Portal steel frame roof and method for constructing a portal steel frame roof

By pre-assembling and hoisting the first and second roof modules, the problems of complex construction and high-altitude operation in traditional portal steel frame warehouse roofs have been solved, resulting in cost reduction, shorter construction period, and improved construction efficiency and integration.

CN123133528APending Publication Date: 2026-11-20BEIJING JINGDONG DONGHONG MANAGEMENT CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611528778.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-29
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The construction process of traditional portal steel frame warehouse roofs is complex, time-consuming, dangerous, and costly due to high-altitude operations. Furthermore, fire sprinkler pipes require secondary high-altitude operations, which further increases the construction period and cost.

Method used

The method of pre-assembling the first and second roof modules, including the first steel beam, the second steel beam, horizontal support components, roof purlins and sprinkler branch pipes, is adopted. These modules are then hoisted to the top of the pre-constructed steel columns to integrate fire protection facilities, reducing the need for individual installation at height.

Benefits of technology

It reduced construction costs and the amount of work at height, shortened the construction period, improved construction efficiency and modularity and integration, and avoided secondary work at height.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133528A_ABST
    Figure CN123133528A_ABST
Patent Text Reader

Abstract

The application discloses a portal steel frame roof and a portal steel frame roof construction method, and relates to the technical field of buildings. A specific embodiment of the portal steel frame roof comprises: a first roof module, a second roof module and a spray branch pipe; the first roof module comprises: a first steel beam and a second steel beam, which are arranged in parallel along a first direction according to the axial spacing of the portal steel frame; a horizontal support component, the two ends of which are connected to the first steel beam and the second steel beam respectively; a first roof purlin, which is arranged between the first steel beam and the second steel beam along a second direction, and the two ends of which are connected to the first steel beam and the second steel beam respectively; the second roof module comprises: a second roof purlin, which is arranged along the second direction; a tension component, which is arranged along the first direction and connected to the second roof purlin; and the spray branch pipe, which is arranged along the second direction and connected to the first roof purlin and / or the second roof purlin. The embodiment reduces construction cost and high-altitude operation amount, and improves construction efficiency and the degree of modularization and integration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building technology, and in particular to a portal steel frame roof and a method for constructing a portal steel frame roof. Background Technology

[0002] The installation of traditional portal steel frame warehouse roofs involves hoisting the main beams, tie rods, purlins, bracing, and corner braces one by one to a height, and then installing them using bolts or welding. The roof cladding and fire sprinkler systems are installed only after the overall structure is completed. This process presents several problems: the construction of roof structural components is complex, time-consuming, involves significant risks of working at height, and is costly; the fire sprinkler systems need to be installed after the overall structure and cladding are completed, requiring secondary work at height, resulting in a longer construction period and higher costs. Summary of the Invention

[0003] In view of this, embodiments of the present invention provide a portal steel frame roof and a method for constructing a portal steel frame roof, which can reduce the construction cost and high-altitude work of the portal steel frame roof, and improve construction efficiency and modularity and integration.

[0004] To achieve the above objectives, according to one aspect of the present invention, a portal steel frame roof is provided, comprising: a first roof module, a second roof module, and sprinkler branch pipes; The first roof module includes: a first steel beam and a second steel beam, arranged parallel to each other along a first direction according to the axial spacing of the portal frame; wherein, the first direction is the direction of the portal frame axis; a horizontal support member, the two ends of which are respectively connected to the first steel beam and the second steel beam; and a first roof purlin, arranged between the first steel beam and the second steel beam along a second direction, the two ends of which are respectively connected to the first steel beam and the second steel beam; wherein, the second direction is the direction perpendicular to the portal frame axis. The second roof module includes: a second roof purlin, arranged along a second direction; and a tension member, arranged along a first direction and connected to the second roof purlin. Sprinkler branch pipes are arranged along the second direction and connected to the first roof purlin and / or the second roof purlin.

[0005] Optionally, the spray branch pipe further includes: downspray nozzles, which are spaced apart along the second direction in the spray branch pipe.

