A new type of ultra-deep concrete cutoff wall joint structure and a construction method thereof

By using a circular interlocking joint between the concrete column and the cutoff wall body in ultra-deep concrete cutoff walls, combined with multi-functional cleaning equipment and digital management, the risks and quality problems of pipe pulling in the construction of ultra-deep cutoff wall joints have been solved, achieving efficient and precise joint connection and construction process control.

CN123133407APending Publication Date: 2026-11-20SINOHYDRO FOUND ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611398062.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing methods for constructing ultra-deep concrete cutoff wall joints present challenges such as high risk of pipe pull-out, difficulty in ensuring joint quality, and low level of digitalization in the construction process. In particular, under conditions of deep overburden and complex geological conditions, traditional methods are insufficient to achieve efficient and precise joint connections.

Method used

A new type of ultra-deep concrete anti-seepage wall joint structure is adopted, which includes connecting the concrete column and the anti-seepage wall body to form an arc interlocking joint, eliminating the pipe pulling process. The cleanliness of the joint is ensured by multi-functional cleaning equipment, and real-time monitoring and digital management are implemented to achieve refined control of the whole process.

Benefits of technology

It eliminated the risk of pipe pulling, improved joint quality and construction efficiency, ensured the tightness and impermeability of the joints, realized the visualization and refined management of the construction process, and reduced the accident rate and construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133407A_ABST
    Figure CN123133407A_ABST
Patent Text Reader

Abstract

The application discloses a novel super-deep concrete cutoff wall joint structure and a construction method thereof, and belongs to the technical field of foundation treatment of water conservancy and hydropower projects. According to the construction sequence, the application comprises the following steps: construction preparation and guide wall positioning; rotary excavation of a connecting concrete column and identification of a bearing layer; pouring and maintenance of the connecting concrete column; excavation of adjacent groove sections and cleaning of the surface of the connecting concrete column; pouring of the cutoff wall body and BIM fine management. The application changes the process logic of the traditional joint pipe method, i.e. 'first groove forming and then pipe pulling', and replaces the joint pipe with a connecting concrete column constructed first, so that the risk of pipe casting and hole collapse caused by pipe pulling force is fundamentally eliminated; and through mathematical models such as a bearing layer identification index, a cleaning efficiency and a construction deviation index, quantitative control of hole forming, cleaning and management is realized, and the joint quality and construction safety of the super-deep cutoff wall are significantly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of foundation treatment and underground continuous wall construction technology for water conservancy and hydropower projects. Specifically, it relates to a novel ultra-deep concrete anti-seepage wall joint structure and its construction method suitable for ultra-deep overburden and complex geological conditions of 200m level. Background Technology

[0002] Concrete cutoff walls are crucial underground continuous walls used in water conservancy and hydropower projects, dikes, reservoir banks, and deep foundation pits to cut off seepage and ensure the safety of dam foundations and cofferdams against seepage. As hydropower development in my country has expanded to the high mountain and canyon areas of southwest China, the depth of cutoff walls has increased from the early 50-70m to 100m, 150m, and even over 200m. The thick overburden, complex geological structure, abundant groundwater, and numerous interlayers of boulders and hard rock place extremely high demands on joint quality, trenching efficiency, and construction safety.

[0003] In terms of wall segment connection technology, traditional methods mainly include: 1. Drilling method: The second-stage main hole is repeatedly drilled at the end of the first-stage slot to form a semi-circular arc joint. This method is highly dependent on impact drilling rigs, has difficulty controlling hole inclination, and has extremely low efficiency and joint quality when the wall depth exceeds 70m.

[0004] 2. Double-reverse-arc joint method: This method uses a double-reverse-arc drill bit to form the pile-column wall segment, which matches the arc surface of the conventional wall segment. This method provides good joint results, but it requires high precision in the inclination of the first-stage trench side holes and faces construction difficulties when encountering isolated boulders, thus limiting its application.

[0005] 3. Joint Pipe Method: Currently the most common connection method for ultra-deep anti-seepage walls. After the first-stage trench is completed, a steel pipe with a diameter close to the wall thickness is installed at the joint with the second-stage trench. When the first-stage concrete is nearing initial setting, it is pulled out using a hydraulic pipe puller, forming a deep hole. Then, the second-stage trench is excavated and concrete is poured, creating an arc connection between adjacent wall sections. This technology has been developed in China into the YBJ series keyed direct-acting large-diameter hydraulic pipe puller and the "pressure-limited pipe pull method" supporting construction method, with a maximum pipe pull depth of up to 200m, setting a construction record of 158m.

[0006] However, the joint tube method still faces core technological bottlenecks. From a mechanical perspective, the tube pulling force mainly consists of three parts: (1) In the formula: The bonding force between the concrete and the pipe wall (kN); The frictional force between the pipe wall and the concrete (kN); The weight of the connector pipe is (kN).

[0007] Adhesive force can be expressed as: (2) In the formula: The bond strength (kPa) between concrete and steel increases with the age of the concrete. The outer diameter of the connector pipe (m); The depth (m) into which the joint pipe is embedded in the concrete. Contact area (m²) 2 ).

[0008] Friction can be expressed as: (3) In the formula: The coefficient of friction between steel and concrete; The lateral pressure of the concrete (kPa); Effective unit weight of concrete (kN / m³) 3 ); To calculate the depth of the point (m).

[0009] From equations (1) to (3), it can be seen that the tube pulling force With burial depth The growth rate is approximately linear or exponential with the age of the concrete. For ultra-deep impermeable walls, The length can reach 150-200m, and the pulling force can easily exceed the rated capacity of the pipe pulling machine, leading to a "cast pipe" accident. Pulling too early, or insufficient concrete strength, can also cause problems. Smaller size makes the connector hole prone to shrinkage or collapse; pulling out too late... and The tube size increases significantly, making it difficult to remove. Therefore, the traditional joint tube method inherently suffers from the contradiction of "narrow time window and high mechanical risk".

[0010] In addition, there are significant shortcomings in ultra-deep overburden rotary drilling, cleaning of joint concrete column surfaces, and digital management of the construction process: (1) Insufficient adaptability of rotary drilling tools: Conventional rotary drilling tools are prone to problems such as hole deviation, hole collapse and rapid wear of drill bits in deep overburden (>100m), and lack real-time identification of bearing layer (bedrock surface), making it difficult to accurately determine the depth of rock penetration.

[0011] (2) Low efficiency of joint cleaning equipment: Existing joint cleaning equipment mostly uses traction wire brushes or simple scrapers, which are not thorough. Mud and sediment residues cause mud to get stuck in the joints, affecting the seepage prevention performance.

[0012] (3) The construction process management is rough: the construction parameters of the anti-seepage wall (hole inclination, mud properties, concrete pouring speed, pipe pulling force, equipment status, etc.) mostly rely on manual recording and experience judgment, making it difficult to achieve real-time visualization, fine and traceable management.

