip pile and reducing the risk of blockage in the converging pipe 3 and the storage cylinder 2. It should be noted that a liquid level sensor can be installed in the vertical shaft 13 to detect the water level in the storage cylinder 2.
[0045] During use, the seepage water on the slope passes sequentially through the soil layer 41, the gravel layer 4, the geotextile and the support net on the sliding side of the pile body 1, and then flows into the interior of the converging pipe 3 through several drainage holes 31 at the top of the converging pipe 3. The geotextile fully covers the drainage holes 31, which can effectively prevent a large amount of fine soil particles from seeping in, allowing only normal water infiltration. The gravel layer 4 plays a role in stabilizing the slope, guiding seepage water, and protecting the geotextile and drainage holes 31 from being squeezed and blocked by the soil layer 41.
[0046] The accumulated water flowing into the converging pipe 3 is rapidly guided towards the storage tank 2. The inclined drain pipe 32 continuously guides the water from the converging pipe 3 into the storage tank 2. Because all three drain pipes 32 are inclined to the same side of the storage tank 2, the introduced water forms a rotating flow inside the storage tank 2, continuously agitating the water and sediment at the bottom of the storage tank 2. Combined with the bottom structure of the storage tank 2, which is low in the middle and high on both sides, the sediment carried by the seepage water continuously accumulates in the low-lying area in the middle of the storage tank 2, effectively preventing the sediment from spreading and accumulating, and blocking the bottom of the storage tank 2, ensuring unobstructed drainage. During this process, the scraper 34 inside the converging pipe 3 does not contact the inner wall, and the water entering the storage tank 2 is transported out of the pile body 1 through the conveying pipe 6.
[0047] When the level sensor detects an abnormal rise in the water level of the storage tank 2, or the flow monitor detects that the drainage volume has dropped to a set threshold, it is determined that silt has accumulated inside the storage tank 2 and the converging pipe 3, and the drainage channel is blocked, and the silt removal operation is initiated. First, the first telescopic cylinder 71 of the drive assembly 7 on the outside of the pile body 1 is activated. The output end of the first telescopic cylinder 71 drives the fixed frame 72, the second telescopic cylinder 73 and the sliding box 74 to move towards the storage tank 2 as a whole. At the same time, the conveyor installed on the sliding box 74 slides along the axis of the support pipe 5 and is pushed into the storage tank 2.
[0048] During the movement of the conveyor, the top rod 67 on the outer support frame 66 of the conveying cylinder 6 moves synchronously with the support frame 66. The top rod 67 is engaged in the second adjustment hole 22 of the adjustment plate 21 and slides along the hole, thereby driving the adjustment plate 21 inside the liquid storage cylinder 2 to rotate.
[0049] During the rotation process, the adjusting plate 21 pushes the adjusting rod 38 to move through the first adjusting hole 25, which drives the support shaft 33 inside the tapered tube 3 to slide axially toward the small inner diameter end of the tapered tube 3, so that several scrapers 34 on the support shaft 33 gradually come into close contact with the inner wall of the tapered tube 3. Since the height of the scraper 34 gradually increases with the increase of the inner diameter of the tapered tube 3, and the adjacent scrapers 34 are axially staggered and overlapped and circumferentially set with a set deflection angle, they can fully cover the inner wall of the tapered tube 3 after contact, without cleaning dead corners and without the problem of dense clogging of scrapers 34 affecting drainage, thus completing the preparatory work for cleaning the inner wall of the tapered tube 3.
[0050] After the scraper 34 is positioned and attached, the second telescopic cylinder 73 of the drive assembly 7 is activated. The output end of the second telescopic cylinder 73 pushes the sliding box 74 to slide relative to the fixed frame 72, which drives the drive source 68 and the spiral blade 61 to advance along the inside of the conveying cylinder 6 into the low-lying area in the middle of the liquid storage cylinder 2, so that the spiral blade 61 extends into the sludge accumulation area of the liquid storage cylinder 2.
[0051] During the advancement of the spiral blade 61, the connecting frame 69 on its connecting shaft moves axially along the guide column 23, driving the first lever 610 and two sets of second levers 611 on the connecting frame 69 to move synchronously. The second levers 611 slide relative to the connecting frame 69, and each set of levers is respectively engaged in the adjustment groove 37 of the support shaft 33 and slides along the groove. Through the limiting and squeezing of the groove structure, the support shaft 33 and the external scraper 34 are forced to rotate as a whole, which comprehensively scrapes and cleans the stubborn mud and silt attached to the inner wall of the converging tube 3. The scraped mud and sand fall into the water flow channel at the bottom of the converging tube 3 and continue to flow to the storage tank 2 with the accumulated water. At the same time, the drive source 68 is started to drive the spiral blade 61 to rotate at a uniform speed, continuously and actively transporting the mud and sand and mixed water accumulated in the middle of the storage tank 2 to the outside of the pile body 1, so as to completely discharge the accumulated mud.