[0006] Optionally, the horizontal support components include horizontal rigid tie rods and roof horizontal cross bracing; The horizontal rigid tie rod is set along the second direction, and its two ends are respectively connected to the first steel beam and the second steel beam; The roof horizontal cross bracing includes a pair of intersecting diagonal braces, with each diagonal brace connected at both ends to the first steel beam and the second steel beam, respectively. Flexible corner bracing is provided at the connection between the first roof purlin and the first steel beam, and / or at the connection between the first roof purlin and the second steel beam.

[0007] Optionally, it further includes: a fixing bracket; the fixing bracket is disposed between two adjacent first roof purlins and / or between two adjacent second roof purlins; The sprinkler branch pipes are mounted on fixed supports.

[0008] Optionally, the fixing bracket includes a set of vertically arranged first angle steels and a set of horizontally arranged second angle steels; Among them, a set of first angle steels is set at the symmetrical position of the first roof purlin; a set of second angle steels is set at the top and bottom of the first angle steels.

[0009] Optionally, the mounting bracket may further include: a fastener; The second angle steel has a pair of mounting holes that match the diameter of the sprinkler branch pipe; The two ends of the fastener extend into a pair of mounting holes and are fixed to the second angle steel. There is a gap between the fastener and the second angle steel that matches the diameter of the sprinkler branch pipe. The outer wall of the spray branch pipe is in contact with the fixing member and the second angle steel, and the spray branch pipe is confined in the gap between the fixing member and the second angle steel.

[0010] Secondly, embodiments of the present invention provide a method for constructing a portal steel frame roof, comprising: Assemble the first roof module, which includes a first steel beam, a second steel beam, horizontal support components, first roof purlins, and sprinkler branch pipes. The assembly of the first roof module includes the following steps: Position and place the first and second steel beams according to the axial spacing of the portal steel frame; install horizontal support components and the first roof purlin between the first and second steel beams; install the sprinkler branch pipes equipped with downspray nozzles to the first roof purlin; Assemble the second roof module, which includes second roof purlins, tension members, and sprinkler branch pipes. The assembly of the second roof module includes the following steps: Place the second roof purlin; install the tension member onto the second roof purlin; install the sprinkler branch pipe equipped with a downspray nozzle onto the second roof purlin, corresponding to the position of the sprinkler branch pipe installed onto the first roof purlin; The assembled first and second roof modules are hoisted to their corresponding positions at the top of the pre-constructed steel columns used to support the portal steel frame roof, and then installed sequentially at the top of the steel columns.

[0011] Optionally, the assembled first and second roof modules are hoisted to corresponding positions at the top of the pre-constructed steel columns supporting the portal frame roof, including: The first roof module is hoisted to the top of the steel column with inter-column support; The second roof module is hoisted to the top of the two adjacent steel columns on which the first roof module has been installed; where "column" refers to the area between adjacent axes of the portal frame.

[0012] Optionally, the first roof module is hoisted to the top of a steel column with inter-column bracing, including: The first roof module was hoisted to the top of the steel column with inter-column support using a point hoisting method; The second roof module is hoisted to the top of the two adjacent steel columns where the first roof module has already been installed, including: The second roof module is hoisted to the top of the two adjacent steel columns where the first roof module has already been installed, using a balancing frame; The balancing frame is a rectangular frame; the second roof module is connected to the balancing frame by ropes of equal length. One end of the rope is connected to a set of symmetrical sides of the balancing frame, and the other end of the rope is connected to the second roof module symmetrically with respect to the balancing frame.

[0013] One embodiment of the above invention has the following advantages or beneficial effects: by pre-constructing a first roof module containing structural components and a second roof module containing structural components, it avoids hoisting all components to the air one by one, reducing construction steps and the amount of high-altitude work; since multiple first and second roof modules can be constructed in advance, the construction period can be further shortened and costs saved. Specifically, horizontal support components provide structural support for the first roof module; first and second roof purlins provide support for subsequent roof cladding and other materials; the sprinkler branch pipes are also equipped with downspray nozzles, integrating fire protection facilities with structural components, avoiding secondary high-altitude work and shortening the construction period. Simultaneously, the sprinkler branch pipes are arranged parallel to the first and / or second roof purlins, utilizing the height of the purlin layer to increase the internal clear height of the portal frame. Therefore, through the portal frame roof and its construction method described in the above embodiment, the construction cost and amount of high-altitude work for portal frame roofs can be reduced, while construction efficiency and modularity / integration can be improved.

