A pile foundation surveying and lofting device for lime-soil pile distribution and an intelligent sensing and positioning method thereof

By combining multiple layout units, drive mechanisms, and intelligent sensing and positioning modules, the problems of manual layout errors and limited applicability of large pile spacing in lime-soil pile layout construction are solved, achieving efficient and accurate layout and automated construction.

CN123133433APending Publication Date: 2026-11-205TH ENGINEERING LTD OF THE FIRST HIGHWAY ENGINEERING BUREAU CCCC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611535952.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the existing lime-soil pile layout construction, the cumulative error of manual layout leads to an increase in pile position deviation, which affects the pile layout accuracy and construction quality, and is also inefficient. The existing equidistant layout device has a limited range of applications under large pile spacing conditions.

Method used

Multiple layout units, drive mechanisms, and equidistant linkage mechanisms are employed, combined with an intelligent sensing and positioning module, to enable the layout units to unfold equidistantly along the crossbeam. The intelligent sensor detects the engagement position between the cam shaft and the drive unit to ensure layout accuracy. Furthermore, the height of the storage tank is adjusted under large pile spacing conditions to avoid incorrect layout.

Benefits of technology

It improves the adaptability and accuracy of the layout device, reduces human error, increases construction efficiency, meets the layout requirements of different pile spacing conditions, and avoids lime waste and interference from invalid points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133433A_ABST
    Figure CN123133433A_ABST
Patent Text Reader

Abstract

The present application relates to the technical fields of engineering lofting, and specifically relates to a pile foundation measurement lofting device for loosing of lime-soil piles and an intelligent sensing positioning method thereof, comprising: a frame body comprising a cross beam; a plurality of lofting units equidistantly arranged along the length direction of the cross beam, and each of the lofting units is provided with a lofting structure at the lower end thereof; a driving mechanism comprising a bracket movable along the length direction of the cross beam and a driving portion provided at the lower end of the bracket, the driving portion having an inclined surface and a horizontal surface; an equidistant linkage mechanism comprising a protruding shaft corresponding to the lofting units, the protruding shaft being matched with the driving portion so as to sequentially unfold the plurality of lofting units along the length direction of the cross beam during the movement of the bracket, and the spacing between the adjacent two groups of lofting structures is equal to the preset pile spacing; and an intelligent sensing positioning module comprising an intelligent sensor, the intelligent sensor being used for detecting the matching position of the protruding shaft and the driving portion, and outputting a positioning control signal to control the action of the driving mechanism, thereby improving the construction speed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of engineering layout technology, specifically to a pile foundation measurement and layout device for lime-soil piles and its intelligent sensing and positioning method. Background Technology

[0002] In the construction of lime-soil piles, it is usually necessary to measure and mark the designed pile positions to facilitate subsequent hole drilling, filling, and compaction. Currently, existing technologies mostly use manual setting out, which involves measuring and marking the setting out positions one by one using measuring tools. With this method, as the number of setting out positions increases, the pile spacing error caused by manual measurement will gradually accumulate, leading to increased deviations in subsequent pile positions, affecting the accuracy of pile layout and construction quality. At the same time, manual setting out is inefficient and labor-intensive, making it difficult to meet the progress requirements of large-scale lime-soil pile construction.

[0003] To address the aforementioned issues, an equidistant layout device has emerged in the prior art. This device sets multiple sets of lime storage tanks on a crossbeam and uses an equidistant mechanism to distribute these tanks equidistantly along the crossbeam, thereby achieving one-time equidistant layout. However, in practical applications, it has been found that due to the limited length of the crossbeam, the maximum distance between two adjacent sets of lime storage tanks is restricted. When the designed pile spacing is large, it is difficult to meet the layout requirements. Furthermore, the adjustment range of the equidistant mechanism is limited, making it unable to flexibly adapt to different pile spacing conditions, especially the layout requirements under large pile spacing conditions, thus limiting the applicability of the device. Summary of the Invention

[0004] The purpose of this invention is to provide a pile foundation measurement and layout device for lime-soil piles and its intelligent sensing and positioning method to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution:

[0006] A pile foundation surveying and setting-out device for lime-soil pile layout includes:

[0007] The frame, including the crossbeams;

[0008] Multiple layout units are equidistantly arranged along the length of the crossbeam, and each layout unit has a layout structure at its lower end.

