Mountainous land construction flood prevention and drainage ditch system and water diversion and drainage method

By incorporating a combination of structures such as flood storage areas, interception ditches, drainage ditches, and drainage culverts into buildings on hillsides, the problems of interception and drainage in flood control and drainage systems for buildings on hillsides have been solved. This has enabled graded storage, energy dissipation, and orderly discharge, thereby improving flood control capacity and slope stability.

CN123133476APending Publication Date: 2026-11-20CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611467667.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the existing technology, the flood control and drainage system of buildings on hillsides is difficult to adapt to the complex catchment area, the water erosion caused by the difference in elevation of the mountains, and the lack of drainage of groundwater on the slope, resulting in insufficient flood control capacity of the building site and affecting the stability of the slope.

Method used

The system employs a combination of flood storage and detention areas, interception ditches, drainage ditches, drainage culverts, and circular culverts to form a graded flood control and drainage system that intercepts, stores, and dissipates energy. Real-time scheduling is achieved through monitoring modules to ensure orderly drainage.

Benefits of technology

Effective interception and zoned diversion of water from the mountain can reduce the pressure of concentrated flood peaks, reduce water erosion, improve the flood control capacity of the construction site, reduce the risk of slope instability, and ensure the continuous and stable operation of the drainage system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133476A_ABST
    Figure CN123133476A_ABST
Patent Text Reader

Abstract

The application relates to a flood prevention and drainage ditch system of a building on a mountainous slope and a water diversion and drainage method, which comprises a storage area arranged on an upstream mountain of a building site, a flood interception ditch arranged on a peripheral mountain of the building site, a flood drainage ditch arranged on a side of the building site, a flood drainage pipe culvert communicated with the flood drainage ditch or the storage area, and a round culvert communicated between the storage areas; the flood interception ditch extends along the contour line of the peripheral mountain slope of the building site, the flood drainage ditch is used for collecting the water of the flood interception ditch and the slope surface of the building site, and the storage areas are arranged in stages along the elevation direction from the upstream to the downstream of the building site; the flood drainage ditch, the storage areas and the flood drainage pipe culvert jointly form a flood prevention and drainage system which gradually converges, stores, dissipates and discharges the water to the outside of the building site along the mountainous terrain. The application can organize the discharge of the surface runoff and the internal seepage of the slope, and reduces the adverse effects of the water seepage or retention on the slope stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of flood control and drainage technology, specifically to a flood control and drainage ditch system and drainage method for buildings on hillsides. Background Technology

[0002] As urban development expands into complex terrains such as mountains and slopes, some residential, public, and other building projects need to be situated in mountainous, sloping, or mountainous environments. In these projects, the construction site is typically located on a mountain slope, in a valley, at the foot of a slope, or between several terrain areas with significant elevation differences, and a large catchment area exists around the site. Especially during rainfall, surface runoff from upstream mountains and surrounding slopes rapidly converges along the terrain's elevation and aspect, flowing towards the construction site and its surrounding areas.

[0003] When surface runoff from the mountains upstream and on both sides of a construction site is not effectively intercepted and diverted before entering the site, flash floods can easily converge along the natural slopes, potentially eroding the outer slopes and causing waterlogging, insufficient drainage capacity in roads and the site, and increasing the risk of slope instability and localized landslides. Therefore, for construction projects located in mountainous, sloping, or mountainous areas, it is necessary to consider the topographic elevation, slope aspect, and catchment area between the construction site and the surrounding mountains to systematically intercept, collect, and discharge mountain runoff and rainwater from the site.

[0004] In existing technologies, flood control and drainage for buildings on hillsides typically employ methods such as internal drainage ditches, intercepting ditches, blind ditches, drainage culverts, or single intercepting ditches around the hillside. However, for building projects on hillsides, slopes, or mountains, relying solely on a single drainage ditch or simple canal connections for drainage presents the following problems: First, it is difficult to adapt to the complex catchment area and multi-directional water inflow of hillsides; the mountains surrounding mountain building sites usually have multiple slopes, and the water flow paths and volumes vary in different areas. If a single drainage channel is used to centrally receive water from all directions, some drainage facilities may bear a large instantaneous flood flow, and floods from different areas may easily converge in local locations, which is not conducive to the zoned drainage of floods outside the building site. Secondly, hillside construction sites typically have significant elevation differences, especially in steep areas. Surface runoff, under the influence of gravity, easily forms high-speed water flows. If only ordinary drainage ditches are used to directly transport floodwater to lower elevations, the water flow in sections with large elevation differences can easily cause strong erosion of the ditch bottom, walls, and bends, potentially leading to further damage to the drainage ditches and scouring of the downstream slope toe. Thirdly, for hillside construction sites with large catchment areas, upstream water may concentrate in the drainage system within a short period. If there is a lack of space for flood storage and tiered release, the floodwater can easily be concentrated and transported to a single downstream drainage node, increasing the instantaneous drainage pressure on drainage pipes, outlets, and external drainage channels. Fourthly, hillside construction sites are surrounded not only by surface runoff but also by stagnant water and groundwater within the slope. If only surface drainage ditches are installed without draining the groundwater within the slope, the water may remain within the slope for extended periods, causing changes in soil moisture content and increasing the risk of compromised slope stability.

