Dredging construction process control method based on multi-source state joint constraint
By forming a joint construction state, the feasible range of hydraulic actuators and resource quotas were determined, solving the problem of safe allocation and recovery of hydraulic resources under multi-source conditions, and realizing safe and continuous construction of dredging equipment.
Patent Information
- Application Number
- CN202611606675.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-16
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies lack a control chain that unifies multiple states into hard constraints and degradable constraints in construction scenarios where wind, current, tide level, ship position and draft, mission status and hydraulic system power supply capacity change simultaneously. This chain then maps these multiple states into the feasible domain, permitted actions and hydraulic resource quotas of the hydraulic execution branches. Furthermore, it lacks a safety action priority redistribution and recovery mechanism for hydraulic resources when hard constraints exceed limits.
By acquiring information on environmental conditions, construction vessel conditions, and dredging task conditions, a joint construction state is formed. Hard constraints and degradable constraints are established to determine the feasible domain of hydraulic execution branches. Within the available hydraulic resources, the action permission level, execution order, and resource quota are determined. When hard constraints exceed the limits, resources are prioritized for safety maintenance or evacuation actions. When resuming, action permission and resource quota are restored in sequence.
It enables safe, continuous, and traceable construction control of dredging equipment under conditions of multi-source changes and limited hydraulic resources, avoiding resource waste and safety boundary violations, and ensuring the safety and continuity of the construction process.
Smart Images

Figure CN123133447A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of intelligent control of hydraulic systems and construction process control technology of dredging equipment, and particularly to a method for controlling the dredging construction process based on multi-source state joint constraints. Background Technology
[0002] Dredging equipment has gradually evolved from manual operation to multi-subsystem collaborative automatic control. Chinese patent CN108442446A discloses "Fully Automatic Dredging Control System and Method for Trailing Suction Hopper Dredger", which coordinates subsystems such as dredging pipeline system, mud pump, high-pressure water jet, and trailing arm winch through main control PLC to achieve automatic dredging in a predetermined construction process, solving the problems of decentralized operation and equipment coordination.
[0003] Furthermore, Chinese patent CN114065639A discloses "A Closed-Loop Real-Time Inversion Method for Construction Parameters of a Dredger", which uses shipboard sensor data and a closed-loop recurrent neural network to invert construction parameters in real time, enabling control to evolve from a fixed process to parameter optimization based on historical and real-time data.
[0004] The aforementioned technologies can improve the coordination of dredging equipment and optimize construction parameters. However, in construction scenarios where wind, current, tide level, ship position draft, mission status, and hydraulic system power supply capacity change simultaneously, there is still a lack of a control chain that unifies the multi-source states into hard constraints and degradable constraints, and then maps them into the feasible domain, action permission, and hydraulic resource quota of each hydraulic execution branch. When hard constraints exceed the limits, there is also a lack of a mechanism to release hydraulic resources for priority redistribution to safe actions and restore them sequentially after the conditions are restored.
[0005] In view of this, there is an urgent need for a dredging construction process control method based on multi-source state joint constraints, in order to at least address the above-mentioned shortcomings. Summary of the Invention
[0006] One of the objectives of this invention is to provide a dredging construction process control method based on multi-source state joint constraints to solve the problems pointed out in the background art.
[0007] The dredging construction process control method based on multi-source state joint constraints provided in this invention is applied to dredging equipment with a high-pressure, high-flow hydraulic system. The high-pressure, high-flow hydraulic system includes multiple hydraulic actuator branches and corresponding high-frequency electro-hydraulic servo valves or electro-hydraulic proportional valves. The hydraulic resources are the hydraulic flow rate that can be allocated to the hydraulic actuator branches in the current control cycle. The method includes: Step S1: Obtain environmental status, construction vessel status, dredging task status, and available hydraulic resources status to form a joint construction status; Step S2: Establish a joint constraint set based on the joint construction state, distinguish between insurmountable hard constraints and degradable constraints that allow for reduced operational capabilities, and determine the action feasible domain of each hydraulic actuation branch; Step S3: Determine the hydraulic execution branches and hydraulic resource requirements for the dredging operation to be performed, and determine the operation permission level, execution order and hydraulic resource quota based on the feasible domain of the operation and the available hydraulic resources. Step S4: Limit the allowable range of valve opening of the corresponding valve according to the action permission level, execution order and hydraulic resource quota; when the joint construction state exceeds the preset safety boundary of hard constraint, record the working status of the affected hydraulic execution branch, revoke the corresponding action permission, and give priority to allocating the released hydraulic resources to the hydraulic execution branch that performs the safety holding action or the safety evacuation action. Among them, the basic safety resource requirements for each safety execution branch to maintain the safety holding state are met first, and then the incremental drive resources that drive the safety action to generate displacement are allocated according to the safety execution order. Step S5: When the preset recovery conditions of the corresponding hard constraints are met, the action feasible domain is redefined, and a recovery action sequence is generated based on the action feasible domain and the working status of the hydraulic execution branch. Then, the action permission is restored and the hydraulic resource quota is redistributed in sequence.
[0008] Preferably, step S1 includes: The environmental status is obtained through environmental monitoring equipment, the status of the construction vessel is obtained through ship positioning and motion status detection equipment, the dredging task status is obtained through construction control system, and the status of available hydraulic resources is determined based on the operating status of hydraulic power unit and hydraulic flow detection information. Associate the acquisition time with each status data point and filter the status data according to the time matching window of the current control cycle; The status data after screening is checked for validity. Status data that meet the preset validity conditions are associated according to status category to form the joint construction status of the current control cycle.
[0009] Preferably, step S2 includes: The construction constraints involved in the dredging action determination are determined based on the joint construction status and preset constraint rules, and the hydraulic execution branches of each construction constraint are determined based on the preset correspondence. Construction constraints that prohibit the relevant hydraulic actuators from continuing to operate after crossing the preset safety boundary are defined as hard constraints, while construction constraints that allow reduced operating capabilities to continue to operate after entering the preset degradation range are defined as degradeable constraints. For each hydraulic actuator branch, the allowed action type and the allowable action speed range are determined according to the corresponding hard constraints and degradable constraints. The set of action types and the corresponding allowable action speed range that simultaneously satisfy the corresponding construction constraints is determined as the action feasible domain of the corresponding hydraulic actuator branch.
[0010] Preferably, for each hydraulic actuation branch, the permissible action type and permissible action speed range are determined according to the corresponding hard constraints and degradable constraints. The set of action types that simultaneously satisfy the corresponding construction constraints and the corresponding permissible action speed range is determined as the action feasible domain of the corresponding hydraulic actuation branch, including: Obtain the hard constraints corresponding to the current hydraulic execution branch, and eliminate action types that do not meet the corresponding hard constraints based on the current joint construction status and preset constraint rules to form a candidate action set; Based on the degradability constraints corresponding to each action type in the candidate action set, limit the allowable range of the corresponding action speed; For the same action type, the common allowable range of action speed is taken for multiple construction constraints, and action types with empty common allowable ranges are eliminated to form a set of executable actions. Based on the action type and allowable speed range in the set of executable actions, the action feasible domain of the current hydraulic execution branch is formed.
[0011] Preferably, step S3 includes: The hydraulic execution branches involved in the dredging action are determined based on the dredging action to be performed and the pre-defined correspondence between the dredging action and the hydraulic execution branch. The hydraulic resource requirements are determined based on the action type, target action speed, and the pre-calibrated action parameters and the correspondence between the hydraulic resource requirements. Determine the permitted action level (permitted, restricted, or prohibited) based on the feasible action domain of each hydraulic actuator branch; The execution order is determined based on the action dependencies between each hydraulic actuator branch. Within the available hydraulic resources of the high-pressure, high-flow hydraulic system, hydraulic resources are allocated to the hydraulic actuator branches that are allowed to execute or restricted to execute, according to the action permission level, execution order, and hydraulic resource requirements, thus forming corresponding hydraulic resource quotas.