[0009] The driving mechanism includes a bracket that can move along the length of the crossbeam and a driving part disposed at the lower end of the bracket, the driving part having an inclined surface and a horizontal surface;

[0010] The equidistant linkage mechanism includes a convex shaft corresponding to the layout unit. The convex shaft cooperates with the drive unit to cause multiple layout units to unfold sequentially along the length direction of the crossbeam during the movement of the support, and to make the spacing between two adjacent sets of layout structures equal to the preset pile distance.

[0011] The intelligent sensing and positioning module includes an intelligent sensor, which is used to detect the mating position between the convex shaft and the driving part, and output a positioning control signal to control the action of the driving mechanism.

[0012] The pile foundation measurement and layout device for lime-soil piles as described above: side connecting plates are provided at both ends of the crossbeam, and the side connecting plates are used to support the crossbeam;

[0013] The layout unit includes a first connector and a second connector. The first connector and the second connector are arranged alternately along the length of the beam. The first connector is connected to the layout structure, and the first connector located at one end of the beam is fixedly connected to the beam.

[0014] The pile foundation measurement and layout device for lime-soil piles as described above: the equidistant linkage mechanism further includes a symmetrical component, the symmetrical component includes an upper structure connected to the layout unit, a connecting frame connected to the upper structure, and two sets of hinge rods, the two sets of hinge rods are respectively connected to the first connecting members located on both sides of the connecting frame, and the convex shaft is set on the connecting frame.

[0015] The pile foundation measurement and layout device for lime-soil piles as described above: the upper structure includes a guide sleeve connected to the second connecting member and a guide shaft connected to the connecting frame. The guide shaft is slidably connected to the guide sleeve. A cylindrical spring is also sleeved on the guide shaft. One end of the cylindrical spring is connected to the end of the guide shaft, and the other end is connected to the guide sleeve.

[0016] The pile foundation measurement and setting-out device for lime-soil piles as described above: the equidistant linkage mechanism further includes a stop structure, which is set between two adjacent sets of connecting frames, including an inner frame set on one set of connecting frames and a sliding connection part set on the other set of connecting frames. A linkage frame is slidably installed on the sliding connection part, and the linkage frame slides in cooperation with the inner frame.

[0017] The pile foundation measurement and layout device for lime-soil piles as described above: the layout structure includes a screw rod connected to the first connecting member and an adjusting rod threadedly engaged with the screw rod. The lower end of the adjusting rod is connected to a storage tank. A through hole is provided at the bottom of the storage tank. A sealing member is also provided at the bottom of the storage tank. An abutment shaft is provided on the sealing member that penetrates the bottom of the storage tank and extends to the outside of the storage tank.

[0018] The pile foundation measurement and setting-out device for lime-soil piles as described above: the screw is provided with an external thread, the adjusting rod has a hollow structure and is provided with an internal thread, and the external thread and the internal thread are threadedly engaged.

[0019] The pile foundation measurement and setting-out device for lime-soil piles as described above: the driving mechanism further includes a linear drive module, the bracket is slidably installed on the linear drive module, and the bracket and the linear drive module are connected by an adjuster.

[0020] A smart sensing and positioning method for a pile foundation measurement and layout device for lime-soil piles as described above includes the following steps:

[0021] Step 1: Place the crossbeam above the area to be laid out, and adjust the height of the support according to the preset pile spacing using the adjuster so that the horizontal plane of the drive unit can drive the convex shaft to move downward.

[0022] Step 2: Activate the linear drive module to move the bracket along the length of the crossbeam, and use the intelligent sensor to detect the engagement position of the cam shaft and the drive unit in real time, and output a positioning control signal;

[0023] Step 3: The drive unit pushes the convex shaft on the current connecting frame through the inclined surface, causing the connecting frame to drive the two sets of hinge rods to move, thereby causing the two adjacent sets of the first connecting parts to unfold along the length of the crossbeam until the convex shaft moves to the horizontal plane. At this time, the distance between the two adjacent sets of the layout structure is equal to the preset pile distance, and the movement stroke of the linear drive module is controlled according to the positioning control signal to keep the horizontal plane in contact with the convex shaft.

[0024] Step 4: The linear drive module continues to drive the support to move, so that the drive part engages with the next set of cam shafts in sequence, and the positioning of the connecting frame is maintained under the action of the stop structure until the multiple layout units are unfolded at equal intervals along the length of the beam in sequence;

[0025] Step 5: Lower the crossbeam so that the storage tank moves toward the area to be sampled. The abutting shaft first abuts against the area to be sampled and pushes the sealing component to move relative to the storage tank, so that the through hole is open and the lime falls into the area to be sampled to complete the sampling.