[0005] Therefore, it is necessary to study a flood control and drainage system and a drainage method for buildings on hillsides. Summary of the Invention

[0006] In view of this, the purpose of the present invention is to provide a flood control and drainage ditch system and drainage method for buildings on hillsides, which effectively solves the problems in the construction of existing buildings on hillsides, such as the difficulty in intercepting and orderly draining water from the mountain in different areas, the large downstream drainage pressure caused by concentrated flood peaks, water erosion caused by mountain elevation differences, and the lack of effective drainage of groundwater on the slope, which affects the continuous operation of the drainage system.

[0007] To achieve the above objectives, the technical solution adopted by the present invention is: a flood control and drainage system and a drainage method for buildings on hillsides, comprising a retention area on the upstream slope of the building site, a flood interception ditch on the outer slope of the building site, a drainage ditch on the periphery of the building site, a drainage culvert connected to the drainage ditch or retention area, and a circular culvert connecting the retention areas; the flood interception ditch extends along the contour lines of the outer slope of the building site to intercept the upstream slope runoff, and the drainage ditch is used to receive the intercepted runoff. The drainage system collects water from the slopes of the construction site and directs it to a storage area or a flood discharge culvert. The storage areas are arranged in stages along the elevation direction from upstream to downstream of the construction site, and adjacent storage areas are connected by the culvert to store and release floodwater from upstream in stages. The flood discharge culvert is used to transport the floodwater collected from upstream to the downstream storage area or the external drainage channel of the site. The flood discharge ditch, storage area and flood discharge culvert together form a flood control and drainage system that collects, stores and dissipates energy along the mountainous terrain and discharges the floodwater outside the construction site.

[0008] Furthermore, a total of six storage and retention areas are set up, five of which are located in the upstream valley and flat areas of the construction site, and one is located in the downstream gully mouth area. The five upstream storage and retention areas are used to receive floods from the mountain slopes, and the multiple upstream storage and retention areas are set up sequentially according to the topographic elevation of the construction site, so that the floods are transported step by step from the storage and retention areas with higher elevations to the storage and retention areas with lower elevations. The gully mouth storage and retention area is used to receive the floods transported by the flood discharge culvert and to perform energy dissipation and retention.

[0009] Furthermore, at least one of the aforementioned storage and detention areas is provided downstream of a concrete gravity dam, which forms a water-retaining structure for the storage and detention area, and the concrete gravity dam is provided with an overflow section; the overflow section adopts an open-type broad-crested weir structure so that floodwaters exceeding the design storage level in the storage and detention area can be discharged downstream through the overflow section.

[0010] Furthermore, it also includes a first drop and a second drop, with the inlet and outlet of the culvert connected to the first drop and the second drop respectively. The first drop is connected to the outlet of the upstream storage area, and the second drop is connected to the downstream storage area through the culvert, so that the water discharged through the culvert undergoes elevation conversion and energy dissipation before entering the downstream storage area.

[0011] Furthermore, the flood discharge culvert is set on the flood transport path from upstream to downstream of the construction site. The flood discharge ditches located on the east and west sides of the construction site flow into the flood discharge culvert, and the downstream of the flood discharge culvert is connected to the storage area at the mouth of the ditch, so as to transport the floodwater collected upstream of the construction site to the storage area at the mouth of the ditch for energy dissipation and storage.

[0012] Furthermore, drop wells and inspection wells are provided along the water conveyance path of the flood discharge culvert. The drop wells are used to receive floodwaters flowing in from the lateral flood discharge ditch and reduce the kinetic energy of the water entering the flood discharge culvert. The inspection wells are used for the maintenance and dredging of the flood discharge culvert.

[0013] Furthermore, the drainage ditch includes an east branch ditch located on the east side of the construction site, an east drainage ditch located on the east side of the mountain, and multiple west drainage ditches located on the west side of the construction site. The east branch ditch is located along the toe of the east slope of the construction site and is arranged correspondingly to the drainage culvert, and is used to receive water from the construction site and the east slope. The east drainage ditch is used to receive runoff from the northeast slope of the construction site. The west drainage ditches are set according to the topography of the west mountain of the construction site, and the drainage ditch located on the northwest side introduces the runoff from the northwest side into the upstream storage area, the drainage ditch in the middle introduces the water into the drainage culvert, and the drainage ditch in the south leads the water to the existing ditch outlet channel outside the site.

[0014] Furthermore, multiple intercepting ditches are set up along the mountain slope, and floodwater from the higher intercepting ditches is diverted to the lower drainage ditches. The intercepting ditches, drainage ditches, slope surface, building drainage branches, and drainage holes together form a multi-level mountain drainage system. In addition, energy dissipation pools are set up at the elevation difference of the slope water catchment path to reduce the water flow velocity.

[0015] Furthermore, it also includes a monitoring module, which includes a water level monitoring device, a flow monitoring device, a rainfall monitoring device, and a video monitoring device installed in the storage area, as well as a data integration platform that is communicatively connected to multiple monitoring devices; the flow monitoring device uses a radar flow meter to acquire water level and flow velocity data in the flood discharge system; the radar flow meter is connected to a telemetry terminal to transmit monitoring data to the data integration platform for centralized monitoring of the operation status of the storage area and flood discharge channel.

