An assembled wallboard verticality closed-loop adjusting device and method
By using a combination of support feet and diagonal braces, along with a closed-loop adjustment method based on angle sensors, the problem of verticality accuracy and efficiency in the installation of prefabricated wall panels was solved, achieving highly efficient verticality adjustment.
Patent Information
- Application Number
- CN202611614464.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-20
AI Technical Summary
During the installation of prefabricated wall panels, it is difficult to improve installation efficiency while ensuring verticality accuracy. Traditional methods rely on manual measurement and repeated adjustments, and the measurement benchmark is easily affected by changes in site conditions.
A combination of support feet, diagonal braces, and angle sensors is used. The support feet are fixed to the floor slab, the diagonal braces are connected to the wall panel, and the angle sensors monitor the tilt angle in real time. Combined with a closed-loop adjustment method, the wall panel can be precisely adjusted for verticality.
This reduces the need for repeated measurements and adjustments, improves installation efficiency, ensures verticality accuracy, and reduces errors caused by manual intervention.
Smart Images

Figure CN123133589A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction, and in particular to a closed-loop adjustment device and method for the verticality of prefabricated wall panels. Background Technology
[0002] Prefabricated wall panels are manufactured in the factory or prefabrication yard and then transported to the construction site for hoisting and assembly. When positioning the wall panels, it is necessary to ensure that their bottom position conforms to the installation layout and to adjust their tilt to achieve the required vertical installation posture. The bottom plane position and the tilt of the wall panel along its height are different installation control points.
[0003] During wall panel installation, positioning lines are typically first marked on the floor slab, and then the corresponding edges of the wall panels are aligned with these lines. While the positioning lines provide a reference for the bottom plane position of the wall panels, simply aligning the bottom with the positioning lines is insufficient to directly determine whether the upper part of the wall panel is tilted inwards or outwards. The operator still needs to check the actual posture of the wall panels and repeatedly verify it after adjustments.
[0004] The technical problems existing in the prior art are: During the installation of prefabricated wall panels, verticality adjustment requires repeated cycles of "measurement-adjustment-remeasurement." Traditional methods rely on manual measurement using straightedges or theodolites, requiring remeasurement after each adjustment. Furthermore, the measurement benchmark is prone to deviation due to changes in site conditions. When multiple wall panels need to be installed simultaneously, it is difficult to improve installation efficiency while ensuring verticality accuracy, and this method needs improvement. Summary of the Invention
[0005] To address the shortcomings of existing technologies, the purpose of this invention is to provide a closed-loop adjustment device and method for the verticality of prefabricated wall panels. The technical problem to be solved is that it is difficult to improve installation efficiency while ensuring verticality accuracy during the traditional prefabricated wall panel installation process.
[0006] The above-mentioned technical objective of the present invention is achieved through the following technical solution: a closed-loop adjustment device for the verticality of an assembled wall panel, comprising: The support leg includes a pair of support plates and a web plate. The pair of support plates are arranged side by side in an L-shape. The web plate is arranged laterally and spaced between the pair of support plates. The bottom horizontally arranged web plate is fixed to the floor slab by expansion bolts. Diagonal bracing is installed at an angle on the floor slab, with its upper end connected to the wall panel; An angle sensor is installed on the inside of the wall panel and is used to monitor the tilt angle of the wall panel.
[0007] In a preferred embodiment, the present invention may be further configured such that: the bottommost web plate is provided with a strip-shaped hole along its length for an expansion screw to pass through.
[0008] In a preferred embodiment, the present invention can be further configured such that the diagonal brace is telescopically oriented and its two ends are rotatably connected to the floor slab and the wall panel, respectively.
[0009] In a preferred embodiment, the present invention can be further configured such that the diagonal brace includes a pair of screws and a helical tube, the pair of screws being rotatably connected to the floor slab and the wall panel respectively, and the helical directions at both ends of the helical tube being opposite and threadedly connected to the screws.
[0010] In a preferred embodiment, the present invention may be further configured such that a handle is provided at the middle position of the solenoid.
[0011] In a preferred embodiment, the present invention can be further configured such that: the diagonal brace includes a support pipe, a support rod, and a hydraulic push rod; the support pipe is rotatably connected to the floor slab; the support rod is slidably connected to the support pipe and its upper end is rotatably connected to the wall panel; and the hydraulic push rod is disposed inside the support pipe and is used to push the support rod to slide.
[0012] In a preferred embodiment, the present invention can be further configured such that: a row of pin holes is provided on the support rod, a pin shaft is transversely disposed in the pin holes, and a threaded sleeve that is threaded to the support tube to tighten the pin shaft is threadedly connected to the support tube.
[0013] In a preferred embodiment, the present invention may be further configured such that the lower end sidewall of the support tube is provided with a mounting hole for the hydraulic push rod to be inserted.