[0012] Preferably, the execution order is determined based on the action dependencies between each hydraulic actuator branch. Within the available hydraulic resources of the high-pressure, high-flow hydraulic system, hydraulic resources are allocated to the hydraulic actuator branches that are permitted or restricted to execution according to the action permission level, execution order, and hydraulic resource requirements, forming corresponding hydraulic resource quotas, including: Obtain the preset hydraulic actuator branch action dependencies, determine the hydraulic actuator branches with preceding relationships and those that are allowed to act synchronously, and form the execution sequence; Hydraulic actuators that are prohibited from being executed are removed based on the action permission level, and a resource allocation sequence is formed according to the execution order; According to the resource allocation sequence, the hydraulic resource demand is compared with the remaining available hydraulic resources, and the allocable hydraulic resources for the current hydraulic execution branch are determined in combination with the action permission level, and the remaining available hydraulic resources are updated. The updated remaining available hydraulic resources are used for resource allocation in the next hydraulic actuation branch until a hydraulic resource quota is formed for each hydraulic actuation branch.
[0013] Preferably, step S4 includes: Based on the action permission level and hydraulic resource quota of each hydraulic actuator branch, determine the allowable range of valve opening for the corresponding high-frequency response electro-hydraulic servo valve or electro-hydraulic proportional valve, and reduce the upper limit of valve opening according to the hydraulic resource quota corresponding to the restricted hydraulic actuator branch. According to the execution sequence, control each hydraulic actuator branch to perform dredging actions within the allowable range of valve opening; When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the affected hydraulic execution branch is identified. Before revoking the action permission, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded to form a hydraulic execution branch working status record. Hydraulic resources are stopped from being allocated to the affected hydraulic execution branch, thus releasing hydraulic resources. The released hydraulic resources will be preferentially allocated to the hydraulic actuators that perform safety holding or safety evacuation actions.
[0014] Preferably, the hydraulic resources released are preferentially allocated to the hydraulic actuators performing safety holding or safety evacuation actions, including: Based on the release of hydraulic resources, the current hard constraints that cross the preset safety boundary, and the correspondence between the preset hard constraints and safety actions, determine the safety holding action or the safety evacuation action to form a set of safety actions. The hydraulic actuator branch for each safety action is determined based on the set of safety actions, and the order of safety execution is determined based on the preset sequential dependency relationship between the safety actions. The hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. The release hydraulic resources are preferentially allocated to the current hydraulic actuator branch, and the available hydraulic resources for the next hydraulic actuator branch are determined based on the remaining release hydraulic resources after the current allocation is completed. The resource allocation of each hydraulic actuator branch is completed sequentially to form the hydraulic resource allocation result corresponding to the safe action, and the allowable range of valve opening of the corresponding valve is determined based on the hydraulic resource allocation result.
[0015] Preferably, the hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. The release hydraulic resources are preferentially allocated to the current hydraulic actuator branch, and the available hydraulic resources for the next hydraulic actuator branch are determined based on the remaining release hydraulic resources after the current allocation is completed. This includes: Based on the preset correspondence between safety actions and hydraulic resource requirements, the hydraulic resource requirements of each safety execution branch are divided into basic safety resource requirements for maintaining the safety holding state and incremental drive resource requirements for driving safety actions to generate displacement. The current hydraulic execution branch is determined according to the safety execution sequence. When the released hydraulic resources are sufficient to cover all basic safety resource requirements, hydraulic resources sufficient to meet the basic safety resource requirements of each branch are first allocated to all safety execution branches to form the basic safety quota of each branch. The released hydraulic resources after deducting all basic safety quotas are used as the first remaining released hydraulic resources. If the resources are insufficient, no incremental drive resources are allocated, the equipment's preset emergency interlock is triggered, and the permission to resume production is prohibited. Compare the first remaining release hydraulic resources with the incremental drive resource requirements of the current hydraulic actuation branch; if the incremental drive resource requirements are met, a corresponding drive quota is formed; if not, the upper limit of the action speed is determined based on the first remaining release hydraulic resources, and the action speed is reduced within the action feasible domain corresponding to the current safe action before the drive quota is re-determined. The basic safety quota and drive quota of the current hydraulic actuation branch are combined to form its allocable hydraulic resources, and the first remaining release hydraulic resources after deducting the current drive quota are used as the basis for allocating incremental drive resources for the next hydraulic actuation branch.
[0016] Preferably, step S5 includes: When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded before the action permission of the affected hydraulic execution branch is revoked, thus forming a hydraulic execution branch working status record; When the state parameter that causes the joint construction state to exceed the preset safety boundary meets the corresponding preset recovery condition, the action feasible domain of each hydraulic execution branch is re-determined according to the current joint construction state, and the hydraulic execution branch whose interruption action type is allowed and whose interruption action speed falls within the current action speed allowable range is determined as the hydraulic execution branch that can be recovered. The order of recovery is determined based on the action dependencies between the hydraulic actuator branches that can be recovered and the working status records of the hydraulic actuator branches, and a recovery action sequence is generated. The action permission is restored sequentially according to the recovery action sequence, and the corresponding hydraulic resource quota is re-determined based on the available hydraulic resources. After the current hydraulic execution branch meets the preset branch recovery completion conditions, the recovery control of the next hydraulic execution branch is initiated.
[0017] The beneficial effects of this invention are as follows: This invention unifies the environment, vessel, mission, and hydraulic power supply status into a single control cycle. It uses hard constraints and degradable constraints to form the feasible domain for each hydraulic actuator branch. Within the available hydraulic resources, it simultaneously determines the permitted actions, execution sequence, and flow quota, and directly limits the valve opening of electro-hydraulic servo valves or proportional valves. When a hard constraint is exceeded, the hydraulic resources released by the affected branch are prioritized for safe maintenance or safe evacuation, preventing other reserves from offsetting the safety boundary. During recovery, restoration is performed sequentially based on the latest feasible domain and the working state before the interruption, ensuring safe, continuous, and traceable construction control of the dredging equipment under conditions of multi-source status changes and limited hydraulic resources.
[0018] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in this application.
[0019] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0020] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of a dredging construction process control method based on multi-source state joint constraints in an embodiment of the present invention; Figure 2 This is a schematic diagram of the safe hydraulic resource redistribution and recovery control after hard constraint triggering in an embodiment of the present invention. Detailed Implementation
[0021] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0022] Example 1: As Figure 1 As shown, this embodiment provides a dredging construction process control method based on multi-source state joint constraints, applied to dredging equipment with a high-pressure, high-flow hydraulic system. The high-pressure, high-flow hydraulic system includes multiple hydraulic actuation branches and corresponding high-frequency electro-hydraulic servo valves or electro-hydraulic proportional valves. The hydraulic resources are the hydraulic flow that can be allocated to the hydraulic actuation branches in the current control cycle. The method includes: Step S1: Obtain environmental status, construction vessel status, dredging task status, and available hydraulic resources status to form a joint construction status; Step S2: Establish a joint constraint set based on the joint construction state, distinguish between insurmountable hard constraints and degradable constraints that allow for reduced operational capabilities, and determine the action feasible domain of each hydraulic actuation branch; Step S3: Determine the hydraulic execution branches and hydraulic resource requirements for the dredging operation to be performed, and determine the operation permission level, execution order and hydraulic resource quota based on the feasible domain of the operation and the available hydraulic resources. Step S4: Limit the allowable range of valve opening of the corresponding valve according to the action permission level, execution order and hydraulic resource quota; when the joint construction state exceeds the preset safety boundary of hard constraint, record the working status of the affected hydraulic execution branch, revoke the corresponding action permission, and give priority to allocating the released hydraulic resources to the hydraulic execution branch that performs the safety holding action or the safety evacuation action. Among them, the basic safety resource requirements for each safety execution branch to maintain the safety holding state are met first, and then the incremental drive resources that drive the safety action to generate displacement are allocated according to the safety execution order. Step S5: When the preset recovery conditions of the corresponding hard constraints are met, the action feasible domain is redefined, and a recovery action sequence is generated based on the action feasible domain and the working status of the hydraulic execution branch. Then, the action permission is restored and the hydraulic resource quota is redistributed in sequence.