[0026] Compared with the prior art, the beneficial effects of the present invention are:

[0027] By setting up multiple layout units, drive mechanisms, and equidistant linkage mechanisms, when laying out small pile spacings, the height of the support can be preset using an adjuster, so that the horizontal plane of the drive unit abuts against the cam shaft. Under the action of symmetrical components and hinge rods, the adjacent first connecting parts are unfolded to the preset pile spacing. Then, the linear drive module drives the support to move, and the inclined surface cooperates with the subsequent cam shafts in sequence, so that multiple layout units are unfolded equidistantly along the length of the crossbeam. The stop structure prevents the positioned connecting frame from retracting, and the intelligent sensor provides real-time feedback on the cooperation position between the cam shaft and the drive unit, ensuring that the spacing between each layout structure is accurate and consistent, thereby avoiding the cumulative error of manual layout. When laying out large pile spacings, the distance between the first two sets of first connecting parts can be adjusted first, and then the support can be driven to move. At this time, the cam shaft on the connecting frame in front of the support in the direction of movement is separated from the support and not unfolded, providing position space for the first connecting parts that move to meet the large pile spacing. Thus, even with the limited length of the crossbeam, the layout requirements for larger pile spacings can still be met, improving the adaptability and applicability of the device to different pile spacing conditions.

[0028] The set-out structure allows for flexible adjustment of the storage tank height. Utilizing the linkage between the sealing component, the abutment shaft, and the through hole, the abutment shaft first touches the ground when the storage tank approaches the area to be laid out, pushing the sealing component to move. This automatically opens the through hole and releases lime, achieving automatic layout. Furthermore, the height of the corresponding storage tank can be adjusted according to the actual number of layouts in a single operation, ensuring that the storage tanks participating in the layout are lower than those not participating, thus preventing accidental layout of non-participating storage tanks and effectively preventing lime waste and invalid points from interfering with subsequent construction. Attached Figure Description

[0029] Figure 1 A schematic diagram of the pile foundation surveying and setting-out device for laying out lime-soil piles.

[0030] Figure 2 A front view of the pile foundation surveying and setting-out device for laying out lime-soil piles.

[0031] Figure 3 for Figure 2 Enlarged view of the structure at point A in the middle.

[0032] Figure 4 A partial structural diagram of a pile foundation surveying and setting-out device for laying out lime-soil piles.

[0033] Figure 5 for Figure 4 Enlarged view of the structure at point B.

[0034] Figure 6 A schematic diagram of the stop structure in the pile foundation surveying and setting-out device for lime-soil piles.

[0035] Figure 7 A schematic diagram of the support structure in the pile foundation surveying and setting-out device for laying out lime-soil piles.

[0036] Figure 8 A schematic diagram of the layout structure in the pile foundation surveying and layout device for laying out lime-soil piles.

[0037] Figure 9 A cross-sectional view of the layout structure in the pile foundation surveying and layout device for laying out lime-soil piles.

[0038] Figure 10 An enlarged view of the structure at point C in the pile foundation surveying and setting-out device for laying out lime-soil piles.

[0039] In the diagram: 1. Side connecting plate; 2. Crossbeam; 3. Linear drive module; 4. Roller; 5. Adjuster; 6. Bracket; 601. Inclined surface; 602. Horizontal surface; 7. First connecting piece; 8. Second connecting piece; 9. Guide sleeve; 10. Connecting frame; 1001. Inner frame; 11. Guide shaft; 12. Cylindrical spring; 13. Hinge rod; 14. Protruding shaft; 15. Linkage frame; 16. Sliding connection part; 17. Screw; 18. Adjusting rod; 19. Storage tank; 1901. Through hole; 20. Sealing part; 2001. Abutment shaft. Detailed Implementation

[0040] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0041] like Figures 1 to 10 As shown, the pile foundation measurement and layout device for lime-soil pile layout provided by the present invention includes a frame, multiple layout units, a drive mechanism, an equidistant linkage mechanism, and an intelligent sensing and positioning module.

