Modularized wire box built-in brick wall structure without slotting construction method

By using precast concrete blocks and embedded conduits with modular junction boxes built into the brick wall structure, combined with BIM technology and multiple verifications, problems such as reduced sound insulation, loose junction box fixing, wall cracking, and conflicts between cross-operations in the construction of electrical junction boxes in traditional hollow brick walls have been solved, achieving efficient and environmentally friendly masonry construction.

CN123133576APending Publication Date: 2026-11-20QIDONG CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611569196.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-12
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Traditional hollow brick wall electrical junction box construction suffers from problems such as reduced sound insulation, loose junction box fixing, easy wall cracking, construction quality dependence on worker operation and large conflicts between overlapping operations, and a large amount of construction waste.

Method used

The construction method of building modular junction boxes into brick wall structures is adopted. Electrical junction boxes and pre-embedded conduits are built into precast concrete blocks. The construction process is formulated in combination with BIM technology to avoid on-site grooving. Precast modules are directly built into the brick wall. Quality is ensured by multiple checks and a three-inspection system.

Benefits of technology

It improved the sound insulation performance of the brick wall, enhanced the fixing strength of the junction box, reduced construction waste and dust, reduced the dependence of construction on workers' operations, reduced conflicts between cross-operations, and improved construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133576A_ABST
    Figure CN123133576A_ABST
Patent Text Reader

Abstract

The application discloses a kind of built-in modularization wire box free trenching construction methods in brick wall structure, prefabricated module includes concrete block body, electrical wire box, pre-buried wire pipe;Electrical wire box is pre-buried and encapsulated in the inside of concrete block body, prefabricated module modulus adapts hollow brick, and builds wall body replaces partial hollow brick and is directly built into wall body;When construction, prefabricated module is advanced, and it is connected with floor lead wire pipe on site, and hollow brick wall is directly embedded and positioned when building, and no longer trenching and opening hole on site.The application solves the problem of sound insulation decline caused by traditional hollow brick wall trenching pre-buried wire box, wire box is easy to loosen, wall surface is easy to crack, and there is much construction waste, wire box is fixed firmly, improves the sound insulation performance of wall, reduces cross operation contradiction, realizes green construction, and is suitable for sintered hollow brick non-bearing partition wall socket wire box pre-buried construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building secondary structure masonry and building electrical installation technology, and in particular to a method for constructing modular junction boxes built into brick wall structures without slotting. Background Technology

[0002] Sintered hollow bricks are widely used in non-load-bearing partition walls of residential and commercial buildings. Hollow bricks are lightweight and have certain thermal insulation properties. The traditional construction method for electrical switches, sockets and junction boxes in hollow brick walls is to cut grooves and holes in the hollow brick wall on site after the wall is built, then bury the electrical junction boxes and conduits, and finally repair the grooves with mortar.

[0003] Existing construction techniques have several drawbacks: First, after opening holes and grooves in hollow brick walls, sound can travel through the air cavities and gaps in the hollow bricks, creating sound leakage points and significantly reducing the sound insulation performance of the partition wall. Second, the on-site installation of junction boxes relies entirely on the later mortar for fixation, resulting in insufficient connection strength. During subsequent wiring, the junction boxes are prone to loosening, displacement, or even falling off. Third, construction quality is highly dependent on the skill level of the workers, making it easy for junction boxes to shift. Fourth, the overlapping work of masonry and electrical work creates significant conflicts, and the grooving operation generates a large amount of construction waste and dust. Later repairs are prone to wall cracking, leading to low construction efficiency and failing to meet the requirements of green construction.