[0023] In this embodiment, the high-pressure, high-flow hydraulic system refers to the main working hydraulic system used to drive the main working mechanism of the dredging equipment, where multiple hydraulic actuators compete for oil supply capacity. It may include a hydraulic power unit, a main oil supply line, a main oil return line, multiple valve-controlled branches, and hydraulic cylinders or hydraulic motors. The multiple hydraulic actuators may correspond to functions such as boom lifting, stick movement, bucket movement, slewing, or equipment retraction. A high-frequency response electro-hydraulic servo valve or electro-hydraulic proportional valve refers to a valve-controlled element whose dynamic response can meet the valve opening adjustment requirements within the control cycle of this invention. Specific rated pressure, rated flow, and response indicators are determined according to the product parameters of the dredging equipment and valves used, and are not limited by a uniform numerical threshold. Hydraulic resources are characterized by the hydraulic flow rate that can be allocated to each hydraulic actuator in the current control cycle, allowing the oil supply demands of different branches to be compared and allocated under a unified dimension. The control cycle and valve response are checked against the same time budget: the total time for state processing, quota calculation, command transmission, and valve response should meet the allowable response time for the corresponding action; if not, execution permission for that action is not issued.
[0024] In this embodiment, the joint construction status refers to a set of valid status data that can jointly participate in control judgment under the same control cycle and the same judgment time. Environmental status may include wind speed, wind direction, rainfall, tide level, water level, current velocity, and visibility; construction vessel status may include position, course, draft, trim, anchor point, anchor chain status, drift, and equipment operating status; dredging task status may include current construction stage, target bottom elevation, latest water depth, remaining excavation volume, current dredging actions to be performed, and mud barge availability status. Available hydraulic resource status represents the distributable flow that the hydraulic power unit can continue to provide to each hydraulic execution branch in the current control cycle, which can be determined based on the operating status of available pump sets, flow detection information, and currently occupied flow; when using multi-pump oil supply, the oil supply capacity of pump sets in the available state can be summarized, and then the reserved flow and allocated flow required to maintain the basic operation of the system can be deducted to obtain the available hydraulic resources for this control cycle.
[0025] In this embodiment, considering the project's construction conditions, the dredging equipment can be a 4m³ bucket dredger, operating in conjunction with a 1000m³ mud barge and an anchor-lifting boat. The project area has an irregular semi-diurnal tide pattern, with an average tidal range of approximately 0.84m, an average high tide duration of approximately 8 hours and 48 minutes, and an average low tide duration of approximately 6 hours and 42 minutes. The above data are used to illustrate the changing environmental conditions over time and the implementation scenario where environmental constraints and vessel status need to be jointly assessed, and do not constitute fixed values for the hard constraints or recovery conditions of this invention.
[0026] The working principle and beneficial effects of the above technical solution are as follows: This invention does not directly adjust a hydraulic branch based on a single construction parameter. Instead, it first establishes a joint construction state, then maps the insurmountable safety requirements and permissible degraded execution constraints to the action feasible domains of each hydraulic execution branch, and determines the permissible level, execution order, and resource quota within the limited available hydraulic resources. When a hard constraint is exceeded, the resources corresponding to the production action are released and prioritized for safe actions; after conditions are restored, recovery is carried out in an orderly manner based on the latest action feasible domain and interruption status, thus forming a closed loop from state acquisition, constraint judgment, hydraulic resource allocation to safety handling and recovery control.
[0027] Example 2: Based on Example 1, step S1 includes: The environmental status is obtained through environmental monitoring equipment, the status of the construction vessel is obtained through ship positioning and motion status detection equipment, the dredging task status is obtained through construction control system, and the status of available hydraulic resources is determined based on the operating status of hydraulic power unit and hydraulic flow detection information. Associate the acquisition time with each status data point and filter the status data according to the time matching window of the current control cycle; The status data after screening is checked for validity. Status data that meet the preset validity conditions are associated according to status category to form the joint construction status of the current control cycle.
[0028] In this embodiment, the environmental status, the status of the construction vessel, and the status of the dredging task are obtained from detection or control data sources that reflect the actual construction conditions. Environmental monitoring equipment may include shipborne anemometers, visibility sensors, water level or tide monitoring interfaces, and current velocity monitoring equipment; vessel positioning and motion status detection equipment may include RTK-GNSS, heading sensors, inertial measurement units, draft sensors, and anchor winch status detection units; the construction control system can read the current construction stage and dredging actions to be performed from the construction plan, task database, or on-site control terminal. These sources illustrate the actual acquisition paths for various statuses, avoiding the direct use of manually assumed values as the combined construction status.
[0029] In this embodiment, the operating status of the hydraulic power unit may include at least the hydraulic pump start / stop status, pump set failure or derating status, and oil supply circuit status. Hydraulic flow detection information can be obtained directly from a flow sensor, or it can be calculated by the construction controller when the pump displacement, speed, and volumetric efficiency are known. All status data are associated with the acquisition time and data source, and validity checks include at least time freshness, effective status of the detection equipment, and whether the data is within the equipment's detectable range. Low-frequency data uses the most recent valid value within the allowable time range, and data exceeding the allowable time is marked as invalid. When a critical status fails and there is no verified redundant source, missing values or old values are not equated with safe values. When a critical status fails and there is no effective alternative source, the process proceeds to a pause decision and new production action permissions are stopped.
[0030] In this embodiment, preset valid conditions are used to determine whether input data can participate in the current control cycle, rather than directly replacing construction safety boundaries. The project construction plan stipulates that water operations should be stopped when the wind force reaches level 6 or above, when the visibility is less than 500m due to heavy fog, and when dredging and mud barge operations are stopped when the water flow speed exceeds the safe operating range. The above conditions can be used as the basis for configuring subsequent constraint rules; the specific safety boundaries, downgrade intervals, and recovery conditions should be based on the approved construction plan, equipment specifications, ship seaworthiness documents, and on-site safety assessment.
[0031] The working principle and beneficial effects of the above technical solution are as follows: This invention clarifies the physical source, acquisition time, and validity judgment method of various status data, ensuring that the joint construction status consists only of data available within the current control cycle. This avoids the incorrect splicing of tide levels, drafts, task status, or hydraulic resource status at different times, thereby improving the reliability of subsequent action feasibility domain judgment and hydraulic resource allocation from the data source level.
[0032] Example 3: Based on Example 1, step S2 includes: The construction constraints involved in the dredging action determination are determined based on the joint construction status and preset constraint rules, and the hydraulic execution branches of each construction constraint are determined based on the preset correspondence. Construction constraints that prohibit the relevant hydraulic actuators from continuing to operate after crossing the preset safety boundary are defined as hard constraints, while construction constraints that allow reduced operating capabilities to continue to operate after entering the preset degradation range are defined as degradeable constraints. For each hydraulic actuator branch, the allowed action type and the allowable action speed range are determined according to the corresponding hard constraints and degradable constraints. The set of action types and the corresponding allowable action speed range that simultaneously satisfy the corresponding construction constraints is determined as the action feasible domain of the corresponding hydraulic actuator branch.
[0033] In this embodiment, the preset constraint rules are configuration data that converts the joint construction state into executable control restrictions. These rules can be derived from approved construction plans, ship seaworthiness requirements, equipment specifications, rated operating conditions of the hydraulic system, and on-site safety assessment results. Each construction constraint is associated with at least the monitored state parameters, constraint type, preset safety boundary or degradation zone, affected hydraulic execution branches, and recovery conditions corresponding to the hard constraint. The correspondence between construction constraints and hydraulic execution branches can be pre-established and stored in the construction control system based on the equipment hydraulic schematic diagram, mechanism motion relationships, and operating procedures. For example, when a ship drifts into a degradation zone, the speed of the previously configured outward extension or rapid turn branches is limited, and the flow demand is retrieved based on the limited speed, and the valve opening is limited. When the safety boundary is crossed, the corresponding production action permission is revoked, and the released hydraulic resource pool prioritizes supplying the permitted recovery or holding action.