[0042] Specifically, the frame includes a crossbeam 2 and side connecting plates 1 connected to both ends of the crossbeam 2. The side connecting plates 1 support the crossbeam 2 and connect to an external suspension device to suspend the entire device above the area to be laid out. Furthermore, the crossbeam 2 serves as the main load-bearing beam, providing a sliding and mounting foundation for multiple laying-out units, thereby ensuring the stability of the overall structure. The multiple laying-out units are equidistantly arranged along the length of the crossbeam 2, and each laying-out unit has a laying-out structure at its lower end. In this embodiment, the laying-out unit includes a first connecting member 7 and a second connecting member 7. The first connecting piece 7 and the second connecting piece 8 are arranged alternately along the length of the crossbeam 2. The first connecting piece 7 is connected to the layout structure. The first connecting piece 7 located at one end of the crossbeam 2 is fixedly connected to the crossbeam 2 and serves as the zero point of position. This facilitates the equal-distance adjustment of the spacing between adjacent layout structures. The crossbeam 2 is provided with corresponding scale markings. The second connecting piece 8 and the remaining first connecting pieces 7 are all connected to the crossbeam 2 by rollers 4 to reduce the resistance when the first connecting piece 7 and the second connecting piece 8 move relative to the crossbeam 2.

[0043] like Figure 3 , Figure 7 As shown, the drive mechanism includes a bracket 6 that can move along the length of the crossbeam 2 and a drive unit disposed at the lower end of the bracket 6. The drive unit has an inclined surface 601 and a horizontal surface 602. Specifically, the drive mechanism also includes a linear drive module 3. The bracket 6 is slidably mounted on the linear drive module 3. The bracket 6 and the linear drive module 3 are connected by an adjuster 5. The linear drive module 3 can be a lead screw module, a synchronous belt module, or a linear motor module. The adjuster 5 can be a screw adjustment mechanism, an electric push rod, or a cylinder. The adjuster 5 adjusts the direction of movement of the bracket 6 to be perpendicular to the direction in which the linear drive module 3 drives the bracket 6 to move. The height of the bracket 6 can be adjusted by the adjuster 5. The linear drive module 3 drives the bracket 6 to move along the length of the crossbeam 2, thereby providing a stable and controllable power input for the equidistant linkage mechanism.

[0044] like Figure 3 , Figure 5As shown, the equidistant linkage mechanism includes a convex shaft 14 corresponding to the layout unit. The convex shaft 14 cooperates with the drive unit to sequentially unfold multiple layout units along the length direction of the crossbeam 2 during the movement of the support 6, and to make the spacing between two adjacent sets of layout structures equal to the preset pile distance. Specifically, the equidistant linkage mechanism also includes a symmetrical component, which includes an upper top structure connected to the layout unit, a connecting frame 10 connected to the upper top structure, and two sets of hinge rods 13. The two sets of hinge rods 13 are respectively connected to the first connecting members 7 located on both sides of the connecting frame 10. The convex shaft 14 is arranged on the connecting unit. On the connecting frame 10, the upper top structure includes a guide sleeve 9 connected to the second connecting member 8 and a guide shaft 11 connected to the connecting frame 10. The guide shaft 11 is slidably connected to the guide sleeve 9. A columnar spring 12 is also sleeved on the guide shaft 11. One end of the columnar spring 12 is connected to the end of the guide shaft 11, and the other end is connected to the guide sleeve 9. Through the elastic action of the columnar spring 12, the connecting frame 10 can be reset when it is not driven by the driving part, and move smoothly when it is driven by the driving part, thereby converting the linear motion of the bracket 6 into the equidistant unfolding motion of the first connecting members 7 on both sides.

[0045] like Figure 3 , Figure 5 , Figure 6 As shown, the equidistant linkage mechanism further includes a stop structure, which is disposed between two adjacent sets of connecting frames 10. The stop structure includes an inner connecting frame 1001 disposed on one set of connecting frames 10 and a sliding connecting part 16 disposed on the other set of connecting frames 10. A linkage frame 15 is slidably mounted on the sliding connecting part 16. The linkage frame 15 and the inner connecting frame 1001 are slidably engaged. When the bracket 6 acts on the next connecting frame 10, the linkage frame 15 on the next connecting frame 10 abuts against the lower end of the inner connecting frame 1001 on the previous connecting frame 10, thereby restricting the retraction of the previous connecting frame 10 and keeping the positioned connecting frame 10 in place, ensuring that the spacing between each layout unit is always consistent.