[0014] In a preferred embodiment, the present invention may be further configured such that: a sealing plate is laterally provided on the side of the support foot near the wall panel to block the lower end of the wall panel, and the support foot is provided with a notch for the sealing plate to be inserted.
[0015] In view of the shortcomings of the existing technology, another objective of the present invention is to provide a construction method for a prefabricated wall panel verticality closed-loop adjustment device. The technical problem to be solved is that it is difficult to improve the installation efficiency while ensuring verticality accuracy during the traditional prefabricated wall panel installation process.
[0016] The above-mentioned technical objective of the present invention is achieved through the following technical solution: a construction method for a prefabricated wall panel verticality closed-loop adjustment device, comprising the following steps: S1. Construction base surface cleaning and positioning layout: Clean the debris, dust and protruding particles from the floor slab base surface at the construction site to ensure that the installation base surface is flat and solid; according to the construction drawings, accurately mark the installation positioning lines of the prefabricated wall panels, the installation reference lines of the support feet and the installation points of the diagonal braces on the floor slab, and make marks to provide accurate positioning basis for the installation of the device and the placement of the wall panels. S2. Installation and fixing of support feet: Place the support feet according to the layout position, adjust the position of a pair of L-shaped support plates so that the support feet are in contact with the wall panel installation reference, insert the expansion screws through the strip hole at the bottom of the web plate, fine-tune the left and right and front and back positions of the support feet, calibrate the installation accuracy, tighten the expansion screws, and fix the support feet to the floor slab; use the notch at the top of the support feet to insert the sealing plate into the notch to complete the pre-installation of the bottom sealing structure of the wall panel, and reserve the wall panel installation position; S3. Wall panel hoisting and positioning: Use hoisting equipment to smoothly hoist the prefabricated wall panel to the construction position, so that the bottom of the wall panel aligns with the inside of the support foot. Rely on the L-shaped support plate of the support foot to limit and support the bottom of the wall panel, initially straighten the wall panel posture, and prevent the wall panel from shifting or tilting, thus completing the initial positioning and fixing of the wall panel. S4. Monitoring equipment installation: Fix the angle sensor in the center of the inner wall of the wall panel, ensuring that the sensor is installed flat and firmly fixed without any looseness or offset. Debug the angle sensor to ensure that it can collect the tilt angle data of the wall panel in real time and accurately, so as to provide data support for the closed-loop adjustment of verticality. S5. Assembly and installation of diagonal bracing components: Complete the assembly and fixation according to the selected diagonal bracing structure; if screw rod and tube type diagonal bracing is used, rotate the ends of the two screw rods to connect to the preset points on the floor slab and the side wall of the wall panel respectively, so that the tubes with opposite spiral directions at both ends connect to the two screw rods; if hydraulic type diagonal bracing is used, rotate the support tube to install it on the floor slab, slide the support tube with the built-in hydraulic push rod to the support rod, and rotate the upper end of the support rod to connect to the side wall of the wall panel to complete the overall assembly of the diagonal bracing; S6. Preliminary adjustment of wall panel verticality: Manual fine-tuning of the diagonal bracing posture. For screw-type diagonal bracing, rotating the central handle drives the screw tube to rotate, which in turn drives the screws at both ends to extend and retract, thereby adjusting the overall length of the diagonal bracing. For hydraulic diagonal bracing, the hydraulic push rod is activated to push the support rod to slide along the support tube, thus initially adjusting the tilt angle of the wall panel and making the verticality of the wall panel close to the construction standard requirements. S7. Closed-loop precision calibration and adjustment: Based on the wall panel tilt angle data transmitted in real time by the angle sensor, a closed-loop adjustment mode for data monitoring and attitude adjustment is formed. According to the deviation value fed back by the sensor, the extension and retraction length of the diagonal brace is precisely adjusted to gradually correct the tilt deviation of the wall panel until the angle sensor monitoring data shows that the verticality of the wall panel meets the design and construction standards. S8. Diagonal brace locking and fixing: After the verticality of the wall panel is calibrated to meet the standard, the diagonal brace is locked and reinforced; the screw-type diagonal brace locks the limiting structure at both ends of the screw tube to prevent the screw from loosening and retracting; the hydraulic diagonal brace adjusts the position of the support rod pin hole, inserts the pin shaft into the corresponding pin hole, tightens the threaded sleeve on the support tube to tighten the pin shaft, and at the same time locks the state of the hydraulic push rod to achieve double locking of the diagonal brace and ensure the stability of the wall panel posture; S9. Sealing and Forming Protection: Push the sealing plate at the support foot to move laterally so that the sealing plate completely seals the gap between the bottom of the wall panel and the floor slab, seals the installation gap at the bottom of the wall panel, avoids grout leakage during subsequent grouting and plastering construction, and at the same time provides limiting protection for the bottom of the wall panel to improve the stability of the wall panel installation. S10. Re-inspection and finished product protection: After standing for 30 minutes, re-inspect the verticality of the wall panel using an angle sensor. After verifying that the installation parameters are correct, clean up the construction site and protect the adjustment device and prefabricated wall panel to prevent subsequent construction collisions and disturbances from causing the verticality of the wall panel to shift, thus completing the overall construction process.