[0013] Therefore, there is an urgent need for a new type of anti-seepage wall joint structure and construction method that can fundamentally avoid the risk of pipe pulling, adapt to ultra-deep and complex strata, ensure joint quality, and achieve refined control throughout the entire process. Summary of the Invention

[0014] In view of the above-mentioned shortcomings in the existing technology, the novel ultra-deep concrete anti-seepage wall joint structure and its construction method provided by the present invention solve the technical problems of existing joint pipe methods, such as difficulty in controlling the timing of pipe pulling, high risk of cast pipe / hole collapse, difficulty in rotary drilling in thick overburden, incomplete joint cleaning, and low degree of digitalization in the construction process.

[0015] To achieve the above-mentioned objectives, the technical solution adopted by this invention is: a novel ultra-deep concrete anti-seepage wall joint structure, comprising: The seepage barrier wall is constructed by pouring multiple sections of concrete in sequence. The connecting concrete column is pre-constructed at the joint between adjacent anti-seepage wall sections, and its diameter is larger than the wall thickness of the anti-seepage wall body. The arc-shaped side of the connecting concrete column forms an arc-shaped interlocking joint with the ends of the two adjacent anti-seepage wall body sections; wherein, the depth of the connecting concrete column penetrates the upper covering layer and is embedded in the lower bearing layer, and the arc-shaped side of the connecting concrete column is free of mud skin and loose layer after cleaning, and contacts the concrete of the anti-seepage wall body to form an anti-seepage curtain.

[0016] On the other hand, a construction method is also provided for a novel ultra-deep concrete anti-seepage wall joint structure, including the following steps: S100. Complete construction preparation and position the current trench section of the anti-seepage wall body to support the positioning of the anti-seepage wall trenching equipment and the positioning of the connecting concrete columns. S200: Drilling is carried out at the joint between the guide walls by designing drilling parameters before construction, real-time monitoring of the drilling process, identification of the bearing layer and determination of the final hole. S300, Concrete column pouring based on drilling between guide walls; S400: In response to the concrete column reaching the set strength, the concrete column is cleaned by a multi-functional concrete column cleaning equipment with a scraper and brush. After the cleaning is qualified, the hole is cleaned and the slurry is replaced, and the anti-seepage wall steel cage is hoisted, the anti-seepage wall body concrete is poured, and the adjacent trench is excavated.

[0017] The beneficial effects of this invention are as follows: Eliminating the risk of pipe pulling: By eliminating the joint pipe and the pipe pulling process, the traditional pipe pulling force increases significantly with the burial depth and the age of the concrete. This invention completely avoids quality accidents such as joint hole collapse, cast pipe damage, and concrete damage caused by improper control of pipe pulling timing and speed.

[0018] Significantly improved joint quality: By appropriately increasing the diameter of the connected concrete columns and overlap allowance Sufficient arc contact length can be obtained. and joint shear bearing capacity The joints are continuous and tight, and the impermeability is better than that of traditional joint pipe methods.

[0019] Adaptable to ultra-deep and complex strata: The provided rotary drilling tool parameter calculation method and bearing layer identification model enable efficient and accurate drilling and rock embedding in deep overburden, highly permeable layers, and strata containing boulder.

[0020] Highly efficient and thorough cleaning: The defined cleaning equipment parameters and cleaning efficiency indicators ensure that the cleanliness of the surface of the connected concrete column meets the requirements for high-quality joints.

[0021] Construction management is refined and digitalized: the deviation indicators and early warning levels provided make the entire construction process visible, predictable, and traceable.

[0022] Significant overall benefits: reduced accident handling costs, reduced concrete and slurry waste, shortened construction period, reduced rework, resulting in significant economic and social benefits. Attached Figure Description

[0023] Figure 1 A schematic diagram of the plan layout of the novel ultra-deep concrete anti-seepage wall joint structure provided by the present invention.

[0024] Figure 2 This is a schematic longitudinal section of the novel ultra-deep concrete anti-seepage wall structure provided by the present invention.

[0025] Figure 3 A flowchart illustrating the construction method of the novel ultra-deep concrete anti-seepage wall structure provided by this invention.

[0026] Figure 4 The structural diagram of the multi-functional concrete connecting column surface cleaning equipment provided by the present invention is shown. Detailed Implementation

[0027] The specific embodiments of the present invention are described below to enable those skilled in the art to understand the present invention. However, it should be understood that the present invention is not limited to the scope of the specific embodiments. For those skilled in the art, various changes are obvious as long as they are within the spirit and scope of the present invention as defined and determined by the appended claims. All inventions utilizing the concept of the present invention are protected.

[0028] This invention provides a novel joint structure for ultra-deep concrete cutoff walls, suitable for the construction of concrete cutoff walls in ultra-deep overburden layers up to 200m deep and under complex geological conditions. (Reference) Figures 1-2 ,include: The seepage barrier wall is constructed by pouring multiple sections of concrete in sequence. The connecting concrete column is pre-constructed at the joint between adjacent anti-seepage wall sections, and its diameter is larger than the wall thickness of the anti-seepage wall body. The arc-shaped side of the connecting concrete column forms an arc-shaped interlocking joint with the ends of the two adjacent anti-seepage wall body sections; wherein, the depth of the connecting concrete column penetrates the upper covering layer and is embedded in the lower bearing layer, and the arc-shaped side of the connecting concrete column is free of mud skin and loose layer after cleaning, and contacts the anti-seepage wall body concrete to form an anti-seepage curtain.

[0029] In this embodiment, the impermeable wall is divided into several trench segments according to the design axis, and the length of each trench segment is generally taken as... The positions of the connecting concrete columns between adjacent trench sections are predetermined, and the center line of the connecting concrete columns coincides with the axis of the anti-seepage wall or is arranged according to the design offset.

[0030] The concrete column is equipped with a structural steel cage and / or grouting pipe. The diameter of the connecting concrete column Its arc-shaped contact length ; in, The thickness of the seepage barrier wall body, To allow for overlap, This ensures that the arc-shaped interlocking joint has sufficient overlap length.

[0031] The shear capacity of the joint can be estimated using the following formula:

[0032] In the formula: The shear strength of the joint (kPa); The height of the wall is in meters (m).

[0033] This invention eliminates the joint pipe pulling process, fundamentally eliminating the risk of quality accidents such as pipe casting and hole collapse. By designing the above-mentioned joint structure, a high-quality, highly integrated, and highly impermeable wall segment connection structure is formed.

