A sewer installation aid docking device and method of use thereof
By designing a drainage pipe docking device that works in concert with multiple components, the problems of inaccurate pipe docking, uneven stress, and easy equipment damage were solved, achieving an efficient and safe pipe docking process.
Patent Information
- Application Number
- CN202611521713.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-20
AI Technical Summary
Existing drainage pipe connection devices suffer from problems such as uneven pipe stress, easy surface damage, poor connection accuracy, narrow applicability, and reliance on electricity, making them prone to damage.
An auxiliary docking device was designed, comprising a base assembly, a moving assembly, a guiding assembly, a clamping assembly, an adjusting assembly, and a pressing assembly. Through the coordinated work of each assembly, the device achieves automatic alignment and uniform force distribution on the pipeline. It adopts a manual mechanical pressing assembly and a closed internal transmission, is compatible with various pipe diameters, and avoids reliance on electricity and equipment damage.
It achieves precise alignment and uniform force distribution in pipe connections, prevents rotation or displacement, reduces equipment maintenance costs, and improves connection quality and safety.
Smart Images

Figure CN123133479A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pipeline installation equipment technology, and in particular to an auxiliary docking device for drainage pipeline installation and its usage method. Background Technology
[0002] The installation and connection of drainage pipes is a common process in municipal and building engineering projects, including rainwater and sewage pipes, fire water pipes, and industrial drainage pipes. The quality of this installation directly affects the operational stability and service life of the entire drainage system. Pipe connection is one of the core procedures during pipe installation, requiring assurance of coaxiality, sealing, and connection strength between adjacent pipes.
[0003] Existing drainage pipe docking devices often use single-sided adjustment or asynchronous clamping methods, which can cause uneven force on the pipe and damage its surface. Furthermore, it is difficult to achieve automatic pipe alignment, and the pipe is prone to rotation or axial displacement during the docking process.
[0004] Therefore, this application requires the design of an auxiliary connection device for drainage pipe installation and its usage method to solve the above-mentioned technical problems. Summary of the Invention
[0005] The purpose of this invention is to address the shortcomings of existing technologies by proposing an auxiliary docking device for drainage pipe installation and its usage method. The device includes a base assembly, a moving assembly, a guiding assembly, a clamping assembly, an adjusting assembly, and a pressing assembly. These components work together to achieve automatic alignment of the pipe, ensure uniform force on the pipe, avoid damage to the pipe surface during clamping, and securely clamp drainage pipes of different diameters. This prevents the pipes from rotating or shifting axially during docking, providing strong assurance for the safety and quality of subsequent pipe connection and fixing operations.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: A drainage pipe installation auxiliary docking device includes a base assembly, a moving assembly, a guiding assembly, a clamping assembly, an adjusting assembly, and a pressing assembly; the moving assembly is mounted on the base assembly, the guiding assembly is connected to the moving assembly, the clamping assembly is connected to the guiding assembly, the adjusting assembly is located at the bottom of the clamping assembly, and the pressing assembly is mounted on and connected to the sides of the base assembly and the moving assembly.
[0007] Preferably, the base assembly includes longitudinal beams, transverse beams, and support columns. Two longitudinal beams and two transverse beams are alternately connected to form a rectangular frame. The support columns are fixedly installed at the bottom of the two longitudinal beams and two transverse beams, and guide grooves are opened on the inner sides of the two transverse beams that are arranged opposite to each other.
[0008] Preferably, the moving component includes a platform base plate and two limiting sliders, with the two limiting sliders respectively fixedly installed on the side of the platform base plate near the crossbeam, and the limiting sliders movably engaging with the corresponding guide grooves.
[0009] By adopting the above technical solution, a base assembly and a moving assembly are designed here. Through the coordinated work of the components of each assembly, the pipe to be connected can be moved smoothly and accurately along the axis, which solves the existing problems of difficult alignment of pipe connection axes, poor connection accuracy, and high labor intensity of operators.
