Steel wire rope sleeve connecting member, fabricated shear wall and connecting joint

By pre-embedding steel wire rope sleeves in prefabricated wall panels and fixing them with connection boxes and post-poured concrete, the production and construction problems of connecting prefabricated wall panels in prefabricated buildings are solved, achieving the effects of simplifying production, avoiding transportation damage, and improving construction efficiency.

CN123133501APending Publication Date: 2026-11-20BEIJING HOUSING INDUSTRIALIZATION GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611527552.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-29
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing prefabricated wall panel connection methods for prefabricated buildings have problems such as complex production processes, high precision in rebar positioning, easy damage during transportation, and cumbersome on-site construction, resulting in low construction efficiency and unstable connection nodes.

Method used

The steel wire rope loop connection components include a connecting rope ring and a connecting box. The rope loop is housed in the receiving cavity of the connecting box and is pre-embedded in the precast wall panel. During on-site splicing, it is fixed by connectors and post-poured concrete to form a straight, L-shaped or T-shaped connection node.

Benefits of technology

It simplifies the production of precast components, avoids damage during steel bar transportation, reduces on-site construction procedures, and improves construction efficiency and the integrity and reliability of connection nodes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133501A_ABST
    Figure CN123133501A_ABST
Patent Text Reader

Abstract

The application discloses a steel wire rope sleeve connecting component, an assembled shear wall and a connecting joint, and relates to the technical field of assembled buildings. The connecting component comprises a connecting rope ring and a connecting box. The connecting box has an open accommodating chamber. One end of the connecting rope ring penetrates through the bottom wall of the accommodating chamber, and the rope sleeve part can be accommodated in the accommodating chamber. The connecting box can comprise a first connecting box and a second connecting box, which are respectively fixed to the opposite two side walls of a prefabricated wall panel. During prefabrication, the connecting component is embedded in the end part or the wall surface of the prefabricated wall panel. The rope sleeve part does not protrude, the wall panel does not have a reinforcing rib, and production and transportation are convenient. During splicing, the rope sleeve part is taken out, the rope sleeve parts of adjacent prefabricated wall panels are connected in sequence through the connecting piece, and the connecting joint in the shape of a straight line, an L shape, a T shape or a cross shape is formed through post-poured concrete fixation. The construction is simple, and the connection is reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building engineering technology, specifically to a wire rope sleeve connecting component, a prefabricated shear wall, and a connecting node. Background Technology

[0002] Prefabricated construction is a building form in which building components are prefabricated in a factory and then transported to the construction site for assembly. In prefabricated construction, the connection between prefabricated wall panels is a crucial link in the entire structural system, and the reliability of the connection nodes directly affects the overall integrity, seismic performance, and waterproofing performance of the building structure. To ensure the effective transfer of horizontal shear forces and vertical reactions between prefabricated wall panels and to maintain the continuity and integrity of the structure under external forces, the structural design and construction technology of the wall panel connection nodes have high requirements.

[0003] Currently, the connection between precast wall panels typically involves pre-installing reinforcing bars at the ends of the panels. These reinforcing bars, embedded within the wall panels, extend from the ends. During on-site assembly, the extended reinforcing bars of adjacent precast wall panels are tied, lapped, or welded together. Formwork is then erected at the connection joint, and concrete is poured to connect the adjacent wall panels into a single unit. However, this connection method has the following drawbacks: Firstly, the pre-embedded connecting steel bars extending from the ends of the wall panels complicate the production process of precast components, require high precision in steel bar positioning, and the protruding steel bars are prone to bending, deformation, or damage during transportation, loading and unloading, and on-site stacking, causing many inconveniences to construction.

[0004] Secondly, on-site steel bar tying or welding is required, which involves complicated construction procedures, high labor intensity, and low construction efficiency.

[0005] In summary, this invention addresses the numerous inconveniences that still exist in the production, transportation, and on-site assembly of prefabricated components in existing prefabricated wall panel connection structures for prefabricated buildings. Summary of the Invention

[0006] To address the aforementioned technical problems, this invention proposes a wire rope sleeve connecting component, a prefabricated shear wall, and a connecting node. Specifically, the following technical solution is adopted: A wire rope sleeve connection component, comprising: Connecting rope loops; A connecting box having an open receiving chamber, one end of a connecting rope loop penetrating the bottom wall of the receiving chamber, the connecting rope loop located on the outer side of the bottom wall of the receiving chamber as the rope root, and the connecting rope loop located on the inner side of the bottom wall of the receiving chamber as the rope loop portion, the rope loop portion being accommodated within the receiving chamber.

[0007] Optionally, the connecting rope loop is formed by a connecting rope, and two rope holes are opened on the bottom wall of the receiving chamber. The two ends of the connecting rope pass through the two rope holes to the outside of the bottom wall of the receiving chamber, and the two ends of the connecting rope are fixedly connected by anchor heads. The part of the connecting rope located on the outside of the bottom wall of the receiving chamber is the rope root, and the part of the connecting rope located on the inside of the bottom wall of the receiving chamber is the rope loop.