[0016] This invention also provides a method for flood control and drainage ditches for buildings on hillsides, comprising the following steps: Step 1: Based on the surrounding mountain topography and catchment area of ​​the construction site, a storage and retention area is set up upstream of the construction site, and a ring-shaped flood interception ditch is set up along the contour lines of the outer slope of the construction site. At the same time, a drainage ditch is set up on the east and west sides of the construction site to intercept the runoff from the upper mountain slope and guide the runoff along the ring-shaped flood interception ditch to prevent mountain floods from eroding the slope and flooding into the construction site. Step 2: Utilize the East Branch Ditch and East Drainage Ditch on the east side of the construction site, as well as multiple West Drainage Ditches on the west side of the construction site, to collect the slope runoff in the corresponding areas. This will allow the runoff collected by the Northwest Drainage Ditch to flow into the upstream storage area, the runoff collected by the Central Drainage Ditch to flow into the drainage culvert, and the runoff collected by the Southern Drainage Ditch to flow into the existing ditch and river channel outside the site. Step 3: The floodwater collected by the drainage ditches on the east and west sides of the construction site is directed into the drainage culvert and transported downstream along the drainage culvert. At the drop well on the water conveyance path of the drainage culvert, the floodwater flowing in laterally is dropped and dissipated. Finally, the floodwater transported by the drainage culvert is directed into the storage area set up in the downstream ditch area of ​​the site. Step 4: Utilize the storage and retention area in the downstream ditch mouth area to receive the floodwater transported by the flood discharge pipe culvert, and centrally store and dissipate the incoming floodwater; when the water level in the storage and retention area reaches the predetermined discharge conditions, the floodwater is discharged to the outside of the construction site through its downstream drainage channel. Step 5: During construction and operation, the monitoring module enables real-time monitoring of flood confluence, storage, transport and discharge status. Based on the monitoring data, the storage area, concrete gravity dam or flood discharge culvert are scheduled to achieve graded storage, staggered peak discharge and orderly diversion and discharge.

[0017] The beneficial effects of the above technical solution are: The flood control and drainage system and drainage method for hillside buildings provided by this invention combine and arrange flood storage areas, intercepting ditches, drainage ditches, drainage culverts and circular culverts according to the terrain elevation and water flow direction around the hillside buildings, so that a flood control and drainage system is formed around the building site, which is connected downstream from the mountain slope. This achieves the interception of water coming from the mountain, zoned flow, graded storage, energy dissipation and orderly discharge.

[0018] This invention constructs a multi-level mountain drainage system by setting up intercepting ditches along the contour lines of the hillside surrounding the construction site, and combining them with the east branch ditch, the east side drainage ditch, the west side drainage ditch, as well as slope branch ditches and drainage holes. This system can intercept and guide the slope runoff according to the water catchment direction of different mountain areas around the construction site, so that the water from the upstream mountains is intercepted and guided to the corresponding drainage channels before entering the construction site. This reduces the situation where mountain torrents directly erode the outer slopes of the construction site and flood into the construction site, thereby improving the flood control capacity of the surrounding hillside construction site.

[0019] This invention establishes multiple flood storage and detention areas upstream of the construction site, enabling the incoming water from the mountain to be stored and transported in stages according to the elevation of the surrounding terrain. At the same time, it utilizes culverts between adjacent flood storage and detention areas to establish an organized connection, preventing upstream floodwaters from concentrating and rapidly flowing into a single drainage node. Instead, the floodwaters are temporarily stored, released slowly, and transported in stages within multiple storage and detention spaces, thereby reducing the instantaneous drainage pressure on downstream flood discharge channels caused by concentrated flood peak discharge.

[0020] This invention combines drainage ditches and culverts in different areas on the east and west sides of the construction site, so that the water flowing from the mountains on the east and west sides can flow into the corresponding flood storage and detention areas, drainage culverts or existing ditches and rivers outside the site in a predetermined direction, forming a zoned drainage path adapted to the specific topography of the construction site.

[0021] This invention uses a ring-shaped flood interception ditch arranged along contour lines around the building site as the core interception unit. Through multi-stage drainage, zoned confluence, cascade energy dissipation, sedimentation and blocking, and underground drainage on the slope, it forms a ring-shaped mountain flood diversion and drainage system. This system intercepts, diverts, dissipates energy, and safely discharges water from the mountain slope before it enters the building area. The system is arranged in a ring and multi-stage manner according to the contour lines, slope, height difference, and catchment area of ​​the mountain. Therefore, it is highly adaptable to mountainous buildings with significant elevation changes and complex terrain, thereby reducing the risk of soil softening and slope instability caused by water. Ultimately, it enables the organized discharge of both surface runoff and internal seepage water on the slope, reducing the possibility of adverse effects on slope stability caused by long-term water infiltration or retention. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the planar layout structure of the flood control and drainage ditch system of the present invention; Figure 2 This is a schematic diagram of the concrete gravity dam implementation structure of the present invention; Figure 3 This is a schematic diagram of the implementation structure of the masonry gravity dam of the present invention; Figure 4 This is a schematic diagram of an embodiment of the circular culvert of the present invention; Figure 5 This is a schematic diagram of the implementation structure of the waterfall of the present invention.

[0023] Attached reference numerals: 1-First detention area, 2-Second detention area, 3-Third detention area, 4-Fourth detention area, 5-Fifth detention area, 6-Sixth detention area, 7-Masonry gravity dam, 8-First drop, 81-Drainage pipe, 9-Second drop, 10-Culvert, 11-East intercepting ditch, 12-East drainage ditch, 13-West intercepting ditch, 14-West drainage ditch, 15-Drainage culvert, 16-Energy stilling basin, 17-Downstream channel, 18-Concrete gravity dam, 181-Drainage pipe. Detailed Implementation

[0024] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments: Example 1: This example aims to provide a flood control and drainage system for buildings on hillsides. It is mainly used for flood control and drainage in building sites located in mountainous, sloping, and hillside terrain. Addressing the challenges of a large catchment area upstream of hillside buildings, significant slope elevation differences, rapid surface runoff under heavy rainfall conditions, and water intrusion into the building foundation area, this invention establishes a comprehensive flood control and drainage system adapted to the terrain characteristics of hillside buildings. This system includes peripheral flood interception, zoned water collection, storage and slow release, energy dissipation and erosion prevention, and orderly external discharge. It achieves the effects of graded storage, staggered peak discharge, orderly drainage, and protection of the site and slope stability.