[0017] In summary, the present invention has the following beneficial effects: 1. The spaced web plates connect two L-shaped support plates to maintain the combined shape of the support feet. The bottom web plate and expansion bolts provide the support feet with a base for fixing to the floor slab. Angle sensors obtain the corresponding tilt angle as the wall panel changes posture, providing a basis for adjustment and verification. The diagonal brace forms a support connection with the wall panel, which helps to maintain the corresponding posture during the positioning process. The angle judgment and the support function work together to help reduce the operation of repeatedly judging the verticality of the wall panel by simply aligning the bottom. 2. The diagonal brace can change the distance between the two connection points. The swivel connection allows the diagonal brace to change its tilt direction as the wall panel's posture changes. Under the condition that the installation position at the bottom of the wall panel and the corresponding constraints are maintained, adjusting the length of the diagonal brace can change its support geometry to the wall panel, which is convenient for correcting the wall panel's tilt state by combining angle readings and reducing the resistance of the rigid fixed end to posture changes. 3. When the relative rotation of the two end screws is constrained, rotating the middle solenoid can simultaneously increase or decrease the screw-in amount of the two end screws, thereby changing the total length of the diagonal brace and achieving manual adjustment; 4. The hydraulic push rod provides a pushing force to the support rod, which slides along the support tube, thereby changing the length of the diagonal brace, reducing the need for continuous manual tightening and length adjustment, and achieving automatic adjustment; 5. The sealing plate forms a corresponding protective part at the lower end of the wall panel. The notch provides an embedding position for the sealing plate, allowing it to be positioned with the help of the support feet. The horizontal arrangement facilitates the coverage of the corresponding lower area, reducing the possibility of the sealing plate shifting when it is only temporarily placed, and making it easy to maintain the sealing position during the wall panel installation and lower end treatment. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the structure of Example 1; Figure 2 This is a schematic diagram of the support leg in Embodiment 1; Figure 3 This is a schematic diagram of the diagonal brace in Example 1; Figure 4This is a schematic diagram of the diagonal brace in Example 2.
[0019] Reference numerals: 1. Support foot; 11. Support plate; 12. Web plate; 13. Strip hole; 14. Notch; 2. Diagonal brace; 21. Screw rod; 22. Screw tube; 23. Handle; 24. Support tube; 25. Support rod; 26. Hydraulic push rod; 27. Pin hole; 28. Pin shaft; 29. Threaded sleeve; 3. Angle sensor; 4. Mounting hole; 5. Sealing plate. Detailed Implementation
[0020] The present invention will be further described in detail below with reference to the accompanying drawings. Example
[0021] like Figure 1 As shown, a closed-loop verticality adjustment device for prefabricated wall panels includes support feet 1, diagonal braces 2, and angle sensors 3. The floor slab serves as the horizontal installation foundation for the wall panels during construction, and the wall panels are prefabricated wall panels requiring posture adjustment. The inner side of the wall panel is the side used for angle monitoring and corresponding support operations at the installation site, which is the inner side of the building structure.
[0022] like Figure 1 , Figure 2 As shown, the support leg 1 includes a pair of support plates 11 and a web plate 12. Both support plates 11 are L-shaped and arranged side by side, with a gap between them for the web plate 12 to be arranged laterally. The L-shape gives each support plate 11 two mutually turning sections, forming the corresponding outline of the support leg 1. The two support plates 11 together constitute the two sides of the support leg 1.
[0023] like Figure 1 , Figure 2 As shown, the web plate 12 is arranged transversely between the two support plates 11 and is distributed at intervals at corresponding positions. Each web plate 12 connects the two support plates 11, so that the two support plates 11 are no longer just independent plates. The web plate 12 and the support plates 11 together maintain the combined shape of the support leg 1, which helps to reduce the tendency of the spacing between the two side plates to change or local relative misalignment during installation and use.
[0024] After the two side support plates 11 are combined by the spacer web 12, the support legs 1 can be matched as a whole during installation without the need to position the two plates separately. After the bottom web 12 is aligned with the floor slab, the upper plate and the web 12 maintain their existing relative positions, which facilitates checking the orientation of the support legs 1 and provides a clear positional reference for the subsequent arrangement of the sealing plate 5.
[0025] like Figure 1 , Figure 2As shown, the bottommost web plate 12 is horizontally positioned and fixed to the floor slab with expansion bolts. The web plate 12 provides a bottom mounting position corresponding to the floor slab. After the expansion bolts pass through the corresponding holes in the web plate 12, they are fixed to the floor slab, so that the support leg 1 is held in the selected position.