[0014] The further effects of the aforementioned unconventional alternative methods will be explained below in conjunction with specific implementation methods. Attached Figure Description

[0015] The accompanying drawings are provided to better understand the invention and are not intended to unduly limit the scope of the invention. Wherein: Figure 1 This is a schematic diagram of a portal steel frame roof provided in one embodiment of the present invention; Figure 2 This is a schematic diagram of the structure of a first roof module provided in one embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the fixed bracket and the spray branch pipe provided in one embodiment of the present invention; Figure 4 This is a schematic diagram of the structure of a second roof module provided in one embodiment of the present invention; Figure 5 This is a schematic diagram of the main process of a method for constructing a portal steel frame roof according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the hoisting sequence of a portal steel frame roof provided in one embodiment of the present invention; Figure 7 This is a schematic diagram of the hoisting method of the first roof module provided in one embodiment of the present invention; Figure 8 This is a schematic diagram of the hoisting method of the second roof module provided in one embodiment of the present invention.

[0016] Reference numerals: 10-First steel beam; 11-Second steel beam; 20-Horizontal support member; 21-Horizontal rigid tie rod; 22-Roof horizontal cross brace; 23-Flexible corner brace; 30-First roof purlin; 40-Sprinkler branch pipe; 41-Downspray nozzle; 50-Fixed bracket; 51-First angle steel; 52-Second angle steel; 53-Fixed component; 60-Tension member; 100-First roof module; 200-Second roof module; 210-Second roof purlin; 220-Tension member; 300-Crane; 400-Balancing frame; 401-Balancing rope; 402-Temperature support. Detailed Implementation

[0017] The following description, in conjunction with the accompanying drawings, illustrates exemplary embodiments of the present invention, including various details to aid understanding. These details should be considered merely exemplary. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the invention. Similarly, for clarity and brevity, descriptions of well-known functions and structures are omitted in the following description.

[0018] It should be noted that in the description of this invention patent, the terms "front", "back", "up", "down", etc., indicating the direction or positional relationship are based on the direction or positional relationship shown in the drawings. This is only for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation on this invention patent.

[0019] Furthermore, it should be noted that, in the description of this invention patent, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention patent according to the specific circumstances.

[0020] like Figure 1 As shown, an embodiment of the present invention provides a portal steel frame roof, including: a first roof module 100, a second roof module 200, and a sprinkler branch pipe 40.

[0021] To more clearly show the structure of the portal frame roof Figure 1 The first roof purlin 30, the second roof purlin 210, and the sprinkler branch pipe 40 are not shown in the diagram.

[0022] Among them, the first roof module 100, such as Figure 2 As shown, it includes: a first steel beam 10 and a second steel beam 11, arranged parallel to each other along a first direction according to the axial spacing of the portal frame; wherein, the first direction (e.g. Figure 1 The x-axis (as shown in the middle) represents the direction of the portal frame axis; horizontal support member 20, with both ends of the horizontal support member 20 connected to the first steel beam 10 and the second steel beam 11 respectively; first roof purlin 30, arranged along the second direction between the first steel beam 10 and the second steel beam 11, with both ends of the first roof purlin 30 connected to the first steel beam 10 and the second steel beam 11 respectively; wherein, the second direction (as shown in the middle x-axis) represents the direction of the portal frame axis; horizontal support member 20, with both ends of the horizontal support member 2 ... Figure 1 (As shown by the y-axis) is the direction perpendicular to the axis of the portal frame; the sprinkler branch pipe 40 is arranged along the second direction and connected to the first roof purlin 30; the sprinkler branch pipe 40 is provided with downspray nozzles 41 at intervals along the second direction.