[0008] Optionally, the connecting box includes a first connecting box and a second connecting box, wherein the bottom wall of the receiving chamber of the first connecting box is disposed opposite to the bottom wall of the receiving chamber of the second connecting box, and the open end of the first connecting box and the open end of the second connecting box face opposite directions; The connecting rope loop passes through the first connecting box and the second connecting box in sequence. The rope loop includes a first rope loop located in the receiving cavity of the first connecting box and a second rope loop located in the receiving cavity of the second connecting box. The rope root is located between the first connecting box and the second connecting box. The first rope loop can be accommodated in the receiving cavity of the first connecting box, and the second rope loop can be accommodated in the receiving cavity of the second connecting box.

[0009] Optionally, the connecting rope loop is formed by a connecting rope. Two rope holes are respectively opened on the bottom wall of the receiving chamber of the first connecting box and the second connecting box. One end of the connecting rope passes through one rope hole on the bottom wall of the receiving chamber of the first connecting box and extends between the first connecting box and the second connecting box. The other end of the connecting rope passes through the other rope hole on the bottom wall of the receiving chamber of the first connecting box and the two rope holes on the bottom wall of the receiving chamber of the second connecting box in sequence and extends between the first connecting box and the second connecting box. The two ends of the connecting rope are fixedly connected by anchor heads. The part of the connecting rope located between the first connecting box and the second connecting box is the root of the rope.

[0010] Optionally, a wire rope loop connection member of the present invention includes a shielding member, the shielding member being detachably encapsulated on the open end of the receiving chamber; The loop portion of the connecting rope loop is housed within the receiving cavity and encapsulated by the shielding member. After the shielding member is removed, the loop portion of the connecting rope loop extends out from the receiving cavity.

[0011] The present invention also provides a prefabricated shear wall, comprising: Precast wall panels; The wire rope sleeve connecting component is pre-embedded and fixed in the precast wall panel. The wire rope loop connecting component is disposed at the end of the precast wall panel or on the wall surface, and the loop portion of the connecting rope ring does not protrude from the end of the precast wall panel or on the wall surface. When precast wall panels are assembled on site, the rope loop of the connecting rope ring extends out from the receiving cavity. Multiple rope loops arranged along the height direction on two adjacent precast wall panels are connected in sequence and then connected through the connector. The splicing and fixing are achieved by pouring concrete afterward.

[0012] The present invention also provides a prefabricated shear wall connection node, including the prefabricated shear wall, wherein the prefabricated shear wall includes a first prefabricated shear wall and a second prefabricated shear wall. When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected with multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through connectors, and splicing and fixing are achieved by pouring concrete afterward.

[0013] Optionally, the wire rope connecting component of the first prefabricated shear wall is disposed at the end of the prefabricated wall panel, and the connecting box of the first prefabricated shear wall is fixed to the end of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed at the end of the prefabricated wall panel. When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, the rope loops on the first prefabricated shear wall extend from the end, and the rope loops on the second prefabricated shear wall extend from the end. Multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected to multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a straight connection node.

[0014] Optionally, the wire rope connecting component of the first prefabricated shear wall is disposed at the end of the prefabricated wall panel, and the connecting box of the first prefabricated shear wall is fixed to the end of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, the rope loops on the first prefabricated shear wall extend from the end, and the rope loops on the second prefabricated shear wall extend from the wall surface. The multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected to the multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through the connectors. The splicing and fixing are achieved by pouring concrete afterward, forming an L-shaped connection node.

[0015] Optionally, the prefabricated shear wall may further include a third prefabricated shear wall; The steel wire rope connecting component of the first prefabricated shear wall is set at the end of the prefabricated wall panel. The connecting box of the first prefabricated shear wall includes a first connecting box and a second connecting box. The first connecting box and the second connecting box are respectively fixed to the opposite two sides of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. The steel wire rope connecting component of the third prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. When the first, second, and third prefabricated shear walls are assembled on site, the rope loops on the first, second, and third prefabricated shear walls extend from both sides of the wall. The rope loops on both sides of the first prefabricated shear wall are sequentially connected to the rope loops of the second and third prefabricated shear walls, respectively, and then connected through connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a T-shaped connection node.

[0016] Compared with the prior art, the present invention has the following beneficial effects: The wire rope loop connecting component of this invention, by setting a connecting box and housing the loop portion of the connecting rope ring within the receiving cavity of the connecting box, ensures that the loop portion of the connecting rope ring does not protrude from the end of the precast wall panel or the wall surface during the prefabrication of assembled shear walls. This effectively avoids problems caused by embedded connecting reinforcing bars or the connecting rope ring extending from the end of the wall panel or the wall surface. Precast components do not require pre-reserved protruding reinforcing bars during production, and no reinforcing bars are present at the end of the wall panel or the wall surface. Production molds are simple, and molding quality is good. During transportation, loading and unloading, and on-site stacking, there will be no bending, deformation, or hooking damage to the protruding reinforcing bars, making transportation convenient and storage safe. The connecting box provides excellent protection for the loop portion, preventing slurry from entering the receiving cavity and contaminating or encasing the loop portion during concrete pouring, and also preventing damage to the loop portion during prefabrication and transportation.