[0052] When the flow monitor detects that the drainage volume has returned to the normal set value and the liquid level sensor detects that the water level in the storage tank 2 has fallen back to the normal standard range, it is determined that the silt removal operation is completed, and the equipment is started to reset and standby. First, the drive source 68 is turned off to stop the rotation of the spiral blade 61. Then, the second telescopic cylinder 73 is controlled to reset, which drives the sliding box 74 and the spiral blade 61 to move in the opposite direction to the initial installation position. The connecting frame 69, the first lever 610, and the second lever 611 are reset synchronously. Then, the first telescopic cylinder 71 is controlled to retract in the opposite direction, which drives the entire conveyor to retract. The top rod 67 slides in the second adjustment hole 22, driving the adjustment plate 21 to rotate and reset. Through the first adjustment hole 25 and the adjustment rod 38, the support shaft 33 and the support ring 36 are pulled to the initial position of the large inner diameter of the tapered tube 3, so that the scraper 34 is completely separated from the inner wall of the tapered tube 3, and the drainage channel at the bottom of the tapered tube 3 is restored.
[0053] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. An anti-slide pile for landslide control, characterized in that: The pile body (1) is formed with a vertical shaft (13), a liquid storage cylinder (2) is installed at the bottom of the vertical shaft (13), and several converging pipes (3) are installed on the liquid storage cylinder (2). Several drainage holes (31) are opened in the upper area of the converging pipes (3). The pile body (1) has a support pipe (5) pre-embedded on the back sliding side, which is connected to the liquid storage cylinder (2). The support pipe (5) passes through the soil layer (41) and a conveyor is installed inside the support pipe (5). The conveyor includes a conveying cylinder (6) and a spiral blade (61). The conveying cylinder (6) slides inside the support tube (5). The spiral blade (61) is equipped with second bearings (62) at both ends. The bushing of one second bearing (62) is slidably connected to the liquid storage cylinder (2). The other second bearing (62) is rotatably mounted on the drive assembly (7). The spiral blade (61) is connected to the drive source (68). The drive assembly (7) includes a first telescopic cylinder (71) installed in the drive box, a fixed frame (72) fixedly installed on the conveying cylinder (6) and connected to the output end of the first telescopic cylinder (71), the fixed frame (72) is slidably connected to the drive box, a second telescopic cylinder (73) is installed on the fixed frame (72), the output end of the second telescopic cylinder (73) is connected to a sliding box (74), the sliding box (74) is slidably connected to the drive box, and the drive source (68) is installed in the sliding box (74); The drive assembly (7) has its output end connected to the conveyor, and the inlet of the conveyor is connected to the storage tank (2). The drive assembly (7) drives the conveyor to extend into the storage tank (2) to drain the mud and water in the storage tank (2).
2. The anti-slide pile for landslide control according to claim 1, characterized in that: The axis of the tapered tube (3) is parallel to the horizontal plane. The inner diameter of the end of the tapered tube (3) away from the liquid storage cylinder (2) is smaller than the inner diameter of the end close to the liquid storage cylinder (2). A drain pipe (32) connected to the inside of the liquid storage cylinder (2) is installed on the tapered tube (3). Several drain pipes (32) are inclined to the same side inside the liquid storage cylinder (2).
3. The anti-slide pile for landslide control according to claim 1 or 2, characterized in that: A support net is installed on the outside of the tapered pipe (3), and geotextile is wrapped around the outside of the support net. The geotextile covers the drainage hole (31), and a layer of crushed stone (4) is laid on the outside of the geotextile and the sliding side of the pile (1).
4. The anti-slide pile for landslide control according to claim 1, characterized in that: The outer diameter of the spiral blade (61) is smaller than the inner diameter of the conveying cylinder (6), and the spiral blade (61) extends into the liquid storage cylinder (2); a baffle (64) is installed on the back side of the conveying cylinder (6), and there is a gap between the bottom of the baffle (64) and the bottom of the liquid storage cylinder (2).
5. The anti-slide pile for landslide control according to claim 1, characterized in that: An adjusting plate (21) is rotatably installed inside the liquid storage cylinder (2), and a second adjusting hole (22) is provided on the adjusting plate (21). A support frame (66) is installed on the conveying cylinder (6), and a top rod (67) is installed on the support frame (66). The top rod (67) slides in the second adjustment hole (22).
6. The anti-slide pile for landslide control according to claim 5, characterized in that: A support shaft (33) is installed inside the tapered tube (3), and several scrapers (34) are installed on the support shaft (33). The height of the scrapers (34) gradually increases as the inner diameter of the tapered tube (3) increases. An adjustment groove (37) is provided on the support shaft (33), and an adjustment rod (38) is rotatably installed on the support shaft (33). The adjustment rod (38) slides along the axial direction of the support shaft (33) inside the liquid storage cylinder (2). The adjusting plate (21) is provided with a plurality of first adjusting holes (25) at an angle, and the adjusting rod (38) slides within the first adjusting holes (25).
7. The anti-slide pile for landslide control according to claim 6, characterized in that: Two adjacent scrapers (34) are staggered in the axial direction and have a set deflection angle in the circumferential direction. Both ends of the support shaft (33) are equipped with first bearings (35), and the first bearings (35) slide axially in the tapered tube (3) through the support ring (36).
8. The anti-slide pile for landslide control according to claim 6 or 7, characterized in that: A connecting frame (69) is rotatably mounted on the connecting shaft of the spiral blade (61). The connecting frame (69) is slidably connected to the liquid storage cylinder (2). A first lever (610) is mounted on the connecting frame (69). Two sets of second levers (611) are slidably mounted on the connecting frame (69). The first lever (610) and the second lever (611) slide in the corresponding adjustment groove (37).