[0010] Preferably, the guide assembly includes support columns, guide rings, and reinforcing rods. The support columns are fixedly installed at the four corners of the top surface of the platform base plate, and the guide rings are fixedly installed at the top of the corresponding support columns. The two reinforcing rods are fixedly installed between the two guide rings on the side of the platform base plate near the crossbeam, and the two reinforcing rods are parallel to each other.
[0011] Preferably, the clamping assembly includes a push rod, a cylindrical rod, a connecting seat, and an arc-shaped pressing block. The bottom of the push rod is connected to an adjusting assembly, the top of the push rod is connected to the connecting seat, the connecting seat is connected to one end of the cylindrical rod, and the other end of the cylindrical rod is provided with an arc-shaped pressing block. The push rod drives the arc-shaped pressing block to move synchronously through the connecting seat and the cylindrical rod, so that the two arc-shaped pressing blocks move closer to each other to clamp or loosen the drainage pipe.
[0012] Preferably, the adjustment assembly includes a rectangular box, a connecting plate, a bidirectional lead screw, a lead screw nut slider, and a handwheel; the rectangular box is located below the platform base plate, the connecting plate is fixedly connected between the platform base plate and the rectangular box, the bidirectional lead screw is movably installed inside the inner cavity of the rectangular box, two lead screw nut sliders are movably engaged at both ends of the inner cavity of the rectangular box, and the top surface of the lead screw nut slider is fixedly connected to the corresponding push rod, the two ends of the bidirectional lead screw are threaded through the lead screw nut slider, and the rotation of the bidirectional lead screw causes the two lead screw nut sliders to move closer to or further away from each other; the central shaft of the handwheel movably passes through the rectangular box and is fixedly connected to the end of the bidirectional lead screw, and the rotation of the handwheel drives the bidirectional lead screw to rotate.
[0013] By adopting the above technical solution, a bidirectional synchronous clamping automatic centering clamping scheme is proposed here. Through clamping components and adjustment components, the automatic centering clamping of the pipeline is realized, and the pipeline is subjected to uniform force. It can be adapted to a variety of pipelines with different diameters, and solves the existing problems of easy damage, narrow applicability, and easy deviation and rotation of pipeline clamping.
[0014] Preferably, the clamping assembly includes a bracket, a clamping screw, a handle, and a grip. One end of the bracket is fixedly installed on the top surface of the platform base plate. The clamping screw is threaded through the bracket, and the bottom end of the clamping screw faces the top surface of the crossbeam. The handle is fixedly connected to the top end of the corresponding clamping screw. The grip is fixedly installed on the end of the bracket away from the platform base plate.
[0015] By adopting the above technical solution, and addressing the shortcomings of traditional pipeline docking equipment that relies heavily on electric drive, lacks protection for transmission components, and is prone to slippage of moving components during docking, a manual mechanical clamping component and a closed internal transmission adjustment component are proposed. Through the action of the clamping component and the adjustment component, the position of the moving component is locked, manual operation is possible without electricity, and the internal transmission components are protected. This solves the existing problems of relying on electric construction, easy damage to transmission components, easy displacement of pipeline docking, and high equipment maintenance costs.
[0016] The present invention also provides a method for using an auxiliary connection device for drainage pipe installation, comprising the following steps: Step 1: Install and secure the base assembly, moving assembly, guiding assembly, clamping assembly, adjusting assembly, and pressing assembly respectively; Step 2: Place the drainage pipe to be connected on the platform base plate, then turn the handwheel to drive the bidirectional screw to rotate, so that the two screw nut sliders move towards each other synchronously. The screw nut sliders drive the arc-shaped pressure blocks on both sides to move closer synchronously through the push rod, connecting seat and cylindrical rod, and firmly clamp the drainage pipe in the center of the platform base plate. Step 3: Next, hold the handle and push the moving component to make the limit slider slide smoothly along the guide groove on the crossbeam, driving the pipe to be connected to move towards the fixed pipe, and completing the precise connection of the pipe. Step 4: Then rotate the handle to drive the clamping screw to rotate downwards, so that its bottom end is pressed against the top surface of the crossbeam. Use friction to lock the relative position of the moving component and the base component to prevent the pipe from shifting during the docking process. Then you can carry out subsequent pipe connection or welding and other fixing operations. Step 5: After the pipe is connected or welded, turn the handle in the opposite direction to loosen the clamping screw, and turn the handwheel in the opposite direction to drive the arc-shaped pressure blocks on both sides to move away from the loosened pipe simultaneously, so that the connected or welded drainage pipe can be removed from the device.