[0017] The wire rope sleeve connecting component of the present invention includes a first connecting box and a second connecting box. The bottom walls of the receiving chambers of the first connecting box and the second connecting box are arranged opposite to each other, with their open ends facing opposite directions. A connecting rope loop passes through the first and second connecting boxes sequentially. The rope sleeve includes a first rope sleeve located in the receiving chamber of the first connecting box and a second rope sleeve located in the receiving chamber of the second connecting box. The rope root is located between the first and second connecting boxes. Therefore, in the prefabrication of precast shear walls, the connecting component can be pre-embedded on the opposite sides of the precast wall panel. Neither the first nor the second rope sleeve protrudes from the wall surface of the precast wall panel, resulting in a flat wall surface without reinforcing bars, simple production, and convenient transportation. During on-site assembly, the first and second rope sleeves can be sequentially connected to the connecting rope sleeves at the ends of adjacent precast wall panels via connectors, achieving T-shaped connection node assembly between the wall surface of one precast wall panel and the end of another precast wall panel. The connection node has good integrity and reliable stress resistance.

[0018] The wire rope sleeve connecting component of the present invention has a shielding member detachably encapsulated on the open end of the receiving chamber. When prefabricating an assembled shear wall, the rope sleeve is housed in the receiving chamber and encapsulated by the shielding member, which effectively prevents slurry from entering the receiving chamber during concrete pouring, ensuring the cleanliness and integrity of the rope sleeve. Before the assembled shear wall is spliced, the shielding member can be removed to allow the rope sleeve to extend out of the receiving chamber, making the operation simple and convenient.

[0019] The prefabricated shear wall of this invention pre-embeds and fixes the wire rope loop connecting component within the precast wall panel. The loop portion of the connecting rope does not protrude from the end or surface of the precast wall panel, resulting in a flat end or surface without reinforcement, simplifying production and facilitating transportation. During on-site assembly, the loop portion of the connecting rope extends from the receiving cavity. Multiple loop portions arranged along the height direction on adjacent precast wall panels are sequentially connected and then joined through a connector. The assembly is achieved by post-pouring concrete, eliminating the need for on-site rebar tying or welding. This simplifies the construction process, significantly improves construction efficiency, ensures good overall integrity of the connection nodes, and provides reliable stress resistance.

[0020] The prefabricated shear wall connection node of the present invention involves the sequential connection of multiple rope loops arranged along the height direction of the first prefabricated shear wall to multiple rope loops arranged along the height direction of the second prefabricated shear wall during on-site splicing of the first and second prefabricated shear walls, and the connection is achieved through a connector and fixed by post-poured concrete. Therefore, according to actual connection requirements, straight-line, L-shaped, or T-shaped connection nodes can be flexibly constructed, offering strong applicability, good overall integrity, reliable stress resistance, and simple on-site construction. This effectively solves the problems of complex structure and cumbersome construction of connection nodes under different connection forms of prefabricated shear walls.

[0021] In this invention, the prefabricated shear wall connection node has steel wire rope connecting components for both the first and second prefabricated shear walls located at the ends of the precast wall panels. During on-site assembly, the rope loops on both sides extend from the ends, and multiple rope loops arranged along the height direction are sequentially connected and then joined together through connectors. The connection is then fixed by post-cast concrete, forming a straight-line connection node. The connection node has a simple structure, is easy to construct, and provides a reliable connection.

[0022] The prefabricated shear wall connection node of the present invention has a steel wire rope sleeve connecting component of the first prefabricated shear wall disposed at the end of the prefabricated wall panel, and a steel wire rope sleeve connecting component of the second prefabricated shear wall disposed on the wall surface of the prefabricated wall panel. During on-site assembly, the rope sleeve portion of the first prefabricated shear wall extends from the end, and the rope sleeve portion of the second prefabricated shear wall extends from the wall surface. Multiple rope sleeve portions arranged along the height direction are sequentially connected and then connected through a connector. The splicing and fixing are achieved by post-pouring concrete to form an L-shaped connection node. This effectively solves the problem of achieving a reliable connection between the end of one prefabricated wall panel and the wall surface of another prefabricated wall panel in an L-shaped connection node, provided that the wall surface is flat and no reinforcement is required.

[0023] The prefabricated shear wall connection node of the present invention includes a first connection box and a second connection box for the first prefabricated shear wall, which are respectively fixed to the opposite sides of the prefabricated wall panel. The steel wire rope connecting components for the second and third prefabricated shear walls are located at the ends of the prefabricated wall panels. During on-site assembly, the rope loops on both sides of the first prefabricated shear wall sequentially align with the rope loops of the second and third prefabricated shear walls, respectively, and are connected through connecting members. The assembly and fixation are achieved by post-pouring concrete, forming a T-shaped connection node. This effectively solves the problem of reliably connecting the end of one prefabricated wall panel to the side of another prefabricated wall panel in a T-shaped connection node under the premise of a flat wall surface and no reinforcement. Attached Figure Description