[0026] like Figure 1 , Figure 2 As shown, the cooperation between the support plate 11 and the web plate 12 is used to maintain the shape of the support leg 1 itself, and the expansion bolts are used to establish the fixed relationship between the support leg 1 and the floor slab. The diagonal brace 2 is inclinedly installed on the floor slab, and its upper end is connected to the wall panel to form a support member extending from the floor slab side to the wall panel side.
[0027] like Figure 1 As shown, angle sensor 3 is installed on the inner side of the wall panel, and its installation posture corresponds to the tilt direction of the wall panel to be monitored. The sensor changes posture along with the wall panel, thus obtaining angle information related to the tilt state of the wall panel. During installation, the relative position between the sensor and the wall panel should be kept stable so that the measured angle change mainly corresponds to the change in the wall panel's posture.
[0028] Before monitoring, the angular reference and measurement direction used by the sensor must be clearly defined. For example, when using a measurement method that represents the deflection angle relative to the vertical direction, the corresponding reading when the wall panel is in a vertical position in that measurement direction should be used as a reference. If the sensor used outputs the angle based on other references, the angle should be converted according to its reference relationship before determining the degree of tilt of the wall panel.
[0029] When using the basic structure, first position the bottom of the wall panel according to the construction layout, then obtain the tilt angle of the wall panel. After adjusting the posture of the wall panel accordingly, maintain the corresponding support state through diagonal brace 2, and read the angle again for verification. The sensor provides the operator with a basis for judgment, allowing the bottom positioning and the tilt state of the wall panel to be checked separately.
[0030] The diagonal brace 2 provides support and performs angle monitoring, each fulfilling a different function. The diagonal brace 2 transmits its function through its connection to the wall panel, while the angle sensor 3 indicates whether the wall panel still has any tilt that needs correction. When used together, the operator can directly compare the state before and after adjustment, reducing the need to infer the upper posture solely based on the relationship between the bottom edge of the wall panel and the positioning line.
[0031] like Figure 1 , Figure 2 As shown, a strip-shaped hole 13 is provided on the bottom web 12 along its length direction, and an expansion bolt passes through the strip-shaped hole 13. The strip-shaped hole 13 has an internal space extending along the length direction, so that an expansion bolt at the same fixed position can correspond to different relative positions of the web 12 within the allowable range of the hole length.
[0032] During installation, first align the expansion bolts with the corresponding fixing positions on the floor slab, then fit the strip hole 13 of the web plate 12 into the corresponding position. Before tightening, adjust the position of the support leg 1 along the length of the strip hole 13 to correspond with the site layout. After confirming the position, tighten the bolts and hold the web plate 12 in the selected position.
[0033] like Figure 1 , Figure 3 As shown, the diagonal brace 2 is telescopically mounted, with its two ends rotatably connected to the floor slab and the wall panel, respectively. An inclined support path is formed between the connection positions on the floor slab side and the connection positions on the wall panel side. When the diagonal brace 2 telescopically extends, it changes the effective length between its two ends, and the rotatable connection allows it to change its tilt posture at the corresponding connection position.
[0034] When the length of the diagonal brace 2 is adjusted, the geometric relationship between its two ends changes accordingly. With the bottom position of the wall panel and the corresponding installation constraints maintained, this change can act on the support position at the top of the wall panel, correcting the tilt of the wall panel.
[0035] The operator first compares the current angle with the desired posture, then makes small length adjustments, and judges the direction of change based on the adjusted reading. When the reading moves closer to the target, adjustments can continue to be made gradually in the corresponding direction. If deviation occurs, the adjustment direction and bottom position should be rechecked.
[0036] The rotating connection at both ends allows the diagonal brace 2 to change its included angle during adjustment, reducing the limitation of the fixed included angle on the telescopic movement. The length of the diagonal brace 2 changes in tandem with the end posture, facilitating further adjustments after the connection between the two ends has been established. Once the desired state is achieved, the corresponding length retention and angle readings are checked to ensure that the support state matches the target posture.
[0037] like Figure 1 , Figure 3 As shown, the diagonal brace 2 includes a pair of screw rods 21 and a threaded tube 22. The two screw rods 21 are located at both ends of the threaded tube 22 and are rotatably connected to the floor slab and the wall panel, respectively. The threads at both ends of the threaded tube 22 have opposite directions and are threadedly connected to the corresponding screw rods 21, forming a combined rod connecting the two screw rods 21 at both ends through the middle threaded tube 22.
[0038] When the solenoid 22 is rotated, under the condition that the relative rotation of the screws 21 at both ends is constrained, the opposite threads at both ends of the solenoid 22 cause the screws 21 to simultaneously increase or decrease their screw-in amount. When the screw-in amount increases, the effective distance between the connection positions at both ends decreases; when the screw-in amount decreases, the effective distance increases. Thus, the total length of the diagonal brace 2 is changed by rotating the central solenoid 22.
