Tunnel raft and column wall integrated pre-backfill top-down construction method

By using the integrated tunnel raft foundation and column wall pre-filling reverse construction method, the problems of high cost of temporary foundation pit support, many cold joints and poor waterproof performance in traditional open-cut tunnel construction are solved, and efficient overall cast-in-place construction and improved durability are achieved.

CN123133418APending Publication Date: 2026-11-20CHINA HARBOUR ENGINEERING +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611537484.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Traditional open-cut tunnel construction suffers from problems such as high cost of temporary support for the foundation pit, numerous cold joints in the phased pouring of the structure, low formwork turnover efficiency, and poor waterproofing performance.

Method used

The tunnel raft foundation and column wall are integrated with the pre-filling reverse construction method. The permanent slope protection structure is formed by backfilling the side walls of the foundation pit in layers. The raft foundation and side walls are cast in place as a whole using a formwork trolley. Combined with the step method of casting, cold joints are eliminated and effective waterproofing measures are provided.

Benefits of technology

It reduced the cost of temporary support, eliminated cold joints, improved construction efficiency and waterproofing performance, enhanced the durability and safety of the tunnel, and shortened the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133418A_ABST
    Figure CN123133418A_ABST
Patent Text Reader

Abstract

This invention provides a reverse construction method for integrated tunnel raft foundation and wall structure with pre-fill backfilling. The method includes: S1, foundation treatment and waterproofing; S2, pre-fill layered backfilling of the pit sidewalls; S3, cast-in-place construction of the bottom slab; S4, integrated cast-in-place construction of the raft foundation and sidewalls; and S5, cyclic sliding of the wall formwork trolley and construction of the top slab. Breaking away from the traditional step-by-step casting mode, this method uses the outer pre-filled soil as a constraint boundary, combined with the inner formwork trolley, to achieve large-volume integrated cast-in-place construction of the raft foundation and walls, completely eliminating construction cold joints. The pre-filled soil not only provides a natural lateral pressure resistance boundary but also effectively inhibits hydration heat cracking, cutting off seepage channels at the source and significantly improving tunnel durability. Furthermore, the pre-fill layered backfilling reverse construction method utilizes compacted soil to directly form a permanent retaining structure, completely replacing expensive temporary slope support and saving on the cost of large-scale support erection and dismantling; it also avoids the risk of collapse under adverse geological conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel construction, and in particular to a method for integrated tunnel raft foundation and column wall pre-filling reverse construction. Background Technology

[0002] With the rapid development of urban underground space and transportation infrastructure (such as airport links and urban rail transit), large-section, multi-compartment underground tunnel projects are becoming increasingly common. Open-cut tunnel construction typically faces numerous engineering challenges, including deep overburden, large cross-sections, complex geological conditions, and high groundwater levels.

[0003] Traditional open-cut tunnel construction generally employs the "continuous construction method," with the standard procedure being: "slope excavation and temporary support of the foundation pit, subbase and waterproofing construction, phased pouring of the foundation slab, step-by-step pouring of the walls, cast-in-place roof slab, and removal of external support and backfilling." However, with the increasing scale of tunnels and stricter time requirements, existing traditional methods have revealed the following significant technical shortcomings: First, the long-term exposure of the foundation pit poses a high risk, and the cost of temporary support is exorbitant.

[0004] In traditional construction processes, the foundation pit is excavated to the bottom slab and then the walls are constructed sequentially, requiring a long exposure period for the pit slopes. To prevent slope slippage or collapse in complex geological conditions (such as sandy or gravelly strata), the construction team must erect a large and expensive temporary slope support system (such as sheet piles and soil nailing walls) around the perimeter of the foundation pit. This not only significantly occupies the construction boundary space, causing project costs to soar, but also often creates conflicts between the outer support and the subsequent installation and dismantling of the wall formwork.

[0005] Secondly, the phased pouring of the structure results in numerous cold joints, posing significant risks to waterproofing and durability.