[0023] To more clearly show the structure of the first roof module 100, Figure 1 The spray branch pipe 40 and the downspray nozzle 41 are not shown in the diagram. Specifically... Figure 3 As shown in the image.

[0024] The first steel beam 10 and the second steel beam 11 can be integrally formed steel beams with equal cross-sections or variable cross-sections, depending on the size of the portal steel frame, or they can be assembled steel beams obtained by connecting multiple steel beams through welding, bolting or other methods.

[0025] In this embodiment of the invention, the connections between various structural components (such as the first steel beam 10, the second steel beam 11, the horizontal support component 20, the first roof purlin 30, etc.) can be made by welding or bolting. The welding and bolting processes should meet the requirements for connection strength, construction, and durability.

[0026] In some embodiments, the horizontal support member 20 includes a horizontal rigid tie rod 21 and a roof horizontal cross brace 22; the horizontal rigid tie rod 21 is arranged along a second direction, and its two ends are respectively connected to a first steel beam 10 and a second steel beam 11; the roof horizontal cross brace 22 includes a pair of intersecting diagonal bars, and the two ends of each diagonal bar are respectively connected to the first steel beam 10 and the second steel beam 11; flexible corner braces 23 are provided at the connection between the first roof purlin 30 and the first steel beam 10, and / or at the connection between the first roof purlin 30 and the second steel beam 11.

[0027] Optionally, the horizontal support member 20 may also include only one or two of the horizontal rigid tie rod 21 and the roof horizontal cross brace 22.

[0028] Among them, the horizontal rigid tie rod 21 is used to transfer horizontal loads (such as wind loads, seismic loads, etc.) in the second direction of the portal steel frame; the roof horizontal cross brace 22 is used to work in conjunction with the horizontal rigid tie rod 21 to form a truss structure in the second direction, making the roof structure more stable.

[0029] The flexible corner brace 23 is positioned at the connection between the first roof purlin 30 and the first steel beam 10, and / or the first roof purlin 30 and the second steel beam 11. Specifically, one end of the flexible corner brace 23 is connected to the first roof purlin 30, and the other end is connected to the web of the first steel beam 10 or the second steel beam 11.

[0030] In some embodiments, the horizontal support member 20 is connected to the web or lower flange of the first steel beam 10 and the second steel beam 11; the first roof purlin 30 is connected to the upper flange of the first steel beam 10 and the second steel beam 11.

[0031] The first roof purlin 30 can be made of Z-shaped steel, I-beam steel or C-shaped steel.

[0032] like Figure 3 As shown, the portal steel frame roof also includes: a fixed support 50; the fixed support 50 is disposed between two adjacent first roof purlins 30 and / or between two adjacent second roof purlins 210; and a sprinkler branch pipe 40 is disposed on the fixed support 50.

[0033] Preferably, the fixed bracket 50 includes a set of vertically arranged first angle steels 51 and a set of horizontally arranged second angle steels 52; wherein, the set of first angle steels 51 is arranged at a symmetrical position on the first roof purlin 30; and the set of second angle steels 52 is arranged at the top and bottom of the first angle steels 51.

[0034] The first angle steel 51 and the first roof purlin 30, and / or the first angle steel 51 and the second roof purlin 210, and the second angle steel 52 and the first angle steel 51 can be connected by bolts.

[0035] Optionally, the first angle steel 51 and the second angle steel 52 can also be made of square steel, C-shaped steel, flat steel, etc.; depending on the specific material selection, the corresponding connection method can be adopted.

[0036] In some embodiments, the first roof module 100 further includes a tension member 60 (such as...). Figure 2 As shown), it is provided along the first direction and connected to the first roof purlin 30.

[0037] Among them, the tension member 60 refers to the tie rod, which can be made of round steel. The tension member 60 connects the adjacent first roof purlins 30 through the holes opened in the web of the first roof purlin 30, providing lateral elastic support for the first roof purlins 30.