[0034] This invention also provides a construction method for the aforementioned novel ultra-deep concrete anti-seepage wall joint structure, with reference to... Figure 3 This includes the following steps: S100. Complete construction preparation and position the current trench section of the anti-seepage wall body to support the positioning of the anti-seepage wall trenching equipment and the positioning of the connecting concrete columns. S200: Drilling is carried out at the joint between the guide walls by designing drilling parameters before construction, real-time monitoring of the drilling process, identification of the bearing layer and determination of the final hole. S300, Concrete column pouring based on drilling between guide walls; S400: In response to the concrete column reaching the set strength, the concrete column is cleaned by a multi-functional concrete column cleaning equipment with a scraper and brush. After the cleaning is qualified, the hole is cleaned and the slurry is replaced, and the anti-seepage wall steel cage is hoisted, the anti-seepage wall body concrete is poured, and the adjacent trench is excavated.

[0035] In S100 of this embodiment, the construction preparation includes: (1) Construction of construction platform: Construct construction platforms on both sides of the anti-seepage wall axis. The top surface of the platform should be at least 1.5m above the groundwater level. The platform should be firm and flat, and the width should meet the walking and operation requirements of heavy equipment such as rotary drilling rigs, hydraulic grab buckets, and double wheel milling machines. When the foundation soil is relatively soft, reinforcement measures such as compaction, high-pressure jet grouting, or vibratory compaction should be taken to ensure that the platform has sufficient bearing capacity. Drainage ditch should be arranged on one side of the platform to discharge construction wastewater in a timely manner. (2) Measurement control: Establish a plane and elevation control network, and measure and set out the anti-seepage wall axis, trench section boundary line, and the center pile position of the connecting concrete column according to the design, and verify and accept them. (3) Geological verification: Based on the geological exploration data, and arrange pilot holes at the joint, investigate the overburden structure, bedrock surface burial depth and undulation shape to provide a basis for determining the final hole depth of the connecting concrete column. (4) Mud system: Complete the installation and commissioning of the mud preparation, purification and circulation system, and reserve a sufficient amount of high-quality wall-stabilizing mud. (5) Equipment arrival: Rotary drilling rig, hydraulic grab bucket, twin-wheel milling machine, concrete pouring equipment and cleaning equipment are brought to the site and put into place, and no-load and load test runs are completed.

[0036] In this embodiment, as Figure 3 As shown, the guide wall is two parallel temporary reinforced concrete strip walls pre-cast on both sides of the anti-seepage wall axis before trenching (hole drilling). The gap between the two guide walls serves as the entry channel for the trenching equipment and rotary drilling tools. The anti-seepage wall trench section and the connecting concrete column hole are both constructed downwards within this gap. In this invention, the guide wall functions include: (1) Positioning and guidance: The hydraulic grab bucket, twin-wheel milling machine and rotary drilling tool all use the inner wall of the guide wall as the centering and guiding reference to control the plane position and verticality of the trench section and the connecting concrete column; (2) Elevation benchmark: The depth of the hole, the depth of the trench and the elevation of the concrete pouring surface are all calculated from the top surface of the guide wall; (3) Protecting the hole and stabilizing the liquid: The guide wall raises the mud level in the hole above the groundwater level to maintain the hydrostatic pressure of the mud and prevent the hole from collapsing; (4) Bearing and protection: to bear the construction load of heavy trenching and rotary drilling equipment and protect the soil at the borehole opening.

[0037] Therefore, the guide wall design must simultaneously meet the dual requirements of positioning the trenching equipment for the anti-seepage wall and positioning the connecting concrete columns: the guide wall should preferably be a cast-in-place reinforced concrete structure with a height of 1.5–2m. The reinforcement should be determined based on the designed wall depth, the expected trenching period, and the compaction of the foundation. It should be built on a solid foundation, and the backfill soil on both sides of the guide wall should be compacted in layers. The net distance between the guide walls (the net distance between the inner walls of the two guide walls) should be 50–200mm larger than the designed wall thickness to ensure that the grab bucket, the twin-wheel milling head, and the rotary drilling bit can be smoothly lowered and maintain effective guidance. The deviation between the centerline of the guide wall and the axis of the anti-seepage wall should not exceed ±10mm, and the elevation deviation of the top surface of the guide wall should be controlled within ±10mm. During construction, the settlement and displacement of the guide wall and the construction platform should also be monitored, and any abnormalities should be promptly addressed with reinforcement.

[0038] In S200 of this embodiment, the drilling operation is carried out in a continuous manner in three stages: “drilling parameter design before construction - real-time monitoring of the drilling process - bearing layer identification and final hole determination”, forming a closed-loop control of “design-monitoring-feedback”. Then, an ultra-deep overburden rotary drilling tool is used to drill holes at the joint to form a connection concrete column pouring hole.

[0039] Specifically, S200 includes the following steps: S201. Drilling parameter design: Based on the borehole diameter and formation compressive strength, the maximum torque, drilling pressure and drilling speed required for drilling under initial working conditions are estimated as initial drilling parameters. S202. Real-time monitoring of the drilling process: Based on the current drilling parameters, multiple physical indicators are collected synchronously with the drilling time and hole depth by multiple sensors deployed on the rotary drilling rig during the drilling process, including drilling pressure, torque, rotation speed, drilling speed, drill string vibration, hole inclination and cuttings return. S203, Drilling Parameter Adjustment: Based on the collected multi-physical indicators, a closed-loop control strategy of target tracking and over-limit protection is adopted to dynamically adjust the drilling parameters; S204, Bearing Layer Identification: Based on the collected multi-physical indicators, the bearing layer identification index is calculated by weighted fusion of multi-source information; The bearing layer identification index is compared with the preset identification threshold to determine whether the bearing layer has been entered. If so, retrieve rock samples from the bottom of the borehole for identification and verification, and continue drilling to the designed depth of rock penetration to complete the drilling construction; If not, return to S202.

[0040] In S201, before construction, the maximum torque, drilling pressure and drilling speed required for drilling are estimated based on the borehole diameter and the compressive strength of the formation. These are used as initial drilling parameters for selecting the power head of the rotary drilling rig, determining the pressurization capacity, checking the strength of the drilling tools and estimating the construction period.

[0041] The formula for calculating the maximum torque required for drilling is as follows:

[0042] In the formula, The maximum torque required by the drill bit (kN·m); This is the torque coefficient, which is related to the drill bit structure and is generally taken as... ; The borehole diameter is in meters. It represents the compressive strength of the formation (MPa).

[0043] The formula for calculating the drilling pressure required is:

[0044] In the formula, The drill bit axial pressure (kN); The drilling pressure coefficient is generally taken as... ; The borehole diameter is in meters. It represents the compressive strength of the formation (MPa).

[0045] The formula for calculating drilling speed (machine rotation speed) is:

[0046] In the formula, Drilling speed (m / h); The drill bit rotation speed (r / min); Drilling pressure (kN); The rock drillability coefficient; Formation compressive strength (MPa); The borehole diameter is in meters (m).

[0047] In this embodiment, the maximum torque, drilling pressure and drilling speed mentioned above are all initial drilling parameters determined before construction, and are not quantities that need to be repeatedly calculated in real time during the drilling process. The drilling rig sets the initial drilling conditions according to this set of parameters, and then dynamically adjusts the drilling pressure, rotation speed and other parameters according to the following real-time monitoring data during the drilling process, so that the drilling tool is always in a working state that matches the formation conditions.