[0006] Limited by traditional formwork technology and the difficulty of controlling the lateral pressure of cast-in-place concrete, traditional tunnel main structures often adopt a phased and segmented alternating pouring pattern of "pouring the bottom slab (or raft slab) first, then pouring the side walls and intermediate walls." This step-by-step pouring inevitably produces a large number of horizontal and vertical "construction cold joints" at the junction of the raft slab and the walls. For tunnels that are constantly exposed to groundwater, construction cold joints are weak points in the structural stress and high-risk areas for groundwater leakage, seriously threatening the waterproofing quality and long-term durability of the tunnel.

[0007] Third, the installation and dismantling of large wall formwork is cumbersome, and the fragmented process leads to low efficiency.

[0008] The sidewalls and central walls of large-section tunnels are massive, and the uncured grout generates enormous lateral water column pressure during the pouring of large volumes of concrete. Current technology, for the sake of explosion-proof formwork, relies heavily on external diagonal bracing systems or full-scale scaffolding for the outer wall formwork, while the central wall requires complex tie rod supports. This external support system is not only time-consuming and labor-intensive to install and dismantle, making efficient continuous operation impossible, but the fragmented process of "formwork erection first, pouring later, and then backfilling the outer side" also prevents the backfill soil from providing timely lateral geological protection in the early stages of structural formation. Summary of the Invention

[0009] The main objective of this invention is to provide a method for integrated tunnel raft foundation and column wall pre-filling reverse construction, which solves problems such as high cost of temporary support for foundation pits, numerous cold joints in staged structural casting, low formwork turnover efficiency, and poor anti-seepage performance.

[0010] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a method for integrated tunnel raft foundation and column wall pre-filling reverse construction, the method comprising: S1. Foundation treatment and waterproofing construction: A cushion layer is poured at the bottom of the tunnel foundation trench, and a waterproof layer is laid on the upper surface of the cushion layer; S2. Pre-filling of the pit sidewalls in layers: Backfilling material in layers along the pit sidewalls to the design bottom elevation of the raft foundation and compacting it, using the backfilled soil to form active earth pressure on the pit sidewalls, thus constructing the outer boundary as a permanent slope protection structure. S3. Cast-in-place construction of the base slab: The base slab concrete is continuously poured on top of the waterproof layer to form the base slab; S4. Integrated cast-in-place construction of raft slab and sidewalls: Before the initial setting of the bottom slab concrete, a wall formwork trolley that can slide along the longitudinal direction of the tunnel is used to support the inner side of the sidewalls; the permanent slope protection structure in step S2 is used as the outer constraint boundary, and the reinforcement binding of the raft slab and sidewalls is completed simultaneously. With the cooperation of the inner rigid support provided by the wall formwork trolley, the concrete is poured continuously in one go, so that the raft slab and sidewalls are integrated into one piece. S5. Wall formwork trolley cyclic sliding and roof slab construction: After the poured concrete reaches the preset demolding strength, drive the wall formwork trolley to demold and move it longitudinally along the tunnel to the next construction section for cyclic operation; set up a support system in the formed tunnel and carry out the cast-in-place construction of the tunnel roof slab.

[0011] In the preferred embodiment, the underground tunnel is a multi-compartment tunnel structure including a central wall; In step S4, while performing the inner formwork of the side walls, the wall formwork trolley is used simultaneously to perform the double-sided formwork of the middle wall. The reinforcement binding of the central wall, raft slab, and side walls was completed simultaneously, and the concrete was poured at the same time.

[0012] In the preferred embodiment, in step S2, the backfill material is plain soil or graded sand and gravel, the thickness of a single layer of backfill is less than or equal to 300mm, and the elevation is re-measured after backfilling to the design bottom elevation of the raft foundation.

[0013] In the preferred embodiment, the wall formwork trolley includes portal frame columns that span both sides of the central wall, and the tops of the portal frame columns on both sides are fixedly connected to the top main beam to form a portal frame. The bottom of the gantry column is equipped with a traveling mechanism with a locking mechanism; Lateral formwork supports are connected to both the inner and outer sides of the gantry column. Wall formwork is installed on the outer end face of the lateral formwork supports away from the gantry column, so as to simultaneously support the central wall inward and the side wall outward.