[0038] like Figure 3 As shown, the fixed bracket 50 further includes: a fixing member 53; a second angle steel 52 having a pair of mounting holes matching the diameter of the spray branch pipe 40; both ends of the fixing member 53 extend into the pair of mounting holes and are fixed to the second angle steel 52, and there is a gap between the fixing member 53 and the second angle steel 52 matching the diameter of the spray branch pipe 40; the outer wall of the spray branch pipe 40 contacts the fixing member 53 and the second angle steel 52, and the spray branch pipe 40 is confined in the gap between the fixing member 53 and the second angle steel 52.

[0039] The fastener 53 can be a flexible, long strip-shaped component, such as stainless steel cable ties or wire; preferably, the fastener 53 can be a U-shaped clamp pre-machined according to the diameter of the spray branch pipe 40. The two ends of the U-shaped clamp are threaded, and after being inserted into the mounting holes of the second angle steel 52, it can be tightened by matching bolts; thus, the spray branch pipe located in the gap between the fastener 53 and the second angle steel 52 is restricted, and cannot move at least in the first direction.

[0040] The gap between the fastener 53 and the second angle steel 52 can be located above or below the second angle steel 52, meaning the sprinkler branch pipe 40 can be located above or below the second angle steel 52. The lower edge of the sprinkler branch pipe 40 should not be lower than the lower edge of the first roof purlin 30 and / or the second roof purlin 210 to ensure effective utilization of the purlin layer height.

[0041] Preferably, the distance between the outer wall of the sprinkler branch pipe 40 and the upper edge of the first roof purlin 30 and / or the second roof purlin 210 is greater than or equal to 150 mm.

[0042] In some embodiments, the sprinkler branch pipe 40 is provided with downspray nozzles 41 spaced apart along the second direction; preferably, the downspray nozzles 41 can be early-suppression, fast-response, drooping sprinkler nozzles. Figure 3 As shown, the downspray nozzle 41 can spray fire-fighting water in a third direction. Among them, the third direction (such as...) Figure 2 The z-axis (as shown in the middle) is the direction perpendicular to the ground.

[0043] Second roof module 200, such as Figure 4 As shown, it includes: a second roof purlin 210; a tension member 220, which is arranged along a first direction and connected to the second roof purlin 210; wherein the first direction is the direction of the portal frame axis; and a sprinkler branch pipe 40, which is arranged along a second direction and connected to the second roof purlin 210; wherein the second direction is the direction perpendicular to the portal frame axis.

[0044] To more clearly show the structure of the second roof module 200, Figure 4 Sprinkler branch pipe 40 is not shown in the diagram.

[0045] In some embodiments, the second roof module 200 further includes horizontal support members, such as one or more of horizontal rigid tie rods, roof horizontal cross braces, and flexible corner braces. The specific type is determined based on structural calculation results.

[0046] The second roof purlin 210 uses the same material as the first roof purlin 30, and has the same spacing and position in the first direction, so as to connect the first roof module 100 and the second roof module 200 after hoisting.

[0047] The tension member 220 refers to the tie rod, which can be made of round steel. The tension member 220 connects the adjacent second roof purlins 210 through the holes opened in the web of the second roof purlin 210, providing lateral elastic support for the second roof purlins 210.

[0048] Optionally, the sprinkler branch pipe connected to the second roof purlin 210 may also be provided with downspray nozzles 41 at intervals; and the same material as the sprinkler branch pipe 40 connected to the first roof purlin 30, as well as the same spacing and position in the first direction.

[0049] Preferably, the spacing between the downspray nozzles 41 on the spray branch pipe 40 is less than or equal to 3m.

[0050] like Figure 1As shown, the first roof module 100 and the second roof module 200 can be connected at intervals; for example, the first roof module 100 and the second roof module 200 can be connected alternately; or every two first roof modules 100 are connected to one second roof module 200.

[0051] The first roof module 100 and the second roof module 200 can also be connected in a mixed manner according to the actual structural calculation results.

[0052] The first roof module 100 and the second roof module 200 are connected by the first roof purlin 30 and the second roof purlin 210, which can be achieved by welding, bolting, or other methods. The sprinkler branch pipes 40 are connected by matching pipe fittings, meeting the necessary requirements for leak prevention and durability.