[0025] like Figure 1-5 As shown, this embodiment takes the Longwangou project located in a certain area of ​​Hebei Province as an example. Specifically, the flood control and drainage system for hillside buildings provided in this embodiment includes a storage area set up on the upstream mountain of the building site, a flood interception ditch set up on the outer mountain of the building site, a drainage ditch laid out around the building site, as well as drainage pipes 15, circular culverts 10, concrete gravity dams 18, drop structures, and stilling basins 16, etc. The storage area, flood interception ditch, drainage ditch, and drainage pipe 15 are arranged as a whole in combination with the terrain elevation, slope aspect, and natural water flow path of the surrounding mountains of the building site, so that floods from different mountain areas flow into the storage area, drainage pipe 15, or natural drainage channels outside the building site along the corresponding drainage paths, thereby preventing upstream mountain floods from directly entering the building site. Thus, the flood interception ditch, drainage ditch, storage area, and drainage pipe 15 together form a flood control and drainage system that flows, stores, dissipates energy, and discharges to the outside of the building site in stages along the mountain terrain.

[0026] In the specific implementation structure, the flood control and drainage system architecture is laid out in combination with the terrain, planned roads, building layout and pipeline conditions of the construction area. In this embodiment, a total of six storage and detention areas are set up, including the first storage and detention area 1, the second storage and detention area 2, the third storage and detention area 3, the fourth storage and detention area 4, the fifth storage and detention area 5 and the sixth storage and detention area 6. These six storage and detention areas are set up in stages along the elevation direction from upstream to downstream of the construction site. Among them, the first to fifth storage and detention areas 5 are set up in the valley and flat areas upstream of the construction site, and the sixth storage and detention area 6 is set up in the ditch area downstream of the construction site. The first storage and detention area 1 is located in the flat terrain area upstream, and a concrete gravity dam 18 is set up at the narrow outlet downstream of it. The concrete gravity dam 18 is used to intercept and store the water coming from upstream, and the reservoir area is dredged.

[0027] like Figure 2 As shown, in this embodiment, the concrete gravity dam 18 has an overflow section in the middle of the dam body, with corresponding overflow sections on both sides. The overflow sections adopt an open-type broad-crested weir discharge form to achieve the required discharge capacity under the corresponding upstream water level conditions. Furthermore, the upstream face of the concrete gravity dam 18 is vertical, the downstream slope is approximately 1:0.5, and the dam shoulder and foundation penetrate approximately 0.5m into the bedrock, thereby improving the connection stability between the water-retaining structure and the mountain foundation. An vent pipe 181 is also installed within the concrete gravity dam 18. A gate valve and a butterfly valve are installed downstream of this vent pipe 181, allowing for controlled venting and maintenance venting as needed for operation and maintenance. Therefore, when the inflow to the first storage area 1 is small and does not meet the design discharge conditions, the effective storage space of the reservoir can be used to temporarily store the floodwater. When the water level in the storage area rises to the corresponding overflow conditions, the floodwater is discharged downstream through the overflow section.

[0028] The second to fourth storage areas 4 are mainly located on both sides of the planned road on the north side of the construction site. They are formed by excavation in combination with the local terrain, and adjacent storage areas are connected by culverts 10. The culverts 10 are set at the outlets of the relevant storage areas, so that the water flow of the upstream storage area can enter the downstream storage area according to the predetermined elevation direction. In this embodiment, the culverts 10 are made of D1500mm steel-plastic composite pipes, and the outside of the pipes is encased with C25 reinforced concrete to meet the structural stability and protection requirements under the backfilling conditions of the mountain.

[0029] Furthermore, such as Figure 3 and 5 As shown, in this embodiment, a masonry gravity dam 7 is provided at the outlet of the third storage area 3. The downstream of the masonry gravity dam 7 is connected to the fourth storage area 4. At the location with a significant height difference at the output end of the fourth storage area 4, a drop structure is also provided, including a first drop 8 and a second drop 9. Specifically, the first drop 8 is provided at the outlet of the fourth storage area 4. The first drop 8 is connected to the inlet of the culvert 10. The outlet of the culvert 10 is connected to the second drop 9. The second drop 9 is connected to the downstream fifth storage area 5 through the culvert 10.

[0030] In this embodiment, the first drop 8 is a steep slope drop with a drop of about 5.0m and a slope ratio of about 1:4; the second drop 9 is a three-stage drop with a total drop of about 3.0m and a drop of about 1.5m for each stage. The drop structure can include, in sequence, an inlet section, an overflow weir, a steep slope, an energy dissipation pool 16, and a seawall section (the specific structure and construction are existing technologies and will not be described in detail here), so as to gradually reduce the energy of the water flow and reduce the scouring of the downstream ditch bottom and slope.