[0014] In the preferred embodiment, the lateral formwork support includes a lateral support frame; The wall formwork includes multiple sliding carriages that are slidably assembled on the side support frame, and a shaped formwork installed on the outside of the sliding carriages; A translation hydraulic cylinder is fixed on the side support frame. The telescopic end of the translation hydraulic cylinder is connected to the translation slide to drive the forming template to perform lateral mold closing and demolding. A lifting hydraulic cylinder is installed between the translational carriage and the forming template to drive the forming template to adjust its vertical elevation.

[0015] In the preferred embodiment, the side support frame includes a main frame and multiple support beams fixedly installed therein, and each support beam is fixedly equipped with a guide sleeve. The translational carriage includes guide columns that are slidably inserted into each guide sleeve. The front ends of all guide columns are fixedly connected by a connecting beam to form a synchronous linkage frame. The tail end of each guide column is provided with an anti-detachment limiting block to prevent it from detaching from the guide sleeve. The cylinder body of the translational hydraulic cylinder is located on the support beam, and its telescopic end is connected to the connecting beam for transmission, so as to drive each guide slide column to move synchronously in a straight line through the connecting beam.

[0016] In the preferred embodiment, the forming template includes a template panel and a supporting back rib fixed to its back. The supporting back rib is composed of a crossbeam and a longitudinal beam located outside the crossbeam. Vertical guide grooves are provided on both sides of the longitudinal beam. The outer side of the translation slide is fixed with a lifting guide seat corresponding to each longitudinal beam. The lifting guide seat is engaged in the corresponding vertical guide groove in a way that can slide up and down, forming a vertical sliding guide pair. A lifting support seat is fixed on the top end face of the longitudinal beam; a lifting hydraulic cylinder is installed on the uppermost translational slide, and the extension end of the lifting hydraulic cylinder is connected to the lifting support seat to drive the forming template to be vertically lifted and lowered along the lifting guide seat.

[0017] In the preferred embodiment, the vertical guide groove is provided with multiple through-holes for elevation positioning along its length; the lifting guide seat is equipped with a self-locking pin assembly, which is adapted to selectively engage with any of the elevation positioning holes to lock the forming template after the lifting adjustment.

[0018] In the preferred embodiment, in step S4, the overall one-time continuous concrete pouring adopts the step method, with a single layer thickness of 300mm and a single layer step length of 3-5m. When using the stepped pouring method, the interval between each pour should be less than 6 hours, and the vibrator of the immersion vibrator should be inserted to a depth of 5 cm or more into the lower layer of concrete.

[0019] In the preferred embodiment, in step S1, the waterproof layer is a polyolefin FPO sheet waterproof membrane, which is laid on the underlayment by hot air welding.

[0020] This invention provides a reverse construction method for the integrated pre-filling backfill of tunnel raft foundation and column wall, breaking the traditional step-by-step casting mode. Using the outer pre-filled soil as a constraint boundary, and in conjunction with the inner formwork trolley, it achieves large-volume integrated casting of the raft foundation and wall, completely eliminating construction cold joints. The pre-filled soil not only provides a natural lateral pressure-resistant boundary but also effectively inhibits hydration heat cracking, cutting off seepage channels at the source and significantly improving tunnel durability. Furthermore, the reverse construction method of pre-filled layered backfill utilizes compacted soil to directly form a permanent retaining structure, completely replacing expensive temporary slope support and saving the cost of large-scale support erection and dismantling. It avoids the risk of collapse under severe geological conditions, greatly improving safety and shortening the overall construction period. Attached Figure Description