[0034] In this embodiment, a hard constraint means that once the combined construction state crosses a preset safety boundary, the corresponding hydraulic execution branch must not continue the original dredging operation. A degradable constraint means that although the hard stop condition has not yet been met, execution can continue by reducing the action speed or the valve opening. For example, strong winds, low visibility, abnormal water flow, abnormal ship attitude, or unavailability of critical hydraulic power units can all be configured as hard constraints according to approved safety rules. Hard constraints are non-compensable, meaning that even if other state parameters have a large safety margin, they cannot offset the hard constraints that have already been exceeded.
[0035] In this embodiment, the action type describes the lifting, lowering, rotating, retracting, holding, or other equipment actions that the hydraulic actuator can perform; the permissible action speed range represents the speed range allowed for the same action type under the combined effect of current construction constraints. The action feasible domain is not a single value, but is composed of the currently allowed action types and the permissible action speed range corresponding to each action type; when an action type has no speed range that can simultaneously satisfy all corresponding construction constraints, that action type does not belong to the current action feasible domain.
[0036] In this embodiment, the construction process can also be divided into four states according to the joint construction status: normal operation, restricted operation, suspended operation, and recovery pending. Normal operation indicates that all hard constraints are met and the main safety margin has not entered the warning zone; restricted operation indicates that the hard constraints are still met, but at least one safety margin has entered the warning zone or is continuously decreasing; suspended operation indicates that any hard constraint has exceeded the limit, critical equipment is malfunctioning, critical data is invalid, or on-site confirmation indicates that operation cannot continue; recovery pending indicates that the factors causing the shutdown have continuously met the recovery conditions, but the recovery starting point and mooring conditions have not yet been verified. Exiting the restricted or suspended state uses a recovery boundary and stabilization time separate from the entry boundary. The construction status is used to determine the dredging action to be performed; the action permission for each branch is still determined separately by its current action feasible domain.
[0037] The working principle and beneficial effects of the above technical solution are as follows: This invention further implements the construction constraints formed by the environment, ships, tasks, and hydraulic power supply conditions into specific hydraulic execution branches, so that the constraint judgment results can directly answer whether a branch can operate and at what speed it is allowed to operate. At the same time, it retains the safety bottom line that hard constraints cannot be compensated by other conditions, providing a definite input for subsequent branch permission and resource quota calculation.
[0038] Example 4: Based on Example 3, determine the feasible action domain of the corresponding hydraulic actuation branch, including: Obtain the hard constraints corresponding to the current hydraulic execution branch, and eliminate action types that do not meet the corresponding hard constraints based on the current joint construction status and preset constraint rules to form a candidate action set; Based on the degradability constraints corresponding to each action type in the candidate action set, limit the allowable range of the corresponding action speed; For the same action type, the common allowable range of action speed is taken for multiple construction constraints, and action types with empty common allowable ranges are eliminated to form a set of executable actions. Based on the action type and allowable speed range in the set of executable actions, the action feasible domain of the current hydraulic execution branch is formed.
[0039] In this embodiment, for the same hydraulic actuation branch, the feasible action domain is formed in the order of "hard constraint screening of action types, degradable constraint shrinkage speed range, and multiple constraints seeking common allowable range". First, based on the current joint construction status and preset constraint rules, action types that do not meet the corresponding hard constraints are eliminated; then, the remaining candidate actions are restricted to the allowable speed range according to the corresponding degradable constraints. For example, when a ship drifts into the degradable range but has not yet reached the hard constraint boundary, the working device retraction or retrieval action can be retained, while the speed limit of outward extension or rapid rotation actions is reduced. This screening is completed based on the correspondence between the state parameters, safety boundaries, and constraints and the branch as described in Embodiment 3: when the state parameters have exceeded the safety boundary, the original dredging action corresponding to the rule table is prohibited; when they have not yet exceeded the boundary, the allowable conditions of the action in the rule table are checked.
[0040] In this embodiment, the preset constraint rules can be implemented using a segmented rule table. Each record includes a state parameter range, affected branches, action type, and permissible speed range. When a state parameter enters the corresponding range, the upper limit of the speed of that record is read, and then the flow requirement is determined according to the correspondence between action parameters and hydraulic resource requirements as described in Embodiment 5. The upper limit of the speed for each range adopts the equipment's permissible value or the limit value determined by the on-site safety assessment. Actions without a permissible range are not permitted. The shutdown boundary is used to prohibit the original production action, and it is not necessary to continuously interpolate the wind force level to the speed.
[0041] In this embodiment, when the same action is simultaneously restricted by multiple construction constraints such as ship attitude, anchoring status, and hydraulic power supply status, the permissible action speed range for each construction constraint is obtained. Then, the common portion that falls within all permissible ranges is taken as the final permissible action speed range. If the common portion is empty, the corresponding action type is deleted from the set of executable actions. This allows for the direct acquisition of the action feasible domain without relying on undefined comprehensive scoring or compensation calculations.
[0042] The working principle and beneficial effects of the above technical solution are as follows: The feasible domain of the present invention has a clear generation path from hard constraints to candidate actions, and then from degradable constraints to form a speed range and make a joint satisfaction determination. This can avoid executing hydraulic actions that are unacceptable under other constraints just because a certain constraint is satisfied, and also make the subsequent permission level and resource allocation have a reproducible judgment basis.
[0043] Example 5: Based on Example 1, step S3 includes: The hydraulic execution branches involved in the dredging action are determined based on the dredging action to be performed and the pre-defined correspondence between the dredging action and the hydraulic execution branch. The hydraulic resource requirements are determined based on the action type, target action speed, and the pre-calibrated action parameters and the correspondence between the hydraulic resource requirements. Determine the permitted action level (permitted, restricted, or prohibited) based on the feasible action domain of each hydraulic actuator branch; The execution order is determined based on the action dependencies between each hydraulic actuator branch. Within the available hydraulic resources of the high-pressure, high-flow hydraulic system, hydraulic resources are allocated to the hydraulic actuator branches that are allowed to execute or restricted to execute, according to the action permission level, execution order, and hydraulic resource requirements, thus forming corresponding hydraulic resource quotas.
[0044] In this embodiment, the preset correspondence between dredging actions and hydraulic actuators is established based on the equipment's kinematic structure and hydraulic schematic diagram. This clarifies which hydraulic actuators are jointly responsible for completing a dredging action. For example, a single excavation action of the working device may require the participation of hydraulic actuators for the boom, stick, and bucket; a safe retraction action may require the participation of the boom lifting actuator, stick retraction actuator, and slewing holding actuator. This correspondence is part of the equipment's configuration data and is reconfigured according to the actual hydraulic circuit when the equipment model or mechanism changes.
[0045] In this embodiment, the correspondence between action parameters and hydraulic resource requirements is used to convert the action type and target action speed into the flow requirements of the corresponding hydraulic actuation branch. This can be pre-calibrated through equipment rated parameters, no-load test runs, and typical load tests, or a lookup table can be established based on the effective area, displacement, and valve flow characteristics of the actuator. The construction controller reads the corresponding flow requirements according to the action type and target action speed to be executed. When the action permission level is restricted execution, the target action speed is first restricted within the action feasible range, and then the hydraulic resource requirements are re-determined based on the restricted target action speed.
[0046] In this embodiment, the action dependency relationship represents the pre-existing, synchronous, or mutually exclusive relationship between multiple hydraulic actuators due to mechanism safety, action sequence, or hydraulic interlocking. This relationship can be pre-stored in the construction control system according to equipment operating procedures and interlocking logic. "Permitted execution" indicates that the action to be executed and its target speed are entirely within the feasible action domain; "Restricted execution" indicates that the action type is still permitted, but the target speed needs to be reduced before entering the feasible action domain; "Prohibited execution" indicates that the action type does not belong to the current feasible action domain.
[0047] In this embodiment, when using construction grid management tasks, grids with insufficient safe water depth, inability to set up anchorages, obstructed access routes, or outdated measurement data are first excluded. When operations are restricted, the remaining candidate grids are compared based on water depth margin, current direction influence, vessel relocation distance, remaining dredging thickness, and adjacent continuous operation conditions. Grids with a larger safety margin and acceptable relocation costs are selected according to preset sorting rules. Then, the single-bucket depth reduction, continuous bucket unloading frequency, or positioning verification is increased based on the reasons for the restrictions. The selected grids and operation intensity are used to generate dredging actions to be performed. Then, the branch flow requirements are determined according to this embodiment, and the hard constraints must not be relaxed when adjusting the operation intensity.