[0048] In S202 of this embodiment, multiple types of sensors are deployed on the power head, drill rod, and drilling tools of the rotary drilling rig. During the drilling process, various physical indicators are continuously collected synchronously with the drilling time and hole depth, and transmitted in real time to the vehicle-mounted monitoring terminal and the ground management platform to form a real-time "time-depth-parameter" curve. The collected physical indicators are shown in the table below:

[0049] The aforementioned real-time collected multi-physical indicators serve as both a dynamic adjustment of the user's drilling conditions and an input for bearing layer identification.

[0050] In S203, a closed-loop control strategy of "target tracking + over-limit protection" is adopted to dynamically adjust drilling parameters, including: Using the estimated initial drilling speed as the target rotational speed, the target rotational speed is tracked and dynamically adjusted. The adjustment formula is as follows:

[0051] In the formula, For speed deviation, For the target speed value, for The actual drilling speed at any given moment; When the measured rotational speed is lower than the target rotational speed, the drilling pressure is automatically increased; when it is higher than the target rotational speed, the drilling pressure is automatically decreased, so that the rotational speed converges around the target value; within the rated drilling pressure range of the drilling rig. The formula for dynamically adjusting drilling pressure is:

[0052] In the formula, for The drill bit shaft pressure at any given moment. Let be the drill bit axial pressure at time t. This is the proportional adjustment coefficient; When the measured torque At this time, the drilling pressure is reduced proportionally to adjust the torque, which is expressed as follows:

[0053] In the formula, This is the corrected drilling pressure after torque over-limit protection. The drill bit axial pressure before correction. This is the load reduction factor. This refers to the rated torque of the power head.

[0054] S204 includes the following steps: S204-1. During the drilling process, the average drilling pressure, average torque, average drilling speed and vibration reference coefficient of the drill bit in the overburden layer are statistically analyzed and used as the discrimination criteria. S204-2. Based on the collected multi-physical indicators, calculate the drill pressure surge increment, torque fluctuation difference, drilling speed attenuation rate, vibration spectrum characteristic change and the area ratio of returned cuttings at the current depth. Specifically, when the drill bit approaches the rock surface (bearing layer), the above indicators are manifested as a significant increase in drilling pressure, a significant increase in torque fluctuation, a sharp drop in drilling speed, a high-frequency peak in the vibration spectrum, and an increase in the proportion of bedrock debris in the returned cuttings. S204-3. Based on the discrimination criteria, the drill pressure surge increment, torque fluctuation standard deviation, drilling speed attenuation rate, drill string vibration spectrum characteristic coefficient and the proportion of returned cuttings are weighted and fused into a bearing layer identification index. S204-4. Determine whether the bearing layer identification index is greater than the preset identification threshold. If so, then enter the bearing layer, retrieve rock samples from the bottom of the hole for identification and verification, and continue drilling to the designed rock penetration depth to complete the drilling construction; If not, return to S202.

[0055] In S204-1, the method for determining the discrimination criteria is as follows: Exclude the disturbed drilling section (0-3m below the borehole opening, disturbed by the casing and backfill) and the obvious interlayer section revealed by the pilot hole, retaining only the effective sampling point sequence of the normal drilling section of the overburden. , ; Outliers are iteratively removed using the Laida criterion, and the mean of the current sequence is calculated. with standard deviation Eliminate those that meet the requirements The sampling points are repeated until no more points are rejected. This step can eliminate contamination of the reference standard by accidental factors such as boulders and collapsed backfill material.

[0056] After removing outliers For each valid sampling point, calculate the following four discrimination criteria:

[0057]

[0058] Simultaneously calculate the standard deviation of each benchmark:

[0059] , , Standard deviation , , Calculate similarly.

[0060] In S204-3, the bearing layer identification index The calculation formula is:

[0061] In the formula, For drilling pressure surge increment, For the standard deviation of torque, The average drilling speed of the overburden layer. For real-time drilling speed, These are the characteristic coefficients of the drill string vibration spectrum. The percentage of returned slag and rock debris area. The average drilling pressure of the overburden layer. The average torque of the coating layer, The vibration reference coefficient for the overburden layer, This represents the average percentage of cutter and rock cuttings area returned during the normal drilling phase of the overburden layer. , , , and The weights are respectively the drill pressure surge increment, torque fluctuation standard deviation, drilling speed attenuation rate, drill string vibration spectrum characteristic coefficient, and the proportion of returned cuttings.

[0062] in, Let the weighting coefficients satisfy:

[0063] when At that time, it was determined that the drill bit had entered the bearing layer; among which The preset identification threshold for the bearing stratum is determined based on field calibration tests. Holes with clear indications of bedrock depth, such as pilot holes, core samples, or ground-penetrating radar, are selected as calibration holes. The critical discrimination criterion between the overburden and the bearing stratum is found through these calibration holes with known true values, and this criterion is used as the preset identification threshold. Generally, a threshold value of [missing value] is used. After drilling to the designed rock penetration depth, the hole depth, diameter, and inclination are measured, and the inclination rate is controlled within a certain range. Within.

[0064] In S204-4, after determining that the bearing stratum has been entered, rock samples are promptly retrieved from the bottom of the borehole for identification and compared with the pilot borehole and geological exploration data to confirm the actual burial depth of the bedrock surface. Drilling then continues to the designed depth to the final borehole depth. All real-time monitoring curves and determination records are stored in the construction archive, enabling traceable management of the bearing stratum identification process.

[0065] In this embodiment, the bearing layer identification index is calculated based on the principle of complementary multiple physical evidence chains. The five sub-indicators involved correspond to five mutually independent evidence chains of physical mechanisms as shown in the table below.

[0066] The five chains of evidence mentioned above, from different physical perspectives, all point to the same event (the drill bit reaching the bedrock surface), forming a redundant and complementary evidence system.

[0067] In step S300 of this embodiment, after cleaning the borehole and replacing the slurry, the reinforcing cage is lowered, and underwater concrete is poured using the tremie pipe method to form a connecting concrete column; wherein, the concrete pouring and rising speed is:

[0068] In the formula: The concrete surface rise rate (m / h); Concrete pouring flow rate (m³) 3 / h); For connecting concrete column cross-sectional area (m²) 2 ).

[0069] For example, the catheter burial depth should meet the following requirements:

[0070] In the formula: The catheter burial depth (m); Elevation of concrete surface (m); Elevation of the bottom of the duct (m).

[0071] Excavation of adjacent trench sections can only proceed after the connecting concrete columns have reached their design strength. Generally, the compressive strength of the concrete cube is required to be no less than [a certain value]. .