[0039] The threaded engagement transforms rotational operations into length variations, facilitating small, incremental adjustments. Each rotation of the screw tube 22 allows for assessment of the wall panel's attitude change based on the angle sensor 3 reading, gradually approaching the desired position. Simultaneous changes in the screw-in depth at both ends help concentrate length corrections in the middle, reducing the need to disassemble the ends separately for adjustment.
[0040] like Figure 3 As shown, a handle 23 is provided in the middle of the solenoid 22. The handle 23 forms an operational connection with the solenoid 22. When the operator holds the handle 23 and applies a rotational force, the solenoid 22 can be rotated. The handle 23 provides a more defined force application point than directly holding the surface of the solenoid 22, making it easier to control the direction of rotation and the amplitude of each operation.
[0041] like Figure 2 As shown, a sealing plate 5 is horizontally installed on the side of the support leg 1 near the wall panel. The sealing plate 5 is used to block the lower end of the wall panel. The support leg 1 is provided with a notch 14 for the sealing plate 5 to be inserted, so that the sealing plate 5 can cooperate with the support leg 1 at the corresponding position near the wall panel. The lateral extension direction of the sealing plate 5 corresponds to the lower end area of the wall panel that needs to be protected.
[0042] When placing the sealing plate 5, embed its corresponding part into the notch 14 so that the sealing plate 5 is held in position by means of the support feet 1, and then check its correspondence with the lower end of the wall panel. The notch 14 provides a clear embedding position, which helps to reduce the possibility of the sealing plate 5 moving or being out of position when it is only temporarily placed, and facilitates the restoration and inspection of the sealing part.
[0043] The sealing plate 5 forms a corresponding shield and protection at the lower end of the wall panel, which facilitates maintaining the sealed state of the area during installation and lower end treatment.
[0044] The complete product suite of this application is primarily designed for rural housing construction, as current housing construction lacks standards, and construction and pouring are often haphazard and unregulated. The application of this complete product suite essentially establishes standards and norms for traditional rural housing construction, enabling on-site pouring and prefabricated assembly, ensuring both the final product's appearance and construction efficiency. Example
[0045] like Figure 4 As shown, the diagonal brace 2 includes a support pipe 24, a support rod 25, and a hydraulic push rod 26. The support pipe 24 is rotatably connected to the floor slab, and the support rod 25 is slidably connected to the support pipe 24. The upper end of the support rod 25 is rotatably connected to the wall panel. The hydraulic push rod 26 is disposed inside the support pipe 24 and is used to push the support rod 25 to move along the sliding direction between it and the support pipe 24.
[0046] The support tube 24 forms the tubular portion on the floor slab side, and the support rod 25 forms the extended portion that connects to the wall panel. The sliding fit between the two is set along the length of the diagonal brace 2, so that the change in the extension of the support rod 25 corresponds to the change in the length of the diagonal brace 2.
[0047] The hydraulic push rod 26 transmits a pushing force to the support rod 25 inside the tube. After being pushed, the support rod 25 slides relative to the support tube 24, and its connection position on the wall panel side changes with the extension amount. The support tube 24 provides the corresponding arrangement and guiding space for this action. The rotatable connection at both ends allows the diagonal brace 2 to change its included angle with the wall panel posture, so that the axial extension and contraction and the posture change of the connection position are coordinated.
[0048] When hydraulically driven, the support rod 25 can be pushed in stages according to the angle reading, and the tilt change of the wall panel can be checked after each action. Compared with the method of continuously relying on manual screwing of the screw tube 22 to change the length, the hydraulic push rod 26 provides a pushing action, which facilitates the corresponding extension adjustment.
[0049] like Figure 4 As shown, a row of pin holes 27 is provided along the length of the support rod 25, and a pin 28 passes through the pin holes 27. A threaded sleeve 29 is threadedly connected to the support tube 24. The sleeve can be adjusted by the thread to move toward the pin 28 and press against the pin 28. The pin holes 27 provide multiple selectable insertion positions, and the sleeve forms an adjustable abutment part in the corresponding position.
[0050] After the support rod 25 extends to the corresponding position, select the pin hole 27 that matches the position of the support tube 24 and the sleeve, insert the pin 28, and then rotate the threaded sleeve 29 to make it abut against the pin 28. The pin 28 passes through the support rod 25 and has a portion for the sleeve to abut against. The selection of the pin hole 27 is used to match different extension amounts, and the thread adjustment of the sleeve is used to reduce the support clearance at the selected position.
[0051] When the support rod 25 is subjected to a retraction action along the axial direction of the diagonal brace 2, the support rod 25 transmits the action to the pin shaft 28 through the pin hole 27. The pin shaft 28 transmits the action to the support tube 24 through the threaded sleeve 29, and then transmits it to the installation foundation through the support tube 24 and its floor slab side connection. This helps to reduce the situation where the corresponding action is concentrated on the hydraulic push rod 26.