[0031] Thus, before the flood enters the downstream storage area from the upstream storage area, it undergoes an elevation conversion and energy adjustment. After being transported by the circular culvert 10, it undergoes another elevation conversion and energy dissipation through the second drop 9, thereby reducing the flow velocity and impact energy of the flood when it enters the downstream storage area.

[0032] like Figure 1 As shown, the fifth storage area 5 is laid out with excavation in the northwest and filling in the southeast. The sixth storage area 6 is located at the downstream end and is used to receive floodwaters transported by the flood discharge culvert 15, and to dissipate and store floodwaters entering the ditch area using the storage space. The flood discharge culvert 15 is the main flood discharge channel, and its layout is based on the existing building layout and pipeline conditions. In this embodiment, the starting and ending points of the culvert are connected to the fifth storage area 5 and the sixth storage area 6, respectively. The pipeline as a whole adopts steel-plastic composite pipe, with some sections using a reinforced concrete fully enclosed structure. The bottom of the remaining pipe sections is set with a sand foundation, and backfilling and compaction are carried out according to different parts such as soil arch foundation, sand foundation, chest cavity, and pipe top to ensure the stable operation of the pipeline under road and site load conditions.

[0033] The flood discharge culvert 15 receives water from the flood discharge ditches on the east and west sides and is equipped with two drop wells and three inspection wells (not shown in the figure). The drop wells are used to guide the water flowing from the lateral flood discharge ditches into the flood discharge culvert 15 and to perform preliminary energy dissipation of the water flow through the drop structure. The inspection wells are used for inspection, dredging and maintenance of the flood discharge culvert 15. The end of the flood discharge culvert 15 is connected to the sixth storage area 6 through the stilling basin 16, which transports the concentrated floodwater from the upstream of the construction site and the flood discharge ditches on both sides to the storage area at the mouth of the ditch, so that the sixth storage area 6 can further store and dissipate the concentrated water during the transportation process.

[0034] like Figure 1 As shown, multiple east branch ditches and east drainage ditches 12 are set up on the east side of the construction site. Among them, the east branch ditches are set along the eastern slope toe (not shown in the figure), adopt a rectangular cross section and reinforced concrete structure, and are located above or corresponding to the drainage culvert 15. They are used to receive the water runoff from the eastern slope of the construction site and the drainage inside the site, and to guide the water flow to the corresponding downstream drainage node. The east drainage ditch on the east side adopts a rectangular cross section masonry structure and is used to receive the slope runoff generated by the northeast mountain of the construction site.

[0035] Multiple eastern branch ditches and eastern drainage ditches 12 form a graded drainage path that transports water from the hillside to the foot of the slope and then downstream, so that the water collected in different elevation areas on the east side of the construction site flows into the flood discharge culvert 15 or flood storage and detention facilities according to the corresponding drainage path, instead of flowing directly into the construction site.

[0036] Multiple western drainage ditches 14 are constructed on the west side of the construction site according to the site layout and the direction of water runoff from the mountain. Among them, the drainage ditches in the northwest mainly receive the runoff from the northwest corner area and direct the runoff into the fifth storage area 5; the drainage ditches in the middle of the west side direct the collected floodwaters eastward into the drainage culvert 15; and the drainage ditches in the south of the west side guide the runoff from the corresponding area to the existing ditch outlet channel, thus forming zoned drainage paths for different areas on the west side. This zoned drainage method avoids all different runoff areas on the west side from converging into the same drainage node, thereby reducing the instantaneous drainage pressure of a single drainage facility.

[0037] like Figure 1As shown, multiple intercepting ditches are constructed on the mountain slopes surrounding the construction site, including the East Intercepting Ditch 11 and the West Intercepting Ditch 13 located on the east and west sides, respectively. These ditches have rectangular cross-sections and masonry structures, and are arranged along the contour lines of the mountain to intercept upstream runoff before floodwaters enter the construction site. In this embodiment, the intercepting ditches and drainage ditches together constitute a surface flood interception and transport system surrounding the construction site. Based on the mountain's catchment area, slope height differences, and the distribution of the construction site, multiple levels of intercepting ditches can be constructed along the elevation direction on the same slope. The intercepting ditches located at higher elevations first receive water from the upper slope, then guide it to lower drainage ditches or the next level of intercepting ditches, thereby gradually reducing the flood catchment area and the amount of floodwater handled by a single ditch section.

[0038] Thus, this embodiment forms a three-level mountain drainage system, including a primary main intercepting ditch around the mountain, a secondary site perimeter drainage ditch, and a tertiary slope branch ditch and drainage holes. The primary main intercepting ditch around the mountain is located on the outer slope of the site and is used to intercept mountain floods from outside the mountain. The secondary site perimeter drainage ditch is located near the building boundary line and is used to collect rainwater from the upper slope of the site. The tertiary slope branch ditch and drainage holes are used to collect surface runoff from the slope and dispersed water flow from the building drainage area and guide it into the next level drainage ditch.

[0039] It should be noted that in actual construction, drainage ditches can adopt different cross-sectional forms according to the terrain slope, the width of the available site, and the peak flood flow. For example, trapezoidal cross-sections can be used for soil slopes and drainage areas with relatively moderate catchment volumes; rectangular cross-sections with reinforced concrete linings can be used for steep slopes, areas with limited land use, or main drainage ditches that bear large flood flows. Regarding seepage prevention, grouted masonry lined ditches can use M10 cement mortar to construct rubble masonry, and achieve seepage prevention through plastering and grouting of the inner walls; C25 seepage-proof and frost-resistant concrete can be used for main drainage ditches, steep slopes with rapid flow sections, turning sections, and soft soil sections. For soil foundations, a gravel cushion layer of approximately 300mm is placed at the bottom of the ditch, followed by concrete hardening to reduce the risk of water seeping into the slope and causing soil softening.