[0024] Figure 1 A top view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component extended). Figure 2 A top view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component stowed). Figure 3 Front view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component extended). Figure 4 Right view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component extended). Figure 5 Front view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component stowed). Figure 6 Right view of the prefabricated shear wall in Embodiment 1 of the present invention (with the wire rope connecting component stowed). Figure 7 Right view of the prefabricated shear wall according to Embodiment 1 of the present invention (with the shielding part of the wire rope connecting component removed). Figure 8 A front view of the installation of the connecting box for the wire rope sleeve connecting component according to Embodiment 1 of the present invention; Figure 9 Side view of the installation of the connecting box of the wire rope sleeve connecting component according to Embodiment 1 of the present invention; Figure 10 Front view of the connecting rope ring of the wire rope sleeve connecting component according to Embodiment 1 of the present invention; Figure 11 A three-dimensional structural schematic diagram of the connector according to Embodiment 1 of the present invention; Figure 12 Cross-sectional view of the connector in Embodiment 1 of the present invention; Figure 13 A schematic diagram of the prefabricated shear wall connection node (straight-line connection node) according to Embodiment 1 of the present invention. Figure 14 A schematic diagram of the connection node of the prefabricated shear wall in Embodiment 1 of the present invention (L-shaped connection node). Figure 15 Top view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component extended). Figure 16 Top view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component stowed). Figure 17 Front view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component extended). Figure 18 Left view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component extended). Figure 19 Front view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component stowed). Figure 20 Left view of the prefabricated shear wall in Embodiment 2 of the present invention (with the wire rope connecting component stowed). Figure 21 Left view of the prefabricated shear wall in Embodiment 2 of the present invention (with the shielding component of the wire rope connecting member removed). Figure 22 Front view of the prefabricated wall panel in Embodiment 2 of the present invention; Figure 23 Left view of the prefabricated wall panel in Embodiment 2 of the present invention; Figure 24 The installation front view of the connecting box of the wire rope sleeve connecting component in Embodiment 2 of the present invention; Figure 25 Side view of the installation of the connecting box of the wire rope sleeve connecting component in Embodiment 2 of the present invention; Figure 26 Front view of the connecting rope ring of the wire rope sleeve connecting component in Embodiment 2 of the present invention; Figure 27 A three-dimensional structural diagram of the connector in Embodiment 2 of the present invention; Figure 28 Cross-sectional view of the connector in Embodiment 2 of the present invention; Figure 29 A schematic diagram of the prefabricated shear wall connection node (T-type connection node) in Embodiment 2 of the present invention. Figure 30 A schematic diagram of the prefabricated shear wall connection node (cross-shaped connection node) in Embodiment 2 of the present invention.

[0025] The following are the labels in the attached diagram: 1-Connecting box; 2-Connecting rope ring; 3-Shielding component; 4-Precast wall panel; 5-Post-cast wall panel area; 6-Connecting component; 7-First connecting bolt; 8-Installation port; 9-Second connecting bolt; 10-Vertical embedded steel bar; 11-U-shaped connecting component; 12-Horizontal embedded steel bar; 101-Box bottom wall; 102-Upper side wall; 103-Lower side wall; 104-Left side wall; 105-Right side wall; 106-Installation hole; 107-Protruding structure; 108-Rope groove; 109-Rope threading hole; 201-Rope root; 202-Anchor head; 203-Rope loop; 601-Connecting groove; 602-Connecting flange; 603-First mounting hole; 604-Second mounting hole; 605-Elongated mounting hole; 606-First connecting plate; 607-Second connecting plate; 608-Third connecting plate; 2001-First prefabricated shear wall; 2002-Second prefabricated shear wall; 2003-Third prefabricated shear wall. Detailed Implementation

[0026] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0027] Therefore, the following detailed description of embodiments of the present invention is not intended to limit the scope of the claimed invention, but merely illustrates some embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0028] It should be noted that, unless otherwise specified, the embodiments and features and technical solutions in the present invention can be combined with each other.

[0029] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0030] In the description of this invention, it should be noted that the terms "upper," "lower," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the product of this invention is in use, or the orientation or positional relationship commonly understood by those skilled in the art. These terms are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention. In addition, the terms "first," "second," etc., are only used to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0031] Example 1 like Figures 1 to 12 As shown, this application provides a wire rope sling connection component, including a connecting box 1 and a connecting rope ring 2. The connecting box 1 has an open receiving chamber, one end of the connecting rope ring 2 penetrates the bottom wall of the receiving chamber, the connecting rope ring 2 located on the outer side of the bottom wall of the receiving chamber is the rope root 201, and the connecting rope ring 2 located on the inner side of the bottom wall of the receiving chamber is the rope sling portion 203, which can be accommodated in the receiving chamber.

[0032] like Figure 8 and Figure 9 As shown, the connecting box 1 has a bottom wall 101 and side walls surrounding the bottom wall 101. The bottom wall 101 and the side walls together form an open-ended receiving chamber. Specifically, the side walls include an upper side wall 102 located above the bottom wall 101, a lower side wall 103 located below the bottom wall 101, a left side wall 104 located to the left of the bottom wall 101, and a right side wall 105 located to the right of the bottom wall 101. The upper side wall 102, lower side wall 103, left side wall 104, and right side wall 105 are inclined, that is, each side wall slopes outward from the bottom wall 101 towards the open end, thereby forming a receiving chamber that gradually expands in size from the bottom wall 101 towards the open end. This arrangement facilitates the insertion and removal of the rope loop 203 of the connecting rope ring 2, and also increases the space of the receiving chamber, which is beneficial for the placement of the rope loop 203 within the receiving chamber.

[0033] The bottom wall 101 of the box has mounting holes 106. Two rope holes 109 are also provided on the bottom wall 101, spaced apart. Corresponding to the two rope holes 109, rope-holding grooves 108 are provided on both sides of the side wall of the box. In this embodiment, the rope-holding grooves 108 are located on the left side wall 104 and the right side wall 105, extending from the open ends of the left side wall 104 and the right side wall 105 towards the bottom wall 101. The rope-holding grooves 108 are used to engage the rope loop 203 of the connecting rope ring 2, facilitating the positioning and removal of the rope loop 203.