[0048] The working principle and beneficial effects of the above technical solution are as follows: This invention breaks down a dredging operation into hydraulic actuators and the flow requirements of each actuator. Based on the feasible domain of the operation, it simultaneously determines the permission level and resource quota, so that the limited available flow of the hydraulic power unit is allocated according to the actual operation dependency of the equipment, rather than each actuator independently competing for oil supply capacity.
[0049] Example 6: Based on Example 5, hydraulic resource quotas are set for each hydraulic actuation branch, including: Obtain the preset hydraulic actuator branch action dependencies, determine the hydraulic actuator branches with preceding relationships and those that are allowed to act synchronously, and form the execution sequence; Hydraulic actuators that are prohibited from being executed are removed based on the action permission level, and a resource allocation sequence is formed according to the execution order; According to the resource allocation sequence, the hydraulic resource demand is compared with the remaining available hydraulic resources, and the allocable hydraulic resources for the current hydraulic execution branch are determined in combination with the action permission level, and the remaining available hydraulic resources are updated. The updated remaining available hydraulic resources are used for resource allocation in the next hydraulic actuation branch until a hydraulic resource quota is formed for each hydraulic actuation branch.
[0050] In this embodiment, action dependencies are pre-stored in the construction control system. A prerequisite relationship indicates that a subsequent hydraulic execution branch is only allowed to enter resource allocation after the preceding hydraulic execution branch reaches its predetermined action stage; simultaneous actions are allowed if two or more branches can operate simultaneously without violating the current action's feasible domain; under a mutual exclusion relationship, only branches in the current execution order that are permitted to obtain action permission are retained. The resulting execution order directly serves as the basis for the resource allocation sequence.
[0051] In this embodiment, the remaining available hydraulic resources represent the remaining value of the available hydraulic resources of the high-pressure, high-flow hydraulic system in the current control cycle after deducting the flow rate already allocated to the preceding hydraulic execution branch. For restricted execution branches, their allocable upper limit can be determined based on the restricted target action speed or the preset permissible level flow rate upper limit; for permitted execution branches, their quota must still not exceed the corresponding hydraulic resource requirement. The remaining available hydraulic resources are updated after the allocation of each branch or a group of synchronous branches is completed.
[0052] In this embodiment, when multiple branches have synchronous operation relationships, the synchronous branches can be treated as a resource allocation group. Quotas are determined separately for each branch within this group, provided that the hydraulic resource requirements of each branch in the group are not exceeded and the currently remaining available hydraulic resources are also not exceeded. When the remaining available flow is insufficient to cover all requirements, branches with pre-emptive or safety-maintaining properties are prioritized, and then the remaining flow is allocated to the remaining branches. The above allocation rules do not change the hard constraints and feasible domain; they only address the problem of limited flow allocation among permitted branches.
[0053] The working principle and beneficial effects of the above technical solution are as follows: In this embodiment, hydraulic resources are allocated to each hydraulic actuator branch according to a predetermined execution order. After the current hydraulic actuator branch completes its allocation, the remaining available hydraulic resources are used for the allocation of resources to the next hydraulic actuator branch. Therefore, the resource allocation of each branch is limited by the current oil supply capacity of the hydraulic power unit. For hydraulic actuator branches in a restricted execution state, their actual action capability is kept within the range allowed by the current action feasible domain by reducing the corresponding hydraulic resource quota.
[0054] Example 7: Based on Example 1, step S4 includes: Based on the action permission level and hydraulic resource quota of each hydraulic actuator branch, determine the allowable range of valve opening for the corresponding high-frequency response electro-hydraulic servo valve or electro-hydraulic proportional valve, and reduce the upper limit of valve opening according to the hydraulic resource quota corresponding to the restricted hydraulic actuator branch. According to the execution sequence, control each hydraulic actuator branch to perform dredging actions within the allowable range of valve opening; When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the affected hydraulic execution branch is identified. Before revoking the action permission, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded to form a hydraulic execution branch working status record. Hydraulic resources are stopped from being allocated to the affected hydraulic execution branch, thus releasing hydraulic resources. The released hydraulic resources will be preferentially allocated to the hydraulic actuators that perform safety holding or safety evacuation actions.
[0055] In this embodiment, the allowable range of valve opening for the high-frequency response electro-hydraulic servo valve or electro-hydraulic proportional valve is determined based on the corresponding hydraulic resource quota. Specifically, the valve opening and flow characteristics provided by the valve manufacturer can be used, or the "target flow rate - valve control input" lookup relationship obtained during equipment commissioning under different oil supply pressures can be used to convert the branch's allocable flow rate into the upper limit of the valve opening. The construction controller can still use the equipment's original position loop or speed loop to adjust the valve opening within this upper limit. Thus, this invention limits the allowable control boundary and does not require replacing the equipment's existing underlying servo controller. During the conversion, a characteristic segment adapted to the current oil supply pressure and load conditions is selected, and the upper limit of the valve control input is determined based on the condition that the obtained flow rate does not exceed the branch quota. The output command of the original position loop or speed loop is limited and then sent to the drive end of the corresponding valve.
[0056] In this embodiment, the hydraulic actuator branch can be in a state of permitted execution, restricted execution, prohibited execution, or recovery determination. When the joint construction state crosses the preset safety boundary corresponding to the hard constraint, the current action stage, interrupted action type, interrupted action speed, action permission level, and hydraulic resource quota are saved before the action permission is revoked. The "current action stage" can be jointly determined by the position of the actuator, the direction of action, and the step identifier of the current dredging action, and is used to determine whether the interrupted action has been completed and whether it needs to continue from the interrupted position or be re-executed during recovery. The interrupted action type and interrupted action speed are respectively taken from the action type and actual action speed before the permission is revoked, and are used for the recovery feasibility domain determination in Embodiment 10.
[0057] In this embodiment, during the pause, the last confirmed completed grid, the last effective bucket position, the area not yet re-measured, the ship's position, fore and aft draft, anchor points, and anchor chain status are also saved, forming a task breakpoint, which is then associated with the working status record of the hydraulic execution branch that was interrupted at the same time. The task breakpoint is used to restore the starting point verification, and the branch working status record is used to restore the actions and their sequential relationship judgment; both are retained separately.
[0058] In this embodiment, releasing hydraulic resources refers to the dispensable flow that is no longer reserved for the original production action in the current control cycle after the action permission of the affected hydraulic actuator branch is revoked. The construction controller releases this flow from the original resource quota and re-includes it in the resource pool available for safe action allocation; flow that has already been occupied by other branches or cannot be provided by the hydraulic power unit itself is not included in the released hydraulic resources, thereby avoiding duplicate allocation.
[0059] The working principle and beneficial effects of the above technical solution are as follows: This invention implements hydraulic resource quotas as executable valve opening boundaries through valve flow characteristics or on-site calibration relationships, enabling upper-level multi-source constraint judgment to actually constrain hydraulic execution; after a hard constraint exceeds the boundary, the action breakpoint is recorded, the permission is revoked, and a traceable release of hydraulic resources is formed, providing a clear source for priority power supply for subsequent safe actions.
[0060] Example 8: Based on Example 7, the hydraulic resources released are preferentially allocated to the hydraulic actuation branches performing safety holding or safety evacuation actions, including: Based on the release of hydraulic resources, the current hard constraints that cross the preset safety boundary, and the correspondence between the preset hard constraints and safety actions, determine the safety holding action or the safety evacuation action to form a set of safety actions. The hydraulic actuator branch for each safety action is determined based on the set of safety actions, and the order of safety execution is determined based on the preset sequential dependency relationship between the safety actions. The hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. The release hydraulic resources are preferentially allocated to the current hydraulic actuator branch, and the available hydraulic resources for the next hydraulic actuator branch are determined based on the remaining release hydraulic resources after the current allocation is completed. The resource allocation of each hydraulic actuator branch is completed sequentially to form the hydraulic resource allocation result corresponding to the safe action, and the allowable range of valve opening of the corresponding valve is determined based on the hydraulic resource allocation result.