[0072] In S400 of this embodiment, after the connected concrete column reaches a certain strength, if the mud skin and loose layer attached to the surface of the connected concrete column are not thoroughly cleaned, a mud-filled joint will be formed between the anti-seepage wall body and the connected concrete column, becoming a leakage channel for the entire anti-seepage curtain. However, the existing traction wire brush or simple scraper has limited functions and poor adhesion, and cannot meet the cleaning requirements of the curved column surface in ultra-deep trenches. Therefore, in this invention, a multi-functional concrete connecting column surface cleaning equipment is used to clean the connected concrete column. The multi-functional concrete connecting column surface cleaning equipment integrates six functions of "shoveling, scraping, brushing, flushing, collecting, and inspecting" into the same frame, and all cleaning operations can be completed in one trenching operation, avoiding repeated drilling and tool changes.

[0073] Specifically, such as Figure 4 As shown, the multi-functional concrete connecting column surface cleaning equipment includes a suspended frame 401, an arc-shaped scraper 402, a rotating steel wire brush roller 403, a high-pressure water / air jet assembly 404, a sludge collection tank 405, and a real-time image detection module 406. The suspended frame 401 is connected to the main unit via a quick connector and carries the arc-shaped shovel 402, the rotating wire brush roller 403, the high-pressure water / air jet assembly 404, the sludge collection trough 405, and the real-time image detection module 406. Specifically, the suspended frame 401 is connected to the hydraulic grab bucket or the twin-wheel milling machine frame via a quick connector, directly utilizing the lifting, pressurizing, and positioning capabilities of the main unit. It does not require a dedicated chassis and can meet the requirements for operations in ultra-deep trenches up to 150m deep. The radius of curvature of the cutting edge of the arc-shaped scraper 402 matches the outer diameter of the connecting concrete column, and is attached to the surface of the connecting concrete column through an elastic pressure mechanism. It adaptively floats and fits with the connecting concrete column when the curvature changes or there is local unevenness, so as to scrape the mud and loose layer on the surface of the connecting concrete column, ensuring uniform contact pressure and no damage to the column concrete. When cleaning the connecting concrete column, the contact pressure between the arc-shaped scraper 402 and the surface of the connecting concrete column is adjusted by the elastic pressure mechanism. If the contact pressure is too low, the mud skin will not be completely removed; if it is too high, it may damage the column concrete. The contact pressure is controlled by the following formula:

[0074] In the formula: The blade contact pressure (MPa); The normal pressure of the shovel blade (kN); The contact area between the shovel and the concrete column (m²) 2 ); The rotating wire brush roller 403 is driven by a hydraulic motor and can rotate in both directions to mechanically scrub the surface of the concrete column connected to the scraper and remove the residual thin layer of mud. The nozzles of the high-pressure water / air jet assembly 404 are arranged synchronously with the brush roller to wash away residues on the surface and in the gaps of the connected concrete column. The mud collection trough 405 is located below the shovel and brush roller to collect the stripped mud and remove it from the trough along with the equipment, thus preventing the mud from settling again and contaminating the bottom of the trough. The real-time image detection module 406 consists of a waterproof camera and underwater lighting, which transmits the cleaned cylindrical surface image to the ground monitoring terminal in real time, enabling online visualization and judgment of the cleaning quality.

[0075] Based on the aforementioned equipment, this invention employs a combined cleaning process of "layered peeling - reciprocating cross-cutting - image determination": The first step involves the curved scraper 402 scraping the cylindrical surface from top to bottom with a set normal pressure under the action of the elastic pressure mechanism, peeling off the attached mud skin and loose layer. The second step involves rotating the wire brush roller and simultaneously spraying high-pressure water / air to remove the thin layer of mud remaining after scraping, and flushing the debris into the mud collection tank 405. The third step is to lift the sludge out of the trench and lower it again, moving it around the arc of the connecting concrete column. Repeat the scraping, brushing, and rinsing operations, maintaining a certain overlap between adjacent cleaning zones, until the entire arc area facing the trench section on the column surface is cleaned. The fourth step is to check the cleaning quality through the real-time image detection module 406. Once it is confirmed that there is no mud skin or loose layer on the column surface and the fresh and dense concrete surface is exposed, it is deemed qualified. Otherwise, the unqualified parts are cleaned at designated points.

[0076] Throughout the entire cleaning process, the cleaning efficiency is defined as:

[0077] In the formula, Cleaning efficiency (%) The mass (kg) of residual mud after cleaning; Total mass of mud cake before cleaning (kg); Target .

[0078] After the cleaning is completed and the grout is replaced, the steel cage of the anti-seepage wall is hoisted and the concrete of the anti-seepage wall body is poured in a timely manner. The exposure time of the column surface after cleaning should be minimized to prevent secondary pollution of the column surface and ensure that a dense integral arc-shaped interlocking joint is formed between the anti-seepage wall body and the connecting concrete column.

[0079] The construction method provided by this invention further includes: refined management of the entire construction process based on BIM, including: During construction, multi-dimensional monitoring indicators are collected in real time, including equipment operating parameters, trenching and hole forming quality parameters, mud parameters, concrete pouring parameters, cleaning equipment parameters, and progress and environmental parameters. In the anti-seepage wall construction management platform, a BIM model of the anti-seepage wall is constructed, each component is assigned a unique code, and the real-time collected monitoring indicators are mapped to the corresponding components of the anti-seepage wall BIM model according to the code. The anti-seepage wall construction management platform provides a visual display of the anti-seepage wall construction process and guides the anti-seepage wall pouring and construction status early warning. Among them, the construction status early warning includes: For each monitoring indicator, determine the corresponding construction deviation indicator; Based on the construction deviation indicators corresponding to each monitoring indicator, the construction status of each monitoring indicator is determined, including normal, first-level warning and second-level warning; Based on the construction status corresponding to each monitoring indicator, implement the corresponding disposal measures.

[0080] In this embodiment, the equipment operating parameters include the drilling pressure, torque, rotation speed, and drilling speed of the rotary drilling rig; the grabbing / milling pressure, lifting force, and bucket or milling head position of the hydraulic grab bucket and twin-wheel milling machine; the trenching and hole forming quality parameters include the hole inclination, trench verticality, trench depth, trench width, and bottom sediment thickness; the mud parameters include density, viscosity, sand content, and liquid level; the concrete pouring parameters include pouring flow rate, pouring surface elevation and rising speed, guide pipe burial depth, slump, and cumulative pouring volume; the cleaning equipment parameters include the blade contact pressure, brush roller rotation speed, high-pressure water pressure, and cleaning efficiency; and the progress and environmental parameters include the construction progress of each trench section, equipment positioning, and settlement displacement monitoring values ​​of the guide wall and platform.

[0081] When constructing a BIM model of the cutoff wall in the construction management platform, a BIM model of the cutoff wall is established based on the design drawings, including guide walls, connecting concrete columns, each trench section, steel cage, guide pipes, construction equipment and monitoring points. Each component is assigned a unique code, and the above-mentioned monitoring indicators collected in real time are mapped to the corresponding components of the BIM model according to the code.