[0040] To adapt to the contours of the mountain and surrounding roads, intercepting and drainage ditches often need to change their direction of extension in plan. Therefore, a circular transition can be used at the turning points of the drainage ditch to reduce local eddies and scouring caused by sharp turns in the water flow. For drainage paths with large elevation differences on the slope, rapid flow channels, waterfalls, stepped flow channels, and stilling basins 16 can be installed in the drainage ditches to prevent the elevation difference from being concentrated at one location, but rather to dissipate the kinetic energy of the water flow in stages according to the drainage direction (this is existing technology and will not be elaborated here). Among them, the rapid flow channel is used to stably guide the water flow downstream on steep slopes; the waterfall is used to create a stepped drop at large elevation differences; the stilling basin 16 is located at the end of the rapid flow channel or downstream of the waterfall to receive high-speed water flow and reduce the flow velocity; when the elevation difference is large, multi-stage waterfalls or stepped flow channels can be installed to dissipate the energy of the water flow in multiple stages. At the final outlet of the drainage ditch, it connects with the existing natural gully, municipal flood control network or other off-site drainage channels, and a masonry bottom and slope protection structure is set on the outside of the outlet to reduce the scouring effect of the high-speed water flow on the slope toe and downstream ground.

[0041] In addition, during actual construction, since mountain floods usually carry debris such as mud, dead branches, and gravel, this embodiment also sets up sedimentation wells (not shown in the figure) in the flood drainage system so that solid particles can be settled before the flood enters the subsequent drainage channel. The sedimentation wells can be set up at intervals along the drainage ditch according to the drainage path to reduce the risk of blockage caused by continuous transport and deposition of mud and sand in long-distance drainage ditches.

[0042] In addition to intercepting surface floodwater, this embodiment also incorporates auxiliary drainage measures for groundwater within the slope. Specifically, inclined drainage holes are installed inside the slope to allow stagnant water to drain outwards under gravity; the angle of these inclined drainage holes can be no less than 6°. Simultaneously, seepage ditches and transverse branch ditches are constructed within the slope to collect and drain groundwater, directing it into a ring-shaped flood interception ditch or drainage ditch to exit the construction site. Therefore, this embodiment not only intercepts surface floodwater but also simultaneously diverts and discharges surface runoff and internal seepage water, thereby reducing the impact of long-term water retention on slope stability.

[0043] like Figure 1 As shown, in this embodiment, after the drainage system completes interception, storage, energy dissipation, and sedimentation, the floodwater is discharged in an organized manner to the outside of the construction site. Depending on the terrain conditions of different areas, the end of the flood discharge system can be connected to natural gullies, existing rivers, municipal flood control networks, or other off-site drainage channels. In this embodiment, the output end of the sixth storage area is connected to the downstream river 17 through a culvert. For areas connected to natural gully mouths, the outflow area is reinforced with bottom and slope protection structures; for floodwater transported through the flood discharge culvert, it first enters the gully mouth storage area for centralized storage and energy dissipation, and then is discharged to the outside of the site through the downstream drainage path.

[0044] In addition, to monitor the operational status of the entire flood control and drainage system, this embodiment also includes a monitoring module. The deployment of the monitoring module is based on the actual topographical layout. The monitoring module includes water level monitoring devices, flow monitoring devices, rainfall monitoring devices, and video surveillance devices installed in each storage and retention area. Each monitoring device is communicatively connected to the data integration platform, thereby forming a centralized monitoring system for storage and retention areas, drainage ditches, drainage culverts, and other major hydraulic structures. The flow monitoring device uses a radar flow meter. The radar flow meter is used to acquire data such as water level and flow velocity in the corresponding waterway. The radar flow meter is connected to a telemetry terminal, which supports communication methods such as GPRS, 4G, Ethernet, and BeiDou, and is equipped with multiple input / output interfaces to connect cameras and other field monitoring equipment. The field monitoring equipment uses an outdoor waterproof enclosure and is equipped with solar panels, a solar charge controller, and a battery to meet the needs of long-term outdoor operation.

[0045] The aforementioned monitoring system can acquire real-time or periodic data on water level changes in the flood storage area, flow and velocity changes in the flood discharge channel, rainfall changes, and on-site video information. The data will be uploaded to the data integration platform to provide data support for judging the operational status of the flood control and drainage system and for subsequent operation and maintenance.

[0046] Based on the above-mentioned flood control and drainage ditch system for hillside buildings, this embodiment also provides a drainage method for the flood control and drainage ditch system for hillside buildings. The specific drainage process is as follows: First, based on the surrounding mountain terrain and catchment area of ​​the construction site, a ring-shaped flood interception ditch is set up on the outer mountain of the construction site, and the flood interception ditch is extended along the contour lines of the mountain slope to give priority to receiving the runoff from the upstream mountain slope.

[0047] After rainfall, the surface runoff formed on the mountain is first intercepted by the intercepting ditches located at higher elevations, preventing floodwater from flowing directly down the natural slope into the construction site. For surface runoff at higher elevations, it can be diverted to lower drainage ditches through slope tributaries or drainage holes; for runoff near the construction site, it is collected through drainage ditches at the edge of the site.