[0017] The present invention has the following beneficial effects: 1. Addressing the shortcomings of traditional manual pipe docking methods, such as difficulty in aligning the pipe axis, low docking accuracy, and high labor intensity, this invention designs a base assembly and a moving assembly. Through the coordinated work of these components, the pipe to be docked is moved smoothly and accurately along the axis, solving the existing problems of difficulty in aligning the pipe docking axis, poor docking accuracy, and high labor intensity for operators.
[0018] 2. Traditional pipe clamping structures suffer from drawbacks such as inability to automatically center, easy scratching of pipe surfaces, limited compatibility with a single pipe diameter, and susceptibility to rotation and axial displacement during pipe connection. This invention proposes a bidirectional synchronous clamping automatic centering clamping solution. Through clamping and adjusting components, it achieves automatic centering and clamping of the pipe, ensuring uniform force distribution. It is adaptable to various pipe diameters and solves the existing problems of easy breakage, narrow applicability, and susceptibility to displacement and rotation in traditional pipe clamping systems.
[0019] 3. Traditional pipe connection equipment often relies on electric power, lacks protection for transmission components, and is prone to slippage during connection. This invention proposes a manual mechanical clamping assembly and a closed internal transmission adjustment assembly. Through the action of the clamping and adjustment assemblies, the position of the moving component is locked, manual operation is possible without electricity, and the internal transmission components are protected. This solves the existing problems of reliance on electric power for construction, easy damage to transmission components, easy displacement of pipe connections, and high equipment maintenance costs.
[0020] 4. Traditional pipe connection auxiliary equipment is mostly an integrated structure, with limited clamping adjustment range suitable for different pipe diameters, resulting in high maintenance and operating costs. This invention proposes a modular structure that can be quickly disassembled and assembled. Through the design of detachable components, worn parts can be replaced individually, the clamping adjustment stroke can be flexibly adjusted, and it can adapt to more pipe specifications. This solves the existing problems of high replacement costs for traditional components, limited pipe diameter compatibility, and high equipment maintenance expenses. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a top view of the present invention; Figure 3 This is a schematic diagram of the cross-sectional structure of the beam in this invention; Figure 4 This is a schematic diagram of the guide component structure in this invention; Figure 5 This is a schematic diagram of the clamping assembly structure in this invention; Figure 6 This is a bottom view diagram of the present invention; Figure 7 This is a schematic diagram of the clamping assembly structure in this invention; Figure 8 This is a cross-sectional structural diagram of the adjustment component in this invention.
[0022] In the diagram: 1. Base assembly; 101. Longitudinal beam; 102. Crossbeam; 103. Guide groove; 104. Support column; 2. Moving assembly; 201. Platform base plate; 202. Limiting slider; 3. Guide assembly; 301. Support column; 302. Guide ring; 303. Reinforcing rod; 4. Clamping assembly; 401. Push rod; 402. Cylindrical rod; 403. Connecting seat; 404. Arc-shaped pressing block; 5. Adjusting assembly; 501. Rectangular box; 502. Connecting plate; 503. Two-way lead screw; 504. Lead screw nut slider; 505. Handwheel; 6. Pressing assembly; 601. Bracket; 602. Pressing screw; 603. Handle; 604. Handle. Detailed Implementation
[0023] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.
[0024] Reference Figure 1 A drainage pipe installation auxiliary docking device includes a base assembly 1, a moving assembly 2, a guiding assembly 3, a clamping assembly 4, an adjusting assembly 5, and a pressing assembly 6; the moving assembly 2 is mounted on the base assembly 1, the guiding assembly 3 is connected to the moving assembly 2, the clamping assembly 4 is connected to the guiding assembly 3, the adjusting assembly 5 is located at the bottom of the clamping assembly 4, and the pressing assembly 6 is mounted on and connected to the sides of the base assembly 1 and the moving assembly 2.