[0004] Therefore, there is an urgent need to develop a prefabricated modular component and supporting construction technology to achieve pre-embedding of electrical junction boxes in hollow brick walls without slotting, thus solving the aforementioned defects of existing technologies. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for constructing modular junction boxes in brick wall structures without slotting. This method solves the technical problems of traditional hollow brick wall electrical junction boxes requiring on-site slotting and drilling, resulting in reduced sound insulation, unstable junction box fixing, easy wall cracking, and excessive construction waste. It improves construction quality, reduces conflicts between cross-operations, and achieves green and low-carbon construction.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A method for constructing a brick wall structure with a built-in modular junction box without slotting is disclosed. The method utilizes prefabricated modules for the built-in modular junction box, comprising a concrete block body, an electrical junction box, and embedded conduits. The electrical junction box is entirely embedded within the concrete block body, with its connection port facing outwards. Embedded conduits connect to both sides of the junction box, with the conduit ends extending beyond the sides of the concrete block body. The concrete block body's dimensions are adapted to the sintered hollow brick masonry module, and the concrete block body directly replaces some hollow bricks within the brick wall. The construction method includes the following steps: S1. Pre-construction preparation: Familiarize yourself with the electrical and masonry construction drawings, use BIM to create a simplified processing diagram of the prefabricated module, cut and install templates, and assemble wooden template molds. During assembly, the side panels should be perpendicular to the bottom plate, and the joints should be tight to prevent grout leakage during later pouring.

[0007] S2. Module Prefabrication: Fix electrical junction boxes inside the assembled wooden formwork mold, and connect the pre-embedded conduits to the electrical junction boxes; pour concrete into the mold, and remove the mold after the concrete has initially set to obtain the prefabricated modules; cure the prefabricated modules and temporarily seal the pipe openings for protection; do not violently knock during demolding to prevent damage to the concrete edges.

[0008] S3. On-site pipeline extension: Extend the electrical conduits within the main building to the switch and socket elevations specified in the drawings.

[0009] S4. Prefabricated module connection: Connect the pre-embedded conduit of the prefabricated module to the electrical conduit leading out from the floor. Insert the conduit into the junction box hole to a depth of 5-10mm and use PVC glue for bonding. Seal and fix the interface with tape. Mark the conduit number and route inside the junction box. Check for gaps in the conduit interface and temporarily seal the interface to prevent mortar and debris from entering the conduit.

[0010] S5. Positioning Verification: Use a laser level and a leveling rod to verify the elevation, planar position, and verticality of the precast modules; conduct multiple verifications during the masonry process, and re-measure the elevation and planar position of the precast modules after a certain height is built, and adjust and correct any deviations in a timely manner.

[0011] S6. Wall construction: Construct sintered hollow brick walls. When the bricks reach the corresponding positions, embed the prefabricated modules into the brick wall to replace the hollow bricks at that location, and continue to complete the remaining brick wall construction work. Before construction, complete the technical briefing for the work team, and protect the prefabricated modules from impact during the construction process.

[0012] S7. Finished Product Protection: Avoid brick impacts on prefabricated modules throughout the entire construction process, protect open areas of junction boxes, prevent accidental cutting or drilling of junction boxes during the decoration phase, and re-inspect the integrity of junction boxes after completion.

[0013] Furthermore, this construction process complies with current national standards such as the "Code for Acceptance of Quality of Concrete Structures" GB50204-2015, the "Code for Acceptance of Construction Quality of Building Electrical Engineering" GB50303-2015, and the "Unified Standard for Acceptance of Construction Quality of Building Engineering" GB50300-2013. It implements a three-inspection system of self-inspection, mutual inspection, and special inspection, conducts on-site verification of key processes, strengthens on-site inspections, and promptly rectifys any deviations found.

[0014] Furthermore, the pre-embedded conduit is a DN20 PVC plastic pipe, and a PVC lock is installed at the connection between the electrical junction box and the pre-embedded conduit. The conduit opening of the finished module is temporarily sealed and protected with tape.

[0015] Furthermore, the concrete block body is cast and formed by wooden formwork mold; the wooden formwork mold includes a base plate, two side plates and two perforated side plates with pipeline clearance holes, and the joints between the plates are sealed to prevent grout leakage; the wooden formwork can be obtained by cutting waste building formwork at the construction site.