[0034] The bottom wall 101 and / or the side wall of the box are provided with protruding structures 107. In this embodiment, the protruding structures 107 are multiple protrusions evenly arranged on the bottom wall 101 and / or the side wall of the box. The protruding structures 107 effectively increase the bond force and friction between the connecting box 1 and the precast wall panel 4 concrete, improve the anchorage strength between the connecting component and the precast wall panel 4, and ensure reliable stress distribution at the connection node.

[0035] like Figure 10 As shown, the connecting rope loop 2 is formed by a connecting rope. The connecting rope loop 2 includes a rope root portion 201 located outside the receiving cavity and a rope loop portion 203 located inside the receiving cavity. Specifically, both ends of the connecting rope pass through two rope holes 109 to the outside of the bottom wall 101 of the box, and the two ends of the connecting rope are fixedly connected by anchor heads 202. The anchor heads 202 can be formed by crimping, casting, or knotting, as long as they can reliably fix the two ends of the connecting rope.

[0036] like Figure 5 and Figure 6 As shown, the wire rope loop connecting component also includes a shielding member 3, which is detachably encapsulated on the open end of the receiving chamber. In this embodiment, the shielding member 3 is a shielding cloth or a shielding plate. During the prefabrication of the assembled shear wall, the rope loop portion 203 of the connecting rope ring 2 is housed within the receiving chamber and encapsulated by the shielding member 3, effectively preventing slurry from entering the receiving chamber during concrete pouring and ensuring the cleanliness and integrity of the rope loop portion 203. Before the assembled shear wall is assembled, the shielding member 3 is removed, and the rope loop portion 203 of the connecting rope ring 2 extends out from the receiving chamber.

[0037] like Figures 1 to 7As shown, this application also provides a prefabricated shear wall, including a prefabricated wall panel 4 and the aforementioned wire rope sleeve connecting component. The wire rope sleeve connecting component is pre-embedded and fixed within the prefabricated wall panel 4. The wire rope sleeve connecting component is disposed at the end or wall surface of the prefabricated wall panel 4, and the rope sleeve portion 203 of the connecting rope ring 2 does not protrude from the end or wall surface of the prefabricated wall panel 4. During on-site assembly of the prefabricated wall panel 4, the rope sleeve portion 203 of the connecting rope ring 2 extends out from the receiving cavity, and multiple rope sleeve portions 203 arranged along the height direction on two adjacent prefabricated wall panels 4 are sequentially connected and penetrated by the connector 6, achieving splicing and fixation through post-poured concrete.

[0038] Specifically, in the prefabrication of precast shear walls, the connecting box 1 is first fixedly installed on the template through the mounting hole 106. The rope loop 203 of the connecting rope ring 2 is housed in the receiving cavity of the connecting box 1, and the open end of the receiving cavity is sealed by the shielding member 3. At this time, the rope root 201 of the connecting rope ring 2 is located outside the bottom wall 101 of the box. Then, concrete is poured into the template, and the concrete pre-embeds and fixes the connecting box 1, the rope root 201 of the connecting rope ring 2, and the anchor head 202 into the precast wall panel 4. After the concrete has cured and formed, the template is removed, and the precast wall panel 4 is obtained. At this time, the end or wall surface of the precast wall panel 4 is flat, and the rope loop 203 of the connecting rope ring 2 does not protrude from the end or wall surface of the precast wall panel 4, such as... Figure 2 , Figure 5 and Figure 6 As shown.

[0039] like Figure 7 As shown, before the prefabricated wall panel 4 is assembled on site, the shielding part 3 is removed. At this time, the rope loop part 203 of the connecting rope ring 2 is still contained in the receiving cavity and has not been removed.

[0040] like Figure 1 , Figure 3 and Figure 4 As shown, during on-site assembly of the precast wall panel 4, the rope loop 203 is removed from the receiving cavity and secured in the rope groove 108. Multiple rope loops 203 arranged along the height direction on adjacent precast wall panels 4 are sequentially connected and threaded through by connectors 6. Then, concrete is poured into the subsequent wall panel area 5 to achieve splicing and fixation. No on-site rebar tying or welding is required, making the construction operation simple and convenient, effectively improving construction efficiency.

[0041] like Figure 11 and Figure 12As shown, the connector 6 includes a connecting groove 601 and connecting flanges 602 located on opposite sides of the connecting groove 601. The connecting groove 601 is fixedly connected to the outer side of the bottom wall 101 of the box, and the connecting flanges 602 on both sides of the connecting groove 601 are fixedly connected to the precast wall panel 4. In this embodiment, a first mounting hole 603 is provided on the bottom wall of the connecting groove 601, and a second mounting hole 604 is provided on the connecting flange 602. The bottom wall of the connecting groove 601 is fixedly connected to the mounting hole 106 of the bottom wall 101 of the box by a second connecting bolt 9 passing through the first mounting hole 603. The connecting flange 602 is fixedly connected to the precast wall panel 4 by a first connecting bolt 7 passing through the second mounting hole 604. The connecting groove 601 is designed to avoid the rope threading hole 109 to prevent the connector 6 from interfering with the threading of the connecting rope.