[0025] In this embodiment, the docking device includes a base assembly 1, a moving assembly 2, a guiding assembly 3, a clamping assembly 4, an adjusting assembly 5, and a pressing assembly 6. The components work together to achieve automatic alignment of the pipe, ensure uniform force on the pipe, avoid damage to the pipe surface during clamping, and firmly clamp drainage pipes of different diameters, preventing the pipe from rotating or shifting axially during docking. This provides a strong guarantee for the safety and quality of subsequent pipe connection and fixing operations.
[0026] Specifically, refer to Figure 2 , Figure 3 The base assembly 1 includes longitudinal beams 101, cross beams 102 and support columns 104. The two longitudinal beams 101 and the two cross beams 102 are alternately connected to form a rectangular frame. The support columns 104 are fixedly installed at the bottom of the two longitudinal beams 101 and the two cross beams 102, and guide grooves 103 are opened on the inner sides of the two cross beams 102 that are arranged opposite to each other.
[0027] Specifically, refer to Figure 4The moving component 2 includes a platform base plate 201 and a limiting slider 202. The two limiting sliders 202 are respectively fixedly installed on the side of the platform base plate 201 near the crossbeam 102, and the limiting sliders 202 are movably engaged with the corresponding guide grooves 103.
[0028] In this embodiment, a base assembly 1 and a moving assembly 2 are designed. Through the coordinated work of the components of each assembly, the pipe to be docked can be moved smoothly and accurately along the axis, which solves the existing problems of difficult alignment of pipe docking axes, poor docking accuracy, and high labor intensity of operators.
[0029] Specifically, refer to Figure 4 The guide assembly 3 includes support columns 301, guide rings 302, and reinforcing rods 303. The support columns 301 are fixedly installed at the four corners of the top surface of the platform base plate 201, and the guide rings 302 are respectively fixedly installed at the top of the corresponding support columns 301. The two reinforcing rods 303 are respectively fixedly installed between the two guide rings 302 on the side of the platform base plate 201 near the crossbeam 102, and the two reinforcing rods 303 are parallel to each other. Specifically, refer to Figure 7 The clamping assembly 4 includes a push rod 401, a cylindrical rod 402, a connecting seat 403, and an arc-shaped pressing block 404. The bottom of the push rod 401 is connected to the adjusting assembly 5, and the top of the push rod 401 is connected to the connecting seat 403. The connecting seat 403 is connected to one end of the cylindrical rod 402, and the other end of the cylindrical rod 402 is provided with an arc-shaped pressing block 404. The push rod 401 drives the arc-shaped pressing block 404 to move synchronously through the connecting seat 403 and the cylindrical rod 402, so that the two arc-shaped pressing blocks 404 move closer to each other to clamp or loosen the drainage pipe.
[0030] Specifically, refer to Figure 6 , Figure 7 , Figure 8 The adjustment assembly 5 includes a rectangular box 501, a connecting plate 502, a bidirectional lead screw 503, a lead screw nut slider 504, and a handwheel 505. The rectangular box 501 is located below the platform base plate 201. The connecting plate 502 is fixedly connected between the platform base plate 201 and the rectangular box 501. The bidirectional lead screw 503 is movably installed inside the inner cavity of the rectangular box 501. Two lead screw nut sliders 504 are movably engaged at both ends of the inner cavity of the rectangular box 501, and the top surface of the lead screw nut sliders 504 is fixedly connected to the corresponding push rod 401. The two ends of the bidirectional lead screw 503 are threaded through the lead screw nut sliders 504. Rotation of the bidirectional lead screw 503 causes the two lead screw nut sliders 504 to move closer to or further away from each other. The central shaft of the handwheel 505 movably passes through the rectangular box 501 and is fixedly connected to the end of the bidirectional lead screw 503. Rotation of the handwheel 505 drives the bidirectional lead screw 503 to rotate.