[0053] In some embodiments, flexible corner braces 23 are also provided at the connection points between the second roof purlin 210 and the first steel beam 10, and / or between the second roof purlin 210 and the second steel beam 11 of the second roof module 200. The first roof module 100 and the second roof module 200 are connected and then installed on-site.

[0054] Figure 5 This is a method for constructing a portal steel frame roof according to an embodiment of the present invention, such as... Figure 5 As shown, it includes the following steps: Step S501: Assemble the first roof module.

[0055] The first roof module includes a first steel beam 10, a second steel beam 11, a horizontal support member 20, a first roof purlin 30, and a sprinkler branch pipe 40.

[0056] Assembling the first roof module includes the following steps: positioning and placing the first steel beam 10 and the second steel beam 11 according to the axial spacing of the portal steel frame; installing the horizontal support member 20 and the first roof purlin 30 between the first steel beam 10 and the second steel beam 11; and installing the spray branch pipe 40 equipped with the downspray nozzle 41 to the first roof purlin 30.

[0057] The first roof module may be the first roof module 100 described in the above embodiments of the present invention.

[0058] Steps S501-S502 can be completed on the ground at the construction site, or they can be pre-processed in the factory.

[0059] For example, when assembling the first roof module on the ground, the following steps may be included: Assemble the first steel beam 10 and the second steel beam 11 according to the drawings; Position and place the first steel beam 10 and the second steel beam 11 according to the axial spacing of the portal steel frame, and correct them by measuring the straight distance and the focus line distance; Square timber is used to support the bottom of the first steel beam 10 and the second steel beam 11. When supporting, the square timber is placed symmetrically with respect to the first steel beam 10 and the second steel beam 11, and diagonal bracing is set every 5 meters. Tighten the high-strength bolts at the assembly joint of the first steel beam 10 and the second steel beam 11. After the bolts reach the required torque value, apply anti-rust paint and topcoat. Install horizontal support components 20 to make the first roof module 100 form a stable unit; Install the first roof purlin 30 and the sprinkler branch pipe 40 equipped with downspray nozzles 41.

[0060] Step S502: Assemble the second roof module.

[0061] The second roof module includes a second roof purlin 210, a tension member 220, and a sprinkler branch pipe 40.

[0062] Assembling the second roof module includes the following steps: placing the second roof purlin 210; installing the tension member 220 onto the second roof purlin 210; and installing the sprinkler branch pipe 40 equipped with a downspray nozzle onto the second roof purlin 210, corresponding to the position of the sprinkler branch pipe 40 installed onto the first roof purlin 30.

[0063] The second roof module may be the second roof module 200 described in any of the above embodiments of the present invention.

[0064] Step S503: Hoist the assembled first roof module and second roof module to the corresponding positions at the top of the pre-constructed steel columns used to support the portal steel frame roof, and install them to the top of the steel columns in sequence.

[0065] In some embodiments, hoisting the assembled first roof module and second roof module to the corresponding positions at the top of the pre-constructed steel columns used to support the portal frame roof includes: hoisting the first roof module to the top of the steel column with inter-column support; and hoisting the second roof module to the top of two adjacent steel columns on which the first roof modules have been installed; wherein, a column refers to the area between adjacent axes of the portal frame.

[0066] Specifically, such as Figure 6 As shown, the numbers above the portal steel frame roof indicate the position of the frame, while the numbers below the portal steel frame roof indicate the hoisting sequence.

[0067] First, hoist the first roof module 100 to the first frame between the first axis and the second axis, and the third frame between the third axis and the fourth axis, and then install it. The second roof module 200 is hoisted to the second frame between the second and third axes and installed. The first roof module 100 was hoisted to the fifth frame between the fifth and sixth axes and then installed. The second roof module 200 is hoisted to the fourth frame between the fourth and fifth axes and installed, and so on.

[0068] The reason for hoisting and installing the first roof module in the above steps is to enable the installed steel frame to form an independent, spatially rigid, and stable unit.