[0042] like Figure 13 As shown, this is a linear connection node provided in this application. The wire rope loop connecting component of the first prefabricated shear wall 2001 is located at the end of the prefabricated wall panel 4, and the wire rope loop connecting component of the second prefabricated shear wall 2002 is also located at the end of the prefabricated wall panel 4. During on-site assembly of the first prefabricated shear wall 2001 and the second prefabricated shear wall 2002, the rope loop portion 203 on the first prefabricated shear wall 2001 extends from its end, and the rope loop portion 203 on the second prefabricated shear wall 2002 extends from its end. Multiple rope loop portions 203 arranged along the height direction of the first prefabricated shear wall 2001 and multiple rope loop portions 203 arranged along the height direction of the second prefabricated shear wall 2002 are sequentially connected and perforated by connectors. The assembly and fixation are achieved by post-pouring concrete, forming a linear connection node.

[0043] like Figure 14 As shown, this is the L-shaped connection node provided in this application. The wire rope loop connecting component of the first prefabricated shear wall 2001 is located at the end of the prefabricated wall panel 4, and the wire rope loop connecting component of the second prefabricated shear wall 2002 is located on the wall surface of the prefabricated wall panel 4. During on-site assembly of the first prefabricated shear wall 2001 and the second prefabricated shear wall 2002, the rope loop portion 203 on the first prefabricated shear wall 2001 extends from its end, and the rope loop portion 203 on the second prefabricated shear wall 2002 extends from the wall surface. Multiple rope loop portions 203 arranged along the height direction of the first prefabricated shear wall 2001 and multiple rope loop portions 203 arranged along the height direction of the second prefabricated shear wall 2002 are sequentially connected and perforated by connectors. The assembly and fixation are achieved by post-pouring concrete, forming an L-shaped connection node.

[0044] Example 2 like Figures 15 to 28As shown, the difference between this embodiment and Embodiment 1 is that the connecting box 1 includes a first connecting box and a second connecting box. The bottom wall of the receiving chamber of the first connecting box and the bottom wall of the receiving chamber of the second connecting box are disposed opposite to each other, and the open ends of the first connecting box and the open ends of the second connecting box face opposite directions. The connecting rope loop 2 passes through the first connecting box and the second connecting box in sequence. The rope sleeve portion 203 includes a first rope sleeve portion located in the receiving chamber of the first connecting box and a second rope sleeve portion located in the receiving chamber of the second connecting box. The rope root portion 201 is located between the first connecting box and the second connecting box. The first rope sleeve portion can be accommodated in the receiving chamber of the first connecting box, and the second rope sleeve portion can be accommodated in the receiving chamber of the second connecting box.

[0045] like Figure 26 As shown, the connecting rope loop 2 is formed by a connecting rope. Two rope holes 109 are respectively opened on the bottom wall of the receiving chamber of the first connecting box and the second connecting box. One end of the connecting rope passes through one rope hole 109 on the bottom wall of the receiving chamber of the first connecting box and extends between the first connecting box and the second connecting box; the other end of the connecting rope passes through the other rope hole 109 on the bottom wall of the receiving chamber of the first connecting box and the two rope holes 109 on the bottom wall of the receiving chamber of the second connecting box, extending between the first connecting box and the second connecting box; the two ends of the connecting rope are fixedly connected by an anchor head 202. The portion of the connecting rope located between the first connecting box and the second connecting box is the rope root 201.

[0046] like Figure 22 and Figure 23 As shown, an installation opening 8 is pre-reserved on the wall surface of the precast wall panel 4 during prefabrication, and the wire rope connecting component is fixedly installed on the installation opening 8. The precast wall panel 4 includes a first precast wall panel and a second precast wall panel arranged at intervals opposite to each other, forming a post-cast wall panel area 5 between the first precast wall panel and the second precast wall panel. The installation opening 8 is respectively provided on the first precast wall panel and the second precast wall panel. The installation opening 8 is located on the wall surface of the precast wall panel 4 and extends through the end of the precast wall panel 4. A vertical pre-embedded steel bar 10 is provided in the installation opening 8 on the side near the end of the precast wall panel 4. In this embodiment, a horizontal pre-embedded steel bar 12 is also provided in the precast wall panel 4.

[0047] like Figure 24 , Figure 25 , Figure 27 and Figure 28As shown, the wire rope connecting member is fixedly connected to the connector 6, and the connector 6 is fixedly connected to the vertical embedded steel bar 10 and the wall surface on the side away from the precast wall panel 4 of the mounting opening 8. Specifically, the connector 6 includes a first connecting plate 606 and a second connecting plate 607 and a third connecting plate 608 located on both sides of the first connecting plate 606. The first connecting plate 606 is fixedly connected to the outer side of the bottom wall of the connecting box 1, the second connecting plate 607 is fixedly connected to the wall surface on the side away from the precast wall panel 4 of the mounting opening 8, and the third connecting plate 608 is fixedly connected to the vertical embedded steel bar 10. In this embodiment, the third connecting plate 608 is formed by folding one edge of the first connecting plate 606, and the second connecting plate 607 is formed by horizontally extending the other edge of the first connecting plate 606.

[0048] The first connecting plate 606 has a first mounting hole 603, the second connecting plate 607 has a second mounting hole 604, and the third connecting plate 608 has an elongated mounting hole 605. The first connecting plate 606 is fixedly connected to the mounting hole 106 of the bottom wall 101 of the box by a second connecting bolt 9 passing through the first mounting hole 603. The second connecting plate 607 is fixedly connected to the wall surface of the mounting opening 8 away from the end of the precast wall panel 4 by a first connecting bolt 7 passing through the second mounting hole 604. The third connecting plate 608 is fixedly connected to the vertical embedded steel bar 10 by a U-shaped connector 11 passing through the elongated mounting hole 605. The elongated mounting hole 605 facilitates adjustment of the connection position between the third connecting plate 608 and the vertical embedded steel bar 10, adapting to embedded steel bars in different positions and improving installation flexibility.