[0016] Beneficial effects: 1. This invention provides precast concrete modules that pre-encapsulate electrical junction boxes within the concrete block body. This allows for direct replacement of hollow bricks in the construction of hollow brick walls, completely eliminating on-site grooving and opening processes, thus eliminating sound leakage defects caused by grooving and improving the sound insulation performance of hollow brick partition walls. 2. The electrical junction boxes are entirely encased in concrete, significantly increasing their fixing strength compared to traditional mortar filling. Wiring operations will not result in loosening, displacement, or detachment of the junction boxes, ensuring stable installation quality and reducing reliance on worker skills. 3. The precast module molds can be made from discarded old templates on-site, allowing for waste recycling and saving material costs. The absence of on-site grooving reduces dust and construction waste, aligning with green construction and low-carbon building concepts. 4. By transferring most of the electrical junction box pre-embedding work to the precast stage, conflicts between masonry and electrical work are reduced, accelerating the overall construction progress of secondary structures and avoiding the quality risks of wall cracking caused by later grooving repairs. 5. The supporting construction methods and procedures are clear, with multiple elevation position checks and three-inspection quality control. It is compatible with the current national engineering acceptance standards, making it easy to implement and promote on the construction site. It is suitable for large-scale use of hollow brick non-load-bearing partition walls in residential and commercial buildings. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of the precast concrete module of the present invention; Figure 2 This is a BIM schematic diagram of the wooden template mold used for processing prefabricated modules according to the present invention; Figure 3 This is a schematic diagram of the wall section after the prefabricated modules of the present invention have been constructed.

[0018] Markings in the diagram: 1-Concrete block body, 2-Electrical junction box, 3-Embedded conduit, 4-Brick wall. Detailed Implementation

[0019] The present invention will be further described in detail below with reference to the embodiments.

[0020] Example 1: A prefabricated module for embedded modular junction boxes in brick wall structures without slotting and its construction method are disclosed, which is used for pre-embedding switch and socket junction boxes in non-load-bearing partition walls of sintered hollow bricks in residential projects.

[0021] Precast modular structure: The concrete block body's dimensions match the hollow brick module; the electrical junction box is completely embedded within the concrete block body, with the junction box panel opening facing outwards; the DN20-PVC pre-embedded conduit and electrical junction box are connected via PVC clips, with the conduit end extending beyond the side of the concrete block body; after prefabrication, the conduit opening is temporarily sealed with yellow tape to prevent debris from entering the conduit. The mold uses scrap wooden templates cut on-site. The mold is assembled from a base plate, two side plates, and two perforated side plates, with sealed joints to prevent concrete leakage during pouring.

[0022] Construction steps: S1. Preliminary preparation: study the masonry drawings and electrical construction drawings, draw a simplified diagram of prefabricated module processing using BIM, cut the waste templates on the construction site, assemble the wooden molds, use a right angle ruler to check the verticality of the side panels and the bottom plate, fix with iron nails, and seal the joints.

[0023] S2. Prefabricated module processing: Fix electrical junction boxes inside the mold and connect DN20 PVC pre-embedded conduits; pour concrete; after the concrete has initially set, gently tap the edges of the mold to remove it, avoiding violent impacts that could damage the concrete edges; water curing of components and sealing of pipe openings with tape.

[0024] S3. On-site, the main electrical wiring of the floor slab is led to the designed socket and switch elevations.

[0025] S4. Prefabricated modules are positioned and connected. Floor-leading conduits are inserted 5-10mm into the conduit interfaces of the prefabricated modules, bonded with PVC glue, and sealed with external tape. The conduit numbers and routes are marked inside the junction boxes.

[0026] S5. Use a laser level and a leveling rod to verify the elevation, planar position, and verticality of the precast modules; conduct segmented re-measurements during the masonry process and correct any deviations promptly.

[0027] S6. Construct a hollow brick wall, reaching the design elevation of the junction box. Replace the hollow brick at that point with a prefabricated module and continue constructing the brick wall upwards. Before construction, provide technical instructions to the bricklaying team. Handle the bricks gently during construction and strictly prohibit impacts to the prefabricated modules.

[0028] S7. Protect finished products; protect the openings of junction boxes; during subsequent plastering and decoration work, do not blindly drill or cut around the junction boxes; after completion, check that the junction boxes are intact and the pipelines are unobstructed.

[0029] Quality control: A three-inspection system is implemented, and each process, including formwork assembly, precast pouring, pipeline connection, and masonry placement, is inspected. Key processes are supervised on-site to verify elevation and position. All processes meet current national standards.