[0082] The model displays the three-dimensional shape of the trench section, excavation progress, borehole trajectory, mud level, and the positions of the reinforcing cage and guide pipe in real time. It also renders the construction status and warning level of each component using color (green / yellow / red), transparency, and animation, making the underground hidden works "visible".

[0083] For each of the above monitoring indicators, the construction parameter deviation index is defined as the relative deviation of the measured value from the design value (target value), calculated using the following formula:

[0084] In the formula: The relative deviation is (%). These are measured values; This refers to the design value or target value.

[0085] Based on the magnitude of the deviation indices of the construction parameters, the construction status of each monitoring indicator is divided into three levels: normal, Level 1 warning, and Level 2 warning. The warning levels are determined by the following formula:

[0086] In the formula: It is at the warning level; , These are the thresholds for Level 1 and Level 2 warnings.

[0087] In this embodiment, the primary and secondary thresholds δ1 and δ2 are determined based on the design values ​​of each monitoring indicator and the corresponding allowable deviations in the specifications, combined with the degree of influence of the indicator deviation on the wall quality. Specifically, the primary warning threshold δ1 is set at 50% to 70% of the allowable deviation of the indicator, serving as a warning value for parameter deviation trends; when this value is reached, the construction parameters must be reviewed and adjusted. The secondary warning threshold δ2 is set at 80% to 100% of the allowable deviation limit of the indicator (i.e., approaching or reaching the upper limit of the allowable deviation), serving as a warning value for triggering the suspension of related procedures. For indicators without clearly defined specification limits, they can be determined through on-site calibration tests: selecting a qualified trench section, under normal construction conditions, the mean μ and standard deviation σ of the relative deviation of the indicator are taken as (μ+2σ) as δ1 and (μ+3σ) as δ2.

[0088] In this embodiment, for grooving quality indicators such as hole inclination and groove verticality, δ1=10% and δ2=20%. For example, when the measured hole inclination X of a certain groove section... m =3.0‰, Design allowable value X d When the value is 2.5‰, the relative deviation is calculated as δ = |3.0 - 2.5| / 2.5 × 100% = 20%, which reaches the level 2 warning threshold. The model changes from green to red and pushes out disposal suggestions.

[0089] The meanings and corresponding measures for each status level are as follows: L=0 (normal): The parameter deviation is within the first-level threshold, the index is under control, the corresponding component in the BIM model is displayed in green, and construction is normal. L=1 (Level 1 Warning): The deviation exceeds the Level 1 threshold but does not exceed the Level 2 threshold. The corresponding component is displayed in yellow. The platform pushes the warning information to the on-site technicians, requiring them to review the indicator and adjust the construction parameters. L=2 (Level 2 Warning): When the deviation exceeds the Level 2 threshold, the corresponding component will be displayed in red. The platform will automatically push disposal suggestions and suspend the relevant process. Work can only resume after the disposal is qualified and the deviation falls back to within the threshold.

[0090] In this embodiment, the anti-seepage wall construction management platform guides the anti-seepage wall pouring process as follows: The platform calculates the concrete pouring surface elevation and rising speed of each section in real time based on the measured pouring flow rate. It dynamically simulates the concrete surface rising process and the change in the tremie pipe burial depth in the BIM model. When the tremie pipe burial depth approaches the lower limit or the concrete surface rising speed exceeds the limit, the platform automatically prompts the adjustment of the pouring flow rate and the timing of removing the tremie pipe to prevent the bottom of the tremie pipe from coming off the concrete surface, causing pile breakage and mud inclusion. At the same time, it counts the volume of concrete poured and the remaining volume of each section to guide the concrete mixing and supply plan, so that the pouring process is transformed from "experience-based control" to "model-guided control".

[0091] Furthermore, the platform automatically records the time, personnel, equipment, parameters, and test results of each process, forming electronic archives of "one file per pile" and "one file per section," and provides suggestions for optimizing the excavation sequence of trench sections, adjusting the mud ratio, and risk warning reports based on historical data.

[0092] In this invention, the above-mentioned construction method improves the drilling efficiency and verticality of joint concrete columns in deep overburden and complex strata; achieves efficient and thorough cleaning of the surface of joint concrete columns; and realizes real-time visualization, refined and digital management of the entire process of anti-seepage wall construction.

[0093] In this embodiment of the invention, specific application examples of the above construction method are further provided.

[0094] Project Overview and Channel Division: The anti-seepage wall project for the foundation of a hydroelectric power station dam has a maximum wall depth of approximately 150m and a wall thickness of... The wall's axial length is approximately 800m. The strata, from top to bottom, consist of: fine silt (0–35m), medium-coarse sand and gravel (35–75m), sand and pebble (75–120m, containing a small amount of boulders), strongly weathered bedrock (120–135m), and weakly weathered bedrock (below 135m). Groundwater is abundant and highly permeable.

[0095] When constructing using the method of this invention, the seepage barrier wall is divided into several trench segments, each segment having a length of... First, construct connecting concrete columns between adjacent trench sections, taking into account the overlap allowance. The diameter of the connecting concrete column is:

[0096] Determine the arc contact length:

[0097] The spacing between the connecting concrete columns should match the length of the trench, and the column base should be embedded in the weakly weathered bedrock for no less than [amount missing]. .

[0098] Connecting rotary drilling of concrete columns with bearing stratum identification: (1) Measurement and layout: Based on the design axis and pile coordinates, accurately mark the center position of the connecting concrete column on the top surface of the guide wall.

[0099] (2) Casing installation: A steel casing driving device is used to install the casing with a diameter of... ,length The steel casing is pressed into the ground surface to prevent the orifice from collapsing and to ensure verticality.

[0100] (3) Rotary drilling: Drilling is carried out using ultra-deep overburden rotary drilling tools, with a drilling diameter of... The compressive strength of the sand and gravel layer is taken as ,Pick The required torque is:

[0101] Pick Then drilling pressure:

[0102] (4) Force layer identification: The force layer is identified based on the fusion of multi-source information, and the weights are taken. , , , , Threshold .

[0103] When drilling reached approximately 120m, the drill pressure was monitored to have decreased from... Sudden increase to The above is the standard deviation of torque fluctuation from Increase to Drilling speed from sudden drop The following are the particle sizes in the returned slag that are larger than... The proportion of bedrock debris exceeds The vibration spectrum is A significant peak appears in the interval. Substituting into equation (10), we get... The system automatically determined that the drill bit had entered highly weathered bedrock; drilling continued to 135m. Further enlargement indicates penetration into weakly weathered bedrock. Based on geological data, the final determined embedment depth of the connecting concrete column base into the bedrock is [details to be inserted here]. .