[0052] After the pin 28 effectively abuts against the sleeve, it can limit the continued retraction of the support rod 25 in the direction of force and provide support for the adjusted extension position. The actual degree of force sharing depends on the abutment state, component fit, and stress conditions.
[0053] If it is necessary to readjust the extension of the support rod 25, first ensure that the corresponding supporting function is properly taken over, then release the sleeve from the pin 28 and remove the pin 28, avoiding forcibly pulling it out while the pin 28 is still bearing significant load. After readjusting to the desired position, select the corresponding pin hole 27 and restore the engagement. The mechanical support and hydraulic adjustment are coordinated according to the operation stages to facilitate both position adjustment and post-adjustment retention.
[0054] like Figure 4 As shown, a mounting hole 4 is provided on the lower side wall of the support tube 24 for the hydraulic push rod 26 to be inserted. This hole, located on the side wall of the tube, provides the lower side with an installation inlet and a partial receiving position corresponding to the pushing component. The corresponding part of the hydraulic push rod 26 can mate with the installation space inside the tube through this hole, facilitating insertion and position verification.
[0055] The specific opening of the mounting hole 4 is adapted to the shape of the corresponding part of the hydraulic push rod 26. Its function is to provide space for the installation arrangement of this component and improve the assembly accessibility of the lower end position. After the hydraulic push rod 26 is inserted, it is still located in the position corresponding to the pushing direction of the support rod 25, so that its pushing force is transmitted along the existing sliding relationship. Example
[0056] A construction method for a prefabricated wall panel verticality closed-loop adjustment device includes the following steps: S1. Construction base surface cleaning and positioning layout: Clean the debris, dust and protruding particles from the floor slab base surface at the construction site to ensure that the installation base surface is flat and solid; according to the construction drawings, accurately mark the installation positioning lines of the prefabricated wall panels, the installation reference lines of support feet 1 and the installation point lines of diagonal braces 2 on the floor slab, and make marks to provide accurate positioning basis for the installation of the device and the placement of the wall panels. S2. Installation and fixing of support foot 1: Place support foot 1 according to the layout position, adjust the position of a pair of L-shaped support plates 11 so that support foot 1 is in contact with the wall panel installation reference, insert expansion screws through the strip hole 13 of the bottom web plate 12, fine-tune the left and right and front and back positions of support foot 1, calibrate the installation accuracy and tighten the expansion screws to fix support foot 1 to the floor slab; use the notch 14 at the top of support foot 1 to insert sealing plate 5 into notch 14 to complete the pre-installation of the bottom sealing structure of the wall panel and reserve the wall panel installation position; S3. Wall panel hoisting and positioning: Use hoisting equipment to smoothly hoist the prefabricated wall panel to the construction position, so that the bottom of the wall panel is aligned with the inside of the support leg 1. Rely on the L-shaped support plate 11 of the support leg 1 to limit and support the bottom of the wall panel, initially straighten the wall panel posture, prevent the wall panel from shifting or tilting, and complete the initial positioning and fixing of the wall panel. S4. Monitoring equipment installation: Fix the angle sensor 3 in the center of the inner wall of the wall panel, ensuring that the sensor is installed flat and firmly fixed without any looseness or offset. Debug the angle sensor 3 to ensure that it can collect the tilt angle data of the wall panel in real time and accurately, so as to provide data support for the verticality closed-loop adjustment. S5. Assembly and installation of diagonal brace 2: Complete the assembly and fixation according to the selected diagonal brace 2 structure; if the diagonal brace 2 is of type 21 screw rod 21 and type 22 screw tube, rotate the ends of the two screw rods 21 to the preset points on the floor slab and the side wall of the wall panel respectively, so that the screw tubes 22 with opposite spiral directions at both ends are connected to the two screw rods 21; if the diagonal brace 2 is of type 2 hydraulic, rotate the support tube 24 to the floor slab, slide the support tube 24 with built-in hydraulic push rod 26 to the support rod 25, and rotate the upper end of the support rod 25 to the side wall of the wall panel to complete the overall assembly of the diagonal brace 2; S6. Preliminary adjustment of wall panel verticality: Manual fine-tuning of the posture of the diagonal brace 2. The diagonal brace 2 with screw rod 21 and screw tube 22 is adjusted by rotating the central handle 23, which drives the screw tube 22 to rotate and drive the screw rods 21 at both ends to extend and retract, thereby adjusting the overall length of the diagonal brace 2. The hydraulic diagonal brace 2 is adjusted by activating the hydraulic push rod 26 to push the support rod 25 to slide along the support tube 24, thereby initially adjusting the tilt angle of the wall panel and making the verticality of the wall panel close to the construction standard requirements. S7. Closed-loop precision calibration and adjustment: Based on