[0049] like Figure 19 and Figure 20 As shown, in the prefabricated assembled shear wall, the first rope loop and the second rope loop are respectively housed in the receiving chambers of the first connecting box and the second connecting box, and are enclosed by the shielding member 3, so that neither protrudes from the wall surface of the prefabricated wall panel 4, and the wall surface of the prefabricated wall panel 4 is flat and without reinforcement.

[0050] like Figure 21 As shown, before the prefabricated shear wall is assembled, the shielding part 3 is removed. At this time, the rope loop part 203 of the connecting rope ring 2 is still contained in the receiving cavity and has not been removed.

[0051] like Figure 15 , Figure 17 and Figure 18As shown, when assembling the prefabricated shear wall, the first rope loop and the second rope loop are taken out from the receiving cavity respectively, and connected sequentially through the connectors, so that the two sides of the first prefabricated wall panel are fixedly connected to the ends of the adjacent prefabricated wall panels respectively, and then the wall panel area 5 and the connection node are poured on site to achieve a fixed connection.

[0052] like Figure 29 The diagram shows a T-shaped connection node provided in this application. The wire rope sleeve connection component of the first prefabricated shear wall 2001 is disposed at the end of the prefabricated wall panel 4. The connection box 1 of the first prefabricated shear wall 2001 includes a first connection box and a second connection box, which are respectively fixed to the opposite side walls of the prefabricated wall panel 4. The wire rope sleeve connection component of the second prefabricated shear wall 2002 is disposed at the end of the prefabricated wall panel 4, and the connection box 1 of the second prefabricated shear wall 2002 is fixed to the wall surface of the prefabricated wall panel 4. The wire rope sleeve connection component of the third prefabricated shear wall 2003 is disposed at the end of the prefabricated wall panel 4, and the connection box 1 of the third prefabricated shear wall 2003 is fixed to the wall surface of the prefabricated wall panel 4. When the first prefabricated shear wall 2001, the second prefabricated shear wall 2002, and the third prefabricated shear wall 2003 are assembled on site, the rope loops 203 on the first prefabricated shear wall 2001 extend from both sides of the wall, the rope loops 203 on the second prefabricated shear wall 2002 extend from the wall, and the rope loops 203 on the third prefabricated shear wall 2003 extend from the wall. The rope loops 203 on both sides of the first prefabricated shear wall 2001 are sequentially connected to the rope loops 203 on the second prefabricated shear wall 2002 and the rope loops 203 on the third prefabricated shear wall 2003, respectively, and are connected through connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a T-shaped connection node.

[0053] like Figure 30The diagram shows a cross-shaped connection node provided in this application. The connection box 1 of the first prefabricated shear wall 2001 includes a first connection box and a second connection box, which are respectively fixed to opposite sides of the prefabricated wall panel 4. The wire rope connecting component of the second prefabricated shear wall 2002 is located at the end of the prefabricated wall panel 4. The connection box 1 of the second prefabricated shear wall 2002 includes a first connection box and a second connection box, which are respectively fixed to opposite sides of the prefabricated wall panel 4. When the first prefabricated shear wall 2001 and the second prefabricated shear wall 2002 are assembled on site, the rope loops 203 on both sides of the first prefabricated shear wall 2001 extend from the side walls respectively, and the rope loops 203 on both sides of the second prefabricated shear wall 2002 extend from the side walls respectively. The rope loops 203 on both sides of the first prefabricated shear wall 2001 and the rope loops 203 on both sides of the second prefabricated shear wall 2002 are connected in sequence and then connected through the connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a cross-shaped connection node.

[0054] In summary, the wire rope loop connection component provided in this application, by setting a connection box 1 and housing the loop portion 203 of the connecting rope ring 2 within the receiving cavity of the connection box 1, ensures that the loop portion 203 of the connecting rope ring 2 does not protrude from the end of the precast wall panel 4 or the wall surface during the prefabrication of precast shear walls. This effectively avoids the problems caused by embedded connecting steel bars or connecting rope rings protruding from the end of the wall panel or the wall surface. The precast component is simple to produce, convenient to transport, easy to assemble on-site, has good overall integrity of the connection node, reliable stress resistance, and can flexibly construct straight, L-shaped, T-shaped, or cross-shaped connection nodes according to actual connection requirements, exhibiting strong applicability and broad application prospects.

[0055] The above embodiments are only used to illustrate the present invention and are not intended to limit the technical solutions described herein. Although the present invention has been described in detail with reference to the above embodiments, the present invention is not limited to the specific embodiments described above. Therefore, any modifications or equivalent substitutions to the present invention, as well as all technical solutions and improvements that do not depart from the spirit and scope of the invention, are covered within the scope of the claims of the present invention.

Claims

1. A wire rope sleeve connecting component, characterized in that, include: Connecting rope loops; A connecting box having an open receiving chamber, one end of a connecting rope loop penetrating the bottom wall of the receiving chamber, the connecting rope loop located on the outer side of the bottom wall of the receiving chamber as the rope root, and the connecting rope loop located on the inner side of the bottom wall of the receiving chamber as the rope loop portion, the rope loop portion being accommodated within the receiving chamber.