[0031] In this embodiment, the clamping component 4 is a bidirectional synchronous clamping automatic centering clamping scheme. Through the cooperation of the clamping component and the adjustment component, the automatic centering clamping of the pipeline is achieved and the pipeline is subjected to uniform force. It can be adapted to a variety of pipelines with different diameters and solves the existing problems of easy damage, narrow applicable range, and easy deviation and rotation of pipeline clamping.
[0032] Specifically, refer to Figure 5 The clamping assembly 6 includes a bracket 601, a clamping screw 602, a handle 603, and a handle 604. One end of the bracket 601 is fixedly installed on the top surface of the platform base plate 201. The clamping screw 602 is threaded through the bracket 601, and the bottom end of the clamping screw 602 is directly opposite the top surface of the crossbeam 102. The handle 603 is fixedly connected to the top end of the corresponding clamping screw 602. The handle 604 is fixedly installed on the end of the bracket 601 away from the platform base plate 201.
[0033] In this embodiment, a manual mechanical clamping assembly and a closed internal transmission adjustment assembly are used. Through the action of the clamping assembly and the adjustment assembly, the position of the moving assembly is locked, manual operation is possible without power, and the internal transmission components are protected. This solves the existing problems of relying on electric construction, easy damage to transmission components, easy displacement of pipeline connections, and high equipment maintenance costs.
[0034] Among them, the above-mentioned components are modular structures that can be quickly disassembled and assembled. Through the design of detachable component combinations, it is possible to replace worn parts individually, adjust the clamping stroke flexibly, and adapt to more specifications of pipes. This solves the existing problems of high replacement cost of traditional components, small pipe diameter adaptation range, and high equipment operation and maintenance expenses.
[0035] A method for using an auxiliary connection device for drainage pipe installation includes the following steps: Step 1: Install and fix the base assembly 1, moving assembly 2, guiding assembly 3, clamping assembly 4, adjusting assembly 5 and pressing assembly 6 respectively; 1) Install the base assembly: Two longitudinal beams and two transverse beams are alternately connected to form a rectangular frame. Support columns are fixedly installed on the bottom surfaces of the two longitudinal beams and two transverse beams, and guide grooves are opened on the side of the two transverse beams that are close to each other.
[0036] 2) Install the moving components: The two limit sliders are fixedly installed on one end of the platform base plate near the crossbeam, and the limit sliders are engaged with the corresponding guide grooves.
[0037] 3) Install the guide assembly: The support columns are fixedly installed at the four corners of the top surface of the platform base plate, and the guide rings are fixedly installed at the top of the corresponding support columns. Two reinforcing rods are fixedly installed between the two guide rings on the side of the platform base plate closest to the crossbeam, and the two reinforcing rods are parallel to each other.
[0038] 4) Install clamping components: One side of the connecting seat is fixedly connected to the end of the cylindrical rod away from the arc-shaped pressure block, and the outer wall of the connecting seat is fixedly connected to one end of the push rod. The push rod drives the arc-shaped pressure block to move synchronously through the connecting seat and the cylindrical rod, so that the two arc-shaped pressure blocks move closer to each other to clamp or loosen the drainage pipe.
[0039] 5) Installation and Adjustment Components: The rectangular box is located below the platform base plate, and the connecting plate is fixedly connected between the platform base plate and the rectangular box. A bidirectional lead screw is movably installed inside the rectangular box. Two lead screw nut sliders are movably engaged on both sides of the rectangular box's inner cavity, and the top surfaces of the lead screw nut sliders are fixedly connected to the corresponding push rods. The threads at both ends of the bidirectional lead screw pass through the lead screw nut sliders. Rotation of the bidirectional lead screw causes the two lead screw nut sliders to move closer or further apart. The central shaft of the handwheel movably passes through the rectangular box and is fixedly connected to one end of the bidirectional lead screw. Rotation of the handwheel drives the bidirectional lead screw to rotate.