the wall panel tilt angle data transmitted in real time by angle sensor 3, a closed-loop adjustment mode for data monitoring and posture adjustment is formed. According to the deviation value fed back by the sensor, the extension and retraction length of the diagonal brace 2 is precisely adjusted to gradually correct the wall panel tilt deviation until the angle sensor 3 monitors and displays that the verticality of the wall panel meets the design and construction standards. S8, Diagonal brace 2 locking and fixing: After the verticality of the wall panel is calibrated to meet the standard, the diagonal brace 2 is locked and reinforced; the screw rod 21 and screw tube 22 type diagonal brace 2 lock the limiting structure at both ends of the screw tube 22 to prevent the screw rod 21 from loosening and retracting; the hydraulic diagonal brace 2 adjusts the position of the pin hole 27 of the support rod 25, inserts the pin shaft 28 into the corresponding pin hole 27, tightens the threaded sleeve 29 on the support tube 24 to tighten the pin shaft 28, and at the same time locks the state of the hydraulic push rod 26 to achieve double locking of the diagonal brace 2 and ensure the stability of the wall panel posture; S9. Sealing and Forming Protection: Push the sealing plate 5 at the support foot 1 to move laterally so that the sealing plate 5 completely seals the gap between the bottom of the wall panel and the floor slab, seals the installation gap at the bottom of the wall panel, avoids leakage of grout during subsequent grouting and plastering construction, and at the same time provides limiting protection for the bottom of the wall panel to improve the stability of the wall panel installation. S10. Re-inspection and finished product protection: After standing for 30 minutes, re-inspect the verticality of the wall panel using angle sensor 3. After verifying that the installation parameters are correct, clean up the construction site and protect the adjustment device and prefabricated wall panel to prevent subsequent construction collisions and disturbances from causing the verticality of the wall panel to shift, thus completing the overall construction process.
[0057] The specific embodiments are merely illustrative of the present invention and are not intended to limit the invention. After reading this specification, those skilled in the art can make modifications to these embodiments without contributing any inventive step, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A closed-loop adjustment device for the verticality of prefabricated wall panels, characterized in that: include: The support leg (1) includes a pair of support plates (11) and a web plate (12). The pair of support plates (11) are arranged side by side in an L-shape. The web plate (12) is arranged horizontally and spaced between the pair of support plates (11). The bottom horizontally arranged web plate (12) is fixed to the floor slab by expansion bolts. Diagonal brace (2) is inclinedly installed on the floor slab and its upper end is connected to the wall panel; An angle sensor (3) is installed on the inside of the wall panel and is used to monitor the tilt angle of the wall panel.
2. The prefabricated wall panel verticality closed-loop adjustment device according to claim 1, characterized in that: The bottommost web plate (12) has a strip hole (13) along its length for the expansion bolt to pass through.
3. The prefabricated wall panel verticality closed-loop adjustment device according to claim 1, characterized in that: The diagonal brace (2) is telescopically designed, and its two ends are rotatably connected to the floor slab and the wall panel, respectively.
4. The prefabricated wall panel verticality closed-loop adjustment device according to claim 3, characterized in that: The diagonal brace (2) includes a pair of screws (21) and a screw tube (22). The pair of screws (21) are rotatably connected to the floor slab and the wall panel respectively. The screw tube (22) has opposite helical directions at both ends and is threadedly connected to the screws (21).
5. The prefabricated wall panel verticality closed-loop adjustment device according to claim 4, characterized in that: A handle (23) is provided at the middle position of the solenoid (22).
6. The prefabricated wall panel verticality closed-loop adjustment device according to claim 3, characterized in that: The diagonal brace (2) includes a support tube (24), a support rod (25), and a hydraulic push rod (26). The support tube (24) is rotatably connected to the floor slab, the support rod (25) is slidably connected to the support tube (24), and its upper end is rotatably connected to the wall panel. The hydraulic push rod (26) is located inside the support tube (24) and is used to push the support rod (25) to slide.
7. The prefabricated wall panel verticality closed-loop adjustment device according to claim 6, characterized in that: The support rod (25) is provided with a row of pin holes (27), and a pin shaft (28) is provided transversely in the pin holes (27). The support tube (24) is threadedly connected with a threaded sleeve (29) that presses against the pin shaft (28).
8. The prefabricated wall panel verticality closed-loop adjustment device according to claim 7, characterized in that: The lower end sidewall of the support tube (24) is provided with a mounting hole (4) for the hydraulic push rod to be inserted.
9. The prefabricated wall panel verticality closed-loop adjustment device according to claim 1, characterized in that: The support foot (1) is provided with a sealing plate (5) on the side near the wall panel to block the lower end of the wall panel, and the support foot (1) is provided with a notch (14) for the sealing plate (5) to be inserted.