[0104] (5) Hole acceptance: Conduct hole depth, hole diameter, and hole inclination tests, and control the hole inclination rate within a specified range. Within.

[0105] Connection of concrete column pouring and curing: (1) Hole cleaning and mud replacement: Use air-lift reverse circulation or pump suction reverse circulation to remove sediment from the bottom of the hole, adjust the mud properties, and ensure that the thickness of sediment at the bottom of the hole is not greater than 100 mm. The sand content of the mud should not exceed [a certain value]. .

[0106] (2) Lowering the steel cage: Connecting the concrete column with a structural steel cage or grouting pipe to improve the overall integrity of the column and the shear resistance of the interface.

[0107] (3) Underwater concrete pouring: Underwater concrete is poured using the tremie pipe method. The concrete strength grade is not lower than that of the anti-seepage wall body, and the slump is controlled at [specific value missing]. If the concrete pouring flow rate Cross-sectional area of ​​connecting columns Then the concrete surface rises at the following speed:

[0108] In actual construction, the rising speed needs to be controlled to be no greater than Therefore, the pouring flow rate should be reduced or multiple guide pipes should be used, and the burial depth of the guide pipes should be maintained during the pouring process. .

[0109] (4) Curing: After the concrete is poured, wait until its cubic compressive strength reaches the required level. Only after the above steps can the excavation of adjacent trench sections be carried out.

[0110] Excavation of adjacent trench sections and cleaning of connecting concrete columns: (1) Reinforcement of guide wall: Since the joint pipe has been eliminated, the guide wall design must meet the dual requirements of positioning the trenching equipment and positioning the connecting concrete column. If necessary, the guide wall reinforcement and internal support should be increased.

[0111] (2) Trench excavation: The "drill-grab-milling" combined process is adopted. First, the main hole and pilot hole are constructed with an impact drill or rotary drilling rig. Then, the soil in the middle of the trench is grabbed with a hydraulic grab bucket. Finally, the trench wall is trimmed with a double-wheel milling machine and the arc-shaped area near the connecting concrete column is excavated.

[0112] (3) Acceptance of the trench section: Inspect the depth, width, verticality and thickness of sediment at the bottom of the hole of the trench section to ensure that the design requirements are met.

[0113] (4) Cleaning the surface of the connecting concrete column: Install the multi-functional scraper and brush cleaning device of this invention on a hydraulic grab bucket or a double-wheel milling machine frame, lower it to the bottom of the trench, and then perform repeated cleaning along the arc-shaped surface of the connecting concrete column. If the normal pressure of the scraper blade... Contact area Then the contact pressure is:

[0114] This value is within the recommended range. Internal. Brush roller speed High-pressure water .

[0115] If the total mass of the mud before cleaning Residue after cleaning Then the cleaning efficiency is:

[0116] satisfy The requirements were met. After cleaning, the image inspection module confirmed that the surface was free of mud, loose layers, and exposed fresh concrete.

[0117] (5) Hole cleaning and grout replacement and steel cage placement: After cleaning, the hole is cleaned and grout replaced again. After passing the inspection, the steel cage for the seepage prevention wall is placed.

[0118] (6) Concrete pouring: The concrete of the anti-seepage wall body is poured using the tremie pipe method. After the concrete comes into contact with the connecting concrete column, an integral arc interlocking joint is formed.

[0119] Waterproofing wall construction and BIM-based refined management: (1) Model establishment: Establish a BIM model of the anti-seepage wall according to the design drawings, including components such as guide wall, trench section, connecting concrete column, steel cage, equipment occupancy, mud circulation system, and monitoring point, and assign a unique code to each component.

[0120] (2) Data acquisition and transmission: Sensors are deployed on rotary drilling rigs, hydraulic grab buckets, twin-wheel milling machines, concrete pouring equipment, mud stations and environmental monitoring points, and data is uploaded to the management platform in real time through 5G / IoT gateways.

[0121] (3) Real-time rendering and early warning: The management platform associates real-time data with the BIM model. For example, when the measured hole slope of a certain groove section... Design allowable value When the relative deviation is calculated, it is as follows:

[0122] If set , If so, a level two warning will be triggered for that slot segment. The model changes from green to red and sends out disposal suggestions.

[0123] (4) Construction process traceability: The platform automatically records the time, personnel, equipment, parameters and test results of each process, forming an electronic archive of "one file per pile" and "one file per section", supporting quality traceability and subsequent operation and maintenance.

[0124] (5) Decision support: Based on historical and real-time data, the platform can provide the optimal trench excavation sequence, mud mix ratio adjustment suggestions, concrete supply plan and risk warning report to assist managers in making scientific decisions.

[0125] This invention binds the construction parameters of the underground hidden project of the seepage barrier wall to the BIM model components in real time, transforming the invisible processes of drilling, rock embedding, cleaning and pouring into a visible, quantifiable and early warning digital image, forming a closed-loop management of "real-time monitoring - deviation calculation - graded early warning - handling feedback - archive traceability", which solves the problems of traditional seepage barrier wall construction relying on manual records and experience judgment, invisible process and difficulty in quality traceability.

[0126] Specific embodiments have been used to illustrate the principles and implementation methods of this invention. The descriptions of the embodiments above are only for the purpose of helping to understand the method and core ideas of this invention. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this invention. Therefore, the content of this specification should not be construed as a limitation of this invention.

[0127] Those skilled in the art will recognize that the embodiments described herein are intended to help the reader understand the principles of the invention, and should be understood that the scope of protection of the invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific modifications and combinations based on the technical teachings disclosed in this invention without departing from the spirit of the invention, and these modifications and combinations are still within the scope of protection of this invention.

Claims

1. A novel joint structure for ultra-deep concrete anti-seepage walls, characterized in that, include: The seepage barrier wall is constructed by pouring multiple sections of concrete in sequence. The connecting concrete column is pre-constructed at the joint between adjacent anti-seepage wall sections, and its diameter is larger than the wall thickness of the anti-seepage wall body. The arc-shaped side of the connecting concrete column forms an arc-shaped interlocking joint with the ends of the two adjacent anti-seepage wall body sections; wherein, the depth of the connecting concrete column penetrates the upper covering layer and is embedded in the lower bearing layer, and the arc-shaped side of the connecting concrete column is free of mud skin and loose layer after cleaning, and contacts the concrete of the anti-seepage wall body to form an anti-seepage curtain.

2. The novel ultra-deep concrete anti-seepage wall joint structure according to claim 1, characterized in that, The connecting concrete column is equipped with a structural steel cage and / or grouting pipe. The diameter of the connecting concrete column Its arc-shaped contact length ; in, The thickness of the seepage barrier wall body, This is for the overlap allowance.