[0046] Furthermore, the projected length on the vertical plane of the inclined surface 601 is greater than the maximum distance that the adjuster 5 can adjust the movement of the support 6, so that when the support 6 moves laterally, even when the support 6 has descended the maximum distance, the inclined surface 601 can still abut against the next set of convex shafts 14 and drive the connecting frame 10 connected to the convex shaft 14 to move downward.

[0047] In use, the side connecting plate 1 is connected to the suspension device. The suspension device controls the vertical movement of the side connecting plate 1 and its inclination in the vertical plane. The height of the support 6 is controlled by the adjuster 5 according to the pile spacing. At this time, the support 6 moves downward. Utilizing the abutment between the horizontal plane 602 and the convex shaft 14 on the first set of connecting frames 10, the connecting frame 10 is driven to move towards the crossbeam 2. Since the first set of first connecting parts 7 is fixed on the crossbeam 2, the adjacent second connecting part 8 can move along the length of the crossbeam 2 under the drive of the hinge rod 13. At the same time, the other connecting part of the connecting frame 10 is also connected to the crossbeam 2. A set of hinge rods 13 drives another set of first connecting parts 7 to move away from the second connecting part 8 along the length of the crossbeam 2. During this process, the first set of first connecting parts 7 is at the zero point. After adjustment, the distance between the other set of first connecting parts 7 and the first set of first connecting parts 7 is the pile distance. The linear drive module 3 moves accordingly to ensure that the horizontal plane 602 can always abut against the convex shaft 14 of the connecting frame 10. After the positions of the first two sets of first connecting parts 7 are adjusted, the linear drive module 3 moves along the length of the crossbeam 2 and uses the inclined surface 601 to make the connecting parts adjacent to the connecting frame 10... The convex shaft 14 on the frame 10 engages, causing another set of connecting frames 10 to move toward the crossbeam 2, thus adjusting the position of the third set of first connecting parts 7. When the convex shaft 14 moves back to the horizontal plane 602, the distance between adjacent sets of the first connecting parts 7 is the initial adjustment length, i.e., the pile distance. With the continuous movement of the support 6, the distance between adjacent sets of first connecting parts 7 remains consistent, achieving equidistant layout. When the support 6 acts on the second set of connecting frames 10, the distance between the first two sets of connecting frames 10 increases, and simultaneously, the first two sets of first connecting parts... The distance between 7 will also increase. At this time, the linkage frame 15 will move relative to the sliding connection part 16 on one of the connecting frames 10. At the same time, the linkage frame 15 will abut against the lower end of the inner frame 1001 on the first connecting frame 10. This will allow the linkage frame 15 on the second connecting frame 10 to stop the first connecting frame 10 when the bracket 6 separates from the convex shaft 14 on the first connecting frame 10. This will ensure that as the bracket 6 moves, the connecting frame 10 behind it will maintain the same distance from the crossbeam 2, thus ensuring that the distance between the two adjacent first connecting parts 7 is consistent.

[0048] When the pile spacing is large, the distance between the first two sets of first connecting parts 7 can be adjusted first. Then, by driving the support 6 to move, the corresponding two sets of first connecting parts 7 can be kept at the same pile spacing. At this time, due to the increase in pile spacing, not all first connecting parts 7 are evenly distributed on the crossbeam 2. However, for the two sets of first connecting parts 7 that can be adjusted, the above-mentioned large pile spacing can be met. That is, at this time, the convex shaft 14 on the connecting frame 10 in front of the support 6 is separated from the support 6 and has not been unfolded. This provides a position for the first connecting parts 7 that move behind the support 6 in order to meet the large pile spacing, ensuring that equidistant layout can be achieved even with a large pile spacing, and realizing the layout operation under the requirement of large pile spacing.

[0049] like Figure 8 , Figure 9 , Figure 10 As shown, the layout structure includes a screw 17 connected to the first connecting member 7 and an adjusting rod 18 threadedly engaged with the screw 17. The lower end of the adjusting rod 18 is connected to a storage tank 19. The bottom of the storage tank 19 is provided with a through hole 1901. A sealing member 20 is also provided at the bottom of the storage tank 19. The sealing member 20 is provided with an abutment shaft 2001 that penetrates the bottom of the storage tank 19 and extends to the outside of the storage tank 19. The screw 17 is provided with external threads, and the adjusting rod 18 has a hollow structure and is provided with internal threads. The external and internal threads are engaged. By rotating the adjusting rod 18, the height of the storage tank 19 can be adjusted so that the storage tank 19 participating in the layout is lower than the storage tank 19 not participating in the layout. When the storage tank 19 moves toward the area to be laid out, the abutment shaft 2001 first abuts against the ground, pushing the sealing part 20 to move upward relative to the storage tank 19, so that the through hole 1901 is open, and the lime in the storage tank 19 falls into the area to be laid out, thereby realizing automatic layout and avoiding the accidental layout of the storage tank 19 not participating in the layout.