[0021] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is a construction structure diagram of the cushion layer of the present invention; Figure 2 This is a construction structure diagram of the backfill soil according to the present invention; Figure 3 This is a construction structure diagram of the base plate of the present invention; Figure 4 This is a construction structural diagram of the side walls, raft slab, and central wall of the present invention; Figure 5 This is a construction structure diagram of the top plate of the present invention; Figure 6 This is a structural diagram of the wall formwork trolley of the present invention; Figure 7 This is a structural diagram showing the connection between the side support frame and the wall template of the present invention; Figure 8 This is the present invention. Figure 7 Another perspective on the structure diagram; Figure 9This is the present invention. Figure 8 Exploded structure diagram; Figure 10 This is a structural diagram of the side support frame of the present invention; Figure 11 This is a structural diagram of the molding template of the present invention; Figure 12 This is a structural diagram of the translational carriage of the present invention; Figure 13 This is a structural diagram showing the connection between the support frame and the translational carriage of the present invention.

[0022] In the diagram: 1. Subbase; 2. Backfill soil; 3. Base slab; 4. Side wall; 5. Raft slab; 6. Wall formwork trolley; 60. Portal column; 61. Top main beam; 62. Lateral support frame; 620. Lower platform; 621. Upper platform; 623. Ladder; 624. Side support frame; 6240. Main frame; 6241. Support beam; 6242. Guide sleeve; 6242. Wall formwork; 63. Translation slide; 630. Guide slide column; 6300. Connecting beam; 6301. Lifting guide seat; 6302. Self-locking pin assembly; 6303. Anti-detachment limit block; 6305. Forming template; 631. Template panel; 6310. Horizontal beam; 6311. Longitudinal beam; 6312. Vertical guide groove; 6313. Elevation positioning hole; 6314. Lifting support seat; 6315. Translation hydraulic cylinder; 632. Lifting hydraulic cylinder; 633. Middle wall; 7. Top slab; 8. Detailed Implementation

[0023] Example 1 like Figure 1-5 As shown, a method for integrated tunnel raft foundation and column wall pre-filling reverse construction is presented. Its core lies in utilizing the synergy between the outer soil mass and the inner equipment support, completely eliminating the need for the full-span scaffolding required for traditional large-section tunnels. The specific construction procedures are as follows: S1. Foundation treatment and waterproofing construction: After the bottom surface of the tunnel foundation trench is leveled and compacted, the foundation layer 1 is poured. After the foundation layer 1 reaches the preset strength, a waterproof layer is laid on its upper surface. To ensure high strength and impermeability, the waterproof layer is made of polyolefin FPO sheet waterproof membrane, which is seamlessly laid on the foundation layer 1 by hot air welding.

[0024] S2. Pre-filling of the pit sidewalls in layers: After the waterproofing layer has passed construction and acceptance, the traditional sequential construction logic of "structure first, backfill later" is completely broken. Plain soil or graded sand and gravel are immediately backfilled in layers along the pit sidewalls as filling material. During backfilling, the thickness of each layer is strictly controlled to be less than or equal to 300mm. Layered compaction is performed, and the backfill is carried out to the designed bottom elevation of the raft foundation 5 before re-measuring the elevation. This step utilizes the compacted backfill soil 2 to create active earth pressure on the pit sidewalls, constructing an outer rigid boundary that serves as a permanent slope protection structure.

[0025] S3, the bottom slab 3 is constructed in place, with the side formwork of the tunnel bottom slab 3 installed above the waterproof layer. The bottom slab side formwork is supported on the foundation layer 1. To prevent the formwork from shifting during the large-volume pouring at the bottom, diagonal bracing is used on the outside of the side formwork, and tie rods are used inside to connect it to the structural steel reinforcement, forming an external support and internal tension reinforcement system. Subsequently, the bottom slab concrete is continuously poured to form bottom slab 3. The pre-solidified bottom slab 3 will provide the bottom positioning benchmark for the subsequent external formwork.

[0026] S4. The raft foundation 5 and the wall are integrally cast in place. Before the concrete of the bottom slab 3 initially sets, the inner formwork of the side wall 4 is supported by the wall formwork trolley 6, which can slide along the longitudinal direction of the tunnel, and the double-sided formwork of the middle wall 7 is carried out simultaneously.