[0030] This embodiment eliminates the need for slotting or drilling holes in the hollow brick wall; the precast concrete modules have strong integrity, and the junction boxes are completely encased and fixed by the concrete, preventing loosening or displacement; the absence of slots or holes in the wall eliminates sound leakage channels, ensuring the sound insulation performance of the partition wall; it reduces construction waste generated from on-site slotting; and it is less prone to cracking at repair locations after plastering.

Claims

1. A method for constructing modular junction boxes within brick wall structures without the need for slotting, characterized in that, The prefabricated module with built-in modular junction box in a brick wall structure, which does not require slotting, includes a concrete block body, an electrical junction box, and embedded conduits. The electrical junction box is pre-embedded and encapsulated inside the concrete block body, with the wiring port of the electrical junction box facing the outside of the wall. Embedded conduits are connected to both sides of the electrical junction box, and the ends of the embedded conduits extend out of the side of the concrete block body. The external dimensions of the concrete block body are adapted to the sintered hollow brick masonry module, and the concrete block body replaces part of the hollow bricks and is directly laid inside the brick wall. The construction method includes the following steps: S1. Pre-construction preparation: Familiarize yourself with the electrical and masonry construction drawings, use BIM to draw a simplified processing diagram of the prefabricated module, cut the template, and assemble the wooden template mold. S2. Module prefabrication: Fix electrical junction boxes inside the assembled wooden formwork mold, and connect the pre-embedded conduits to the electrical junction boxes; pour concrete into the mold, and remove the mold after the concrete has initially set to obtain the prefabricated modules; cure the prefabricated modules and temporarily seal the pipe openings for protection. S3. On-site pipeline routing: Extend the electrical conduits within the main building to the switch and socket elevation positions designed in the drawings; S4. Prefabricated module connection: Connect the pre-embedded conduit of the prefabricated module to the electrical conduit leading out from the floor. Insert the conduit into the junction box hole to a depth of 5-10mm, use PVC glue for bonding, and seal and fix the interface with tape; mark the conduit number and route inside the junction box. S5. Positioning Verification: Use a laser level and a leveling rod to verify the elevation, planar position, and verticality of the prefabricated modules. S6. Wall construction: Construct sintered hollow brick walls. When the bricks are laid to the corresponding position, the prefabricated modules are embedded into the brick wall to replace the hollow bricks at that position. Continue to complete the remaining brick wall construction work. S7. Finished Product Protection: Avoid brick impacts on prefabricated modules throughout the entire construction process, protect open areas of junction boxes, prevent accidental cutting or drilling of junction boxes during the decoration phase, and re-inspect the integrity of junction boxes after completion.

2. The method for constructing modular junction boxes within brick wall structures without slotting, as described in claim 1, is characterized in that... In step S2, the demolding operation is carried out after the concrete has initially set. The wooden formwork is loosened by tapping the edges to release the formwork. Violent tapping is prohibited to prevent damage to the edges and corners of the concrete blocks.

3. The method for constructing modular junction boxes within brick wall structures without slotting, as described in claim 1, is characterized in that... After the conduit is connected in step S4, check that there are no gaps at the conduit interface and temporarily seal the interface to prevent mortar and debris from entering the conduit.

4. The method for constructing modular junction boxes within brick wall structures without slotting, as described in claim 1, is characterized in that... In step S5, multiple checks are performed during the masonry process. After a certain height is reached, the elevation and plane position of the prefabricated module are re-measured, and any deviations are adjusted and corrected in a timely manner.

5. The method for constructing modular junction boxes within brick wall structures without slotting, as described in claim 1, is characterized in that... The wooden formwork molds used in step S1 are made from discarded building formwork cut and processed on the construction site. The joints of the formwork are tight to prevent grout leakage during concrete pouring.

6. The method for constructing modular junction boxes within brick wall structures without slotting, as described in claim 1, is characterized in that... The concrete block body is cast and formed by wooden formwork mold; the wooden formwork mold includes a base plate, two side plates and two open side plates with pipeline clearance holes, and the joints between the plates are sealed to prevent grout leakage.