[0050] For the layout structure, when the storage tank 19 moves toward the area to be laid out, the abutment shaft 2001 can first abut against the area, causing the sealing part 20 to move upward relative to the storage tank 19, so that the through hole 1901 at the bottom of the storage tank 19 is open, and the lime in the storage tank 19 can fall into the corresponding area. For the case of large pile spacing, the corresponding adjustment rod 18 can be adjusted according to the actual number of layouts in a single operation, thereby changing the height of the storage tank 19, so that the height of the storage tank 19 participating in the actual layout is lower than that of the storage tank 19 not participating in the layout. Thus, after the pile spacing is adjusted, only the storage tank 19 with the lower height needs to be in contact with the layout position to achieve the layout, preventing the storage tank 19 not participating in the layout from also being laid out, which would lead to lime waste and invalid layout points interfering with subsequent construction.

[0051] The intelligent sensing and positioning module includes an intelligent sensor. The intelligent sensor is used to detect the mating position between the cam shaft 14 and the drive unit, and outputs a positioning control signal to control the action of the drive mechanism. The intelligent sensor includes, but is not limited to, at least one of a displacement sensor, a laser rangefinder, a proximity switch, a pressure sensor, or a vision sensor. In this embodiment, the intelligent sensor can be set at the linear drive module 3 to detect the displacement of the bracket 6, and set at the connecting frame 10 or the cam shaft 14 to detect the contact state between the cam shaft 14 and the horizontal surface 602 or the inclined surface 601. By providing real-time feedback on the mating position between the cam shaft 14 and the drive unit through the intelligent sensor, the control system can accurately control the movement stroke of the linear drive module 3, thereby improving the automation level and positioning accuracy of the lofting device.

[0052] As an embodiment of the present invention, an intelligent sensing and positioning method for the pile foundation measurement and setting-out device for the lime-soil pile layout as described above is also proposed, including the following steps:

[0053] Step 1: Place the crossbeam 2 above the area to be laid out, and adjust the height of the support 6 according to the preset pile spacing through the adjuster 5 so that the horizontal plane 602 of the drive unit can drive the convex shaft 14 to move downward.

[0054] Step 2: Start the linear drive module 3 to make the bracket 6 move along the length of the crossbeam 2, and use the smart sensor to detect the engagement position of the convex shaft 14 and the drive unit in real time, and output a positioning control signal;

[0055] Step 3: The drive unit pushes the convex shaft 14 on the current connecting frame 10 through the inclined surface 601, causing the connecting frame 10 to drive the two sets of hinge rods 13 to move, thereby causing the two adjacent sets of first connecting members 7 to unfold along the length direction of the crossbeam 2 until the convex shaft 14 moves to the horizontal surface 602. At this time, the distance between the two adjacent sets of the layout structure is equal to the preset pile distance, and the movement stroke of the linear drive module 3 is controlled according to the positioning control signal, so that the horizontal surface 602 remains in contact with the convex shaft 14.

[0056] Step 4: The linear drive module 3 continues to drive the support 6 to move, so that the drive part cooperates with the next set of convex shafts 14 in sequence, and the already positioned connecting frame 10 is kept in position under the action of the stop structure, until the multiple layout units are unfolded at equal intervals along the length direction of the crossbeam 2.

[0057] Step 5: Lower the crossbeam 2 so that the storage tank 19 moves toward the area to be sampled. The abutment shaft 2001 first abuts against the area to be sampled and pushes the sealing member 20 to move relative to the storage tank 19, so that the through hole 1901 is open and the lime falls to the area to be sampled to complete the sampling.