3. A construction method applied to the novel ultra-deep concrete anti-seepage wall joint structure as described in any one of claims 1 to 2, characterized in that, Includes the following steps: S100. Complete construction preparation and position the current trench section of the anti-seepage wall body to support the positioning of the anti-seepage wall trenching equipment and the positioning of the connecting concrete columns. S200: Drilling is carried out at the joint between the guide walls by designing drilling parameters before construction, real-time monitoring of the drilling process, identification of the bearing layer and determination of the final hole. S300, Concrete column pouring based on drilling between guide walls; S400: In response to the concrete column reaching the set strength, the concrete column is cleaned by a multi-functional concrete column cleaning equipment with a scraper and brush. After the cleaning is qualified, the hole is cleaned and the slurry is replaced, and the anti-seepage wall steel cage is hoisted, the anti-seepage wall body concrete is poured, and the adjacent trench is excavated.

4. The construction method according to claim 3, characterized in that, S200 includes the following steps: S201. Drilling parameter design: Based on the borehole diameter and formation compressive strength, the maximum torque, drilling pressure and drilling speed required for drilling under initial working conditions are estimated as initial drilling parameters. S202. Real-time monitoring of the drilling process: Based on the current drilling parameters, multiple physical indicators are collected synchronously with the drilling time and hole depth by multiple sensors deployed on the rotary drilling rig during the drilling process, including drilling pressure, torque, rotation speed, drilling speed, drill string vibration, hole inclination and cuttings return. S203, Drilling Parameter Adjustment: Based on the collected multi-physical indicators, a closed-loop control strategy of target tracking and over-limit protection is adopted to dynamically adjust the drilling parameters; S204, Bearing Layer Identification: Based on the collected multi-physical indicators, the bearing layer identification index is calculated by weighted fusion of multi-source information; The bearing layer identification index is compared with the preset identification threshold to determine whether the bearing layer has been entered. If so, retrieve rock samples from the bottom of the borehole for identification and verification, and continue drilling to the designed depth of rock penetration to complete the drilling construction; If not, return to S202.

5. The construction method according to claim 4, characterized in that, In step S203, the dynamic adjustment of drilling parameters includes: Using the estimated initial drilling speed as the target rotational speed, the target rotational speed is tracked and dynamically adjusted. The adjustment formula is as follows: In the formula, For speed deviation, For the target speed value, for The actual drilling speed at any given moment; When the measured rotational speed is lower than the target rotational speed, the drilling pressure is automatically increased; when it is higher than the target rotational speed, the drilling pressure is automatically decreased. Within the rated drilling pressure range of the drilling rig, the formula for dynamic adjustment of drilling pressure is: In the formula, for The drill bit shaft pressure at any given moment. Let be the drill bit axial pressure at time t. This is the proportional adjustment coefficient; When the measured torque At this time, the drilling pressure is reduced proportionally to adjust the torque, which is expressed as follows: In the formula, This is the corrected drilling pressure after torque over-limit protection. The drill bit axial pressure before correction. This is the load reduction factor. This refers to the rated torque of the power head.

6. The construction method according to claim 4, characterized in that, S204 includes the following steps: S204-1. During the drilling process, the average drilling pressure, average torque, average drilling speed and vibration reference coefficient of the drill bit in the overburden layer are statistically analyzed and used as the discrimination criteria. S204-2. Based on the collected multi-physical indicators, calculate the drill pressure surge increment, torque fluctuation difference, drilling speed attenuation rate, vibration spectrum characteristic change and the area ratio of returned cuttings at the current depth. S204-3. Based on the discrimination criteria, the drill pressure surge increment, torque fluctuation standard deviation, drilling speed attenuation rate, drill string vibration spectrum characteristic coefficient and the proportion of returned cuttings are weighted and fused into a bearing layer identification index. S204-4. Determine whether the bearing layer identification index is greater than the preset identification threshold. If so, then enter the bearing layer, retrieve rock samples from the bottom of the hole for identification and verification, and continue drilling to the designed rock penetration depth to complete the drilling construction; If not, return to S202.

7. The construction method according to claim 4, characterized in that, The bearing layer identification index The calculation formula is: In the formula, For drilling pressure surge increment, For the standard deviation of torque, The average drilling speed of the overburden layer. For real-time drilling speed, These are the characteristic coefficients of the drill string vibration spectrum. The percentage of returned slag and rock debris area. The average drilling pressure of the overburden layer. The average torque of the coating layer, The vibration reference coefficient for the overburden layer, This represents the average percentage of cutter and rock cuttings area returned during the normal drilling phase of the overburden layer. , , , and The weights are respectively the drill pressure surge increment, torque fluctuation standard deviation, drilling speed attenuation rate, drill string vibration spectrum characteristic coefficient, and the proportion of returned cuttings.

8. The construction method according to claim 3, characterized in that, In the S400, the multi-functional concrete connecting column surface cleaning equipment includes a suspended frame, an arc-shaped scraper, a rotating steel wire brush roller, a high-pressure water / air jet assembly, a sludge collection tank, and a real-time image detection module. The suspended frame is connected to the main unit via a quick connector and carries the arc-shaped shovel, rotating wire brush roller, high-pressure water / air jet assembly, sludge collection tank and real-time image detection module. The radius of curvature of the curved blade is matched with the outer diameter of the connecting concrete column, and it is attached to the surface of the connecting concrete column through an elastic pressure mechanism. It adaptively floats and fits the connecting concrete column when the curvature changes or there is local unevenness, so as to scrape the mud and loose layer on the surface of the connecting concrete column. When cleaning the connecting concrete column, the contact pressure between the curved blade and the surface of the connecting concrete column is adjusted by the elastic pressure mechanism. The rotating steel wire brush roller mechanically scrubs the surface of the concrete column connected after the scraper, removing the residual thin layer of mud. The high-pressure water / air jet assembly washes away residues on the surface and in the gaps of the connecting concrete column; The sludge collection tank collects the stripped sludge and removes it from the tank along with the equipment. The real-time image detection module transmits the cleaned images to the ground monitoring terminal in real time.

9. The construction method according to claim 3, characterized in that, Also includes: Implement BIM-based refined management of the entire construction process, including: During construction, multi-dimensional monitoring indicators are collected in real time, including equipment operating parameters, trenching and hole forming quality parameters, mud parameters, concrete pouring parameters, cleaning equipment parameters, and progress and environmental parameters. In the anti-seepage wall construction management platform, a BIM model of the anti-seepage wall is constructed, each component is assigned a unique code, and the real-time collected monitoring indicators are mapped to the corresponding components of the anti-seepage wall BIM model according to the code. The anti-seepage wall construction management platform provides a visual display of the anti-seepage wall construction process and guides the anti-seepage wall pouring and construction status early warning. Among them, the construction status early warning includes: For each monitoring indicator, determine the corresponding construction deviation indicator; Based on the construction deviation indicators corresponding to each monitoring indicator, the construction status of each monitoring indicator is determined, including normal, first-level warning and second-level warning; Based on the construction status corresponding to each monitoring indicator, implement the corresponding disposal measures.