10. A construction method for a prefabricated wall panel verticality closed-loop adjustment device, comprising the following steps: S1. Cleaning and positioning of the construction base: Clean the debris, dust and protruding particles on the floor base of the construction site to ensure that the installation base is flat and solid; according to the requirements of the construction drawings, accurately mark the installation positioning line of the prefabricated wall panel, the installation reference line of the support foot (1) and the installation point line of the diagonal brace (2) on the floor, and make marks to provide accurate positioning basis for the installation of the device and the placement of the wall panel; S2. Installation and fixing of support foot (1): Place support foot (1) according to the layout position, adjust the position of a pair of L-shaped support plates (11) so that support foot (1) fits the wall panel installation reference, insert expansion screws through the strip hole (13) of the bottom web plate (12), fine adjust the left and right and front and back positions of support foot (1), tighten the expansion screws after calibrating the installation accuracy, and fix support foot (1) on the floor slab; use the notch (14) at the top of support foot (1) to insert sealing plate (5) into notch (14) to complete the pre-installation of the bottom sealing structure of the wall panel and reserve the wall panel installation position; S3. Wall panel hoisting and positioning: The prefabricated wall panel is hoisted to the construction position using hoisting equipment, so that the bottom of the wall panel is aligned with the inner side of the support foot (1). The L-shaped support plate (11) of the support foot (1) is used to limit the bottom of the wall panel, and the wall panel is initially positioned to avoid displacement or tilting. The initial positioning and fixing of the wall panel is completed. S4. Installation of monitoring equipment: Fix the angle sensor (3) in the center of the inner side wall of the wall panel, ensuring that the sensor is installed flat and firmly fixed without loosening or offset. Debug the angle sensor (3) to ensure that it can collect the tilt angle data of the wall panel in real time and accurately, so as to provide data support for the verticality closed-loop adjustment. S5. Assembly and installation of diagonal brace (2) components: Complete the assembly and fixation according to the selected diagonal brace (2) structure; if a screw (21) and screw tube (22) type diagonal brace (2) is used, rotate the ends of the two screws (21) to the preset points on the floor and the side wall of the wall respectively, so that the screw tubes (22) with opposite spiral directions at both ends connect to the two screws (21); if a hydraulic diagonal brace (2) is used, rotate the support tube (24) to the floor, slide the support tube (24) with the built-in hydraulic push rod (26) and the support rod (25) together, and rotate the upper end of the support rod (25) to the side wall of the wall to complete the overall assembly of the diagonal brace (2); S6. Preliminary adjustment of wall panel verticality: Manually adjust the posture of the diagonal brace (2). The screw (21) and screw tube (22) type diagonal brace (2) rotates by turning the middle handle (23), which drives the screw tube (22) to rotate and drives the screws (21) at both ends to extend and retract, thereby adjusting the overall length of the diagonal brace (2). The hydraulic type diagonal brace (2) pushes the support rod (25) to slide along the support tube (24) by activating the hydraulic push rod (26), thus initially adjusting the tilt angle of the wall panel and making the verticality of the wall panel close to the construction standard requirements. S7. Closed-loop precision calibration and adjustment: Based on the wall panel tilt angle data transmitted in real time by the angle sensor (3), a closed-loop adjustment mode of data monitoring and posture adjustment is formed. According to the deviation value fed back by the sensor, the extension length of the diagonal brace (2) is precisely adjusted to gradually correct the wall panel tilt deviation until the angle sensor (3) monitors and displays that the wall panel verticality meets the design and standard construction standards. S8, Diagonal brace (2) locking and fixing: After the verticality of the wall panel is calibrated to meet the standard, the diagonal brace (2) is locked and reinforced; the screw (21) and screw tube (22) type diagonal brace (2) locks the limiting structure at both ends of the screw tube (22) to prevent the screw (21) from loosening and retracting; the hydraulic diagonal brace (2) adjusts the position of the pin hole (27) of the support rod (25), inserts the pin shaft (28) into the corresponding pin hole (27), tightens the threaded sleeve (29) on the support tube (24) to tighten the pin shaft (28), and at the same time locks the state of the hydraulic push rod (26) to achieve double locking of the diagonal brace (2) and ensure the stability of the wall panel posture; S9. Sealing and forming protection: Push the sealing plate (5) at the support foot (1) to move laterally so that the sealing plate (5) completely seals the gap between the bottom of the wall panel and the floor slab, seals the installation gap at the bottom of the wall panel, avoids leakage of grout during subsequent grouting and plastering construction, and at the same time provides limiting protection for the bottom of the wall panel to improve the stability of the wall panel installation. S10. Re-inspection and finished product protection: After standing for 30 minutes, re-inspect the verticality of the wall panel through the angle sensor (3). After verifying that the installation parameters are not deviated, clean up the construction site and protect the adjustment device and the prefabricated wall panel to avoid subsequent construction collisions and disturbances that could cause the verticality of the wall panel to shift, and complete the overall construction process.