[0069] In some embodiments, hoisting the assembled first roof module and second roof module to the corresponding positions at the top of the pre-constructed steel columns used to support the portal steel frame roof includes: hoisting all the first roof modules to the top of the steel columns with inter-column supports; and hoisting the second roof module to the top of the steel columns where the first roof modules are not installed; wherein, the "frame" refers to the area between adjacent axes of the portal steel frame.

[0070] Specifically, all positions requiring the installation of the first roof module can be determined based on structural calculations, and the first roof modules can be hoisted to their corresponding positions. After all the first roof modules have been hoisted and installed, the second roof modules are hoisted to the positions where no first roof modules are installed, i.e., the positions where no first roof modules are installed.

[0071] In some embodiments, the inter-column bracing of the steel columns can be installed and secured after the first roof module is hoisted to the top of the steel column where inter-column bracing is required and installed. After the first roof module and steel column of the first truss are completed, the verticality of the steel column needs to be corrected.

[0072] In some embodiments, hoisting the first roof module to the top of a steel column with inter-column support includes: hoisting the first roof module to the top of the steel column with inter-column support by point hoisting; hoisting the second roof module to the top of two adjacent steel columns on which the first roof modules have been installed includes: hoisting the second roof module to the top of two adjacent steel columns on which the first roof modules have been installed by a balancing frame 400; wherein, the balancing frame 400 is a rectangular frame; the second roof module is connected to the balancing frame 400 by ropes of equal length, one end of the rope is connected to a set of symmetrical sides of the balancing frame 400, and the other end of the rope is symmetrically connected to the second roof module relative to the balancing frame 400.

[0073] Among them, the first roof module 100 is installed by point hoisting using two cranes 300 positioned on the same side (e.g., Figure 7 As shown); the second roof module 200 is balanced and hoisted using a balancing frame 400 (as shown). Figure 8 As shown). Figure 8 As shown, during the balanced hoisting of the second roof module 200, the stability of the second roof module 200 can be maintained by adding temporary supports 402 to prevent displacement during hoisting, and the relative movement position of the second roof module 200 can be controlled by adjusting the balance frame 400 through the balance rope 401.

[0074] To more clearly illustrate the hoisting method, Figure 7 , 8 Some structural components are not shown in the diagram.

[0075] After hoisting the assembled first and second roof modules to their corresponding positions at the top of the pre-constructed steel columns supporting the portal frame roof, and sequentially installing them onto the top of the steel columns, the process further includes: Connect the first roof purlin 30 of the first roof module to the second roof purlin 210 of the second roof module; connect the sprinkler branch pipe 40 connected to the first roof purlin 30 to the sprinkler branch pipe 40 connected to the second roof purlin 210.

[0076] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can occur depending on design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.

Claims

1. A portal steel frame roof, characterized in that, include: First roof module (100), second roof module (200) and sprinkler branch pipe (40); The first roof module (100) includes: a first steel beam (10) and a second steel beam (11), which are arranged parallel to each other along a first direction according to the axial spacing of the portal frame; wherein, the first direction is the direction of the axis of the portal frame; a horizontal support member (20), the two ends of which are respectively connected to the first steel beam (10) and the second steel beam (11); and a first roof purlin (30), which is arranged between the first steel beam (10) and the second steel beam (11) along a second direction, the two ends of which are respectively connected to the first steel beam (10) and the second steel beam (11); wherein, the second direction is the direction perpendicular to the axis of the portal frame. The second roof module (200) includes: a second roof purlin (210) disposed along the second direction; and a tension member (220) disposed along the first direction and connected to the second roof purlin (210). Sprinkler branch pipe (40) is arranged along the second direction and connected to the first roof purlin (30) and / or the second roof purlin (210).

2. The roof according to claim 1, characterized in that, The spray branch pipe (40) further includes: a downspray nozzle (41), which is disposed at intervals along the second direction on the spray branch pipe (40).