[0027] During this process, the permanent slope retaining structure formed in step S2, namely the backfill soil 2, serves as the outer constraint boundary to resist lateral pressure. Simultaneously, the reinforcement binding of the raft slab 5, side walls 4, and central wall 7 is completed. With the cooperation of the inner rigid support provided by the wall formwork trolley 6, the entire structure is continuously poured in one go.

[0028] Among them, the pouring parameters for preventing cold joints are controlled as follows: the overall continuous pouring of concrete must strictly adopt the stepped pouring method, the thickness of a single layer is controlled at 300mm, and the step length of a single layer is 3-5m. The interval between layer pouring must be less than 6 hours, and the vibrator of the immersion vibrator must be inserted into the lower layer of concrete to a depth of greater than or equal to 5cm, so as to prevent construction cold joints at the interface of large-volume concrete from the source.

[0029] S5. The wall formwork trolley circulates and slides during roof slab construction. After the poured concrete reaches the preset demolding strength, the wall formwork trolley 6 is driven to shrink and demold, and then the traveling mechanism at the bottom of the trolley is used to push it longitudinally along the tunnel to the next construction section for continuous operation. Finally, a support system is erected in the formed tunnel for the in-situ casting of the tunnel roof slab 8.

[0030] Example 2 Further explanation in conjunction with Example 1, such as Figure 6-13 The structure shown is for realizing the large-volume integrated cast-in-place casting in step S4 above. The specific structure of the wall formwork trolley 6 used in this embodiment is as follows: The wall formwork trolley 6 includes portal frame columns 60 spanning both sides of the central wall 7. The tops of the portal frame columns 60 are fixedly connected by a top main beam 61 to form a high-rigidity portal frame. The bottom of the portal frame columns 60 is equipped with a traveling mechanism with a locking mechanism for transferring sections in step S5.

[0031] In this embodiment, the walking mechanism adopts track wheels with locking mechanisms, and the base plate 3 is equipped with tracks that match the track wheels, thereby ensuring the stable movement of the wall formwork trolley 6. At the same time, when setting up the formwork, it can lock itself in place through the locking mechanism.

[0032] Both the inner and outer sides of the gantry column 60 are connected to lateral formwork supports 62. The outer end face of the lateral formwork supports 62 away from the gantry column 60 is equipped with wall formwork 63, thereby realizing synchronous bidirectional formwork support for the central wall 7 inward and the side wall 4 outward.

[0033] Among them, the central wall 7 is the formwork supported by two wall templates 63 on opposite sides of the two portal frame columns 60.

[0034] In a preferred embodiment, the lateral formwork support 62 includes an upper platform 621 and a lower platform 620 fixed to the side of the gantry column 60. A ladder 623 is provided between the upper platform 621 and the lower platform 620 for construction workers to climb to the upper platform 621. A guardrail is provided on the outer edge of the upper platform 621 for safety protection. A side support frame 624 is provided between the outer sides of the upper platform 621 and the lower platform 620.

[0035] The side support frame 624 includes a main frame 6240 and multiple support beams 6241 fixedly therein. To ensure that the wall formwork 63 does not skew or get stuck when it is moved, each support beam 6241 is fixedly equipped with a guide sleeve 6242.

[0036] The wall formwork 63 includes multiple translational carriages 630 that are slidably mounted on the side support frame 624, and a forming template 631 installed on the outside of the translational carriages 630. The number of support beams 6241 corresponds to the number of translational carriages 630.

[0037] The translational slide 630 includes guide pins 6300 that are slidably inserted into each guide sleeve 6242. The front ends of all guide pins 6300 are fixedly connected by a connecting beam 6301 to form a synchronous linkage frame, and each guide pin 6300 is provided with an anti-detachment limiting block 6305 at its tail end to prevent it from detaching from the sleeve when subjected to force.

[0038] A translational hydraulic cylinder 632 is mounted on the supporting crossbeam 6241, and its telescopic end is connected to the connecting beam 6301. By driving the connecting beam 6301 through the translational hydraulic cylinder 632, all the guide slides 6300 can be moved synchronously in a straight line within the guide sleeve 6242, thereby driving the front forming template 631 to perform smooth lateral mold closing and demolding.