[0048] The runoff from the eastern area flows into the East Branch Ditch and the East Drainage Ditch. The East Branch Ditch mainly receives runoff from the construction site and slope near the foot of the eastern slope, while the East Drainage Ditch receives runoff from the northeastern mountain. The western area is divided into northwest, central and southern sections for drainage. Runoff from the northwest is directed to the corresponding upstream storage area, runoff from the central section flows into the drainage culvert, and runoff from the southern section flows into the existing ditch outlet channel.

[0049] Floodwaters entering the upstream storage and detention areas are first stored and their peaks reduced within the corresponding storage and detention areas. Different storage and detention areas are connected by culverts. When the water level in the upstream storage and detention areas reaches the corresponding discharge conditions, the water flows through the first drop into the culvert, is transported along the culvert, and then discharged into the downstream storage and detention areas through the second drop, thus completing multiple levels of elevation conversion and energy dissipation during the transport process.

[0050] Meanwhile, floodwaters collected from the east and west drainage ditches flow into the drainage culvert through drop manholes and are transported downstream along the culvert. The floodwaters in the drainage culvert eventually enter the sixth ditch mouth storage area, where they are further stored and dissipated before being discharged to the outside of the construction site through the downstream drainage channel.

[0051] For drainage sections with steep slopes, rapid flow channels, drop waterfalls, stepped slow flow channels, and stilling basins are used to dissipate energy in the water flow step by step. For inflows with high sediment content, sediment is settled through sedimentation wells. For seepage generated inside the slope, it is introduced into the drainage system through inclined drainage holes, slope seepage ditches, and transverse branch ditches, so that both surface floodwater and slope groundwater can be discharged in an organized manner.

[0052] Throughout the operation, the hydrological status of each flood storage area and the main flood discharge channel is monitored through water level monitoring, flow monitoring, rainfall monitoring and video surveillance. The collected data is then uploaded to the data integration platform to understand the confluence, storage, transport and discharge status of floods in different areas.

[0053] The drainage method of the flood control and drainage ditch system for hillside buildings provided in this embodiment intercepts upstream mountain floods before they enter the building site by setting up a ring-shaped flood interception ditch around the perimeter of the building site; it collects dispersed runoff from different areas through east branch ditches, east and west drainage ditches, and slope branch ditches; it performs graded storage and peak reduction of floods through multiple storage and retention areas, and organizes water transport between adjacent storage and retention areas and between different areas through culverts and drainage pipes; it dissipates energy in sections at locations with large topographic elevation differences by using drop structures, rapid flow channels, stilling basins, and stepped flow-slowing structures; it reduces the amount of sediment entering the downstream drainage channel by using sedimentation wells; it draws out groundwater from inside the slope through inclined drainage holes, slope seepage ditches, and transverse branch ditches; and finally, the water flow, after interception, confluence, storage, energy dissipation, and sedimentation treatment, is discharged outside the building site. Simultaneously, a monitoring module monitors the above-mentioned flood operation process, enabling real-time monitoring of water levels, flow velocities, rainfall, and other conditions in different areas.

[0054] This invention's flood control and drainage system can form a relatively complete flood barrier around the construction site on a hillside, spatially isolating upstream mountain floods from the construction site; it reduces the impact of concentrated flood peaks on single drainage facilities through zoned water collection and graded storage; it reduces the kinetic energy of water flow caused by the elevation difference of the mountain through structures such as drop structures and stilling basins, reducing scouring of the ditch bottom, slope toe, and outlet; it reduces leakage, siltation, and the impact of water on the slope during the drainage process through seepage prevention, sedimentation, and underground drainage structures; and it improves the monitorability of the flood control and drainage facilities' operational status by utilizing an intelligent monitoring system, thereby improving the safety, continuity, and operational reliability of the overall flood control and drainage system for hillside buildings.

[0055] The embodiments of the present invention described above do not constitute a limitation on the scope of protection of the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.

Claims

1. A flood control and drainage ditch system for buildings on hillsides, characterized in that: The system includes a retention area located on the upstream slope of the construction site, a flood interception ditch located on the outer slope of the construction site, a drainage ditch located around the construction site, a drainage culvert connected to the drainage ditch or retention area, and a circular culvert connecting the retention areas. The flood interception ditch extends along the contour lines of the outer slope of the construction site to intercept the runoff from the upstream slope. The drainage ditch receives the runoff from the flood interception ditch and the slope of the construction site and directs the runoff into the retention area or drainage culvert. The retention areas are arranged in stages along the elevation direction from upstream to downstream of the construction site, and adjacent retention areas are connected by the circular culvert to stage and slow down the flow of floodwater from upstream. The drainage culvert is used to transport the floodwater collected from upstream to the downstream retention area or the external drainage channel of the site. The drainage ditch, retention area, and drainage culvert together form a flood control and drainage system that gradually collects, stores, dissipates energy, and discharges the floodwater outside the construction site along the mountainous terrain.

2. The flood control and drainage system for hillside buildings according to claim 1, characterized in that: A total of six flood storage and detention areas are set up, five of which are located in the upstream valley and flat areas of the construction site, and one is located in the downstream gully mouth area. The five upstream flood storage and detention areas are used to receive floods from the mountain slopes, and the multiple upstream flood storage and detention areas are set up sequentially according to the topographic elevation of the construction site, so that the floods are transported step by step from the flood storage and detention areas with higher elevations to the flood storage and detention areas with lower elevations. The gully mouth flood storage and detention area is used to receive the floods transported by the flood discharge culvert and to perform energy dissipation and storage.