[0061] In this embodiment, the pre-defined correspondence between hard constraints and safety actions is established and stored in the construction control system based on equipment operating procedures, safe positions of mechanisms, and on-site emergency plans. This system is used to convert different hard constraints into executable safety actions. For example, when wind conditions reach the project shutdown criteria, stopping bucket digging, retrieving the working device, maintaining the slewing position, and retracting necessary equipment can be configured as safety actions. When water flow or water level is abnormal, stopping the original operation, lifting the working device, and maintaining the safe posture of the equipment can be configured as safety actions. Specific safety actions are configured according to the equipment specifications and approved construction plans to avoid the controller automatically inferring undefined emergency actions. For these safety actions, the feasible domain is determined according to the corresponding state parameters, mechanism limits, loads, and collision avoidance conditions. Triggered shutdown constraints prohibit the continuation of the original dredging operation, while safety maintenance or evacuation actions are determined according to their own permissible conditions and must not exceed the hard constraints applicable to that safety action.
[0062] In this embodiment, the safety execution sequence is used to address the sequential relationship when multiple safety actions require limited hydraulic resources simultaneously. The sequential dependency between safety actions can be pre-configured based on mechanical interlocks and emergency response sequences. For example, holding or retrieving actions that eliminate the risk of loss of control, fall, or collision can be executed first, followed by actions that generate evacuation displacement, and finally, a stable holding state can be entered. If two safety actions do not have a sequential dependency and hydraulic resources are sufficient, they can be configured to be executed synchronously.
[0063] In this embodiment, such as Figure 2 As shown, the basic safety resource requirements of all safety execution branches are first met according to Example 9, and then incremental drive resources are allocated according to the safety execution order. After the drive quota allocation for the current branch is completed, the quota is deducted from the incremental available resources to obtain the remaining resources available for the next branch; the basic safety quotas of each branch that have already been formed do not participate in the incremental allocation. After all safety execution branches have been allocated, the hydraulic resource allocation result corresponding to the safety action is formed, and the allowable range of valve opening for each valve is determined according to the valve flow characteristics or calibration relationship described in Example 7.
[0064] The working principle and beneficial effects of the above technical solution are as follows: When a hard constraint is exceeded, the hydraulic flow released by the original production action is not directly transferred to other production branches. Instead, a safe execution sequence is formed based on the safety actions and mechanical dependencies corresponding to the hard constraint, and the remaining resources are then transferred to each branch, so that the limited hydraulic power supply can prioritize the maintenance of equipment and safe evacuation.
[0065] Example 9: Based on Example 8, the hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. The release hydraulic resources are preferentially allocated to the current hydraulic actuator branch, and the available hydraulic resources for the next hydraulic actuator branch are determined based on the remaining release hydraulic resources after the current allocation is completed. This includes: Based on the preset correspondence between safety actions and hydraulic resource requirements, the hydraulic resource requirements of each safety execution branch are divided into basic safety resource requirements for maintaining the safety holding state and incremental drive resource requirements for driving safety actions to generate displacement. The current hydraulic execution branch is determined according to the safety execution sequence. When the released hydraulic resources are sufficient to cover all basic safety resource requirements, hydraulic resources sufficient to meet the basic safety resource requirements of each branch are first allocated to all safety execution branches to form the basic safety quota of each branch. The released hydraulic resources after deducting all basic safety quotas are used as the first remaining released hydraulic resources. If the resources are insufficient, no incremental drive resources are allocated, the equipment's preset emergency interlock is triggered, and the permission to resume production is prohibited. Compare the first remaining release hydraulic resources with the incremental drive resource requirements of the current hydraulic actuation branch; if the incremental drive resource requirements are met, a corresponding drive quota is formed; if not, the upper limit of the action speed is determined based on the first remaining release hydraulic resources, and the action speed is reduced within the action feasible domain corresponding to the current safe action before the drive quota is re-determined. The basic safety quota and drive quota of the current hydraulic actuation branch are combined to form its allocable hydraulic resources, and the first remaining release hydraulic resources after deducting the current drive quota are used as the basis for allocating incremental drive resources for the next hydraulic actuation branch.
[0066] In this embodiment, both the basic safety resource requirement and the incremental drive resource requirement are expressed in terms of flow rate. The basic safety resource requirement represents the minimum allocable flow rate required for the current safety execution branch to maintain a safe holding state. For branches that can maintain a safe state without continuous flow by relying on load holding valves, mechanical locking, or valve core neutral position, the basic safety resource requirement can be set to zero. For branches that require active leakage compensation or continuous micro-motion holding, a non-zero basic safety resource requirement is determined based on static holding tests. The incremental drive resource requirement represents the flow rate required to further drive the actuator to generate lifting, retraction, rotation, or other safe displacements after the basic safety conditions are met. During calibration, the minimum flow rate required to maintain a safe holding state is first determined under specified load and holding conditions, and then the total flow rate requirement for each permissible safe action speed is determined under the same operating conditions. The portion of the total flow rate requirement exceeding the basic safety resource requirement is used as the incremental drive resource requirement for the corresponding speed and is not repeatedly included in the basic part.
[0067] In this embodiment, the preset correspondence between safe actions and hydraulic resource requirements can be pre-calibrated through the rated parameters of the actuator, the flow characteristics of the valve, and safe action tests. If the first remaining release hydraulic resource is sufficient to meet the incremental drive resource requirements, a drive quota is formed according to the target safe action speed; if insufficient, the basic safety quota remains unchanged, and the upper limit of the action speed that the current branch can support is checked back based on the available remaining flow. The safe action speed is then lowered within the action feasible domain corresponding to the current safe action, and the drive quota is re-determined. The first remaining release hydraulic resource is formed only after all basic safety quotas have been met and cannot borrow the basic safety quotas of other branches. When the release hydraulic resource is insufficient to cover all basic safety resource requirements, no incremental drive resources are allocated, a resource shortage state is output, and the equipment's preset emergency interlock is triggered; for the load holding valve, mechanical lock, or valve core center position holding measures configured in the equipment, they are put into holding according to their applicable conditions. Before the safe holding conditions are confirmed to be met, the resumption of production action permission is prohibited, and the cycle is not judged as a safe allocation completion. The above processing does not replace the equipment's own oil supply loss protection capability with flow allocation.
[0068] In this embodiment, the basic safety quota for each safety execution branch is initially retained and is not deducted due to displacement of the preceding branch. The sum of the basic safety quota and the drive quota of the current branch constitutes its allocable hydraulic resources; the total basic safety quota and the total allocated drive quota of all branches must not exceed the available release hydraulic resources. Each incremental allocation only deducts the current drive quota and then passes the remaining incremental resources to the next branch; when the remaining resources cannot support the allowable speed within the current safe action feasible domain, its drive quota is zero and remains in a waiting state, while the basic safety quota continues to be retained.
[0069] The working principle and beneficial effects of the above technical solution are as follows: This invention divides safety resource requirements into basic safety requirements that must be met first and incremental driven requirements that can be executed at a reduced speed as remaining resources are available. It also clarifies two types of equipment scenarios: zero flow maintenance and active pressure maintenance. This ensures that there is still an implementable degradation path when resources are insufficient, and avoids occupying the minimum resources required to maintain equipment safety in pursuit of full operation speed.
[0070] Example 10: Based on Example 1, step S5 includes: When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded before the action permission of the affected hydraulic execution branch is revoked, thus forming a hydraulic execution branch working status record; When the state parameter that causes the joint construction state to exceed the preset safety boundary meets the corresponding preset recovery condition, the action feasible domain of each hydraulic execution branch is re-determined according to the current joint construction state, and the hydraulic execution branch whose interruption action type is allowed and whose interruption action speed falls within the current action speed allowable range is determined as the hydraulic execution branch that can be recovered. The order of recovery is determined based on the action dependencies between the hydraulic actuator branches that can be recovered and the working status records of the hydraulic actuator branches, and a recovery action sequence is generated. The action permission is restored sequentially according to the recovery action sequence, and the corresponding hydraulic resource quota is re-determined based on the available hydraulic resources. After the current hydraulic execution branch meets the preset branch recovery completion conditions, the recovery control of the next hydraulic execution branch is initiated.