2. The wire rope sleeve connecting component according to claim 1, characterized in that, The connecting rope loop is formed by a connecting rope. Two rope holes are opened on the bottom wall of the receiving chamber. The two ends of the connecting rope pass through the two rope holes to the outside of the bottom wall of the receiving chamber. The two ends of the connecting rope are fixedly connected by anchor heads. The part of the connecting rope on the outside of the bottom wall of the receiving chamber is the rope root, and the part of the connecting rope on the inside of the bottom wall of the receiving chamber is the rope loop.

3. The wire rope sleeve connecting component according to claim 1, characterized in that, The connecting box includes a first connecting box and a second connecting box. The bottom wall of the receiving chamber of the first connecting box is disposed opposite to the bottom wall of the receiving chamber of the second connecting box, and the open end of the first connecting box and the open end of the second connecting box face opposite directions. The connecting rope loop passes through the first connecting box and the second connecting box in sequence. The rope loop includes a first rope loop located in the receiving cavity of the first connecting box and a second rope loop located in the receiving cavity of the second connecting box. The rope root is located between the first connecting box and the second connecting box. The first rope loop can be accommodated in the receiving cavity of the first connecting box, and the second rope loop can be accommodated in the receiving cavity of the second connecting box.

4. A wire rope sleeve connecting component according to claim 3, characterized in that, The connecting rope loop is formed by a connecting rope. Two rope holes are respectively opened on the bottom wall of the receiving chamber of the first connecting box and the second connecting box. One end of the connecting rope passes through one rope hole on the bottom wall of the receiving chamber of the first connecting box and extends between the first connecting box and the second connecting box. The other end of the connecting rope passes through the other rope hole on the bottom wall of the receiving chamber of the first connecting box and the two rope holes on the bottom wall of the receiving chamber of the second connecting box in sequence and extends between the first connecting box and the second connecting box. The two ends of the connecting rope are fixedly connected by anchor heads. The part of the connecting rope located between the first connecting box and the second connecting box is the root of the rope.

5. A wire rope sleeve connecting component according to claim 1, characterized in that, Includes a shielding element, which is detachably encapsulated on the open end of the receiving chamber; The loop portion of the connecting rope loop is housed within the receiving cavity and encapsulated by the shielding member. After the shielding member is removed, the loop portion of the connecting rope loop extends out from the receiving cavity.

6. A prefabricated shear wall, characterized in that, include: Precast wall panels; The wire rope sleeve connecting member as described in any one of claims 1-5 is pre-embedded and fixed within the precast wall panel; The wire rope loop connecting component is disposed at the end of the precast wall panel or on the wall surface, and the loop portion of the connecting rope ring does not protrude from the end of the precast wall panel or on the wall surface. When precast wall panels are assembled on site, the rope loop of the connecting rope ring extends out from the receiving cavity. Multiple rope loops arranged along the height direction on two adjacent precast wall panels are connected in sequence and then connected through the connector. The splicing and fixing are achieved by pouring concrete afterward.

7. A prefabricated shear wall connection node, characterized in that, Includes the prefabricated shear wall as described in claim 6, wherein the prefabricated shear wall includes a first prefabricated shear wall and a second prefabricated shear wall; When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected with multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through connectors, and splicing and fixing are achieved by pouring concrete afterward.

8. A prefabricated shear wall connection node according to claim 7, characterized in that, The wire rope connecting component of the first prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the first prefabricated shear wall is fixed to the end of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed at the end of the prefabricated wall panel. When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, the rope loops on the first prefabricated shear wall extend from the end, and the rope loops on the second prefabricated shear wall extend from the end. Multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected to multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a straight connection node.

9. A prefabricated shear wall connection node according to claim 7, characterized in that, The wire rope connecting component of the first prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the first prefabricated shear wall is fixed to the end of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. When the first prefabricated shear wall and the second prefabricated shear wall are spliced ​​on site, the rope loops on the first prefabricated shear wall extend from the end, and the rope loops on the second prefabricated shear wall extend from the wall surface. The multiple rope loops arranged along the height direction of the first prefabricated shear wall are sequentially connected to the multiple rope loops arranged along the height direction of the second prefabricated shear wall, and are connected through the connectors. The splicing and fixing are achieved by pouring concrete afterward, forming an L-shaped connection node.

10. A prefabricated shear wall connection node according to claim 7, characterized in that, The prefabricated shear wall also includes a third prefabricated shear wall; The steel wire rope connecting component of the first prefabricated shear wall is set at the end of the prefabricated wall panel. The connecting box of the first prefabricated shear wall includes a first connecting box and a second connecting box. The first connecting box and the second connecting box are respectively fixed to the opposite two sides of the prefabricated wall panel. The wire rope connecting component of the second prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. The steel wire rope connecting component of the third prefabricated shear wall is set at the end of the prefabricated wall panel, and the connecting box of the second prefabricated shear wall is fixed to the wall surface of the prefabricated wall panel. When the first, second, and third prefabricated shear walls are assembled on site, the rope loops on the first, second, and third prefabricated shear walls extend from both sides of the wall. The rope loops on both sides of the first prefabricated shear wall are sequentially connected to the rope loops of the second and third prefabricated shear walls, respectively, and then connected through connectors. The splicing and fixing are achieved by pouring concrete afterward, forming a T-shaped connection node.