[0040] 6) Install the clamping assembly: One end of the bracket is fixedly installed on the top surface of the platform base plate. The clamping screw thread passes through the bracket, and the bottom end of the clamping screw faces the top surface of the crossbeam. The handle is fixedly connected to the top end of the corresponding clamping screw; the handle is fixedly installed on the end of the bracket away from the platform base plate.
[0041] Step 2: Place the drainage pipe to be connected on the platform base plate 201, then turn the handwheel 505 to drive the bidirectional lead screw 503 to rotate, so that the two lead screw nut sliders 504 move towards each other synchronously. The lead screw nut sliders 504 drive the arc-shaped pressing blocks 404 on both sides to move closer synchronously through the push rod 401, connecting seat 403 and cylindrical rod 402, and firmly clamp the drainage pipe in the center of the platform base plate 201. Step 3: Next, hold the handle 604 and push the moving component 2 so that the limit slider 202 can slide smoothly along the guide groove 103 on the crossbeam 102, driving the pipe to be connected to move towards the fixed pipe, and completing the precise connection of the pipe. Step 4: Then rotate the handle 603 to drive the clamping screw 602 to rotate downwards, so that its bottom end is pressed against the top surface of the crossbeam 102. Use friction to lock the relative position of the moving component 2 and the base component 1 to prevent the pipe from shifting during the docking process. Then subsequent pipe connection or welding and other fixing operations can be carried out. Step 5: After the pipe is connected or welded, turn the handle 603 in the opposite direction to loosen the clamping screw 602, and turn the handwheel 505 in the opposite direction to drive the arc-shaped pressure blocks 404 on both sides to move away from the loosened pipe simultaneously, so that the connected or welded drainage pipe can be taken out of the device.
[0042] In summary, the present invention includes a base assembly, a moving assembly, a guiding assembly, a clamping assembly, an adjusting assembly, and a pressing assembly. These components work together to achieve automatic alignment of the pipe, ensure uniform force on the pipe, avoid damage to the pipe surface during clamping, and securely clamp drainage pipes of different diameters, preventing rotation or axial displacement of the pipe during docking. This provides a strong guarantee for the safety and quality of subsequent pipe connection and fixing operations.
[0043] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. An auxiliary connection device for installing drainage pipes, characterized in that, It includes a base assembly (1), a moving assembly (2), a guide assembly (3), a clamping assembly (4), an adjusting assembly (5), and a pressing assembly (6); the moving assembly (2) is mounted on the base assembly (1), the guide assembly (3) is connected to the moving assembly (2), the clamping assembly (4) is connected to the guide assembly (3), the adjusting assembly (5) is located at the bottom of the clamping assembly (4), and the pressing assembly (6) is mounted on the side of the base assembly (1) and the moving assembly (2) and connected to them.
2. The auxiliary docking device for drainage pipe installation according to claim 1, characterized in that, The base assembly (1) includes longitudinal beams (101), cross beams (102) and support columns (104). The two longitudinal beams (101) and the two cross beams (102) are alternately connected to form a rectangular frame. The support columns (104) are fixedly installed at the bottom of the two longitudinal beams (101) and the two cross beams (102), and guide grooves (103) are opened on the inner side of the two cross beams (102) that are arranged opposite to each other.
3. The auxiliary docking device for drainage pipe installation according to claim 2, characterized in that, The moving component (2) includes a platform base plate (201) and a limiting slider (202). The two limiting sliders (202) are respectively fixedly installed on the side of the platform base plate (201) near the crossbeam (102), and the limiting sliders (202) are movably engaged with the corresponding guide grooves (103).
4. The auxiliary docking device for drainage pipe installation according to claim 3, characterized in that, The guide assembly (3) includes a support column (301), a guide ring (302), and a reinforcing rod (303). The support column (301) is fixedly installed at the four corners of the top surface of the platform base plate (201). The guide rings (302) are fixedly installed at the top of the corresponding support column (301). The two reinforcing rods (303) are fixedly installed between the two guide rings (302) on the side of the platform base plate (201) near the crossbeam (102), and the two reinforcing rods (303) are parallel to each other.