[0071] In this embodiment, preset recovery conditions and preset safety boundaries corresponding to hard constraints are configured separately to form a hysteresis relationship between entry and exit, avoiding repeated shutdowns and recoveries when state parameters fluctuate near the boundaries. For example, if the construction plan stipulates that water operations should be stopped immediately when the wind force reaches the shutdown level, the recovery condition can be set to the recovery range where the wind force drops below the shutdown boundary and remains stable for a preset time; corresponding recovery conditions can also be set for abnormalities in visibility, water flow, water level, or hydraulic power unit. The recovery conditions only determine when to enter the recovery judgment and do not change the safety boundary of the hard constraint itself.
[0072] In this embodiment, after entering the recovery candidate list, the latest environment, ship position, draft, anchorage status, and task breakpoint are read. Grids that may have experienced siltation, ship disturbance, or expired data during the downtime are converted to be reviewed. First, starting points that do not meet the requirements for safe water depth, approach route, anchorage arrangement, or task continuity are excluded. Then, safety margin, relocation costs, and remaining workload are compared according to preset rules to form candidate recovery starting points. If the original bucket position does not meet the conditions, it is reselected from the incomplete grids. After the water depth, ship position, and anchorage are reviewed on-site, the confirmed starting point and its task status are used to determine the recovery action. Production action is not permitted until the starting point review is completed; branch line safety maintenance or evacuation is still carried out according to its own permitted conditions.
[0073] In this embodiment, when redetermining the feasible domain of an action, the latest environmental state, construction vessel state, dredging task state, and available hydraulic resource state at the time of recovery determination are used, instead of directly using the feasible domain of an action before the hard constraint was exceeded. For each affected hydraulic actuator branch, the interrupted action type and interrupted action speed in the working status record are compared with the redetermined feasible domain of an action; only when the interrupted action type is allowed and the interrupted action speed falls within the current allowed range is the hydraulic actuator branch determined as a hydraulic actuator branch that can be recovered.
[0074] In this embodiment, the recovery action sequence is generated based on the action dependencies between allowed recovery branches and the interrupted action phase. The construction controller first determines that there are no allowed recovery branches with incomplete prerequisite actions as the current recovery target; after the current recovery target meets the preset branch recovery completion condition, the subsequent branch with that action as a prerequisite is released, and the above process is repeated until the sequence ends. The preset branch recovery completion condition can be determined by at least one of the following: the actuator reaches the target position or allowable position range, the action speed enters a stable range, the corresponding valve control state is stable, and the necessary prerequisite interlock is released. For example, the attitude maintenance and position stabilization branches can be restored first, then the working device can be restored to the allowable construction attitude, and finally the original dredging production action can be restored.
[0075] In this embodiment, the execution feedback record includes the receipt of instructions, actual start and completion times, actual changes in vessel position, anchor adjustments, workload, and reasons for non-execution. The actual completion time is compared with the planned time, and associated with routes, soil layers, or action types to update the estimated transfer time and operational capacity for similar working conditions. When navigation delays occur, the estimated time for the corresponding route is increased, prioritizing paths with lower waiting costs for candidate grids with similar conditions. When adjusting the ranking weights, only candidate ranking items such as transfer time and remaining workload are adjusted; hard safety boundaries are not adjusted, nor is the determination that the original production action will stop upon exceeding the hard constraint remains unchanged.
[0076] The working principle and beneficial effects of the above technical solution are as follows: The recovery control of this invention does not directly replicate the valve control state before the hard constraint exceeds the limit. Instead, it recalculates the feasible domain of action and available hydraulic resources using the latest joint construction state, and then generates a recovery sequence step by step according to the clear branch precondition relationship. In this way, even if the environment, ship position, mission status or hydraulic power supply capacity changes during the shutdown, it can recover from the current actual state, rather than from the historical control state that has failed.
[0077] In the above embodiments, the project parameters are only used to illustrate the possible implementations of the present invention. Taking the second phase of the Tanmen Central Fishing Port upgrade and renovation project as an example, the construction plan includes a 4m³ bucket dredger, a 1000m³ mud barge, and an anchor-lifting boat, and requires continuous monitoring of tides, currents, ship draft, anchoring, and severe weather; these existing on-site data can serve as data sources for the joint construction status. For hard areas such as completely weathered granite or coral reef limestone, pretreatment equipment such as hydraulic breakers can be used; only when the pretreatment equipment and dredging equipment share the same hydraulic power unit and participate in the flow competition of this control cycle will their corresponding branches be included in the unified allocation of hydraulic resources in this application.
[0078] Those skilled in the art can adjust the number of hydraulic actuator branches, action dependencies, valve control types, and status data sources according to the specific structure of the dredging equipment. For different equipment, the correspondence between dredging actions and branches, constraints and branches, and valve opening and flow rate should be re-established based on the actual hydraulic schematic diagram, rather than directly using the calibration parameters of other equipment. As long as constraints are established according to the joint construction state, a feasible action domain is formed, branch resources are allocated within the limited available hydraulic resources, and safe resource reallocation and orderly recovery are implemented after hard constraints exceed the limits, this invention can be implemented.
Claims
1. A dredging construction process control method based on multi-source state joint constraints, characterized in that, A method applicable to dredging equipment with a high-pressure, high-flow hydraulic system, the high-pressure, high-flow hydraulic system including multiple hydraulic actuator branches and corresponding high-frequency electro-hydraulic servo valves or electro-hydraulic proportional valves, wherein the hydraulic resources are the hydraulic flow that can be allocated to the hydraulic actuator branches in the current control cycle, the method comprising: Step S1: Obtain environmental status, construction vessel status, dredging task status, and available hydraulic resources status to form a joint construction status; Step S2: Establish a joint constraint set based on the joint construction state, distinguish between insurmountable hard constraints and degradable constraints that allow for reduced operational capabilities, and determine the action feasible domain of each hydraulic actuation branch; Step S3: Determine the hydraulic execution branches and hydraulic resource requirements for the dredging operation to be performed, and determine the operation permission level, execution order and hydraulic resource quota based on the feasible domain of the operation and the available hydraulic resources. Step S4: Limit the allowable range of valve opening of the corresponding valve according to the action permission level, execution order and hydraulic resource quota; when the joint construction state exceeds the preset safety boundary of hard constraint, record the working status of the affected hydraulic execution branch, revoke the corresponding action permission, and give priority to allocating the released hydraulic resources to the hydraulic execution branch that performs the safety holding action or the safety evacuation action. Among them, the basic safety resource requirements for each safety execution branch to maintain the safety holding state are met first, and then the incremental drive resources that drive the safety action to generate displacement are allocated according to the safety execution order. Step S5: When the preset recovery conditions of the corresponding hard constraints are met, the action feasible domain is redefined, and a recovery action sequence is generated based on the action feasible domain and the working status of the hydraulic execution branch. Then, the action permission is restored and the hydraulic resource quota is redistributed in sequence.
2. The dredging construction process control method based on multi-source state joint constraints according to claim 1, characterized in that, Step S1 includes: The environmental status is obtained through environmental monitoring equipment, the status of the construction vessel is obtained through ship positioning and motion status detection equipment, the dredging task status is obtained through construction control system, and the status of available hydraulic resources is determined based on the operating status of hydraulic power unit and hydraulic flow detection information. Associate the acquisition time with each status data point and filter the status data according to the time matching window of the current control cycle; The status data after screening is checked for validity. Status data that meet the preset validity conditions are associated according to status category to form the joint construction status of the current control cycle.
3. The dredging construction process control method based on multi-source state joint constraints according to claim 1, characterized in that, Step S2 includes: The construction constraints involved in the dredging action determination are determined based on the joint construction status and preset constraint rules, and the hydraulic execution branches of each construction constraint are determined based on the preset correspondence. Construction constraints that prohibit the relevant hydraulic actuators from continuing to operate after crossing the preset safety boundary are defined as hard constraints, while construction constraints that allow reduced operating capabilities to continue to operate after entering the preset degradation range are defined as degradeable constraints. For each hydraulic actuator branch, the allowed action type and the allowable action speed range are determined according to the corresponding hard constraints and degradable constraints. The set of action types and the corresponding allowable action speed range that simultaneously satisfy the corresponding construction constraints is determined as the action feasible domain of the corresponding hydraulic actuator branch.