[0058] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or essential characteristics. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0059] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. A pile foundation surveying and setting-out device for lime-soil pile layout, characterized in that, include: The frame, including the crossbeams; Multiple layout units are equidistantly arranged along the length of the crossbeam, and each layout unit has a layout structure at its lower end. The driving mechanism includes a bracket that can move along the length of the crossbeam and a driving part disposed at the lower end of the bracket, the driving part having an inclined surface and a horizontal surface; The equidistant linkage mechanism includes a convex shaft corresponding to the layout unit. The convex shaft cooperates with the drive unit to cause multiple layout units to unfold sequentially along the length direction of the crossbeam during the movement of the support, and to make the spacing between two adjacent sets of layout structures equal to the preset pile distance. The intelligent sensing and positioning module includes an intelligent sensor, which is used to detect the mating position between the convex shaft and the driving part, and output a positioning control signal to control the action of the driving mechanism.

2. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 1, characterized in that, The crossbeam is provided with side connecting plates at both ends, and the side connecting plates are used to support the crossbeam. The layout unit includes a first connector and a second connector. The first connector and the second connector are arranged alternately along the length of the beam. The first connector is connected to the layout structure, and the first connector located at one end of the beam is fixedly connected to the beam.

3. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 2, characterized in that, The equidistant linkage mechanism also includes a symmetrical component, which includes an upper structure connected to the lofting unit, a connecting frame connected to the upper structure, and two sets of hinge rods. The two sets of hinge rods are respectively connected to first connecting members located on both sides of the connecting frame, and the convex shaft is disposed on the connecting frame.

4. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 3, characterized in that, The upper structure includes a guide sleeve connected to the second connector and a guide shaft connected to the connecting frame. The guide shaft is slidably connected to the guide sleeve. A cylindrical spring is also sleeved on the guide shaft. One end of the cylindrical spring is connected to the end of the guide shaft, and the other end is connected to the guide sleeve.

5. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 4, characterized in that, The equidistant linkage mechanism further includes a stop structure, which is disposed between two adjacent sets of connecting frames. The stop structure includes an inner frame disposed on one set of connecting frames and a sliding connecting part disposed on the other set of connecting frames. A linkage frame is slidably mounted on the sliding connecting part, and the linkage frame is slidably engaged with the inner frame.

6. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 5, characterized in that, The layout structure includes a screw connecting the first connecting member and an adjusting rod threadedly engaged with the screw. The lower end of the adjusting rod is connected to a storage tank. The bottom of the storage tank is provided with a through hole. The bottom of the storage tank is also provided with a sealing member. The sealing member is provided with an abutment shaft that penetrates the bottom of the storage tank and extends to the outside of the storage tank.

7. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 6, characterized in that, The screw is provided with an external thread, and the adjusting rod has a hollow structure with an internal thread. The external thread and the internal thread are threaded together.

8. The pile foundation surveying and setting-out device for lime-soil pile layout according to claim 7, characterized in that, The drive mechanism further includes a linear drive module, and the bracket is slidably mounted on the linear drive module. The bracket and the linear drive module are connected by an adjuster.

9. A smart sensing and positioning method for a pile foundation measurement and setting-out device for lime-soil pile layout as described in claim 8, characterized in that, Includes the following steps: Step 1: Place the crossbeam above the area to be laid out, and adjust the height of the support according to the preset pile spacing using the adjuster so that the horizontal plane of the drive unit can drive the convex shaft to move downward. Step 2: Activate the linear drive module to move the bracket along the length of the crossbeam, and use the intelligent sensor to detect the engagement position of the cam shaft and the drive unit in real time, and output a positioning control signal; Step 3: The drive unit pushes the convex shaft on the current connecting frame through the inclined surface, causing the connecting frame to drive the two sets of hinge rods to move, thereby causing the two adjacent sets of the first connecting parts to unfold along the length of the crossbeam until the convex shaft moves to the horizontal plane. At this time, the distance between the two adjacent sets of the layout structure is equal to the preset pile distance, and the movement stroke of the linear drive module is controlled according to the positioning control signal to keep the horizontal plane in contact with the convex shaft. Step 4: The linear drive module continues to drive the support to move, so that the drive part engages with the next set of cam shafts in sequence, and the positioning of the connecting frame is maintained under the action of the stop structure until the multiple layout units are unfolded at equal intervals along the length of the beam in sequence; Step 5: Lower the crossbeam so that the storage tank moves toward the area to be sampled. The abutting shaft first abuts against the area to be sampled and pushes the sealing component to move relative to the storage tank, so that the through hole is open and the lime falls into the area to be sampled to complete the sampling.