5. The auxiliary docking device for drainage pipe installation according to claim 3, characterized in that, The clamping assembly (4) includes a push rod (401), a cylindrical rod (402), a connecting seat (403), and an arc-shaped pressing block (404). The bottom of the push rod (401) is connected to the adjusting assembly (5), and the top of the push rod (401) is connected to the connecting seat (403). The connecting seat (403) is connected to one end of the cylindrical rod (402), and the other end of the cylindrical rod (402) is provided with an arc-shaped pressing block (404). The push rod (401) drives the arc-shaped pressing block (404) to move synchronously through the connecting seat (403) and the cylindrical rod (402), so that the two arc-shaped pressing blocks (404) move closer to each other to clamp or loosen the drainage pipe.
6. The auxiliary docking device for drainage pipe installation according to claim 5, characterized in that, The adjustment assembly (5) includes a rectangular box (501), a connecting plate (502), a two-way lead screw (503), a lead screw nut slider (504), and a handwheel (505); the rectangular box (501) is located below the platform base plate (201), the connecting plate (502) is fixedly connected between the platform base plate (201) and the rectangular box (501), the two-way lead screw (503) is movably installed inside the inner cavity of the rectangular box (501), and the two lead screw nut sliders (504) are movably engaged in the rectangular box (505). The top surface of the lead screw nut slider (504) is fixedly connected to the corresponding push rod (401) at both ends of the inner cavity of the 501. The two ends of the bidirectional lead screw (503) are threaded through the lead screw nut slider (504). The rotation of the bidirectional lead screw (503) causes the two lead screw nut sliders (504) to move closer to each other or further away from each other. The central shaft of the handwheel (505) moves through the rectangular box (501) and is fixedly connected to the end of the bidirectional lead screw (503). The rotation of the handwheel (505) drives the bidirectional lead screw (503) to rotate.
7. The auxiliary docking device for drainage pipe installation according to claim 3, characterized in that, The clamping assembly (6) includes a bracket (601), a clamping screw (602), a handle (603), and a handle (604). One end of the bracket (601) is fixedly installed on the top surface of the platform base plate (201). The clamping screw (602) is threaded through the bracket (601), and the bottom end of the clamping screw (602) is directly opposite the top surface of the crossbeam (102). The handle (603) is fixedly connected to the top end of the corresponding clamping screw (602). The handle (604) is fixedly installed on the end of the bracket (601) away from the platform base plate (201).
8. A method of using the auxiliary docking device for drainage pipe installation according to any one of claims 1-7, characterized in that, Includes the following steps: Step 1: Install and fix the base assembly (1), the moving assembly (2), the guiding assembly (3), the clamping assembly (4), the adjusting assembly (5), and the pressing assembly (6) respectively; Step 2: Place the drainage pipe to be connected on the platform base plate (201), then turn the handwheel (505) to drive the two-way screw (503) to rotate, so that the two screw nut sliders (504) move towards each other synchronously. The screw nut sliders (504) drive the arc-shaped pressing blocks (404) on both sides to move closer synchronously through the push rod (401), connecting seat (403) and cylindrical rod (402), and firmly clamp the drainage pipe in the center of the platform base plate (201); Step 3: Next, hold the handle (604) and push the moving component (2) so that the limiting slider (202) slides smoothly along the guide groove (103) on the crossbeam (102), driving the pipe to be connected to move towards the fixed pipe direction, and completing the precise connection of the pipe. Step 4: Then rotate the handle (603) to drive the clamping screw (602) to rotate downwards, so that its bottom end is pressed against the top surface of the crossbeam (102). Use friction to lock the relative position of the moving component (2) and the base component (1) to prevent the pipe from shifting during the docking process. Then the subsequent pipe connection or welding fixing operation can be carried out. Step 5: After the pipe is connected or welded, turn the handle (603) in the opposite direction to loosen the clamping screw (602), and turn the handwheel (505) in the opposite direction to drive the arc-shaped pressure blocks (404) on both sides to move away from the loosened pipe simultaneously, so that the connected or welded drainage pipe can be taken out of the device.