3. The flood control and drainage system for hillside buildings according to claim 2, characterized in that: At least one of the aforementioned storage and detention areas is provided downstream of a concrete gravity dam, which forms a water-retaining structure for the storage and detention area, and the concrete gravity dam is provided with an overflow section; the overflow section adopts an open-type broad-crested weir structure so that floodwaters exceeding the design storage level in the storage and detention area can be discharged downstream through the overflow section.

4. The flood control and drainage system for hillside buildings according to claim 1, characterized in that: It also includes a first drop and a second drop, with the inlet and outlet of the culvert connected to the first drop and the second drop respectively. The first drop is connected to the outlet of the upstream storage area, and the second drop is connected to the downstream storage area through the culvert, so that the water flowing out through the culvert undergoes elevation conversion and energy dissipation before entering the downstream storage area.

5. The flood control and drainage system for hillside buildings according to claim 2, characterized in that: The flood discharge culvert is located on the flood transport path from upstream to downstream of the construction site. The flood discharge ditches located on the east and west sides of the construction site flow into the flood discharge culvert, and the downstream of the flood discharge culvert is connected to the storage area at the mouth of the ditch, so as to transport the floodwater collected upstream of the construction site to the storage area at the mouth of the ditch for energy dissipation and storage.

6. The flood control and drainage system for hillside buildings according to claim 5, characterized in that: Drop wells and inspection wells are provided along the water conveyance path of the flood discharge culvert. The drop wells are used to receive floodwaters flowing in from the lateral flood discharge ditch and reduce the kinetic energy of the water entering the flood discharge culvert. The inspection wells are used for the maintenance and dredging of the flood discharge culvert.

7. The flood control and drainage system for hillside buildings according to claim 1, characterized in that: The drainage system includes an east branch ditch located on the east side of the construction site, an east drainage ditch located on the east side of the mountain, and multiple west drainage ditches located on the west side of the construction site. The east branch ditch is located along the toe of the east slope of the construction site and is arranged correspondingly to the drainage culvert, and is used to receive water from the construction site and the east slope. The east drainage ditch is used to receive runoff from the northeast slope of the construction site. The west drainage ditches are set according to the topography of the west mountain of the construction site, and the drainage ditch located on the northwest side introduces the runoff from the northwest side into the upstream storage area, the drainage ditch in the middle introduces the water into the drainage culvert, and the drainage ditch in the south leads the water to the existing ditch outlet channel outside the site.

8. The flood control and drainage system for hillside buildings according to claim 1, characterized in that: Multiple intercepting ditches are set up along the mountain slope, and floodwater from the higher intercepting ditches is diverted to the lower drainage ditches. The intercepting ditches, drainage ditches, slope surface, building drainage branches, and drainage holes together form a multi-level mountain drainage system. Furthermore, stilling basins are set up at the elevation differences of the slope water catchment path to reduce the water flow velocity.

9. The flood control and drainage system for hillside buildings according to claim 1, characterized in that: It also includes a monitoring module, which comprises a water level monitoring device, a flow monitoring device, a rainfall monitoring device, and a video monitoring device installed in the storage area, as well as a data integration platform that is communicatively connected to multiple monitoring devices; the flow monitoring device uses a radar flow meter to acquire water level and flow velocity data in the flood discharge system; the radar flow meter is connected to a telemetry terminal to transmit monitoring data to the data integration platform for centralized monitoring of the operation status of the storage area and the flood discharge channel.

10. A method for drainage and flood control ditches in hillside buildings, employing the drainage and flood control ditches system for hillside buildings as described in any one of claims 1-9, characterized in that: The process includes the following steps: Step 1: Based on the surrounding mountain topography and catchment area of ​​the construction site, a storage and retention area is arranged upstream of the construction site, and a ring-shaped intercepting ditch is arranged along the contour lines of the surrounding mountain slopes. Simultaneously, drainage ditches are arranged on the east and west sides of the construction site to intercept the runoff from the upper mountain slopes, guiding the runoff along the intercepting ditches in a ring to prevent mountain torrents from eroding the slopes and flooding the construction site; Step 2: The eastern branch ditch on the east side of the construction site, the eastern drainage ditch, and multiple western drainage ditches on the west side of the construction site are used to collect the slope runoff from their respective areas. The runoff collected by the northwest drainage ditch flows into the upstream storage and retention area, the runoff collected by the central drainage ditch flows into the drainage culvert, and the runoff collected by the southern drainage ditch is discharged into the existing ditch outlet outside the site; Step 3: The runoff collected by the eastern and western drainage ditches of the construction site... Floodwater is introduced into the flood discharge culvert and transported downstream along the culvert. At the drop wells along the water conveyance path of the flood discharge culvert, the laterally converging floodwater is dropped and dissipated, and finally the floodwater transported by the flood discharge culvert is directed into the storage area set up in the downstream ditch area of ​​the site; Step 4: The storage area in the downstream ditch area receives the floodwater transported by the flood discharge culvert and centrally stores and dissipates the incoming floodwater; when the water level in the storage area reaches the predetermined discharge conditions, the floodwater is discharged to the outside of the construction site through its downstream drainage channel; Step 5: During construction and operation, the flood confluence, storage, transport and discharge status are monitored in real time through the monitoring module, and the storage area, concrete gravity dam or flood discharge culvert is scheduled according to the monitoring data to achieve graded storage, staggered peak discharge and orderly diversion and discharge.