4. The dredging construction process control method based on multi-source state joint constraints according to claim 3, characterized in that, For each hydraulic actuator branch, the permissible action types and permissible action speed ranges are determined based on the corresponding hard constraints and degradable constraints. The set of action types that simultaneously satisfy the corresponding construction constraints and the corresponding permissible action speed ranges is defined as the action feasible region of the corresponding hydraulic actuator branch, including: Obtain the hard constraints corresponding to the current hydraulic execution branch, and eliminate action types that do not meet the corresponding hard constraints based on the current joint construction status and preset constraint rules to form a candidate action set; Based on the degradability constraints corresponding to each action type in the candidate action set, limit the allowable range of the corresponding action speed; For the same action type, the common allowable range of action speed is taken for multiple construction constraints, and action types with empty common allowable ranges are eliminated to form a set of executable actions. Based on the action type and allowable speed range in the set of executable actions, the action feasible domain of the current hydraulic execution branch is formed.
5. The dredging construction process control method based on multi-source state joint constraints according to claim 1, characterized in that, Step S3 includes: The hydraulic execution branches involved in the dredging action are determined based on the dredging action to be performed and the pre-defined correspondence between the dredging action and the hydraulic execution branch. The hydraulic resource requirements are determined based on the action type, target action speed, and the pre-calibrated action parameters and the correspondence between the hydraulic resource requirements. Determine the permitted action level (permitted, restricted, or prohibited) based on the feasible action domain of each hydraulic actuator branch; The execution order is determined based on the action dependencies between each hydraulic actuator branch. Within the available hydraulic resources of the high-pressure, high-flow hydraulic system, hydraulic resources are allocated to the hydraulic actuator branches that are allowed to execute or restricted to execute, according to the action permission level, execution order, and hydraulic resource requirements, thus forming corresponding hydraulic resource quotas.
6. The dredging construction process control method based on multi-source state joint constraints according to claim 5, characterized in that, The execution sequence is determined based on the action dependencies between each hydraulic actuator branch. Within the available hydraulic resources of the high-pressure, high-flow hydraulic system, hydraulic resources are allocated to the hydraulic actuator branches that are permitted or restricted to execution, according to the action permission level, execution sequence, and hydraulic resource requirements, forming corresponding hydraulic resource quotas, including: Obtain the preset hydraulic actuator branch action dependencies, determine the hydraulic actuator branches with preceding relationships and those that are allowed to act synchronously, and form the execution sequence; Hydraulic actuators that are prohibited from being executed are removed based on the action permission level, and a resource allocation sequence is formed according to the execution order; According to the resource allocation sequence, the hydraulic resource demand is compared with the remaining available hydraulic resources, and the allocable hydraulic resources for the current hydraulic execution branch are determined in combination with the action permission level, and the remaining available hydraulic resources are updated. The updated remaining available hydraulic resources are used for resource allocation in the next hydraulic actuation branch until a hydraulic resource quota is formed for each hydraulic actuation branch.
7. The dredging construction process control method based on multi-source state joint constraints according to claim 1, characterized in that, Step S4 includes: Based on the action permission level and hydraulic resource quota of each hydraulic actuator branch, determine the allowable range of valve opening for the corresponding high-frequency response electro-hydraulic servo valve or electro-hydraulic proportional valve, and reduce the upper limit of valve opening according to the hydraulic resource quota corresponding to the restricted hydraulic actuator branch. According to the execution sequence, control each hydraulic actuator branch to perform dredging actions within the allowable range of valve opening; When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the affected hydraulic execution branch is identified. Before revoking the action permission, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded to form a hydraulic execution branch working status record. Hydraulic resources are stopped from being allocated to the affected hydraulic execution branch, thus releasing hydraulic resources. The released hydraulic resources will be preferentially allocated to the hydraulic actuators that perform safety holding or safety evacuation actions.
8. The dredging construction process control method based on multi-source state joint constraints according to claim 7, characterized in that, Prioritize the allocation of released hydraulic resources to hydraulic actuators performing safety holding or safety evacuation actions, including: Based on the release of hydraulic resources, the current hard constraints that cross the preset safety boundary, and the correspondence between the preset hard constraints and safety actions, determine the safety holding action or the safety evacuation action to form a set of safety actions. The hydraulic actuator branch for each safety action is determined based on the set of safety actions, and the order of safety execution is determined based on the preset sequential dependency relationship between the safety actions. The hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. The release hydraulic resources are preferentially allocated to the current hydraulic actuator branch, and the available hydraulic resources for the next hydraulic actuator branch are determined based on the remaining release hydraulic resources after the current allocation is completed. The resource allocation of each hydraulic actuator branch is completed sequentially to form the hydraulic resource allocation result corresponding to the safe action, and the allowable range of valve opening of the corresponding valve is determined based on the hydraulic resource allocation result.
9. The dredging construction process control method based on multi-source state joint constraints according to claim 8, characterized in that, The hydraulic resources required for each hydraulic actuator branch to perform the corresponding safety action are determined sequentially according to the safety execution order. Release hydraulic resources are preferentially allocated to the current hydraulic actuator branch. Based on the remaining release hydraulic resources after the current allocation, the available hydraulic resources for the next hydraulic actuator branch are determined, including: Based on the preset correspondence between safety actions and hydraulic resource requirements, the hydraulic resource requirements of each safety execution branch are divided into basic safety resource requirements for maintaining the safety holding state and incremental drive resource requirements for driving safety actions to generate displacement. The current hydraulic execution branch is determined according to the safety execution sequence. When the released hydraulic resources are sufficient to cover all basic safety resource requirements, hydraulic resources sufficient to meet the basic safety resource requirements of each branch are first allocated to all safety execution branches to form the basic safety quota of each branch. The released hydraulic resources after deducting all basic safety quotas are used as the first remaining released hydraulic resources. If the resources are insufficient, no incremental drive resources are allocated, the equipment's preset emergency interlock is triggered, and the permission to resume production is prohibited. Compare the first remaining release hydraulic resources with the incremental drive resource requirements of the current hydraulic actuation branch; if the incremental drive resource requirements are met, a corresponding drive quota is formed; if not, the upper limit of the action speed is determined based on the first remaining release hydraulic resources, and the action speed is reduced within the action feasible domain corresponding to the current safe action before the drive quota is re-determined. The basic safety quota and drive quota of the current hydraulic actuation branch are combined to form its allocable hydraulic resources, and the first remaining release hydraulic resources after deducting the current drive quota are used as the basis for allocating incremental drive resources for the next hydraulic actuation branch.
10. The dredging construction process control method based on multi-source state joint constraints according to claim 1, characterized in that, Step S5 includes: When the joint construction state crosses the preset safety boundary corresponding to any hard constraint, the current action stage, interruption action type, interruption action speed, action permission level and hydraulic resource quota are recorded before the action permission of the affected hydraulic execution branch is revoked, thus forming a hydraulic execution branch working status record; When the state parameter that causes the joint construction state to exceed the preset safety boundary meets the corresponding preset recovery condition, the action feasible domain of each hydraulic execution branch is re-determined according to the current joint construction state, and the hydraulic execution branch whose interruption action type is allowed and whose interruption action speed falls within the current action speed allowable range is determined as the hydraulic execution branch that can be recovered. The order of recovery is determined based on the action dependencies between the hydraulic actuator branches that can be recovered and the working status records of the hydraulic actuator branches, and a recovery action sequence is generated. The action permission is restored sequentially according to the recovery action sequence, and the corresponding hydraulic resource quota is re-determined based on the available hydraulic resources. After the current hydraulic execution branch meets the preset branch recovery completion conditions, the recovery control of the next hydraulic execution branch is initiated.
Citation Information
Patent Citations
Full-automatic dredging control system and method for trailing suction hopper dredger
CN108442446A
Closed-loop real-time inversion method for dredger construction parameters
CN114065639A