[0039] In the preferred embodiment, to ensure precise positioning of the elevation of complex underground tunnels, a supporting back rib composed of a crossbeam 6311 and an outer longitudinal beam 6312 is fixed to the back of the forming template 631. Vertical guide grooves 6313 are provided on both sides of the longitudinal beam 6312.

[0040] A lifting guide seat 6302 corresponding to each longitudinal beam 6312 is fixedly provided on the outward side of the translation slide 630. The lifting guide seat 6302 is engaged in the corresponding vertical guide groove 6313 in a sliding manner to form a highly stable vertical sliding guide pair. A lifting support seat 6315 is fixedly provided on the top end face of the longitudinal beam 6312; a lifting hydraulic cylinder 633 is installed on the uppermost translation slide 630. The telescopic end of the lifting hydraulic cylinder 633 pushes the lifting support seat 6315 to drive the entire forming template 631 to vertically lift and lower along the lifting guide seat 6302.

[0041] To prevent the formwork from collapsing due to the decompression of the lifting hydraulic cylinder 633 caused by long-term high-frequency vibration of large-volume concrete, the vertical guide groove 6313 is provided with multiple through-holes 6314 along its length.

[0042] The lifting guide seat 6302 is equipped with a self-locking pin assembly 6303. When the lifting hydraulic cylinder 633 adjusts the template to the elevation, the self-locking pin assembly 6303 selectively engages with the corresponding elevation positioning hole 6314, thereby locking the forming template 631.

[0043] The above embodiments are merely preferred technical solutions of the present invention and should not be considered as limitations on the present invention. The scope of protection of the present invention should be limited to the technical solutions described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the scope of protection of the present invention.

Claims

1. A method for integrated tunnel raft foundation and column wall pre-filling reverse construction, characterized in that: The construction method includes: S1. Foundation treatment and waterproofing construction: A cushion layer (1) is poured on the bottom surface of the tunnel foundation trench, and a waterproof layer is laid on the upper surface of the cushion layer (1); S2, Pre-filling of the pit sidewall: Backfill material is backfilled in layers along the pit sidewall to the design bottom elevation of the raft slab (5) and compacted. The backfill soil (2) is used to form active earth pressure on the pit sidewall, and the outer boundary is constructed as a permanent slope protection structure. S3, Bottom Slab (3) Cast-in-place construction: The bottom slab concrete is continuously poured above the waterproof layer to form the bottom slab (3). S4. Integrated cast-in-place construction of raft slab (5) and side wall (4): Before the initial setting of the concrete of the bottom slab (3), the inner formwork of the side wall (4) is supported by a wall formwork trolley (6) that can slide along the longitudinal direction of the tunnel; the permanent slope protection structure in step S2 is used as the outer constraint boundary, and the steel reinforcement binding of the raft slab (5) and the side wall (4) is completed simultaneously. With the cooperation of the inner rigid support provided by the wall formwork trolley (6), the concrete is continuously poured in one go, so that the raft slab (5) and the side wall (4) are integrated into one. S5. Wall formwork trolley (6) cyclic sliding and top slab (8) construction: After the poured concrete reaches the preset demolding strength, drive the wall formwork trolley (6) to demold and move it along the tunnel longitudinal direction to the next construction section for cyclic operation; set up a support system in the formed tunnel and carry out the cast-in-place construction of the tunnel top slab (8).

2. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 1, characterized in that: The underground tunnel is a multi-compartment tunnel structure including a central wall (7); In step S4, when the inner side formwork of the side wall (4) is being constructed, the wall formwork trolley (6) is used simultaneously to construct the double side formwork of the middle wall (7). The reinforcement binding of the central wall (7) was completed simultaneously with that of the raft slab (5) and the side walls (4), and the concrete was poured simultaneously.

3. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 1, characterized in that: In step S2, the backfill material for the backfill soil (2) is plain soil or graded sand and gravel. The thickness of a single backfill layer is less than or equal to 300 mm. After backfilling in layers to the design bottom elevation of the raft slab (5), the elevation is re-measured.

4. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 2, characterized in that: The wall formwork trolley (6) includes portal frame columns (60) spanning both sides of the central wall (7), and the tops of the portal frame columns (60) on both sides are fixedly connected to the top main beam (61) to form a portal frame; The bottom of the gantry column (60) is equipped with a traveling mechanism with a locking mechanism; Both the inner and outer sides of the gantry column (60) are connected to lateral formwork frames (62). The outer end face of the lateral formwork frame (62) away from the gantry column (60) is equipped with wall formwork (63) to provide simultaneous formwork support for the central wall (7) inward and the side wall (4) outward.

5. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 4, characterized in that: The lateral formwork support (62) includes a side support frame (624); The wall formwork (63) includes a plurality of translational carriages (630) slidably mounted on the side support frame (624), and a forming template (631) installed on the outside of the translational carriages (630). A translational hydraulic cylinder (632) is fixed on the side support frame (624). The telescopic end of the translational hydraulic cylinder (632) is connected to the translational slide (630) to drive the molding template (631) to perform lateral mold closing and demolding. A lifting hydraulic cylinder (633) is provided between the translation slide (630) and the forming template (631) to drive the forming template (631) to adjust the vertical elevation.

6. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 5, characterized in that: The side support frame (624) includes a main frame (6240) and multiple support beams (6241) fixedly installed therein, and each support beam (6241) is fixedly fitted with a guide sleeve (6242). The translational slide (630) includes guide slides (6300) that are slidably inserted into each guide sleeve (6242). The front ends of all guide slides (6300) are fixedly connected by a connecting beam (6301) to form a synchronous linkage frame. The tail end of each guide slide (6300) is provided with an anti-detachment limiting block (6305) to restrict its detachment from the guide sleeve (6242). The cylinder body of the translational hydraulic cylinder (632) is located on the support beam (6241), and its telescopic end is connected to the connecting beam (6301) for transmission, so as to drive each guide slide column (6300) to move synchronously in a straight line through the connecting beam (6301).

7. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 6, characterized in that: The forming template (631) includes a template panel (6310) and a support back rib fixed to its back. The support back rib is composed of a cross beam (6311) and a longitudinal beam (6312) located outside the cross beam (6311). Vertical guide grooves (6313) are provided on both sides of the longitudinal beam (6312). The outer side of the translation slide (630) is fixed with a lifting guide seat (6302) corresponding to each longitudinal beam (6312). The lifting guide seat (6302) is engaged in the corresponding vertical guide groove (6313) in a way that can slide up and down, forming a vertical sliding guide pair. A lifting support seat (6315) is fixed on the top end face of the longitudinal beam (6312); a lifting hydraulic cylinder (633) is installed on the uppermost sliding slide (630), and the telescopic end of the lifting hydraulic cylinder (633) is connected to the lifting support seat (6315) to drive the forming template (631) to be vertically lifted and lowered along the lifting guide seat (6302).

8. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 7, characterized in that: The vertical guide groove (6313) is provided with a plurality of through elevation positioning holes (6314) spaced apart along its length; the lifting guide seat (6302) is equipped with a self-locking pin assembly (6303), which is adapted to selectively engage with any elevation positioning hole (6314) to lock the forming template (631) after lifting adjustment.

9. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 1, characterized in that: In step S4, the overall one-time continuous concrete pouring adopts the step method, with a single layer thickness of 300mm and a single layer step length of 3-5m. When using the stepped pouring method, the interval between each pour should be less than 6 hours, and the vibrator of the immersion vibrator should be inserted to a depth of 5 cm or more into the lower layer of concrete.

10. The method for integrated tunnel raft foundation and column wall pre-filling reverse construction according to claim 1, characterized in that: In step S1, the waterproof layer is a polyolefin FPO sheet waterproof membrane, which is laid on the pad layer (1) by hot air welding.