3. The roof according to claim 1, characterized in that, The horizontal support member (20) includes a horizontal rigid tie rod (21) and a roof horizontal cross brace (22); The horizontal rigid tie rod (21) is arranged along the second direction, and the two ends of the horizontal rigid tie rod (21) are respectively connected to the first steel beam (10) and the second steel beam (11). The roof horizontal cross bracing (22) includes a pair of intersecting diagonal braces, with the two ends of each diagonal brace connected to the first steel beam (10) and the second steel beam (11), respectively. Flexible corner braces (23) are provided at the connection between the first roof purlin (30) and the first steel beam (10), and / or at the connection between the first roof purlin (30) and the second steel beam (11).

4. The roof according to claim 1, characterized in that, Also includes: Fixed bracket (50); the fixed bracket (50) is disposed between two adjacent first roof purlins (30) and / or between two adjacent second roof purlins (210); The spray branch pipe (40) is mounted on the fixed bracket (50).

5. The roof according to claim 4, characterized in that, The fixed bracket (50) includes a set of vertically arranged first angle steels (51) and a set of horizontally arranged second angle steels (52). Among them, a set of first angle steels (51) are arranged symmetrically on the first roof purlin (30); a set of second angle steels (52) are arranged at the top and bottom of the first angle steels (51).

6. The roof according to claim 5, characterized in that, The fixed bracket (50) further includes: a fastener (53); The second angle steel (52) has a pair of mounting holes that match the diameter of the spray branch pipe (40); The two ends of the fixing member (53) extend into a pair of mounting holes and are fixed to the second angle steel (52). There is a gap between the fixing member (53) and the second angle steel (52) that matches the pipe diameter of the spray branch pipe (40). The outer wall of the spray branch pipe (40) is in contact with the fixing member (53) and the second angle steel (52), and the spray branch pipe (40) is confined in the gap between the fixing member (53) and the second angle steel (52).

7. A method for constructing a portal steel frame roof, characterized in that, include: Assemble the first roof module, which includes a first steel beam (10), a second steel beam (11), a horizontal support member (20), a first roof purlin (30), and a sprinkler branch pipe (40). The assembly of the first roof module includes the following steps: Position and place the first steel beam (10) and the second steel beam (11) according to the axial spacing of the portal steel frame; install the horizontal support member (20) and the first roof purlin (30) between the first steel beam (10) and the second steel beam (11); install the spray branch pipe (40) with the downspray nozzle (41) to the first roof purlin (30). Assemble the second roof module, which includes a second roof purlin (210), a tension member (220), and a sprinkler branch pipe (40). The assembly of the second roof module includes the following steps: Place the second roof purlin (210); install the tension member (220) onto the second roof purlin (210); install the spray branch pipe (40) equipped with the downspray nozzle (41) onto the second roof purlin (210), and the position corresponds to that of the spray branch pipe (40) installed onto the first roof purlin (30); The first and second roof modules obtained from the assembly are hoisted to the corresponding positions at the top of the pre-constructed steel columns used to support the portal steel frame roof, and then installed sequentially at the top of the steel columns.

8. The method according to claim 7, characterized in that, The first and second roof modules, obtained from the assembly, are hoisted to their corresponding positions at the top of the pre-constructed steel columns supporting the portal frame roof, including: The first roof module is hoisted to the top of a steel column with inter-column support; The second roof module is hoisted to the top of two adjacent steel columns on which the first roof module has been installed; wherein, the column refers to the area between adjacent axes of the portal frame.

9. The method according to claim 8, characterized in that, The first roof module is hoisted to the top of a steel column with inter-column support, including: The first roof module was hoisted to the top of the steel column with inter-column support using a point hoisting method; The second roof module is hoisted to the top of two adjacent steel columns on which the first roof module has already been installed, including: The second roof module is hoisted to the top of the two adjacent steel columns on which the first roof module has been installed, via the balance frame (400); The balancing frame (400) is a rectangular frame; the second roof module is connected to the balancing frame (400) by ropes of equal length, one end of the rope is connected to a set of symmetrical sides of the balancing frame (400), and the other end of the rope is symmetrically connected to the second roof module relative to the balancing frame (400).